Connect the GridApplying the Tool for Community Solar
Applications Application Entry Stage
![Page 2: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/2.jpg)
Together We Will:
1. Learn to Register a New User Account
2. Understand the CTG Application Process
3. Learn how to use Connect The Grid (CTG) for Community Solar CREF/CSEGS Applications
4. Reach out with feedback, suggestions and questions:
Pepco - DC - [email protected]
Pepco -Maryland- [email protected]
Delmarva MD- [email protected]
Atlantic City Electric- [email protected]
![Page 3: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/3.jpg)
• Connect the Grid is an online portal that will replace existing paper
application and provide an enhance processing experience.
• Exelon has partnered with West Monroe Partners to implement
Connect the Grid (CTG) across all Utilities
• Exelon has selected a best in class partner to ensure an optimal
customer experience for all customers / developers that are seeking to
add renewable energy to the Exelon Grid
• PHI (PEPCO, Delmarva, ACE) utilities has rolled out CTG through the
end of 2019 into 2020 for NEM applications
CTG & West Monroe Partners
![Page 4: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/4.jpg)
Connect The Grid Timeline
Below is the timeline of key activities for accepting CREF/CSEGS Community Solar Applications through CTG.
❖ April 3rd & April 6th – External Stakeholder’s Training sessions
❖ April 10th – All 2020 CREF/CSEGS Community Solar applications
received will be entered in CTG.
❖ Applications that are entered by GPC will appear under the email address
associated with the application.
❖ April 13th – PHI will begin accepting CREF/Community Solar
applications through CTG.
![Page 5: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/5.jpg)
Connect the Grid (CTG)
Net Energy Metering
• Customer already has an established account number.
• No required documents necessary to proceed
with the application.
CREF/CSEGS Community Solar
• New applications will not have an account number. To
process the app, use the generic account number
40000000000 (4 and 10 zeroes)
• When asked, “Is this new construction”, select NO to
proceed with application. (Enhancements to the
system are still in production. Selecting NO will ensure
your application moves forward)
• Pepco MD, Pepco DC, and DPL MD requires specific
CREF/CSEGS Applications or Addendums to be
signed by the Developer to proceed with the
community solar application. These documents can be
located on the My GPC page listed below.
• PHI will begin accepting CREF/CSEGS Community Solar applications through
CTG on April 13th. Entering the applications will be similar to NEM process,
however, there are a few differences.
• Users must be in Chrome for the tool to work correctly.
Delmarva MD
Delmarva DE
Pepco DC
Pepco MD
Atlantic City Electric
![Page 6: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/6.jpg)
How to Register as a Developer• CTG Provides self-service account registration for Developers
to eliminate internal user involvement in external account
registration.
https://phi.connectthegrid.com/#/login/
1. 2.
3.
![Page 7: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/7.jpg)
7
Getting Started Log in Screen
![Page 8: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/8.jpg)
Instructions1. Navigate to the CTG Login Page.
2. Select “No Account Yet? Register Here.” button underneath the submit
button.
3. Complete the required fields and select “submit”.
4. New user will receive an email asking for email confirmation.
5. Once the email has been confirmed, users will be able to successfully
submit applications and receive notifications.
![Page 9: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/9.jpg)
Email Confirmation
![Page 10: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/10.jpg)
Creating a New Application
![Page 11: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/11.jpg)
Creating a New Application
• On the Applications page, click New to Start creating an
application.
![Page 12: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/12.jpg)
Getting An Application Started (Cont)
• A new screen will open to fill out all needed application information. All fields are required.
• In the Project Name field, CREF or CSEGS must be entered. This allows your application to be filtered to the right GPC Team Member.
• For Account Number field, use the generic account number, 40000000000 (4 and ten 0’s)
• Select Intent of Generation and choose Community Energy (Solar) Facility.
• All CREF/CSEGS Community Solar applications will be Level 2 and up.
• Once all information is added to the application click Submit and your application will be sent to a draft status for additional information.
![Page 13: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/13.jpg)
Editing Application
• More information is required after creating
a new application, CTG will bring the user
to the Editing Application page where
their application is in a Draft status.
• Additional fields are required to be filled
out before an application can be
processed. If unsure of required fields
scroll down to the bottom of the form and
click submit. Red boxes with required field
will appear showing the missing fields that
need to be entered.
13
![Page 14: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/14.jpg)
Editing Application (Required Utility Fields)
• Facility Information• Property type
• Is the customer mailing address the same as the facility address Y/N
• Project Contacts• Customer Phone Number (Primary)
• Customer’s email
• Contractor Information• Company Name
• Phone Number
• Email Address
• Electrical Contractor• Company Name
• Phone Number
• Email Address
• Generator Information• PV Panel Manufacturer
• PV Panel Model
• PV Panel Size
• Number of PV Panels
• Inverter 1• Inverter Manufacturer
• AC Rating kw (Max)
• AC Rating KVA
• AC Rated Voltage
• Reverse Power Relay Technology (Y/N)
• Final Questions• Is there a utility taggable, lockable, accessible disconnect (Y/N)
• Is there one line diagram ready to attach (Y/N)
• Is the Site Plan ready to attach (Y/N)
• Upload Part 1 Interconnection Application & Agreement with Signature
14
Here is a list of the Fields required to be filled out in an
Application.
