compliance activity management system w background
TRANSCRIPT
COMPLIANCE ACTIVITY MANAGEMENT SYSTEMS
WELCOME
Relavance Software Corp
There is a Root Problem in IT:Tables are used for storing information. So what’s wrong with that? Here
is the short list...
• Tables require pre-defined specifications from known requirements and then inherently resist or block change
• But reality and requirements both change• Tables are 2 dimensional structures for storing
data• But Information is ‘n’- dimensional• Tables and columns are named by IT professionals • But Users need to get information, don’t care how
its stored, don’t have time to learn to write SQL queries themselves, and don’t want to wait for the IT pros to do it, eventually, after the SAP ERP and SCM systems, and the big data warehouse projects, are finished, installed and working.
There is a serious disconnect here: The Solution and the Requirements do not match, ...
at all.
Relavance Associative Information Systems are:
A New Paradigm for Information Storage / Management
• ‘n’-D Information Storage Model, Multi-D Management
An Associative Information Architecture• Many to Many relationship oriented architecture, holds all possible quantities and types of relationships an item (concept) may have, in all dimensions of association
Employing an active, dynamic Dendritic Network Model
• Works analogously to the brain, creating a fact based learning environment that can embody any real world info
Models all types of humanly differentiable relationships
• Every way we can think of things is intrinsically supported
Namespace, Data Structure, and Data Type independent
• All data access processing handled with Concept Tokens
Copyright 2010 - 2012, Relavance Corp. Confidential and Proprietary.
Relavance Associative Information Systems
The Relavance Associative Information Architecture::
- stores each piece of information, each concept, at the center of its own Universe of relationships,
- supports implementation of complex and rapidly changing data models and structures without redesign,
- accommodates every kind of data and information in:
• A Table-Free, Encapsulated Data Object Free, Dynamic Storage Model that can have a perfect one-to-one correspondence with the Concept model or schema of the target system or business
• A run-time Configurable, Adaptable, Evolvable Application, with unbounded extensibility
• A fully inclusive, inter-reference-able, data-type and data-source agnostic, information management platform that scales linearly with complexity and size
• A system of systems approach
Relavance Associative Information Systems
Copyright 2010 - 2012, Relavance Corp. Confidential and Proprietary.
Comparison of development cycles
ALLREGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
123321
12
6749
3
2971
2 5212
15
48137
9
2854
11
2337
8
3616
14
157
2
4497
13486793
79
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
...
ALLREGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
123321
12
6749
3
2971
2 5212
15
48137
9
2854
11
2337
8
3616
14
157
2
4497
13486793
79
COMPLIANCE DASHBOARD
......
ALLREGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
123321
12
6749
3
2971
2 5212
15
48137
9
2854
11
2337
8
3616
14
157
2
4497
13486793
79
COMPLIANCE DASHBOARD
...
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
123321
12
6749
3
2971
2 5212
15
48137
9
2854
11
2337
8
3616
14
157
2
4497
13486793
79
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
ALLREGULATIONS
ALL DEPARTMENTS
DESIGN
HR
IT
MARKETING
PRODUCTION
PURCHASING
R&D
SALES
PRODUCTION
INVENTORY
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
123321
12
6749
3
2971
2 5212
15
48137
9
2854
11
2337
8
3616
14
157
2
4497
13486793
79
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
ALL DEPARTMENTS
DESIGN
HR
IT
MARKETING
PRODUCTION
PURCHASING
R&D
SALES
ALLREGULATIONS
PRODUCTION
INVENTORY
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6749
2
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6749
2
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6749
2
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED ACCOUNTABILITY
INTERNAL PROCESS ID LAST QUALIFIED TEST / DOCUMENT REFERENCE
Air Exchange Filtration / Contamination
BR-38-A-724 Prod.92.137 2011/11/28
Surface Contaminant Cleansing BR-38-W-27 Prod.6.12 2011/10/01
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6749
2
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED ACCOUNTABILITY
INTERNAL PROCESS ID LAST QUALIFIED TEST / DOCUMENT REFERENCE
Air Exchange Filtration / Contamination
BR-38-A-724 Prod.92.137 2011/11/28
