Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE
ENVIRONMENTAL CLEARANCE
PREAMBLE:
EIA follow up commonly referred to as Compliance reporting is the process of monitoring,
evaluation and validation of the outcomes of EIA. It is followed by management and
communication to the stakeholders. EIA Notification, 2006 (S. No. 1533) mandates the project
management to submit the half yearly compliance in respect of the stipulated prior environmental
clearance terms and conditions in hard and soft copies to the regulatory authority concerned, on 1st
June and 1st December of each calendar year (Para 10, sub para (i) of said Notification).
Follow-up is internationally considered essential to determine the outcome of EIA through
evaluating environmental performance of projects (Marshall et al., 2005; Morrison-Saunders et
al., 2007). It is also termed as monitoring and auditing. EIA follow up relates to the construction
as well as operational phase of the project. EIA follow-up is in place until the very end of the
project’s life cycle. It plays an important role in tracking the environmental performance of the
project.
EIA follow-up comprises of four elements {Art et al, 2010 (page 176)} which are as follows:
1. Monitoring:
Monitoring compares data that has been collected in the assessment with the standards,
predictions and expectations outlined prior to the project’s commencement. Post project
monitoring takes into consideration compliance to the guidelines set out and the
effectiveness of the project. In some cases, multiple projects may be included in the
monitoring process in order to compare effects and outcomes from various studies.
2. Evaluation:
Evaluation takes into account the findings of the project in relation to standards, pre-
project predictions and expectations. It often includes scientific and technical policies.
3. Management:
Management is the act of responding to the issues which may arise from the monitoring
and evaluation processes. The role of management is undertaken by the parties including
the proponent and the regulator.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
4. Communication:
Communication is the act of informing project stakeholders and the general public about
the results from the EIA follow-up. Again the proponent and the regulator may be involved
in the communication process.
PROJECT INTRODUCTION:
The proposal involves construction of group housing project coming up at village, Dhunela,
Sector-33, Tehsil Sohna, Gurgaon, Haryana. The project is promoted by “Aum Shree Hotels &
Resorts Pvt. Ltd”. Total plot area of the project is 75,838.08 sq. m. and the built up area envisaged
is 1,48,644.68 sq. m. The project has been granted Environmental Clearance by State Environment
Impact Assessment Authority, Haryana vide letter no. SEIAA/HR/2014/870 dated 30th
June 2014.
Copy of environmental Clearance is enclosed as Annexure I.
PROJECT DESCRIPTION:
Location : Killa Nos. 47//1(8-0), 2(8-0), 3(8-0), 4(8-0), 7(8-0), 8(8-0), 9(8-
0), 10/1(6-10), 10/2(1-7), 11/1(7-7), 11/2(0-13), 12(8-0), 13(8-0),
18(6-10), 19(6-2), 20(5-7), 48//4/2(1-9), 5/1/1(1-19), 5/1/2(2-1),
5/2(4-0), 6/1(2-13),6/2(5-7), 7(4-11), 14(1-8), 15/1(0-8), 16(4-4),
17(1-10), 15/2/1(3-16), 15/2/2(3-16), 13//16(3-15), 25 (3-6),
Sector 33, village Dhunela, Tehsil Sohna, Gurgaon, Haryana
Plot Area : 75,838.08 sq. m.
Built up Area : 1,48,644.68 sq. m.
Project cost : Rs. 396.92 crores
Number of Building
blocks
: Tower A (G+ 20 floors), A1 (GF+25 floors), (B (GF+35 floors)
B1 GF+25) and EWS 2 Blocks (GF+4 floors), Primary School,
Nursery School, Community Building, Convenient Shopping and
Guard Room.
Compliance Period : January- June’ 2016
Water Demand : 859 KLD (Fresh Water: 505 KLD; Treated water: 496KLD)
Power Demand : 5000 kVA (Maximum Demand)
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
STP Capacity : 744 KLD
STP Technology : Moving Bed Bio Reactor (MBBR)
PROJECT STATUS:-
No construction activity has been undertaken at site. Site photographs enclosed as Annexure II.
The company has incurred 36.06 crores on the said project till 31.03.2016.
The breakup of the same is given below:-
Particulars Amount (Rs. In Cr.)
• Land Cost 25.16
• Work in progress 2.29
• EDC/IDC 8.61
Total 36.06
Copy of Certificate of Capital Investment is enclosed as Annexure III.
OBJECTIVES:
• To analyze the outcomes of EIA studies.
• To monitor the environmental data that has been collected in the assessment with the
standards, predictions and expectations outlined prior to the projects’ commencement.
• To evaluate taking into account the findings of the project in relation to standards, pre-project
predictions and expectations.
• To establish the links between pre-project goals and targets and post project achievements.
• Control of project and environmental impacts
METHODOLOGY:
1. Monitoring – Collection of Environmental data (one day) post project scenario during
construction phase. The parameters include:
• Ambient Air Monitoring
• Ambient Noise levels at the project boundary
• Ground water analysis
• Soil analysis
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
Other related information was collected during site visits as well as compliance of the
conditions were monitored and recorded during site visits.
2. Evaluation – the appraisal of the conformance with standards, predictions or expectations as
well as the environmental performance of the activity.
3. Management – making decisions and taking appropriate action in response to issues arising
from monitoring and evaluation activities.
4. Communication – informing the stakeholders about the results of EIA follow-up in order to
provide feedback on project/plan implementation as well as feedback on EIA processes.
AGENCY:
The study has been collectively carried out by Gaurang Environmental Solutions, Jaipur & the
environmental parameters were recorded by M/s Eko Pro Engineers Pvt. Ltd. (NABL accredited
& MOEF recognized Environmental Laboratory)
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
COMPLIANCE OF THE CONDITIONS LAID IN THE ENVIRONMENTAL
CLEARANCE
PART A: SPECIFIC CONDITION
1. CONSTRUCTION PHASE
S. No. Condition in EC Compliance status
1. “Consent for Establish” shall be
obtained from Haryana State
Pollution Control Board under Air
and Water Act and a copy shall be
submitted to the SEIAA, Haryana
before the start of any construction
work at site.
Consent to Establish has been obtained vide letter
no. HSPCB/Consent: 2821215GUNOCTE1815568,
dated 15.04.2015 and (valid upto 14.04.2017). Copy
of the CTE is enclosed as Annexure IV.
2. A first aid room as proposed in the
project report shall be provided
both during construction and
operational phase of the project.
