    CONCRETE BATCH PLANTS

    Uur KARAHAN

    2010706030

    CE 579GRADUATE SEMINAR

    Prof. Dr. S. Semih TEZCAN

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    2/23

    What is Concrete?

    The Concrete Production Process at aStationary Batch Plant

    Environmental Objectives and Performanceof Batch Plants

    Classifications of Batch Plants

    Agenda

    Batch Plant Certification

    04.05.2012 2

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    3/23

    WHAT IS CONCRETE?

    Concrete is manufactured by mixingcarefully controlled proportions ofportland cement, coarse aggregates(gravel, crushed stone or slag), fine

    aggregates (sand) and water.

    04.05.2012 3

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    4/23

    BATCH PLANTS

    Concrete batch plants are used in thepreparation of ready mixed concrete. Such

    plants typically include a supply ofcement, water, aggregates and admixtures.At the batch plant these mix ingredientsare measured by either mass or volume

    and introduced in the mixer. To produceconcrete of uniform quality, the

    ingredients must be measured accuratelyfor each batch.

    04.05.2012 4

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    5/23

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    6/23

    Portable Plants

    Portable plants as the namesuggests are able to berelocated relatively easily.In general, they have a

    cement silo and anoverhead bin for one or twoaggregates. They typicallymove to the constructionsite in cases where thedistance the trans-mixershave to travel is too far.

    Classification By Mobility

    These plants operate from the same location for arelatively long period of time.

    04.05.2012 6

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    7/23

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    8/23

    Central Mixing or Wet Batching

    The dry batch process differsfrom wet batching only in thatthe constituent materials areweighed and then discharged

    "dry" into the drum of thevehicle used to transport themix.

    Classification by Mix

    Water and any admixture are addedsimultaneously with the dry materials, and then

    the mixing process takes place in the transportvehicle.

    04.05.2012 8

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    9/23

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    10/23

    Shrink Mixed Concrete

    Concrete that is partially mixed in a plant mixerand then discharged into the drum of the truckmixer for completion of the mixing is calledshrink mixed concrete. The amount of mixing that

    is needed in the truck mixer varies and should bedetermined via mixer uniformity tests. Generally,about thirty turns in the truck drum, or about twominutes at mixing speed, is sufficient to

    completely mix shrink-mixed concrete.

    Classification by Mix

    04.05.2012 10

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    11/23

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    12/23

    THE CONCRETE PRODUCTION PROCESS AT

    A STATIONARY BATCH PLANT

    04.05.2012 12

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    13/23

    THE CONCRETE PRODUCTION PROCESS AT

    A STATIONARY BATCH PLANT

    04.05.2012 13

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    14/23

    ENVIRONMENTAL OBJECTIVES ANDPERFORMANCE OF BATCH PLANTS

    Batch plant operators should be cognizant ofthe environmental impact of their plants. At a well-managed concrete production plant, the main areasof environmental significance are kept under

    constant review to ensure that local and nationallaws are being followed.

    04.05.2012 14

    External appearance:

    The aim here is to ensure that plant

    operations are landscaped and screened from thesurrounding industrial, commercial, residential orrural community so that the impact on the localenvironment is reduced.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    15/23

    ENVIRONMENTAL OBJECTIVES ANDPERFORMANCE OF BATCH PLANTS

    Traffic Control and Cleanliness:

    The aims here are to ensure that traffic will

    avoid sensitive areas, vehicles are maintained in aclean condition and that concrete spillage on publichighways is avoided.

    04.05.2012 15

    Plant, office buildings and staff facilities:All buildings, plant and machinery are to be

    maintained regularly and repaired as necessary.Office buildings are cleaned and cared forinternally and have adequate toilet facilities forstaff and visitors.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    16/23

    ENVIRONMENTAL OBJECTIVES ANDPERFORMANCE OF BATCH PLANTS

    04.05.2012 16

    Dust Control:Batch plant operators must use

    appropriate technology to ensure that dustemissions are in line with local and nationalregulations. Where required, dust monitoringshould be undertaken for environmental, healthand safety purposes. Guidelines should beprovided to staff on the procedures that must befollowed to reduce dust production. The batch

    plant can also be retrofitted with filters and otherequipment to reduce the amount of dust thatescapes from both cement and aggregates in the

    batching process.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    17/23

    ENVIRONMENTAL OBJECTIVES ANDPERFORMANCE OF BATCH PLANTS

    Water management:

    Here the aims are to improve the quality ofeffluent discharge, reduce volumes of discharge,and restrict water usage and wastage.Procedures should be adopted for controlling theuse and wastage of water at the plant.

    04.05.2012 17

    Noise and vibration:Batch plant operators should try to

    ensure that plant, vehicle noise and vibrations arekept to a minimum. This can be achieved througheither plant design or the use of appropriatetechnology.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    18/23

    ENVIRONMENTAL OBJECTIVES ANDPERFORMANCE OF BATCH PLANTS

    Waste management:

    The goal here is to introduce procedures andworking practices which reduce the production ofwaste. In cases where waste production cannot beavoided, the plant operator should try to provideenvironmentally sound treatment and disposal

    methods or find markets for its use as a resource.04.05.2012 18

    Fuel, oil and admixture storage:The goal here should be preventing the

    pollution of surrounding surface and groundwaters from accidental spillage of fuel, oil oradmixtures from storage tanks either above or

    below grade. Routine inspections are to be made forleaks or spillage from these storage facilities.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    19/23

    ENVIRONMENTAL OBJECTIVES ANDPERFORMANCE OF BATCH PLANTS

    04.05.2012 19

    Communication:

    Employees should be fully aware of theirresponsibility to the environment. All employeesshould receive training to increase their awareness

    of their responsibility to the environment. Theyshould also be encouraged to give high priority tosite care and good housekeeping.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    20/23

    BATCH PLANT CERTIFICATION

    04.05.2012 20

    To achieve certification, a licensed

    professional engineer must inspect each plant forcompliance with the requirements of a designatedchecklist. Certification goes beyond the workings ofthe actual plant, covering proper aggregate storage

    to avoid contamination, water for batching,admixtures, etc.

    Scale calibration is very important, andcertification requires the scales to be accurate

    within 0.20% of scale capacity throughout therange of measurement. Certification also extendsto record keeping and proper ticketing for eachload.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    21/23

    BATCH PLANT CERTIFICATION

    04.05.2012 21

    Specifications for Ready Mixed Concrete:

    *all pertinent information must be on eachload ticket,

    *such as the mix number,

    *the truck number,

    *the job address,

    *the name of the contractor or purchaser,

    *the time the truck was loaded,

    *the mix design being supplied with adescription, etc.

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    22/23

  • 8/12/2019 Concrete Batch CONCRETE BATCH PLANTSPlants

    23/23

    QUESTIONS & VISIONS