AN ORGANISATIONAL STUDY OF MIDDLE EAST SURVEY ENGINEERING, DUBAI A Report Submitted in partial fulfillment of requirement for the award of Degree of Master of Business Administration Of the Mahatma Gandhi University, Kottayam, Kerala Submitted by Name: ANZY JALALUDEEN Roll No: 21185 Under the guidance of Prof. Balalkrishna Menon D C School of management and technology Vagamon, Kerala 2010-2012

Upload: dhanesh-mohanachandran

Post on 07-Mar-2015

398 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Completed OS Report

AN ORGANISATIONAL STUDY

OF

MIDDLE EAST SURVEY ENGINEERING, DUBAI

A Report Submitted in partial fulfillment of requirement for the award of

Degree of

Master of Business Administration

Of the

Mahatma Gandhi University, Kottayam, Kerala

Submitted by

Name: ANZY JALALUDEEN

Roll No: 21185

Under the guidance of

Prof. Balalkrishna Menon

D C School of management and technology

Vagamon, Kerala

2010-2012

Page 2: Completed OS Report

DECLARATION

I declare that the project report entitled ―AN ORGANISATIONAL

STUDY ON MIDDLE EAST SURVEY ENGINEERING, DUBAI‖

submitted by me for the award of the degree of Master of Business

Administration of the M.G University Kottayam, Kerala is my own

work. The report has not been submitted for the award of any other degree

of this university or any other university.

ANZY JALALUDEEN

Place: Vagamon

Date: 29-07-2011

Page 3: Completed OS Report
Page 4: Completed OS Report
Page 5: Completed OS Report

ACKNOWLEDGEMENT

First of all I would like to thank the Almighty God

without whose kindness we would never have had a successful completion of our project

work. During the period of my organizational study, several people have helped me in

several ways directly and indirectly to build up this work a reality to whom I should

express our boundless thanks and gratitude. I sincerely express my deep sense of

gratitude and profound thanks to my project guide Prof. Balakrishna Menon, Faculty,

MBA DCSMAT, Vagamon for his valuable guidance, whole-hearted co-operation and

suggestions throughout the completion of this project work. I with immense pleasure and

profound gratitude express my sincere thanks to Mr. Abdul Rahman Nasarudeen

General Manager and Mr. Ajimsha Basheer manager, Middle East Survey Engineering

for providing me the necessary information and formal sanction required for carrying out

the project study. It will be negligent if I do not acknowledge the contribution of the staff

in completing my project at their facility in Dubai. We also express my heartfelt

gratitude to all our friends and parents who helped and encouraged us to make this

endeavor a successful one.

Page 6: Completed OS Report

TABLE OF CONTENTS

CHAPTER

TITLE

PAGE NO

1

INTRODUCTION

1

2

INDUSTRY PROFILE

9

3

COMPANY PROFILE

18

4

ORGANISATIONAL CHART

26

5

DEPARTMENTAL ANALYSIS

23

OPERATIONS DEPARTMENT

32

HUMAN RESOURCE DEPARTMENT

40

COMMERCIAL DEPARTMENT

48

ADMINISTRATION DEPARTMENT

58

QUALITY CONTROL & ASSURANCE

68

6

SWOT ANALYSIS

71

7

FINDINGS,SUGGESTIONS &

CONCLUSION

73

8

BIBLIOGRAPHY

77

Page 7: Completed OS Report

EXECUTIVE SUMMARY

As a part of the course curriculum of full time MBA program under Mahatma Gandhi

University Kerala, students need to undertake one month organization study in a fairly

large organization. I am very much delighted to get a chance to associate myself with

MIDDLE EAST SURVEY ENGINEERING, DUBAI, one of the fastest growing Civil

Survey Company in Dubai.

The report begins with the importance and objectives of this study. The report gives a

brief description on history, present Global and Indian scenario, Government policies

and the predicted scenario of the industry. An account on the background, objectives,

mission and vision, structure, functional areas, products, markets and competition of the

company is also included in the report.

This report is an insight into the strategies and style of functioning adopted by Middle

East Survey Engineering, Dubai. A critical analysis on the strength, weakness,

opportunities and threats of the company and certain findings on this regard have also

been carefully incorporated in the report. Formulation of suggestions and

recommendations was done with due care, so that the findings made during the study

are addressed. The report ends with a conclusion on the study and prospective remedial

steps to be undertaken by the Company.

Page 8: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 2

CHAPTER-1

INTRODUCTION

Page 9: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 3

INTRODUCTION

Organization study deals with critical evaluation and analysis of all the aspects

of a particular firm. It gives a clear idea about the functions and practice of various

department heads and operational efficiency of the department as a whole. This

particular study gives a clear idea about the functions, practices and the delegation of

authority of Middle East Survey Engineering.

SCOPE OF THE STUDY

Work force constitutes a major factor in the proper functioning of an

organization. It is the proper satisfaction of the employees that facilities the fulfilling

of company‘s objectives. Any attempt to increase the productivity, efficiency of labor

can bear fruit only if the workers are given the right type of work environment and are

provided with these amenities of life which have direct bearing on his physical

efficiency.

In a broad sense the scope of this study is an attempt to know about the

organization as a whole and also about the functions and practices of the organization

and duties and responsibilities of different staffs. The study helps to understand the

nature, the working conditions, work environment and the issues that the company is

facing

TITLE OF THE STUDY

―An Organizational study at Middle East Survey Engineering, Dubai ―

Page 10: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 4

OBJECTIVES

The main objectives of the ORGANISATIONAL STUDY at ―MIDDLE EAST

SURVEY ENGINEERING‖ is

1. To study about the organization structure.

2. To understand the functions and processes of the departments.

3. To analyze the strengths, weaknesses, opportunities and threats of the

organization.

4. To understand the practical applications of the theory in an organizational

setting.

LIMITATIONS OF THE STUDY

1. Busy schedule of the personnel, like the department heads was a hindrance in

collecting the information.

2. Non- cooperation of some of the employees in the company.

3. The unavailability of the data which were kept confidential.

4. They don‘t have much written documents about the company.

5. The study relies largely on secondary data and hence the limitation.

METHOD OF DATA COLLECTION

This study is conducted with the help of Primary and Secondary data

I. PRIMARY DATA

Primary data are those collected by for the first time and thus are original in

character. They are collected for a particular purpose

METHODS FOR COLLECTING PRIMARY DATA

a) OBSERVATION METHOD

It is a systematic viewing of a specific phenomenon in the proper setting

for the specific purpose of gathering data for a particular study

Page 11: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 5

b) INTERVIEW METHOD

It is the direct method of collecting data. It is a verbal method of securing

data. For the purpose of this study direct interview of employees and workers are

done

II. s

SECONDARY DATA

Secondary data are those which have been collected by some other person for

his purpose and published. So researcher is said to use that type of data for this study.

Following are some of secondary source of data.

NEWS PAPERS & MAGAZINES

Audited reports, articles published in news paper and magazines related to Middle

East Survey Engineering.

WEBSITES

Websites of Middle East Survey Engineering, websites of some market survey

companies or share brocking firms sites and official sites of government helps

more to conduct this study.

CHAPTERIZATION

Page 12: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 6

The entire project report is divided into nine chapters, described below;

CHAPTER 1 – INTRODUCTION

This chapter is classified into five different parts they are objective of the study,

methodology, scope of the study, limitations and chapterization.

CHAPTER 2 – INDUSTRY PROFILE

This chapter includes the history of the industry, nature of the business and

current scenario.

CHAPTER 3 – COMPANY PROFILE

This chapter contains three main parts; they are history of the company, strategic

intent.

CHAPTER 4- ORGANISATION CHART

This chapter contains the Organization chat and its description.

CHAPTER 5 – DEPARTMENT PROFILE

All the departmental structure, its functions and authorities are explained in this

chapter. The diagrammatical representation of each department includes in this

chapter.

