computation sheet effective dec 1 2008 (2)

2
Note: This template is not applicable to Boni Heights, Villa Alegre and Woodland Hills and those projects under promo StudioUnit A In House Div1 StudioUnit B In House Div2 DATE 07/30/10 ( automatic basedoncomputer systemdate) Regular Unit In house Div3 RESERVATIONDATE ParkingSlot BUYER Ebrokers ADDRESS International PROJECT Corporate TYPE Regular Unit Pick from dropdown list BUILDING UNIT no./ PS No. AREA sqm RFO DATE NO. OF MONTHS TO RFO ( input number of months up to completion or 0 if RFO) LIST PRICE AGENT NAME/SM/PSM Joseph Dungca Sales Channel** 5 ebrokers Issue PDCs? 1 ( encode 1= yes, 2= no) Local buyers are REQUIRED to issue PDCs Spot cash payment? 2 ( encode 1= yes, 2= no) (Spot cash discount will be automatically computed) Closing Fees: Payable in 4 terms (1= cash, 2= dp period, 3=lumpsum at RFO, 4=terms) ** for sales channel please input the following numbers: 1 for international division 2 for in house division 1 3 for in house division 2 4 for in house division 3 5 for e-brokers Input Data on yellow fields only DMCI HOMES PRICING SCHEME EFFECTIVE APRIL 30, 2008 For RFO and Non RFO CASH TERM: DISCOUNT 100% CASH 10% Non Cash terms: Downpayment: Discount: Terms: Int % Factor Int % Factor Int % Factor Int % Factor 1 Year 0% 0% 0% 0% 2 Years 9.0% 4.568474% 9.0% 4.568474% 9.0% 4.56847% 9.0% 4.568474% 3 Years 11.0% 3.273872% 10.5% 3.250244% 10.0% 3.22672% 9.5% 3.203295% 4 Years 12.0% 2.633384% 11.5% 2.608901% 11.0% 2.58455% 10.5% 2.560338% 5 Years 14.0% 2.326825% 13.0% 2.275307% 12.0% 2.22444% 11.0% 2.174242% 10 Years 19.0% 1.866724% 17.0% 1.737977% 16.0% 1.67513% 15.0% 1.613350% Balance thru: A. In House Financing ( using above factor) B. Bank Financing c. Cash Upon Turnover /RFO Discount 10-10-80 UCPB Special 2% Notes: 1. For DP more than 40%, the applicable discount and factor rates shall be based on 40% DP also. 2. Minimum DP for Regular Bank Financing is 20% 3. Downpayment -- payable in CASH for RFO units. If NON RFO, can be paid in equal monthly payments during construction period, INTEREST FREE. 4. 100% CASH -- payable 30 days after reservation date if RFO. If NON RFO, can be paid in equal monthly payments during construction period, INTEREST FREE 5. SPOT CASH payment during construction period is entitled to additional discount depending on the remaining months to complete the unit ( see attached) 10% 20% 30% 40% 2% 3% 4% 5% ADDITIONAL DISCOUNT FOR SPOT CASH PAYMENT DURING CONSTRUCTION PERIOD ( FOR NON RFO) # OF MONTHS Discount TO COMPLETE 30 10.00% For projects with more than 30 months construction period, applicable discount shall be maximum of 10% 29 9.50% 28 9.25% Above is applicable to any spot cash payments during construction period. In the case of spot downpayment or partial cash payments, 27 9.00% In the case of spot downpayment or partial cash payments during construction period, the additional discount shall be applied 26 8.50% on the "cash" portion only 25 8.25% 24 8.00% 23 7.50% 22 7.25% 21 7.00% 20 6.50% 19 6.25% 18 6.00% 17 5.50% 16 5.25% 15 5.00% 14 4.50% 13 4.25% 12 4.00% 11 3.50% 10 3.25% 9 3.00% 8 2.50% 7 2.25% 6 2.00% 5 1.50% 4 1.25% 3 1.00% 2 0.50% 1 0.25%

Upload: megan-kristine

Post on 29-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 1/44

cable to Boni Heights, Villa Alegre and Woodland Hills

promoStudio Unit A In House Div 1

Studio Unit B In House Div 2

atic based on computer system date) Regular Unit In house Div 3

Parking Slot

E brokers

International

Corporate

m dropdown list

number of months up to completion or 0 if RFO)

se 1 = yes, 2 = no)

uyers are REQUIRED to issue PDCs

e 1 = yes, 2 = no)

ash discount will be automatically computed)

h, 2= dp period, 3=lumpsum at RFO, 4=terms)

Page 2: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 2/44

r Int % Factor Int % Factor Int % Factor

0% 0% 0%

4% 9.0% 4.568474% 9.0% 4.56847% 9.0% 4.568474%

2% 10.5% 3.250244% 10.0% 3.22672% 9.5% 3.203295%

4% 11.5% 2.608901% 11.0% 2.58455% 10.5% 2.560338%

5% 13.0% 2.275307% 12.0% 2.22444% 11.0% 2.174242%

4% 17.0% 1.737977% 16.0% 1.67513% 15.0% 1.613350%

ount and factor rates shall be based on 40% DP also.