Surface Contaminant Cleansing BR-38-W-27 Prod.6.12 2011/10/01
Anne Bitmonger
ALL PERSONNEL
Billy Snarguffle
Evelyn Sneeple
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League
Jimmy Gotcha
David Waterhead
Colin Fludgrister
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6750
1
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED ACCOUNTABILITY
INTERNAL PROCESS ID LAST QUALIFIED TEST / DOCUMENT REFERENCE
Air Exchange Filtration / Contamination
BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Surface Contaminant Cleansing BR-38-W-27 Prod.6.12 2011/10/01
Anne Bitmonger
ALL PERSONNEL
Billy Snarguffle
Evelyn Sneeple
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League
Jimmy Gotcha
David Waterhead
Colin Fludgrister
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6750
1
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED ACCOUNTABILITY
INTERNAL PROCESS ID LAST QUALIFIED TEST / DOCUMENT REFERENCE
Air Exchange Filtration / Contamination
BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Surface Contaminent Cleansing BR-38-W-27 Prod.6.12 2011/10/01
Anne Bitmonger
ALL PERSONNEL
Billy Snarguffle
Evelyn Sneeple
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League
Jimmy Gotcha
David Waterhead
Colin Fludgrister
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED ACCOUNTABILITY
INTERNAL PROCESS ID LAST QUALIFIED TEST / DOCUMENT REFERENCE
Air Exchange Filtration / Contamination
BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Surface Contaminent Cleansing BR-38-W-27 Billy Snarguffle Prod.6.12 2011/10/01
Anne Bitmonger
ALL PERSONNEL
Billy Snarguffle
Evelyn Sneeple
Frampton Rockstar
Gary Bonecrusher
Harvey Luggage
Ivy League
Jimmy Gotcha
David Waterhead
Colin Fludgrister
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235310
42
PRODUCTION
PRODUCTION
REGULATION AREA REGULATION ID ASSIGNED ACCOUNTABILITY
INTERNAL PROCESS ID LAST QUALIFIED TEST / DOCUMENT REFERENCE
Air Exchange Filtration / Contamination
BR-38-A-724 David Waterhead Prod.92.137 2011/11/28
Surface Contaminant Cleansing BR-38-W-27 Billy Snarguffle Prod.6.12 2011/10/01
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REF ID REGULATION ID REGULATION NAME COMPLIANCE PROCESS ID
COMPLIANCE ACTIVITIES / EVENTS
ASSIGNED Accountability Expertise REQUIRED
PRIORITY RANK
COMPLIANCE STATE
11174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 Initiative 1174 David Waterhead 4
11175 BR-38-W-27 Surface Contaminant Cleansing PROD.06.12 Initiative 1175 Billy Snarguffle 4
13812 Et cetera Et cetera Et cetera Initiative …
... Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
PRODUCTION
REF ID REGULATION ID REGULATION NAME COMPLIANCE PROCESS ID
COMPLIANCE ACTIVITIES / EVENTS
ASSIGNED Accountability Expertise REQUIRED
PRIORITY RANK
COMPLIANCE STATE
11174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 Initiative 1174 David Waterhead 4
11175 BR-38-W-27 Surface Contaminant Cleansing PROD.06.12 Initiative 1175 Billy Snarguffle 4
13812 Et cetera Et cetera Et cetera Initiative …
... Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
Initiative
PRODUCTION
...STATUSDEPARTMENTS CONSULTANTS PRIORITYPERSONNEL
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
PRODUCTION
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
BR-38-A-724David Waterhead Gap: No Process 2012/01/27 PRODUCTION Initiative 1174
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
PRODUCTION
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
BR-38-A-724David Waterhead Gap: No Process 2012/01/27 PRODUCTION Initiative 1174
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
David Waterhead
Initiative 1174
Gap Determined
Process Developed
Schedule Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
Proc Docs Done
Process Approved
COMPLIANCE INITIATIVE
REGULATION ID REGULATION AREA
COMPLIANCE PROCESS ID
ASSIGNED ACCOUNTABILTY
COMPLIANCE ACTIVITY DATE BEGUN DATE COMPLETE
PLANNED
Initiative 1174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of March
ACTIVITY
BR-38-A-724 2012/01/27 PRODUCTION
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
Gap: No Process
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
COMPLIANCE INITIATIVE
REGULATION ID REGULATION AREA
COMPLIANCE PROCESS ID
ASSIGNED ACCOUNTABILTY
COMPLIANCE ACTIVITY DATE BEGUN DATE COMPLETE
PLANNED
Initiative 1174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of March
Gary Bonecrusher Identify Available Process Model 2012/02/07
David Waterhead
Initiative 1174
Gap Determined
Process Developed
Schedule Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Proc Docs Done