The first aid facility will be provided at the site and
will be maintained throughout the construction and
post construction phase.
3. Adequate drinking water and
sanitary facilities shall be provided
for construction workers at the site.
Provision should be made for
mobile toilets. Open defecation by
the labours is strictly prohibited.
The safe disposal of waste water
and solid waste generated during
the construction phase should be
ensured.
Housing Facility: Temporary housing facility will
be provided for construction workers.
Safe drinking water: Effective arrangements for
sufficient supply of wholesome drinking water will
be provided at suitable points conveniently situated
for all persons employed.
Toilet Facility: Separate temporary toilets will be
provided for male and female workers at site. The
toilets will be conveniently situated so that they are
accessible to the building workers at all times.
Waste Water Disposal: Waste water generated
during construction phase will be routed to septic
tank followed by soak pit.
Construction Waste :
Excavated Soil: The total excavated earth quantity
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Total of about 9000 MT of the construction waste is estimated to be generated. Details of the same
is given as under:
S.
No.
Particulars
1. Wood
2. Dry Wall
3. Concrete
4. Metal Scrap
5. Cardboard
6. Plastics
7. Electronic Scrap
8. Misc.(Paint,
Ceramic etc)
4. All the topsoil excavated during
construction activities shall
for use in horticulture/landscape
development Within the project site.
Group Housing Colony
: Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to
For Aum shree Hotels & Resorts Pvt. Ltd.
is estimated to be 1,35,600 m
material will be utilized for backfilling and
horticulture development at the project site
MT of the construction waste is estimated to be generated. Details of the same
Waste generation
as per standard (MT)
%
4320 48 Sold to vendors
1800 20 Will be reused within project
site to the extent possible
810
9 Will be reused for filling
purposes
180 2 Sold to vendors
1350 2 Sold to vendors
180 15 Sold
180 2 Sold to actual users
180 2 Sold to actual users
Source: Semann, 06
All the topsoil excavated during
activities shall be stored
r use in horticulture/landscape
development Within the project site.
The topsoil excavated during construction phase
will be preserved at designated places and stock
piled. Temporary seeding, mulching will be to
preserve the top soil. The same will be reutilized
within the site itself for landscaping purposes.
Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
is estimated to be 1,35,600 m3.The excavated earth
material will be utilized for backfilling and
development at the project site.
MT of the construction waste is estimated to be generated. Details of the same
Disposal
Sold to vendors
Will be reused within project
to the extent possible
Will be reused for filling
to the extent possible
Sold to vendors
Sold to vendors
Sold to vendors
Sold to actual users.
Sold to actual users
The topsoil excavated during construction phase
preserved at designated places and stock
Temporary seeding, mulching will be to
The same will be reutilized
within the site itself for landscaping purposes.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
5. The project proponent shall ensure that
the building material required during
construction phase is properly stored
within the project area and disposal of
construction waste should not create
any adverse effect on the neighbouring
communities and should be disposed of
after taking necessary precautions for
general safety and health aspects of
people, only in approved sites with the
approval of competent authority.
Building material storage: Building material
required for construction will be properly stored
in designated storage area within the project
premises.
• Wooden blocks will be stored in the shed.
• Steel material will be stored in open
• Cement will be stored in storage rooms
• Bricks will be stored in open area.
• Dry area for plasterboard.
• Raw material( Sand /Stone) stored in bays
Construction Waste Management :
The construction waste generated during
construction phase will be managed effectively
by the contractors and site engineers. Instructions
will be given to the contractor to dispose-off the
solid waste with prior permission at the
municipality disposal sites only. However, efforts
will be made to reduce the quantity of the waste
generated by proper management of the
construction material and judicious use of the
resources. The management has been given at
point no. 3 above.
6. Construction spoils, including
bituminous material and other
hazardous materials must not be
allowed to contaminate water courses
and the dump sites for such material
must be secured so that they do not
leach in to the ground water and any
hazardous waste generated during
construction phase, should be disposed
The construction waste generated during
construction phase will be managed effectively
by the contractors and site engineers. Instructions
will be given to the contractor to dispose- off the
solid waste with prior permission at the
municipality disposal sites only. Efforts will be to
reduce the quantity of the waste generated by
proper management of the construction material
and judicious use of the resources.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
off as per applicable rules and norms
with necessary approval of the Haryana
State Pollution Control Board.
7. The diesel generator sets to be used
during construction phase should be of
ultra-low sulphur diesel type and
should conform to Environment
(Protection) Rules prescribed for air
and noise emission standards.
D.G. set conforming to the applicable rules for air
and noise emissions will be deployed at the site.
Low sulphur fuel (sulphur content: 0.05%) will
be used in the DG sets during construction phase.
8. The diesel required for operating DG
Sets shall be stored in underground
tanks and if required, clearance from
Chief Controller of Explosive shall be
taken.
Diesel used for D.G. sets will be stored in plastic
drums. Further, the same will be placed on
impervious base to avoid contamination of soil or
ground water due to spillages.
9. Ambient noise level should conform to
the residential standards both during
day and night. Incremental pollution
loads on the ambient air and noise
quality should be closely monitored
during construction phase. Adequate
measures should be taken to reduce
ambient air and noise level during
construction phase, so as to conform to
the stipulated residential standards of
CPCB/MoEF.
All necessary measures will be adopted to ensure
that air & noise levels conform to residential
standards laid down by CPCB.
The same are listed as under:
• Idling will be avoided to the extent possible.
• Regular sprinkling on haul road to minimize
the fugitive emissions.
• PUC Certified vehicles will be used.
• Enclosure construction will be fully bolted
keeping in view the major service
requirement.
• Provision of protective equipments like ear
muffs to the workers.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
10. Fly ash should be used as building
material in the construction as per the
provisions of fly ash notification of
September 1999 and as amended on
27th
August 2003.
Fly ash will be used as building material as
mentioned under:
S. No. Building Material Fly Ash
content
1. Portland Pozzolana Cement 17-20 %
2. Ready Mix Concrete 30 %
3. Fly ash bricks 60-80%
Fly ash content varies as per the grades of
material used.
11. Storm water control and its reuse as per
CGWB and BIS standards for various
applications should be ensured.
Storm water control and rain water harvesting
will be done as per the standards laid down by
CGWA & BIS.
12. Water demand during construction
should be reduced by use of pre mixed
concrete, curing agents and other best
practices.
