1User Guide – Conquip Lightweight Manhole Box
Introduction
The Conquip Lightweight Manhole Box is a simple to assemble, two sided trench lining support system designed to be installed by an excavator using the ‘dig and push’ technique, or by simply carrying out the excavation and then lowering each box into place.
The Lightweight Manhole Box is available in approximately 3m length and is generally suitable for trench depths of up to 3m.
Conquip Lightweight Manhole Boxes are manufactured from Grade S275 British and European steel. The equipment is manufactured at our fabrication facility in the UK to the highest manufacturing standards held in the construction industry.
Conquip supply a full range of suitable lifting and extraction chains, edge protection and trench access accessories.
Important Notes
• This User Guide is for the Conquip
Lightweight Manhole Box System only.
Non-standard applications should be
approved by a suitably qualified engineer
• All excavation work must be thoroughly
planned before work commences on
site to identify potential hazards and
assess risk
• All personnel involved in installation
must be properly briefed and supervised
by a competent person
• Any general or specific drawings that
are relevant to the application of this
unit must be read in conjunction with
this User Guide
User GuideUser Guide
Edge Support Trench Lining SystemConquip Lightweight Manhole Box
![Page 2: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/2.jpg)
2User Guide – Conquip Lightweight Manhole Box
Lightweight Manhole Box Specification
Overall length 2989mm
Overall height 2012mm
Width Refer to pages 5-8
Weight 900kg (Excluding Struts)*
Limit state 30kN/m2
design load
Base Box (TL104-00013)
Base Box at minimum extension
Base Box at maximum extension
Overall length 3500mm
Overall height 1301mm
Width Refer to pages 5-8
Weight 660kg (Excluding Struts)*
Limit state 30kN/m2
design load
W
L
H
W
L
H
Extension Box (TL104-00014)
Base Box at minimum extension
Base Box at maximum extension
*For weights of Incremental Struts refer to page 8.
For weights of Variable Struts refer to page 10.
W
L
H
W
L
H
![Page 3: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/3.jpg)
3User Guide – Conquip Lightweight Manhole Box
Base Box Parts Diagram
Lightweight Manhole Box Specification
1
2
Item No. Part No. Description Quantity
1 TL900072 Manhole Side Panel 2
2
See Page 5 Incremental Strut
4
See Page 7 Variable Strut
![Page 4: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/4.jpg)
4User Guide – Conquip Lightweight Manhole Box
Extension Box Parts Diagram
Lightweight Manhole Box Specification
1
2
3
Item No. Part No. Description Quantity
1 TL900073 Manhole Extension Side Panel 2
2
See Page 5 Incremental Strut
2
See Page 7 Variable Strut
3 TL900046 Connecting Bracket 4
![Page 5: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/5.jpg)
5User Guide – Conquip Lightweight Manhole Box
Struts Specification
Incremental Struts to suit Lightweight Manhole Box
No. of Sections
Strut Length Strut Weight Trench Width (External)
Working Width (Internal)
Working Width between ‘C’ sections
Strut Resistance
1 780mm 9.6kg 1992mm 1865mm 865mm 164kN
2 880mm - 1480mm 18.4kg 2092mm - 2692mm 1965mm - 2565mm 965mm - 1565mm 164kN
3 1580mm - 2180mm 27.2kg 2792mm - 3392mm 2665mm - 3265mm 1665mm - 2265mm 164kN
IMPORTANT: The increments between each hole are 100mm.
