construction inspection report · 2021. 1. 12. · 3223 n. powell parkway report type: construction...
TRANSCRIPT
19
1
9
22
3
5
8
15
7
23
2
16
17
114
10
20
13
12
1421
18
6
US H
IGHW
AY 75
W WHITE ST
N POWELL PKWY
S POW
ELL P
KWY
E OUTER LOOP RD
E FM 455
W OUTER LOOP RD
E WHITE ST
US H
IGHW
AY 75
US H
IGHW
AY 75
US H
IGHW
AY 75
US H
IGHW
AY 75
US H
IGHW
AY 75
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
City Limits ETJ Parcels Streets
¯
0 1 20.5Miles
DISCLAIMER: This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries. H:\GIS\Construction Inspection Reports\ReportMap.mxd
Construction Inspection Report
*Note: All data is based upon current information at the time of map publication and is subject to change. Please contact Public Works or the Planning Department for more information. Published By: A. Vanderslice January 2021
The Week of January 8th, 2021
1- Anna Crossing Ph 1C
2- Anna Crossing Ph 4B
3- Anna Crossing Ph 6
4- Anna Hotel
5- Anna Ranch Ph 1
6- Anna Town SquareLift Station
7- Avery Pointe Ph 6
8- Camden Parc Ph 3
9- Camden Parc Ph 4
10- Children'sLighthouse
11- City Hall
12- Collin CountySheriff Radio System
13- Deep RootsMontessori School
14- Freedom Flex CarWash
15- Green Meadows
16- Lakeview EstatesPh 3
17- Nelson Bros Ready-Mix Concrete Plant
18- Panda Express
19- Shadowbend
20- Standridge Blvd
21- Texas Bank
22- Villages ofHurricane Creek
23- West Crossing Ph 8
Report Type: Construction Inspection Report Date: 01-08-2021 Completed by: Justin Clay, Construction & Engineering Superintendent #1 Anna Crossing Phase 1C- The contractor has been working on the storm and
has started the water. #2 Anna Crossing Phase 4B- Contractor working on punch-list items. #3 Anna Crossing Phase 6- The contractor is working on the sidewalk on Finley
Blvd. #4 Anna Hotel- On Hold #5 Anna Ranch Phase 1A- The contractor is working on grading. #6 ATC Liftstation upgrade- No work this week. #7 Avery Pointe Phase 6 – Contractor finished gradutaions for the sub-grade. #8 Camden Parc Phase 3 – The contractor proof rolled the sub-grade. #9 Camden Parc Phase 4- Reviewed the S.S videos and sent punch-list to the
developer. #10 Children’s Lighthouse – Contractor finished the S.S. line they also tested all the
S.S. #11 City Hall Complex – The contractor worked on the Fire Station building and
poured the slab for the City Hall Complex. #12 Collin County Sheriff Radio System – Contractor is working on final punch-list. #13 Deep Roots Mont. School – No civil work this week. #14 Freedom Flex Carwash – The contractor has completed all civil work. #15 Green Meadows- Contractor is working on the retaining walls. #16 Lakeview Estates Phase 3- The contractor is working on decorative fence on
North side of property. #17 Nelson Brothers Concrete Plant- Contractor is working on the landscaping. #18 Panda Express- Held Pre-con 1-8-2021 #19 Shadowbend- Contractor is working on paving the streets. #20 Standbridge Blvd- No work this week. #21 Texas Bank- Held pre-con on 1-5-2021
City of Anna Public Works 3223 N. Powell Parkway Anna, Texas 75409 (972) 924-4510
#22 Villages of Hurricane Creek- Franchise utilities has been working on installing power.
#23 West Crossing Ph. 8- The contractor isworking on installing the inlet tops and throats.
On-Hold Projects
#4 Anna Hotel – No civil work completed this week.
Completed Projects (Infrastructure and Site Construction Complete) • Altice/Suddenlink- Final Walk Complete & Acceptance given.
New Projects
• Panda Express
• Texas Bank
Right-of-Way Inspections Completed This Week
• Residential ROW Inspections by Public Works – 24 • Franchise Utility and Commercial ROW Inspections – 26