2
PRESUPUESTO TOTAL ITEM DESCRIPCION I - ETAPA 01 TRABAJOS PRELIMINARES S/. 12,010.32 02 DESMONTAJE Y DEMOLICIONES S/. 56,726.98 03 CONSTRUCCION DE 02 AULAS DE NIVEL INICIAL S/. 130,418.85 04 CONSTRUCCION DE 01 SS.HH. NIVEL INICIAL S/. 47,713.52 05 CONSTRUCCION DE AMBIENTE ADMINISTRATIVO DE NIVEL INICIAL - 2DO PISO S/. 56,373.03 06 CONSTRUCCION DE TALLER DE INDUSTRIA PARA VESTIR S/. 152,994.24 07 CONSTRUCCION DE 01 TALLER DE MANUALIDADES CETPRO (2DO NIVEL ) S/. 116,676.36 08 CONSTRUCCION DE ESCALERAS S/. 24,360.55 09 CONSTRUCCION DE 01 SSHH ALUMNOS S/. 44,230.78 10 CONSTRUCCIÓN DE AMBIENTE DE GUARDIANIA S/. - 11 MEJORAMIENTO Y ACONDICIONAMIENTO DE AMBIENTES EN PABELLÓN 01 S/. - 12 MEJORAMIENTO EN PABELLÓN 02 (COCINA COMEDOR) S/. - 13 MEJORAMIENTO EN PABELLON 03 (02 AULAS DE NIVEL INICIAL INCLUYE SSHH Y PA S/. - 14 MEJORAMIENTO EN PABELLON 04 (02 AULAS DE NIVEL INCIAL INCLUYE SSHH) S/. - 15 MEJORMAMIENTO DE PABELLON 05 (02 AULAS DE REFORZAMIENTO ESCOLAR) S/. 86,800.86 16 MEJORAMIENTO EN PABELLON 06 (AUDITORIO) S/. - 17 CONSTRUCCIÓN DE AREAS DE JUEGOS S/. - 18 CONSTRUCCION DE VIAS DE CIRCULACION S/. 75,303.18 19 CONSTRUCCION DE TANQUE ELEVADO Y TANQUE CISTERNA S/. 84,904.75 20 MEJORAMIENTO DE CERCO PERIMÉTRICO S/. - 21 CONSTRUCCION DE 01 ESCALERA EN NIVEL INICIAL S/. 13,897.83 22 RED DE AGUA, DESAGUIE E INSTALACIONES ELECTRICAS S/. 65,803.42 COSTO DIRECTO S/. 968,214.67 GASTOS GENERALES (10%) S/. 96,821.47 MOBILIARIO Y EQUIPAMIENTO S/. 120,312.25 COSTO DE OBRA ### EXPEDIENTE TECNICO S/. 33,299.51 SUPERVISION (2%) S/. 23,706.97 LIQUIDACION (1%) S/. 11,853.48 ADMINISTRACION (2%) S/. 25,084.17 TOTAL PRESUPUESTO ###

Upload: geo-ronald-arias-m

Post on 11-Jan-2016

1 views

Category:

Documents


0 download

DESCRIPTION

LIQUIDACIONES

TRANSCRIPT

Page 1: CONSOLIDADO EXPEDIENTE TECNICO

PRESUPUESTO TOTAL

ITEM DESCRIPCION I - ETAPA II - ETAPA

01 TRABAJOS PRELIMINARES S/. 12,010.32 S/. 1,980.00 S/. 13,990.32 02 DESMONTAJE Y DEMOLICIONES S/. 56,726.98 S/. 6,213.42 S/. 62,940.40 03 CONSTRUCCION DE 02 AULAS DE NIVEL INICIAL S/. 130,418.85 S/. - S/. 130,418.85 04 CONSTRUCCION DE 01 SS.HH. NIVEL INICIAL S/. 47,713.52 S/. - S/. 47,713.52 05 CONSTRUCCION DE AMBIENTE ADMINISTRATIVO DE NIVEL INICIAL - 2DO PISO S/. 56,373.03 S/. - S/. 56,373.03 06 CONSTRUCCION DE TALLER DE INDUSTRIA PARA VESTIR S/. 152,994.24 S/. - S/. 152,994.24 07 CONSTRUCCION DE 01 TALLER DE MANUALIDADES CETPRO (2DO NIVEL ) S/. 116,676.36 S/. - S/. 116,676.36 08 CONSTRUCCION DE ESCALERAS S/. 24,360.55 S/. - S/. 24,360.55 09 CONSTRUCCION DE 01 SSHH ALUMNOS S/. 44,230.78 S/. - S/. 44,230.78 10 CONSTRUCCIÓN DE AMBIENTE DE GUARDIANIA S/. - S/. 14,865.34 S/. 14,865.34 11 MEJORAMIENTO Y ACONDICIONAMIENTO DE AMBIENTES EN PABELLÓN 01 S/. - S/. 120,205.07 S/. 120,205.07 12 MEJORAMIENTO EN PABELLÓN 02 (COCINA COMEDOR) S/. - S/. 45,450.27 S/. 45,450.27 13 MEJORAMIENTO EN PABELLON 03 (02 AULAS DE NIVEL INICIAL INCLUYE SSHH Y PATIO) S/. - S/. 41,908.13 S/. 41,908.13 14 MEJORAMIENTO EN PABELLON 04 (02 AULAS DE NIVEL INCIAL INCLUYE SSHH) S/. - S/. 40,673.73 S/. 40,673.73 15 MEJORMAMIENTO DE PABELLON 05 (02 AULAS DE REFORZAMIENTO ESCOLAR) S/. 86,800.86 S/. - S/. 86,800.86 16 MEJORAMIENTO EN PABELLON 06 (AUDITORIO) S/. - S/. 61,586.45 S/. 61,586.45 17 CONSTRUCCIÓN DE AREAS DE JUEGOS S/. - S/. 74,654.88 S/. 74,654.88 18 CONSTRUCCION DE VIAS DE CIRCULACION S/. 75,303.18 S/. 3,473.23 S/. 78,776.41 19 CONSTRUCCION DE TANQUE ELEVADO Y TANQUE CISTERNA S/. 84,904.75 S/. - S/. 84,904.75 20 MEJORAMIENTO DE CERCO PERIMÉTRICO S/. - S/. 65,151.03 S/. 65,151.03 21 CONSTRUCCION DE 01 ESCALERA EN NIVEL INICIAL S/. 13,897.83 S/. - S/. 13,897.83 22 RED DE AGUA, DESAGUIE E INSTALACIONES ELECTRICAS S/. 65,803.42 S/. - S/. 65,803.42

COSTO DIRECTO S/. 968,214.67 S/. 476,161.54 S/. 1,444,376.21 GASTOS GENERALES (10%) S/. 96,821.47 S/. 47,616.15 S/. 144,437.62 MOBILIARIO Y EQUIPAMIENTO S/. 120,312.25 S/. - S/. 120,312.25 COSTO DE OBRA S/. 1,185,348.39 S/. 523,777.69 S/. 1,709,126.08

EXPEDIENTE TECNICO S/. 33,299.51 S/. - S/. 33,299.51 SUPERVISION (2%) S/. 23,706.97 S/. 10,475.55 S/. 34,182.52 LIQUIDACION (1%) S/. 11,853.48 S/. 5,237.78 S/. 17,091.26 ADMINISTRACION (2%) S/. 25,084.17 S/. 10,789.82 S/. 35,873.99

TOTAL PRESUPUESTO S/. 1,279,292.52 S/. 550,280.84 S/. 1,829,573.36

TOTAL EXP. TECNICO