    1

    Considerations for windfarm repowering

    New Zealand Wind Energy Conference 2017

  • DNV GL © 2017 12 April 201712 March 2017

    Ungraded

    2

    NEW ZEALAND

    SITUATION

    LIFECYCLE

    STRATEGY

    UNIQUE

    OPPORTUNITES

    INTERNATIONAL

    EXPERIENCE

    ! RISKS

  • DNV GL © 2017 12 April 2017

    0

    100

    200

    300

    400

    500

    600

    700

    800

    1995 2000 2005 2010 2015

    Year

    Cumulative Capacity (MW) Cumulative Units

    0

    100

    200

    300

    400

    500

    600

    700

    800

    1995 2000 2005 2010 2015

    Year

    The NZ opportunity

    3

  • DNV GL © 2017 12 April 2017

    Post Construction Options

    4

    RIP

    DECOMMISSION

    LIFE OPTIMISATION

    REPOWER

  • DNV GL © 2017 12 April 2017

    The Lifecycle Strategy Process

    5

    SITE SUITABILITY

    ANALYSIS

    LIFE ASSESSMENT

    LIFECYCLE OPTIMIZATION

    REMAININGLIFE

    SUITABLE?

    DECOMMISSION

    MODIFY

    NO

    YES

    YES

    NO

    POST CONSTRUCTIONPRE CONSTRUCTION

    REPOWER

    REPOWER?

    NO

    YES

  • DNV GL © 2017 12 April 2017

    The Lifecycle Strategy Process

    6

    Site Conditions

    Operational Data

    Turbine Design

    Inspection Data

    Basic

    • Generic Turbine

    • Met Data

    Advanced

    • SCADA

    • Specific Turbine Model

    • Probabilistic Analysis

    SITE SUITABILITY

    ANALYSIS

    LIFE ASSESSMENT

    LIFECYCLE OPTIMIZATION

    REMAININGLIFE

    SUITABLE?

    DECOMMISSION

    MODIFY

    NO

    YES

    YES

    NO

    POST CONSTRUCTIONPRE CONSTRUCTION

    REPOWER

    REPOWER?

    NO

    YES

  • DNV GL © 2017 12 April 2017

    The Lifecycle Strategy Process

    7

    Economic Parameters

    O&M Inputs

    • Maintenance Strategy

    • SCADA Data

    • Probabilistic Analysis

    • Turbine Specifications

    Retrofits

    Controller Upgrades

    Windfarm Control

    Targeted Inspections

    Operational Modifications

    Site specific upgrades

    SITE SUITABILITY

    ANALYSIS

    LIFE ASSESSMENT

    LIFECYCLE OPTIMIZATION

    REMAININGLIFE

    SUITABLE?

    DECOMMISSION

    MODIFY

    NO

    YES

    YES

    NO

    POST CONSTRUCTIONPRE CONSTRUCTION

    REPOWER

    REPOWER?

