Page 1 of 15 LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARS Name of Consultant : E.H. SISON ENGINEERS, CO. Business Address : 3431 Guernica St., Palanan, Makati City Name and Location of Project Description of the Project Classifica tion (Governmen t/ Private) Date of Award of Contract Type of Consulting Services Amount of Contract (Cost of Services only of your firm) Contract Duration Consultant's Role (Main, Sub- contractor or Partner in a JV) 1. Consultancy Services for the Conduct of Master Plan and Feasibility Study of Metro Iloilo Urban and Drainage Improvement and Related Works Project This Project, mainly involving the formulation of a Master Plan and preparation of Feasibility Studies of Metro Iloilo Urban drainage improvement. It is intended to develop a comprehensive guide to prioritize the development of drainage improvement and consequently reduce the serious flooding in several areas. The drainage areas of consideration which contributes flooding in the project areas are 1) Buntala Creek; (2) Mansaya Creek; (3) Dungon Creek; (4) Calajunan Creek. Government January 2012 Master Plan and Feasibility Study Php 17,137,520.00 Jan.2012 to Jan.2013 Main Consultant 2. Detailed Engineering Design for the Retrofitting of Bridges in the National Capital Region As per findings of the DPWH Inspectorate Teams, some bridges have high seismic vulnerability rating and maybe heavily damaged or collapse in the event of a major earthquake. The recent destructive earthquakes in nearby countries could be Government December 2012 Detailed Structural and Retrofitting Designs, Structural investigation and analysis Php 6,112,486.80 Dec. 2012 to June 2013 Main Consultant

Upload: archie-pamatmat

Post on 21-Dec-2015

216 views

Category:

Documents


2 download

DESCRIPTION

free

TRANSCRIPT

Page 1: Completed Projects NIA R2

Page 1 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARS

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)1. Consultancy

Services for the Conduct of Master Plan and Feasibility Study of Metro Iloilo Urban and Drainage Improvement and Related Works Project

This Project, mainly involving the formulation of a Master Plan and preparation of Feasibility Studies of Metro Iloilo Urban drainage improvement. It is intended to develop a comprehensive guide to prioritize the development of drainage improvement and consequently reduce the serious flooding in several areas. The drainage areas of consideration which contributes flooding in the project areas are 1) Buntala Creek; (2) Mansaya Creek; (3) Dungon Creek; (4) Calajunan Creek.

Government January 2012

Master Plan and Feasibility Study

Php 17,137,520.00

Jan.2012 to Jan.2013

Main Consultant

2. Detailed Engineering Design for the Retrofitting of Bridges in the National Capital Region

As per findings of the DPWH Inspectorate Teams, some bridges have high seismic vulnerability rating and maybe heavily damaged or collapse in the event of a major earthquake. The recent destructive earthquakes in nearby countries could be expected anytime to occur in Metro Manila due to movement of West Valley Fault Line which according PHIVOLCS can generate a magnitude of 7.2 earthquake. Hence there is urgent need for the early completion of the seismic retrofitting works. Detailed Engineering/Retrofitting Design for Ten (10) NCR bridges consisting of 3 single spans and 7 multispans shall be performed. The objective is to upgrade the load carrying

Government December 2012

Detailed Structural and Retrofitting Designs, Structural investigation and analysis

Php 6,112,486.80

Dec. 2012 to June 2013

Main Consultant

Page 2: Completed Projects NIA R2

Page 2 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARScapacity and seismic resistance of these existing bridges

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)3. Consultancy

Services for the Detailed Engineering Design for the Reconstruction of Bridges in the National Capital Region (Package II)

Proposed reconstruction of five (5) bridges namely 1. Lambingan Bridge 2. Lagarian Bridges 1 and 2 3. Libis South Bridge 4. Malabon Bridge and 5. Regalado Bridge, these bridges are subject to detailed engineering design. The project also includes preparation of technical studies, procurement and implementation plans, bidding documents, traffic management (including detour if necessary) and construction methodology

