Development of Curtain Wall Systems inHong Kong
1st Generation Early to late 1970s
features: mainly non-proprietary products design
by local window manufacturers.
common systems: stick-type, spandrel and cover,
unit-in-frame types
material: aluminium sections, fabricated locally
and erected in-situ using manual means
-
7/31/2019 Construction and Performance of Curtain Wall System
3/84
Development of Curtain Wall Systems in
Hong Kong (Cont.)
2nd Generation Early 1980s to early 90s
features: mainly proprietary products usually instandard design out from the manufacturersinventory
common systems: stick-type, spandrel and cover,
unit-in-frame and sometimes unitized types
material: sections in aluminium or its alloys,
fabricated overseas and delivered to site for
installation.
-
7/31/2019 Construction and Performance of Curtain Wall System
4/84
Development of Curtain Wall Systems in Hong
Kong (Cont.)
3rd Generation mid 1990s onward
features: mainly proprietary or expert productsusually tailor-designed and made for highlyspecific purposes
common systems: majority are in unitized types
material: sections in aluminium alloys, some in
stainless steel, large areas of glass was also used,large amount of accessories and fixing components
are involved, components fabricated overseas (incl.
China) and delivered to site for installation.
-
7/31/2019 Construction and Performance of Curtain Wall System
5/84
Use of Curtain Wall Systems in Hong Kongsbuildings (Cont.)
1) Office buildings
2) hotels
3) Shopping centers
4) Public/Functional buildings
5) Residential buildings
6) Other types
-
7/31/2019 Construction and Performance of Curtain Wall System
6/84
The city profile of Hong Kong as viewed from the
Kowloon Peninsula. Generations of tall buildings sprung
up from the harbour side since the 1970s can be seen.
-
7/31/2019 Construction and Performance of Curtain Wall System
7/84
Aerial views of the downtown
area of Central District
-
7/31/2019 Construction and Performance of Curtain Wall System
8/84
Close up seeing the buildingfaades of some high-rise
buildings in downtown areas
-
7/31/2019 Construction and Performance of Curtain Wall System
9/84
Buildings using Curtainwall of the first generation
- The office zone of East
Tsim Sha Tsui developed
in the late 1970s
-
7/31/2019 Construction and Performance of Curtain Wall System
10/84
Common types of curtain wall systems forhigh-rise buildings
1) Stick system
2) Unit system
3) Unit and mullion system
4) Column-cover and spandrel system
5) Various types of glass wall system
-
7/31/2019 Construction and Performance of Curtain Wall System
11/84
Typical stick system wall
the Gateway at Tsim Sha Tsui
-
7/31/2019 Construction and Performance of Curtain Wall System
12/84
Typical unitized system wall the Cheung Kong Center
-
7/31/2019 Construction and Performance of Curtain Wall System
13/84
p
Glass wall and skylight for the Festival Walk Shopping Mall
-
7/31/2019 Construction and Performance of Curtain Wall System
14/84
Glass wall for the Terminal
Building at Hong Kong Chek
Lap Kok International Airport
-
7/31/2019 Construction and Performance of Curtain Wall System
15/84
p
Glass wall used for the
Hong Kong Conventionand Exhibition Center
-
7/31/2019 Construction and Performance of Curtain Wall System
16/84
p
The glass wall for the
International Finance Center(Hong Kong Station)
-
7/31/2019 Construction and Performance of Curtain Wall System
17/84
Glass Hubs at podium roof of the
International Finance Center
-
7/31/2019 Construction and Performance of Curtain Wall System
18/84
Curtain wall for the
Cyberport Development
-
7/31/2019 Construction and Performance of Curtain Wall System
19/84
Functions and performance requirements of
curtain wall for high-rise buildingssituations where buildings in Hong Kong are
expected to face
Very large building envolop (say, up to 50000 sq m)
Typhoon situations (wind speed up to 60m/s) Thunderstorm situations
Extreme temperature difference
Exposure to salty or polluted atmosphere
Long period of air-conditioning/cooling time
-
7/31/2019 Construction and Performance of Curtain Wall System
20/84
Functions and performance requirements ofcurtain wall for high-rise buildings
1) strength and stability dead load and wind load
2) weather resistance ability to keep out water & wind
3) thermal insulation and condensation max 30W/sq m
4) sound insulation 25dB or above
5) fire resistance usually no specific requirement if
enough separating distance from relevant boundary is
provided
-
7/31/2019 Construction and Performance of Curtain Wall System
21/84
Testing of curtain wall
1) air infiltration
2) water penetration under static & dynamic pressure
3) structural adequacy under static & dynamic pressure
4) vertical and horizontal seismic movement
5) hinge and frame test6) in-situ pull-out test
-
7/31/2019 Construction and Performance of Curtain Wall System
22/84
Installation process
