Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

at IDCO IT SEZ , Plot No: E/8,Infocity,

Bhubaneswar-751024, Odisha.

M/s. WIPRO Ltd. IDCO IT SEZPlot No: E/8

InfocityBhubaneswar-751024

Odisha.

August-2015

ENVIRONMENTAL CONSULTANT

VITYA Consultants Pvt. Ltd., Engineering & Environmental Services,

(An ISO 9001:2008| QCI-NABET Accredited Company)4th Floor, Laxmi Plaza, Beside Shenoy Nursing Home, East

Marredpally, Secunderabad - 500 026, T.S. (India).

Page 3: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

1

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:-

S. No

Information required Information to be furnished by the proponents

1 Name of the project or activity Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ Plot no : E/8, Infocity, Bhubaneshwar-751024. Odisha

2 Name of the organization/owner. M/s. WIPRO Limited

3 Address for communication M/s. WIPRO Ltd. IDCO IT SEZ Plot No: E/8 Infocity Bhubaneswar-751024 Odisha.

4 Telephone numbers 08978694111 5 Email ID of the organization or contact

person [email protected] [email protected]

6 Location of the Proposed project or activity

At IDCO IT SEZ Plot No: E/8 Infocity Bhubaneswar-751024

7 Appraisal Category (B2 or B1) Category B2 Project. 8 Nearest habitation and distance from the

project or activity • Bhakti Vihar colony : 0.5 km • Niladri Vihar :2 km • PadmapaniVihar, AWHO

COLONY :2 km • Chandrasekharpur :2.3 km

9 Installed capacity / Production Capacities Construction in a plot area of about

104455 Sq m (25.99 acres). with a BUA of 81848Sq m. Existing : 19833 Sq m Proposed : 65494 Sq m

10 Specify the Fuel (Coal / CNG / biomass/Others) and quantity required

During power failure HSD will be used to run standby DG sets.

11 Details of Land use/Land Cover Software development activities. 12 Occupancy, ownership of the land in

which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department)

Presently the land is an open land of WIPRO.

13 If it is a Forest land, the following details shall be furnished: (Whether it is a Reserved forest / Protected forest/Demarcated forest/

Not applicable.

Page 4: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

2

National Parks/Sanctuaries/any land in possession of Forest Department.)

(The village map with Sy. No. indicating nearest forest boundary line from the site shall be enclosed)

14 Total investment of the project/activity. Rs.257 Crores (including Existing buildings)

a. Funds allocated for EMP (capital cost and recurring cost per annum)

Included in the project cost

15 Brief description of the project with special reference to specific pollution and its control measures.

Since it is a IT SEZ building project by Wipro, with Proper Environment Management Plan as per the CPCB norms no hazardous or specific pollution that can be harmful to people and surrounding areas is envisaged.

16 Compliance report on the following : NA

Status of compliance of the conditions and environmental safeguards stipulated in the earlier clearance letters.

-

Details of the court cases, if any, pending in any Court of Law against the project as well as any directions passed by the Court relating to the project directly or indirectly.

-

Details of the notices, if any, given to the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, 1981.

-

17 Name of the Consultant: M/s. VITYA Consultants Pvt. Ltd 4th Floor Laxmi Plaza, Beside Shenoy Nursing Home, East Marredpally,Secunderabad - 500 026, T.G. (India). Ph : 9989211387, 9000611387 Mail Id : [email protected]

Page 5: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD
Page 6: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD
Page 7: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

5

APPENDIX I (See paragraph-6)

FORM 1 I) Basic Information S. No. Item Details 1 Name of the project

Proposed IT SEZ building projectby M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

2 Sr. No. in the Schedule Under 8 (a) 3 Proposed Capacity/area/length/tonnage to be

handled/command area/lease area/number wells to be drilled

Construction in an area of about 104455 Sq m (25.99 acres). with a BUA of 81848Sq m. Existing : 19833 Sq m Proposed : 65494 Sq m

4 New/Expansion/Modernization Expansion from 19833 Sq m of BUA to 81848 Sq m

5 Existing capacity/area etc., Existing BUA : 19833 Sq m 6 Category of the Project “ A” or” B” Category B2 7 Does it attract to General conditions? if Yes, Please

specify No

8 Does it attract to Special conditions? if Yes, Please specify

No.

9

Location IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

Plot/Survey No./Khasra No.

M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity Khurda (D) Bhubaneshwar – 751024

Village Tehsil/Mandal District State

10 Nearest Airport along with Distance, if any in Kms Biju Patnaik International Airport: 15km (SSE)

11 Nearest Town, city, District Headquarters Along with distance in kms.

The project is located Khorda (D) in Bhubhaneshwar.

Gajapatinagar: 7.3 km SSE, 12 Village Panchayats, Zilla Parishad, Municipal

Corporation, Local body (complete postal Address with Tele. No.s to be Given)

Bhubaneswar Municipal Corporation

13 Name of the applicant M/s.WIPRO Limited.,

Page 8: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD
Page 9: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

7

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use(with respect to local land use plan)

Yes There will be permanent change in the land use & land cover pattern due to project

1.2 Clearance of existing land, vegetationand buildings?

No This is vacant piece of land and addition of floors vertically so no clearance of land, vegetation and buildings structure is required.

1.3 Creation of new land uses? Yes The plot of project site is already earmarked for development as per local development plan and will be developed as per the local building by-laws. Hence, no new land use will be created.

1.4 Pre-construction investigations e.g. bore houses, soil testing?

Yes Soil testing will be carried out during the detailed engineering phase of the project.

1.5 Construction works? Yes This is building construction project. Since all such construction activities will be confined within the project premises; there will be no physical changes outside the project boundary.

1.6 Demolition works? No Not applicable 1.7 Temporary sites used for

construction works or housing of construction workers?

No Construction workers will be hired from local areas. No labour camps will be at project site. All the construction activities including temporary storage of raw materials will be confined within the project site.

1.8 Above ground buildings, structures or earthworks including linearstructures, cut and fill or excavations

Yes Soil will be excavated for foundation and basements. The excavated soil shall be used for backfilling.

1.9 Underground works including mining or tunneling?

No No underground works including mining/ tunneling required except construction of basements.

1.10 Reclamation works? No No reclamation work required. 1.11 Dredging? No No dredging required 1.12 Offshore structures? No No offshore structures required 1.13 Production and manufacturing

processes? No No production / manufacturing process

involved. As this is a Construction of Buildings for office purpose.

Page 10: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

8

S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

1.14 Facilities for storage of goods or materials?

Yes Separate raw material storage yard will be made. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. The storage yard will be located within the project site.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes Liquid Waste Domestic sewage generated in construction phase will be disposed off to septic tank followed by soak pit. The sewage generated in the operation phase will be treated up to tertiary level in a sewage treatment plant. Treated sewage will be reused for toilets flushing and horticulture. Solid Waste During construction phase, construction materials will be sold to valid registered recyclers. Unusable, excess construction debris will be disposed at designated places in tune with the local norms. Solid wastes likely to be generated in project are of domestic in nature. It will be collected from designated locations and segregated into inorganic and organic wastes. The inorganic non-biodegradable wastes will be sold to authorize vendors for recycling and the organic biodegradable wastes will be disposed into municipal bin for further disposal by local authority.

1.16 Facilities for long term housing of operational workers?

No No housing for operational workers is proposed.

1.17 New road, rail or sea traffic during construction or operation?

No Not applicable. Existing roads are sufficient to carry out the construction works. Internal roads will be constructed in the proposed development as per the Local Authority.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

No Not applicable.

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No Not applicable

1.20 New or diverted transmission lines or pipelines?

No There will be no shifting of transmission lines or Pipe lines.

Page 11: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

9

S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

1.21 Impoundment, damming, culverting, Realignment or other changes to the hydrology of watercourses or aquifers?

No No Impoundment, damming, culverting, realignment or other changes to the hydrology of surface water-courses is proposed.