CHAPTER 6 – SWOT ANALYSIS

This chapter contains mainly four elements that are strengths, weakness,

opportunities and threats of the company.

CHAPTER 7 – FINDINGS, CONCLUSION AND SUGGESTIONS

The main three parts of this chapter are findings, suggestions and conclusion.

Page 13: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 7

CHAPTER 1-

INDUSTRY PROFILE

DUBAI CONSTRUCTION INDUSTRY

Page 14: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 8

Dubai has emerged as a global city and a business hub. Although Dubai's economy was

built on the oil industry, currently the emirate's model of business, similar to that of

Western countries, drives its economy, with the effect that its main revenues are now

from tourism, real estate, and financial services. Dubai has recently attracted world

attention through many innovative large construction projects and sports events. This

increased attention has highlighted labour rights and human rights issues concerning its

largely South Asian workforce. Dubai's property market experienced a major

deterioration in 2008 and 2009 as a result of the worldwide economic downturn

following the financial crisis of 2007–2010.

Tourism is an important part of the Dubai government's strategy to maintain the flow of

foreign cash into the emirate. Dubai's lure for tourists is based mainly on shopping, but

also on its possession of other ancient and modern attractions. As of 2007, Dubai was

the 8th most visited city of the world. Dubai is expected to accommodate over 15

million tourists by 2015. Dubai is the most populous emirate of the seven emirates of

United Arab Emirates. It is distinct from other members of the UAE in that a large part

of the emirate's revenues are from tourism.

Dubai has been called the "shopping capital of the Middle East". Dubai alone has more

than 70 shopping malls, including the world's 7th largest shopping mall, Dubai Mall.

The city draws large numbers of shopping tourists from countries within the region and

from as far as Eastern Europe, Africa and the Indian Subcontinent. While boutiques,

some electronics shops, department stores and supermarkets operate on a fixed-price

basis, most other outlets consider friendly negotiation a way of life.

Dubai is also known for its souk districts located on either side of the creek.

Traditionally, dhows from the Far East, China, Sri Lanka, and India would discharge

their cargo and the goods would be bargained over in the souks adjacent to the docks.

Many boutiques and jewellery stores are also found in the city. Dubai is known as "the

City of Gold" and Gold Souk in Deira houses nearly 250 gold retail shops. Dubai Duty

Page 15: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 9

Free at the Dubai International Airport offers merchandise catering to the multinational

passengers using the airport.

Dubai has a rich collection of buildings and structures of various architectural styles.

Many modern interpretations of Islamic architecture can be found here, due to a boom

in construction and architectural innovation in the Arab World in general, and in Dubai

in particular, supported not only by top Arab or international architectural and

engineering design firms design firms such as Al Hashemi and Aedas, but also by top

firms of New York and Chicago. As a result of this boom, modern Islamic – and world

– architecture has literally been taken to new levels in skyscraper building design and

technology. Dubai now boasts more completed or topped-out skyscrapers higher than

2/3 km, 1/3 km, or 1/4 km than any other city.

A $3.89 billion, Dubai Metro project is currently operational although partly under-

construction. The Red Line is operational and runs through the heart of the city. The

Metro system was partially opened on September 2009 and will be fully operational by

2011. UK-based international service company Serco Group is responsible for operating

the metro. Dubai Metro is also the world's second cheapest metro transportation system

after Tehran Metro in Iran. The metro comprises the Green Line from Al Rashidiya to

the main city center and the Red Line from the airport to Jebel Ali. A Blue and a Purple

Line have also been planned. The Dubai Metro (Green and Blue Lines) will have 70 km

(43.5 mi) of track and 43 stations, 37 above ground and ten underground. The Dubai

Metro is the first urban train network in the Arabian Peninsula.

The Palm Jumeirah Monorail is a monorail line on the Palm Jumeirah. The monorail

connects the Palm Jumeirah to the mainland, with a planned further extension to the

Red Line of the Dubai Metro. The line opened on 30 April 2009. Two trams systems are

expected to be built in Dubai by 2011. The first is the Downtown Burj Khalifa Tram

System and the second is the Al Sufouh Tram. The Downtown Burj Khalifa Tram

System is a 4.6 km (2.86 mi) tram service that is planned to service the area around the

Burj Khalifa, and the second tram will run 14.5 km (9 mi) along Al Sufouh Road from

Dubai Marina to the Burj Al Arab and the Mall of the Emirates.

Page 16: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 10

Dubai has announced it will complete a link of the UAE high speed rail system which

will eventually hook up with the whole GCC and then possibly Europe. The High Speed

Rail will serve passengers and cargo.

Construction Industry in Dubai, U.A.E

Construction industry in Dubai is the lifeblood of this state. Dubai cannot survive

without construction industry. Dubai is the place, which has the largest number of

construction projects in the world. Here is a review of major construction companies in

Dubai.

In the past decade the construction industry in Dubai has grown at an explosive rate.

Many new structures have been build including tourist attractions, hotels, shopping

malls, commercial business space, residential areas, and the world‘s tallest building.

Dubai has been focusing on aspects other than oil for its GDP and the construction

industry now accounts for 22.6% of its GDP.

Some major construction projects in Dubai:

The Palm Islands: Palm Jumeirah, the Palm Jebel Ali and the Palm Deira. Three

artificial palm tree shaped islands made of sand dredged from the Persian Gulf that are

the largest manmade islands. The first two are already under construction and all three

are expected to be finished in 10-15 years.

Madinat Al Arab – (Dubai Waterfront) A manmade island, still under construction, in

the shape of a crescent moon around the Palm Jebel Ali, that will like the palm islands

feature many hotels, residential areas, and recreation areas. In 2005, the first 33 million

square feet of the district sold out for $3.5 Billion, mostly bought by American

investors.

Hydropolis - A ten star hotel that will be underwater. It was originally scheduled to be

finished by 2006 but has been pushed back to 2009. Its features will be those of any

high class resort plus the bonus of being underwater. The price of the hotel will come in

at around $500,000,000.

Page 17: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 11

Burj Khalifa: A culmination point was reached in 2010 with the completion of the Burj

Khalifa (Khalifa Tower), now by far the world's tallest building at 828 m (2,716 feet).

The Burj Khalifa's design is derived from the patterning systems embodied in Islamic

architecture, with the triple-lobed footprint of the building based on an abstracted

version of the desert flower hymenocallis which is native to the Dubai region. The

completion of the Khalifa Tower, following the construction boom that began in the

1980s, accelerated in the 1990s, and took on a rapid pace of construction unparalled in

modern human history during the decade of the 2000s, leaving Dubai with the world's

tallest skyline as of January 4, 2010.

Construction Speed

The speed of construction in Dubai is very rapid compared to western countries. The

labor available is cheap because most of the laborers are from Asia and will accept

lower wages. Therefore the building companies can hire more laborers to do the work

faster to begin having occupants in the new facilities.

Major problems that arise for construction companies in Dubai, like many other

companies around the world, are delays. These are especially bad when there is a large

workforce at hand that can run out of things to build or have downtime. The

construction companies lose money when dates are extended and migrants who are

expecting to have a place to call home have to be displaced for the time of the delay.

Delays are never good for any construction job and are especially bad for Dubai

because it causes rental prices to go up. This potentially causes investors to turn away

and can possibly ruin Dubai‘s reputation and further repel international investors.

Surveying Engineering:

This industry comprises establishments primarily engaged in performing surveying and

mapping services of the surface of the earth, including the sea floor. These services may

include surveying and mapping of areas above or below the surface of the earth, such as

the creation of view easements or segregating rights in parcels of land by creating

underground utility easements. Surveying is one of the oldest activities of the civil

Page 18: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 12

engineer, and remains a primary component of civil engineering. It is also one field that

continues to undergo phenomenal changes due to technological developments in digital

imaging and satellite positioning. These modern surveying tools are not only

revolutionizing regular surveying engineering tasks but are also impacting a myriad of

applications in a variety of fields where near-real-time positioning is of great value.