Government February 2012

Detailed Engineering Design, Structural investigation and analysis

Php 6,397,914.60

Feb. 2012 to July 2012

Main Consultant

4. Parcellary/Design Consultancy of Molino Boulevard-Aguinaldo Highway, Cavite

Proposed Molino Boulevard – Aguinaldo Highway, Cavite Province with an approximate length of 12.0 kms which included Parcellary Survey works, Detailed Engineering design works for a 4-lane highway with a length of 12kms, 2-lane flyovers along Molino Boulevard and Aguinaldo Highway, and ECC for the 12kms (including transition for the proposed flyovers)

Government January 2010

Parcellary survey plans for RROW Acquisitions/Detailed Engineering designs and estimate quantification for roads, bridges, flyover, intersections and other related structures and the Environmental Impact Assessment.

Php 15,660,000.00

Jan. 2010 to June 2010

Main Consultant

5. Detailed Engineering Design of Austrian-Assisted DPWH Bridge Construction Acceleration Project for Calamity Stricken Areas (3 bridges)

The project involves the detailed engineering design and consultancy services for 3 bridges that were affected by natural disasters. The superstructures will utilize the WBB Modular System Bridge

Government January 2010

Detailed Engineering Designs including Preparation of Bridge Layout, Design of Approaches and Slope Protection;

Php 2,072,650.00

Jan. 2010 to May 2010

Partner in JV

Page 3: Completed Projects NIA R2

Page 3 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARSDesign and will rest on isolated footings, driven steel H-piles or bored piles depending on the site conditions

Perform Geotechnical Investigation and Detailed Topographic Surveys; and Perform Hydrologic Studies & Hydraulic Analysis

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)6. Retrofitting/

Strengthening of Bacood,-Mandaluyong Bridge

Retrofitting/strengthening Works on incorrect fabrication of 3 continuous boxed steel type curved girders resulting to a gap of about 1.5m above the support on one of its abutment. Design for retrofitting consists of removing portion of steel plates to enable the girder to rest on its bearing support. Then additional steel plates were provided to strengthen the steel girders.

Private 2009 Detailed Engineering and Retrofitting Design

Php 200,00.00 2009 Partner in a JV

7. Consultancy Services for the Preparation of Detailed Engineering Design including Parcellary Survey for the Construction of Flyover Crossing Commonwealth Avenue (Connecting Tandang-Sora – Damayan Alley to Luzon Avenue, Quezon City)

The proposed C-5 extension beyond Katipunan Avenue shall be 30 m wide and can accommodate approximately 6 lanes, 3 in each direction. The proposed flyover shall be around 18 m wide in total, and can accommodate four (4) lanes (two – 7.32 m wide lanes in each direction), sidewalks on both sides, and a center islands

Government December 2008

Detailed Engineering Designs/ Plans including Structural Analysis Computations, Cost Estimates, and Detailed Topographic & Parcellary Surveys

Php 12,036,088.00

Dec. 2008to

June 2009

Main Consultant

8. Preliminary and Detailed Engineering Design of Austrian Assisted – DPWH Bridge Construction

The project involves the detailed engineering design and consultancy services for 18 single and muti-span

Government April 2008 Detailed Engineering Designs including Preparation of

Php 18,200,000.00

April 2008to

April 2009

Partner in a JV

Page 4: Completed Projects NIA R2

Page 4 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARSAcceleration Project for Calamity Stricken Areas (18 bridges); Nationwide

bridges that were affected by natural disasters. The superstructures will utilize the WBB Modular System Bridge Design and will rest on isolated footings, driven steel H-piles or bored piles depending on the site conditions

Bridge Layout, Design of Approaches and Slope Protection; Perform Geotechnical Investigation and Detailed Topographic Surveys; and Perform Hydrologic Studies & Hydraulic Analysis

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)9. Consulting Services

for the Conduct of Detailed Investigation and Detailed Engineering Design of Slope Failure and Mass Movement Mitigation Measures for Critical Road Sections along Bontoc-Tabuk Road Section, Kalinga and Mt. Province

