Comprehensive Design Studio Lab Arch 565
Instructor: Mark E. Bess, AIAOffice: Weston # 677 – Hours by appointmente-mail: [email protected]
![Page 2: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/2.jpg)
Course Description The purpose of this course is to help the
student carry their design concept from the schematic design phase into the design development phase.
The course is designed to supplement the Comprehensive Design Studio by introducing the student to the various ways architectural design is translated into the second phase of construction documentation
![Page 3: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/3.jpg)
Course Description The class focus is assisting the student
towards the development and execution of a Building Component Assembly Technique that relates to the design project.
The class consists of seminar sessions along with small group & 1-on-1 sessions.
Case studies are reviewed and the student is introduced to a variety of reference sources
![Page 4: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/4.jpg)
Textbooks Building Construction Illustrated 3rd Edition
by Francis D.K. Ching Published by John Wiley & Sons, Inc. ISBN 0-
471-35898-3 Architect's Studio Companion: Rules of
Thumb for Preliminary Design by Edward Allen, Joseph Iano, Joseph Iano,
Joseph Iano Published by John Wiley & Sons, Inc. ISBN:
0471392359
![Page 5: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/5.jpg)
Relevant Dates Class will meet in Weston Lecture Hall
#2 on the following 5 dates: January 22 January 29 February 5 February 12 February 29
![Page 6: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/6.jpg)
Student Requirements Each student is required to create a Project Binder.
This Project Binder contains all of the information and documentation of their semester Comprehensive Design Studio Project.
Along with the specific project documentation, the Project Binder will contain a “sketch book” of scaled hand sketches and drawings.
The required sketches are of various building components and methods of assembly researched by the student and customized for their specific Project.
Students should be able to articulate how these details represent the design intent of their project .
![Page 7: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/7.jpg)
Comprehensive Design Studio Lab - Student Project Binder Each student is required to create a notebook consisting of the
following: Illustrations of schematic design process ideas and
development leading up to final concept Illustrations of building’s structural system Illustrations of building’s environmental control system(s)
show how fresh air, exhaust, heating and cooling systems function
Illustrations of building’s exterior envelope and section showing construction and assembly
Illustration and analysis of building’s sustainable features Photocopies or web prints of various researched building
components & materials used in your project Review the bound document for this class on reserve in the
library
![Page 8: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/8.jpg)
Course Assessment and Final Grade Determination
Students will be evaluated based on the development of their sketch book, which will be collected and reviewed at random intervals during the semester.
![Page 9: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/9.jpg)
Why an Architect??
What do you think is the Architect’s Purpose?
Why not just hire a “builder” for your project?
![Page 10: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/10.jpg)
Answer….. By the end of this class you should
understand what I call the architect’s purpose.
You hopefully will begin to understand the importance of the architect’s concept and maintaining it through the design and construction process.
This is extremely important for your comprehensive project to be successful.
![Page 11: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/11.jpg)
Your Mission..
If we agree that our mission (in this class) is to translate your design concept into a built reality, several things must occur.
Practically speaking, in order to give form and materials to your design concept, several important choices must be made.
![Page 12: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/12.jpg)
These choices include the following:
Optimum structural system Suitable building envelope materials
and their component products Environmental controls, mechanical
systems, lighting, distribution, etc. Building services systems
![Page 13: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/13.jpg)
Continued… These systems must be integrated and
located within the building for …. the structural system to support a building
envelope and “support” the design intent the building envelope to create spaces and
exclude undesirable environmental factors; for this purpose the envelope may contain active devices that operate the envelope
environmental control measures to provide the desired environment and to complement the envelope
![Page 14: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/14.jpg)
Design Phases
Before we can jump directly into these issues we should take a look at a typical office and see how it’s usually organized, so let’s review the Design Phases
Schematic Design (SD) Design Development (DD) Construction Documents (CD)
![Page 15: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/15.jpg)
Design Phases
This class addresses Schematic Design and Design Development only
![Page 16: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/16.jpg)
Schematic Design – Expanding Ideas During schematic design we start with
programming, attempting to understand the client’s practical requirements along with the site characteristics
During schematic design we formulate a “concept” – a “theme” – which turns our written description and diagrams into spatial definition. This “theme” like the topic sentence in a paragraph, directs the design work.
We begin to create rough drawings that explore scale, appearance and adjacencies. The form and extent of the project emerges from these studies.
