construction procedure

31
CONSTRUCTION PROCEDURES AND QUALITY CONTROL GUIDELINES FOR EARTHTRAC HA MECHANICALLY STABILIZED EARTH (MSE) STRUCTURES TM 703.771.7305 413 Browning Ct. Purcellville, VA 20132 www.earthteccorp.com

Upload: raianebrandao

Post on 26-Sep-2015

15 views

Category:

Documents


0 download

DESCRIPTION

Construction

TRANSCRIPT

  • CONSTRUCTION PROCEDURESAND QUALITY CONTROL GUIDELINES FOR EARTHTRAC HA MECHANICALLY STABILIZED EARTH (MSE) STRUCTURES

    TM

    703.771.7305413 Browning Ct.Purcellville, VA 20132www.earthteccorp.com

  • Focus Points

    Materials and Components Site Preparation MSE Wall Construction Troubleshooting

  • Materials and Services Suppliedby EarthTec

    Precast concrete facing panels Nominal size 5 x 10

  • Materials and Services Suppliedby EarthTec

    Hard neoprene bearing pads for horizontal panel joints used from the second course of panels upwards.

  • Materials and Services Suppliedby EarthTec

    Geotextile strip, in rolls, for placing against panel joints.

  • Materials and Services Suppliedby EarthTec

    EarthTrac HA ribbed steel soil reinforcing strips, supplied cut to length, and galvanized. nuts and bolts complying with ASTM Grade A325.

  • Materials and Services Suppliedby EarthTec

    Precast Corner / Slip joint panels

  • Materials and Services Suppliedby EarthTec

    Site assistance and training.

  • Materials and Services Suppliedby Contractor

    All labor and supervision.

    All safety equipment.

    Project specific safety plan.

    All tools, construction, earthmoving, lifting and compaction equipment as outlined in the General Notes section of the design.

    Backfill in accordance with the Specification.

    Materials to install all required drainage systems.

    Concrete and forming materials to install levelling pad.

    Material to install parapet or copings.

    Timber props for first row of panels.

    Large and small crow bar for adjusting panels.

  • Materials and Services Suppliedby Contractor

    Timber clamps for temporarily clamping each row of panels until backfilled (1 per vertical joint).

    Timber wedges for maintaining panel batter during setting of panels prior to clamping (6 per vertical joint).

    spacers (2 per panel). 4 Spirit level. Site level and rod. Plumb bob. Adhesive for securing geotextile at panel joints. Corner or slip joint backing blocks.

  • Site Preparation

    Preparation of Foundation Soils Check that foundation material is consistent with the site

    investigation Local soft spots removed and replaced with compacted

    granular fill Foundation area is proof rolled

  • Construct Leveling Pads

    Levelling pads may be precast or CIP concrete The levelling pad shall be toweled smooth Constructed to within 3mm (1/8) of the specified

    level

  • Site Preparation

    Setting Out (Staking) String lines or pegs Define wall lines

    Establishing the Wall Line Front face of the wall is established

    with a chalk line drawn on the pad. Line represents the front face of the

    panels including any special finish Additional points located at all bends, points of curvature or

    tangency of curves

  • Installing First Panels

    Bottom row placed directly on top of the levelling pad Panels set out sequentially in alternating A & B pattern

    Panel Installation

  • Installing First Panels

    spacer guide used to achieve the correct front face spacing

    Panels checked for alignment and battered back a minimum of 5mm ()

    Bottom course propped vertical using 2 x 4 timber props

    Rubber or asphalt shims installed if necessary to level the first row

    Once the panel is securely held, lifting eyes are removed

  • Installing First Panels

    Bottom panels propped

  • Applying Geotextile

    Apply geo-textile over all vertical and horizontal panel joints

    Apply adhesive to panel, not to geotextile

  • Backfilling to Specification

    Lift thickness

    First backfill stage up to level of lugs

    Fill graded away from facing (temporary drainage)

