Constellation Space Transportation Planning Office July 30, 2009. Charter Evolution CSTP Implementation Plan Program and Technical Authority Relationships. Agenda. Constellation Space Transportation Planning Office Charter. SOMD Established with concurrence of ESMD in December 2008 - PowerPoint PPT Presentation

TRANSCRIPT

www.nasa.govwww.nasa.gov

Constellation Space

Transportation Planning Office

July 30, 2009

22

Agenda

Charter

Evolution

CSTP Implementation Plan

Program and Technical Authority Relationships

Constellation Space Transportation Planning Office Charter

33

SOMD Established with concurrence of ESMD in December 2008

Develop methodology and corporate processes to manage NASA Human System Operations activities while continuing to develop further NASA Human Systems capabilities

Constellation Space Transportation Program• Manage the production, sustaining engineering, launch preparations, and

recovery of the Ares I/Orion vehicle configuration that will transport crew safely to/from the ISS• ESMD/CxP will manage DDTE test flights through Certification completion• SOMD/CSTP will manage post-DDTE operations flights

Status of CSTP Implementation Plan

44

● Initiate definition of Program Processes

●Continue Program Planning, Prepare Program Plan

●Develop System Integration Plan

●Define Production Structure and WBS Structure

FY09 FY10 FY11 FY12…

Effective November 23, 2008

●Establish Project Offices/Managers

●Partner Sub-System Managers assignments

●Establish Sharing for DDTE Production Engineering with MSFC and JSC

●Facility and System O&M

●Support T&E Flight Tests

●Establish Planning Office

●Prepare draft Formulation Authorization Document

● Initiate Multi-Center agreements for Program support

● Initiate CSTP WBS Structure with CxP

●Prepare initial CSTP level II FY10-15 resource requirements

55

Constellation Space TransportationPlanning Office - Evolution

Feb Apr

May

Jun

Jul

Aug

Sep

Oct

2008

Jan

Feb

Mar

Apr

Jul

Aug

Sep Nov

Bill Hill TeamImplementation of Hawes-Geyer

Recommendations

05/20/2008Status to SMC

09/24/2008Out-brief to SMC

•Agency approved•CSTPO Kickoff

06/11/2008KSC Implementation

Plan submitted to Bill Hill team.

Feb

Mar

Apr

May Jul

Dec

May

12/10/2007Out-brief to Administrator• Bill Hill team

kicked off

Dec

CSTPO

12/04/2008SOMD/ESMD letter establishing CSTPO

2009

07/2009CxP CSTP Strategic Alliance Agreement

Signed

Hawes-Geyer TeamMethodology for Development &

Operations

10/18/2007Out-brief to

SOMD/ESMD

02/2007Hawes-Geyer Team Kickoff

Mar Jan

Oct JunJun

2007

Nov

66

Constellation Space Transportation Program

Established a partnership between ESMD and SOMD Post-DDTE Programmatic Structure with authority and

responsibility for: • Program control, including budget, schedule, and program content• Maintaining requirements baseline • Maintaining technical capability to perform systems engineering

within established performance criteria• Maintaining configuration control system and Certification of Flight

Readiness process• Manufacturing and Production of the flight and ground hardware to

support the manifest.• Directing pre-launch processing, launch execution, mission

operations, recovery operations, and turnaround operations• Partnering with ISS Program Customer and Mission Operations

Directorate at the JSC

End State

Constellation Evolution

77

CxPDDT&E

CSTPProduction

and Operations

88

Operations Program Imbeddinginto Development Program

99

Summary

Operations Program Planning established early enough to • Gain Sub-System Sustaining Design Experience• Participate in Flight Hardware Evolution• Create Solid Engineering Relationships

Operations Program Elements imbedded at all critical levels• Sub-system engineering• SE&I Development and Products• Mission Planning and Operations Elements• Program and Program Elements• SMA and Engineering Technical Authority

NASA recognizes the unique demands of pursuing development and operations within Human Space Systems. We have a solid programmatic plan to provide space system operations while developing the next series of exploration Human Space Systems