Best construction practices will be adopted to
reduce the water demand for construction
activities:
• Ready mix concrete will be used to the extent
possible, for construction purposes to reduce
the water demand.
• Use of curing water: Spraying of curing water
and after liberal curing, all concrete structures
are covered with gunny bags, followed by
spraying of water.
• Use of polymer dispersion and air entraining
agents to reduce the construction water
demand.
• Admixtures will be used to reduce water
demand during construction.
• Discouraging the washing of vehicles and
equipment on the construction site. Workers
will not be allowed to wash their personal
vehicles on site. Vehicles and equipment that
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
regularly leave the construction site should be
washed offsite.
13. In view of the severe constrains in
water supply augmentation in the
region and sustainability of water
resources, the developer will submit the
NOC from CGWA specifying water
extraction quantities and assurance
from HUDA/ utility provider indicating
source of water supply and quantity of
water with details of intended use of
water – potable and non-potable.
Assurance is required for both
construction and operation stages
separately. It shall be submitted to the
SEIAA and RO, MoEF, Chandigarh
before the start of construction.
Drinking water (Potable): will be met through
tanker water supply of HUDA.
Construction water (Non-potable): The water
demand will be met from STP treated waste water
supply from HUDA (primary & secondary
treated) treated) which will be treated in STP of
capacity 744 KLD (secondary & tertiary
treatment) and then reused for construction
activities.
Related records:
• No Objection Certificate from HUDA,
Gurgaon: Annexure V (a).
• Ground water will not be used for
construction activities.
• During operational phase of the project water
demand will be met through water supply
from HUDA. Ground water will not be used
for the project. Water assurance letter from
HUDA enclosed as Annexure VI.
14. Roof must meet prescriptive
requirement as per energy conservation
building code by using appropriate
thermal insulation material.
Thermal characteristics of the roof assembly shall
be as under:
Climate zone: Composite*
Building Type: 24 hrs. use building
U value (W/m2-°C) 0.409
R value (m2°C/W) 2.1
*Source: ECBC CODE 2007
Following measures will be adopted to reduce the
heat ingress into the building:
• The solar panels will be provided on the roof
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
which will help to reduce exposed area,
thereby, reducing the heat gains inside the
building.
• Energy efficient materials, heat reflecting
terrace surface and roof (by using broken
white china tiles & heat reflecting paint) will
be provided to reduce head gains.
• Broken bricks will be used for roof insulation.
• Roofs will be painted with reflective,
aluminium based paints with solar reflectance
ranging from 0.3-0.6. This will result in less
absorption of sunlight causing 40% back
reflection and less heating of building
structure during summer seasons.
15. Opaque wall must meet prescriptive
requirement as per Energy
Conservation Building Code which is
proposed to be mandatory for all air
conditioned spaces while it is desirable
for non-air conditioned spaces by use
of appropriate thermal insulation
material to fulfil requirement.
Thermal characteristics of the wall assembly shall
be as under:
Climate zone: Composite*
Building Type: 24 hrs. used building
U value (W/m2-°C) 0.352
R value (m2°C/W) 2.35
*Source: ECBC CODE 2007
The wall will be made with fly ash bricks, AAC
blocks, plastered outside and water proofing
paint. Shading devices provided to shade to
windows and external façade. Following
measures will be adopted to reduce the heat
ingress inside the building:
• Recessed windows and Covered balconies to
limit direct heat gains.
• For walls of the building, a maximum of 10%
window to wall ratio will be there to minimize
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
solar radiation
• There will be less no. of openings on the west
side and more no. of openings in the south
side.
• Use of fly ash based cement having lower U
& R values.
16. The approval from competent authority
shall be obtained for structural safety of
the building on account of earthquake,
adequacy of fire fighting equipments,
etc. as per National Building Code
including protection measures from
lightening etc. If any forest land is
involved in the proposed site, clearance
under Forest Conservation Act shall be
obtained from the competent authority.
Structural Stability:
The entire building will be designed as per the
provisions of National Building Code-2005 for
structural safety of the building against any
possible earthquakes.
Further, Forest Clearance under Forest
Conservation Act is not applicable as there is no
forest land involved in the project. Copy of letter
from Dy. Conservator of Forests, Gurgaon,
Haryana is enclosed as Annexure VII.
17. Overexploited groundwater and
impending severe shortage of water
supply in the region requires the
developer to redraw the water and
energy conservation plan. Developer
shall reduce the overall footprint of the
proposed development. Project
proponent shall incorporate water
efficiency /saving measures as well as
water reuse /recycling within 3 months
and before start of construction to the
SEIAA, Haryana and RO MOEF, GOI,
Chandigarh.
During construction phase water demand will be
met through treated water supply from HUDA.
Water conservation measures (Construction
Phase): has been detailed at point 12 above.
The water and energy conservation plan is given
below:
Total Water Demand : 859 KLD
Type Quantity Source
Fresh water 505 KLD HUDA water supply
Treated
water
496 KLD STP treated water
Water conservation measures (Construction Phase):
• Water sprayed for curing and after liberal curing, all concrete structures will be covered with
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
gunny bags. This will conserve water.
• There will be provision of using polymer dispersion and air entraining agents to reduce the
water demand for construction.
• Provisions to ensure the construction vehicles stick to the access track to prevent mud & dirt
being deposited on roads.
• Fence will be constructed around the site to trap sediments whilst allowing the water to flow
through.
Water conservation measures (Post Construction phase):
• Dual plumbing system will be used for the project to utilize the treated waste water .This will
help in reducing the fresh water.
• Dual flushing fixtures will be used to allow different volumes of water for solid and liquid
flushing which will help in conserving the water demand for flushing significantly.
• Landscape design & management of irrigation systems:
• Drought tolerant species will be selected.
• Turfs will be avoided to the extent possible.
• Central shut off valve will be provided
• Drip irrigation/ sprinkler irrigation system will be used to conserve water
• Water meters will be installed for the following:
• Potable water consumption
• Landscape water consumption
• Hot water consumption through solar systems, at building level
• Treated waste water consumption
Energy Conservation Measures (Construction Phase):
• Efficient work scheduling and methods that minimise equipment idle time and double
handling of material
• Switching off construction equipment when not in use
• Switching off site office equipment and lights and using optimum lighting intensity for
security and safety purposes
• Regular maintenance of equipment to ensure optimum operations and fuel efficiency.