Surveying and engineering are closely related professional activities. The area of

surveying and mapping is in many countries a discipline by itself, and taken in total, it

is almost as broad in scope as civil engineering. In the U.S., surveying engineering has

been historically allied to civil engineering. Engineering surveying is defined as those

activities involved in the planning and execution of surveys for the location, design,

construction, operation, and maintenance of civil and other engineered projects.

Such activities include the preparation of survey and related mapping specifications;

execution of photogrammetric and field surveys for the collection of required data,

including topographic and hydrographic data; calculation, reduction, and plotting of

survey data for use in engineering design; design and provision of horizontal and

vertical control survey networks; provision of line and grade and other layout work for

construction and mining activities; execution and certification of quality control

measurements during construction; monitoring of ground and structural stability,

including alignment observations, settlement levels, and related reports and

certifications; measurement of material and other quantities for inventory, economic

assessment, and cost accounting purposes; execution of as-built surveys and preparation

of related maps and plans and profiles upon completion of construction; and analysis of

errors and tolerances associated with the measurement, field layout, and mapping or

other plots of survey measurements required in support of engineering projects.

Engineering surveying may be regarded as a specialty within the broader professional

practice of engineering and, with the exception of boundary, right-of-way, or other

cadastral surveying, includes all surveying and mapping activities required to support

the sound conception, planning, design, construction, maintenance, and operation of

Page 19: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 13

engineered projects. Engineering surveying does not include surveys for the re

tracement of existing land ownership boundaries or the creation of new boundaries.

Modern surveying engineering encompasses several specialty areas, each of which

requires substantial knowledge and training in order to attain proper expertise. The most

primary area perhaps is plane surveying because it is so widely applied in engineering

and surveying practice. In plane surveying, we consider the fundamentals of measuring

distance, angle, direction, and elevation. These measured quantities are then used to

determine position, slope, area, and volume — the basic parameters of civil engineering

design and construction. Plane surveying is applied in civil engineering projects of

limited aerial extent, where the effects of the earth‘s curvature are negligible relative to

the positional accuracy required for the project.

Geodesy, or higher surveying, is an extensive discipline dealing with mathematical and

physical aspects of modeling the size and shape of the earth, and its gravity field. Since

the launch of earth-orbiting satellites, geodesy has become a truly three-dimensional

science. Terrestrial and space geodetic measurement techniques, and particularly the

relatively new technique of satellite surveying using the Global Positioning System

(GPS), are applied in geodetic surveying. GPS surveying has not only revolutionized

the art of navigation but has also brought about an efficient positioning technique for a

variety of users, prominent among them the engineering community. GPS has had a

profound impact on the fundamental problems of determining relative and absolute

positions on the earth, including improvements in speed, timeliness, and accuracy. It is

safe to say that any geometry-based data collection scheme profits to some degree from

the full constellation of 24 GPS satellites. In addition to the obvious applications in

geodesy, surveying, and photogrammetry, the use of GPS is applied in civil engineering

areas such as transportation (truck and emergency vehicle monitoring, intelligent

vehicle and highway systems, etc.) and structures (monitoring of deformation of

structures such as water dams). Even in other areas such as forestry and agriculture

(crop yield management) GPS provides the geometric backbone of modern (geographic)

information systems.

Page 20: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 14

Photogrammetry and remote sensing encompass all activities involved in deriving

qualitative and quantitative information about objects and environments from their

images. Such imagery may be acquired at close range, from aircraft, or from satellites.

In addition to large-, medium-, and small-scale mapping, many other applications such

as resource management and environmental assessment and monitoring rely on

imageries of various types. Close-range applications include such tasks as accident

reconstruction, mapping of complex piping systems, and shape determination for

parabolic antennas.

Large-scale mapping (including the capture of data on infrastructure) remains the

primary civil engineering application of photogrammetry. Recent evolution toward

working with digital imagery has brought about the increasing acceptance of the digital

orthophoto to augment or supplant the planimetric map. Digital image processing tools

offer the probability of great increases in mapping productivity through automation. For

small- and medium-scale mapping, the increasing availability of satellite image data

offers an alternative to chemical photography. Commercially available satellite data

with spatial resolutions of 0.6 to 3 meters, proposed for the near future, would have a

profound impact on all mapping activities within civil engineering. Inclusion of GPS in

photogrammetric and remote sensing acquisition platforms will lead to substantial

improvements in accuracy, timeliness, and economy.

For centuries, maps have provided layered information in graphical form and have been

used as legal documents and as tools to support decision making for applications such

as urban planning. Recently, geographic information systems (GIS) have broadened the

role played by all types of maps to encompass a total system of hardware, software, and

procedures designed to capture, manage, manipulate, and produce information in a

spatial context. GIS applications are broad indeed; they include land record

management, base mapping, infrastructure maintenance, facilities management, and

many others.

Page 21: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 15

A driving force behind the move toward integrating mapping and other spatially

oriented data has been the various utility industries and municipalities who need to plan

and manage their infrastructure facilities and property assets. This automated

mapping/facilities management, or AM/FM, concept is being used successfully today

by many cities, counties, and utility industries, which may have embarked on the

transition as much as 15 years ago. Successful practitioners of GIS can satisfy the needs

of a broad spectrum of users with a single system, minimizing the duplication of

resources required to support historically independent user groups.

All other components of surveying engineering contribute to the construction of a GIS.

The range of survey methods, from classical to modern geodesic and space-based

technologies, provides the required reference framework. Digital mapping provides an

efficient technology to populate the GIS with spatial information. Remote sensing

techniques applied to the earth and their environments provide the various thematic

layers of information.

Competitors of Middle East Survey Engineering Companies in Middle East:

Fugro MAPS Middle East:

Fugro MAPS is the leading provider of geospatial products and services in the Middle

East and Africa. Utilizing the latest state-of-the-art technologies in airborne and satellite

imaging, LiDAR, ground based collection systems and customized GIS software

solutions; Fugro MAPS serves all land-use and natural resource industries in the region.

With a multinational staff of 350 engineers and surveyors and over three decades of

operational experience, Fugro MAPS has executed over 1000 aerial survey and

mapping projects in 60 countries. Fugro MAPS is part of the Fugro worldwide

organization. A conglomerate of 14,000 employees spread over 60 countries in 270

offices. Clients include engineering and land-use firms, energy and utility providers,

municipalities, local and regional authorities, national governments and international

agencies and organizations.

Page 22: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 16

Capital Survey:

Capital Surveys was established in 1996 and now it is one of the leading organization in

the field of Land, Marine, GIS, Geophysical Surveys and as well as Geotechnical

Services with a fully developed Material Testing Laboratory services. Capital surveys

has been providing specialist land and engineering survey services to a wide range of

infrastructure, construction and development projects in United Arab Emirates and

abroad since last fourteen years.

The uniqueness of capital surveys is its personnel. The staff of capital surveys consists

of highly qualified and experienced man power to serve its client in an efficient and

professional way. Their operations are carried out through its various operating

sections. A supervisory staff specialist, with many years of experience in the relevant

discipline, heads each of the operating departments.

Capital surveys has the latest proven equipments to be used in the field and most cost

effective technologies in the office to provide their clients with the most cost effective

surveying and geotechnical services in the region.

Initially in 1996, it started work as an on Shore & off Shore Oil and Gas Field Services,

Engineering surveying Service organization, later they enhanced their expertise and

skills in the field of Geophysical & Geotechnical Investigation Work, and established

their own Soil Testing Laboratory. They have carried out many projects for our clients

in Northern Emirates, Oman, Iran and Tunis. Every project, regardless of the size,

accomplished with expertise, technology and equipment required to meet the client‘s

needs.

