completed denr- foreign assisted projects...

372
Completed DENR-Foreign Assisted Projects i COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILE

Upload: trinhque

Post on 31-Jan-2018

266 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects i

COMPLETED DENR-

FOREIGN ASSISTED PROJECTS

PROFILE

Page 2: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects i

TABLE OF CONTENTS

Abra Pine Plantation Development Project ............................................................... 1

Acquisition of Magnetic Observation Equipment Under JICA's Equipment Supply Program .................................................................................................................... 2

ADB/Technical Assistance on Biodiversity Conservation and National Integrated Protected Areas Systems .......................................................................................... 3

Advisory Technical Assistance on Environmental Education .................................... 5

Advisory Technical Assistance on Environmental Education (Phase III) .................. 7

After Care Program for the Japanese Technical Cooperation of the Forestry Development Project Watershed Management in Pantabangan and Carranglan ..... 9

Air Quality Management for Metro Manila ............................................................... 11

Allah Valley Watershed Development Project ........................................................ 13

An Action Study to Develop a Training and Information, Education and Communications (IEC) Plan for Industrial Efficiency and Pollution Control............. 15

Application of an Integrated Exploration Strategy for Precious and Base Metal Mineralization in the Bicol Peninsula ....................................................................... 17

Application of an Integrated Exploration for Precious and Base Metal in the Bicol Peninsula (PBMBP) ................................................................................................ 19

ASEAN-Australian Coastal Living Resources Project (CLRP) (Phase I & II) .......... 21

ASEAN-Australian Tides and Tidal Phenomenon Regional Ocean Dynamics) ...... 22

ASEAN Institute of Forest Management (AIFM) DENR Integrated Forest Management Project (INFOMAP) Phase II ............................................................. 23

ASEAN-New Zealand Afforestation Project ............................................................ 24

ASEAN-New Zealand Inter-institutional Linkages Program, Project 2: Sustainable Integrated Rural Development (SIRD) .................................................................... 25

ASEAN-New Zealand Inter-Institutional Linkages Programme (Project 3 - Forest Rehabilitation) ......................................................................................................... 27

ASEAN-US Watershed Project ............................................................................... 29

ASEAN Forest Tree Centre (AFTSC) Project ......................................................... 31

Asia Pacific Agroforestry Network Philippine Secretariat (APAN - Philippine Secretariat) .............................................................................................................. 32

Assessment of the Marine Resources of Tikling Island - A Proposed Marine Park/Reserve .......................................................................................................... 34

Assistance in Reducing Mercury Emissions in Highly Contaminated Gold Areas in Mindanao - Phase I ................................................................................................. 35

Aurora Integrated Area Development Project Watershed Management and Forestry Component) Phase I ............................................................................................... 37

Page 3: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects ii

Bioecological, Social and Economic Assessment of Assisted Natural Regeneration (ANR) as an Approach to Forest Cover Restoration ................................................. 39

Bliss Waste Management Project ........................................................................... 41

Buhi/Lalo Upland Development Pilot Project ........................................................... 42

Central Visayas Regional Project - I ........................................................................ 43

Coastal Environmental Management Plan .............................................................. 45

Coastal Zone Environmental and Resource Management Project (CZERMP) ....... 46

Community Based Development and Management of Logged-Over Areas Pilot Project ..................................................................................................................... 48

Conceptual Approach to the Development of Exploration Strategies for Gold Precious and Base Metal Mineralization in the Island of Catanduanes .................. 49

Debt for Nature Swap Program ............................................................................... 51

DENR-Upland Development Program Stage III: Expansion Phase ........................ 53

Design for an Integrated Protected Areas System for the Philippines .................... 54

Development of Bentonites for Use in Urban Project Bentoda ............................... 56

Development of Dessication and Moisture Standards for Selected Mangrove Species ................................................................................................................... 57

Development of Mining Laws and Mineral Investment Promotion Programme ....... 59

Economic Valuation of Impacts of Environmental Degradation in Laguna Lake ..... 61

Effects of Land Titling on the Adoption and Conservation-Oriented Farming Technologies in the Uplands ................................................................................... 62

Energy Sector Program Loan (DENR COMPONENT) ............................................ 64

Enhancement of Reference Sections of Sedimentary Basins in the Philippines ..... 66

Environmental and Natural Resources Accounting Project (Phase IV) ................... 67

Environment and Natural Resources - Sectoral Adjustment Loan Program (ENR-SECAL) ................................................................................................................... 69

EX-SITU Genebank for Philippine Teak (Tectona philipinensis) ............................. 74

Feasibility of the Limited Production Forest Concept In Critical Watersheds and Forest Reserve Areas ............................................................................................. 76

Feasibility Study on the Industrial Air Emission Source Project .............................. 78

Fisheries Sector Program Loan - DENR Component .............................................. 80

Forest Fire Management Project ............................................................................. 83

Forestry Master Plan Phase I .................................................................................. 84

Forestry Sector Project (ADB) ................................................................................ 85

Formulation of a Master Plan for Mineral Resources Development in the Philippines ................................................................................................................................ 88

Page 4: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects iii

Geological and Geo-Chemical Exploration of Panaon Island, Leyte (RP-Korea Project) .................................................................................................................... 89

Geological Assessment of Chromite, Platinum and Related Precious Metal Occurences in South Central Palawan and Northeastern Panay ............................ 90

Human Resources Development in Environmental Planning and Management for Sustainable Development in the Philippines ........................................................... 91

IGCP 246 - Project PANETS (International Geological Correlation Program) ........ 92

Implementation of the Forestry Master Plan for the Philippines (2nd Phase) ......... 93

Improved Productivity of Man-made Forest thru Application of Technological Advances in Tree Breeding and Propagation (Forest Tree Improvement Project - FORTIP) .................................................................................................................. 94

Improving the Implementation of Environment Impact Assessment Project, Philippines ............................................................................................................... 96

Industrial Efficiency and Pollution Control Project ................................................... 97

Industrial Environmental Management Project (IEMP)............................................ 99

Industrial Forest Plantation Program ..................................................................... 101

Industrial Restructuring Program (Environmental Management Phase II) ............ 103

Industrial Restructuring Program: Environment Component ................................. 105

Industrial Waste Exchange in the Philippines (IWEP) ........................................... 106

Information Technology Strategic Plan (ITSP) ...................................................... 108

Integrated Environmental Management for Sustainable Development (IEMSD) .. 110

Integrated Forest Protection Pilot Project .............................................................. 112

IPAS Training Program ......................................................................................... 114

Lake Bato Watershed Rehabilitation Pilot Project ................................................. 115

Leachate Pollution from Open Dumping Sites in Metro Manila (Main Study) ........ 116

Legislative Studies for the Integrated Protected Areas System of the Philippines 117

Livelihood Project for the On-Going Community Forestry Program (FS) .............. 118

Local Development Assistance Program (Environment Sector) ............................ 119

Magat Smallholder Agroforestry Pilot Project ........................................................ 120

Management, Supervision and Institutional Support to the IFP Program (Piggy-backed to the IFP) ...................................................................................... 121

Mangrove Development Project (FS) .................................................................... 122

Manila Bay Monitoring Program (PART II) ............................................................ 123

Marikina Watershed Development Project, FS ..................................................... 124

Marine Environmental Masterplan for the Philippines ........................................... 126

Metropolitan Environmental Improvement Programme (MEIP) ............................. 127

Page 5: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects iv

Mineral Exploration and Tectonics of Two Contrasting Geologic Environments in the Philippines ............................................................................................................. 129

Mini-Project Type Technical Cooperation in Hydrographic Surveying and Nautical Charting ................................................................................................................. 130

Mining Titles Computerization Project (MTCP) ..................................................... 131

Monitoring of Land-use and Land Cover Using Remote Sensing and Geographic Information System ............................................................................................... 133

Motor Vehicle Emission Control and Establishment of Testing Center ................. 134

Muleta-Manupali Watershed Development Project ............................................... 135

National Cartographic Center Project .................................................................... 136

Natural Resources Accounting Phase II ................................................................ 137

Natural Resources Accounting Project (Phase I) ................................................. 139

Natural Resources Accounting Project (Phase III) ................................................ 140

Natural Resources Management and Development Project (NRMDP) ................. 142

Network for Industrial Environment Management ................................................. 145

Ozone Depletion Substances Phase-out Country Program Preparation ............... 146

Palawan Integrated Area Development Project - Land Classification Component 147

Palawan Integrated Area Development Project - Upland Stabilization Component .............................................................................................................................. 148