18. The project proponent as stated in the Rain water harvesting (RWH) system for roof
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
proposal shall construct 17 nos. rain water
harvesting pits for recharging the ground
water within the project premises. Rain
water harvesting pits shall be designed to
make provisions for silting chamber and
removal of floating matter before entering
harvesting pit. Maintenance budget and
persons responsible for maintenance must
be provided. Care shall also be taken that
contaminated water do not enter any RWH
pit.
run-off and surface run-off will be designed
and implemented as per the submitted plan &
GOI manual.
17 nos. of rain water harvesting pits will be
provided for rain water harvesting during
operational phase of the project.
Design of Rain Water Harvesting :
For good design of rainwater harvesting,
following points will be kept under
consideration:
• Ideal location with good ground slope.
• The location has adequate subsurface
permeability of the aquifer to accommodate
maximum recharge of rainwater through
injection well.
• Rate of filtration should exceed average
rainfall intensity.
• Clogging of filtration media should be
cleaned periodically.
• Ground water pollution does not take place.
• There will be provision of silting chamber
to remove floating matter before entering
harvesting pit.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
19. The project proponent shall provide for
adequate fire safety measures and
equipments as required by Haryana Fire
Service Act, 2009 and instructions issued
by the local Authority / Directorate of fire
from time to time. Further the project
proponent shall take necessary permission
regarding fire safety scheme/NOC from
competent Authority as required.
The same will be complied with.
Adequate fire safety measure will be
adopted at site:
• All necessary precautions will be taken to
prevent outbreak of fires at the construction
site.
• Proper training will be provided to all the
workers in fire fighting and extinguishing
methods.
• All the combustible materials like timber,
bamboos, coal, paints, etc., will be properly
stored at designated place to avoid
unnecessary fire hazards at site.
• All Safe construction practices &
precautionary measures will be adopted and
use of PPE will be mandatory.
• Adequate fire-fighting arrangements will be
as per National Building Code - 2005 &
conditions laid in fire NOC.
• All applicable IS standards for electricity
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
will be followed during construction phase.
• Indian Electricity Act of 1910 and rules
issued there under revised up to date will be
followed.
• Regulations for electrical equipment in
building issued by The Bombay Regional
Council of Insurance Association of India
will be followed.
20. The project proponent shall obtain
assurance from the DHBVN for supply of
5000 kVA of power supply before the start
of construction. In no case project will be
operational solely on generators without
any power supply from any external power
utility.
Assurance will be obtained from DHBVN for
power supply before the start of construction.
DG sets will be used as power back up source
during the power cuts & failure only and the
project will not be operational solely on
generators without power supply from any
external power utility.
21. Detail calculation of power load and
ultimate power load of the project shall be
submitted to DHBVN under intimation to
SEIAA Haryana before the start of
construction. Provisions shall be made for
electrical infrastructure in the project area.
Detailed calculation of power load will be
submitted to DHBVN and power supply
assurance letter will be obtained from DHBVN
before the start of construction.
22. The project proponent shall not raise any
construction in the natural land depression
/ Nallah / water course and shall ensure
that the natural flow from the Nallah/
Water course is not obstructed.
The same is noted and no construction will be
raised on the natural land/ nallah or water
course.
23. The project proponent shall keep the plinth
level of the building blocks sufficiently
above the level of the approach road to the
project. Levels of the other areas in the
group housing project shall also be kept
The plinth level of the building blocks will be
constructed sufficiently above the level of the
approach road.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
suitably so as to avoid flooding.
24. Construction shall be carried out so that
density of population does not exceed
norms approved by Director General Town
and Country Department, Haryana.
The maximum density of population due to the
proposed project will not exceed the approved
density of population by Director General
Town and Country Department, Haryana. The
same is summarized as under:
Max. Population density as
per approved zoning plan
Population Achieved Population density
as per design
Population
400 ppa 7329 286 5238
25. The project proponent shall submit an
affidavit with the declaration that ground
water will not be used for construction and
only treated water should be used for
construction.
During construction phase of the project water
demand will be met from treated water from
HUDA. Copy of Certificate in this regards
issued from HUDA, Gurgaon, is enclosed as
Annexure V. The affidavit in this regard was
submitted during the EIA stage. We would like
to assure that ground water will not be used for
construction activities.
26. The project proponent shall not cut any
existing tree and project landscaping plan
should be modified to include those trees
in green area.
The content of para 26 are noted and will be
followed.
27. The project proponent shall provide 3
meter high barricade around the project
area, dust screen for every floor above the
ground, proper sprinkling and covering of
stored material to restrict dust and air
pollution during construction.
The same will be complied with. Following
measures will be adopted for mitigating dust
pollution during construction phase:
• 3 meter high barricade
3 meter high barricades will be provided for
the four sides to minimise the impact of
dust. It will be maintained throughout
construction phase as well as in operation
phase.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
• Dust Screen
Dust screen will be provided for every floor
to minimize the dust emission.
• Water sprinkling
Water sprinkling will be done on haul roads
to minimize dust emission. Water or Dust
suppressants which are more effective than
water will be applied judiciously.
• Covering of stored material
Covering the stockpiles to prevent wind
whipping. Storage pile activity will be
conducted downwind. Unpaved roads will
be properly maintained. Minimizing the haul
roads by construction of semi pucca roads
during construction phase.
28. The project proponent shall construct a
sedimentation basin in the lower level of
the project site to trap pollutants and other
wastes during rains.
The content of para. 28 is noted and will be
followed.
29. The project proponent shall provide proper
rasta of proper width and proper strength
for the project before the start of
construction
The same will be complied with. Proper rasta
of proper width and strength will be provided
during the construction phase.
30. The project proponent shall ensure that the
U value of the glass is less than 3.177 and
maximum solar heat gain co-efficient is
0.25 for vertical fenestration.
The same will be complied with. However, as
per ECBC 2007, the thermal characteristics of
the vertical fenestration will be as under:
Maximum U-factor Maximum SHGC Maximum VLT
3.30 W/m2-°C 0.25 0.27
Source:ECBC CODE 2005
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
31. The project proponent shall adequately
control construction dust like silica dust,
non-silica dust and wood dust. Such dusts
shall not spread outside project premises.
Project Proponent shall provide respiratory
protective equipments to all construction
workers.
The same will be complied with. Following
measures will be adopted for mitigating dust
pollution during construction phase:
• Cutting & grinding operations on site will be
conducted using equipment and techniques
that suppress and reduce dust emissions
• Respiratory protective equipments will be
provided to the construction workers.