1) transportation, storage and handling
2) anchorage and connection provision
3) installation arrangement
4) final fixing and inspection
-
7/31/2019 Construction and Performance of Curtain Wall System
23/84
Handling of the
window units
-
7/31/2019 Construction and Performance of Curtain Wall System
24/84
Built-in anchor andhanging brackets
-
7/31/2019 Construction and Performance of Curtain Wall System
25/84
Cases for References
-
7/31/2019 Construction and Performance of Curtain Wall System
26/84
Shun Hing Plaza
- 68-storey office
building constructed incomposite form (core
wall plus external steelframe)
-
7/31/2019 Construction and Performance of Curtain Wall System
27/84
Installing of the curtain wall
-
7/31/2019 Construction and Performance of Curtain Wall System
28/84
Close up of the mullion frame at the external faces of building
-
7/31/2019 Construction and Performance of Curtain Wall System
29/84
Close up of the
walling frame with
mullion andtransom in position
-
7/31/2019 Construction and Performance of Curtain Wall System
30/84
Wall to cover the
bracing memberslocated in the
building exterior
-
7/31/2019 Construction and Performance of Curtain Wall System
31/84
Fixing the mullion onto
the floor structure
-
7/31/2019 Construction and Performance of Curtain Wall System
32/84
Detail of the fixing bracket
-
7/31/2019 Construction and Performance of Curtain Wall System
33/84
Wall framing components
-
7/31/2019 Construction and Performance of Curtain Wall System
34/84
Manulife Tower
(Lee Garden Hotel
Redevelopment)
50-storey office
building in
compositeconstruction
-
7/31/2019 Construction and Performance of Curtain Wall System
35/84
Overview of the buildings exterior
-
7/31/2019 Construction and Performance of Curtain Wall System
36/84
-
7/31/2019 Construction and Performance of Curtain Wall System
37/84
Close up of the rebate on the sides of the building exterior
-
7/31/2019 Construction and Performance of Curtain Wall System
38/84
Close up seeing the walling
arrangement of the sky garden
-
7/31/2019 Construction and Performance of Curtain Wall System
39/84
The hanger brackets and the
secured units on the floor edges
-
7/31/2019 Construction and Performance of Curtain Wall System
40/84
Transporting the wall units
into the building interiors
-
7/31/2019 Construction and Performance of Curtain Wall System
41/84
Placing the window unit into position
-
7/31/2019 Construction and Performance of Curtain Wall System
42/84
Close up of the standard units
-
7/31/2019 Construction and Performance of Curtain Wall System
43/84
To be continued in Part II . . . .
-
7/31/2019 Construction and Performance of Curtain Wall System
44/84
The Center- A 80-storey office
building constructed instructural steel frame
(mega-structure).
-
7/31/2019 Construction and Performance of Curtain Wall System
45/84
The configuration of the building frame
-
7/31/2019 Construction and Performance of Curtain Wall System
46/84
A separating line between the curtain wall and the building structure worksuspended pending to the approval of the fixing detail
-
7/31/2019 Construction and Performance of Curtain Wall System
47/84
Gondola set up to facilitate the
installation of the curtain wall units
-
7/31/2019 Construction and Performance of Curtain Wall System
48/84
Hanging, fixing and
joining detail of the units
Pyramid feature at
h b ildi
-
7/31/2019 Construction and Performance of Curtain Wall System
49/84
the building corners
The backing structure of
the pyramid feature
-
7/31/2019 Construction and Performance of Curtain Wall System
50/84
the pyramid feature
-
7/31/2019 Construction and Performance of Curtain Wall System
51/84
Detail of the backing frame before placing of the glass panes
Forming the inverted
pyramid feature at one
-
7/31/2019 Construction and Performance of Curtain Wall System
52/84
pyramid feature at one
of the building corners
i h i d f
-
7/31/2019 Construction and Performance of Curtain Wall System
53/84
Seeing the window from
the pyramids interior
-
7/31/2019 Construction and Performance of Curtain Wall System
54/84
Wall cleansing machine and the sliding door on the penthouse
-
7/31/2019 Construction and Performance of Curtain Wall System
55/84
Rail track for the hanging-typesliding door to provide a flush
exterior look for an opening
for the wall cleansing machine
-
7/31/2019 Construction and Performance of Curtain Wall System
56/84
Stretching out of the
wall cleansing machinefrom a hydraulic arm
-
7/31/2019 Construction and Performance of Curtain Wall System
57/84
Close up detail of theautomatic cleansing robot that
mounted onto concealed track
provided on the window units
-
7/31/2019 Construction and Performance of Curtain Wall System
58/84
Cheung Kong Center
- A 62-storey office
building in compositeconstruction
Cheung Kong
Center at night
-
7/31/2019 Construction and Performance of Curtain Wall System
59/84
Center at night
-
7/31/2019 Construction and Performance of Curtain Wall System