While providing surveying services, they have always maintained quality assurance,

Proficiency at the required standard of the clients. they have on roll most highly

qualified and experienced multinational manpower to serve the clients in an efficient

and professional ways in the field of surveying and drafting services. They are an

ENISO 14001-2004, EN ISO 9001 -2000, ISO 9002, and OHSAS 18001-1989 Certified

Organization and strictly follow these standards.

National Survey Engineering:

Page 23: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 17

NATIONAL SURVEY ENGINEERING LLC is a surveying firm established in April

2004 in Dubai and has been working with reputed Consultants, Architects, Contractors

and Site Investigation Companies. They provide complete solutions to meet the specific

needs of the customers, adding new dimensions to images and data to enable engineer,

geologists, and managers to access and process information more effectively. Their

successful history of project experience and extensive resources demonstrate their

capacity and commitment to provide data solutions for a diversity of challenges.

The construction industry around the world has taken a devastating blow over the last

year due to downed economies and declining numbers of new homebuyers. In the

United States alone, over 2 million construction workers lost their jobs, and the majority

of them still have not found work. While things may look grim for the construction

industry worldwide, Dubai may be a safe haven for those in the field.

For those not tied to their location and that are willing to consider relocation, Dubai is

has a tremendous amount of opportunity for skilled tradesmen and site management

personnel. According to a report released on July 21, 2010, the job outlook for the

construction industry is more than favorable. As it stands today, 90% of the workforce

in Dubai is expatriates, and of those 45% are employed in the construction sector.

The Dubai Chamber of Commerce and Industry (DCC) expect the construction sector to

boom next year. A large number of infrastructure and construction projects have already

been awarded this year, with twice as many to be awarded by the end of 2010. It is

estimated that over $714.8 billion worth of projects are at the design phase right now.

The majority of the new opportunities will be in infrastructure, versus previously when

real estate was the driving force in the construction market. This causes a tremendous

amount of need for skilled and unskilled labor to man these projects.

Page 24: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 18

CHAPTER-3

COMPANY PROFILE

MIDDLE EAST SURVEY ENGINEERING

Page 25: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 19

History:

Mr. Abdul Rahman Nasarudeen, the General Manager of Middle East Survey

Engineering, started his career working with major engineering consultants and

contractors in Middle East since 1992. In 2002, Middle East Survey Engineering had a

humble start in Dubai with about four employees and with the full support of Mr.

Mohsin Omar Al Attas, Director of Middle East Survey Engineering. During the next

few years the operation grew from a four man business taking up subcontracting works

from major consultants in UAE to one of the major civil - surveying firms in Middle

East with international contracts and consultants.

Middle East Survey Engineering always recognized workforce as its greatest strength.

With continuous increase in force every year, by 2004 it had workforce strength of 10

employees and it grew over 70 employees by 2007. They are established as the premier

engineering company in UAE, taking care of precise civil engineering surveying. Re in

forced by a team of seasoned top score professional surveyors, resourceful work force

and a collection of sophisticated survey instruments. Middle East Survey Engineering is

today a name with innovation and excellence in civil engineering surveying with over

100 employees and was involved in the execution of over 5000 prestigious projects

such as interchanges; building complexes, infra structure developments and world class

shopping complexes in UAE and Oman as consultant and contractor for surveying

services.

To achieve the quality results in surveys we are using most modern equipments viz.

Trimble5700 and 5800, R6 and R8 GPS Receivers, Trimble 5000 series & S6 Total

stations, Topcon Imaging Stations, Wild theodlites, Trimble digital levels Leica Auto

levels, etc. The internal quality system of the company ensures the clients with a highly

reliable and most accurate result with in the stipulated time.

One of the secrets of continuous growth of Middle East Survey Engineering is the

intensive investment quality control program, backed by well- qualified technicians and

Page 26: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 20

management staff. The company has also made use of most advanced technology and

up to date knowledge fully automated process have been put to use long time ago.

To stay in new economy one has to constantly reinvent, acquire new sets of skills and

trend new paths. At Middle East Survey Engineering, objectives are met by putting

people at premium. The organizational culture is build around this theme. This enables

them to empower the staff, nurture leadership qualities and build stronger relationship

with their customer. Special emphasis is given to HR management, training programs,

seminar, customer and dealer relationship management. These efforts instill a sense of

pride and passion for quality and brand among the workforce.

The management of Middle East Survey Engineering exercises rigid controls regarding

project budgets, schedules and design quality, while specific project planning and

implementation, upon approval by management, is accomplished and directed by

professional staffs. The project professional operates with maximum flexibility and

authority and with minimum constraints. They believe that this approach results in

well-conceived and efficiently executed projects, which, while tailored to our client's

needs, nevertheless satisfies the professional objectives.

STRATEGIC INTENT

VISION

―To enhance customer satisfaction and achieve exponential growth to leadership

through world class civil engineering services‖.

MISSION

1. Zero breakdowns

2. Zero maintenance

QUALITY POLICY

Page 27: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 21

Establish global presence in the survey industry by providing quality service and

customer satisfaction through companywide efforts in continual improvement of people,

systems, process and technology.

QUALITY GOAL

To be the leader in quality and value of production and services

QUALITY MANAGEMENT PROCESS

1. Focus on customers.

2. Establish vision, mission

3. Understand, standardize, stabilize, and maintenance process

4. Plan, do, check, act for continual improvement and innovation.

OPERATIONAL POLICY

1. Achieve process stability and reliability.

2. Control every process to decide target.

3. Improve process capability.

PRINCIPLES

1. Customer satisfaction- anticipates, understand and excel at meeting

customers‘ needs.

2. Continue; improve a current level of performance of process, products and

services.

3. Process emphasis- focus on process as the means to improve results.

MANAGEMENT LEADERSHIP

Creative and maintain a shared vision, consistency of purpose and supportive

environment that includes appropriate recognition and reinforcement.

Page 28: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 22

EMPOWERMENT

Create a culture where people have the knowledge, skill and authority for the events of

their actions and for their contribution to the success of the company.

STASTICAL METHODS

Understand the concept of variation. Apply appropriate statistical methods for continual

improvement and innovation.

EMPLOYEES DEVELOPMENT

Knowledge and support for lifelong learning and personal growth.

PARTNERSHIP

Build long- term relationship with customers and suppliers.

ASSESSMENT

Assess performance and benchmark against world‘s best.

QUALITY IMPROVEMENT METHODOLOGY

1. Problem description

2. Containment action

3. Define root cause

4. Verification of cause

5. Permanent Corrective Action

6. Implementation

7. Effectiveness

8. Standardization

These are explained in detail in the Quality Department.

Page 29: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 23

Survey Methodology

a. GPS Survey

The Global Positioning System (GPS) is a satellite-based positioning system made up

of a network of 24 satellites placed into orbit by the U.S. Department of Defense. GPS

satellites circle the earth twice a day in a very precise orbit and transmit signal

information to earth. GPS receivers take this information and use triangulation to

calculate the exact position of them. GPS receiver compares the time a signal was

transmitted by a satellite with the time it was received. The time difference tells the

GPS receiver how far away the satellite is. With the distance measurements from a few

more satellites, the receiver can determine its position with centimeter accuracy.

b. Total station survey

A total station is an optical instrument used in modern surveying. It is a combination of

an electronic theodolite (transit), an electronic distance meter (EDM) and software

running on an external computer known as data collector. A total station allows the

surveyor to store all information he needs to establish a setting out and can store all

information recorded from site as existing features, original ground levels, road edges,

etc.

Also the remote measurements are facilitated by the total station where a direct access

is not available. For example the height of street light poles, ground clearance of

overhead power lines, etc.

c. Theodolite survey

A theodolite is an instrument for measuring both horizontal and vertical angles, as used

in triangulation networks. It is the old, mechanical / manual version of total station.