1.22 Stream crossings? No Not applicable. 1.23 Abstraction or transfers of water

form ground or surface waters? No Public water supply and treated sewage will be

used. However in case of emergencies ground water will be extracted with prior permission from Concerned Ground Water Authority.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No Surface drainage will not be affected

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes Construction workers will be hired from local area. Movements of few trucks/ vehicles are envisaged for transport of construction materials. Heavy vehicle movement would be restricted to non- peak hour. Provision shall be made for parking during operational phase.

1.26 Long-term dismantling or decommissioning or restoration works?

No Not applicable

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No Not applicable

1.28 Influx of people to an area in either temporarily or permanently

Yes There will be an influx of people into the proposed project site after the construction phase as it is a Construction of office building. However it will not affect the local social dynamics.

1.29 Introduction of alien species? No Not applicable 1.30 Loss of native species or genetic

diversity? No Not applicable

1.31 Any other actions? No Not applicable. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates,wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

No The proposed project site is earmarked for the proposed office building facilities.

Page 12: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

10

S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates,wherever possible) with source of information data

2.2 Water (expected source & competing users) unit: KLD

Yes Total water demand at operation stage will be 303.345 kLD and for green belt 38.385 kLD.

S.No. Description Quantity(kld)1 Domestic (Non Flushing)/Make

up water 101.115

2 Flushing (treated sewage water) 202.230 3 Gardening &green Belt

development (treated sewage water)

38.385

Total requirement 341.73 Net Fresh water Demand 101.115

2.3 Minerals (MT) No Not applicable. 2.4

Construction material-stone, aggregates, sand / soil (expected source-MT)

Yes

Construction materials required as follows: S.No. Material 1 Steel (T) 2 Cement (bags) 3 Stone Aggregate (m3) 4 Sand (m3) 5 Bricks (m3) 6 Fly ash based products (m3)

Steel and cement will be procured from authorized vendors. Sand & aggregate will be procured from local material suppliers.

2.5 Forests and timber (source –MT)

No Not applicable

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes The total power requirement will be 5000KVA. HSD (High Speed Diesel) will be used for proposed backup DG sets during power failure.

2.7 Any other natural resources (use appropriate standard units)

No Not applicable

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

Page 13: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

11

S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

No The proposed project is a Building project for software development centre, no storage of hazardous chemicals (as per MSIHC rules) will be done, except HSD required to run standby DG sets and LPG Banks, for which the quantity stored will be below the threshold limit specified in the MSIHC rules. Necessary permission will be obtained from the Explosives dept.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No Suitable drainage and waste management measures will be adopted in both construction and operational phase, which will restrict stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors.

3.3 Affect the welfare of people e.g. by changing living conditions?

No No adverse impacts on human health and their living conditions due to proposed project are envisaged. Moreover this project will provide direct employment to local labors during construction phase.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No Not applicable

3.5 Any other causes No Not applicable 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes will be generated.

4.2 Municipal waste (domestic and or commercial wastes)

Yes The solid wastes generated during operation phase will consist of mainly papers, cartons, thermocol, plastics, polythene bags, glass, food items and e-waste etc. Segregation of municipal wastes into biodegradable and non-biodegradable at source of generation shall be encouraged and collected separately and placed in covered containers at designated transfer centres from which it will be transferred to authorised disposal facility developed in accordance with the MSW (M&H) Rules, 2000.

Page 14: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

12

S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

4.3 Hazardous wastes(as per Hazardous Waste Management Rules)

No No Hazardous waste will be produced.

4.4 Other industrial process wastes No Not applicable. 4.5 Surplus product No Not applicable. 4.6 Sewage sludge or other sludge

from effluent treatment Yes Dewatered/ dried sludge from STP will be used as

manure in horticulture. 4.7 Construction or demolition

wastes Yes The construction waste will consist of excess

earth and construction debris along with cement bags, steel in bits and pieces, insulating & packaging materials etc. Recyclable waste construction materials sold to recyclers Unusable and excess construction debris/wastes will be disposed at designated places in tune with local norms.

4.8 Redundant machinery or equipment

No Not applicable

4.9 Contaminated soils or other materials

No Not applicable

4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes The operation of proposed project does not envisage any air pollution sources excepting emission from DG sets which would be used in case of power failure.

5.2 Emissions from production processes

No Not applicable

5.3 Emissions from materials handling including storage or transport

No Construction material storage yards will be always covered to reduce emission.

5.4 Emissions from construction activities including plant and equipment

Yes Some emissions are envisaged from machinery and equipment engaged during construction phase. They will be fitted with dust extraction units. This is temporary in nature.

Page 15: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

13

S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

5.5 Dust or odors from handling of materials including construction materials, sewage and waste

Yes Dust is likely to be generated during construction which will be suppressed by water-sprinkling and tarpaulin cover will be provided on stored raw material to reduce dust emissions.

5.6 Emissions from incineration of waste

No Not applicable

5.7 Emissions from burning of waste in open air(e.g. slash materials, construction debris)

No Open burning of biomass/ other material will be prohibited within the site area

5.8 Emissions from any other sources No Not applicable 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

Yes To control the Noise and Vibration Acoustic panels will be used for DG sets and as per the Regulatory authorities guidelines all precautionary measures will be taken to control emissions etc.

6.2 From industrial or similar processes

No Not applicable

6.3 From construction or demolition Yes During construction work noise will be generated from construction machinery, however, adequate precautions will be taken to reduce the noise generation.

6.4 From blasting or piling No No blasting or mechanized piling will be used. 6.5 From construction or operational

traffic Yes There will be slightly increase in noise levels due

to traffic movement during construction & operational phases.

6.6 From lighting or cooling systems No Not applicable 6.7 From any other sources No Not applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

7.1 From handling, storage, use or spillage of hazardous materials

No No Hazardous material will be used on the site

Page 16: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

14

S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

7.2 From discharge of sewage or other effluents to water or the land(expected mode and place of discharge)

No Treated sewage will be reused for toilet flushing and horticulture. All efforts shall be made for 100% recycling of treated sewage in the proposed project.

7.3 By deposition of pollutants emitted to air into the land or into water

No Not Applicable

7.4 From any other sources No 7.5 Is there a risk of long term build

up of pollutants in the environment from these sources?

No Not Applicable

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances

No This is Wipro Building project in Infocity, Khorda District, Bhubaneswar, Odisha and doesnot involve any hazardous material handling during construction activity. So no chances of explosions, spillages, and fires.

8.2 From any other causes Yes Training and awareness about the safety norms will be provided to all supervisors and labours involved in construction activities. All the labours will be provided with suitable personal protective equipment (PPE). Adequate fire fighting equipments and first aid kits will be provided during construction and operation phases.

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

No The area under study falls in zone II, according to the Indian Standard Seismic Zoning Map. The structure has been designed with adequate Seismic safety factors.

Page 17: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

15

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. No.

Information / Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: •Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other

No The proposed project will have positive impact on the ancillary infrastructure like roads, markets, public health amenities, conveyance facilities in the area. Moreover this project will provide employment to local labours in the construction phase and to IT professionals in the operational phase. Thus, the proposed project is supposed to have major beneficial impacts.

9.2 Lead to after-use of the site, which could have an impact on the environment

No Not applicable

9.3 Set a precedent for later developments

No Not applicable

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

No Not applicable

(III) Environmental Sensitivity S. No.

Areas Name/ Identity

Aerial distance (within 15 km) of proposed project location boundary

1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value

Yes Chandaka Forest & elephant reserve5.81 km WNW , shikhar chandi hill forest: 1km N

2 Areas which are important or sensitive for ecological reasons Wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests

Yes Mahanadi and tributariesof Mahanadi, shikhar chandi hill forest: 1km N

Page 18: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

16

S. No.

Areas Name/ Identity

Aerial distance (within 15 km) of proposed project location boundary

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

Yes Nandankanan Zoo: 6 km NNE,

4 Inland, coastal, marine or under-ground waters

Yes Mahanadi and tributaries of Mahanadi (12.28 km)

5 State, National boundaries No Not Located. 6 Routes or facilities used by the

public for access to recreation or other tourist, pilgrim areas

No Not located.

