construction change order analysis
DESCRIPTION
Construction Change Order analysis. CPSC 533C Analysis Project Presented by Chiu, Chao-Ying Department of Civil Engineering University of British Columbia. Problems of Using Construction Data. Hybrid of physical and abstract data Difficult to link, model, and organize - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/1.jpg)
Construction Change Order Construction Change Order analysisanalysis
CPSC 533C Analysis ProjectPresented by Chiu, Chao-YingDepartment of Civil EngineeringUniversity of British Columbia
![Page 2: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/2.jpg)
Problems of Using Construction Problems of Using Construction DataData
• Hybrid of physical and abstract data – Difficult to link, model, and organize– Costly to link, model, and organize
• Try to model, but lack of medium to interpret and see the benefit
• Vicious cycle between model and interpret data
But, Construction Data Really Valuable for Enhancing Project Performance!
![Page 3: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/3.jpg)
Nature of Construction Data(1)Nature of Construction Data(1)• Original Format
– Filled out preprinted forms, workbooks, and logs
– Plain text documents like contracts, memorandum, e-mail, meeting minutes
– Pictorial documents like drawings, pictures, and videos
![Page 4: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/4.jpg)
Nature of Construction Data(2)Nature of Construction Data(2)• Digitized Format
– Format for Abstract Data• Database or spreadsheet of workbooks and
logs– Format for Physical Data
• Collections of digital video and picture• Collection of electronically stored text
documents (contracts, memorandum, e-mail, meeting minutes)
• Collection of electronic product drawings(2D Cad, 3D Cad)
![Page 5: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/5.jpg)
Nature of Construction Data(3)Nature of Construction Data(3)• Link to Physical Data in Abstract Data
– Categorize Physical Data by types• Memorandums from Sub-trade vs Client• Drawings of Interior Components vs Structure
Components– Categorize Physical Data by contents
• Two pictures show the site conditions are Good vs Bad
• Problems encountered described in daily site report includes Bad Weather, Equipment Down, etc.
Lots of physical data can be transformed into categorical abstract data!
![Page 6: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/6.jpg)
Nature of Construction Data(4)Nature of Construction Data(4)• Construction data can be transformed to
totally abstract data for the purpose of analysis
• In the abstract data form, they are multidimensional!
![Page 7: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/7.jpg)
Current Practice of Using Current Practice of Using Construction DataConstruction Data
• Use Excel or Access to store abstract data• Visualization is only focused on physical
data and important abstract data like cost , resource, and schedule
• Seldom are full spectrum of construction data analyzed
• Excel charts used for rare presentation situation
• Too challenging when trying to analyze more data using Excel--ad hoc manner, time consuming. Graphing rather than analyzing
![Page 8: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/8.jpg)
Key Criteria of Visualization Key Criteria of Visualization Tools SelectionTools Selection
• Alleviate the burden of retrieving and visualizing abstract data
• Shorten the time of comprehending the meaning of data represented by visual encodings
• Link between visualization of abstract data and physical data
• Comprehensive, Robust and Easy to Use. Not necessarily the best.