![Page 6: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/6.jpg)
6User Guide – Conquip Lightweight Manhole Box
Incremental Struts Parts Diagram
Struts Specification
1
4
3
2
5
ITEM NO. PART NAME PART NO With Rockers/QTY. DESCRIPTION
1 TL900041 2 Rocker Assembly
2 TL900042 1120x120 x8mm Strut Section With
Adjustment Holes, Length 780mm
3 TL900043 2 40mm Pin assembly
4 TL900044 3 28mm Pin Assembly
5 TL900047 1100x100x10mm Strut Section
With Adjustment Holes, Length 780mm
C
E
D
FF
C
D
E
3 16 4 27 5
6 5
B
A
78 234 1
B
A
10/02/2017Drawn By: Checked By:
Strut Assembly without RockersDWG No:
Description:
Material: All dims in mm unless otherwise stated
All content belongs to Conquip Engineering Group
Tolerances: 1Unless otherwise stated
8
Date:Part Code:
Notes:
©
Item No. Part No. Description Quantity
1 TL900041 Rocker 2
2 TL900042Strut with Adjustable Holes, Length 780mm
(120x120x8mm)1
3 TL900043 Pin 40mm Ø x 250mm Length 2
4 TL900044 Pin 28mm Ø x 150mm Length 3
5 TL900047Strut with Adjustable Holes, Length 780mm
(100x100x10mm)1
![Page 7: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/7.jpg)
7User Guide – Conquip Lightweight Manhole Box
Struts Specification
Variable Struts
Brace Extension Working Width (bi) Working Width (bc) Trench Width (b) Weight
Without 990mm - 1290mm 1990mm - 2290mm 2200mm - 2500mm 71kg
500mm 1490mm - 1790mm 2490mm - 2790mm 2700mm - 3000mm 91kg
1000mm 1990mm - 2290mm 2990mm - 3290mm 3200mm - 3500mm 102.1kg
1500mm 2490mm - 2790mm 3490mm - 3790mm 3700mm - 4000mm 113.3kg
2000mm 2990mm - 3290mm 3990mm - 4290mm 4200mm - 4500mm 124.4kg
2500mm 3490mm - 3790mm 4490mm - 4790mm 4700mm - 5000mm 135.5kg
![Page 8: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/8.jpg)
8User Guide – Conquip Lightweight Manhole Box
Struts Specification
Variable Struts Parts Diagram
2
6
3
1
5
4
Item No. Part No. Description Quantity
1
TL900006 Strut Extension 500mm
1
TL9000068 Strut Extension 1000mm
TL9000069 Strut Extension 1500mm
TL900007 Strut Extension 2000mm
TL900008 Strut Extension 2500mm
2 TL900004 Standard Spring Plate/Strut Connector 2
3 TL900011 Standard Variable Length Strut 300mm Stroke 1
4 TL900010 Pin Ø40mm x 226mm 2
5 TL900009 Pin Ø20mm x 148mm 3
6 ZZ290006 Retaining R Clip 5mmØ 5
![Page 9: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/9.jpg)
9User Guide – Conquip Lightweight Manhole Box
Original Working Instructions
1.
Using a certified lifting sling connected to the four corner lifting points, lift the panel onto some bearers and using the pins provided connect the rocker assembly to the panel. (As shown in Diagram A)
4.
Connect the sling to the lifting points of the panel facing downwards and lift it into position above the struts.
2.
Place all four struts onto the rockers protruding from the panel facing upwards and secure them using the pins and R-clips supplied. (As shown in Diagram B)
5.
Lower the plate carefully, guiding the runners onto the four upright strut assemblies.
7.
Disconnect the lifting sling connection points from the two lower lifting points and lift the box to the upright working position.
8.
Connect the two free legs of the lifting sling to the upper lifting points of the other panel before lifting the box into the trench.
Assembly Instructions
3.
Then connect the four remaining rocker assemblies to the struts using the 40mm pins and R-clips supplied.
6.
Secure the struts to the panel with the remaining four pins and R-clips. (As shown in Diagram C)
Diagram A Diagram B Diagram C
C
E
D
FF
C
D
E
3 16 4 27 5
6 5
B
A
78 234 1
B
A
13/01/2017Drawn By: Checked By:
Trench Box Standard Kit Assembly InstructionsDWG No:
Description:
Material: All dims in mm unless otherwise stated
All content belongs to Conquip Engineering Group
Tolerances: 1Unless otherwise stated
8
Date:Part Code:
Notes:
©
C
E
D
FF
C
D
E
3 16 4 27 5
6 5
B
A
78 234 1
B
A
13/01/2017Drawn By: Checked By:
Trench Box Standard Kit Assembly InstructionsDWG No:
Description:
Material: All dims in mm unless otherwise stated
All content belongs to Conquip Engineering Group
Tolerances: 1Unless otherwise stated
8
Date:Part Code:
Notes:
©
C
E
D
FF
C
D
E
3 16 4 27 5
6 5
B
A
78 234 1
B
A
13/01/2017Drawn By: Checked By:
Trench Box Standard Kit Assembly InstructionsDWG No:
Description:
Material: All dims in mm unless otherwise stated
All content belongs to Conquip Engineering Group
Tolerances: 1Unless otherwise stated
8
Date:Part Code:
Notes:
©
IMPORTANT: Top extension boxes are to be assembled in the same way but only two struts should be fitted. Extension boxes are secured to the base boxes using connector brackets and pins (see page 11).