• Dust mask will be provided to all the
construction workers.
• Concentration of dust, gases or fumes will be
prevented by providing suitable means to
control their concentration within the
permissible limit so that they may not cause
injury or create health hazard to a building
worker.
32. The project proponent shall develop
complete civic infrastructure of the group
housing colony including internal roads,
green belt development, sewerage line, rain
water harvesting arrangements, storm
water drainage system, solid waste
management site and provision for
treatment of bio-degradable waste, STP,
water supply line, dual plumbing line,
electric supply lines etc. and shall offer
possession of the units/flats thereafter.
The same will be complied with. Complete
infrastructural facilities will be provided before
operational phase of the project.
• Proper internal roads with adequate width
will be provided.
• Greenbelt development
About 24268.18 sq. m. (32%) area will be
under landscape during operational phase of
the project.
• Sewerage Line
Separate pipeline will be provided for sewage
generated from the project.
• Rain water harvesting
Rain water harvesting will be done in the
project. About 17 nos. of rain water
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
harvesting pits will be provided to recharge
the ground water aquifer.
• Solid waste management
Solid waste generated from the project will
be handled as per Municipal Solid Wastes
(Management and Handling) Rules, 2000 and
amended Rules, 2008. The same is described
at point no. (e) of operational phase
conditions.
• Dual plumbing
There will be dual plumbing system for use
of water with different water quality which
will result in optimal use of water for
different applications. There will be two
pipelines, one supplying fresh water and
other for supply of treated water for flushing,
landscaping etc.
33. The project proponent shall provide one
refuge area till 24 meter, one till 39 meter
and one after 15 meter as per National
Building Code. The project proponent shall
not convert any refuse area in the habitable
space and it should not be sold
out/commercialized.
The contents of para 33 are noted and will be
complied and will be complied as per the
requirements of NBC2005
34. The project proponent shall provide fire
control room and fire officer for building
above 30 meter as per National Building
Code.
Proper fire fighting arrangements will be made
as per NBC 2005.
35. The project proponent shall obtain
permission of Mines & Geology
Department for excavation of soil before
The same will be complied with. Permission
will be obtained from Mines and Geology
Department for excavation of soil before the
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
the start of construction. start of construction.
36. The project proponent shall seek specific
prior approval from concerned local
Authority/HUDA regarding provision of
storm drainage and sewage system
including their integration with external
services of HUDA/Local authorities
besides other required services before
taking up any construction activity.
The same will be complied with.
37. The site for solid waste management plant
is earmarked on the layout plan and the
detailed project for setting up the solid
waste management plant shall be submitted
to the Authority within one month.
The same will be complied with. Solid waste
generated during construction phase will be
handled as per rules and norms.
38. The project proponent shall submit the
copy of the fire safety plan duly approved
by Fire department before the start of
construction.
The same will be submitted before the start of
construction.
39. The project proponent shall discharge
excess of treated waste water /storm water
in the public drainage system and shall
seek permission of HUDA before the start
of construction.
The same will be complied with. Excessive
treated water will be discharged into public
drainage system and the permission for the
same will be obtained from HUDA.
40. The project proponent shall maintain the
distance between STP and water supply
line.
The same is noted and will be followed.
Adequate distance between STP and water
supply line will be maintained.
41. The project proponent shall ensure that the
stack height is 6 meter more than the
highest tower.
The same will be complied with. DG sets will
be provided with adequate stack. Height as per
the norms of CPCB.
42. The project proponent shall ensure that
structural stability to withstand earthquake
The entire building will be designed as per the
provisions of National Building Code-2005 for
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
of magnitude 8.5 on Richter scale. structural safety of the building against any
possible earthquakes. Structure stability
certificate will be obtained.
43. The project proponent shall seek NOC
from Town and Country department
regarding height of the building allowed in
the skyline of that city.
The same will be complied with.
44. The project proponent shall provide
helipad facility as required under NBC
norms and shall seek permission of helipad
from AAI accordingly.
The same is noted and will be complied with.
Permission of helipad from AAI will be
obtained.
45. The project proponent shall implement the
revised parking /traffic circulation plan
dated 12.06.201 as submitted in the
meeting (width of ramp up to 6 meter)
The same is noted and will be complied.
46. The project proponent shall implement
revised layout plan as submitted dated
12.06.2014 (parking in between the blocks
of schools).
The contents of para 45 are noted and will be
complied
• OPERATIONAL PHASE
a) “Consent to Operate” shall be obtained
from Haryana State Pollution Control
Board under Air & Water Act and a copy
shall be submitted to the SEIAA, Haryana.
The content of para (a) is noted and will be
complied with.
b) The sewage treatment plant shall be
installed for the treatment of the sewage to
the prescribed standards including odour
and treated effluent will be recycled. The
installation of STP should be certified by an
independent expert and a report in this
The STP will be commissioned under the
guidance of an expert. Sewage treatment plant
scheme will be approved by HSPCB.
The treated effluent from STP (744 KLD) will
be recycled/ reused for flushing (216 KLD),
plantation (116 KLD), make up water for
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
regard should be submitted to the SEIAA
Haryana before the project is commissioned
for operation. Tertiary treatment of waste
water is mandatory. Discharge of treated
sewage shall conform to the norms and
standards of HSPCB, Panchkula. Project
Proponent shall implement such STP
technology which does not require filter
backwash.
cooling towers/ DG sets (22 KLD), water
Body (5 KLD).
Treated water will comply to the applicable
norms and standards of HSPCB.
c) Separation of the grey and black water
should be done by the use of dual plumbing
line. Treatment of 100% grey water by
decentralized treatment should be done
ensuring that the re-circulated water should
have BOD level less than 5 mg/litre and the
recycled water will be used for flushing
,gardening and DG set cooling
Etc. to achieve zero exit discharge.
The same will be complied with. Dual
plumbing will be done.
d) For disinfection of the treated waste water
ultra-violet radiation or ozonization process
should be used.
The same will be complied with. Ozone
treatment or UV radiation process will be used
for disinfection of treated waste water.
e) Diesel power generating sets proposed as
source of back-up power for lifts. Common
area illumination and for domestic use
should be of enclosed type and conform to
rules made under the environment
(protection) Act .1986.The location of the
DG set shall be in the open as promised by
the project proponent with appropriate
stack height above the highest roof level of
the project as per the CPCB norms. The
D.G. set of cumulative capacity 4000 kVA (4
nos. - 1000 kVA each) will be deployed at the
site.