Palawan Integrated Area Development Project - Land Surveys and Titling Component ............................................................................................................ 149

Pasig River Rehabilitation Program (Project Component-River Rehabilitation Secretariat) ............................................................................................................ 151

Pasig River System Rehabilitation and Restoration Project Preparation .............. 153

Pasig River Rehabilitation Program (Project Component- River Rehabilitation Secretariat) Phase II ............................................................................................ 154

Philippines-Australia Human Resources Development (HRD) Project .................. 156

Philippine Forestry Development Project in Ilocos Norte (PFDPIN) ...................... 159

Philippine-Korea Project On The Exploration Of Submarine Placer Mineral Deposits Off Surigao Del Norte and Agusan Del Norte, Mindanao ...................................... 160

Philippine Tarstier Conservation Project ............................................................... 161

Pilot Project on Community Based Management of Logged-Over Areas .............. 162

Plantation Establishment of Cashew, Fuelwood Species and Essential Oil Producing Grass Following an Agroforestry Scheme for Profit and Conservation 163

Population-Environment IEC Programme ............................................................. 165

Potential Non-Traditional Forest Products (NTFP) in Muleta-Manupali Watersheds .............................................................................................................................. 166

Page 6: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects v

Preparation of Industrial Common Treatment Facilities and Waste Abatement for Individual Enterprises ........................................................................................... 167

Preparation of Regional Resource Management Studies (ENR-SECAL) ............. 169

Preparation for the Samar Island Biodiversity Project ........................................... 170

Preparatory Assistance for the Empowerment of IPs for Sustainable Management of Ancestral Domains ............................................................................................ 171

Program Loan for the Forestry Sector ................................................................... 172

Project on Waste Minimization and Pollution Control for Small and Medium Enterprises (IWEP Phase II) ................................................................................. 175

Quarternary Geological Research Project/ Geoscience for Coastal Environmental Study in the Philippines (GEOCES) ...................................................................... 176

Rainfed Resources Development Project ............................................................. 178

Regional Office Environment Project .................................................................... 180

Research on Exploration Techniques for Rare and Precious Mineral Resources . 182

RP-Australian Remote Sensing Project ................................................................ 183

RP-EC Cooperation Project for the Development of Marble ................................. 185

RP-France Geodynamics and Metallogenesis at Northern Luzon ........................ 187

RP-German Cebu Upland Project ......................................................................... 188

RP-German Dipterocarp Management .................................................................. 190

RP-German Forest Resources Inventory .............................................................. 191

RP-German Industrial Pollution Control - Cebu Project ....................................... 192

RP-Japan Crocodile Farming Institute Project ...................................................... 194

RP-Japan Forestry Development Project and Watershed Management .............. 197

RP-Japan Technical Cooperation Project ............................................................. 199

RP-NZ Bukidnon Industrial Plantation Project (Phases I & II) ............................... 200

RP-US Non Government Environmental Organizational Linkages ....................... 202

Safety and Control of Toxic Chemical and Hazardous Wastes............................. 203

Seagrass Habitat Restoration Project ................................................................... 204

SEAMEO-France: Methodology and Training and Monitoring of Deforestation Using Satellites ................................................................................................................ 205

Second Palawan Integrated Area Development Project Survey and Land Titling . 206

SSC Topo Mapping ............................................................................................... 208

Strengthening Environmental Impact Assessment Project.................................... 209

Study of the Leachate Pollution from Open Dumping Sites in Metro Manila ......... 210

Study on the Philippine Fault and Metallogenesis ................................................. 211

Page 7: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects vi

TA for the Evaluation on Environmental Standards for Selected Industry Subsector .............................................................................................................................. 212

TA for Metro Manila Air Quality Improvement Sector Development Program ....... 213

TA on Industrial Tree Plantation ............................................................................ 214

TA on Rattan Plantation Development .................................................................. 215

TA on the Rationalization of the Wood-Based Industries ...................................... 216

TA on Waste Management Plan for Cebu ........................................................... 217

Third Davao Del Norte Irrigation Project Soil Conservation and Watershed Management Component ...................................................................................... 218

Timber Stand Improvement Project ...................................................................... 220

Toxic Chemicals and Hazardous Wastes Management ........................................ 221

Tree Improvement in Industrial Forest Plantation (Piggy-backed to IFP) .............. 223

UNDP/FAO Bamboo Research and Development Project .................................... 224

UNDP-FAO Strengthening of the ISF Programme ................................................ 226

Urban Air Quality Management Strategy in Asia (URBAIR) .................................. 228

Urban Forestry Program (FS) ................................................................................ 229

Vehicular Emission Control Planning in Metro-Manila (Phase I) ........................... 230

Vehicular Emission Control Planning in Metro-Manila (Phase II) .......................... 231

Low-Income Upland Communities Project (LIUCP) .............................................. 233

Private Sector Participation in Managing the Environment (PRIME) .................... 235

Swedish International Development Cooperation Agency (SIDA) Project Technical Assistance to Develop GIS for Local Government Units ....................................... 237

Technical Assistance for Improving Biodiversity Conservation in Protected Areas in the Philippines (TABC) – Phase II ......................................................................... 238

The Study on Mapping and Land Cover Assessment of Mangrove Areas in the Philippines ............................................................................................................. 240

Developing Tropical Forest Resources Through Community-Based Forest Management (ITTO Project No. PD 21/97 Rev. 2F) ............................................. 242

RP-ERSDAC: “The Cooperative Study on the Applications and Techniques using Remote Sensing Data for Monitoring and Mapping the Environment and Natural Resources in the Philippine Archipelago ............................................................... 244

Strengthening Local Environmental Planning and Management (LOCAL-EPM) . 245

Conservation of Priority Protected Areas Project (CPPAP) ................................... 247

Metro Manila Solid Waste Management Program (Support to Republic Act 9003 - Solid Waste Management Act) .............................................................................. 249

Natural Resources Management Program (NRMP ) ............................................. 251

Philippine-German Community Forestry Project - Quirino (CFPQ) ....................... 253

Page 8: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects vii

Quirino Community - Based Forestry Program: A Debt-For-Nature Swap Initiative (DFNSI) ................................................................................................................. 255

National Integrated Protected Areas Programme (NIPAP) ................................... 257

Master Plan Study for Integrated Watershed Management in Upper Magat and Cagayan River ....................................................................................................... 259

International Coral Reef Initiative (ICRI) Secretariat ............................................. 261

Initial Assistance to the Philippines to Meet its Obligations under the Stockholm Convention on Persistent Organic Pollutants ........................................................ 263

RP-JICA: Capacity Building for Environmental Management in Mining ................ 265

RP-Japan: Application of Integrated Exploration Strategy for Precious and Base Metal Mineralization in the North Bicol Area (A Follow-up Study) ......................... 266

DOST-NASA PACRIM2 Project, MGB Component: “MASTER and AirSAR Data Integration for Environmental Studies in Cebu, Philippines” ................................. 267

RP-ERSDAC: “The Cooperative Study on the Applications and Techniques using Remote Sensing Data for Monitoring and Mapping the Environment and Natural Resources in the Philippine Archipelago” .............................................................. 268

Pilot Study on the Formulation of Ecological Solid Waste Management Plan for Local Government Units in the Philippines ............................................................ 269

Assessment of Capacity Building Needs For Biodiversity Conservation and Management in the Philippines (Add-On EA Project on Biodiversity) ................... 270

Forest Resources Assessment Project ................................................................. 272

Sustainable Forest Management, Poverty Alleviation and Food Security in Upland Communities in the Philippines (Project PHI/O1/010) ........................................... 275

FS in the Philippine Projects & Activities Pursuant to the Country’s Maritime Claims under the Law of the Sea ...................................................................................... 278

Forestry Sector Project (FSP) ............................................................................... 279

NRMP-Philippine Environmental Governance Program (ECOGOV) ..................... 281

Public & Private Sectors Convergence for Solid Waste Co-Governance in Urban Poor Communities (PHI/02/G58)........................................................................... 283

MGB-NASDA ALOS Project: “Analysis of Topographic and Geologic Terrain Features in Relation to Rapidly Developing Urban Areas in the Philippines” ........ 284

National Biosafety Framework for the Philippines (NBFP) .................................... 285

Development and Implementation of the Pilot Project of the Forestry Statistics Information System (FSIS) - Phase I..................................................................... 288

Pilot Study on Participatory Control of Burning and Timber Pouching in the Philippines ............................................................................................................. 290

ENR Shell Program: Environment and Natural Resources (ENR) Framework Development and Implementation ........................................................................ 291