![Page 9: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/9.jpg)
Why Are the Criteria?Why Are the Criteria? • Multidimensional data means you need to
understand them from “multi-perspectives”
• Images conveying information from “multi-perspectives” just too many
• The iterative process of retrieving data->visualizing data->observing visualization->retrieving data is sheer tedious
• Visualization of physical data help validate users’ semantic perception of it’s abstract form
![Page 10: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/10.jpg)
Key Visualization Techniques Key Visualization Techniques TargetedTargeted
• Query Data Faster– Query by slider– Query by Data Dimensions– Query by Brush
• Generate Visualization Faster– Automation of Graph Generation
• More effective Visualization– Built-in Visual Encoding Formalism based on Psychology
Ground • Link Between Abstract and Physical Data
– Coordinated Multiple Views (or linked data views)
![Page 11: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/11.jpg)
Tools SelectedTools Selected• Query Data Faster
– Query by slider (Tableau)– Query by Data Dimensions (Tableau and
Advizor)– Query by Brush (Advizor)
• Generate Visualization Faster– Automation of Graph Generation (Tableau)
• More effective Visualization– Built-in Visual Encoding Formalism based on
Psychology Ground (Tableau and Advizor)• Link Between Abstract and Physical Data
– Coordinated Multiple View(Tableau and Advizor; Not implement exactly yet, but have extension potential)
![Page 12: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/12.jpg)
Scenario Formalisms (why) Scenario Formalisms (why) • Information technology experts use handy
tools in a technical thinking; but can not read the images of domain contexts
• Domain experts knows what the images mean; but do not use the tools in the underlying technology thinking
• Scenario Formalisms bridge the gap for domain experts so that they can systematically and mechanically use tools thereby focusing on “reading information”
![Page 13: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/13.jpg)
Scenario Formalisms (what)Scenario Formalisms (what)• Find quantity distributions along any
Dimension type dimension• Compare quantity distributions along the
same Dimension type dimension (Correlations Finding)
• Compare trend and occurrence of time dependent data
• Association between Data of Different Dimensions
![Page 14: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/14.jpg)
Definitions of Formalisms (1)Definitions of Formalisms (1)
Dimension Type dimensions Measure Type dimensions
![Page 15: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/15.jpg)
Definitions of Formalisms (2)Definitions of Formalisms (2)
Values of Measure type dimension “Sales” for Dimension type dimension “sales number”
Statistics Values of Measure type dimension “Profit” for Dimension type dimension “car color”
“Color” to ”Profit” : 1 to many
“Number” to ”sales” : 1 to 1
Called “Quantity Measurement”!!
![Page 16: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/16.jpg)
Definitions of Formalisms (3)Definitions of Formalisms (3)Quantity Distribution of Data along Dimension Type Dimension:The distribution of Quantity Measurements along a Dimension type dimension
![Page 17: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/17.jpg)
Find quantity distributions along Find quantity distributions along any Dimension type dimensionany Dimension type dimension
• Find in the whole dataset• Find in the subset of data
![Page 18: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/18.jpg)
Compare quantity distributions along Compare quantity distributions along the same Dimension type dimension(1)the same Dimension type dimension(1)• Same data. • Different quantity
measurements
Different quantity measures
![Page 19: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/19.jpg)
Compare quantity distributions along Compare quantity distributions along the same Dimension type dimension(2)the same Dimension type dimension(2)• Different subsets of data
filtered from same dimension • Same quantity measurement
Along this dimension
Filter this dimension
![Page 20: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/20.jpg)
Compare Trend and Occurrence of Compare Trend and Occurrence of Time Dependent DataTime Dependent Data
Trend
Occurrence
![Page 21: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/21.jpg)
Association Between Data of Association Between Data of Different DimensionsDifferent Dimensions
• Similar to finding quantity distribution (first type of scenario formalism)
• But quantity is not our concern now. • Find “which data has something to do with
what data”.
![Page 22: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/22.jpg)
Dataset of Change Order DomainDataset of Change Order Domain
![Page 23: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/23.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(1.1Visualization Tools(1.1))
• Scenario Formalism: Find quantity distribution
• Tool: Adivzor (better in gaining overview)
• Key Techniques: Query by dimensions, query by brush, linked data views, visual encoding formalism
![Page 24: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/24.jpg)
Create 7 bar charts to see quantity distributions of 7 dimensions
Query by dimension
Restrict to quantitative data
![Page 25: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/25.jpg)
Quantity Distributions of the whole dataset along with different Dimension type dimensions
![Page 26: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/26.jpg)
Filter to the subset of data whose location is “main floor”
Query by brush
![Page 27: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/27.jpg)
Quantity Distributions of the subset of dataset along with different Dimension type dimensions
Synchronizing changes powered by linked data views
![Page 28: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/28.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(1.2)Visualization Tools(1.2)
