construction drawings

18
JONATHAN ADLER INTERIOR DESIGN 333 Hudson Street Suite 702 New York, NY 10013 (p) 212-645-2802 (f) 212-645-3072 PROJECT: REVISIONS: JONATHAN ADLER STORE WESTPORT, CT SCALE: AS NOTED A.0 DATE: 7.12.2012 166 MAIN ST , WESTPORT, CT 06880 DRAWING SET

Upload: michelle-foerster

Post on 13-Mar-2016

219 views

Category:

Documents


1 download

DESCRIPTION

Store build Construction Set

TRANSCRIPT

Page 1: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.0

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

DRAWING SET

Page 2: Construction Drawings

20'

30'

21'

80'-3"

4'-1"

10'-3"

7'

17'-7"

40'-4

5

16

"

2'-1"

2'-8

3

8

"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.1

DATE: 7.12.2012

166 MAIN ST, WESPORT, CT 06880

EXISTING FLOORPLAN

Page 3: Construction Drawings

20'

21'

4'-1"

10'-3"

7'

17'-7"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.1

a DATE: 7.12.2012

166 MAIN STREET, WESTPORT, CT 06880

EXISTING FLOORPLAN

Page 4: Construction Drawings

20'

29'-6"

21'

80'-3"

2'-8

3

8

"

4'-1"

10'-3"

7'

17'-7"

40'-4

5

16

"

3'-3"

4'-7

1

2

"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.2

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

DEMOLITION FLOORPLAN

THROUGHOUT SPACE:

Remove existing walls as noted by

dashed line on plan.

Remove all laminate wall paneling from

walls & mirror from walls.

Demo built-ins as noted by dashed line.

Remove all construction debris.

Patch/Repair at floor/walls/ceilings as

needed.

Page 5: Construction Drawings

20'

21'

4'-1"

10'-3"

7'

17'-7"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.2

a

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

DEMOLITION FLOORPLAN

THROUGHOUT SPACE:

Remove existing walls as noted by

dashed line on plan.

Remove all construction debris.

Patch/Repair at floor/walls/ceilings as

needed.

Page 6: Construction Drawings

30'

68'-5

3

16

"

21'

80'-7

3

8

"

7'

17'-7"

40'-4

5

16

"

10'-5

1

2

"

2'-2"

7'-8

7

8

"

10'-10

1

8

"

36°

3'-7

3

8

"

13'-6"

3'-4

3

4

"

7'-4"

3'-8"

2'-2"

10'

10'-9"

1'-6"

1'-10

1

2

"

13'-1"

9'-11"

5'

5'

10'

2'

10'-0

1

2

"

10'-3"

6'-2"

6'

3

3

8

"

1'-6"

9'-9

7

8

"

12'-6"

4'-3

3

8

"

3'-9

1

8

" 8'-11

1

2

"7'-5

1

2

"

2'-9"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.3

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

CONSTRUCTION PLAN

CASH WRAP:

Cash Wrap drawings to be

provided separately.

FLOORING:

Wood flooring throughout

Main floor space. Dark

ebony wood sample to

be provided and

matched..

Coco Mat (approx. 24 sq.

ft) - American Floor Mats

1

2

" Natural Recessed

Coco Mat at both front &

back entrances.

Seagrass flooring as

noted in back floor and

back hallway area.

Add 2

1

2

" x

1

2

" base trim

throughout space on all

perimeter walls of shop

floor painted Benjamin

Moore Super White

semi-gloss (approx. 220'

LF)

WALNUT COLUMN

MILLWORK:

Walnut Column Millwork

unit (approx.13'-6").

Millwork Specifications on

E.1.

Electric & Lighting

Requirements on sheets

A.4 & A.5.

Total throughout space: 1

PLATFORMS:

Platform drawings to be

provided separately.

DINING AREA:

12'-6" x 10'-1/2" (includes

6" border) area of floor to

be Walker Zanger Marble,

Calacata CL Grigio or

similar.

