coms nodal commercial systems project update cops meeting may 2007 by bill barnes and justin...
TRANSCRIPT
COMSNodal Commercial Systems Project Update
COPs MeetingMay 2007By Bill Barnes and Justin Rasberry
2Texas Nodal2
Agenda
Item Purpose Presentor
Requirements Update For Information Bill Barnes
Mini-Market Update For Information Bill Barnes
Mini-Market Update For Information Bill Barnes
Delivery Schedule Update For Information Justin Rasberry
Questions For Information Bill and Justin
3Texas Nodal3
COMS Requirements Update
ERCOT is currently syncing all projects to the March 2007 Protocols and a
number of NPRRs and whitepapers (termed Baseline 1).
The baseline sync is needed to make sure all projects can communicate data
appropriately with one another
Future baselines will be coordinated by ERCOT
COMS Requirements will be updated to Version 1.1 based on Baseline 1 and
submitted to TPTF for review and approval.
All associated documentation (use cases, CSDs, test cases, etc) will be updated
as Business Requirement updates are approved
COPs personnel should review updates to COMS requirements to stay abreast
on changes to Protocol rules.
4Texas Nodal4
COMS Requirements Update
The following COMS Requirements are being submitted to TPTF as version 1.1: AIEC
DAM, 3 documents -- Energy, AS, and Make Whole
RUC
Eligibility
Statements and Invoices, 2 documents
Financial Transfer
Real Time Operations, 6 documents – AS, Energy, Voltage, Emergency Operations, RMR,
and Black Start
Registration
The following COMS requirements version 1.1 will be submitted at a later date Disputes – only after COPs has solidified changes to section 9
Data Aggregation –after SDAWG discussion and decision in May 2007
CRR Requirements – May 2007 due to significant changes in CRR sections
CMM – May 2007 based on revised detailed design, NPRR review
Verifiable Cost – May 2007
Extracts – will be updated within EDW project
5Texas Nodal5
COMS Use Case Update
ERCOT has created Use Cases to help describe the business process for
specific aspects of Settlements Use Cases were created by both IT and business to generate a common
understanding for delivery Use Cases will be linked to Protocols and Requirements in Req Pro and also to
test cases and test scripts in order to trace testing and functionality
management Use Cases will also be related to SoSa (System of System Architecture) and end
to end test cases Use Cases will have both the “positive” and alternative conditions (also termed
“negative conditions”) Use Cases will be updated (eg. version 1.1 etc) as the project moves forward to
align to Requirements and other work products
6Texas Nodal6
COMS Use Case Update
COMS Functional Area Number of Use Cases
AIEC 5
Black Start 2
CRR Revenue Dispursement, Balancing, DAM, and RT
35
DAM – Energy, AS, and Make Whole 19
Data Aggregation 13
Emergency Operations 2
Eligibility 8
Financial Transfer and Late fees (GUI and Process)
22
RMR 5
Real time AS and Energy 29
RUC 18
Registration 5
Statements and Invoices 13
Voltage Support 3
Verifiable Costs 2
Global 1
Disputes 6
Credit Monitoring and Management (CMM)
In requirements Document
Total of 188 Use Cases
A number of use cases have been updated to reflect Requirements version 1.1. The version number will be listed with the use case.
Interface use cases will be within IDA or interface team (End to End)
7Texas Nodal7
Mini-Market and Simple Illustrative Examples
Mini-Market = Pool of hypothetical market data Used to create simple illustrative examples of the nodal settlement formulas
First version will not include CRR settlements
Includes:Simple Network ModelSample of ERCOT Market Participant Demographic
Load and Generation QSELoad only QSEGeneration only QSETrading only
Cross section of ERCOT generation resource typesVarious market activities and deployments
All data will mocked up, but realistic Solely for settlement demonstration purposes only, Protocols Rule
Formulas may change due to NPRRs Actual implementation may deviate from examples
Examples will be shared with Market Participants
8Texas Nodal8
Development Update
Completed CSDs for all Commercial Operations areas Updating CSDs to Version 1.1 based on Requirements Version 1.1. Should be
complete by June 2007
Detailed Design on task Should have drafts of Detailed Design documents by 2Q2007
Functional Decompositions completed in April 2007 on base coding
Lodestar version 4.7 successfully delivered in April 2007 Code base which will be used to build Nodal
Working with Lodestar on installation scripts
Lodestar metadata changes version 1 submitted April 2007 Significant number of new tables and columns submitted to support Nodal
Future changes will be tracked through version control
Plan to start unit testing as early as Summer 2007 to meet EDS timeline Initial testing at the Modular level and will “build up” to batch
9Texas Nodal9
Development Update
Most build packages consists of multiple modules Modules aligned into business functional components (i.e. DAM Energy,
DAM AS, CRR, etc.)
Target FAT completion by mid 4th quarter 2007 Target SAT completion by early 1st quarter 2008 Currently, Lodestar S&B slated for EDS 3 & 4
Statements and Invoice format for EDS 3 Shadow Settlements EDS 4 (requires Extracts)
Settlements Go Live with 1st CRR auction
2007 2008
APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB
Build & Unit TestFATSAT
10Texas Nodal10
Question ??