Page 1: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

COMPULSORY PRE-BID MEETING

Page 2: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

AGENDA

WELCOME & INTRODUCTION

PRESENTATION

INDUCTION SESSION

SITE VISIT

QUESTION & ANSWER SESSION

SIGNING OF SITE INSPECTION CERTIFICATE (FORM 7.8)

CLOSURE

Page 3: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

1. SCOPE OF WORK

Page 4: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

1.1 Electrical Installation

NEW INTERNAL LIGHTING (HEIGHT – 10m, 250 LUX) REPARATION OF EXISTING TASK LIGTHING

- INSTALL EMERGENCY LIGTHING / SIGNAGE ON ESCAPE ROUTES/STAIRCASES (0.3 LUX)- INSTALL EXTERNAL LIGHTS (NORTHERN / WESTERN / SOUTHERN AREAS – 36 UNITS)- INSTALL NEW DISTRIBUTION BOARD FOR ROOF SERVICES- RE-ROUTE ALL EXISTING CABLING ON THE EXISTING WESTERN WALL- REPLACE COOLING TOWER SUPPLY AND CONTROL CABLING - EXTEND EXISTING COMPRESSOR POWER SUPPLY - NEW SUPPLY TO NEW FRESH AIR SUPPLY UNIT- CABLE SUPPORT EXTENSION / RELOCATION FOR EXISTING PROCESS EQUIPMENT- CABLE RACKS (EXISTING TO NEW ROOF STRUCTURE)- REPLACE FIBER OPTIC CABLE TO WORKSHOP- THREE PHASE POWER SUPPLY TO NEW MACHINE SHOP

SECURITY AND CONTROL SYSTEMS- DOOR AUTOMATION- FENCE ELECTRIFICATION (SOUTH WALL RELOCATION)- SECURITY CAMERA RELOCATION (SOUTH WALL)

Page 5: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

1.1 Electrical Installation (continue)

- CONFIRM THAT EXISTING PROCESS CABLING DOES NOT REQUIRE ANY CHANGES / RE-LOCATION / FUNCTIONAL - CONFIRM THAT EXPANSION IS AVAILABLE IN EXISTING SUBSTATION TO ADD SUPPLY NEW FRESH AIR SUPPLY UNIT, MACHINE SHOP AND NEW ROOF SERVICES - REPAIR / TIDYING OF EXISTING ELECTRICAL SERVICES ON CABLE RACKS (THOUGHOUT

NEW BUILDING FACILITY) SECURITY AND CONTROL SYSTEMS

- DOOR AUTOMATION- FENCE ELECTRIFICATION (SOUTH WALL RELOCATION)- SECURITY CAMERA RELOCATION (SOUTH WALL)- CONFIRM THAT EXISTING PROCESS CABLING DOES NOT REQUIRE ANY CHANGES / RE-

LOCATION / FUNCTIONAL - CONFIRM THAT EXPANSION IS AVAILABLE IN EXISTING SUBSTATION TO ADD SUPPLY

NEW FRESH AIR SUPPLY UNIT, MACHINE SHOP AND NEW ROOF SERVICES - REPAIR / TIDYING OF EXISTING ELECTRICAL SERVICES ON CABLE RACKS (THOUGHOUT

NEW BUILDING FACILITY)

Page 6: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

1.2 Mechanical & HVAC Installation

AIR CONDITIONING UNIT (SERVER ROOM) - ONE COOLING TOWER TO BE RE-POSITIONED. RE-ROUTE CHILLED WATER PIPELINE - COMPRESSED AIR – EXISTING COMPRESSOR AND RADIATOR TO BE RE-POSITIONED NEXT TO THE EXISTING FILTER AND DRYER PLANT. PIPING TO BE ADJUSTED - COLD ROOM (HOT AIR TO BE EXTRACTED FROM UNITS) - EXTRACTION SYSTEM IN CERTAIN AREAS OF PACKAGING AREAS TO BE RECONNECTED - FIRE PROTECTION – NEW SPRINKLER PIPE SYSTEM EXISTING PIPE ON WESTERN WALL WILL BE RE-ROUTED / FIRE HYDRANTS RE- POSITIONED - PROCESS : AIR CONVEYER FAN / FILTER UNITS WILL BE RE-POSITIONED. EXTRACTION DUCTING BE EXTENDED / RE-ROUTED TO MONITOR - STEAM : TWO BOILER STACKS TO BE RE-POSITIONED. STEAM PIPE (WESTERN WALL) TO BE RE-POSITIONED

Page 7: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

1.2 Mechanical & HVAC Installation (continue)

VENTILATION : EXISTING FRESH AIR SUPPLY UNITS WEATHER LOUVER - EXISTING AIR DISTRIBUTION DUCT TO BE ADJUSTED – COOKER AREA - ADDITIONAL FRESH AIR SUPPLY UNIT TO BE INSTALLED – CRUMBS PLANT - EXISTING MECHANICAL ROOF VENTILATORS WILL BE REPLACED BY PRESSURE RELIEF DAMPERS (HOT PROCESS AREAS) - REPAIR / TIDYING OF EXISTING MECHANICAL SERVICES ON CABLE RACKS / WALLS (THOUGHOUT NEW BUILDING FACILITY)