Page 9: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects viii

Enabling Activity for the Maintenance and Enhancement of National Capacities to Prepare the National Communication on Climate Change .................................... 293

Strengthening the Environmental Performance Monitoring and Evaluation System of the Philippine Environmental Impact Statement System (EIS) Project ................. 295

Geology and Mineral Potential of the Malimono-Cabadbaran Area of the Surigao Mineral District, Philippine: a RP-Korea Joint Investigation Project ...................... 297

Governance and Natural Resources Management Sector Study .......................... 299

Ulot Watershed Model Forest ............................................................................... 300

Land Administration and Management Program (LAMP) ...................................... 303

Water Resources Development Project - Watershed Management Improvement Component (WRDP-WMIC) .................................................................................. 305

Cordillera Highland Agricultural Resources Management Project (CHARM) -Reforestation Component ..................................................................................... 307

Visayan Sea Coastal Resources and Fisheries Management Project (VisSea) – DENR Component ................................................................................................ 309

ASEAN Regional Centre for Biodiversity Conservation (ARCBC) ......................... 312

Establishment of Clean Development Mechanism (CDM) National Authority, Operational Framework and Support Systems for the Philippines ........................ 314

Establishment of an ISO 14001-based Environmental Management System at the DENR .................................................................................................................... 315

Support to the Implementation of Executive Order No. 247 in the Philippines ...... 316

Integrated Coastal Resources Management Project - Project Preparation Technical Assistance ............................................................................................................. 318

Ligawasan Marsh Biodiversity Conservation Project - Component of the River Basin and Water shed Management Program (RBWMP) ............................................... 319

Community-Based Resource Management Project (CBRMP) –Environmental Technology Transfer Component .......................................................................... 321

(Loan No. 4299 PH) .............................................................................................. 321

Philippines-Canada Environmental and Economic Management Project (PCEEM) .............................................................................................................................. 323

National Capacity Self-Assessment Project .......................................................... 325

Philippine Enabling Activity: Initial Assistance to the Philippines to Meet Its Obligations Under the Stockholm Convention on Persistent Organic Pollutants .. 326

Management, Risk Assessment and Capacity Building on Persistent Organic Pollutants .............................................................................................................. 328

Study on Capacity Building to Promote Clean Development Mechanism Projects in the Philippines ....................................................................................................... 329

Adoption and Implementation of an Appropriate System of Criteria and Indicators (C & I) for Sustainable Forest Management............................................................... 330

Page 10: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects ix

Establishment of a National Database System for Watershed Information and Development of Guidelines for Integrated Watershed Management Plans .......... 332

Strengthening Coordination for Effective Environmental Management (SEEM) ... 334

Feasibility Study for Community-Based Forest and Mangrove Management Project in Panay and Negros ............................................................................................. 335

Metro Manila Air Quality Improvement Sector Development Program (MMAQISDP) .............................................................................................................................. 336

Southern Mindanao Integrated Coastal Zone Management Project (SMICZMP) . 338

Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan ................................................................................................. 340

Enhancement of Hydrographic Capabilities for Navigational Safety ..................... 342

Partnerships in Environmental Management for the Seas of East Asia - Manila Bay Environmental Management Project (PEMSEA-MBEMP) .......................................... 344

Samar Island Biodiversity Conservation Project (SIBP) ........................................ 347

Coastal Hazards Management Program ............................................................... 349

Itogon Integrated Watershed Management Project .............................................. 350

Research and Development Project on “Improving Financial Returns to Smallholder Tree Farmers in the Philippines ............................................................................ 352

Page 11: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 1

Abra Pine Plantation Development Project

PROJECT CODE : 85-00100 PROJECT TYPE : Plantation Establishment PROJECT SITE : Abra Province

PROJECT DESCRIPTION:

In line with the National Program for Forest Ecosystem Management (PROFEM), the Philippine Government requested from the World Bank technical and financial assistance for a reforestation project proposal.

In January 1978, the World Bank approved the proposal and identified two (2) main project components: (1) Smallholder Tree-farming involving a supervised credit scheme under the Development of the Philippines (DBP); and (2) Pine Plantation Development under BFD Management.

The Pine Plantation Development Component endeavors to bolster the government's reforestation of long-fibered pine species to cope the projected increases in the domestic demand for pulp and paper products.

PROJECT OBJECTIVES:

General Objectives:

To establish a 3000-hectare Pilot Pine Plantation and pave the way for wide-scale industrial reforestation.

Specific Objectives:

1. To strengthen the Bureau of Forest Development project planning and implementation capabilities;

2. To initiate industrial-scale reforestation using long-fiber species; 3. To develop economically attractive mode of resettling occupants of government forest

lands and of providing them with employment opportunities.

PROJECT ACTIVITIES: 1. Provision of nursery facilities, including watershed, irrigation system and propagating

sheds for imported seeds; 2. Development of about 3,000 has. critical Pinus Caribaea plantations as the first stage

of planting program and the conduct of surveys covering some 10,000 has. earmarked for plantation establishment; and

3. Construction and maintenance of forest roads, fire breaks, watch towers, headquarters complex and other support facilities.

FUNDING AGENCY : WB-IBRD PROJECT COST (IN US$ '000) : 3,680 TOTAL FOREX : 1,040 TOTAL GOP : 2,640 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 1890-PH START DATE : 1978 END DATE : 1985

Page 12: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 2

Acquisition of Magnetic Observation Equipment Under JICA's Equipment

Supply Program

PROJECT CODE : 93-06400 PROJECT SITE : Bilibid Prisons Compound, Muntinlupa, Metro-Manila PROJECT OBJECTIVES: To provide the surveying and mapping community, as well as the international scientific community, with updated magnetic data in the Philippine Islands. PROJECT ACTIVITIES/COMPONENTS: Construction of variation building, installation of new equipment, training of observatory staff and resumption of magnetic observations. FUNDING AGENCY : JICA TYPE OF FUNDING : Grant START DATE : 1993 END DATE : 1993 IMPLEMENTING AGENCY : CGSD, NAMRIA TARGET BENEFICIARIES : Surveyors and users of maps and charts

Page 13: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 3

ADB/Technical Assistance on Biodiversity Conservation and National

Integrated Protected Areas Systems

PROJECT CODE : 95-00100 PROJECT TYPE : Biodiversity Conservation PROJECT SITE : Bicol National Park (Camarines Sur and Camarines

Norte) and Mt. Iglit-Baco National Park in (Oriental and Occidental Mindoro)

PROJECT OBJECTIVES: To assist the government of the Philippines in protecting the biodiversity heritage of the country through the establishment of a national system of integrated protected areas, as promulgated by the NIPAS Act of 1992. PROJECT DESCRIPTION: The T.A. will assist the DENR and the PAMBs in testing and modifying, if necessary, the guidelines for buffer zone establishment and related land tenure instruments so that they are sensitive to the actual conditions prevailing in the national parks and to the interests of the affected resident population. The TA. will also support an IEC and training program for core DENR field staff and PAMBs in NIPAS administration and protected area and buffer zone management. It will help develop training curricula and materials on relevant topics. Short in-country site visits and a study tour to establish protected areas in the Asian region will be included. Subsequently, the T.A. will support a pilot activity to extend NIPAS Act implementation to a third protected area site, to be selected during the T.A. inception, where the trainees will practice what they have learned. It is envisaged that thereafter, the trained DENR staff will be able to provide technical guidance to PAMBs at other sites to initiate the protected area and buffer zone management planning process on their own. PROJECT ACTIVITIES/COMPONENTS:

1. Regional coordination in the conduct of TA implementation 2. Conduct of training/workshop for PAWB and PAW sector staff, PAMB

Conduct of extension workshop. 3. Actual TA implementation

Pilot testing of buffer zone Preparation of buffer zone management plan Preparation of a proposal for the third pilot site 4. Monitoring and evaluation 5. Production and dissemination of IEC materials.

Page 14: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 4

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 600 TOTAL FOREX : 600 TOTAL GOP : 0 EXCHANGE RATE : 24.65 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : TA No. 2234 PHI PROJECT DURATION : Two years START DATE : May 22, 1995 END DATE : May 22, 1997 PROJECT DIRECTOR/MANAGER: Dir. Celestino Ulep OFFICE ADDRESS : Protected Areas and Wildlife Bureau (PAWB) TELEPHONE NUMBER : 924-60-31 to 34 IMPLEMENTING AGENCY : Protected Areas and Wildlife Bureau (PAWB) TARGET BENEFICIARIES : DENR and local communities

Page 15: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 5

Advisory Technical Assistance on Environmental Education

PROJECT CODE : 91-23800 PROJECT TYPE : Institutional Development PROJECT SITE : Metro Manila PROJECT OBJECTIVES: 1. To assess the policies, scope, status and effectiveness of current environmental

education in both general and technical education. 2. To review the main components of environmental education including curriculum

and teacher training 3. To identify strategies for improving environmental education at all levels. 4. To prepare an action plan and develop costed project components for addressing

issues in environmental education in order to facilitate coordination of activities and collaboration among agencies.