7 Defence installations No Not located.

8 Densely populated or built-up area Yes Workers colony & Sai vihar colony 9 Areas occupied by sensitive man-

made land uses (hospitals, schools, places of worship, community facilities)

Yes Schools/Hospitals/ Religious places: S. No.

Places Dist. from Project Site(Km)

1. KIIT University 2.5 (NE) 2. Sai international

School 2.00(E)

3. College Of Engineering

3.2(E)

4 DAV school 2.7 (S) Temples S. No.

Places Dist. from Project Site(Km)

1 Shikhar Chandi Temple

2.2 (N)

10 Areas containing important, highquality or scarce resources(groundwater resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

Yes Mahanadi and tributaries of Mahanadi (12.28 km)

11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded)

No Not located.

Page 19: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

17

S. No.

Areas Name/ Identity

Aerial distance (within 15 km) of proposed project location boundary

12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

Yes According to the Indian Standard Seismic Zoning Map, the project is located in the zone II of seismic intensity and therefore will have minimum risk of damage from earthquake. The structure has been designed with adequate Seismic safety factors.

(IV) Proposed Terms of Reference for EIA studies Not Applicable

Page 20: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

18

APPENDIX II (See paragraph 6)

FORM-1A

(Only for construction projects listed under item 8 of the Schedule)

CHECK LIST OF ENVIRONMENTAL IMPACTS

(Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) 1. LAND ENVIRONMENT 1.1 Will the existing land-use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land-use if any and the statutory approval from the competent authority are submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. Location of the Project Site:

The Proposed IT development building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no: E/8, Infocity, Bhubaneshwar-751024.. The project is directly connected to Nandan kanan road through existing Infocity roads which in turn connects to NH5. The proposed project site is earmarked for said development and the proposed project is planned and designed as per the regulations and procedures laid down by the Local Authority. The location of the project site is shown in Annex- 1 Surrounding Features:

The project is in the SEZ area where there are many IT companies located with well established educational institutes like KIIT, DAV public school, Engineering Colleges and hospitals in the 10 km vicinity. There are also Chandaka Forest & elephant reserve5.81 km WNW , shikhar chandi hill forest: 1km N and Nandan kanan Zoo: 6 km NNE. Mahanadi and tributaries of Mahanadi flow at a distance (12.28 km) the max and 7.2 km min distance from the project site 1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc.

Salient Features of the Project Items Details Location

IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024. Plot area About 104455 Sq m (25.99 acres). Built up area BUA of 81848Sq m.

Existing : 19833 Sq m Proposed : 65494 Sq m

Page 21: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

19

Items Details Parking facilities 2 basements and 2 stilts of the proposed Project in SDB2: 12780

Sqm Power requirement & source

5000KVA Electricity supply from Odisha State Electricity Board.

Power backup 3x2000 KVA in addition to 2x1500 KVA and 1x 750 KVA. Water requirement & source

Bore wells and Municipal water supply

Sewage treatment & disposal

Existing Sewage treatment facility: STP of 130KLD capacity Proposed sewage @80%:242.676 so proposed STP of 120 KLD capacity

Project cost Rs.257 Crores Connectivity The site is directly accessible from Nandan kanan road through

existing Infocity roads which in turn connects to NH5. The layout plan of the project is shown in Annex 2.

1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). No adverse impacts of the proposed activity on the existing facilities adjacent at the proposed site are envisaged. 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). No significant land disturbance is expected. 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) There will be no alteration to natural drainage system. The study area have natural slope towards Southern side. No storm water will be disposed off during operation as rainwater harvesting system will be provided 1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) Waste construction materials will be recycled and excess construction debris will be disposed at designated places in tune with the local norms. 1.7 Give details regarding water supply, waste handling etc. during the construction period. Water requirement for the construction period will be met through municipal sources/ tankers.

Page 22: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

20

The construction workers will be hired from nearby areas and no labour camps are to be built at site. On site drinking water facilities and sanitation facilities will be provided for construction workers. 1.8 Will the low-lying areas & wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) As such there is no modification on the wet lands due to the project. The project development is within the boundary limits of the project. 1.9 Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labour and the means of disposal) The excess earth would only be the construction waste and will not cause any health hazards. 2. WATER ENVIRONMENT 2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement. Total water requirement for the project is 303.345 kLD and for green belt 38.385 kLD. Out of this 101.115 KLD only is the makeup water from Pipe line supply. The details of water requirement and its breakup, source given in the Table below and the water balance details are given in Annex 4.

Water Requirement, Source and Water Balance

S.No. Description Quantity(kld) 1 Domestic (Non Flushing)/Make

up water 101.115

2 Flushing (treated sewage water) 202.230 3 Gardening &green Belt

development (treated sewage water)

38.385

Total requirement 341.73 Net Fresh water Demand 101.115

Water Treatment Treated water will be supplied by dual plumbing system. However, filtration & disinfection will be done to achieve the desired quality. 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? The source of water will be met through public water supply and Bore wells.

Page 23: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

21

2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) Not applicable. The water will be taken from Govt. pipe line supply, permission is being obtained for domestic (non-flushing) &treated STP water for flushing and horticulture.

2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) About 240.615 KLD of water shall be met thru recycling of waste water. The waste water shall be treated at Sewage treatment plant planned for the project and shall be used for flushing and horticulture. 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) No, there is no diversion of water from the other users. 2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity)

The excess waste water if any left after using for landscape and flushing shall be let out in Municipal sewer lines with prior permission. Table below shows the expected characteristics of wastewater and treated wastewater.

The Raw Waste Water characteristics pH : 6.5 – 7.5 TSS : 400 mg/ L BOD5 : 300 – 350 mg/ L The treated water characteristics pH : 6.5 – 8.5 TSS : Less than 20 mg/ L BOD5, 20oC : Less than 10 mg/L. 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. The rainwater collected from the rooftop and other paved areas within the project area will be conveyed into the rainwater harvesting system consisting of Oil & Grease Traps, Desilting-cum-Filter Chamber for recharge into the groundwater. The details of rainwater harvesting system are given in Annex 4.

Page 24: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

22

2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long-term basis? Would it aggravate the problems of flooding or water logging in any way? The project will have provision for rainwater harvesting system. No storm water will be disposed in nearby drains in operation phase of the project. There will be no excess run off generated from construction phase of the project that will cause problems of flooding and water logging in the nearby area.

2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) The ground water table in the area is about 5-10m. Rainwater harvesting provision has been made for recharge of groundwater aquifer& will have beneficial impact on the groundwater resources. 2.10 What precautions/measures are taken to prevent the run-off from construction activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts). The runoff from construction activities will be recycled after treatment. No runoff will be disposed outside the project boundary. Strom water drains will be provided along with the internal roads over the site to meet the expected increase in the runoff during the rainy season due to the impervious nature of the roof, roads and other paved areas. In addition, all roof water will be collected and discharged into specially designed rainwater harvesting facilities. Considering all roof tops rain water will be collected and diverted to rainwater harvesting facilities, and the rest of the rainwater as contributing to runoff on the site with annual rainfall of the district is 1288.65 mm. 2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) The storm water from the site will be collected by rainwater harvesting system and will be used for recharging the ground water. 2.12 Will the deployment of construction labourers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) The construction laborers will not be stationed in the project site. Proper on site sanitation facilities will be provided at the construction site.

Page 25: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

23

2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal). Sewage Treatment and Reuse: The details of quantity of sewage and sewage collection, treatment, reuse and disposal are given below and design parameters, process description and schematic flow diagram of the STP is given in Annex 4.

Sewage Quantity, Treatment, Reuse & Disposal

Quantity of sewage 243 KLD Collection of sewage Sewage generated during the operation phase will be collected

through underground sewerage system for treatment in STP. Separate Storm water drainage system will be provided for rainwater.