DG sets will be housed in a room/ enclosure
designed to meet the applicable CPCB
standards.
The DG sets will be equipped with acoustic
enclosure with proper stack height to
minimize the emission and noise generation.
Low sulphur fuel (sulphur content: 0.05%)
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
diesel used for DG sets shall be ultra-low
sulphur diesel (35 ppm sulphur), instead of
low sulphur diesel.
will be used in the DG sets.
f) Ambient Noise level should be controlled
to ensure that it does not exceed the
prescribed standards both within and at the
boundary of the proposed Group Housing
Project.
All necessary measures will be adopted to
ensure that noise levels conform to residential
standards laid down by CPCB. The same are
listed as under:
• D.G. sets will be housed in an acoustic
rooms designed to meet the CPCB standards
of noise.
• The driveways will have sufficient width so
that there is no congestion of vehicles during
peak hours which lead to increase in the
noise levels
• Adequate parking including provisions of
visitors parking
• Entry & exits will be manned with trained &
efficient security to ensure smooth flow of
vehicles.
• There will be less starting and stopping and
the vehicles will be speed restricted to
ensure the noise within the permissible
limits.
• The area will cover 24268.18 sq. m. (32%)
area under landscape, which will help to
absorb noise.
g) The project proponent as started in the
proposal should maintain at least 32 % as
green cover area for tree plantation
especially all around the periphery of the
project and on the road sides preferably
About 32% of the total area will be under
green belt as shelter belt, Avenue Plantation,
Shrubs, herbs, parks, landscaping, water body
and climber plants. The same is detailed as
under:
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
with local species which can provide
protection against noise and suspended
particulate matter. The open spaces inside
the project shall be preferably landscape
and covered with vegetation/grass, herbs &
shrubs. Only locally available plant species
shall be used.
Description Area (sq. m.)
Total plot area 75838.08
Landscape Area 22814.55
Shelter belt 9268.42
Avenue plantation 6416.59
Shrubs, herbs, organised
green area etc.
3564.77
water body 3564.77
Total 22814.55
h) The project proponent shall strive to
minimize water in irrigation of landscape
by minimizing grass area, using native
variety, xeriscaping and mulching, utilizing
efficient irrigation system, scheduling
irrigation only after checking
evapotranspiration data.
• The same will be complied with. Following
measures will be adopted to minimize water
requirement for landscaping :
• Native & xeriscaping plant species:
Choose native plant species that need less
water (list of the same is provided at point h
above).
• Creating Hydro zones: Grouping of plant
according to their water needs to provide
adequate water to all plants without over or
under-watering.
• Maintain Healthy Soil: Healthy soils are
the basis for a water-smart landscape; they
effectively cycle nutrients, minimize runoff,
retain water, and absorb excess nutrients,
sediments, and pollutants.
• Mulching: Incorporate mulch around shrubs
and garden plants to help reduce
evaporation, inhibit weed growth, moderate
soil temperature, and prevent erosion.
Adding organic matter and aerating soil can
improve its ability to hold water.
• Avoid watering during the heat of the day.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
Water early in the morning to reduce the
evaporation rate
• Turfs will be avoided to the extent possible
• Central shut off valve will be provided
• Drip irrigation/ sprinkler irrigation system
will be used to conserve water.
i) Rain water harvesting for roof run-off and
surface run-off, as per plan submitted
should be implemented. Before recharging
the surface run off, pre-treatment through
sedimentation tanks must be done to
remove suspended matter, oil and grease.
The bore well for rain water recharging
shall be kept at least 5 mts. above the
highest ground water table. Care shall be
taken that contaminated water do not enter
any RWH pit .The project proponent shall
avoid Rain water Harvesting of first 10
minutes of rain fall. Roof top of the
building shall be without any toxic material
or paint which can contaminate rain water.
Wire mess and filter should be used
wherever use required.
Rain water harvesting (RWH) system for roof
run-off and surface run-off will be designed
and implemented as per the submitted plan &
GOI manual.
Surface run off from the roof top and the
paved areas will be channelized through storm
water network after pre-treatment to remove
oil & grease to remove suspended matter, oil
& grease and ensure the quality of water.
Details of rain water harvesting structures are
as under:
Design Parameters
Average annual rainfall 541 mm
Peak intensity of rainfall 45 mm/hr
Details of structures
Number of structures 17
j) The ground water level and its quality
should be monitored regularly in
consultation with central Ground Water
Authority.
The ground water monitoring will be done and
piezometric well will be constructed in
consultation with Central Ground Water
Authority.
k) A report on the energy conservation
measures conforming to energy
conservation norms finalized by Bureau of
Energy Efficiency should be prepared
The detailed report on the energy conservation
measures conforming to energy conservation
norms finalized by Bureau of Energy
Efficiency shall be prepared and will be
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
incorporating details about building
material & technology, R&U Factors etc
and submitted to the SEIAA, Haryana in
three months’ time.
submitted as desired with subsequent
compliance reports. Energy conservation
measures are detailed below:
• Solar geysers will be used for meeting hot water requirement (top two floors).
• Energy efficient compact Fluorescent Lamps will be used as these CFL gives same
illumination with less wattage compare to GLS Lamps.
• Automatic Power Factor correction panel with capacitor will be used for Common Load &
Fixed Capacitor for Transformer to minimize the losses
• Day light integrated to reduce artificial lighting demand.
• Emphasis will be given on low maintenance, low wattage and longer life in selection of
chokes and lamps for all common area and external light fixtures.
• Following measures will be adopted to reduce the heat ingress inside the building:
o Recessed windows and Covered balconies to limit direct heat gains.
o The wall will be made with fly ash bricks, AAC blocks, plastered outside and water
proofing paint.
o Shading devices are being provided to shade to windows and external façade.
• Optimizing building envelop & window design to reduce cooling demand (by selecting
energy efficient low U value materials for envelop is application of high reflecting white
china mosaic tiles to terrace).
• All the lifts and other pumps will be provided with variable frequency drives (VFD) which
will help in cutting the energy demand by 23%
l) Energy conservation measures like
installation of LED only for lighting the
areas outside the building and inside the
building should be integral part of the
project design and should be in place before
project commissioning. Use of solar panels
must be adapted to the maximum energy
conservation.
LED lights will be used for lighting the areas
outside the building.