5. To implement specific high-priority activities in environmental education such as

training, workshops, materials development workshops and development of instruction materials.

PROJECT ACTIVITIES/COMPONENTS: 1. Review of environmental education. 2. Development and Publication of a National Action Plan. 3. Implementation of Specific activities including: a) workshops for teachers; subject supervisors, curriculum developers, NGO

staff and the staff of government departments; b) development and distribution of additional instructional materials including

videotapes and radio broadcast scripts.

Page 16: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 6

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 418 TOTAL FOREX : 418 TOTAL GOP : 0 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : 1385-PHI START DATE : 1991 END DATE : 1992 PROJECT DIRECTOR/MANAGER: Elenida del Rosario TELEPHONE NUMBER : 97-32-54 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : DENR-EMB TARGET BENEFICIARIES : academe, public, sector, NGOs, local

government officials

Page 17: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 7

Advisory Technical Assistance on Environmental Education (Phase III)

PROJECT CODE : 91-23800 PROJECT TYPE : Institutional Development PROJECT SITE : Metro Manila PROJECT OBJECTIVES:

1. To develop an Environmental Education Curriculum Framework that will help teachers and other EE trainors perform their tasks effectively and efficiently.

2. To review, revise and/or develop instructional materials for environmental

education.

3. To undertake a series of teachers training on the teaching of environmental education for basic education teachers.

PROJECT DESCRIPTION: Scope of Activities

A. For the development of Environmental Education (EE) Curriculum Framework, the technical assistance shall focus on the following:

1. describe the philosophy, guiding principle and objectives, general

scope and evaluation schemes of EE for the different levels of education (pre-school, elementary, secondary, post-secondary, higher and non-formal education).

2. prepare a scope and sequence chart of EE concepts, skills and

related attitudes that need to be infused into the existing curricula at all levels of formal and non-formal education.

B. For the preparation of instructional materials, the technical assistance shall

focus on the following:

1. review/evaluate and revise existing EE materials for the basic educational level (elementary, secondary and non-formal education;

2. prepare print and non-print instructional materials for the same;

3. implement the use of these instructional materials on a pilot basis.

Page 18: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 8

C. For the upgrading of competencies of basic education teachers on environmental education, the technical assistance shall focus on the conduct of training program on the following:

1. orientation on EE framework; 2. appropriate strategies for teaching EE core messages and related

concepts/issues; and use of instructional materials. PROJECT ACTIVITIES/COMPONENTS: A. Development of Environmental Education (EE) Framework B. Preparation of Instructional Materials Training’s C. Conduct of Pilot Teacher FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 240 TOTAL FOREX : 240 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 1 year START DATE : January 1996 END DATE : December 1996 PROJECT DIRECTOR/MANAGER: Elenida del Rosario TELEPHONE NUMBER : 97-32-54 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : DENR-EMB TARGET BENEFICIARIES : academe, public, sector, NGOs, local

government officials

Page 19: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 9

After Care Program for the Japanese Technical Cooperation of the Forestry

Development Project Watershed Management in Pantabangan and

Carranglan

PROJECT TYPE : Plantation Development PROJECT SITE : R.A. Padilla, Carranglan, Nueva Ecija PROJECT OBJECTIVES:

The Aftercare Program of Pantabangan Rehabilitation is being implemented to supplement and further develop the techniques on afforestation and forest conservation introduced and disseminated through the technical training during the term of RP-Japan Forestry Development Project from 1976 until 1992. PROJECT DESCRIPTION:

The operations of the Aftercare Program will be directly managed and implemented by the DENR National Training Center formerly the RP-Japan Training Center at R.A. Padilla, Carranglan, Nueva Ecija renamed as such upon the termination of the Project in July, 1992. The DENR National Training Center was created by virtue of DENR Special Order No. 6 dated October 28, 1992 and is already on its 6

th year of

providing training venue and facilities to all sectors of the DENR and other government agencies and non-government institution as well as the maintenance and development of its training facilities and Model Sites used as field laboratories during training implementation. PROJECT ACTIVITIES:

1. Development, protection and maintenance of plantations previously established by the RP-Japan Project.

2. Formulation and implementation of training plans/programs on afforestation, forest conservation and social forestry.

3. Rehabilitation and maintenance of facilities and related equipment provided by the Japan’s Grant Aid Program for the Forestry Development Project-Phase I and Phase II.

FUNDING AGENCY : Japan International Cooperation Agency, Gov. of Japan

Page 20: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 10

PROJECT COST (IN US$ ‘000) TOTAL COST : 825.24 TOTAL GOP : 601.36 TOTAL GP : 223.88 TYPE OF FUNDING : Grant PROJECT DURATION START DATE : January, 1998 END DATE : December, 1999 PROJECT MANAGER : Rafael Otic OFFICE ADDRESS : Carranglan, Nueva Ecija

Page 21: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 11

Air Quality Management for Metro Manila

PROJECT TYPE : Pollution Control PROJECT SITE : Metro Manila PROJECT OBJECTIVES: 1. To develop modern Air Quality Management function at the Environmental

Management Bureau (EMB); 2. Improve EMB reporting and information capacity to decision makers, the general

public, the media and etc; and 3. Improve ambient air quality through emission reductions and optimized action. PROJECT DESCRIPTION: Ambient air quality in the Philippines is deteriorating. The interest from the different sector of the government as well as the general public to reduce the pollution levels id rapidly increasing. Cooperation between the Philippine and Sweden Governments Technical Assistance on Air Quality Management has been agreed. SIDA financed Technical Assistance (TA) is divided into two phases. Technical Assistance I includes the following: a) Installation of Advanced computerized AQM System (AIRVIVO); b) Specifications for SIDA Mixed Credit and ADB; and c) Basic build up of emission database over Metro Manila.

Technical Assistance 2 will cover the following activities: a) Continued formal and practical training; b) Upgrading of the computerize AQM system to handle the Metro Manila network; c) Advance data handling and reporting functions; d) enhanced database for M.M.; e) Advance simulation studies; f) Seminar and cooperation and; g) Organization and legislation and project management. On the investment phase, the proposed mixed credit facility (SIDA and ADB) will finance activities for the enhancement of the ambient air quality monitoring network over Metro Manila. Asian Development Bank (ADB) will financed the Upgrading of the ambient air quality monitoring network in Metro Manila including the operation, services and maintenance for three years and connection to the computerized Air Quality Management system. ADB agreed that the SIDA financed TA Project will take the lead in such a way that the technical and functional specifications the mixed credit will be coordinated with the ADB activities. mixed credit content includes the installation of a quality ambient air monitoring for Metro Manila (17 + fixed), limited number of mobile stations, operations, services and maintenance for three years, outdoor display boards for information, internet based air quality information and connection to the computerized Air Quality Management System.

Page 22: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 12

FUNDING AGENCY : SWEDEN PROJECT COST (IN US$ '000) TOTAL COST : 454 TOTAL FOREX : 454 TOTAL GOP : 0 EXCHANGE RATE : 28.00 TYPE OF FUNDING: Grant IMPLEMENTING AGENCY : EMB DENR PROJECT DURATION START DATE : January, 1998 END DATE : December, 1998 PROPONENT AGENCY : EMB-DENR

Page 23: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 13

Allah Valley Watershed Development Project

PROJECT CODE : 89-25800 PROJECT TYPE : Plantation Development PROJECT SITE : Luhib, Lake Sebu, Surallah and T'boli in South

Cotabato and Bagumbayan in Sultan Kudarat. It lies between the latitude of 6 degrees and 45 minutes, longtitude of 125 degrees and 00 minutes

PROJECT OBJECTIVES: To rehabilitate manage and protect critically denuded areas within the Allah Valley Watershed comprising an area of 102,350 hectares. PROJECT DESCRIPTION: The Allah Valley Watershed Development Project is an agency component of the National Irrigation Administration with financial assistance from the Asian Development Bank. The Project is responsible for the Watershed Management and Rehabilitation work pursuant to a MOA dated September 6, 1978 between the National Irrigation Administration (NIA) and Bureau of Forest Development (BFD). The project began its operation in 1979 and was supposed to terminate in Dec. 31, 1983. However, immense backlog and adequate balance of the Project allotment and cost overrun prompted the NIA_ARIP to request the extension of the agreement and was granted extension by the ADB up to June 1987. PROJECT ACTIVITIES/COMPONENTS: A. Reforestation (10,500 has.) B. Agroforestation (2,500 has.) C. Forest Protection (85,688 has.) D. Infrastructure (44.658 kms. roads)