Page 30: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 24

Theodolite survey widely using for single line executions like pipe lines, cable routes,

curb lines, road centre lines, etc. A modern theodolite consists of a movable telescope

mounted within two perpendicular axes—the horizontal or trunnion axis, and the vertical

axis. When the telescope is pointed at a desired object, the angle of each of these axes can

be measured with great precision, typically on the scale of arc seconds.

d. Dumpy levels survey

A dumpy level is an optical instrument used in surveying to transfer, measure, or set

horizontal levels with reference to the mean sea level or available approved datum

precisely. The instrument and staff are used to gather and/or transfer elevations (levels)

during site surveys. Measurement generally starts from a benchmark with known height

determined by a previous survey, or an arbitrary point with an assumed height.

Services

The company is committed to fulfill the requirements of clients to their satisfaction and

offers the following services as professionals to the construction industry.

Surveying and Leveling

All type of Topographic Surveys

Bathymetric Survey (Marine Survey)

Demarcation services

Building settlement monitoring

Setting out for all type of projects including roads, railways and multi-storied buildings

Page 31: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 25

Cross-section survey for roads

Gate level computation services.

Preparation of Drawings (As built, Profiles, shop drawing for services, cross sections

etc).

Contour Mapping.

Utility Surveys.

Quantity calculation for earth works & stock piles

Control point establishments

Supplying of qualified Surveyors (with or without instruments)

Survey contracting and consultancy for all kind of projects

Traffic Surveys

Real world 3d scanning

Page 32: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 26

CHAPTER-4

ORGANIZATION CHART

Page 33: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 27

Page 34: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 28

The top most level of the organization is the Director, Mr. Mohsin Omar Al Attas. Under

the director the General Manager, Mr. Abdul Rahman Nasarudeen, controls the whole

departments. All the actions should be approved by the General Manager under the

consent of the director. The General Manger controls all the departments in the

organization. The functional departments in Middle East Survey Engineering are Human

Resource Department, Administration Department, Quality Control and Assurance

Department, Operations Department and Commercial Department.

The most important and functional department in the organization is the Operations

department. The main service of the organization is done in this department. Under this

department comes the Operations manager who is the head of this department. Then the

project managers who are responsible for each project they undertake and is directly

responsible to the Operations manager, and the project manager has is responsible for the

functioning of surveyors and draftsman. In the Human Resource Department the Human

Resource manager controls the human resource functions. Under the Administration

department come the accounts department and the logistics department. The accounts

department includes the accounts officers and the logistics department controls all the

transportation activities.

Page 35: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 29

Under the commercial department comes the Quantity surveyor, the marketing managers

and the sales and purchase managers. All the commercial activities are controlled by this

department. Quality Control and Assurance department is a separate and important

department of the organization. They have to control the quality of the service, and have

to report directly to the General Manager.

Page 36: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 30

CHAPTER-6

DEPARTMENTAL PROFILE

Page 37: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 31

FUNCTIONING DEPARTMENTS

1. OPERATIONS DEPARTMENT

2. HUMAN RESOURCE DEPARTMENT

3. COMMERCIAL DEPARTMENT

4. SALES & MARKETING DEPARTMENT

5. PURCHASE DEPARTMENT

6. ADMINISTRATION DEPARTMENT

7. FINANCE & ACCOUNTS DEPARTMENT

8. LOGISTICS DEPARTMENT

9. QUALITY DEPARTMENT

Page 38: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 32

OPERATIONS DEPARTMENT

Page 39: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 33

7.1 STRUCTURE OF OPERATIONS DEPARTMENT

Project Managers

Operations Manager

Chief Surveyors Draughtsman

Senior Surveyors

Surveyors Asst. Surveyors Chainmen

Operations

Department

Page 40: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 34

Technology

The most advanced Survey technologies are used.

Machines and equipment used

G.P.S. with 1cm Accuracy

Robotic Total Stations

Total Stations

Stationary Scanners

Digital Levels

Dumpy levels

Dual Frequency Echo sounder

Page 41: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 35

7.2 OPERATION PROCESS FLOW CHART

Enquiry by the clients

Commercial department (estimation)

Quotation quoting by the company

Approval (after negotiation)

Drawings issue by the clients (designs)

Shop drawings creation

Shop drawing submission to the client

Shop drawing approval

Quality Assurance and Quality Control department

Controlled shop drawing submission to the Project manager

Chief surveyors

Execution of the project

As built creation

Report (data collection)

Drawings preparation by draughtsman

Verified by Project Manager and then to Quality Assurance and Quality Control head Not approved

(correction)

If approved by QA&QC drawings send to the clients

Wait for client‘s feedback or approval not approved (correction)

If approved, then estimation of the work done

Page 42: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 36

Invoicing by the commercial department

Operations Manager:

The role of the Operations Manager is to ensure that:

All the projects are planned, executed, and finalize projects are submitted by the

project managers as per the strict deadlines and within budget.

This includes acquiring resources and coordinating the efforts of project managers

and team members and third-party contractors or consultants in order to deliver

projects according to plan.

The Operations manager will also define the project‘s objectives and oversee

quality control throughout its life cycle.

Conduct project post mortems and create a recommendations report in order to

identify successful and unsuccessful project elements.

Develop best practices and tools for project execution and management.

Effectively communicates relevant project information to superiors.

Delivers engaging, informative, well-organized presentations.

Resolves and/or escalates issues in a timely fashion.

Understands how to communicate difficult/sensitive information tactfully.

Direct and manage project development from beginning to end.

Where required, negotiate with other department managers for the acquisition of

required personnel from within the company.

Determine and assess need for additional staff and/or consultants and make the

appropriate recruitments if necessary during project cycle.

Page 43: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 37

Project Manager:

Project Site Manager will manage all activities on site related to:

Civil survey works, communications and security hardware and software.

Managing and supervising the complete range of activities right from

conceptualization, costing, budgeting, site survey, testing and maintenance of

equipment.

Ensure quality/quantity and timely delivery of all materials required at the site.

Manage sub-contractors, coordinate and balance the sub-contractors manpower

and equipment as per the work plan.

Responsible for QA at the sites in his area

Work with the end-user and the customer.

Follow the time schedule of the works

Study production schedules and estimates for worker hour requirements for

completion of job assignment.

Analysis and resolving work problems at the site and supervision in solving work

problems.

Responsible for the logistics at site, coordination and balancing the equipment

per the time schedule.

Prepare daily PTW for site activities. Build a time schedule for the site

infrastructure

Facilitates team and client meetings effectively.

Holds regular status meetings with project team.

Keeps project team well informed of changes within the organization and general

corporate news.

Define project scope, goals and deliverables that support business goals in

collaboration with senior management and stakeholders.

Develop full-scale project plans and associated communications documents.

Page 44: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 38

Effectively communicate project expectations to team members and stakeholders

in a timely and clear fashion.

Liaise with project stakeholders on an ongoing basis.

Estimate the resources and participants needed to achieve project goals.

Draft and submit budget proposals, and recommend subsequent budget changes

where necessary.

Set and continually manage project expectations with team members and other

stakeholders.

Delegate tasks and responsibilities to appropriate personnel.

Identify and resolve issues and conflicts within the project team.

Identify and manage project dependencies and critical path.

Plan and schedule project timelines and milestones using appropriate tools.

Track project milestones and deliverables.

Develop and deliver progress reports, proposals, requirements documentation, and

presentations.

Determine the frequency and content of status reports from the project team,

analyze results, and troubleshoot problem areas.

Proactively manage changes in project scope, identify potential crises, and devise

contingency plans.

Define project success criteria and disseminate them to involved parties

throughout project life cycle.

Coach, mentor, motivate and supervise project team members and contractors,

and influence them to take positive action and accountability for their assigned

work.

Build, develop, and grow any business relationships vital to the success of the

project.

Page 45: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 39

Surveyor:

Conduct all land survey works of the project with Total Station/GPS or both

Setting out in Residential Multistory Buildings, Recording Existing features from

site to prepare Topographic Maps

Draughtsman:

The main responsibilities will include preparation of technical drawings, Oversee

indexing and detailing of reinforced structures from verbal descriptions and rough

sketches.