• Information Extracted:– 9~12 information pertinent to change order
obtained– Example Information: Interior construction and
service construction encounter more change orders than other components of the building
• Time Spent on Retrieving and Visualizing : Less Than 5 minutes (excluding one time overhead of setting environment)
![Page 29: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/29.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(2.1)Visualization Tools(2.1)
• Scenario Formalism: Compare quantity distribution
• Tool: Tableau (better in trend comparisons)
• Key Techniques: Query by dimensions, Visualization Automation, Visual Encoding Formalism
![Page 30: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/30.jpg)
Drag Measure type dimension of “projected cost”, “approved cost”, and “record count” to Column Shelf, instruct the system to total these three dimensions, and drag the Dimension type dimension “reason of change” to Row Shelf
Drag From
![Page 31: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/31.jpg)
Replace the Dimension type dimension “reason of change” on the Row Shelf by “issued date”. Also add another Measure type dimension “difference between projected and approved cost” (same data, along same Dimension dimension, different quantity measurement)
First type of quantity distribution comparison
![Page 32: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/32.jpg)
Drag Dimension type dimension “sub-trade” and Measure type dimension “trade change order cost” to Column Shelf and Row Shelf respectively. Also we instruct the system to do total on “trade change order cost”
![Page 33: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/33.jpg)
Insert a different Dimension type dimension “reason of change” in front of the Measure type dimension “trade change order cost” on the Row Shelf. (Align different subsets of data, along same Dimension dimension, same quantity measurement)
Second type of quantity distribution comparison
Insert into
![Page 34: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/34.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(2.2)Visualization Tools(2.2)
• Information Extracted:– 3 information pertinent to change order
obtained– Example Info.: Client has no problem of
approving request of extra cost at the beginning. However, along the increases of change orders, the amount of disagreement starts to rise!
• Time Spent on Retrieving and Visualizing: Less Than 2 minutes (excluding one time overhead of setting environment)
![Page 35: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/35.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(3.1)Visualization Tools(3.1)
• Scenario Formalism:Compare trend and occurrence of time dependent data
• Tool: Advizor• Key Techniques:
Query by dimensions, query by brush, linked data views, visual encoding formalism
![Page 36: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/36.jpg)
Occurrence
Trend
Juxtapose Timetable chart with bar chart. Brush the clustering visual encodings in the TimeTable, corresponding data in the bar chart are highlighted too.
![Page 37: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/37.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(3.2)Visualization Tools(3.2)
• Information Extracted:– 2 information pertinent to change order
obtained– Example Info.: There are two periods of time
when the change orders involve almost all locations of the building. During those two time period, one sharply increase of projected cost is observed!!
• Time Spent on Retrieving and Visualizing: Less Than 2 minutes (excluding one time overhead of setting environment)
![Page 38: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/38.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(4.1)Visualization Tools(4.1)
• Scenario Formalism: Association between data of different dimensions
• Tool: Advizor• Key Techniques:
Query by dimensions, query by brush, linked data views, visual encoding formalism, TreeMap
![Page 39: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/39.jpg)
Using bar chart to see the quantity distribution along “issued date” in terms of “differences between projected cost and approved cost”
![Page 40: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/40.jpg)
Brush to select data that have over $10,000 of differences of projected and approved cost
![Page 41: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/41.jpg)
Switch to already generated Heatmap chart that visualize data of “reason of change” and “initiated documents”; data of of “affected sub-trade” and “sub-trade revision number”. All related data values are highlighted.
![Page 42: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/42.jpg)
Switch to the already generated Multiscape chart that visualizes related data of combinations of two dimensions (time and space)
![Page 43: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/43.jpg)
Scenario Formalism+ Scenario Formalism+ Visualization Tools(4.2)Visualization Tools(4.2)
• Information Extracted:– 5 information pertinent to change order
obtained– Example Info.: Of those change orders that the
client strongly disagree with, we find the coincidental time and space in which those change orders occurs
• Time Spent on Retrieving and Visualizing: Less Than 3 minutes (excluding one time overhead of setting environment)
![Page 44: Construction Change Order analysis](https://reader035.vdocuments.us/reader035/viewer/2022062310/568167da550346895ddd371e/html5/thumbnails/44.jpg)
Conclusion Conclusion • Difficult to say which still images better (infovis
technology generated vs Excel or even hand made)
• Big improvement made mostly by technology of interaction
• We specifically value “linked data view” most:• It help link data and give overview of data• It give flexibility of graphing (no need to consolidate
nD into a 2D or 3D)• It bridge the infovis with scientific visualization, which
is major focus of engineering field. • Scenario formalism further enhance improvement