Treatment of sewage Advanced Wastewater Treatment Plant (AWWTP) i:e Extended Aeration Activated Sludge System followed by Tertiary treatment.

Reuse/recycle and Disposal of treated sewage

During normal operations, the treated sewage will be reused and recycled for toilet flushing, horticulture. The excess waste water if any left after using for landscape and flushing shall be let out in public sewer line with prior permission from the competent authority.

2.14 Give details of dual plumbing system if treated waste used is used for flushing of toilets or any other use. The treated water will be used for horticulture & flushing. Hence dual plumbing system will be adopted. 3. VEGETATION 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any) There is no threat to local biodiversity. Further, there are no forests, National parks and Sanctuaries located in the project area. 3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) The project site is a piece of vacant land having very sparse vegetative cover. Further, the plant species around the site are local tree species and no rare or endangered tree species are found in the site hence unlikely to be affected. Any loss of vegetation in the project site will be compensated through plantation and landscaping.

Page 26: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

24

3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) Any loss in vegetation will be compensated by plantation of trees adopting the following measures. The landscape of project site has been planned to provide a clean, healthy and beautiful green environment for the people. Within the proposed project site, landscape/ green areas will be developed to achieve a blend between modern building and various species of plants to create a clean, healthy and aesthetic environment that provides a visual treat and relaxation to the occupants of these buildings. Within these green areas walking tracks, fountains, etc. will be developed all through the building. A combination of evergreen and ornamental flowering trees, palms, shrubs and ground covers will be planted along the roadsides and in open spaces within the project complex. The planting arrangement should be based on optimal use of available land and quantum of irrigation water and treated wastewater. It is recommended that tree plantation (large size species) should be undertaken at the time of preparation of the site so that they would grow to considerable size by the time of commissioning of the proposed project. The landscape plan is shown in the project site layout plan given as Annex 3. 4. FAUNA 4.1 Is there likely to be any displacement of fauna-both terrestrial and aquatic or creation of barriers for their movement? Provide the details. The proposed site is an open land and devoid of forestation or aquatic body, so in existing conditions, this place is not the habitat for local fauna, hence there will not be any type of displacement or effect on the local fauna due to proposed project activities. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details. Within the proposed project site, green areas will be developed to achieve a blend between modern and various species of plants to create a clean, healthy and aesthetic environment. Common native variety of trees and ornamental flowering species will be planted in the green space. Landscaping can have direct positive impact on the local avifauna as this will provide shelter to local birds. 4.3 Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on fauna These measures are not applicable for the proposed project.

Page 27: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

25

5. AIR ENVIRONMENT 5.1 Will the project increase atmospheric concentration of gases & result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) As per the secondary data, it is clear that 24-hourly average levels of PM10,PM2.5, SO2, NOX and CO were observed to be within the limit for residential, rural & other areas as stipulated in the National Ambient Air Quality Standards. 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. No such impacts are envisaged such as smoke, odour or hazards gases and will not be generated from this project. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site. Proposed Parking Facilities: The building is proposed to have adequate parking. The parking facility will be provided at 2 basements and 2 stilts of the proposed Project in SDB2. Traffic Management Plan at the Entry & Exit to the Project Site: The proposed project is directly connected to Nandan kanan road through existing infocity roads which in turn connects to NH5. The increase in traffic due to the project would be minimal compared to the existing road widths. 5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category. The proposed project development will have access through the proposed width as per the design norms for free movement of internal traffic. 5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. There will be marginal increase in traffic that will contribute to increase in traffic noise and vibrations which will be countered by the thick green cover.

Page 28: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

26

5.6 What will be the impact of DG sets & other equipment on noise levels, vibration & ambient air quality around the project site? Provide details. Impacts on Air Quality due to DG Sets: Impacts on ambient air during operation phase would be due to emissions from the stacks attached to standby DG sets only during grid power failure. Mitigation Measures for Impacts of DG Sets on Ambient Air Quality: • Back up DG sets will comply the applicable emission norms. • Adequate stack height for DG sets will be provided as per norms. • Back up DG sets will be used only during power failure. • During operation stage, monitoring of emissions from DG sets and ambient air quality will be

carried out as per norms. 6. AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? The architecture of the project matches with the surroundings. The approval of the architectural plan will be taken from local authority. 6.2Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? This will not have any adverse impact on the existing structures in the vicinity of the project site. 6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. The proposed site falls under the area of development plan of Local authority. 6.4 Are there any anthropological or archaeological sites or art facts nearby? State if any other significant features in the vicinity of the proposed site have been considered. Not located 7. SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. The operation of the project will provide value addition to the existing infrastructure and good building facilities for the work space and in turn the social development, as due to development of

Page 29: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

27

the project, the commercial facilities such as public transport, water supply, telecommunications, power lines, road maintenance etc. will be upgraded. The operation of project and other allied facilities will provide direct and indirect employment opportunities for a large section of society. The employment will have positive impact thereby increasing the quality of life. 7.2 Give details of the existing social infrastructure around the proposed project. The project site being located within the limits Infocity, Bhubaneswar Taluk, all sorts of social infrastructure like transportation facilities, water supply & sanitation facilities, communication facilities, educational institutions, hospitals, markets, banks, cultural amenities etc. already exist around the project area. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? The project will be Developed and constructed as per the defined building by-laws of local authority. The project activities will be confined within the premises and no adverse impacts are envisaged. 8. BUILDING MATERIALS 8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) Conventional construction material will be used. The major materials required for construction of the proposed project will be steel, cement, bricks, metal, flooring tiles/stones, sanitary and hardware items, electrical fittings, water, etc. 8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? Mitigation Measures for Air Pollution during Construction Stage Air quality around the project site will be adversely impacted during construction stage. Various construction activities especially related to handling of loose material are likely to generate fugitive dust that will affect the air quality of the surrounding area of the project site. To minimize such impacts following measures has been proposed: All construction material will be covered by tarpaulin during transportation and will be kept at covered storage yard.

Water sprinkling will be done for dust suppression. To minimize the occupational health hazard, proper personal protective gears i.e. mask will be provided to the workers who are engaged in dust generation activity.

Page 30: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

28

Mitigation Measures for Noise Pollution during Construction Stage During construction stage, expected noise levels will be in the range of 80-85 dB (A), which will decrease with increase in distance. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver’s end. All noise generating construction activities beyond standards will not be carried out during night time.. Use of such plant or machinery will be strictly allowed during day time only. To prevent any occupational health hazard, ear-muff / ear plug will be given to the workers working around or operating plant and machinery emitting high noise levels Careful planning of machinery operation and scheduling of operations will be done to minimise such impact. 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? The possibility of using recycled material such as fly ash products has been proposed in construction of this project .If the recyclable material is readily available and if it is economically feasible it will be used for the construction of roads and structures. Waste from construction like excavated earth, iron rods/cuttings etc shall be handed over to the authorized vendor for recycling. 8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. The details of solid wastes collection recycle and disposal is given in the Table below.

Solid Wastes Collection, Recycle & Disposal

Nature and quantity Organic waste: Waste vegetables and foods

Inorganic waste: Papers, cartons, thermocol, plastics, polythene bags, glass, e-waste etc.

Collection and disposal

The solid wastes generated will be segregated into organic and inorganic components and collected in separate bins. The organic biodegradable wastes (waste vegetables, foods etc.) will be transferred into a designated solid waste collection point for disposal by municipal authority. Dewatered / dried sludge from STP will be used as manure in horticulture.

Recycling The inorganic wastes comprising recyclable materials, such as paper, plastic, glass, e-waste etc., will be sold to prospective buyers.

Page 31: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

29

9. ENERGY CONSERVATION 9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption? The details of power requirement, source, and power backup are given in the Table below.