    Backfilling carried out in direction parallel to facing panels

    Compaction not performed

    directly behind panel until first

    strip has been secured with fill

  • Compaction Equipment

    Keep equipment weighing more than 1500kg (1.5 tons) and at least 1.5m (5ft.) away from the facing panels

    Fill within 1.5m of the face compacted using a vibrating pedestrian roller or a vibrating plate compactor

  • Strip Installation

    Strips laid out perpendicular to the wall face Connecting bolts inserted so that the nut is

    installed on top

  • Second Stage Backfilling

    Backfill to the tops of the B panels

    Compact fill outside 5 feet prior to compacting fill immediately behind the panel

    Verify horizontal and vertical alignment and adjust as necessary

    Provide temporary hand railing

  • Intermediate Panels

    Place two rubber bearing pads on top of each of the lower panels

  • Intermediate Panels

    Place intermediate row of panels on the bearing pads

    Adjust for batter and alignment Place timber wedges in horizontal joints to maintain

    batter Clamp panel corners to control movement Remove wedges from lower row as soon as the next

    layer of panels is positioned

  • Repeat Sequence

    Remove temporary hand railing and place rubber spacers

    Lift panels into position and secure with timber clamps and wedges

    Check for line, level and joint consistency and record on control sheets

    Fix geotextile to back of panels with adhesive Backfill and compact to next lug layer Install strip Reinstate hand railing

  • Top Panels

    Same as for normal panels Additional mortar bedding added to the top of the

    panels to provide a smooth line Upper layer of strips deflected to avoid anchor

    slabs

  • Top Panels

    Mortar bedding on top of panels

  • Troubleshooting

    Out of Tolerance Condition Negative batter (wall leaning out)

    Possible Cause Insufficient batter prior to fill placement Backfill material not within specifications:

    More than 2% over optimum moisture content Excessive fines (% passing 200 sieve) Plasticity Index beyond specified limits

    Heavy equipment operated within 5 feet of panels Backfill material placed and compacted perpendicular to the

    wall Lift thickness beyond specifications Excessive compaction of backfill Clamps and wedges not properly secured

  • Troubleshooting

    Out of Tolerance Condition Positive batter (wall leaning in)

    Possible Cause Excessive batter on panels prior to backfill placement Insufficient compaction of backfill

  • Troubleshooting

    Out of Tolerance Condition Difficulty installing upper panels

    Possible Cause Levelling pad out of tolerance Panels not level Incorrect horizontal spacing Differential settlement causing panel to panel contact

    and spalling

  • Troubleshooting

    Out of Tolerance Condition Bulging or horizontal alignment out of tolerance

    Possible Cause Backfill material not within specifications:

    More than 2% over optimum moisture content Excessive fines (% passing 200 sieve) Plasticity Index beyond specified limits

    Heavy equipment operated within 5 feet of panels Backfill material placed and compacted perpendicular to the

    wall Lift thickness beyond specifications Excessive compaction of backfill Saturation of backfill due to rain

  • Questions?

    EARTHTEC, INC.703-771-7305703-771-7306 Fax413 Browning Ct.Purcellville, VA 20132www.earthteccorp.com

    Construction ProceduresFocus PointsMaterials and Services Supplied by EarthTecMaterials and Services Supplied by EarthTecMaterials and Services Supplied by EarthTecMaterials and Services Supplied by EarthTecMaterials and Services Supplied by EarthTecMaterials and Services Supplied by EarthTecMaterials and Services Suppliedby ContractorMaterials and Services Suppliedby ContractorSite PreparationConstruct Leveling PadsSite PreparationInstalling First PanelsInstalling First PanelsInstalling First PanelsApplying GeotextileBackfilling to SpecificationCompaction EquipmentStrip InstallationSecond Stage BackfillingIntermediate PanelsIntermediate PanelsRepeat SequenceTop PanelsTop PanelsTroubleshootingTroubleshootingTroubleshootingTroubleshootingQuestions?