Page 24: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 14

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 7,669 TOTAL FOREX : 5,409 TOTAL GOP : 2,290 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 341/727-PHI PROJECT DURATION : 10 years START DATE : 1979 END DATE : 1989 IMPLEMENTING AGENCY : BFD and NIA TARGET BENEFICIARIES : Upland Farmers

Page 25: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 15

An Action Study to Develop a Training and Information, Education and

Communications (IEC) Plan for Industrial Efficiency and Pollution Control

PROJECT CODE : 94-03900 PROJECT SITE : Metro-Manila PROJECT OBJECTIVES: 1. To define a framework for the on-going identification of training and human

resource development needs in the IPC sector; 2. To develop a multi-year plan for meeting these needs in a coordinated response

by the institutions presently involved. PROJECT DESCRIPTION: The Study is in support of an Industrial Efficiency and Pollution Control Project in Metro-Manila Area (Philippines); it will initiate a process of consultation and analysis in preparation of the substantive content in a Training and IEC Component. The most critical area of need in pollution reduction in the Metro Manila Area has been identified as the strengthening of the overall Government of the Philippines (GOP) institutional capacity in Regulation, Enforcement and Monitoring of pollution reducing technologies. It is anticipated therefore that the training needs in these areas of institutional strengthening would be identified in priority to others, and that training activities and programs to meet such needs would be planned and scheduled accordingly. The study will address both resources and needs for training (and related aspects of human resource development) as well as equipment and material supplies needed for these purposes. The area for such a study will cover all of the institutions currently, or likely to become, involved in industrial pollution abatement and its regulation, enforcement and monitoring within the public (e.g. DENR (central, Regional and provincial levels), LLDA, MMA and other local LGUs and municipalities) and private (e.g. industry, financial institutions, NGOs and communities) sectors. PROJECT ACTIVITIES/COMPONENTS: 1. Update the Inventory of Training Supply 2. Update the Demand for Training 3. FS for a Clearinghouse Secretariat in Training, IEC and Human Resources

Development 4. Worshops to Develop Priority Areas in a 3-year Action Plan 5. The 3-Year Training and HRD Action Plan

Page 26: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 16

FUNDING AGENCY : Japan TA Grant PROJECT COST (IN US$ '000) TOTAL COST : 85 TOTAL FOREX : 85 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 9 MONTHS START DATE : September 1994 END DATE : May 1995 PROJECT DIRECTOR/MANAGER : Elisea Gozun OFFICE ADDRESS : 2nd Floor DENR Bldg., Visayas Ave.,

Diliman, Q.C. TARGET BENEFICIARIES : Public

Page 27: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 17

Application of an Integrated Exploration Strategy for Precious and Base

Metal Mineralization in the Bicol Peninsula

LOCATION : Bicol North Area

FUND SOURCE : Japan International Cooperation Agency (JICA) Metal Mining Agency of Japan (MMAJ) PROJECT COST : P 8 M

GOJ : P 6 M GOP : 2 M

IMPLEMENTING AGENCY : Department of Environment & Natural Resources (DENR) Mines and Geo-Sciences Bureau (MGB) BENEFICIARIES :

1. MGB in the form of:

a. equipment donation b. technology transfer c. new geologic data

c.a. regional geologic data c.b. regional geochemical data c.c. regional geophysical data

2. Mining Industry 3. Local Economy

a. short term labor employment b. short term contractual service c. short term enhance commercial activities

4. Environmental baseline database (for EMB) PROJECT DESCRIPTION : The project study will involve geologic mapping at semi-detailed and detailed scales, accompanied by appropriate sampling methods for rock, stream sediment and soil analysis and subsurface geophysical mapping. A full-blown diamond drilling program will be undertaken to verify and to delineate the magnitude of the mineral deposit identified. The main purpose of the survey is to explore and to assess the mineral potential of the survey area.

Page 28: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 18

OBJECTIVES :

1. To undertake the systematic exploration of promising areas delineated earlier on by the previous RP-Japan Mineral Exploration Project.

2. To promote the exploration for and exploitation of the mineral resources of the country by providing the initial geologic data on prospective or promising areas or sites.

3. To develop a comprehensive exploration model that can be useful in the assessment and evaluation of mineral resources potentials of areas with similar or comparable geologic character.

4. To identify mineral deposit within the area that can be subjected to future development and exploitation.

EXPECTED OUTPUT: 1. Reports 2. Maps (hard copy and digital format) 3. New geologic data 4. Recommendation for promising area

Page 29: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 19

Application of an Integrated Exploration for Precious and Base Metal in the

Bicol Peninsula (PBMBP)

PROJECT TYPE : Natural Resources Management PROJECT SITE : Region V: Provinces of Albay, Camarines, Camarines Sur

and Sorsogon PROJECT OBJECTIVES :

1. To develop an effective exploration strategy for precious and base metal mineralization applicable to areas or regions of similar or comparable geologic setting or character

2. To upgrade the capability of the MGB, DENR and DENR Region V through the training of technical personnel in the conduct of this type of survey and the use of modern equipment and instruments.

3. To assess the potentials of the target area in terms of viable precious and base metal mineralization

PROJECT DESCRIPTION: The project will include the following components: literature survey and research; analysis of remotely sensed data (Landsat, ERTS imagery analysis); reconnaissance geologic mapping; survey; geophysical survey; diamond drilling/chemical analysis; data processing and interpretation; and presentation of technical reports/results. The project aims to optimize the output of each component to meet the desired objectives. During the course of the project, the following outputs are expected:

1. regional geologic/lithogic maps of 1:50,000 scale 2. regional geochemical maps (stream sediment/soil samples) 1:50,000 scale 3. structural/tectonic development maps 1:100,000 or 1:50,000 scale 4. detailed geologic maps 1:10,000 scale 5. detailed geochemical maps 1:10,000 scale (possible grid soil maps) 6. aeromagnetic map 1:250,000 scale 7. detailed resistivity or I.P. geophysical maps 1:25,000/1:10,000 scale 8. technical reports for each phase or program 9. anomaly maps or mineral potential maps 10. final or terminal technical report

Aside from these quantifiable or tangible outputs, the project is also expected to result into the upgrading of the expertise of the personnel involved through the practical training provided for by the project. This is true for the geologists, chemists, geophysicists and support personnel responsible for the actual field and laboratory works.

Page 30: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 20

PROJECT ACTIVITIES/COMPONENTS : Phase I (Reconnaissance Geological/Geochemical Survey)

1. Planning and Negotiation 2. Compilation and Research Work 3. Field Survey 4. Data Compilation/Laboratory Analysis 5. Data Analysis and Processing 6. Report Writing

Phase II (Semi-detailed Geol./Geochemical Survey)

1. Planning 2. Field Survey 3. Laboratory Analysis 4. Data Analysis and Processing 5. Report Writing

Phase III (Detailed Geological/Geochemical/Geophysical and Drilling)

1. Planning 2. Field Survey (Mapping and Sampling) 3. Laboratory Analysis 4. Drilling 5. Data Processing/Compilation 6. Report Writing

FUNDING AGENCY : JICA PROJECT COST (IN US$ '000)

TOTAL COST : 2,012 TOTAL FOREX : 2,000 TOTAL GOP : 12

EXCHANGE RATE : 40.00 PROJECT DURATION : 3 years

START DATE : 1997 END DATE : 1999

PROJECT DIRECTOR : Mr. Almeda OFFICE ADDRESS : Geology Div. BMGS, North Ave., Diliman, Q.C. IMPLEMENTING AGENCY : MGB,DENR and DENR Region V-MGDS PROPONENT AGENCY : MGB, DENR and DENR Reg. V-MGDS

Page 31: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 21

ASEAN-Australian Coastal Living Resources Project (CLRP) (Phase I & II)

PROJECT CODE : 86-00200 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: 1. To train CLRP researchers in the application of satellite geographic data and

image processing system in coastal resources studies and to popularize the use of geographic satellite data.

2. To conduct actual spatial analysis of coastal area phenomenon among CLRP

study sites using the geographic satellite data and microbian. 3. To train Pilipinos to produce timely remotely sensed coastal environment info

which will directly aid the projects coastal living resources research and management activities.

