Development Target
1. Durability & reliability.2. Increase blow power.3. Reduce maintenance cost.4. Multi-function valve to meet market demand.5. Newly designed box frame.6. Introduce series of product to fit series of
excavator sizes.
-
7/30/2019 Construction F Series
3/28
Sales features
1. Clean air-intake system extends piston andbushing life.
2. Lubrication for upper and lower bushings.3. Relief valve to maintain system pressure.4. Anti-idle blow valve.5. Front and side mounted hose fitting ports.6. Tunnel conversion ease.
-
7/30/2019 Construction F Series
4/28
Series Construction
1. Mini Series F1.2.3.4.52. Mid - Size Series F6. 93. Conventional Series F11.20.30.704. Multi - Function Series F12.19.22.27.35.45
-
7/30/2019 Construction F Series
5/28
Mini Series (F1-F5)
Accumulator
Front-head
Rod
Through bolt
Nitrogen GasBack-headCylinder
PistonRod pin
Oil portControl valve
Front bushing
-
7/30/2019 Construction F Series
6/28
Mid-Size Series(F6 & F9)
Nitrogen gasBack-headCylinder
Piston
Through-bolt
Thrust ringThrust bushingRod-pin
Accumulator
Front-head
Rod
Control valve
Front bushing
Charge valve
Nitrogen gas
Oil port
-
7/30/2019 Construction F Series
7/28
Conventional Series (F11F20F30F70)
Accumulator
Front-head
Rod
Oil ports
Nitrogen gas
Charge valve
Grease fitting
Nitrogen gasBack-headCylinderPiston
Through bolt
Front-coverRod pin
Thrust ringThrust bushing
Control valve
-
7/30/2019 Construction F Series
8/28
Multi-Function Series (F12 - F45)
Nitrogen gasBack-headCylinderPistonFront head
Through bolt
Front coverRod pin
Accumulator
Rod
Control valveCharge valve
Nitrogen gas
Oil portsAir intake
Thrust ringThrust bushing
-
7/30/2019 Construction F Series
9/28
Functions
1. Through bolt2. Cylinder3. Accumulator4. Piston5. Front-head6. Front cover/bushing7. Rod8. Control valve9. Stroke adjuster10. Valve adjuster11. Safety valve12. Back-head
-
7/30/2019 Construction F Series
10/28
Retains back-head, cylinder and front-head together.All the threads are die-rolled to maintain material flow.
When one through bolt is failed, replace diagonally opposed through-bolt also.To re-torque through-bolts, loosen four of them to turn, and re-torquethem to the specification.
Back-head
F6 F70F1 F5
Cylinder
Front-head
Through-bolt Through-boltack-head
Cylinder
Front-head
Through-bolt
-
7/30/2019 Construction F Series
11/28
The largest single part of the breaker. It is machined, thenheat-treated and polished to the specification.
F1 F5 F6 & F9 F11 - F70
Cylinder
-
7/30/2019 Construction F Series
12/28
Reserves pressure oil and absolves pressure spike when piston is at top deadcenter and bottom dead center. It is Nitrogen filled.F11and up,diaphragms can be replace with hand tools.
When diaphragm is damaged, inlet hose will vibrates and brake power willbe decreased.
Accumulator
F1
F5
Accumulator
Back-headCylinder
Diaphragm
Screw-onNeeds dieBolt-on
-
7/30/2019 Construction F Series
13/28
Transmits dynamic power toward the rod and rod will break object rock.Surface of the piston is super finished. Not chrome plated.
Surface of the piston is only protected by the oil film from rusting.
Pistonod
F1 F5
F6 F70
PistonodF6
F701
F5
Piston
-
7/30/2019 Construction F Series
14/28
Front-Head-1
Front-head is installed with thrust bushing and front-bushing.They hold rod in-line to the piston.
Front-HeadGrease fitting
Front bushing
Grease fitting
F1 F5 F6, F9
Thrust bushing
-
7/30/2019 Construction F Series
15/28
Front-Head-2
Front-head is installed 3 wear bushings named thrust ring, thrust bushing andfront-cover. They hold the rod in-line to the piston.