![Page 15: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/15.jpg)
Facility Information
![Page 16: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/16.jpg)
Project Contact Information
![Page 17: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/17.jpg)
Contractor Information
![Page 18: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/18.jpg)
Electrical Contractor
![Page 19: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/19.jpg)
Equipment Information
![Page 20: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/20.jpg)
Generator Information
![Page 21: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/21.jpg)
Inverter Information
![Page 22: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/22.jpg)
• Pepco MD, Pepco DC, and DPL MD requires specific CREF & CSEGS Applications or Addendums to be signed by the Developer to proceed with the community solar application.
– CREF Addendum DC
– CSEGS Pilot Program Application – DC CREF Application & Contract
• Developers can download the required documents via the My GPC webpage, complete the documents and upload them using the Upload Addition File option.
Uploading Required Documents
![Page 23: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/23.jpg)
Terms & Conditions
![Page 24: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/24.jpg)
Payment Calculation & Customer’s Signature
• The last step to filling out an application is to: Upload Part 1 Interconnection
Application & Agreement with Signature
• Then click Submit Application
![Page 25: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/25.jpg)
Submitting the Application
• Once you click Submit, CTG will change the status of the application
from Draft to Submitted
• At this point, the application moves to the GPC team for In Technical
Review.
25
![Page 26: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/26.jpg)
Adding an additional Collaborator
26
![Page 27: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/27.jpg)
Adding an additional Collaborator
• Collaborator: Additional contact that will receive all Status change notifications on the
application
• If developer/contractor email information changed during the interconnection
process, new contact information can be added
27
![Page 28: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/28.jpg)
Adding an additional Collaborator (cont.)
• A new box titled Application Collaborators will open.
28
![Page 29: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/29.jpg)
Adding an additional Collaborator (cont.)
• Click on New to add an email address and then click Add Collaborator
29
![Page 30: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/30.jpg)
Adding an additional Collaborator (cont.)
• Once that is completed the first screen, with your added Collaborator’s email address
updated.
30
![Page 31: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/31.jpg)
CTG: Application Status Dashboard
In progress
Completed successfully Process halted
![Page 32: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/32.jpg)
Fixing Problems
![Page 33: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/33.jpg)
Application Halted Prior to Review
Status: Incomplete, More Information
Required or Denied
Messages section will tell you what is needed to
move the Application forward
Any further questions can go to the My GPC
Team Inbox
Pepco - DC - [email protected]
Pepco -Maryland- [email protected]
Delmarva MD- [email protected]
Atlantic City Electric- CommunitySolarNJ@exeloncorp
![Page 34: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/34.jpg)
Sending Messages
![Page 35: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/35.jpg)
Draft Mode Turns Back on When Application is Halted
Clicking top left corner will
enable you to choose Edit
Application and apply
requested changes
![Page 36: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/36.jpg)
Approval To Install
![Page 37: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/37.jpg)
Approval To Install
Once Approval to Install has been granted, an email is sent. You will now be able to
upload part 2 of the Interconnection Agreement.
You will also receive notification with your Approval to Install to log on to the
Community Solar Portal (CSP) and begin the subscription management process.
![Page 38: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/38.jpg)
Submitting Part 2 – Certificate Of Completions & Final Electrical Inspection Certificate
Status: Approval to Install
Opens up the ability to now submit
Part 2 Documents
Select Forms link from left hand
sidebar of Application’s Dashboard
Navigates to area to upload the
required Part 2 Documents
Upload the Following Part 2
Documents:
Proof of Passed Electrical Inspection
As Built Documents
Certificate of Completion
![Page 39: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/39.jpg)
Ready For Your Meter?
![Page 40: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/40.jpg)
• Once Part 2 of the Interconnection Agreement has been reviewed and applied, PHI will issue the meter request.
• PHI completes the Approval To Operate within the timeframe based on your jurisdiction.
• Status will change to “In service“ and an E-mail with the Counter-Signed Documents will be sent out
Meter Installation Process
![Page 41: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/41.jpg)
Feedback for PHI & Contact Information
• As PHI and our sister Utilities roll out Connect the Grid (CTG) we want
to hear from you.
• Feedback (positive or constructive) is not only encouraged but
necessary as all stakeholders continue to evolve and shape The Grid of
the Future
Pepco - DC - [email protected]
Pepco -Maryland- [email protected]
Delmarva MD- [email protected]
Atlantic City Electric- [email protected]
![Page 42: Connect the Grid - Atlantic City Electric | Atlantic City ......•Connect the Grid is an online portal that will replace existing paper application and provide an enhance processing](https://reader035.vdocuments.us/reader035/viewer/2022071219/6054a44c84e4b70b170493f2/html5/thumbnails/42.jpg)
Questions?