comprehensive asset management & structurescomprehensive ... · comprehensive asset management...

45
A New Way Forward Comprehensive Asset Management & Structures Comprehensive Asset Management & Structures NYSDOT’s Capital Planning Approach for the Future Roderic Sechrist Assistant Commissioner Bi K ll R6 RD & SSMT C Ch i Brian Kelly R6 RD & SSMT Co-Chair New York State Department of Transportation October, 2012 1

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

A New Way Forward

Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures NYSDOT’s Capital Planning Approach for the Future

Roderic Sechrist Assistant CommissionerB i K ll R6 RD & SSMT C Ch iBrian Kelly R6 RD & SSMT Co-Chair

New York State Department of Transportation

October, 2012

1

Page 2: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Transportation essential to a vibrant economy d i bl iand sustainable society

130 billion vehicle miles 130 billion vehicle miles annuallyannuallyannuallyannually

485 public and private aviation facilities 485 public and private aviation facilities

12 major public and private ports12 major public and private ports

Page 3: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Transportation is at a critical crossroads

Deteriorating and aging infrastructureinfrastructure

NYS has some of the oldest and heavily utilized systems in the nation

Given the significant needs of our

nationHarsh weather conditions accelerate deterioration

transportation system, it is essential that we invest in aLess federal and state

resourcesLess gas tax revenues and

that we invest in a way that produces the greatest possible Less gas tax revenues and

reduced purchasing powerFederal Highway Trust FundState fund debt service

return on investment.

State fund debt service

Page 4: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Resources are diminishing while demands are increasing

In response, NYSDOT is p ,changing its investment

strategies to maximize public benefits while being g

affordable over the long term.4

Page 5: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

NYSDOT Asset Management FrameworkNew Framework Established ToNew Framework Established To:

Generate Consistent Decision‐makingmaking

Set Targets/ Performance Metrics

Ensure AccountabilityEnsure Accountability

Guide Local and Regional Decisions for Preservation of the  System

Make Centralized Decisions for All Projects Beyond Preservation

Manage Expectations

Ensure Best Investment Regardless of Ownershipof Ownership

5

Page 6: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Forward Four Guiding Principles

Page 7: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Invest for the futureOur program establishes strategic and deliberate decisions that support our transportation system today while also ensuring and optimizing transportation for future generations.

7

Page 8: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Bridge and Highway Conditions(does not include NY Works Program)

72

74

llent

ges

STATE HIGHWAY BRIDGE CONDITION

(does not include NY Works Program)

62

64

66

68

70

ercent Goo

d + Exce

By Num

ber o

f Bridg

New way of business

60

62

'94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16

PeB

History Flat Funding with Old Strategy Flat Funding with New Strategy

75

STATE PAVEMENT CONDITION

50

55

60

65

70

nt Goo

d + Excellent

Lane

‐miles New way of business

40

45

50

'94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16

Percen

History Flat Funding with Old Strategy Flat Funding with New Strategy

8

Page 9: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

NYSDOT Capital Program/NY Works Accelerated Bridge/Pavement ProgramBridge/Pavement Program

The Budget includes an unprecedented level of investment in the State’s highway and bridges of approximately $2.9 billion in SFY 2012‐13.

o $1.7 billion for State and local road/bridge construction;

o $1.2 billion to accelerate the repair, replacement and improvement of roads and bridges authorized under the Governor’s NY Works program.

This extraordinary support creates new and exciting opportunity to improve our infrastructure while creating well‐paying construction‐related jobsrelated jobs.  

9

Page 10: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Accelerated Bridge/Pavement Program

To ensure that NYSDOT put people to work immediately at the beginning of this construction season, the accelerated preservation projects were put out for bid in April, May and June.projects were put out for bid in April, May and June.