Responsible for preparing approval drawings, proposal drawings, drafting, Shop

Drawings using AutoCAD latest version or Micro station

In Middle East Survey Engineering, the commercial and operations department are

interlinked. The estimation is conducted by the Quantity Surveyor and if it is accepted by

the commercial department then the work is handed over to the operations department,

which as a whole is under the control of the General Manager of the company.

Page 46: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 40

HUMAN RESOURCE DEPARTMENT

Page 47: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 41

7.3 STRUCTURE OF HUMAN RESOURCE DEPARTMENT

GENERAL MANAGER HR

DEPUTY GENERAL

MANAGER HR

Page 48: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 42

Personnel management is that part of management function which is primarily

concerned with the human problems in industries. In order to solve these problems

personnel management is assigned a very important role to play labour, being an

important factor of production needs motivation and power guidance from the side of

management to get the desired result.

DUTIES, RESPONSIBILITIES AND INSTRUCTIONS

1. To find suitable solution for all confusion.

2. In charge of continuous improvement

- Organizational change, Organizational development, Action plans.

3. Acquisition of human resource

4. Determination of the kind or quality of personal, Job analysis, Job description, Job

specification, Man power planning, Recruitment, Selection and Induction.

5. Post appraisal interview.

6. Evaluation of performance appraisal system.

7. Potential appraisal and promotion.

8. Training and development.

9. Preparation of assessment report of employees.

10. Impact training as per schedule.

11. Handling the disciplinary cases.

12. Welfare of employees.

13. Implementation of various improvement activities in the interest of the company.

14. To maintain discipline amongst the employees.

15. To find suitable solution for all confusion.

16. Evaluation of performance appraisal system.

17. Potential appraisal and promotion.

Employee welfare

Page 49: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 43

Middle East Survey Engineering providing many facilities for their employees.

(a)Economical status

Ensures that every employee in the company receives their salary and gratuity

(b)Health and Safety

Middle East Survey Engineering has developed a Safety System, to the importance of

planning health and safety into projects to satisfy the needs of clients and to improve the

management system of the company

The company will actively seek the support of all operatives engaged on a project to

look after the health and safety of themselves and their colleagues by working within

the spirit of this safety plan

The company requires employees at all levels shall support and strictly implement the

safety end environment program to achieve the target "ZERO ACCIDENT WORKING

ENVIRONMENT" during all operations.

Health plan

a. First - Aid

Responsibility:

A full first aid box shall be maintained and placed in the site offices and on all survey

vehicles.

All first aid cases shall be recorded in a first aid treatment log

All Senior surveyors are trained in providing first aid.

b. Medical Facility

Page 50: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 44

Minor injuries which cannot be treated by the First Aider will be immediately referred

to nearest hospital. In the event of a more serious injury, adequate facility will be made

available to call a physician or ambulance or contact any other agency or to transport

the injured person from the workplace to nearest health Centre

Safety plan

a. Safety Induction

All employees shall attend safety induction training program before starting work on

any project according to the project requirement.

b. Basic Fire Extinguisher Training

Basic fire fighting training shall be given to the Survey crew to ensure that sufficient

trained personnel are available in the event of a breaking out of fire at working place.

c. Accident / Incident Reporting

Each event which results an occupational injury or illness shall be reported and

investigated in accordance with the company procedures prepared.

The learning value of the accident investigation report will be Implemented and

cascaded to all employees

d. Personnel Protective Equipment (PPE)

The company provides all its employees working at site with the survey personal

protective equipment required for different operations. Project personnel are required to

wear PPE‘s supplied while at work. Any defaulter shall be penalized for not wearing

PPE by Safety Default Notice

HARD HAT, SAFETY FOOTWEAR AND COVERALLS are mandatory for all

workforces.

Employees shall be provided with eye protections, Hearing protection Hand protection

and fall protection equipment etc., as required depending on site conditions.

Drinking water: Effective arrangement of drinking water at suitable points conveniently

suited for all workers.

Latrines and Urinal: Company provides latrine and urinal facilities.

(c)Accommodation

Page 51: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 45

Company accommodation is provided to all the employees working in

Middle East Survey Engineering.

Function of HR manager

1. Note the leave of employees

2. To check the feedback of the decision taken by the operations manager.

3. To check the manpower is allocated and watching the feedback.

4. To verify these complaints and take initiative action.

5. Should watch the activities and give necessary instructions.

STANDING ORDERS OF MIDDLE EAST SURVEY ENGINEERING

In Middle East Survey Engineering workmen shall be classified as permanent

and probationers. Immediately on recruitment, the name of the workmen and the grade

or category to which he belongs shall be entered in the muster roll. Every workman

appointed in the company shall be on probation for a period of six months. Every

workman shall on being admitted to the service, sign the ‗form‘ with the regular to

conditions of services signifying his consent to comply with the standing orders for the

company. The periods and hours of work for all classes of workman shall be posted

upon a notice board at the main office.

Attendance

The workman shall be at work in the site at the time fixed and notified.

However, a workman in a relay shift shall normally not leave his post until he is relived

by his successor or otherwise instructed by Head of section or any other superior officer

empowered to instruct. Any workman who is more than half hour late shall be liable to

be treated as absent for half a day. All workmen will be entitled to national and festivals

holidays as per the Government rules. However, the management reserves the right to

detail any workmen to work on a holiday other than national holidays. And all

Page 52: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 46

employees are given one month leave in a year with leave salary and ticket charges if

they are travelling.

Promotion

No workman shall be entitled to be promoted as of right. All promotions shall be

on the basis of merit and suitability in the discretion of the management. No strike of

any kind shall be staged by the workman as per the UAE government rules.

A workman found guilty of misconduct shall be imposed any one or more of the

following punishments, warning, censure, and suspension for a specified period.

Demotion to a lower post, imposition of fine, reduction in pay, discharge from service,

dismissal from service.

Secrecy

All process, plans, photographs, designs or drawing pertaining to the company

whether prepared by the workman or otherwise are secret documents which no persons

shall publish or causes to be published. No workman shall disclose any secret or secret

information regarding the company‘s activities to any person except when it is

necessary to do so during the performance of his duties.

Fines

The Management may in its discretion impose fines on workman if they do not

work in accordance with the company rules and regulations.

Certificate of Termination

Every permanent and probationary workman shall be entitled to a service

certificate at one time of his dismissal or discharge from service.

Page 53: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 47

Resignation

A workman accept one who is under obligation to serve the company for a

limited or unlimited contract minimum, who wishes to resign and leave the company‘s

services must give the company the same notice as the company is required to give him,

before one month to the date of resignation as per UAE labor law. The employer may

deduct any amount owed to him by the employee such as outstanding loans from the

employees‘ end of the service gratuity. If there is dispute over the payment of gratuity

payable, matter should be referred to the Ministry of Labor. Employee may be deprived

of the end of the service gratuity for reasons stated in the Articles 120 and 121 of the

Law.

The Human Resource department is the strongest department of Middle East

Survey Engineering, which has several sub section, and their functioning are mentioned

above. It has a well established industrial relation and this department gives more

importance to the welfare and the safety of the employees. Also the time management

of Middle East Survey Engineering is very good. All these section are under the direct

control of HR manager.

Page 54: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 48

COMMERCIAL DEPARTMENT

Page 55: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 49

STRUCTURE OF COMMERCIAL DEPARTMENT:

Purchase & Sales

Manager

Marketing

Manager

Draughtsman

Commercial

Department

Quantity

Surveyor

Marketing

Department

Purchase& Sales

Department

Page 56: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 50

7.4 STRUCTURE OF SALES AND MARKETING

DEPARTMENT

FIG-6.

MARKETING & SALES

DEPARTMENT

MARKETING MANAGER

MARKETING EXECUTIVES

TELEMARKETING

EXECUTIVES

Page 57: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 51

MARKETING

To identify opportunities, preparation of marketing strategies and plans for guiding

programs towards building up the new opportunities in the market.