The Bontoc-Lubuagan is a 64 km road that serves as the main artillery linking the lower Cordillera with the rest of Northern Cordillera. About 35 major problem areas have been identified along the Bontoc-Lubuagan Road (landslides, slope instability, erosion). The present situation of the Bontoc-Lubuagan Road is unsustainable, since without appropriate intervention the slopes will continue to fail; access will be interrupted; economic activities disrupted

Government December 2008

Detailed Engineering Designs and Consultancy Services including Slope Stability Analysis and Slope Mitigation Measures

Php 11,951,919.00

Jan. 2009to

July 2009

Main Consultant

10. Consultancy Services for the Detailed Engineering Design including Parcellary Survey of Priority Road Projects (SONA Projects), Bontoc–Tabuk-Tuguegarao Road; Cagayan, Kalinga and Mt. Province

The project comprises the improvement, rehabilitation, and enhancement of Bontoc – Lubuagan Road. The 64 km road serves as the main artillery linking the lower Cordillera with the rest of Northern Cordillera

Government August 2007 Detailed Engineering Designs and Consultancy Services including Parcellary Surveys

Php 19,185,415.00

July 2007to

Sept. 2008

Main Consultant

Page 5: Completed Projects NIA R2

Page 5 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARS

11. Preliminary and Detailed Engineering including Investigation and Parcellary Surveys for the Replacement / Widening / Retrofitting of Bridges, Meycauayan, Bulacan to Mabalacat, Pampanga

The project comprises the replacement/ widening/ retrofitting of ten (10) identified weakened bridges with an aggregate length of 189.3 meters along Manila North Road from Meycauayan, Bulacan to Mabalacat, Pampanga

Government June 2007 Detailed Engineering Designs and Consultancy Services including Investigation and Parcellary Surveys

Php 6,700,000.00

June 2007to

Feb. 2008

Main Consultant

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)12. Consultancy

Services for Structural Investigation and Detailed Engineering for the Repair and Strengthening/ Retrofitting of the Presidential Management Staff (PMS) Building

The project is a 12storey building located at Arlegui St., San Miguel, Manila recommended by DPWH to be subjected to structural investigation and evaluation in order to determine necessary strengthening measures to increase level of safety since PMS building houses a major government agency, it is prudent to assure its safety in case a major earthquake occurs.

Government Dec. 2011 Structural investigation, analysis and retrofitting design

Php3,140,768.00

Dec 2011 to April 2012

Main Consultant

13. Consultancy Services for the Structural Investigation and Detailed Engineering Design for the Strengthening / Retrofitting of the Premier Guest House, Malacanang

The project is a one storey building with mezzanine level located at the Malacanang Compound, San Miguel, Manila. The building is where the President of the Philippines and Executive Secretary holds their

Government Dec. 2011 Structural investigation, analysis and retrofitting design

Php2,099,072.00

Dec 2011 to March 2012

Main Consultant

Page 6: Completed Projects NIA R2

Page 6 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARSCompound., San Miguel, Manila

office. It was constructed during the pre-war and has gone under numerous renovations. The structural system is composed of beam-column frames, and shearwalls with material strengths ranging from 2,000 psi - 3,000 psi for the concrete and grade 33 and grade for reinforcing steel bars, both for plain and deformed. The structure is also adjacent to the pasig river and liquefaction is a major concern for the stability of the building. The building shall be subjected to a full structural investigation, analysis and structural strengthening/retrofitting design to assure its safety in the event of occurrence of strong earthquake.

Page 7: Completed Projects NIA R2

Page 7 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARS

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)

14. Consultancy Services for Structural Investigation and Retrofitting for National Children’s Hospital (four multi-storey buildings)

The project consists of four (4) buildings namely 3storey,

6storey, 7storey which is subject for visual inspection, full structural investigation and analysis, and structural strengthening/retrofitting

design (if necessary). While the new 6storey building will

be subjected to structural analysis/peer review

Government Mar 2011

Structural investigation, analysis and

retrofitting design

Php2,498,827.00

Mar 2011 to

July 2011

Main Consultant

15. Structural Investigation and Retrofitting Design Works for 9storey Edsa Operations Center (EOC) Building

The existing structure of EDSA Operation Center is a

9-storey building with basement and roofdeck. The building has a total floor area

of approximately 5,400 square meters. The 1st floor has a height of 3.8m, while the 2nd to 8th floors have a height of 3.6m, and 3.2m for

the 9th floor. Offices and telecommunication

equipments occupy the building. A 21m and 6m 4-

legged self-supporting tower is resting at the roof deck of

the building.