Solar Panels will be installed on the terrace
floor and will be used for meeting hot water
requirement.
m) The Project Proponent shall use zero ozone The same will be complied with.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
depleting potential material in insulation,
refrigeration, air-conditioning and adhesive.
Project Proponent shall also provide Halon
Free fire suppression system.
• Zero ozone depleting material will be used
in insulation, air-conditioning and
adhesives.
• Refrigeration will not be required.
n) The solid waste generated should be
properly collected and segregated as per the
requirement of the MSW Rules, 2000 and
as amended from time to time. The bio
degradable waste should be treated by
appropriate technology at the site ear
marked within the project area and dry/inert
solid waste should be disposed off to the
approved sites for land filling after
recovering recyclable material.
About 2732 kg/day municipal solid waste will
be generated during the operational phase of
the project which will be collected and
segregated as per the Municipal Solid Waste
Rules 2000 and amended Rules, 2008.Details
for the same is given below :-
Collection and Segregation of waste:
• A door to door collection system will be provided.
• The vendors will be hired to provide separate plastic bags for dry recyclables and Bio-
Degradable waste.
• For commercial waste collection, adequate number of colour coded bins (Green and Blue &
dark grey separate for Bio-degradable and Non Bio-degradable) are proposed to be provided at
the strategic locations of the commercial area.
• Litter bin will also be provided in open areas like parks etc.
Treatment of waste:
� Bio-Degradable wastes:
• STP sludge will be used for horticultural purposes as manure.
• Horticultural Waste will be composted and will be used for gardening purposes.
� Recyclable wastes:
Recyclable wastes like paper, plastic, metals etc. will be sold off to vendors.
o) The provision of the solar water heating
system shall be as per norms specified by
The same will be complied with. Solar water
heating system will be installed as per
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
HAREDA and shall be made operational in
each building block.
guidelines of Haryana Renewable Energy
Development Agency (HAREDA).
p) The traffic plan and the parking plan
proposed by the project proponent should be
adhered to meticulously with further scope
of additional parking for future
requirements. There should be no traffic
congestion near the entry and exit points
from the roads adjoining the proposed
project site .Parking should be fully
internalized and no public space should be
used.
Adequate parking will be provided to avoid
traffic congestion near the entry and exit
points. The movement pattern inside the
project area will be guided traffic ways with
one-way traffic movement to avoid traffic
congestion. Fully internalized parking
facilities will be provided at basement, stilt
and open surfaces at well designated parking
places and no public space will be utilized for
the same.
q) The Project shall be operationalized only
when HUDA/local authority will provide
domestic water supply system in the area.
The content of para (q) is noted and will be
followed.
r) Operation and maintenance of STP, solid
waste management and electrical
Infrastructure, pollution control measures
shall be ensured even after the completion of
project.
The same will complied with.
s) Different type of waste should be disposed
off as per provisions of municipal solid
waste, biomedical waste, hazardous waste,
e-waste, batteries & plastic rules made under
Environment Protection Act, 1986.
Particularly E-waste and battery waste shall
be disposed of as per existing E-waste
management Rules 2011 and Batteries
management Rules 2001.The project
proponent should maintain a collection
center for E-waste and it shall be disposed of
Hazardous waste or bio medical waste will not
be generated from the project. However, the
municipal solid waste generated from the
project will be handled as per the Municipal
Solid Waste (Management & Handling) Rules.
The same is detailed in point number (d)
above. E-Waste and battery waste generated
from the project will be disposed off as per
norms and rules.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
to only registered and authorised
dismantler/recycler.
t) Standard discharge of environment
pollutants as enshrines in various schedules
of rule 3 of Environment Protection Rule
1986 shall be strictly complied with.
The same will be complied with.
u) Water supply shall be metered among
different users and different utilities.
The same will be complied with. Water meter
will be installed to monitor the water usage at
the following points:
� Fresh water intake
� Inlet of flushing tanks
� STP inlet
� STP outlet
� Landscaping
v) The project proponent shall ensure that the
use of DG sets is more than the highest
tower and also ensure that the emission
standards of noise and air are within the
CPCB latest prescribed limits. Noise and
Emission level of DG set greater than 800
KVA shall be as per CPCM latest standards
for high capacity DG sets.
The same will be complied with. DG sets will
be provided with effective stack height as per
the norms of CPCB.
w) All electric supply exceeding 100 amp, 3
phases shall maintain the power factor
between 0.98 lag to 1 at the point of
connection.
The same is noted and will be followed.
x) The project proponent shall not use fresh
water HVAC and DG cooling. Air based
HVAC system should be adopted and only
treated water shall be used by project
proponent for cooling. If it is at all needed.
The same will be complied with. The project
does not envisages the use of HVAC system.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
The project proponent shall also use
evaporative for cooling technology and
double stages cooling system for HVAC in
order to reduce water consumption .Further
temperature, relative humidity during
summer and winter seasons should be kept
at optimal level. Variable speed drive, best
Co-efficient of Performance (Cop), as well
as optimal Integrated Point Load value and
minimum outside fresh air supply may be
resorted for conservation of power and
water. Coil type cooling DG sets shall be
used for saving cooling water consumption
for water cooled D.G sets.
y) The project proponent shall ensure that the
transformer is constructed with high quality
grain oriented, low loss silicon steel and
virgin electrolyte grade copper. The project
proponent shall obtain manufacturer’s
certificate also for that.
The content of para (y) is noted and will be
complied with.
z) The project proponent shall ensure that exit
velocity from the stack should be
sufficiently high. Stack shall be designed in
such a way that there is no stack down-wash
under any meteorological conditions.
The same will be complied with.
aa The project proponent shall provide water
sprinkling system in the project area to
suppress the dust in addition to the already
suggested mitigation measures in the Air
Environment Chapter of EMP.
The same will be complied with.
• Proper water sprinkling system will be
used to suppress dust.
• Dust screen will be used for every floor to
minimise the dust emission.
ab The project proponent shall ensure proper The same will be complied with.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
Air Ventilation and light system in the
basements area for comfortable living of
human being and shall ensure that number of
Air changes per hour/(ACH) in basement
never falls below 15.In case of emergency
capacity for increasing ACH to the extent of
30 must be provided by the project
proponent.
ac The project proponent shall ensure drinking
/domestic water supply as per prescribed
standard till treated water supply is made
available by HUDA.
The same will be complied with.