Process Approved
ACTIVITY
BR-38-A-724 Process Req’d 2012/02/02 PRODUCTION
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
COMPLIANCE INITIATIVE
REGULATION ID REGULATION AREA
COMPLIANCE PROCESS ID
ASSIGNED ACCOUNTABILTY
COMPLIANCE ACTIVITY DATE BEGUN DATE COMPLETE
PLANNED
Initiative 1174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of March
Gary Bonecrusher Identify Available Process Model 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
David Waterhead
Initiative 1174
Gap Determined
Process Developed
Schedule Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Proc Docs Done
Process Approved
ACTIVITY
BR-38-A-724 Process Modified 2012/02/10 PRODUCTION
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
COMPLIANCE INITIATIVE
REGULATION ID REGULATION AREA
COMPLIANCE PROCESS ID
ASSIGNED ACCOUNTABILTY
COMPLIANCE ACTIVITY DATE BEGUN DATE COMPLETE
PLANNED
Initiative 1174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of March
Gary Bonecrusher Identify Available Process Model 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
Review with DE 2012/02/13 2012/02/13
Update Process Docs 2012/02/14 2012/02/15
Evelyn Sneeple Institute Process Training 2012/02/20 2012/02/22
Implement Process in Lab 2012/02/23 2012/02/24
David Waterhead
Initiative 1174
Gap Determined
Process Developed
Schedule Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Proc Docs Done
Process Approved
ACTIVITY
BR-38-A-724PRODUCTION
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
Training Done 2012/02/22
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
COMPLIANCE INITIATIVE
REGULATION ID REGULATION AREA
COMPLIANCE PROCESS ID
ASSIGNED ACCOUNTABILTY
COMPLIANCE ACTIVITY DATE BEGUN DATE COMPLETE
PLANNED
Initiative 1174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of March
Gary Bonecrusher Identify Available Process Model 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
Review with DE 2012/02/13 2012/02/13
Update Process Docs 2012/02/14 2012/02/15
Evelyn Sneeple Institute Process Training 2012/02/20 2012/02/22
Implement Process in Lab 2012/02/23 2012/02/24
Inspect Process activities 2012/03/05 2012/03/05
Evaluate Process Efficacy 2012/03/07 2012/03/07
Determined Process Satisfies Regulation Req’s
2012/03/07 2012/03/07
Process Approved 2012/03/08 2012/03/08 2012/03/31
David Waterhead
Initiative 1174
Gap Determined
Process Developed
Schedule Done
Training Developed
Training Done
Institute Process
Inspect & Verify
Evaluate Process
Proc Docs Done
Process Approved
ACTIVITY
BR-38-A-724 Process Approved 2012/03/08 PRODUCTION
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
COMPLIANCE INITIATIVE
REGULATION ID REGULATION AREA
COMPLIANCE PROCESS ID
ASSIGNED ACCOUNTABILTY
COMPLIANCE ACTIVITY DATE BEGUN DATE COMPLETE
PLANNED
Initiative 1174 BR-38-A-724 Air Exchange Filtration / Contamination
PROD.92.137 David Waterhead Schedule Initiative 2012/01/27 2012/02/03 TBC by end of March
Gary Bonecrusher Identify Available Process Model 2012/02/07 2012/02/07
GAP Determined 2012/02/09 2012/02/09
PROD.92.137-A Modify Process Model 2012/02/09 2012/02/10
Review with DE 2012/02/13 2012/02/13
Update Process Docs 2012/02/14 2012/02/15
Evelyn Sneeple Institute Process Training 2012/02/20 2012/02/22
Implement Process in Lab 2012/02/23 2012/02/24
Inspect Process activities 2012/03/05 2012/03/05
Evaluate Process Efficacy 2012/03/07 2012/03/07
Determined Process Satisfies Regulation Req’s
2012/03/07 2012/03/07
Process Approved 2012/03/08 2012/03/08 2012/03/31
01/23 01/30 02/06 02/13 02/20 02/27 03/05
REGULATION ID: BR-38-A-724 - INITIATIVE 1174 - PRODUCTION DEPARTMENT - DAVID WATERHEAD
03/1201/18
Initiative Scheduled Process Model Ready Personnel Trained
Process Implemented
Inspection DoneRegulation Assigned
Process Approved
BR-38-A-724David Waterhead Process Approved 2012/03/08 PRODUCTION Initiative 1174
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6850
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
PRODUCTION
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
BR-38-A-724David Waterhead Process Approved 2012/03/08 PRODUCTION Initiative 1174
PERSONNEL ACTIVITY REGULATION STATUS DATEDEPARTMENTS
01/23 01/30 02/06 02/13 02/20 02/27 03/05
BIO RISK REGULATION ID: BR-38-A-724 - INITIATIVE 1174 - PRODUCTION DEPARTMENT - DAVID WATERHEAD
03/1201/18
Initiative Scheduled Process Model Ready Personnel Trained
Process Implemented
Inspection DoneRegulation Assigned
Process Approved
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL
PRODUCTION
PRODUCTION
CONSULTANTS PRIORITY STATUS ...