Poplar, maple or similar

wood moldings on wall.

See E.3 for wall elevation

and RCP detail.

Paint wall in Benjamin

Moore Super white.

BEDDING NICHES:

Bedding Niches

(approx. 20-0").

Millwork Specifications

on E.2.

Electric & Lighting

Requirements on

sheets A.4 & A.5.

Total throughout

space: 1

STANDARD NICHES 3:

Standard Niches (approx. 13'-1").

Millwork Specifications on E.6.

Electric & Lighting Requirements

on sheets A.4 & A.5.

Total throughout space: 3

HVAC/MEP:

Duct distribution as per existing.

Any additions to be noted in

seperate MEP plans.

Paint any exposed ductwork

BM super white flat matte paint.

STANDARD NICHES 1:

Standard Niches (approx. 10'-9").

Millwork Specifications on E.4.

Electric & Lighting Requirements

on sheets A.4 & A.5.

Total throughout space: 3

STANDARD NICHES 2:

Standard Niches (approx.

9'-11").

Millwork Specifications on

E.5.

Electric & Lighting

Requirements on sheets

A.4 & A.5.

Total throughout space: 3

BACK ENTRANCE:

New glass entry door.

Contractor to quote door similar to

front entry doors.

Coco mat inside entry.

Page 7: Construction Drawings

5'-4

1

2

"

9'-9

1

8

"

13'-8

7

8

"

6'-0

1

2

"

15'-1

3

8

"

4'-4

5

8

"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.4

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

ELECTRICAL PLAN

WALNUT COLUMN MILLWORK:

Add 2 duplex outlets @ 34" h

at unit countertop.

See E.1 for exact locations.

Total throughout space: 1

ELECTRICAL OUTLETS:

Add 21 duplex outlets throughout

space as noted.

Add 9 quad outlets throughout

space as noted.

Floor outlets-7 throughout space.

5 channeled into concrete

floor as shown

2 recessed in storefront

platforms

All wall outlets at approx.11" h

from floor on center unless

otherwise noted.

CASH WRAP:

Cash Wrap drawings to be

provided separately.

General Requirements:

2 Cat 5 lines for

computers

3 Cat 5 for phones/fax

2 hardwired duplex inside

cash wrap for electric.

Add 2 duplex outlets at back

counter (approx. 54" o.c.).

STORAGE ROOM DESK:

General Requirements:

1 Cat 5 lines for computer

1 Cat 5 for phones/fax

Add 1 quad outlet.

CUSTOM DESK AREA:

General Requirements:

1 Cat 5 lines for computer

1 Cat 5 for phones/fax

Add 1 quad outlet.

* Electrician to include Cat 5

cabling in quote (phone and

computer jacks and final

connection to phone panel will

be installed by others.)

LEGEND

Page 8: Construction Drawings

3'-7"

3'-7

1

4

"

2'-9

1

2

"

4'-2

1

2

"

8'-3

1

4

"

EQ.EQ. EQ.

2'-4"

2'-5"

5'-0

5

8

"

2'-7

1

4

"

2'-4"

2'-6"

3'-1

3

4

" 4'-10"

6'-3

1

4

"

1'-8

1

2

"

2'-8

7

8

"

EQ. EQ.

10'-11

1

8

"

8'-9

1

4

"

10'-11

1

8

" 10'-11

1

8

" 10'-11

1

8

"

10'-11

1

8

" 10'-11

1

8

" 10'-11

1

8

" 10'-11

1

8

"

8'-5

5

8

"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.5

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

REFLECTED CEILING PLAN

SPEAKER LOCATIONS:

Wire for 6 speakers at locations

noted.

All wires to terminate at Storage

Room Desk.

Install 6 speakers to be provided

by JA co.