![Page 17: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/17.jpg)
Schematic Design – Expanding Ideas Schematic design is the most important time we
spend interacting with clients. At this stage, we have frequent meetings in order to
keep clients abreast of our work and direction. During these meetings, we present drawings that
describe design ideas with respect to the budget. In addition to plans, elevations and sections –
drawings used to communicate among design professionals and with contractors, we prepare perspective drawings and models which we find are more useful for visual communication with clients.
During schematic design alternate uses of space and various design options are explored In order to ensure a project design that meet the client’s objectives.
![Page 18: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/18.jpg)
Design Development – Editing Ideas After reviewing the options completed in
schematic design, we work to choose a design direction.
We continue to define - through plans, elevations and sections – the size of spaces, materials, and building placement.
In addition we begin perspective sketches of details and overall building design
During this phase we study the building systems, including specific construction issues which may affect the final project.
![Page 19: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/19.jpg)
Design Development – Editing Ideas
Just as the intangibles of architecture are important – the way the sun will enter a space I the winter – the tangibles are just as crucial such as what is the most appropriate heating system? What is the best roof for the climate?
These questions are answered during this phase.
![Page 20: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/20.jpg)
Class Focus
This class will focus on the above phases only.
The 1st step is to examine your schematic design.
Schematic design is not drafted, hand drawings are preferred because of their “loose-ness”; drawings must be to scale.
![Page 21: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/21.jpg)
Class Focus
The 2nd step is to develop and refine the schematic design concept into the design development drawings.
The most critical issue is to be true to your concept!!!!
All of your decisions and moves must be accomplished with the concept in mind.
THIS IS NOT AS EASY AS IT SOUNDS!!!!
![Page 22: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/22.jpg)
Demonstration / Example
Corbs 5 points Citrohan House Villa Stein example of concept in
action
![Page 23: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/23.jpg)
Housing (un-built) – Le Corbusier
![Page 24: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/24.jpg)
Casa Citrohan 1920-1922Casa Citrohan 1920-1922Le CorbusierLe Corbusier
Named after the mass-produced Citroen Named after the mass-produced Citroen carcar
Corbu’s first design meant to be mass-Corbu’s first design meant to be mass-produced and easily serviceable – “a produced and easily serviceable – “a machine for living in”machine for living in”
The Citrohan Project was the first of The Citrohan Project was the first of Corbu’s designs that explored elements Corbu’s designs that explored elements of what he would later name the “Five of what he would later name the “Five Points of New Architecture”Points of New Architecture”
![Page 25: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/25.jpg)
5 points as a design concept5 points as a design concept
The 5 points as a whole focus on two The 5 points as a whole focus on two design objectives and form a design objectives and form a “concept” for future projects“concept” for future projects
1. Freeing design options from 1. Freeing design options from construction requirementsconstruction requirements
2. Engaging the environment2. Engaging the environment These two issues still are a part of These two issues still are a part of
contemporary architecture….contemporary architecture….
![Page 26: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/26.jpg)
Five PointsFive Points 11 PilotisPilotis
– Thin columns used to elevate the entire mass off the Thin columns used to elevate the entire mass off the ground, freeing the space for a garden or car storageground, freeing the space for a garden or car storage
22 Free PlanFree Plan– Load-bearing columns were separated from the interior Load-bearing columns were separated from the interior
wallswalls 33 Free FaçadeFree Façade
– Similar to the Free Plan, but applied in sectionSimilar to the Free Plan, but applied in section 44 Long WindowsLong Windows
– Long horizontal windows to effectively bring in the Long horizontal windows to effectively bring in the maximum amount of natural lightmaximum amount of natural light
55 Roof GardenRoof Garden– Helps replace the space taken by the building footprintHelps replace the space taken by the building footprint
![Page 27: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/27.jpg)
Casa Citrohan 1920-1922 – Le Corbusier
![Page 28: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/28.jpg)
Villa Stein 1927 – Le Corbusier
![Page 29: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/29.jpg)
![Page 30: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/30.jpg)
![Page 31: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/31.jpg)
![Page 32: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/32.jpg)
![Page 33: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/33.jpg)
![Page 34: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/34.jpg)
![Page 35: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/35.jpg)
11 PilotisPilotis 22 Free PlanFree Plan 33 Free FaçadeFree Façade 44 Long WindowsLong Windows 55 Roof GardenRoof Garden
![Page 36: Comprehensive Design Studio Lab Arch 565 Instructor: Mark E. Bess, AIA Office: Weston # 677 – Hours by appointment e-mail: mbess@njit.edumbess@njit.edu](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d405503460f94a1ae5a/html5/thumbnails/36.jpg)
Questioning / Problem
Are spatial relationships shown? What is the concept? Is the concept shown in the work?