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL
PRODUCTION
PRODUCTION
CONSULTANTS PRIORITY STATUS ...
Status Bubbles
ALL CONTROLS
Grid 1
Grid 3
Grid 2
Dropdown 1
Dropdown 2
Dropdown 3
Dropdown 4
Dropdown 5
Dropdown 6
...
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL
PRODUCTION
PRODUCTION
CONSULTANTS PRIORITY STATUS ...
Status Bubbles
COMPLIANCE REFERENCE CONTEXTS Status 1 Status 2 Status 3
Ref ID x x
REGULATION ID x x x
REGULATION AREA x x x
COMPLIANCE PROCESS ID x x
COMPLIANCE ACTIVITIES / EVENTS x x
ASSIGNED Accountability x x x
Expertise area x x
PRIORITY RANK x x
COMPLIANCE STATE x x
DATE BEGUN x
DATE COMPLETED x
COMPLIANCE Initiative ID
PLANNED / Scheduled
PROGRAM / PROCESS IDENTIFIED
PROGRAM / PROCESS DEVELOPED
PROGRAM / PROCESS DOCUMENTATION DONE
PROGRAM / PROCESS TRAINING DEVELOPED
TRAINING DONE
PROGRAM / PROCESS INSTITUTED
COMPLIANCE INSPECTION COMPLETED
PROGRAM / PROCESS EVALUATION COMPLETED
PROGRAM / PROCESS APPROVED
REGULATIONS
ENVIRONMENTAL
PUBLICSAFETY
PUBLICHEALTH
SOURCE MATERIALS
ELECTRONICRECORDS
BIO-RISK
BIO-HAZARD
CORPORATEGOVERNANCE
ACCOUNTING
EMPLOYEESAFETY
37104
2
6751
0
2971
2 198
4
00
0
2132
7
612
3
3616
14
157
2
418
6235312
40
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM
DEPARTMENTS PERSONNEL
PRODUCTION
PRODUCTION
CONSULTANTS PRIORITY STATUS ...
Status Bubbles
COMPLIANCE REFERENCE CONTEXTS Status 1 Status 2 Status 3
Ref ID x
REGULATION ID x x x
REGULATION AREA x x x
COMPLIANCE PROCESS ID x x
COMPLIANCE ACTIVITIES / EVENTS x x
ASSIGNED Accountability x x x
Expertise area x x
PRIORITY RANK x x
COMPLIANCE STATE x x
DATE BEGUN x x
DATE COMPLETED x x
COMPLIANCE Initiative ID x
PLANNED / Scheduled x
PROGRAM / PROCESS IDENTIFIED
PROGRAM / PROCESS DEVELOPED
PROGRAM / PROCESS DOCUMENTATION DONE
PROGRAM / PROCESS TRAINING DEVELOPED
TRAINING DONE
PROGRAM / PROCESS INSTITUTED
COMPLIANCE INSPECTION COMPLETED
PROGRAM / PROCESS EVALUATION COMPLETED
PROGRAM / PROCESS APPROVED
COMPLIANCE ACTIVITY MANAGEMENT SYSTEM