PART B: GENERAL CONDITION
i. The project proponent shall ensure the
commitments made in Form-1, Form-1A,
EIA/EMP and other documents submitted to the
SEIAA for the protection of environment and
proposed environmental safeguards are complied
with in letter and spirit.
The content of para (i) is noted and will
be complied with.
ii. The project proponent shall also submit Six
monthly reports on status of compliance of the
stipulated EC conditions including results of
monitored data (both in hard copies as well as by
e-mail) to the northern Regional office of MoEF,
the respective Zonal Office of CPCB, HSPCB
and SEIAA Haryana.
The same will be noted and complied
with.
iii. STP outlets after stabilization and stack emission
shall be monitored monthly. Other environmental
parameters and green belt shall be monitored on
quarterly basis. After every 3 months, the project
The same will be complied with.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
proponent shall conduct environmental audit and
shall take corrective measure, if required, without
delay.
iv. The SEIAA Haryana, reserves the right to add
additional safeguards measures subsequently, if
found necessary. Environmental Clearance
granted will be revoked if it is found that false
information has been given for getting approval
of this project. SEIAA reserves the right to
revoke the clearance if conditions stipulated are
not implemented to the satisfaction of
SEIAA/MoEF.
If any additional safeguards measures
will be given, it will be followed and
complied.
v. The project proponent shall not violate any
judicial orders/ pronouncements issued by the
Hon’ble Supreme Court/High Courts.
We will try to the best possible extent not
to violate any judicial orders/
pronouncements issued by the Hon’ble
Supreme Court/ High Courts.
vi. All other statutory clearances such as the
approvals for storage of diesel from Chief
Controller of Explosive, Fire Department, Civil
Aviation Department, Forest Conservation Act,
1980 and Wildlife (Protection) Act 1972, Forest
Act 1927, PLPA 1900, etc. shall be obtained, as
applicable by project proponents from the
respective authorities prior to construction of the
project.
The same will be complied with as per
applicability on the project.
Forest Clearance under Forest
Conservation Act is not applicable as
there is no forest land involved in the
project. The copy of certificate obtained
from Dy. Conservator of Forests,
Gurgaon is enclosed as Annexure VII.
vii. The project proponent should inform the public
that the project has been accorded Environmental
Clearance by the SEIAA and copies of the
clearance letter are available with the State
Pollution Control Board & SEIAA. This should
be advertised within 7 days from the date of issue
The same will be complied with. The
copy of the newspaper advertisement will
be enclosed as Annexure VIII.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
of the clearance letter at least in two local
newspapers that are widely circulated in the
region and the copy of the same should be
forwarded to SEIAA Haryana. A copy of
Environment Clearance conditions shall also be
put on project proponent’s web site for public
awareness.
viii Under the provision of Environment (Protection)
Act, 1986, legal action shall be initiated against
the project proponent it was found that
construction of the project has been started before
obtaining prior Environmental Clearance.
The content of para viii is noted and
undisputed.
ix. Any appeal against this Environmental Clearance
shall lie with the National Green Tribunal, if
preferred, within a period of 30 days as
prescribed under Section 16 of the National
Green Tribunal Act, 2010.
The content of para ix is noted and
undisputed.
x. The project proponent shall put in place
Corporate Environment Policy as mentioned in
MoEF, GoI OM No. J-11013/41/2006-IA II (I)
dated 26.04.2012.within 3 months period .Latest
Corporate Environment Policy should be
submitted to SEIAA within 3 months of issuance
of this letter.
The same will be complied with.
xi. The fund ear-marked for environment protection
measures should be kept in separate account and
should not be diverted for other purposes and
year wise expenditure shall be reported to the
SEIAA/RO MoEF GoI under rules prescribed for
Environmental Audit.
The same will be complied with.
xii. The project proponent shall ensure the The same will be complied with.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
compliance of Forest Department, Haryana
Notification no.S.O.121/PA2/1900/S.4/94 dated
28.11.1997
xiii The project proponent shall ensure that no vehicle
during construction /operation phase enter the
project premises without valid ‘Pollution Under
Control’ certificate from competent Authority.
The same will be complied with. PUC
certified vehicle will be used during
construction phase of the project.
xi. The project proponent is responsible for
compliance of all conditions in Environment
Clearance letter and project proponent cannot
absolve himself /herself of the responsibility by
shifting it to any contractor engaged by project
proponent.
The project proponent is responsible for
compliance of all conditions in
Environmental Clearance letter.
xv. The project proponent shall seek fresh
Environment clearance if at any stage there is
change in the planning of the proposed project.
The same will be followed.
xvi Besides the developer/applicant ,the
responsibility to ensure the compliance of
Environmental Safeguards/conditions imposed in
the Environmental Clearance letter shall also lie
on the licensee/licensees in whose name/names
the license/ CLU has been granted by the Town &
country Planning Department ,Haryana.
The same is noted and will be complied
with.
xvii. The proponent shall upload the status of
compliance of the stipulated EC conditions,
including results of monitored data on their
website and shall update the same periodically. It
shall simultaneously be sent to the Regional
Office of MoEF, the respective Zonal Office of
CPCB and the SPCB .The criteria pollutant level
namely ; PM2.5, PM10, SOX, NOX, Ozone, Lead,
The same will be complied with.
Project : “Arascape” Group Housing Colony
Promoter : Aum Shree Hotels & Resorts Pvt Ltd.
Compliance Report of the conditions laid in the
Environmental Clearance: up to June 2016
For Aum shree Hotels & Resorts Pvt. Ltd.
(Authorized Signatory)
CO, benzene, Ammonia, Benzopyrine, arsenic
and Nickel. (Ambient level as well as stack
emissions) or crictical sectoral parameters,
indicated for the project shall be monitored and
displayed at a convenient location near the main
gate of the company in the public domain.
xviii The Environment statement for each financial
year ending 31st march in Form V as is mandated
to be submitted by the project proponent to
HSPCB, Panchkula as prescribed under the
Environment (Protection) Rules, 1986, as
amended subsequently, shall also be put on the
website of the company along with the status of
the compliance of EC conditions and shall also to
be respective Regional Office of MoEF by e-
mail.
The same will be followed.
xix. The project proponent shall conduct environment
audit at every three months interval and thereafter
corrected measures shall be taken without any
delay. Details of environmental audit and
corrective measures shall be submitted in the
monitoring report.
The same will be complied with.
For Aum Shree Hotels & Resorts Pvt Ltd
(Authorized Signatory)
***********