Thrust bushingThrust ring
Air check valveF11, F20, F30F12, F19, F22, F27, 35, F45, F70
next page
-
7/30/2019 Construction F Series
16/28
Front-Cover/Bushing
Front-Cover/Bushing holds rod and it is exposed to the dusty condition.Grease lubrication is a keyfor maintenance.
Front-Bushing
Front-Cover
For F11 and larger breakers, front-cover is provided with wear indicating recess.Advise operator to replace front cover before recess is wear out.Use of worn front cover can damage rod head or piston striking face .
F1 - F5 4mmF6 F9 6mm
F11 - F27 : 3.5 mmF30 - F70 : 4.5 mm
Clearance
Thrust ringThrust bushing
Front-head
.
Front cover
-
7/30/2019 Construction F Series
17/28
Rod
Four different kind of rods are available for different rock conditions.
-
7/30/2019 Construction F Series
18/28
Flat(blunt)rodFlat tip design rod, common for shot rock breaking. Used for hard butcracked rock. Rod breaks rock with shock wave.Because of flat face, rod will not slip during breaking.
Moil point / corn rodConical tip is named corn rod and square dipyramid is named moil pointrod. Commonly used for breaking of concrete, rock layers, hard foundationand road construction. Sharp point can penetrate well against the rockwith wedge effect.
Rod
-
7/30/2019 Construction F Series
19/28
Wedge pointChisel design tip is named wedge point.. Wedge effect of the tip willpenetrate into the object rock. Good for trenching, breaking of layeredrock. It is not recommended to use for hard rock.
Core rodFitted hard alloy steel bar in the moil point rod. This rod is onlyrecommended for abrasive rock.
Rod
-
7/30/2019 Construction F Series
20/28
Control Valve
F1 F5:Control valve is directly mounted on the piston.
F6 & F9:Control valve is built in the cylinder.
Control valveF1 - F5 F6 , F9
Piston
Cylinder
-
7/30/2019 Construction F Series
21/28
Multi-Function Control Valve
Stroke adjusterValve adjuster
Remote grease port
Safety valve
F12, F19, F22, F27, F35, F45
-
7/30/2019 Construction F Series
22/28
Stroke Adjuster
Stroke Adjuster
Stroke Valve
Constant Blow
Stroke valve
Automatic Stop
Available for F11 and larger
Adjusts piston stroke. LONG stroke or SHORT stroke.LONG stroke: less number of blows. 100% blows.SHORT stroke: more number of blows. 150% blows but 70% force of LONG strokeFor hard rock use LONG stroke.For soft or cracked rock, use SHORT stroke.
Choice of AUTOMATIC STOP valve.Named Anti idle blowQuit blows when rock is broke.To restart simply press the rodagainst the rock.*Only active at LONG stroke position.
-
7/30/2019 Construction F Series
23/28
Stroke Adjuster
Screw Position
Number of rotations from the fully screwed in position.
Numberofblo
ws
V l Adj & S f l
-
7/30/2019 Construction F Series
24/28
Open : To increase number of blows and decrease operating pressure.Close : To reduce number of blows and raise operating pressure.
Valve Adjuster & Safety valve
Open Close
Adjuster
Valve Adjuster (Factory preset, no adjustment required)
V l Adj & S f l
-
7/30/2019 Construction F Series
25/28
Safety ValveValve Adjuster & Safety valve
Control maximum operating pressure at 21MPa.Valve is not re-adjustable. Replace spring, needle and sheet if operating pressure becomes low.
needlespring
sheet
-
7/30/2019 Construction F Series
26/28
F1 F5: Nitrogen gas is not charged.F6 F9: Nitrogen gas is charged.
Compressed nitrogen gas increases piston down speed.
Back-head
AccumulatorF1 - F5 F6, F9 Back-head
Charge valve
Back-Head
-
7/30/2019 Construction F Series
27/28
Back-Head F12, F19, F22, F27, F35, F45, F70Increase gas press. : Increase impact power and decrease number of blows.
Decrease gas press. : Decrease impact power and increase number of blows.
Nitrogen gas can leak. When impact power is decreased, measure nitrogen gas pressure.
Back-Head
Charge valve
Swivel adopter
Back-head2 x 2 Oil port
Charge valve
F11F20F30
Hi pressure IN
Back-head
Air cap
Hi pressure IN
-
7/30/2019 Construction F Series
28/28
Rock Professional