![Page 10: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/10.jpg)
10User Guide – Conquip Lightweight Manhole Box
This shows 1 Base Box with 1 Extension Box
Original Working Instructions
Lightweight Manhole Box Assembly Diagrams
IMPORTANT: The Lightweight Manhole Box should only be used as one Base Box and one Extension Box.
![Page 11: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/11.jpg)
11User Guide – Conquip Lightweight Manhole Box
Original Working Instructions
Connector Bracket
The Base Box and extension box are connected via a connector bracket (as shown above Detail D)
The connector bracket will fit within the panel soldier of the base box and is secured using a 40mm pin and R-clip.
The extension box is then placed on top of the Base Box. The protruding connector bracket must lock into the top of the panel soldier of the extension box.
Once in place, insert a 40mm Ø pin through the panel soldier and connector bracket. Secure with an R-clip.
D
DETAIL DSCALE 1 : 8 C
E
D
FF
C
D
E
3 16 4 27 5
6 5
B
A
78 234 1
B
A
18/01/2017Drawn By: Checked By:
3.5m Manhole Box + ExtensionDWG No:
Description:
Material: All dims in mm unless otherwise stated
All content belongs to Conquip Engineering Group
Tolerances: 1Unless otherwise stated
8
Date:Part Code:
Notes:
©
E
DETAIL ESCALE 1 : 8
C
E
D
FF
C
D
E
3 16 4 27 5
6 5
B
A
78 234 1
B
A
18/01/2017Drawn By: Checked By:
3.5m Manhole Box + ExtensionDWG No:
Description:
Material: All dims in mm unless otherwise stated
All content belongs to Conquip Engineering Group
Tolerances: 1Unless otherwise stated
8
Date:Part Code:
Notes:
©
![Page 12: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/12.jpg)
12User Guide – Conquip Lightweight Manhole Box
Original Working Instructions
H – Handling Point
L – Lifting Point
VC – Vertical Connecting Point for connecting base boxes to extension boxes
PC – Panel connector which is used to connect base boxes to extension boxes
Components
BC
F
DETAIL BSCALE 1 : 8
PC
DETAIL CSCALE 1 : 5
L, H
DETAIL FSCALE 1 : 6
VC
C
E
D
FF
C
D
E
3 16 4 27 5
6 5
B
A
78 234 1
B
A
18/01/2017Drawn By: Checked By:
3.5m Manhole Box + ExtensionDWG No:
Description:
Material: All dims in mm unless otherwise stated
All content belongs to Conquip Engineering Group
Tolerances: 1Unless otherwise stated
8
Date:Part Code:
Notes:
©
![Page 13: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/13.jpg)
13User Guide – Conquip Lightweight Manhole Box
Original Working Instructions
Installation Instructions
Extraction
IMPORTANT: Never enter an unsupported excavation.
IMPORTANT: This should be done when the top of the base is approximately. 200mm above ground level.
1. Excavate the ground to approximately 1m or deeper, as ground conditions permit.
2. Lower the box into the trench using a 4 leg chain sling of the correct capacity.
1. Simply reverse the installation process, start by backfilling the trench.
2. Progressively pull the box upwards using a certified 4 leg lifting chain sling .
3. If top extension boxes have been used, these should be disconnected as the joint becomes clear of the ground and then lifted clear before reconnecting the sling to the Base Box and continuing the extraction.
3. The excavator operator then digs progressively between the two faces of the box plates.
4. The operator then uses the back of the bucket of the excavator to push down on the 4 corners of the box in turn.
5. Repeat steps 3 and 4 until the desired depth is reached.
6. When attaching a top extension, these should be attached to the Base Box at each corner, using connectors supplied. Each connector is secured using a pair of pins and R-clips.
IMPORTANT: All personnel involved in installation must wear relevant personal protective equipment.