60/84
-
7/31/2019 Construction and Performance of Curtain Wall System
61/84
Installing the curtain wall during the construction of the superstructure
Belt truss at
-
7/31/2019 Construction and Performance of Curtain Wall System
62/84
building top
Curtain wall installation close to the building top
-
7/31/2019 Construction and Performance of Curtain Wall System
63/84
Belt-truss and
Outrigger systems
Transfer Truss
system
-
7/31/2019 Construction and Performance of Curtain Wall System
64/84
Backing frame for the louvered
panels at the transfer truss level
-
7/31/2019 Construction and Performance of Curtain Wall System
65/84
Installing the standard
panels on typical floors
-
7/31/2019 Construction and Performance of Curtain Wall System
66/84
Fixing detail of the panels
-
7/31/2019 Construction and Performance of Curtain Wall System
67/84
Fixing detail of the panels
-
7/31/2019 Construction and Performance of Curtain Wall System
68/84
Detail of the louvered panels
-
7/31/2019 Construction and Performance of Curtain Wall System
69/84
Exterior detail of the standard panels
Exterior detail of
-
7/31/2019 Construction and Performance of Curtain Wall System
70/84
Exterior detail of
the standard panels
-
7/31/2019 Construction and Performance of Curtain Wall System
71/84
Elevation and sectional detail of typical panels
-
7/31/2019 Construction and Performance of Curtain Wall System
72/84
Enlarged detail of a typical panel unit
-
7/31/2019 Construction and Performance of Curtain Wall System
73/84
Storage arrangement of the panel
units inside building interior
-
7/31/2019 Construction and Performance of Curtain Wall System
74/84
Close up of standard panels seeing thesection and junction detail of the units
Stainless steel entrance
-
7/31/2019 Construction and Performance of Curtain Wall System
75/84
canopy forming part ofthe building faades
Residential
-
7/31/2019 Construction and Performance of Curtain Wall System
76/84
Development atStubbs Road
- A 66-storeyresidential building
with internal andexternal shear walls
forming the major
part of the buildingstructure
-
7/31/2019 Construction and Performance of Curtain Wall System
77/84
Backing arrangement to thebuilding exterior before the
fixing of the wall panelling
-
7/31/2019 Construction and Performance of Curtain Wall System
78/84
Detail of the built-in anchor
channel and the fixing bracket
-
7/31/2019 Construction and Performance of Curtain Wall System
79/84
Touching up of the
window and wall units
-
7/31/2019 Construction and Performance of Curtain Wall System
80/84
Detail of the fixing atthe rebate window
Maintenance Consideration
common problem sources where failures to
-
7/31/2019 Construction and Performance of Curtain Wall System
81/84
p
curtain wall often occur
Design failure selection and appropriateness of the
system, non-compliance to design and performancestandards, imperfection in the jointing design and
detailing, improper use of materials etc.
Construction and structural failure wrong location
or method of fixing, improper anchorage and
connection provision (including failure in welding),failure in the walling components, unpredicted
deflection or deformation appears in the background
structure, poor supervision and workmanship.
Maintenance Consideration
common problem sources where failures to
-
7/31/2019 Construction and Performance of Curtain Wall System
82/84
p
curtain wall often occur (cont.)
Aging and deterioration discolouring and surface
damaging due to weather action; corrosion due to airpollution, acid rain, or electro-chemical effect to
dissimilar metals; aging and hardening of the glazing
compound or sealing gasket, deteriorating of the
insulating materials that lead to further dampening of
the walling materials/components, disfiguring orloosening of the fixing and connections, loosening or
broken-off of the glazing or other fitting items.
Maintenance Consideration
Signs to observed during maintenance inspectio
-
7/31/2019 Construction and Performance of Curtain Wall System
83/84
g g p
- Sign of distress and deterioration of the entire wall
system,
- cracked, loose or missing glass panels,
- bulging, bowing, separation, delamination, rotation,
displacement of panels,
- marks of water, staining and rust,
- damaged and missing parts, corrosion, loosening or
other defects,- extrusion, wrinkle, split, missing or other signs of
deterioration of the sealing materials.
- moisture appears around or behind the curtain wall.
End of presentation
-
7/31/2019 Construction and Performance of Curtain Wall System
84/84
and
Sorry for the rough and not perfectly organized presentation. ThePowerpoint was prepared in a very hurried manner.
If you wish to know more about the research output of the Author,
you can visit Raymonds Homepage at
http://personal.cityu.edu.hk/~bswmwong/
Thank you
http://personal.cityu.edu.hk/~bswmwong/http://personal.cityu.edu.hk/~bswmwong/