FUNDING AGENCY : Australia PROJECT COST (IN US$ '000) TOTAL COST : 500 TOTAL FOREX : 500 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : June 1986 END DATE : 1991

Page 32: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 22

ASEAN-Australian Tides and Tidal Phenomenon Regional Ocean Dynamics)

PROJECT CODE : 91-25800 PROJECT TYPE : Research PROJECT SITE : Southeast Asian Seas, with a network of project tide stations

at 23 locations (5 of which are in the Philippines), and current and other physical oceanographic measurement points at different straits/passages within.

PROJECT OBJECTIVES: To obtain tidal and current data in the ASEAN Seas for the practical use of navigation, port and harbor management and pollution control; and prediction of perturbing events such as storm, surges, tsunamis, and climate changes.

PROJECT DESCRIPTION: The Regional Ocean Dynamics is the extension/Phase II the ASEAN-Australia Tides and Tidal Phenomena Project designed to continue water level monitoring to obtain simulation data suitable for calibration, validation and initialization of the numerical models of the ASEAN Seas and extraction of non-tidal and long period signals. PROJECT ACTIVITIES/COMPONENTS: 1. Water level observation 2. Data Processing 3. Annual Releveling 4. Inspection trips 5. Management Committee 6. In-country Workshops 7. Improvement of Regional Dynamics Project Office FUNDING AGENCY : AIDAB and the ASEAN countries PROJECT COST (IN US$ '000) TOTAL COST : 159 TOTAL FOREX : 149 TOTAL GOP : 10 TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : July 1989 END DATE : June 1994 PROJECT DIRECTOR/MANAGER: Captain Renato Feir OFFICE ADDRESS : NAMRIA, Fort Bonifacio, Makati IMPLEMENTING AGENCY : NAMRIA TARGET BENEFICIARIES : Coastal population, shipping community and

marine scientists.

Page 33: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 23

ASEAN Institute of Forest Management (AIFM) DENR Integrated Forest

Management Project (INFOMAP) Phase II

PROJECT TYPE : Institutional Development PROJECT SITE : Doña Remedios Trinidad/General Tinio Watershed Forest

Reserve in Nueva Ecija, the Mt. Makiling Reservation in Los Baños, Laguna and PICOP in Bislig, Surigao del Sur

PROJECT OBJECTIVES: To upgrade forest management policies and practices as well as the documentation and dissemination of results thereof. PROJECT DESCRIPTION: The Integrated Forest Management Project (INFOMAP) is a joint undertaking between the ASEAN Institute of Forest Management (AIFM) and the Department of Environment and Natural Resources (DENR), acting as the executing agency for the Philippines towards the development and dissemination of forestry technologies. PROJECT ACTIVITIES/COMPONENTS: Integrated resource planning Growth and yield studies GIS studies Biodiversity management Training of forest managers both in the government and private FUNDING AGENCY : ASEAN Institute of Forest Management/CIDA TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : 22/09/93 END DATE : 00/00/98 PROJECTMANAGER : Napoleon Dalangin OFFICE ADDRESS : FMB Director's Office, Visayas Ave., Diliman, Q.C. IMPLEMENTING AGENCY: DENR, FMB PROPONENT AGENCY : DENR TARGET BENEFICIARIES : Forestry policy makers

Page 34: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 24

ASEAN-New Zealand Afforestation Project

PROJECT CODE : 89-30000 PROJECT TYPE : Institutional Development PROJECT SITE : Tarlac, Region 3 PROJECT OBJECTIVES : 1. To establish a forest nursery and a Pilot Pine Plantation to demonstrate effective

afforestation measures on site which has characteristics similar to those lands requiring afforestation in other ASEAN Countries using techniques adopted from New Zealand experiences and some ASEAN Countries.

2. To use the pilot plantation for practical on-the-job training for forest officers from

ASEAN countries who will subsequently direct or be involved in training forest officers in forest plantation management in their own countries.

PROJECT DESCRIPTION: The Project is a cooperative undertaking by the ASEAN countries and the New Zealand Government. It was one of the series of regional projects in which New-Zealand has undertaken to provide assistance to benefit ASEAN countries. The Project involved the establishment of forest nursery to raise a range of tree species of various provenance with the major objective of initiating a commercial forest resource, to demonstrate techniques of site preparation, planting and survival practices and silvicultural tending, fire protection and general forest management procedures. FUNDING AGENCY : New Zealand/ASEAN PROJECT COST (IN US$ '000) TOTAL COST : 3,097 TOTAL FOREX : 163 TOTAL GOP : 2,934 EXCHANGE RATE : 5.23 TYPE OF FUNDING : Grant PROJECT DURATION : 8 years START DATE : December 1979 END DATE : October 1987 PROJECT DIRECTOR/MANAGER : Rodolfo S. Rivera IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Communities within project area and forest

officers engaged in reforestation

Page 35: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 25

ASEAN-New Zealand Inter-institutional Linkages Program, Project 2:

Sustainable Integrated Rural Development (SIRD)

PROJECT CODE : 91-22800 PROJECT TYPE : Institutional Development PROJECT SITE : ASEAN countries PROJECT OBJECTIVES: The primary objective of the Programme is to establish self-sustainable linkages among ASEAN member-nations and New Zealand in academic, professional, scientific and commercial spheres. Project 2 - SIRD aims to create a forum leading to the preparation and dissemination of technical training materials designed to promote sustainable rural development. PROJECT DESCRIPTION: Project 2 is structured into three phases: Phase I is focused on the meaning of and factors involved in SIRD Phase II is to identify the policy(ies) necessary to achieve sustainability particularly in the context of small rural communities; Phase III is focused on training on SIRD PROJECT ACTIVITIES/COMPONENTS: 1. Develop a Sustainable Integrated Rural Development (SIRD) model to be piloted

in each participating country 2. Formulation of a national policy necessary for the implementation of the SIRD

model. 3. Training planners to equip them with the necessary skills to implement the SIRD

model. 4. Establishment of a network of associate institutions for exchange of information,

and skills on the subject

Page 36: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 26

FUNDING AGENCY : New Zealand PROJECT COST (IN US$ '000) TOTAL COST : 229 TOTAL FOREX : 229 TOTAL GOP : 0 EXCHANGE RATE : 27.55 TYPE OF FUNDING : Grant PROJECT DURATION : 4 years START DATE : July 1990 END DATE : June 1994 PROJECT DIRECTOR/MANAGER : Cecille T. Mercado OFFICE ADDRESS : 99-101 Topaz Bldg., Kamias Rd., Q.C. TELEPHONE NUMBER : 97-32-54 IMPLEMENTING AGENCY : EMB TARGET BENEFICIARIES : Rural communities

Page 37: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 27

ASEAN-New Zealand Inter-Institutional Linkages Programme (Project 3 -

Forest Rehabilitation)

PROJECT CODE : 94-02800 PROJECT SITE : ASEAN-member nations PROJECT OBJECTIVES: 1. To establish an on-going self-sustainable linkages among ASEAN member-nations

and New Zealand in academic, professional, scientific and commercial spheres. 2. To develop a resource-base for the rehabilitation of degraded forests and

wasteland. PROJECT DESCRIPTION: a. Development of Computerized ASEAN Forestry Database b. Forest Rehabilitation Manual. Each country will prepare a compilation of available

technologies and Malaysia, as the project leader, will be responsible to consolidate the output.

This will cover the following topics: i. Forestry in General ii. Forest Rehabilitation iii. Nursery Operation Seed Planting Stock Production Stock Quality iv. Forest Establishment Land Preparation Planting Maintenance PROJECT ACTIVITIES/COMPONENTS: Establishment of the Philippine forestry database on forestry rehabilitation.

Page 38: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 28

FUNDING AGENCY : New Zealand Government PROJECT COST (IN US$ '000) TOTAL COST : 5,000 TOTAL FOREX : 5,000 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : January 1991 END DATE : December 1995 PROJECT DIRECTOR/MANAGER : Pio Bote OFFICE ADDRESS : Economics Division, FMB Bldg., Visayas

Ave., Dil.iman,Q.C. TELEPHONE NUMBER : 926-21-41/927-47-88 IMPLEMENTING AGENCY : DENR/FMB TARGET BENEFICIARIES : Researchers

Page 39: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 29

ASEAN-US Watershed Project

PROJECT CODE : 89-26400 PROJECT TYPE : Research PROJECT SITE : Nationwide PROJECT OBJECTIVES: To establish a Watershed Management Research Network among the Asean Countries with a common theme of watershed management research for productive and protective upland emphasis on soil erosion reduction and improved water quality, quantity and distribution. PROJECT DESCRIPTION: The Project is envisioned to promote cooperation and collaboration among ASEAN member countries to improve watershed conservation and management activities in the region through manpower development and information/data collection and dissemination. PROJECT ACTIVITIES: 1. Project Sponsored Activity - the aim is to set joint research and training objectives

and encourage information exchanges and to improve skills of network participants.