Power Requirement, Source and Backup Arrangement Power requirement 5000 KVA Sources of power from Odisha Electricity Board Backup power supply arrangement

DG capacity: 3x2000 KVA in addition to 2x1500 KVA and 1x 750 KVA

9.2 What type of, and capacity of, power back up do you plan to provide? Details are given in point 9.1 above. 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? The project is IT building project for which glass will be used only for windows. Therefore appropriate glass will be used for windows. 9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. No solar architecture systems will be used. 9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. There will be no usage of solar energy systems.

9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? Shading options wherever available will be used for energy saving. 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. Energy Efficient Features as required will be duly incorporated in the project.

Page 32: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

30

9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? The building will be constructed with environmental friendly designs that will control formulation of heat island effect. There will be also sufficient green cover at site to reduce formation of heat island. Passive design concepts have been used to minimize energy consumption and maximize the energy efficiency. 9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R-values of the individual components. The U-values of the roof, external wall and fenestration of the retail portion of the building will meet the requirements as specified in the Energy Conservation Building Code (ECBC).

S. No.

Component Material Used Permissible U-Value as per ECBC (W/m2-°C)

1. Roof Concrete 0.409 2. External Wall Brick 0.44 3. Fenestration Glazing Facade 3.3

9.10 What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. Fire Fighting System: The basic system for Fire Fighting will be designed as per provisions of the National Building Code. Various types of fire-fighting measures proposed in the project are as follow: Automatic Sprinkler System Dry Rising Main and Hose Reel Private Hydrants Automatic Fire Detection and Alarm System Portable Fire Extinguishers Wet Chemical Extinguishing System

Fire pumps will be provided. Also jockey pumps. Water from the reserve tanks will be drawn by electrically driven fire pump. The system will be kept pressurized at all times in order to ensure instant availability of water at all points. Minor line losses would be made up by an on-line jockey pump. Emergency Lighting The emergency lights operated on battery power should be provided at appropriate locations–such as Internal Roads, corridors, common area, staircase, exit and entrance gates,parks & parking, etc. The transformers will be kept energized and should feed independently alternate rows of lights so that in case of failure of one transformer, there will not be complete darkness.

Page 33: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

31

Fire Safety The electrical systems will be provided with automatic circuit breakers activated by the rise of current as well as activated by over current.

Fire detection systems Fire Alarm systems at appropriate places Means of escape, Access for fireman Adequate fire fighting requirement will be taken into account while designing the electrical distribution.

9.11 If you are using glass as wall materials provide details and specifications including emissivity and thermal characteristics. Glass will not be used as a wall material and will only be used in fenestration. 9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration. Adequate provisions are provided to mitigate the effects of air infiltration. 9.13 To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. There will be no usage of Non conventional technologies for the proposed project. 10. Environment Management Plan The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. Detailed Environmental Management Plan is submitted at Annex 4.

Page 34: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

32

Annex-1

Project location

Page 35: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

33

Annex-2 Conceptual Plan/Layout plan

Page 36: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

34

Annex 3 Landscape Plan

The landscape of the project has been planned to provide a clean, healthy and beautiful green environment for the people to live in and work in. 12% of the net plot area is proposed for green belt development. The total landscape coverage is about 12795 m2. The landscape plan comprises:

a) Landscape within the Building Complex b) Parks and other Gardens c) Development of Internal Roadside Plantation

It has been designed to achieve a blend between modern architecture of the building complex and various species of plants keeping in view the canopy form, leaf texture and flowering pattern to compliment/ blend with the architectural features, to create a clean, healthy and aesthetic environment that provides a visual retreat and relaxation to the users of the buildings. A combination of evergreen trees and ornamental flowering trees, shrubs and palms is used in the complex. Further, in the project will have Landscape experts, who will recommend the species looking at the site conditions and also which takes less water.

Page 37: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

35

Annexure-4

ENVIRONMENTAL MANAGEMENT PLAN

OBJECTIVE The Purpose Of The Environmental Management Plan (EMP) Is to Minimize The Potential Environmental Impacts Due To Proposed Project. The EMP Reflects the Commitment Of project to create an Environmental Friendly atmosphere. The Potential Impacts On The Environment From The Project Are Identified Based On The Nature Of The Various Activities Associated With The Location, Construction And Operation Of The Proposed Project And Also On The Current Status Of The Environmental Quality At The Proposed Area.

MITIGATION MEASURES FOR AIR POLLUTION Construction Stage

Air Quality around the project site will be impacted during construction stage. Various construction activities especially related to handling of loose material like to cause generation of fugitive dust, that adversely impact the air quality of the surrounding area of the project site. To minimize such impact following measures shall be taken: Ready mix concrete will be used. All the loose material either stacked or transport shall be provided with suitable covering

Such as tarpaulin etc.Water sprinkling shall be done at the location where dust generation is anticipated.

To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity.

Operation Stage

Table below gives the overview of the air pollution control measures adopted during the project operation stage

Table 1.1: Overview of Air Pollution Control Measures

S. No. Air pollutant Source Control

1 SO2, NOx DG sets Adequate stack height , acoustic enclosure

2 Dust, SO2, NOx, CO, HC

Vehicles

Internal roads will be maintained properly to reduce fugitive dust and smooth movement of vehicle.

Informatory sign shall be provided to

Page 38: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

36

encourage vehicle owners to maintain their vehicle and follow the emission standards fixed by Government Authorities

Measures for Control Emission from DG Set

To minimize emissions from the DG set, it is necessary to ensure that the stack height for exhausting the flue gases is such that there shall be proper dispersion of gases without increase in the ground level concentration. The minimum height of the stack shall be provided as per As per the Notification, Dated 9th July 2002, G.S.R. 489(E) for more than 800 KW generator set and as amended thereof.

Measures for Controlling Vehicular Emission To control the emissions from the movement of vehicular traffic following measures shall be adopted: Proper maintenance of the internal roads. Adequate greenbelt will be developed and maintained. Informatory sign shall be provided to encourage vehicle owners to maintain their vehicles

and Follow the emission standards fixed by Government Authorities.

MITITGATION MEASURES FOR NOISE POLLUTION Construction Stage

During the construction stage, expected noise levels shall be in the range of 80-100 dB (A), which will decrease with increase in distance. Hence all the construction activities shall be carried out during the daytime. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimise such impact.

Operation Stage

All the equipment in the proposed for the project would be designed to have a noise level not exceeding 75 dB (A) at 1 m distance as per G.S.R. 371 (E) 17-05-2002. Therefore, adequate protective measures in the form of ear muffs/ earplugs shall be given to workers working in these areas should be provided. And the proposed greenbelt and double glazed windows will attenuate the noise generated by passing of train and vehicular movement.

Page 39: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

37

MANAGEMENT PLAN FOR WATER POLLUTION Construction Stage

During the construction operation, Runoff from the construction site shall not be allowed to stand (water logging) or enter into the roadside or nearby drain. Adequate measures shall be taken to collect such run off and either shall be reuse (if possible) or disposed at the designated construction waste disposal location.

Operation Stage

In order to mitigate adverse impacts on water environment due to the surface run off, waste water, etc. provisions for adequate infrastructure facilities such as drainage system, wastewater collection and conveyance including treatment and reuse; has been developed during the project design stage of the Project. Hence no further measures are needed other than proper and regular maintenance of such facilities.

1.5 Water Balance

Total water requirement for the project is 303.345 kLD and for green belt 38.385 kLD. Out of this 101.115 KLD only is the makeup water from Pipe line supply. The details of water requirement and its breakup, source given in the Table below and the water balance details are given in Annex 4.

Water Requirement, Source and Water Balance

S.NoDescription Quantity(kld)

1 Domestic (Non Flushing)/Make up water

101.115

2 Flushing (treated sewage water) 202.230 3 Gardening &green Belt

development (treated sewage water)

38.385

Total requirement 341.73 Net Fresh water Demand 101.115

Water Treatment Treated water will be supplied by dual plumbing system. However, filtration & disinfection will be done to achieve the desired quality.