    NO

    YES

  • DNV GL © 2017 12 April 2017

    Turbine life gauge

    8

    FULL REPOWER

    Complete decommission and

    replacement

    Includes foundation work

    LIFE EXTENSION

    Certification exercise

    Keep running turbines

    beyond life

    PARTIAL REPOWER

    OR RETROFIT

    Replace specific parts

    Increase gross power capture

    Increase reliability

  • DNV GL © 2017 12 April 2017

    Opportunities

    9

    REPOWERED PROJECTS

    Leverage productive sites

    Improved site/operational knowledge

    Re-use existing services

    Second hand turbine market

    NEW PROJECTS

    Increased production per hectare

    Advanced grid support features

    Increased reliability

    Reduced supply chain risk

    Reduced noise

  • DNV GL © 2017 12 April 2017

    Opportunities

    10

    REPOWERED PROJECTS

    Leverage productive sites

    Improved site/operational knowledge

    Re-use existing services

    Second hand turbine market

    NEW PROJECTS

    Increased production per hectare

    Advanced grid support features

    Increased reliability

    Reduced supply chain risk

    Reduced noise

  • DNV GL © 2017 12 April 2017

    Opportunities

    11

    REPOWERED PROJECTS

    Leverage productive sites

    Improved site/operational knowledge

    Re-use existing services

    Second hand turbine market

    NEW PROJECTS

    Increased production per hectare

    Advanced grid support features

    Increased reliability

    Reduced supply chain risk

    Reduced noise

  • DNV GL © 2017 12 April 2017

    Opportunities

    12

    REPOWERED PROJECTS

    Leverage productive sites

    Improved site/operational knowledge

    Re-use existing services

    Second hand turbine market

    NEW PROJECTS

    Increased production per hectare

    Advanced grid support features

    Increased reliability

    Reduced supply chain risk

    Reduced noise

  • DNV GL © 2017 12 April 2017

    Opportunities

    13

    REPOWERED PROJECTS

    Leverage productive sites

    Improved site/operational knowledge

    Re-use existing services

    Second hand turbine market

    NEW PROJECTS

    Increased production per hectare

    Advanced grid support features

    Increased reliability

    Reduced supply chain risk

    Reduced noise

    Nition1 at English Wikipedia

  • DNV GL © 2017 12 April 2017

    Opportunities

    14

    REPOWERED PROJECTS

    Leverage productive sites

    Improved site/operational knowledge

    Re-use existing services

    Second hand turbine market

    NEW PROJECTS

    Increased production per hectare

    Advanced grid support features

    Increased reliability

    Reduced supply chain risk

    Reduced noise

    Nition1 at English Wikipedia

  • DNV GL © 2017 12 April 2017

    International Experience

    15

    DENMARK

    Premium pricing

    75 MW in 2014

    1.3 GW goal (2012-2020)

    USA

    Possible PTC

    75 MW in 2014

    GERMANY

    Incentives ended 2014

    484 MW in 2015

    (>1 GW in 2014)

  • DNV GL © 2017 12 April 2017

    International Experience

    16

    FOR

    Policy incentives

    Poor greenfield sites

    Fast technology changes

    Strong PPA

    Rising O&M costs

    High cost savings

    Public support

    AGAINST

    Business as usual

    Productive greenfield sites

    Slow technology changes

    Price taker

    Stable O&M costs

    Poor cost savings

    Public opposition

    DENMARK

    Premium pricing

    75 MW in 2014

    1.3 GW goal (2012-2020)

    USA

    Possible PTC

    75 MW in 2014

    GERMANY

    Incentives ended 2014

    484 MW in 2015

    (>1 GW in 2014)

  • DNV GL © 2017 12 April 2017

    Risks – Electrical Balance of Plant

    17

    Collection System

    Collector Substation

    Transmission/

    Tie in Line

    Interconnection Facilities

    CAPABILITY/

    REMAINING LIFE

  • DNV GL © 2017 12 April 2017

    Risks

    18

    AVIAN

    ISSUES

    CAA

    APPROVALS

    COMMUNITY

    IMPACTSOTHER

    REGULATIONS

  • DNV GL © 2017 12 April 2017

    And for the future, optimise from Day 1

    19

    RECORD KEEPING

    Escrow design information

    Create document preservation plan

    ADVANCED MODELLING AND DESIGN

    Site specific designs

    Design Foundations and BOP for 30+

    years

    ADVANCED MONITORING

    Add structural inspections to O&M

    plans

    Digital Twins

  • DNV GL © 2017 12 April 201712 March 2017

    Ungraded

    20

    NZ’s first generation

    of turbines reaching

    end of design life

    Leverage repowering

    opportunities

    ! Plan early to avoid/overcome risk

    Modern turbines

    benefit from lifetime

    optimisation

    Full repowering

    favours replacing

    older technology

  • DNV GL © 2017 12 April 2017

    SAFER, SMARTER, GREENER

    www.dnvgl.com

    21

    [email protected]

  • DNV GL © 2017 12 April 2017

    References

    ▪ DNV GL White Paper on Technical and Contractual Considerations in Partial

    Repowering of Wind Turbines. (2016)

    ▪ DNVGL-SE-0263 Certification of lifetime extension of wind turbines

    ▪ DNVGL-SE-0262 Lifetime extension of wind turbines

    ▪ Lantz et. al, Wind Power Project Repowering: Financial Feasibility, Decision

    Drivers, and Supply Chain Effects. TP-6A20-60535. NREL. (2013)

    ▪ Global Wind Report: Annual Market Update. GWEC. (2016)

    ▪ Global Wind Report: Annual Market Update. GWEC. (2015)

    ▪ Global Wind Report: Annual Market Update. GWEC. (2014)

    22