Responsible for

To relay on market research.

To identify understand segment.

To spend time in plan.

To think long term and short term strategies.

Aim to produce profits and gain market share.

Pre occupied with the planning the right products and marketing strategies to meet

the customer long seen needs.

To recommend solution for improving sales, understand the problem, monitoring

competitors activities and to determine customer satisfaction.

To use the telemarketing executives and sales coordinators for getting orders and

inform the bill amount for the purpose of cash discount.

To allocate marketing effort in relation to long seen profit potential of the targeted

segment to develop winning offers for each marketing segments.

In charge of getting customers and collection and allow provision for credit to

trusted customers.

Advertisement, promotional materials, exhibitions etc.

Risk assessment and proper selection of customer site based on Safety norms.

Identify upcoming projects and develop new client base.

Networking in construction/infrastructure industry to generate the new business.

Achieve profit in line with generating Volume and maintaining Average selling

Price (ASP).

Outstanding payments collections from customers in time.

Order generation for new survey works.

Customer relations and resolving customer queries in time

Page 58: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 52

In Middle East Survey Engineering, they are following specified process for the

marketing of their company. They encourage promotional activities through

advertisements, and have active participation in exhibitions. In the national market

Middle East Survey Engineering has large market share, and this is availed only

because of the company‘s goodwill that make through the last many years.

Page 59: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 53

PURCHASE DEPARTMENT

Page 60: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 54

7.7 STRUCTURE OF PURCHASE DEPARTMENT

PURCHACER

STORE KEEPER

Page 61: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 55

Store keeper

Working time 8 am to 5 pm.

The prime duty is to maintain an up to date records of materials and tools.

To ensure proper records of issue of tools and materials after getting due demand

for concept individuals demand forms.

To ensure tool loan cards prepared and signature obtained from concern

individuals.

All items including (stationery purchased after approval from management is to

checked) physical, quality and quantity is assured and the same is reported to the

concerned head. The bills for such purchase to be verified and attested and

obtained signature from the concerned head. The same is pass through deports for

further action.

To obtain section for purchase of items and record each purchase after due

approval of management.

Ensure in wards and out wards of materials, tools especially for tool room with

the help of the computer.

Also ensure proper handling of records for each project separately at record room.

He/ she are in charge of filing system.

In Middle East Survey Engineering, Purchase department consist of instrument

and equipment purchase and storage. Each store has its own executives for fulfilling

the functions.

Page 62: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 56

Quantity Surveyor:

Responsible for providing accurate Civil cost estimates and quotations.

Providing post contract award Civil works cost reports and forecasts.

Review in detail tender documentation conditions, scope of work and

specifications.

Provide appropriate bills of quantities.

Provide financial and commercial tender risk assessments.

Participate in subcontract negotiations and prepare subcontract documentation.

Review layout and building arrangement drawings.

Provide price schedule breakdown and invoicing procedure.

Review main contract and subcontract conditions.

Identify potential variations and claims.

Identify the requirement for additional tendering and post contract award support

Page 63: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 57

ADMINISTRATION

DEPARTMENT

Page 64: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 58

7.5 STRUCTURE OF ADMINISTRATION

DEPARTMENT

Administration

Department

Finance

Department

Logistics Receptionist

A/CS Officer

Assistant Cost Account

Page 65: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 59

Administration

Ensuring punctuality and discipline amongst the office staff.

To look after all matters of the company related with the government

departments.

To deal with all correspondence and settlement of company with all government

departments. Preparation of all relevant return and notification as per schedule.

To make visit to all government departments as and when detailed by the

management and to render feedback on various visits or settlements.

To give timely advise and guidelines to other staff regarding departmental

settlement of the company.

In Middle East Survey Engineering, the main responsibility of the administrative

manager is to ensure punctual and discipline among the office staff. It is the duty of the

administrative manager to give timely advice and guidelines to the staff regarding

departmental settlement of the company.

Page 66: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 60

FINANCE & ACCOUNTS

DEPARTMENT

Page 67: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 61

7.6 STRUCTURE OF FINANCE DEPARTMENT

FINANCE DEPARTMENT

ACCOUNTS OFFICER

ASSISSTANTS COST ACCOUNTS

Page 68: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 62

Accounts/ finance department

Calculation of monthly salary of office staff. Until otherwise notified all

employees shall be paid on the 10th

of every month through WPS (Wages

Protection Scheme).

Calculation of over time of employees. The salary slip and computer print of

salary must be collected back from the concerned supervisors with workers

individual signature.

Sending of cheques received from parties to bank.

Accounting of dishonored cheques.

Preparation of slips for all bank transactions.

Preparation of bank reconciliation.

Trial balance tally is to be ascertained and when call for.

Inform the management all due payment in advance and ensure payment of

creditors on due date as per the instruction before issuance of cheques of any

nature, the accounted should ensure that the efficient fund balance is available. No

cheque is to be issued without having sufficient fund.

Finalization of accounts

(a) Miscellaneous accounts are to be adjusted.

(b) Nullification of all balances

Submission of returns- ensure that monthly, quarterly, half yearly and annual

returns are submit on due date.

Besides duties he/ she is to assist administration in correspondence and other

works related and labor welfare fund and industries departments in consultation and

approval of manager administration.

Responsible for maintenance or registers, ledgers, computer printouts and all files.

Page 69: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 63

Cost accounts

Responsible for total cost management of the organization to calculate the

expenditure incurred by sales representatives on ALC of sales promotion and to

identify thrust areas, if any.

To check cash credit bills of the day corresponding to cash receipts of each party.

For all partial payments of cash credit bills, debit note to be prepared.

To proper budgeting for all activities of the organization.

Preparation of balance sheet of all units‘ monthly and comparative study of

accounts and to assist in the finalization of accounts.

Accounts- data entry

Responsible for data entries of all units.

Responsible for maintenance of all vouchers, unit wise to sent cheques on daily

base to bank.

Understands basic revenue models, P/L, and cost-to-completion projections and

makes decisions accordingly.

Understands our pricing model and billing procedures.

Accurately forecasts revenue, profitability, margins, bill rates and utilization.

Assures project legal documents are completed and signed.

In Middle East Survey Engineering, Finance Department prepares accounts and

audits them to make it up to date. This department makes necessary arrangements for the

working capital requirement.

Page 70: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 64

LOGISTICS

DEPARTMENT

Page 71: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 65

7.8 STRUCTURE OF LOGISTICS DEPARTMENT

Logistics department

Loading

Supervisor

Dispatch

Supervisor

Drivers Drivers

Page 72: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 66

The main aim of logistics department is to make task simple and easy. The

purpose of this is to make sure that the workers and the equipments that are necessary for

a work reaches the site at the correct time. It is also responsible for the delivery of the

final drawing to the clients or customers at the correct time. Loading supervisor and the

driver should be able to handle quite easily and without time wastage and to avoid

confusions when workmen and equipments have to be allocated to different work sites.

Functions:

1. The employees should be picked up from their respective accommodation and

reach the office by 8 am.

2. The necessary workmen and the equipments required for their work in the site

which is listed should be checked and ticked by the supervisors before taken to

the worksite.

3. Taking the employees and equipment to the worksite and back.

4. Rechecking the equipments before handing over to the stores department.

5. The dispatching supervisors are responsible for taking the drawing to the

customers as hard copy and soft copy.

Dispatching:

In Middle East Survey Engineering, logistics department is there to make task

simple and easy. The purpose is to make sure that the final drawing reaches the right

clients.

Page 73: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 67

QUALITY DEPARTMENT

Page 74: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 68

QUALITY CONTROL DEPARTMENT

It is one of the most important departments which maintain the product quality.