1.6 Sewage Treatment Plant (STP)

Page 40: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

38

02. QUANTITY AND QUALITY OF WASTEWATER: The wastewater quantity from domestic sources and washings is based on actual consumption of water considered at 2,50,000 LPD. The quality of raw effluent is considered as under. pH : 6.5 – 7.5 TSS : 400 mg/ltr. BOD5 : 300 – 350 mg/ltr. It is proposed to set up an STP, such that the treated water will have following characteristics. pH : 6.5 – 8.5 TSS : Less than 20 mg/ltr. BOD5, 20oC : Less than 10 mg/ltr. The treated water from STP will be fit for re-use for flushing and gardening. 03. PROPOSED TREATMENT SCHEME – 250 KLD (Drawing no. 60 – P – 3376 R1) Based on the quantity and quality of wastewaters as also the treatment of the same at other places and also PCB requirements, it is proposed to treat the wastewater in an Extended Aeration Activated Sludge System followed by Tertiary treatment, to render the treated wastewater fit for flushing / Gardening. The treatment methodology is as follows: a) Bar Screening. b) Collection and Equalisation. c) Extended Aeration and Activated Sludge System. d) Sludge re-circulation. e) Sludge disposal system. f) Intermediate treated effluent sump. g) Tertiary coagulation, flocculation and settling. h) Pressure Sand Filtration / Activated Carbon Filtration. i) On-line Chlorination. j) Final Sump.

Page 41: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

39

04. DESCRIPTION OF TREATMENT UNITS: a) BAR SCREEN: In the incoming channel, a chamber with medium screen shall be fitted, the purpose of which is to filter out coarse trashy matter from intruding into succeeding units of the treatment plant. Screens shall be made of M.S.Construction epoxy painted. Size : 800mm x 600mm Type of screen : M.S.Construction manually cleaned with M.S.Flats placed at 10 mm C/c, with M.S.Handrake with handle all epoxy painted. . b) EQUALISATION TANK: Size : 4000 x 8500 x 3800 SWD Capacity : 129.2 KL. Aeration : 12 sets, 90 dia x 760 long Coarse Bubble Diffusers. D.P. : 10.3 hrs. c) RAW EFFLUENT PUMP SETS: The equalized wastewater shall be pumped at a uniform rate of 12.5 cum / hr into the anoxic tank. Quantity : 2 nos. (1W + 1S) Type : Vertical submersible ABS make. Capacity : 12.5 cum/hr TDH : 8 mtr. Temp. : Ambient Solids : 35 mm maximum pH : 7 – 8 d) ANOXIC TANK: The MLSS is recirculated from aeration tank for Denitrification. Size : 2250 x 8500 x 4000 SWD Volume : 76.5 cum Aeration : 7sets, 90 dia x 760 long Coarse Bubble Diffusers e) AERATION TANK: Biological stabilization of the wastewater is accomplished in the aeration tank in the presence of micro-organisms for the respiration of which Oxygen is supplied by means of diffused aeration

Page 42: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

40

comprising membrane diffuser and air blowers. As micronutrients such as Nitrogen and Phosphorus will be already present in sufficient quantities, no external supplementation will be necessary. Size : 49.4 Sq mtr x 4000 SWD Flow quantity : 250 cum/day BOD in : 300 mg/ltr (max). BOD out desired : 10 mg/ltr. Tank volume : 197.6 cum Dimensions : As in enclosed drawing. Diffusers : 21 sets, 63 Dia x 1000 Long Fine Pore Diffusers. F: M : 0.12 MLSS : 3500 mg/ltr. f) AIR BLOWERS: Type : Twin lobe compressors Capacity : 325 m3/hr at 0.5 kg/cm2 pressure, 02 nos. (1W+1S). The Standard Air Requirement (SAR) is arrived at on the basis of 2 kg oxygen per kg of BOD5. g) SECONDARY CLARIFIER: The mixed liquor (wastewater with micro-organisms) existing in the aeration tank has to be clarified in a clarifier tank having hopper bottom. In order to reduce the TSS in the clarified waste, as well as to thicken the biomass for re-circulation back to the aeration tank in order to maintain the design MLSS (Mixed Liquor Suspended Solids). Size : 4000x 4000 x 2500 SWD Recirculation : 50% D.P. : 2.13 hrs – O.K. O/R : 28.12 cum / sqm / day h) SLUDGE DISPOSAL: The biomass in the aeration tank stabilizes BOD in wastewater by consuming the organic matter in the wastewater. The metabolic activity results in growth of the biomass population in the aeration tank. Consequently, in order to contain the level of MLSS in the aeration tank to the design level of 3500 mg/ltr, it will be necessary to bleed off or waste the excess activated sludge. For this purpose it is proposed to provide a solids bowl centrifuge for dewatering the sludge and re-use as manure. Centrifuge Feed Pump : Screw pumps – 01 No. 2 KLH / 10 mtrs. Head.

Page 43: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

41

i) CLARIFIED WATER SUMP: Here, chemicals (Lime and Alum) are added for intense mixing with the secondary treated water. Size : 4000 x 3100 x 3450 TD Clariflocculator feed Pumps : 02 Nos. Capacity : 15 CuM/hr @ 6M head. Aeration : Provided 6 sets, 90 dia x 760 long Coarse Bubble Diffusers. j) TERTIARY CLARIFLOCCULATOR: The coagulated water is flocculated with PE and the solids are allowed to settle down. Size : 4000 x 4000 x 2500 SWD HRT : 3.2 hrs. Equipment : Flocculator in MSEP, 8.6 RPM with 0.75 HP motor. Clarifier in MSEP with sludge scraper. O/R : 18.75cum / sqm / day k) FILTER FEED TANK: The overflow from clariflocculator is collected in this tank for onward treatment in PSF/ACF. Size : 4000 x 3000 x 3200 TD Pumps : 02 nos., each 15 KLH. l) PRESSURE SAND FILTER / AC FILTER -1 No. Each: Size : 1500 dia x 1300 HOS each L/R : 7.1 cum / sqm / hr. m) CHLORINATOR: Size : 4 LPH Quantity : 01 No. Model : V-11 Dosage : 3 - 5mg/L

1.7 Rain water Harvesting

Depth of groundwater table: About 6-10 m below ground level. Excess runoff will be discharged into the storm water drain at various points running along the internal road.

Page 44: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Propos

The rainconveyeFilter C As such

sed IT SEZ

nwater colleed into the r

Chamber for

h RWH is m

building pr

ected from trainwater har recharge in

mandatory to

oject by M/Bhub

the rooftop arvesting synto the grou

o construct,

/s. WIPRO baneshwar-

and other pystem consiundwater.

to get the a

LTD., IDCO-751024.

paved areas isting of Oil

approval of

O IT SEZ, P

within the pl & Grease T

Master Plan

Plot no : E/

project areaTraps, Desi

ns.

8, Infocity,

42

a will be ilting-cum-

2

Page 45: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Propos

Fig 1.3. 1.8 WAConstr

During will be surroun

A

sed IT SEZ

.: Typical d

ASTE MANuction Stag

the construgenerated.

nding land u

1950.0000

780.0000

MANHOLE

AS PER SITEDIA

LAST MANHOLE

LAST MANHOLE ODRAINAGE NET WO

building pr

etail of Rain

NAGEMENge

uction consStacking an

use and shal

S

SECTION A-A

TYPICALDETAIL O

E

1200

V ARIES

3000

F ORK

roject by M/Bhub

nwater Harv

NT

siderable qund disposal ll be dispose

DETAIL-B

SCALE N.T.S.

A

OF RAIN WATER HARVEST

2000

FILTER CHAMBER

/s. WIPRO ubaneshwar-

vesting pit

uantity of cof such mated off at the

A

750

TING

CHAMBER

CHAMBER

LTD., IDCO-751024.

onstructionterial shall be designated

750

DRAWING TITLE:

AJAY NEGI

DRAWN BY

N.T.S.