Page 8: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

1.3 Fire Sprinkler Installation

Page 9: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

1.3 Fire Sprinkler Installation (continue)

Page 10: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

2. COMPLETION DATES OF THE WORKS

TENDER CLOSING DATE : 15 MARCH 2010TENDER EVALUATION : 16 – 18 MARCH 2010REVISED PROJECT COST ESTIMATE : 26 MARCH 2010 PRESENTATION TO KELLOGG’S : ??ANTICIPATED COMMENCEMENT DATE (Site Handover) : ?? 1 JUNE 2010TIME OF COMPLETION OF THE WORKS : ??COMPLETION DATES FOR SECTIONS OF WORKS- Electrical Installation :- Mechanical & HVAC Installation :- Fire Sprinkler Installation :

Page 11: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3. BID DOCUMENT

Page 12: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.1 Instruction to Bidders

Employer : Kellogg’s

Fix price contract :

Bid validity period : 60 days

Bid security amount : Nil

Employer’s address for bid submission : Greene Consulting Engineers (Pty) LtdBondev Office Park, Block Dcorner Willem Botha Str & Wierda RoadEldoraigne

Bid closing date : 15 March 2010 at ???

Page 13: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.2 General Conditions of Contract

FIDIC – General Conditions of Contract for Construction for Building and Engineering Works

(First Edition 1999 as published by the International Federation of Consulting Engineers)

Page 14: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.3 Particular Conditions of Contract

Sub-Clause 2.2 : Permits, Licences or Approvals

Sub-Clause 4.20 : No equipment of the Employer will be available on Site

Sub-Clause 6.1 : “The Contractor shall not recruit labour from any other Contractor, Subcontractor, the Employer (AdX) or any other company operating on the site, without the approval of Engineer

Information on the recruitment of local labour will be made available by Mr ??

Sub-Clause 6.2 : The Contractor shall pay the same rates of wages and observe

the same conditions of labour as ADX ( List of wage rates will be attached to pre-bid meeting’s minutes)

Sub-Clause 6.7.1 : Health and Safety – Government and Local Laws and Regulations pertaining to Health and Safety to the Work, including without limitation, the requirements of the South African Occupational Health and Safety Act No.85, 1993

Page 15: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.4 Project Specifications (Portion 1)

PS 2 : Site Description & Access :

PS 5 : Site Facilities Available : Water - 3 to 5 bar Electricity - 400V AC

(Available free of charge, approximately 150m of Works)

: Sewage - Chemical toilets: Telephone & Fax – Contractor to arrange own facilities

PS 7 : Features requiring special attention : Safety Health and Environmental Aspects

Page 16: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.4 Project Specifications (Portion 1) continue

PS 3.3 : Testing & Quality Control : Contractor shall engage the services of an approved independent laboratory to undertake all

testing of materials

PS 7.4 : Subcontractors : All matters pertaining to subcontractors shall be dealt with directly between Engineer and

Contractor

PS 20 : Applicable Standardized Specifications : SABS / SANS

Page 17: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.5 Form of Tender

Section 7 : Forms 7.1 to 7.17 - All forms MUST be completed and submitted with bid documentation

FORM 7.2 – APPENDIX TO TENDER

Employer : Kellogg’s

Engineer : Greene Consulting Engineers (Pty) Ltd

Time of Completion : ??(Completion dates for each section of the Works)

Performance Security : 10% of Accepted Contract Amount (South African Rand)

Delay damages : 0.14% of Accepted Contract Amount for each sectionMaximum amount for delays – 10% of Contract Price

Total Advance payment : 10% of Accepted Contract Amount excluding Prov Sums

Page 18: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.5 Form of Tender (continue)

Retention : 10% to a limit of 5% of the Accepted Contract Amount

Maximum amount of deductibles of Employers’ risk (Sub-Clause 18.2d)

The Employer will provide Professional Indemnity insurance of R50m with a first deductible of a R1m in aggregate. The Employer will provide Contract Insurance cover in joint names of the Employer and Contractor. The Contractor shall be responsible for the first deductibles for claims which initiates as follows:- Fire, explosion, testing and commissioning : R500 000- Storm and other perils : R250 000- Any other loss : R100 000- Public liability : R100 000

Page 19: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

3.6 Annexure A – Safety, Health and Environmental Specification (SHE) & Huley Rules

Page 20: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

4. INDUCTION SESSION

Page 21: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

5. SITE VISIT

Page 22: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

6. QUESTION & ANSWER SESSION

Page 23: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

7. SIGNING OF SITE INSPECTION CERTIFICATE (FORM 7.8)

Page 24: COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE

Kellogg’s – Springs Factory – Infrastructure Upgrade Phase 3 – New Building Project

8. CLOSURE