This department is headed by a Quality Controller. The quality control department checks

the quality of the equipments as well as the drawings prepared. If the equipments used is

not of the standard quality the equipment will be rejected and will send back to the

suppliers. If the equipments are of good quality the equipments are used in the operations

department. After starting the survey there are many steps to check the accuracy of the

survey. If the survey done is not accurate the reason for the errors will be identified and

proper corrections will be made and the work will be continued until the drawings made

are accurate and as per standard.

QUALITY MANAGEMENT

Middle East Survey Engineering is committed to supply the very best quality

drawings to meet the customer‘s need and expectations by continuous quality up

gradation as per ISO norms and specifications. Superior quality is the main reason behind

their dignified position in the same sphere of business. For their excellent quality

management, they have credited with ISO 9001:2008 certifications. Company‘s quest for

excellence and efforts towards achieving quality has enabled them to gain a substantial

market share within a short span of time.

This ISO 9001-2008 certified company follow the Total Quality Management in

Land and Bathymetric Survey contracting and consultancy. They abide by stringent

quality control measures at all stages of survey. It has been always ensured by the

company that their customers get superior quality drawings. These quality control

specifications are followed tooth-to-nail from equipments to delivery of drawings. They

use the finest quality equipments which is purchased from reputed names in the market.

Afterwards, they check all these equipments and the workers for their exactness

and utility. Every stage is thoroughly monitored by highly qualified experts, ensuring

Page 75: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 69

flawless operation at every stage. The company guarantees customer satisfaction through

on time delivers of accurate drawings as per customer‘s requirement.

QUALITY POLICY AND OBJECTIVES

The company‘s Quality Policy and Objectives are given below:

(1) Quality Policy

Middle East Survey Engineering is committed to fulfill the requirements of the clients by

maintaining the effectiveness of quality management system to the full satisfaction of

them.

Prime features of their quality policy are:

Develop a better image in the market by possessing systematic practices.

Satisfying the customized needs of the clients by fulfilling their commitments

in terms of prompt delivery and quality.

Work as a team to achieve effective implementation of the standards and

requirement of construction industries.

Train staff and impart knowledge on latest developments in construction field.

Comply with applicable statutory and regulatory requirements.

Continually improve the Quality Management System by establishing &n

reviewing quality objectives.

(2) Quality Objective

Consistent and concerted efforts on process improvement.

Right quality control procedures to ensure flawless operation.

Total involvement of the entire workforce on quality improvement.

Strict adherence to documented quality system.

(The company has a documented system procedure to carry out each and every

activity from order processing to order execution. Since all these activities are being

carried out and monitored as per the international standards prescribed by the ISO 9001

system standard, quality is full assured in every activity.)

Page 76: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 70

PRODUCT QUALITY

The company has a dedicated Quality Control Department under the supervision

of a Quality Controller provided with the various types of tools and equipments.

Company‘s teams of quality controllers make sure that each of the survey conducted is as

per the various national and international quality standards

There are documented procedures to check the accuracy of the work done at each

stage. The Quality Assurance and Quality Control Department is in charge of checking

each stage of the process of survey. The Quality Control head compares the Shop

drawing which is approved by the clients with the final drawing provided by the project

manager for accuracy. Any correction to be made should be done only under the consent

of Quality control head. Periodic checking will be conducted by the Quality Control

department ensure accuracy of all works. Also equipment calibration is done every six

months to ensure the accuracy of the equipments. All the records connected with the shop

drawing, final drawing, redrawing etc will be maintained with the department for future

references.

OTHER FUNCTION

1. Responsible and authorized for the quality of all equipments and drawings.

2. Formulating and updating specification for the equipments and final drawings

based on National and International standards.

3. Responsible and authorized for the quality products to the customers and to attend

customer complaint from respective quality if any.

4. Working with the management team for necessary administrative matters

interacting with the operations, marketing, materials and technical service

department for corrective and preventive actions required.

5. Responsible and authorized for research and development activities.

6. Internal quality audit.

7. Process audit and final product inspection.

Page 77: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 71

CHAPTER-6

SWOT ANALYSIS

Page 78: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 72

WEAKNESSES

1. Less promotion activities.

2. Lack of international marketing.

STRENGTHS

1. The Quality of the Products is their

greatest strength.

2. Strong support from top

management.

3. Highly professional management.

4. Good employee relationship.

5. A well- motivated work force.

6. A solid base of satisfied

customers.

OPPORTUNITIES

1. Company is in lucrative area

where there is a lot of scope for

development and growth.

2. Due to the large scale of

construction projects, there is high

demand for the company‘s service in near

future.

3. Survey is considered to be very

essential prior to any construction

activity. Hence there are always

possibilities for stable demand.

4. Company always has the option of

expanding the market throughout GCC.

THREATS

1. Competition: The Company is

facing severe competition from

local as well as international

competitors.

2. Increasing maintenance cost of

equipments.

3. Price war between existing

surviving companies.

4. Climatic conditions are an

obstacle for the timely completion

of the project.

Page 79: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 73

CHAPTER-7

FINDINGS, SUGGESTIONS

AND CONCLUSION

Page 80: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 74

FINDINGS

The organization study is based upon the information imparted by the

respected personnel of the organization. Interaction with workers,

information from journals, magazines, news papers and annual report also

helped to discover newer areas in the functioning of the organization.

1. Middle East Survey Engineering deliver quality product at right time.

2. Skilled, trained co-operative and experienced manpower.

3. Employees are satisfied with job and salary.

4. Middle East Survey Engineering facing high competition from similar

business concerns in the market.

5. Good co-ordination between the different departments of the

organization.

6. Good industrial relation.

7. Customers are very much satisfied with the quality and delivery of the

product.

Page 81: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 75

SUGGESTIONS

1. Effective training programs to the employees for increasing the

production.

2. Give timely rest to the workers in order to produce consistent

performance.

3. The cost reduction steps taken by the management were fine, but need

improvement.

4. Maintain better ties with the clients.

5. Company should adopt advertising and increase the promotional

strategies for increasing the sales.

6. Company should have to utilize their manpower capacity fully.

Page 82: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 76

CONCLUSION

Middle East Survey Engineering is one of the best survey companies

in Dubai, offering high quality survey. Its ardent and sincere passion,

multifarious facilities, monumental growth, marvelous operation and

variegated facilities are the hall marks of the company. The standard quality

of their survey is their greatest strength.

The study helped me to understand that the company is facing severe

competition and it affects the profitability of the company. I was also able to

understand some of the drawbacks and problems of the Middle East Survey

Engineering such as absence of efficient Marketing department and

absenteeism. I hope that if the unit is managed to overcome these drawbacks

and problems, it can increase its efficiency.

Being a student of MBA the organization study, which I have done in

Middle East Survey Engineering, has benefited me with so much of

confidence and awareness, so as to be capable of orienting myself to work in

a firm. The various exposures I have got from the firm have been a turning

point in my academic curriculum. This study has improved my practical

knowledge hand in hand with that of theoretical knowledge.

Page 83: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 77

BIBLIOGRAPHY

Page 84: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 78

Books:

1. CHHABRA .T.N “Principles & Practice of Management” Dhanpat Rai & Co (9

th

Reprint Edition 2009).

2. POTTI .L .R “Research Methodology” Yamuna Publications(2009 Reprint Edition)

3. CHHABRA .T.N “Human Resource Management” Dhanpat Rai & Co 5th

(Revised)

(2010 Reprint Edition)

4. Ramaswamy.V.S & Namakumari.S “Marketing Management” Macmillan Publishers

India Ltd 4th

Edition 2009

5. KOTHARI.C.R “Research Methodology” New Age International Publishers Reprint

Edition 2010

6. PANDEY.I.M “Financial Management” Vikas Publishing House Pvt Ltd Reprint

Edition 2009

7. SONTAKKI.C.N “Marketing Management” Kalyani Publishers Reprint Edition 2009

Website:

1. www.middleeastsurveyengineering.com

2. www. Google.com

Page 85: Completed OS Report

Middle East Survey Engineering 2011

DCSMAT, Vagamon Page 79