Page 1: Connected Community for Project Visualization, Management and Collaboration

Connected Community for Project Visualization, Management and

Collaboration

Page 2: Connected Community for Project Visualization, Management and Collaboration

Plan for presentation – LIVE DEMO

Plan would be to show live demos – ppt’s just showing what I would show and for others to understand the flows>

1.TCC Site from Dimensions – using base data, renamed and have a Site ready for Con-Expo

2.If we have two monitors – it worked well at Dimensions to show the ppt on one monitor and Live Software on the other. If only one monitor – my preference would be for the live demo

Page 3: Connected Community for Project Visualization, Management and Collaboration

Connected Site Workflow

Page 4: Connected Community for Project Visualization, Management and Collaboration

Communications

Microwave brings Internet onto site Wireless Bridges move Internet access to key

locations Wireless Bridges connect to SNM920’s SNM920’s provide local internet in trailers &

connection to Bullets or Rajants Bullets or Rajants provide WIFI coverage

outside

Page 5: Connected Community for Project Visualization, Management and Collaboration

Communications

Saxnet is an alternative to Microwave for internet Saxnet brings in Internet over cellular Hard wired cable would be a third option for Internet

Page 6: Connected Community for Project Visualization, Management and Collaboration

File Management

Forums

Page 7: Connected Community for Project Visualization, Management and Collaboration

Site Reconnaissance

Where are the existing power and utilities What does the site look like? Where are the vehicle access points? Where will we get internet access? Where will we put our base stations? Which communication tools will we use?

Page 8: Connected Community for Project Visualization, Management and Collaboration

Trailers set up; Communications outlined Ready to get Site Topo’s

Tools available:– Trimble Data Collectors

TSC2s, TSC3’s, Trimble Tablets, TCA1s SCS900 / SCS700 Data Manager

Site Reconnaissance – Follow up

Page 9: Connected Community for Project Visualization, Management and Collaboration

We selected the TCA1 (SCS700, Camera, Trips) Site Topo’s Uploaded Using TCC Sync Used Visual Organizer to Display:

Control Points Designs Work Orders

Using Trip Manager – we took images of control points and/or troublesome areas

Site Images were captured and emailed into the community Enhanced the data using BC-HCE

Site Reconnaissance – Follow up

Page 10: Connected Community for Project Visualization, Management and Collaboration

Display, Review and Share Designs

Site topo’s using TSC2 , TCA1,

Trimble Tablet

SCS700 and Connected Community Sync

Brought in:• Control Points• Designs• Work Orders• Inspections• Site Images

Page 11: Connected Community for Project Visualization, Management and Collaboration

Business Center-HCE Publish Design

Import Data from the SCS900 Create Surface Models Capture 2D Images for Overlay Capture 3D Images Generate Cut and Fill Maps Publish Complete Project for Sharing

to the Connected Community

Page 12: Connected Community for Project Visualization, Management and Collaboration

Cut and Fill

Created in BC-HCE and Published to TCC Weekly Cut and Fill Map Track progress to projections

Page 13: Connected Community for Project Visualization, Management and Collaboration

Tracker: Track Resources, People and Devices

Where are my assets?

Where are the field crews?

What devices are not being used?

Page 14: Connected Community for Project Visualization, Management and Collaboration

Display using the GeoPicture Viewer

Take site photos and upload

Know what your site looks like

Share data with others

Page 15: Connected Community for Project Visualization, Management and Collaboration

Operations Assets and vehicles tracked People and resources tracked – snapshot of where

everyone is located Daily web cams

Top soil removed Cut and fill maps Electrical, power and internet access Tents

Page 16: Connected Community for Project Visualization, Management and Collaboration

VisionLink™

Where are my assets?

What vehicles are not being used?

Can I relocate assets to another project?

Page 17: Connected Community for Project Visualization, Management and Collaboration

Web Cams• Install Web Cams for Site Access

from Back in the Office• Real Time Data Streaming

Page 18: Connected Community for Project Visualization, Management and Collaboration

Thank You