SCALE

A

G E N E R A L

O IT SEZ, P

n waste suchbe such thatd disposal si

DRAWING NO.

AUG. 2005

DATE

REV. NO.

N O T E S

Plot no : E/

h as earth, t it shall notite.

8, Infocity,

43

debris, etct disturb the

3

. e

Page 46: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

44

Operation Stage

During the operation stage, two types of waste are expected to be generated viz. (i) municipal or domestic waste and (ii) landscape waste iii) e-waste. Measures to be taken to minimize the adverse impact due the said waste are given below:

Municipal Solid Waste Adequate number of collection bins separate for biodegradable and non-biodegradable

waste shall be provided as per The Municipal Solid Waste (Management and Handling) Rule, 2000. Waste form such bin shall be collected separately on daily bases.

All the collection bin shall be properly maintain on regular bases.

Arrangement will be made with concern authority, for the providing garbage station or transfer point, from where all waste collected from collection bin shall be disposed off for further disposal by the municipal authorities.

Landscape Waste

Landscape waste comprises of fallen leaves and other vegetative material shall be collected at the secured location such that it shall not hindered daily activity schedule or washed away by the surface run off causing choking of drains, etc. For such waste also, adequate arrangement shall be worked out with municipal authority to collect and disposed such waste in appropriate manner.

E-waste

E-waste has been defined as “waste electrical and electronic equipment, whole or in part or rejects from their manufacturing and repair process, which are intended to be discarded”. Whereas Electrical and electronic equipment has been defined as “equipment which is dependent on electrical currents or electro-magnetic fields to be fully functional”. Since it is aIt compant the e-waste will be handled according to the e-waste (Management & Handling) Rules, 2011 have been notified in May 2011 and which are effective from 01-05-2012.

FIRE PROTECTION

Fire protection is one of the most essential services to be provided. In design component of the project adequate measure has being taken as per the provisions of the National Building Code (2005).

Page 47: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

45

DISASTER MANAGEMENT PLAN (DMP)

Disaster is an unexpected event due to sudden failure of the system, external threats, internal disturbances, Earthquakes, fire and accidents. Thus an appropriate DMP shall be incorporated. Preventive Action

Once the likelihood of a disaster is suspected, action has to be initiated to prevent a failure. The project in-charge responsible for preventive action should identify sources of repair equipments, materials, labour and expertise for use during emergency.

The project in-charge should notify the officer for the following information: Exit points for the public, Safety areas Nearest medical facilities.

Communication System

An efficient communication system is absolutely essential for the success of any disaster management plan. This has been worked out in consultation with local authorities involving police and fire department, hospital department. Emergency Action Committee

To ensure coordinated action, an Emergency Action Committee shall be constituted. An Emergency evacuation plan based on local needs and facilities available shall be prepared. The broad content of plan shall include following:

Demarcation of the areas to be evacuated with priorities, Safe area and shelters, Security of property left behind in the evacuated areas, Functions and responsibilities of various members, and Setting up of joint control action.

Emergency Measures

Emergency Lighting The emergency lights operated on battery power shall be provided at appropriate locations–such as corridors, common area, staircase, exit and entrance doors, parking, etc.10-20% of common area lighting shall be backed by inverter/UPS to provide adequate lighting during power failure.

Page 48: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

46

Fire Protection

Building materials shall be of appropriate fire resistance standard. Further, design shall include provision for the following:

• The electrical systems shall be provided with automatic circuit breakers activated by the rise of current as well as activated by over current.

• Fire detection systems, • Means of escape, • Access for fireman • Adequate fire fighting requirement shall be taken into account while designing the

electrical Distribution system

GENERIC ENVIRONMENTAL MANAGEMENT PLAN Apart from the mitigation measures describe in above sections, Table describes the generic measures that need to be undertaken during project construction and operation stage.

Page 49: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

47

Table 1.4: Generic Environmental Management Plan

S.No

Potential Impact

Action Parameters for

Monitoring Timing

I. Construction Phase

1. Air Emissions

All equipments are operated within specified design parameters.

Random checks of equipment logs/ manuals

Construction activities

Vehicle trips to be minimized to the extent possible

Vehicle logs Site Clearance and Construction activities

Any dry, dusty materials stored in sealed containers or prevented from blowing.

Absence of stockpiles or open containers of dusty materials.

Construction activities

Compaction of soil during various construction activities

Construction logs Construction activities

Ambient air quality within the premises of the proposed unit to be monitored.

The ambient air quality will conform to the standards for SPM, SO2 and NOx,CO and Pb

As per requirement.

2. Noise

List of all noise generating machinery onsite along with age to be prepared. Equipment to be maintained in good working order.

Equipment logs, noise reading

During construction phase.

Night working to be minimized.

Working hour records Construction activities

Generation of vehicular noise

Maintenance records of vehicles

During construction phase.

Implement good working practices (equipment selection and sitting) to minimize noise and also reduce its impacts on human health (ear muffs, safe distances and enclosures).

Site working practices records, noise reading

During construction phase.

Page 50: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

48

S.No

Potential Impact

Action Parameters for

Monitoring Timing

No machinery running when not required. Acoustic mufflers / enclosures to be provided in large engines

Mufflers / enclosures in place.

Prior to use of equipment.

Noise to be monitored in ambient air within the plant premises.

Noise reading As per requirement or quarterly whichever is lesser. The Noise level will not

exceed the permissible limit both during day and night times. All equipment operated within specified design parameters.

Random checks of equipment logs/ manuals

During construction phase.

Vehicle trips to be minimized to the extent possible

Vehicle logs During construction phase.

3. Wastewater Discharge

No untreated discharge to be made to surface water, groundwater or soil.

No discharge hoses in vicinity of watercourses.

During construction phase.

The discharge point should be selected properly and sampling and analysis should be undertaken prior to discharge

Discharge norms for effluents as given in consent to operate by PCC.

During construction phase. Take care in disposal of wastewater generated such that soil and groundwater resources are protected.

Discharge norms for effluents as given in consent to operate by PCC.

4. Soil Erosion

Minimize area extent of site clearance, by staying within the defined boundaries

Site boundaries not extended / breached as per plan document.

During construction phase.

Page 51: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

49

S.No

Potential Impact

Action Parameters for

Monitoring Timing

Protect topsoil stockpile where possible at edge of site.

Effective cover in place.

During construction phase

5. Drainage and effluent Management

Ensure drainage system and specific design measures are working effectively. The design to incorporate existing drainage pattern and avoid disturbing the same.

Visual inspection of drainage and records thereof

During construction phase

6. Waste Management

Implement waste management plan that identifies and characterizes every waste arising associated with proposed activities and which identifies the procedures for collection, handling & disposal of each waste arising.

Comprehensive Waste Management Plan in place and available for inspection on-site. Compliance with MSW Rules, 1998 and Hazardous Wastes (Management and Handling Rules), 2003

Prior to site clearance.

7.

Non-routine events and accidental releases

Plan to be drawn up, considering likely emergencies and steps required to prevent/limit consequences.

Mock drills and records of the same

During construction phase

8. Environmental Management Cell/Unit

The Environmental Management Cell/Unit is to be set up to ensure implementation and monitoring of environmental safeguards.

A formal letter from the management indicating formation of Environment Management Cell

During construction phase

II. Operational Phase

Page 52: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

50

S.No

Potential Impact

Action Parameters for

Monitoring Timing

9. Air Emissions

Stack emissions from DG set to be optimized monitored

The ambient air quality will conform to the standards for SPM, SO2 and NOx as given by PCC.

During operation phase

Ambient air quality within the premises of the proposed unit to be monitored. Exhaust from vehicles to be minimized by use of fuel efficient vehicles and well maintained vehicles having PUC certificate.