The process utilized both traditional and innovative delivery methods, i l diincluding: 

Design‐build

Pre‐qualification of contractors 

Best value 

Bundled regional contracts

The selection of accelerated program projects was based on engineering needs and the implementation of a preservation first strategy that will b t i t i th hi h t ithi il bl f dibest maintain the highway system within available funding.  

10

Page 11: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

NY Works/NYSDOT Two‐Year Capital Plan Proposal

11

Page 12: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

NYSDOT Two‐Year Capital Program

Integrates asset management based preservation strategies to guide the capital programming and project planning process for all 

dmodes.  

Ensures appropriate investments are made at the right time pp p g

Maximizes the amount of infrastructure in “good” condition 

Employs innovative program delivery and project procurement processes, such as Design‐Buildp , g

Enhances flexibility to address emergencies and unforeseen i tcircumstances.

12

Page 13: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Beyond the short termThrough strategic investment in our transportation system – with an emphasis on preserving our existing infrastructure -our existing infrastructure -NYSDOT will help build the foundation for future

i th f Neconomic growth of New York State.

NYSDOT is taking action to ensure its decisions today will support future quality of life and the economy of the State for decades to come.

Page 14: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

What does that mean for structures?

Preservation FirstPreservation FirstFederal Aid

TIP/STIP Update & MAP21TIP/STIP Update & MAP21Statewide Prioritization Program

14

Page 15: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Preservation First

Get full useful lifeLook for window of opportunity investments

Focused repair workpLimit work, fix what is brokenCombined element specific contracts

Monitor conditions & needsDefer capital action until no longer possiblep g pPlan at least one major rehab in bridge life

Page 16: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Structures Preservation Options

Region 4 (Rochester) examplesRegion 4 (Rochester) examplesUnit costs (2011$) and life cycles not applicable statewideapplicable statewide.

16

Page 17: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Preservation Treatment TableState Forces Treatment Expected Element Life (yrs)

Bridge Washing 2

Superstructure Sealing 5

Beam End Repairs 40 +Beam End Repairs 40 +

Substructure Repairs Varies

Joint Repairs 15

Bearing Replacement 25

Deck Repairs Varies

Page 18: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Capital Treatment Expected Element Life (yrs) Unit Cost(y )

Zone Painting 12 $75,000 / bridge

Bridge Painting 12 $ 1.0 Million

J i t R i 15 $45 000 / j i tJoint Repairs 15 $45,000 / joint

Bearing Replacement 25 $6,000 / bearingReplacementSubstructure Rehabilitation 20+ Varies

Beam End Repairs 40 + $12,000 - $30,000 per beam

$150 000+/pierPier Replacement 50+ $150,000+/pier($30,000/pedestal)

Page 19: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Deck TreatmentExpected

Element Life Unit CostDeck Treatment Element Life (yrs)

Unit Cost

Superstructure 5 $5 000 / bridgeSealing 5 $5,000 / bridge

Thin Polymer Overlay $6 / SFOverlay

Deck Inlay 20+ $30 / SFDeck Inlay 20 $30 / SF

Deck OverlayDeck Overlay (Membrane andPave)

10-12 $4 / SF

Deck Replacement 50+ $125+ / SF

Page 20: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Pier Rehab/Replacement

After

Before

Investigation required to determine appropriate scope consisting of partial repair, encasement, or replacement.

Page 21: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Structural Flag Beam End Repair

After

Before

Page 22: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Substructure Repair and Bearing Replacement

AfterAfter

Before

Page 23: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Bridge Deck Inlay

After

Before

Investigation required to determine appropriate scope consisting of inlay, overlay, or membrane and pave.

Page 24: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Joint Repair

After

Before

Page 25: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Membrane and Overlay

After

Before

R t d k f ti lit b idi lit idiRestore deck functionality by providing a quality riding surface while maximizing remaining deck life.

Page 26: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Investigation NeedsReview Biennial Bridge Inspection Reports and Inventory g p p yData

Visual Inspection

Complete element sounding (hand tools, chain drag)

Ground Penetrating RadarGround Penetrating Radar

Chloride testing (cores or drill powder testing)

Substructure cores.