Private Mar 2011

Structural Investigation, analysis and evaluation including

geotechnical investigation

Php773,400.00

Mar 2011 to

May 2011

Main Consultant

16. Proposed Milling Plant Facility Project

The project is a proposed Milling Plant Facility on a 8.31 hectares. The facility includes

the furnace, billet storage, melting plant, cooling bed & Product storage also includes

Admin facilities such as offices , quarters, etc

Private October 2010

Detailed Engineering Design and Consultancy

Services

Php 11,200,000.00

October 2010

to February

2011

Main Consultant

17. Structural Investigation of Bayantel Communication Towers (Canini RS, Samar)

The project consist of existing telecommunication Tower which will be provided with additional antenna loads.

Private Feb 2011 Structural Investigation, Review and Engineering

Design

Php91,000.00

Feb 2011 Main Consultant

Page 8: Completed Projects NIA R2

Page 8 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARSRetrofitting Works and Consultancy

Services

Page 9: Completed Projects NIA R2

Page 9 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARS

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)18. Structural

Investigation of Bayantel Communications Tower (12 Sites in Eastern Visayas)

The project consist of various existing telecommunication Towers which will be provided with additional antenna loads.

Private Oct 2010 Structural Investigation, Review and Engineering Design Retrofitting Works and Consultancy Services

Php997,600.00

Oct 2010 - Nov 2010

Main Consultant

19. Architectural and Engineering Design of NMS Place Building located at Brgy. Palanan, Makati City

The project is 786sq.m. reinforced concrete 5-storey Residential/ Commercial Building resting on a bored pile foundation

Private June 2010Detailed Architectural and Engineering Designs

Php 500,000.00

July 2010 to

August 2010

Main Consultant

20. Structural Investigation of DIGITEL Towers six (6) sites

The project consist of various existing telecommunication Towers which will be provided with additional antenna loads.

Private May 2010 Structural Investigation, Review and Engineering Design Retrofitting Works and Consultancy Services

Php522,600.00

May 2010-

June 2010

Main Consultant

21. Structural Investigation of Bayantel Communication Towers (4 sites in Mindanao)

The project consist of various existing telecommunication Towers which will be provided with additional antenna loads.

Private May 2010 Structural Investigation, Review and Engineering Design Retrofitting Works and Consultancy Services

Php447,000.00

May 2010 Main Consultant

22. Building Engineering & Architecture Design for the Globe Telecom Project Ark located at Apacible Boulevard, Brgy. Bucana, Nasugbu, Batangas

The project involves engineering and architectural design for Globe Telecom Project Arck including 2,400 sqm. site development, 800sqm. 1 storey building, police military quarters, transformer and genset house, pump room, staff house and additional services for the 740sq.m building expansion located at Apacible Blvd., Brgy Bucana, Nasugbu, Batangas.

Private July 2009 Detailed Architectural and Engineering Designs

Php 2,325,000.00

July 2009 to

April 2010

Main Consultant

23. Structural The project consist of two Private Apr 2009 Structural Php Apr 2009 Main

Page 10: Completed Projects NIA R2

Page 10 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARSInvestigation of 65 Various Globe and Innove Telecommunication Towers, Various Locations

existing telecommunication Towers which will be provided with additional antenna loads.

Investigation, Review and Engineering Design Retrofitting Works and Consultancy Services

5,100,000.00 to May 2010

Consultant

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)24. Structural

Investigation of PLDT Towers (2 sites)

The project consist of two existing telecommunication Towers which will be provided with additional antenna loads.

