    1

    Ambatovy Operations

  • 8/4/2019 Conference Mining in Tana

    2/13

    Safety Performance of Ambatovy Goal 0

    9 500 000

    worked hours

    without a LTI is a

    record

    Rolling LTI over 52 weeks

    0 12

    0,14

    0,16

    0,18

    0,40

    0,50

    0,60Rolling TRI over 52 weeks

    2010 and 2011

    0,00

    0,02

    0,04

    0,06

    0,080,10

    0,00

    0,10

    0,200,30

    2010 and 2011

    Lost Time Index (LTI) is trending down Today it represents 1800 staff and 2800

    contractors working for Ambatovy on a

    daily basis.

    TRI (Total Recordable Index)stays belowthe value of 0.75, which is a typical

    value within this kind of industry,

  • 8/4/2019 Conference Mining in Tana

    3/13

    HS training A key element for a successful start-up

    HS training program scope :

    o 35 modules identified,

    o 13 full time trainers for the delivery

    2010 was a key transition year for HS

    training (more than 10000 persons

    trained) :

    o General safety inductiono Permit to work

    o Confined space entry

    3

    ERT trained by internationalexperts to :

    o Basic fire-fighting,

    o High angle rescue,

    o Hazardous materialsresponse

  • 8/4/2019 Conference Mining in Tana

    4/13

    Ambatovy Project Components

    A mine and ore

    plant

    A 220 km slurry

    pipeline A refinery at

    4

  • 8/4/2019 Conference Mining in Tana

    5/13

    Auxiliary Plants and Infrastructure

    Port bulk handling system Ammonia Stora e

    Hydrogen Plant Air Separation Plant Water Treatment Powerhouse

    Sulphuric Acid Plants

    5

  • 8/4/2019 Conference Mining in Tana

    6/13

    Inputs and Outputs

    Raw materials

    .600,000 t/y Sulphur

    450,000 t/y Coal

    60,000 t/y Ammonia

    60,000 t/y Nickel

    5,600 t/y Cobalt

    210,000 t/y Ammonium Sulphate

    6

  • 8/4/2019 Conference Mining in Tana

    7/13

    The Process

    Ore

    Pressureleach

    Sulphuric acid

    H2S

    Refinery

    7

    Hydrogen

    Ammonia Nickel Metal

    Cobalt Metal

  • 8/4/2019 Conference Mining in Tana

    8/13

    CORPORATE SOCIAL RESPONSABILITY

    Ambatovy is an active member of the community

    5 priority sectors: health, education, small infrastructure, SMME development,

    Various donations: renovation and expansion of educational institutions, publicoffices, school materials

    SOCIAL INVESTMENTS:

    Education (CPRS): training for principals, grantsMedical equipment donations (with Project CURE and Ministry of Health): 5containers carrying devices valued at US$2.5 million

    DEMOBILIZATION :Assistance Initiative for Demobilized worker (AIDE) : monthly allowance paid to

    demobilized workers on the construction of Ambatovy

    Capacity building ( Agricultural Training Center)

    Opportunities for income-generating activities (such as the CAM, uniform, etc.)

    8

  • 8/4/2019 Conference Mining in Tana

    9/13

    ENVIRONMENTAL PROGRAM

    Committed to the highest international standards:strict compliance with national and internationalregulations

    Conservation efforts aimed at achieving no net lossin biodiversity and hopefully a net gain

    Ambatovys Biodiversity Management Plan has a

    Compensation Program based on the Business andBiodiversity Offset Program (BBOP) Standards

    Close collaboration with national and internationalNGOs: Vahatra, World Conservation Societ , Missouri

    Botanical Gardens, etc. Independent biodiversity monitoring by the

    Malagasy government, Scientific Advisory Committeeand independent engineers reporting to the lenders

    9

  • 8/4/2019 Conference Mining in Tana

    10/13

    HUMAN RESOURCES / TRAINING

    Direct jobs: aim 85% Malagasy

    Construction: 20,000+

    ,

    Thousands of indirect and induced jobs forlocals : Transportation, services, etc.

    Priority for local recruitment: preference toqualified personnel that are from nearbycommunities (local economic benefits and inflationreduction

    Succession planning: preparation ofMalagasies to replace foreign workers inOperations; Ambatovy Training Center Programme of Technical Excellence (PEXT)

    10

  • 8/4/2019 Conference Mining in Tana

    11/13

    Procurement Team

    Objective of Ambatovy Supply Chain Team:

    To procure goods and services required by the Project, ensuring we meet

    and exceed clients expectations in terms of costs, delivery, and quality.

    Searching for local and national suppliers who meet this criteria Developing small and medium companies in close collaboration with

    the Ambatovy Local Business Initiative (ALBI)

    Our mandate

    respond adequately to Ambatovys requirements and criteria oncompetitiveness.

    We can be reached at: www.ambatovy.com, supplier section

  • 8/4/2019 Conference Mining in Tana

    12/13

    Local Business Initiative

    2010 YTD Purchasing Volume 2010 YTD Number of Suppliers

    $ Local; 57%

    $International;

    43%

    -

    # Suppliers -Local; 79%

    # Suppliers -Int'l; 17%

    -

    12

    Business with 430 suppliers in Madagascar: $83 millions USD in 2010

  • 8/4/2019 Conference Mining in Tana

    13/13

    Current Status

    Pre start testing of Ore Preparation plant complete

    , Plant site Water treatment, some utilitiesoperational

    First unit of Powerhouse being Commissioned First shipment of coal has been unloaded and

    rans erre o e s e y ra First nickel production in summer 2011

    13