Deck cores

Investigation is an integral aspect to asset management. Good field information coupled with laboratory tests and engineering experience

Deck cores.

p y g g pallow choosing the right treatment at the right time.

Page 27: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and
Page 28: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

TIP/STIP Overview

Required update to match MAP21 and spendRequired update to match MAP21 and spend federal aid.Includes new Statewide Capital PrioritizationIncludes new Statewide Capital Prioritization Program

Projects after 10/1/14Projects after 10/1/1425% of available funds11/9/12 deadline for candidate submission from11/9/12 deadline for candidate submission from NYSDOT Region to Albany. Earlier from local sponsor to NYSDOT Region.

Page 29: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

NYSDOT Planning Target ConceptStep 1 : Distribute Non-core funds

HSIPCMAQMPTA

29

Page 30: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Planning Target ConceptStep 2: Apportion Remaining Funds

5% Commissioners Discretionary Reserve60% Regional Preservation Allocation10% Regional Capital Allocation25% Statewide Capital Prioritization25% Statewide Capital Prioritization

Preservation defined morebroadlybroadly

Demand response, guiderail, …

Cannot predetermine MPO useCannot predetermine MPO use. . . Marchiselli discussion

30

Page 31: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Planning Target Concept

Step 3. Regional Targets : RelativeStep 3. Regional Targets : Relative Infrastructure Needs

Model driven bridge & pavement needs.Preservation (60%) and capital (10%)State and local systems

Step 4. Regional Targets : Apportion regional allocations proportional to needallocations proportional to need

31

Page 32: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Planning Target ConceptStep 5. Statewide Capital Prioritization (25%)

Apportion funds proportional to capital needsApportion funds proportional to capital needs

Centralized reviewCentralized reviewSubmit ‘Beyond Preservation’ candidatesStatewide asset teams review and recommend priorities to CPTCPT endorsementE ti lExecutive approval

32

Page 33: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Statewide Prioritization SummaryStatewide Capital Prioritization

Replacement, Major rehabs (>50% RP cost) & some very large preservation projectslarge preservation projects

Project solicitationBridge/Pavement Index

Quantitative, data driven. SSMT/SPMT/CPT Review & Selection

3 Priority TiersyProject review & prioritization within available fundsIncorporates qualitative factorsIncorporates qualitative factors

Executive Approval MPO Programming

Page 34: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Statewide Capital Prioritization

Bridge Pavement Index Index

(0 to 100) (0 to 10)

Must Satisfy or Justify

34

Page 35: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Reference Bridge Examples

Page 36: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

New, Local, Low-VolumeGrist Mill Rd / Ston Creek 2009 (BINGrist Mill Rd / Stony Creek -2009 (BIN 3305560)R i 1 R l Mi C ll tRegion 1, Rural Minor CollectorAdjacent PS boxesCR=7, AADT =1396

Category Points

Capital Need 0

Facility Importance 4.02

Restrictions 0Restrictions 0

Potential Risk 7.5

Bridge Index 11.52

Page 37: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

New, State 2-lane, Low-VolumeSR429/ Bergholtz Creek 1997 (BINSR429/ Bergholtz Creek – 1997 (BIN 1048440)Region 5 Urban Minor ArterialRegion 5, Urban Minor ArterialReinforced concrete frameCR 6 931 AADT 8 349 5% T kCR=6.931, AADT =8,349, 5% Trucks

Category Points

Capital Need 0

Facility Importance 10.89

Restrictions 0Restrictions 0

Potential Risk 2

Bridge Index 12.89

Page 38: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

New, Interstate, Low/Mid-VolumeI86/ Meads Creek 2011 (BIN 1011222)I86/ Meads Creek – 2011 (BIN 1011222)Region 6, Interstate, NHSSteel multigirderCR=7, AADT =13,303, 21% trucks