20%

units. If NON RFO, can be paid in equal monthlyREST FREE.

vation date if RFO. If NON RFO, can be paid in equal monthly

REST FREE

eriod is entitled to additional discount depending on the remaining

)

20% 30% 40%3% 4% 5%

Page 3: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 3/44

T

or projects with more than 30 months construction period, applicable discount shall be maximum of 10%

Above is applicable to any spot cash payments during construction period. In the case of spot downpayment or partial cash payments,

n the case of spot downpayment or partial cash payments during construction period, the additional discount shall be applied

n the "cash" portion only

Page 4: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 4/44

eff December 1, 2008 

PUTATION SHEET

RFO DATE: Jan-00

No. of Months to RFO: 0

Unit t pe Re ular Unit 

Unit Closing fees Total

terms

0% - 

% - - 

% - 

-  n/a # VALUE! #VALUE!

20,000.00   

(20,000.00) #VALUE!

¨ ©

,© © ©

.© ©

  ¦

 

 /

vation f ee  is   !

  " # $ % & ' ( "

 and  valid  f o r ) 0

 days  only .3 " ( ( & 1

I!

 o f r ese r vation . (4

lease  r e f e r to  

ese r vation  &

gr eement  f o r 

Start  of DP / MA

eve r y  7t h o f t he  mont h

eve r y  15t h o f t he  mont h

eve  r y 22n d o f t he  mont h 

#eve  r y 22n d o f t he  mont heve  r y  30t h o f t he  mont h ( o r 28 t h i f 

#

eb r ua r y) 

e  do c uments  a r e  submitted  w it hin  1

HI 1

Y() 0

)  days  fr om r ese r vation  date 

4 ! 1

 % & 1 " %

 3 " 34 ! 1

 % & 1 " %

 3 " 3

ax ,1

r ans f e r #

ees ,

egist r ation  #

ees , nota r ial  and  

dminist r ative  and handling f ees  in  o r de r to  t r ans f e r 

e  assesed  o f Joining f ees ,2

e r al c o  deposit , w ate r mete r 

the r cha r ges .

ented  p r io r to  tu r nove r o f unit .

may change  based  on  t he  f inal c onst r u c tion  d r a w ings 

0   Signatu r e  ove r p r inted  name 

Josep  h%

ung c a 

Si natu r e  ove r r inted  name  

el eb r oke r s 

Page 5: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 5/44

Page 6: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 6/44

Page 7: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 7/44

Page 8: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 8/44

Page 9: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 9/44

Page 10: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 10/44

Page 11: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 11/44

Page 12: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 12/44

Page 13: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 13/44

Page 14: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 14/44

Page 15: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 15/44

Page 16: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 16/44

Page 17: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 17/44

Page 18: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 18/44

Page 19: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 19/44

Page 20: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 20/44

Page 21: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 21/44

Page 22: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 22/44

Page 23: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 23/44

Page 24: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 24/44

Page 25: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 25/44

Page 26: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 26/44

Page 27: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 27/44

Page 28: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 28/44

Page 29: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 29/44

Page 30: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 30/44

Page 31: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 31/44

Page 32: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 32/44

Page 33: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 33/44

Page 34: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 34/44

Page 35: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 35/44

Page 36: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 36/44

Page 37: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 37/44

Page 38: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 38/44

Page 39: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 39/44

Page 40: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 40/44

eff Dec 1, 2008

010

COMPUTATION SHEET

900

0

0

0

0 RFO DATE: Jan-00

- 0

- s m Unit T e Re ular Unit

% Upon turnover

S NOT APPLICABLE TO RFO UNITS

Unit Closing fees Total

terms

#

LUE!

#V

!

00% #

ALUE!

& '

ALUE! 4.5%& '

ALUE!& '

ALUE!

0% #VALUE!0% #VALUE!

00% #VALUE!

#VALUE!

20,000.00 #VALUE!

4 5

6

4 5

6 - C 4 5

6

4 5

6  

T 4 5

ALUE!U 8 V

W 4 5

ALUE!4 5

ALUE!

4 5

ALUE!4 5

ALUE!

#VALUE! - 4 5

ALUE!

4 5

ALUE!

4 5

ALUE!