LEGEND

LIGHT SWITCHES:

All lights; including duplex ceiling

outlets & J boxes switch to

Storage Room (except restroom).

Add 3 gang switches as needed.

Track Lights in window and lights

over cashwrap (track & J boxes)

to be on separate switches.

LIGHTING :

Add 44 Small Recessed Lighting

Fixtures throughout space as noted.

Add 10 Globe Pendant lights

throughout space @10'-10" AFF.

Add 11 duplex ceilng outlets

throughout space as noted. Duplx

outlets to be switched storage room.

Add 9 J Boxes throughout space (inc.

restroom) as noted.

Add approx. 392 L.F. of Line Voltage

track hung with 18" suspension kit.

Add approx. 116 low voltage track

heads.

DINING AREA:

J Box as noted.

See E.3 for details.

JA Co. to provide chandelier for J

box.

WALNUT COLUMN MILLWORK:

8 LED 3-1/2" White Recessed light

fixtures in each Walnut Millwork

Unit.

See E.1 for details.

Total throughout space: 1

HANGING DISPLAY UNISTRUT:

Add 4 Unistrut rods painted white

and suspended with all-thread at

top of each window height in the

store front for display.

BEDDING NICHES:

2 EA (4 total) LED 3-1/2" White Recessed

Light Fixtures in each soffit (2 total) of each

Bedding Niche.

3 LED 3-1/2" White Recessed Light Fixtures in

soffit between Bedding Niches.

See E.2 for details.

Total throughout space: 1

LIVING ROOM AREA:

8 Large White Pendant Lights with J

Box in center.

JA Co. to provide chandelier for J

box.

STORAGE ROOM:

Add (1) 6'-0" 2 light hanging

Fluorescent fixtures in Storage

Room.

THROUGHOUT SPACE:

Paint ceiling (including any ducts,

joists, etc.) Benjamin Moore Super

White Flat/Matte.

Paint all exposed electrical conduit

BM Super White Flat/Matte.

STANDARD NICHES 1,2 & 3:

Add 2 each/20 total Low Voltage

3" White Recessed Light Fixtures

in soffits.

HVAC:

Duct distribution as per existin. See

MEP plans (provided separately) or

any additions.

EXTERIOR SIGN:

Add one 120v circuits for

exterior signage above windows

inside space.

Signage co. to provide and

install sign andelectrician to make

final connection.

Page 9: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.5

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

LIGHTING SPECIFICATIONS

Page 10: Construction Drawings

20'

30'

21'

80'-3"

40'-4

5

16

"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.6

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

FURNITURE FLOORPLAN

Page 11: Construction Drawings

21'

10'-3"

3'-3"

6'-4"

7'-7

1

2

"

1'-3"

1'-5

1

4

"

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

A.7

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

ADA RESTROOM

Page 12: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

E.1

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

WALNUT COLUMN MILLWORK

Page 13: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

E.2

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

BEDDING NICHES

Page 14: Construction Drawings

HARDWOOD MOLDINGS SPECIFICATIONS - POPLAR, MAPLE OR SIMILAR

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

E.3

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

WALL PANEL DETAIL

Page 15: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

E.4

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

STANDARD NICHE 1

Page 16: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

E.5

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

STANDARD NICHES 2

Page 17: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

E.6

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

BEDDING NICHES

Page 18: Construction Drawings

JO

NA

TH

AN

A

DL

ER

IN

TE

RIO

R D

ES

IG

N

33

3 H

ud

so

n S

tre

et

Su

ite

7

02

Ne

w Y

ork, N

Y 1

00

13

(p

) 2

12

-6

45

-2

80

2

(f) 2

12

-6

45

-3

07

2

PROJECT:

REVISIONS:

JONATHAN ADLER STORE

WESTPORT, CT

SC

AL

E: A

S N

OT

ED

E.7

DATE: 7.12.2012

166 MAIN ST , WESTPORT, CT 06880

AREA/ADA BATHROOM