2. Training - its aim is to train individual participants in academic courses and

research to improve the ability to contribute to the ASEAN network and watershed management research.

3. Research Support Component - aims to provide research support equipment and

training in the use of equipment to improve and standardize data collection and analysis in priority research activities.

4. Los Banos Center - includes the Management Information Service, which is

intended to coordinate network activities and provide information exchange among which is the publication of Newsletter, abstracts and proceedings and manuals, manage project activities and channel project resources to support established priorities.

Page 40: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 30

FUNDING AGENCY : ASEAN-USAID PROJECT COST (IN US$ '000) TOTAL COST : 5,200 TOTAL FOREX : 4,000 TOTAL GOP : 1,200 TYPE OF FUNDING : Grant START DATE : 1984 END DATE : 1989 PROJECT DIRECTOR/MANAGER: Dr. Severo Saplaco

Page 41: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 31

ASEAN Forest Tree Centre (AFTSC) Project

PROJECT CODE : 94-04400 PROJECT SITE : ASEAN Countries PROJECT OBJECTIVES: To solve seed related problems encountered by the association of Southeast Asian Nations (ASEAN) in the production of good quality forest tree seeds and vegetative planting materials. PROJECT DESCRIPTION: The Project was established in Muak Luak, Saraburi Province, Thailand. The ASEAN Forest Tree Seed Centre as the first major cooperative project between the ASEAN and the Government of the Canada. In 1984, the ASEAN requested Canada to continue support to the in-house development and research functions to support related aspects of development being conducted by other ASEAN agencies. PROJECT ACTIVITIES/COMPONENTS: 1. Research and Development 2. Operational Support 3. Information Exchange 4. Training FUNDING AGENCY : CIDA PROJECT COST (IN US$ '000) TOTAL COST : 14,500 TOTAL FOREX : 14,500 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 7 years START DATE : April 1989 END DATE : March 1996 PROJECT DIRECTOR/MANAGER: Sofio Quintana OFFICE ADDRESS : SFD, FMB, Visayas Ave., Diliman, Quezon City TELEPHONE NUMBER : 927-66-17/927-62-17 IMPLEMENTING AGENCY : FMB-DENR TARGET BENEFICIARIES : ASEAN Forestry Personnel

Page 42: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 32

Asia Pacific Agroforestry Network Philippine Secretariat (APAN - Philippine

Secretariat)

PROJECT CODE : 94-04700 PROJECT SITE : ERDB, College, Laguna and Regional APAN office

base in Bogor, Indonesia. Demo agroforestry farms will be established in Luzon, Visayas and Mindanao

PROJECT OBJECTIVES: To promote agroforestry information and technology exchange among member countries. PROJECT DESCRIPTION: The National APAN Secretariat facilitate and promote the exchange and dissemination of viable, applicable and sustainable agroforestry technologies and information through technical cooperation and collaboration with the local institutions and international networks. The Project intends to serve clienteles from government sector, non-government organizations, academe, and private individuals working and engaged in agroforestry and upland development activities. The project will establish and maintain agroforestry technologies for adaption and at the same time will serve as learning laboratories for the farmers and other interested individuals. Component of the project is the conduct and attendance to training, crossfarm visits, study tours in order to build up technical capability of the member of the network. PROJECT ACTIVITIES/COMPONENTS:

1. Data gathering and research, compilation of agroforestry practices.

2. Packaging and reproduction of agroforestry information, materials, brochures, pamphlets for dissemination to clienteles in the academe, GOs and NGOs involved in agroforestry R & D activities.

3. Continue mailing and distribution of APAN publication to local and

international networks.

4. Monitoring of APAN agroforestry demonstration plots.

5. Coordination, networking and linkaging through conduct and/or attending to meetings, seminars, tours, symposia and other fora to strengthen institutional linkages

Page 43: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 33

FUNDING AGENCY : FAO and fund 101 of SPD-FASPO PROJECT COST (IN US$ '000) TOTAL COST : 5,020 TOTAL FOREX : 5,000 TOTAL GOP : 20 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : GCP/RAS/133/JPN PROJECT DURATION : 4 years START DATE : 1993 END DATE : December 1997 PROJECT DIRECTOR/MANAGER: Aleli M. Luna OFFICE ADDRESS : Upland Farms Ecosystem Research Div.,

ERDB, Laguna TELEPHONE NUMBER : 2229,2509,2269 l.231 IMPLEMENTING AGENCY : DENR-ERDB TARGET BENEFICIARIES : Focal institutions/individuals active in

agroforestry research development and training in Asia-Pacific member countries.

Page 44: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 34

Assessment of the Marine Resources of Tikling Island - A Proposed Marine

Park/Reserve

PROJECT CODE : 92-04600 PROJECT SITE : Tikling Island, Eastern Samar PROJECT OBJECTIVES : The project involves survey and assessment of the marine resources of Tikling Island. The data gathered shall be the basis for recommendation of the establishment of the island as marine protected area and the preparation of future management and zoning plans. The implementing strategies and activities include: a) Preliminary field survey to determine sites for assessment and existing uses

of said sites; b) Detailed resource survey and mapping of resources within the study sites; c) Survey of the socio-economic conditions of the residents of the island. PROJECT DESCRIPTION: PROJECT ACTIVITIES/COMPONENTS: FUNDING AGENCY : NAGAO TYPE OF FUNDING : Grant PROJECT DURATION : 3 months START DATE : March 1992 END DATE : May 1992 IMPLEMENTING AGENCY : DENR/PAWB

Page 45: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 35

Assistance in Reducing Mercury Emissions in Highly Contaminated Gold

Areas in Mindanao - Phase I

PROJECT TYPE : Capacity Building PROJECT SITE : Naboc River, Davao del Norte and Hijo River, Apoko in

Mindanao

PROJECT OBJECTIVES: The Project is focusing on the Government’s development target to phase out the use of mercury in artisanal and small-scale mining operations by providing improved health, working and living conditions as well as increased income for the gold mining population. The project will help the Government bridge the technological gap from which the sub-sector is suffering and introduce environmental management and cleaner production methods unknown to the rural population. PROJECT DESCRIPTION: Amalgamation is the preferred method adopted by artisanal miners to process gold ore since mercury is still a cheap and effective reagent for extracting gold. However, the impact of amalgamation on the environment is pollution caused by either mercury substances evaporating into the air and mercury discharged with the residues (tailings) from mining operations. Symptoms of poisoning from mercury vapour or through the aquatic environment are already evident. Education is a pre-requisite for a long term solution of the mercury emission problem. Technical solutions, however, must be rapidly provided to avoid a future epidemic situation. PROJECT ACTIVITIES/COMPONENTS: 1. Advise the MGB on possible legal and administrative framework to address the

various environmental challenges of small-scale gold mining; and 2. Provide advisory assistance to MGB in the formulation of new Small-Scale Mining

Law, taking into consideration the various political, social and environmental dimensions of small-scale mining activities.

FUNDING AGENCY : UNDP and Cost-Sharing Inputs PROJECT COST (IN US$’000) TOTAL COST : US$213,950 TOTAL FOREX : US$213,950 TOTAL GOP : US$ --------

Page 46: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 36

EXCHANGE RATE : US$1=37.80 TYPE OF FUNDING : Grant

START DATE : May 1998 END DATE : February 1999

PROJECT DIRECTOR : Johnny Galvez OFFICE ADDRESS : Metallic Technical Division

BMGS, North Ave., Diliman, Q.C. TARGET BENEFICIARIES : Gov’t Org’ns/Local Gov’t Org’ns EXECUTING AGENCY : United Nations Industrial Dev’t Org’n (UNIDO) COOPERATING AGENCY : Mines and Geosciences Bureau , DENR

Page 47: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 37

Aurora Integrated Area Development Project Watershed Management and

Forestry Component) Phase I

PROJECT CODE : 89-25300 PROJECT TYPE : Watershed Rehabilitation PROJECT SITE : Diamanen-Dimabuno, Dipaculao; Davil-Davilan; Dingalan;

Casiguran; Dinalungan; Ma. Aurora; and San Luis (all in Aurora)

PROJECT OBJECTIVES: The project will provide financial and technical assistance for the implementation of an integrated area development project in Aurora. To establish and implement based on sound principles of resource development and management, a development program which recognizes the especial environment hazards of the area and which will ensure early and continuing improvements in the income and living condition of the people of Aurora. To protect and conserve critical watersheds through pilot activities in watershed rehabilitation and upland stabilization. To undertake a detailed management and forestry study for promoting the rational use of forest resources. PROJECT DESCRIPTION: The component involves the implementation of pilot watershed rehabilitation program and upland stabilization schemes. This component also includes the conduct of a resource planning workshop during the inception year. Integral with this exercise are studies involving review of land classification and present boundaries of forest resource, present location and extent of swidden agriculture, validity of forest inventories, and present level of allowable cut, potential for minor forest products, etc. Out of this exercise, two field activities are intended to develop reforestation and/or enrichment program and limitation and stabilization of swidden agriculture. PROJECT ACTIVITIES/COMPONENTS: 1. Demarcation of 161.55 kms. of A & D Lands 2. Survey of 183.5 has. of denuded lands 3. Procurement of 105,000 seedlings and 270 kgs. of seeds 4. Plantation in degraded areas (156.6 has.) 5. Maintenance and protection of 120 has. of community forest 6. Protection of 18,987.42 has. of watershed reserve areas.