4 5

ALUE!

fee is NON REFUNDABLE and valid for 30   days only. Failure to submit required documents

te: Start   of DP / MA

every 7th of  the month

 every 7th of  the month

every 15th of  the month

every 22nd of  the month

st every 30th of  the month ( or 28th if February)

  

e docum ents ar e su b mitt ed w it h in  t h i r ty  (30) d a ys  fr om  r es erva tion  d a t e

mentary Stamp Tax, Transfer Fees, Registration Fees, notarial and documentation fees

strative and s 

andling fees in order to transfer title to buyer's name

er, buyer will be assesed of Joining fees, Meralco deposit, water meter deposit  s 

 s 

 s 

 s 

.

may c s 

ange based on t s 

e final construction drawings

0

Signat

ure over  print

ed nau

e/ dat

e signed

Josepv Dungw

a

Signat ure over  prin t ed na u e / da t e signed

ebr  oker s

Page 41: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 41/44

Page 42: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 42/44

eff Dec 1, 2008

010

COMPUTATION SHEET

900

0

0

0

0 RFO DATE: Jan-00

- 0

- s m Unit T e Re ular Unit

% Upon turnover

S NOT APPLICABLE TO RFO UNITS

Unit Closing fees Total

terms

% - 

00% -  

-  4.5"

- - 

0% - 0% - 

00"

20,000.00 (20,000.00) 

) ) - 6

, .  ) ) - 

0F

- G 1 H

I

#DIV/0! #DIV/0!

- - 

- - 

- - - - 

fee is NON REFUNDABLE and valid for 30   days only. Failure to submit required documents

te: Start   of DP / MA

every 7th of  the month

 every 7th of  the month

every 15th of  the month

every 22nd of  the month

st every 30th of  the month ( or 28th if February)

  

e docum ents ar e su b mitt ed w it h in  t h i r ty  (30) d a ys  fr om r es erva tion  d a t e

mentary Stamp Tax, Transfer Fees, Registration Fees, notarial and documentation fees

strative and e 

andling fees in order to transfer title to buyer's name

er, buyer will be assesed of Joining fees, Meralco deposit, water meter deposit  e 

 e 

 e 

 e 

.

may c e 

ange based on t e 

e final construction drawings

0

Signaf

ure over  prinf

ed nag

e/ daf

e signed

Joseph Dungi

a

Signaf ure over  prinf ed na g e / da f e signed

ebr  oker s

Page 43: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 43/44

eff Dec 1, 2008

010

COMPUTATION SHEET

900

0

0

0

0 RFO DATE: Jan-00

- 0

- s m Unit T e Re ular Unit

% Upon turnover

S NOT APPLICABLE TO RFO UNITS

Unit Closing fees Total

terms

% - 

00% -  

-  4." #

- - 

0% - 0% - 

00#

20,000.00 (20,000.00) 

0 0 - 7

, .  0 0 - 

0G

- H 2 I

P

#DIV/0! #DIV/0!

- - 

- - 

- - - - 

fee is NON REFUNDABLE and valid for 30   days only. Failure to submit required documents

te: Start   of DP / MA

every 7th of  the month

 every 7th of  the month

every 15th of  the month

every 22nd of  the month

st every 30th of  the month ( or 28th if February)

  

e docum ents ar e su b mitt ed w it h in  t h i r ty  (30) d a ys  fr om r es erva tion  d a t e

mentary Stamp Tax, Transfer Fees, Registration Fees, notarial and documentation fees

strative and f 

andling fees in order to transfer title to buyer's name

er, buyer will be assesed of Joining fees, Meralco deposit, water meter deposit  f 

 f 

 f 

 f 

.

may c f 

ange based on t f 

e final construction drawings

0

Signag

ure over  pring

ed nah

e/ dag

e signed

Josepi Dungp

a

Signag ure over  pring ed na h e / da g e signed

ebr  oker s

Page 44: Computation Sheet Effective Dec 1 2008 (2)

8/9/2019 Computation Sheet Effective Dec 1 2008 (2)

http://slidepdf.com/reader/full/computation-sheet-effective-dec-1-2008-2 44/44

eff Dec 1, 2008

010

COMPUTATION SHEET

900

0

0

0

0 RFO DATE: Jan-00

- 0

- s m Unit T e Re ular Unit

% Upon turnover

S NOT APPLICABLE TO RFO UNITS

Unit Closing fees Total

terms

% - 

00% -  

-  4." #

- - 

0% - 0% - 

00#

20,000.00 (20,000.00) 

0 0 - 7

, .  0 0 - 

0G

- H 2 I

P

#DIV/0! #DIV/0!

- - 

- - 

- - - - 

fee is NON REFUNDABLE and valid for 30   days only. Failure to submit required documents

te: Start   of DP / MA

every 7th of  the month

 every 7th of  the month

every 15th of  the month

every 22nd of  the month

st every 30th of  the month ( or 28th if February)

  

e docum ents ar e su b mitt ed w it h in  t h i r ty  (30) d a ys  fr om r es erva tion  d a t e

mentary Stamp Tax, Transfer Fees, Registration Fees, notarial and documentation fees

strative and f 

andling fees in order to transfer title to buyer's name

er, buyer will be assesed of Joining fees, Meralco deposit, water meter deposit  f 

 f 

 f 

 f 

.

may c f 

ange based on t f 

e final construction drawings

0

Signag

ure over  pring

ed nah

e/ dag

e signed

Josepi Dungp

a

Signag ure over  pring ed na h e / da g e signed

ebr  oker s