Category Points

Capital Need 0

Facility Importance 22.89

Restrictions 0Restrictions 0

Potential Risk 0

Bridge Index 22.89

Page 39: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Older, Local, Low-VolumeCR116/H nts Creek 1930 (BIN 3312050)CR116/Hunts Creek - 1930 (BIN 3312050)Region 3, Rural minor collectorReinforced concrete archCR= 3.714, AADT = 1,178, 9% trucks

Category Points

Capital Need 37.68

Facility Importance 4.20

Restrictions 0Restrictions 0

Potential Risk 6.25

Bridge Index 48.13

Page 40: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Older, State 2-lane, Low-VolumeSR96/ Catatonk Creek 1949 (BIN 1034960)SR96/ Catatonk Creek – 1949 (BIN 1034960)Region 9, Rural minor arterialSt l lti i d ilSteel multigirder, no pilesCR= 3.444, AADT = 2,898, 10% trucksReplacement programmed, 2012

Category Points

Capital Need 41.40

Facility Importance 10.06

Restrictions 5 00Restrictions 5.00

Potential Risk 5.50

Bridge Index 61.95

Page 41: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Older, Interstate, Mid-VolumeI490/CSX RR 1963 (BIN 1048591)I490/CSX RR - 1963 (BIN 1048591)Region 4, Interstate, NHSSt l lti i dSteel multigirderCR= 3.563, AADT = 12,597, 8% truckssuperstructure replacement programmed 2015 (small qualitative bump for rehab possible)

Category Points

Capital Need 37.96

Facility Importance 20.88

Restrictions 0Restrictions 0

Potential Risk 0.50

Bridge Index 61.13

Page 42: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

More Risk, Older, Mid-volume StateSR13/Fall Creek 1964 (1010400)SR13/Fall Creek -1964 (1010400)Region 3, Urban Principal Arterial, NHSSt l lti i d il (lSteel multigirder, no piles (larger qualitative bump likely for potential risk)CR 3 406 AADT 14 805 6% kCR=3.406, AADT =14,805, 6% trucksReplacement Programmed 2012

Category Points

Capital Need 41.92

Facility Importance 18.85

Restrictions 0Restrictions 0

Potential Risk 5.50

Bridge Index 66.27

Page 43: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Priority Tier : Qualitative ReviewQualitative Review & Selection

1 CAPITAL NEED1. CAPITAL NEED 2. FACILITY IMPORTANCE3. RESTRICTIONS4 POTENTIAL RISK4. POTENTIAL RISK

Same categories as index, but for issues not captured by existing data‘Ti ’ ti & fi l i iti‘Tier’ sorting & final priorities

No meaningful difference in priority between close index scoresEngineering judgment and non-recorded, special circumstance d t d d f fi l i iti tidata needed for final prioritization.

No specific score‘Trump’ case. Special circumstance makes p preplacement very important.

Page 44: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

Conclusions

NYSDOTNYSDOTContinued Emphasis on PreservationSuccessful in slowing system deteriorationSuccessful in slowing system deterioration

MAP21Elimination of old bridge program Rolled intoElimination of old bridge program. Rolled into NHPP (85%) and STP (15%)Shift in emphasis to NHS routes.p

Statewide Capital Prioritization ProgramPicking most important projects in the statePicking most important projects in the state

44

Page 45: Comprehensive Asset Management & StructuresComprehensive ... · Comprehensive Asset Management & StructuresComprehensive Asset Management & Structures ... Less gas tax revenues and

QUESTIONS1. What is an example of a bridge preservation treatment?2. Is preservation a cost effective tool to slow bridge deterioration?3. What is the name of the new federal transportation program?4. The old federal bridge funding program (HBRR/HBP) has been rolled up an refocused

h t ti f th t ?on what portion of the system?5. Is the Statewide Capital Prioritization Program f d b id t ?focused on bridges or pavements?

45