Private Mar 2010 Structural Investigation, Review and Engineering Design Retrofitting Works and Consultancy Services

Php182,500.00

Mar 2010 Main Consultant

25. Structural investigation and consultancy services for various sites/location at Alabang town center

Investigation and retrofitting works for various tenants of Alabang town center, from demolition of existing walls/ columns/ beams/ slabs and removal of existing stairs and provision of additional slabs and on other open areas. Provision of additional loads on some areas.

Private Various Detailed Structural Investigation, analysis and design/retrofitting

Php800,000.00

Various Main Consultant

26. Bangko Sentral ng Pilipinas Office and Training Center and Renovation of 17th, 18th, 19th and Roofdeck floors, Multi-Storey Building

The project is a 20-storey Office and Training Center Building. Major renovation of 17, 18, and 19 floors including additional escalators on the 20-storey Office and Training Center Central Bank Building. This also includes the construction of a steel truss roofing to be placed on top of the roofdeck

Government 2005 Structural Investigation, Review, Design and retrofitting works

Php1,000,000.00

2005 to 2009 (Project

extension due to

revisions and

occupancy of the owner)

Main Consultant

27. Holland-America Training Center Annex

The project is a 3-storey building with a total area of 3,500sq.m. A training center specializing in Mechanical, Plumbing and Electrical

Private April 2009 Detailed Engineering Designs and Consultancy Services

Php 3,500,000.00

April 2009 to March 2010

Main Consultant

Page 11: Completed Projects NIA R2

Page 11 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARSmaintenance of Luxury Cruise Liners.

28. SMART Communications Tower Structural Review and Investigation of Thirty One (31) Existing Towers (SST and Guyed), Various Locations

The project consist of existing telecommunication Tower which will be provided with additional antenna loads.

Private Oct 2008 Structural Investigation, Review and Engineering Design Retrofitting Works and Consultancy Services

Php1,400,000.00

Oct 2008To

Mar 2009

Main Consultant

Name of Consultant : E.H. SISON ENGINEERS, CO.Business Address : 3431 Guernica St., Palanan, Makati City

Name and Location of Project Description of the Project

Classification

(Government/

Private)

Date ofAward ofContract

Type of Consulting Services

Amount of Contract (Cost

of Services only of your

firm)

Contract Duration

Consultant's Role (Main,

Sub-contractor or Partner in a

JV)29. Oblate Sisters of St.

Francis Xavier School located at San Bartolome st., San Antonio Valley 1, Paranaque City

The project is a 4-storey High School Building and Sports Facilities with a total area of 4,000sq.m.

Private April 2008 Engineering Design and Consultancy

services

Php 900,000.00

April 2008to

April 2009

Main Consultant

30. Fort Santiago I located at Fort Santiago, Intramuros, Manila

The project is a 3-storey Commercial and Dormitory Building with a total area of 2,800 sq.m including Site Development

Private November 2007

Engineerng Design and Consultancy Services

Php 750,000.00 November 2007 to

March 2008

Main Consultant

31. Holland – America Training Center

The project is a 3-storey building with a total area of 3,300 sq.m. It is a training facilities offering advance courses for Luxury Cruise Liner Food and Beverages Crew Members.

Private February 2007

Engineering Design and Consultancy Services

Php 950,000.00

February 2007 to

August 2008

Main Consultant

32. The Seed Montessori School

The Project is a Montessori School Campus development in Quezon City consisting of 2 to 3 storey structures for CASA elementary and high school students. The project includeds

Private November 2006

Engineering Design and Consultancy Services

Php 800,000.00

November 2006 to May

2008

Main Consultant

Page 12: Completed Projects NIA R2

Page 12 of 12

LIST OF RELATED COMPLETED GOVERNMENT AND PRIVATE CONTRACTS WITHIN THE LAST FIVE (5) YEARSplanning of additional classroom buildings, gymnasium / multi-purpose hall, laboratory room, canteen, audio-visual room, faculty lounge, children’s playground and landscaping of the entire campus.

Attachments:1. Certificate of satisfactory Completion issued by the Client

Submitted by:

EFREN H. SISONManaging PartnerDate : September 20, 2012