![Page 14: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/14.jpg)
14User Guide – Conquip Lightweight Manhole Box
Original Working Instructions
Diagram A
Diagram C
Diagram E
Diagram B
Diagram D
Diagram F
Installation Instructions
![Page 15: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/15.jpg)
15User Guide – Conquip Lightweight Manhole Box
Safety Notes
Installation & Transportation
Personnel
Equipment Maintenance & Cleaning
• It is recommended that the box panels extend over the full
height of the dig and are not “flown” above the base of an
excavation unless the box is adequately supported and has
been approved as a safe method of work by a risk assessment
undertaken by a competent person.
• Ensure support is provided over the full height of the dig.
• Pins should face inwards and clips must be correctly fitted.
• It is essential that four panel connectors are used to attach
extension boxes (top boxes).
• When moving the equipment make sure that only lifting points
are used to attach the chains or lifting apparatus.
• When installing the box system push at the corners only.
• When moving or installing equipment always use a banksman.
• Before excavating locate underground services.
• Lay the box horizontal to the ground before excavating.
• When installing the box make sure that it is not excessively
forced into the ground.
• Suitable edge protection must be set-up directly after box
installation, for more details on edge protection and accessories
contact a representative from Conquip Engineering Group.
• It is prohibited to stand within the pivoting range of the
excavator or crane and beneath suspended loads.
• When handling and removing the shoring, pay attention for
overhead contact lines and power cables.
• A load operator must stand to the front of the excavator and
be in eye contact with the machine operator.
• Ensure personnel are not in the box during installation.
• Once installed, operatives must never exit the box into an
unsupported area.
• Never climb on the struts, always use a secured ladder.
• The end-user has a responsibility under LOLER to ensure that all
lifting equipment is fit for use.
• When not in use is it essential that the boxes are stored on flat
stable ground. There is a wind loading risk if in an exposed area.
They can either be stacked on their side or dug into the ground
by at least 0.5m.
• It is imperative that all components are inspected at the start
of every shift.
• Assess the self-weight of equipment correctly and use
appropriately certified lifting equipment to lift and move the
panels and assembled boxes.
• Store assembled boxes on firm, level ground. If this is not the
case, or there is tendency to adverse weather conditions, lay the
boxes flat on their sides.
• Do not store materials on the struts as it could damage them.
![Page 16: Conquip Lightweight Manhole Boxcqegroup.com/uk/wp-content/uploads/sites/5/2017/05/... · above the struts. 2. Place all four struts onto the rockers protruding from the panel facing](https://reader033.vdocuments.us/reader033/viewer/2022050422/5f9142174c3f14202461bbf7/html5/thumbnails/16.jpg)
16User Guide – Conquip Lightweight Manhole Box
Disclaimer
Warranty
The products supplied by Conquip Engineering Group are all
guaranteed by a 12 month warranty.
Apart from where exceptions apply, Conquip Engineering Group
promises to repair or replace any fault which the Company considers
to be due to defective material or workmanship within 12 months of
the date of sale, at no additional cost.
Exceptions include:
• Faults arising from unauthorised alterations
(see modifications section below for full details)
• Damage caused by abuse, neglect, misuse or falling
• Damage caused because of failure to follow transportation,
storage, loading, cleaning or operating instructions
• Replacement or repair of components due to fair wear and tear
• Any consequential damage or wear arising from the use or
fitting of additional or non-standard parts
Conquip Engineering Group will not cover or reimburse any
transportation and/or shipment costs to and from their premises
or their recognised agents, or any material and/or labour costs
for repair, replacement or assessment against a warranty claim.
Conquip Engineering Group and/or their directors, employees,
insurers or recognised agents will not be held liable for
consequential damages, losses or expenses relating to the
inability to use the product correctly for its purpose.
Modifications
If any third-party modifications or alterations, involving drilling,
welding, cutting or distortion of materials in any form, are to be
carried out on the product, Conquip Engineering Group must
provide full written approval prior to the work being carried out.
Alterations, modifications, additions or repairs must be carried out
by Conquip Engineering Group’s recognised distributors, if they are
not carrying out the work themselves.
Conquip Engineering Group operate a continuous improvement
policy and therefore reserve the right to alter technical
specifications and user guide details at any point without notice.