The ambient air quality will conform to the standards for SPM, SO2 and NOx ,CO and Pb as given by PCC Vehicle logs to be maintained

During operation phase

Vehicle trips to be minimized to the extent possible

Vehicle logs During operation phase

10. Noise

Noise generated from operation of DG set to be optimized and monitored DG sets to generate less than 75 dB(A) Leq at 0.5 m from the source DG sets are to be provided at basement with acoustic enclosures with height of chimney 6.35 m above roof level or as specified by PCC

Maintain records of vehicles

Generation of vehicular noise

Maintain records of vehicles

During operation phase

11. Wastewater Discharge

No untreated discharge to be made to surface water, groundwater or soil.

No discharge hoses in vicinity of watercourses.

During operation phase.

Take care in disposal of wastewater generated such that soil and groundwater resources are protected

Discharge norms for effluents

Page 53: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

51

S.No

Potential Impact

Action Parameters for

Monitoring Timing

12. Drainage and effluent Management

Ensure drainage system and specific design measures are working effectively. Design to incorporate existing drainage pattern and avoid disturbing the same.

Visual inspection of drainage and records thereof

During operation phase

13. Indoor air contamination

Contaminants such as CO, CO2 and VOCs to be reduced by providing adequate ventilation.

Monitoring of indoor air contaminants such as CO, CO2 and VOCs.

During operation phase

14. Energy Usage

Energy usage for air-conditioning and other activities to be minimized Conduct annual energy audit for the buildings

Findings of energy audit report

During operation phase

15.

Emergency preparedness, such as fire fighting

Fire protection and safety measures to take care of fire and explosion hazards, to be assessed and steps taken for their prevention.

Mock drill records, on site emergency plan, evacuation plan

During operation phase

16.

Environment Management Cell/Unit

The Environment Management Cell/Unit to be set up to ensure implementation and monitoring of environmental safeguards.

A formal letter from the management indicating formation of Environment Management Cell

During operation phase

1.12 Environmental monitoring Plan

The environmental monitoring programme is a vital process in the Management Plan for construction projects. This helps in signaling the potential problems that would result from the proposed project and will allow for prompt implementation of effective corrective measures. The environmental monitoring will be required during construction and operational phases.

Page 54: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

52

WATER QUALITY AND PUBLIC HEALTH

Since water contamination leads to various water related diseases, the project authorities shall establish a procedure for water quality surveillance and ensure safe water for the consumers. A detailed epidemiological study related to water borne diseases shall be carried out and the data shall be compiled for every year in the project area. This data would help the authority in finding out the trends for incidence of water related diseases prevalent in the area, which would help them to take suitable remedial measures for reducing or eradicating the occurrence of these diseases in future.

Water quality parameters shall be monitored before and after the completion of the project. Monitoring shall be carried out on monthly basis to cover seasonal variations for four years. Water quality shall be analyzed by applying the standard technique. The parameters recommended for monitoring are as follows:

1. pH 2. Dissolved Oxygen 3. Biochemical Oxygen Demand 4. Total Dissolved Solids 5. Temperature 6. Total Hardness 7. Calcium 8. Magnesium 9. Iron 10. Manganese 11. Chlorides 12. Sulphates 13. Nitrates 14. Fluorides 15. Total Nitrogen 16. Total Phosphates 17. Total Coli form

During Construction Phase:

The attributes to be monitored as a part of the mitigation measures are Air Quality, Noise Levels; the monitoring programme for the construction phase is presented in Table below:

Page 55: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

53

Table 1.5: Monitoring programme during construction phase

Ambient Air Quality Monitoring

1 Parameters to be monitored

Suspended Particulate Matter ( SPM) Respirable Particulate Matter ( RPM) Sulphur Dioxide ( SO2 ) Oxides of Nitrogen ( NOx ) Carbon Monoxide ( CO) Hydrocarbons (HC )

2 Sampling Methodology

The air quality monitoring should be conducted using High Volume Samplers. CO will be collected by Peroxide tube method or by portable CO meter. HC should be collected in Mylar Bags.

3 No of locations Three locations to be monitored.

4 Frequency of Measurements Once in a month @ two days per monitoring

5 Compliance The monitoring results should be compared with the National Ambient Air Quality Standards.

Noise Quality Monitoring

1 Parameters to be monitored Hourly noise levels for 24 hours

2 Sampling Methodology The noise levels should be recorded using a portable hand held noise level meter.

3 No of locations Three locations to be monitored

4 Frequency of Measurements Once in a month

5 Compliance The monitoring results should be compared with the National Ambient Noise Quality Standards.

During Operation Phase

The attributes to be monitored as a part of the mitigation measures are Airquality , Water Quality and Noise Levels. The monitoring programme for the construction phase is presented in following Table:

Table 1.6: Monitoring programme during operation phase

Ambient Air Quality Monitoring

1 Parameters to be monitored

1. Suspended Particulate Matter ( SPM) 2. Respirable Particulate Matter ( RPM) 3. Sulphur Dioxide ( SO2 ) 4. Oxides of Nitrogen ( NOx ) 5. Carbon Monoxide ( CO)

Page 56: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

54

6. Hydrocarbons ( HC ) 7. Ammonia 8. Chlorine

2 Sampling Methodology

The air quality monitoring should be conducted using High Volume Samplers. CO will be collected by Peroxide tube method or by portable CO meter. HC should be collected in Mylar Bags.

3 No of locations Three locations to be monitored

4 Frequency of Measurements

Every 3 months @ two days per monitoring.

5 Compliance The monitoring results should be compared with the National Ambient Air Quality Standards.

Noise Quality Monitoring

1 Parameters to be monitored Hourly noise levels for 24 hours.

2 Sampling Methodology The noise levels should be recorded using a portable hand held noise level meter.

3 No of locations Three locations to be monitored

4 Frequency of Measurements Every 3 months

5 Compliance The monitoring results should be compared with the National Ambient Noise Quality Standards.

The cost of environmental monitoring of air, water and noise during and after construction of the project period is tabulated below:

Table 1.7: Cost of Environmental Monitoring

S.No Description of monitoring Frequency Cost

1. Air quality monitoring Seasonal ~ 2.5lakhs

2. Noise monitoring Seasonal ~ 0.5 lakhs

3 Water quality monitoring Seasonal ~ 1.0 lakhs

Total Rs. 4.0 Lakhs

ENVIRONMENTAL MANAGEMENT SYSTEM

The Environmental Management System constitutes provision of an Environmental Division, which should be staffed by an Environmental Engineer/Officer, an Environmental Assistant and other assistant (miscellaneous works). The task assigned should include supervision and co-ordination of studies, monitoring and implementation of environmental mitigation measures.

Page 57: Construction of Proposed IT SEZ Buildingenvironmentclearance.nic.in/.../FormB/...1A-WiprobhubaneshwarFinal.pdf · Construction of Proposed IT SEZ Building Project by M/s. WIPRO LTD

Proposed IT SEZ building project by M/s. WIPRO LTD., IDCO IT SEZ, Plot no : E/8, Infocity, Bhubaneshwar-751024.

55

ENVIRONMENTAL COSTS

All costs involved in Environmental Mitigating measures and Management to be put on the account proposed project are summarised in Table.

Table 1.8: Cost Estimates

Item Capital Cost (Rs. Lacs)

Water pollution control (Capital cost of STP and recurring cost of water &effluent quality (monitoring)

Included in the project cost

Air pollution control (capital cost of DG room enclosure, acoustic treatment and recurring cost of noise monitoring)

Included in the project cost

Noise pollution control (capital cost of stack and recurring cost of noise monitoring)

Included in the project cost

Solid wastes management (Capital cost of bins for solid wastes, storage space for hazardous wastes and recurring cost of handling & disposal)

Included in the project cost

Rainwater harvesting system Included in the project cost

Strom water drainage system Included in the project cost

Landscaping Included in the project cost Provision will be made in total capital cost towards the maintenance of Environment which would be approximately 3.28 crores. Further, The Environment Management Plan should be implemented in phases, so that optimum benefit could be achieved and it should be synchronised with the construction schedules.