construction - emap
TRANSCRIPT
JobJob NoDateScale
Blackbird18063September 20181:100@A3
ConstructionProposed - Lower Ground Floor Plan
18063-GA-102-C1
StatusDrawing Name
Drawing No
Date Rev Revision descriptionGENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)
Do not scale from this drawing. Base survey carried out by others.
Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.
All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.
All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C
Studio 204, 120-150 Hackney Road, London. E2 7QS
t: 0207 012 1284
NORTH
Washing machine
SVP 2 FROM ABOVE
SVP 1 FROM ABOVE
SVP 3 FROM ABOVE
C1 C1 C1 C1 C1 C1 C1 C1
C1 C1 C1 C1 C1 C1 C1 C1
C2 C2
C2 C2
1
3
3
1
DLG - 01
LG-01Store
LG-02 Entrance
LG-03Plant room
XX.XX.XX X X
CONSTRUCTION
JAN-2020
DLG - 02
DLG - 03
DLG - 04
JobJob NoDateScale
Blackbird18063September 20181:100@A3
ConstructionProposed - Raised Ground Floor Plan
18063-GA-103-C1
StatusDrawing Name
Drawing No
Date Rev Revision descriptionGENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)
Do not scale from this drawing. Base survey carried out by others.
Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.
All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.
All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C
Studio 204, 120-150 Hackney Road, London. E2 7QS
t: 0207 012 1284
NORTH
Bedroom 1
Hallway
Bathroom
Stairs
Living spaces
Walk In Wardrobe
Master Bedroom
Bedroom 2
RAMP
TimberColumn
WRAP AROUND WALKWAY / VERANDA
XX.XX.XX X X
CONSTRUCTION
JAN-2020
1
3
3
1
JobJob NoDateScale
Blackbird18063September 20181:100@A3
ConstructionProposed - Section 1
18063-GA-109-C1
StatusDrawing Name
Drawing No
Date Rev Revision description
XX.XX.XX X X
GENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)
Do not scale from this drawing. Base survey carried out by others.
Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.
All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.
All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C
Studio 204, 120-150 Hackney Road, London. E2 7QS
t: 0207 012 1284
LIVING SPACES MASTER SUITE
SVP
3 TO
BEL
OW
GRO
UND
BEDROOMS UTILITY/STAIRSTUDIO
CONSTRUCTION
JAN-2020
JobJob NoDateScale
Blackbird18063September 20181:50@A3
ConstructionProposed - Section 03
18063-GA-111-C1
StatusDrawing Name
Drawing No
Date Rev Revision description
XX.XX.XX X X
GENERAL NOTES (DRAWING TO BE READ IN CONJUNTION WITH DESIGN TEAM INFORMATION)
Do not scale from this drawing. Base survey carried out by others.
Use figured dimensions only and bring any discrepancies to the attention of the architect. Figured dimensions are in millimetres.
All specified products and materials to be fitted and installed according to manufacturers specifications and instructions.
All building works to be carried out in accordance with current Building Regulations, British Standards and relevant codes of practice.C
Studio 204, 120-150 Hackney Road, London. E2 7QS
t: 0207 012 1284
Section A - AGA
CONSTRUCTION
JAN-2020