Page 48: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 38

FUNDING AGENCY : EEC PROJECT COST (IN US$ '000) TOTAL COST : 2,610 TOTAL FOREX : 2,556 TOTAL GOP : 54 EXCHANGE RATE : 27.70 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : ALA 8525 PH PROJECT DURATION : 6 years START DATE : 00/01/88 END DATE : 00/12/94 PROJECT DIRECTOR/MANAGER : Lino Domingo OFFICE ADDRESS : Baler, Aurora IMPLEMENTING AGENCY NEDA, DENR TARGET BENEFICIARIES : Upland Farmers (208)

Page 49: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 39

Bioecological, Social and Economic Assessment of Assisted Natural

Regeneration (ANR) as an Approach to Forest Cover Restoration

PROJECT CODE : 94-03400 PROJECT TYPE : Research PROJECT SITE : Penablanca,& Gonzaga,Cagayan; Nagtipunan,& Diffun,

Quirino; Narra, Palawan; Sablayan,Occ. Mindoro; Real,& Pagbilao,Quezon; Valencia, Calabugao,Talakag, &Don Carlos, Bukidnon; Kiblawan, D. Del Sur;Tagum, D.del Norte;Marilog, Davao City;Banga,Allah Valley

PROJECT DESCRIPTION: Assisted Natural Regeneration (ANR) is one of the approaches being adopted by the DENR since 1989 to reforest as quickly as possible more than 7 million hectares of forest land in the Philippines. The adoption of ANR was based on the recommendation that the ecological processes during secondary succession can be assisted or accelerated to shorten the time required for plant communities to naturally reach a climax forest state. Although DENR has adopted a system of monitoring the implementation of reforestation projects nationwide the existing system can only reflect in effect the administrative implementation of ANR and does not reflect accurately the actual effectivenes of ANR in restoring forest cover. Significant improvement can be made on the present monitoring system with the closer assessment of ANR's application in the on-going national reforestation program.

PROJECT ACTIVITIES/COMPONENTS:

1. Biological Assessment of ANR 2. Social Assessment of ANR 3. Economic Assessment of ANR 4. Assessment of Existing ANR Policies 5. Presentation of Results

FUNDING AGENCY : NRMP, USAID PROJECT COST (IN US$ '000) TOTAL COST : 44 TOTAL FOREX : 44 TOTAL GOP : 0 EXCHANGE RATE : 27.00 TYPE OF FUNDING : Grant PROJECT DURATION : 18 months START DATE : January 1994 END DATE : June 1995

Page 50: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 40

PROJECT DIRECTOR/MANAGER: Aljoy H. Abarquez OFFICE ADDRESS : ERDB, College, Laguna IMPLEMENTING AGENCY : ERDB PROPONENT AGENCY : NRMP TARGET BENEFICIARIES : DENR

Page 51: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 41

Bliss Waste Management Project

PROJECT CODE : 89-26200 PROJECT TYPE : Environmental Protection PROJECT SITE : U.P Bliss, Diliman, Quezon City (NCR) PROJECT OBJECTIVES: To design, construct and implement an aerated and facultative pond treatment facilities; to monitor and maintain the operation of the facility; to provide information materials such as technical waste water treatment manual, primer, pamphlet and audio visual aide for operations and maintenance. PROJECT DESCRIPTION: The BLISS/UP Housing Community was used as a laboratory to test the effectiveness the financial and operational viability of a facultative pond treatment facility. PROJECT ACTIVITIES/COMPONENTS: 1. Construction/establishment of Waste Water Treatment Facility 2. Conduct of socio-economic acceptability study 3. Conduct of training FUNDING AGENCY : IDRC, Canada PROJECT COST (IN US$ '000) TOTAL COST : 48 TOTAL FOREX : 48 TOTAL GOP : 0 EXCHANGE RATE : 21.50 TYPE OF FUNDING : Grant START DATE : 1987 END DATE : 1989 PROJECT DIRECTOR/MANAGER : Clarissa Arida TARGET BENEFICIARIES : BLISS residence

Page 52: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 42

Buhi/Lalo Upland Development Pilot Project

PROJECT CODE : 84-00100 PROJECT TYPE : Developmental PROJECT SITE : Buhi/Lalo watershed PROJECT OBJECTIVES: To improve the socio-economic condition and quality of life of the people living within the project area. FUNDING AGENCY : USAID PROJECT COST (IN US$ '000) TOTAL COST : 252 TOTAL FOREX : 154 TOTAL GOP : 98 TYPE OF FUNDING : Grant START DATE : 1981 END DATE : 1984

Page 53: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 43

Central Visayas Regional Project - I

PROJECT CODE : 84-00001 PROJECT SITE : Badian-Alegria, Cebu; Siquijor Province; Ipil River,

Bohol; Bayaman, Ayungan_Bindoy, Negros Oriental PROJECT OBJECTIVES: To assist the de facto resource management small-scale upland farmers, artisanal fishermen and forest occupants to stabilize and improve their resource base while increasing their productivity, and build local government capability to manage local development and line agency capacity to provide appropriate support services. PROJECT DESCRIPTION: The Central Visayas Regional Project I (CVRP-I) is a pilot project in regional rural development founded on the principles of devolution and community-based resource management. It is the first project to be funded by the IBRD or World Bank. Implementation began in July 1984 with the deployment of 35 core staff to conduct social preparation activities and introduce resource management technologies in 18 pilot barangays. CVRP-I is composed of a water management component with four technical sub-component (upland agriculture, social forestry, nearshore fisheries and infrastructure and a support component with institutional strengthening, research, training and technical assistance and applied communications as sub-component. The Social Forestry Project site is located in the forest areas of Ayungon and Bindoy, Negros Oriental with an approximate area of 17,000 has. and is within the former logging concession area of the Philippine-American Timber Co., Inc. (permit cancelled when Negros Oriental Province was declared log-deficient in 1979). With the project life, the Social Forestry component would develop and manage the area thru forest improvement on logged-over areas, reforestation of open cogonal areas and improved upland farming practices in cultivated areas. The activities would be undertaken by the forest dwellers who would be given secure access to the forest resources. PROJECT ACTIVITIES/COMPONENTS: 1. Organize communities for widespread grassroots participation to ensure maximum

impact and sustainability. 2. Provide security of tenure over primary resources on government lands including

the issuance of stewardship contracts, community timber utilization permits, smallholder timber concessions, community reforestation contracts, artificial reef licenses, municipal sanctuaries and similar instruments of resource access;

Page 54: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 44

3. Improve resource management through effective smallholder application of

appropriate technologies enabling improved conservation, production and profit; 4. Improve key rural infrastructure such as road, trails and village water supplies. 5. Strengthen support services including applied research, training and manpower

development, applied communications and local technical assistance. 6. Strengthen the regional administrative system particularly the capacity and

capability of local governments to conceptualize, prepare and implement community-based development plans from the barangay level up, as well as the coordinative mechanisms at regional and provincial levels that would enable national line agencies to provide appropriate and timely services in support of local development plans.

7. Reforestation of 5,050 has. 8. Agroforestry Development FUNDING AGENCY : WB-IBRD PROJECT COST (IN US$ '000) TOTAL COST : 35,400 TOTAL FOREX : 25,600 TOTAL GOP : 9,800 TYPE OF FUNDING : Loan PROJECT DURATION : 5 years START DATE : 1984 END DATE : 1989

Page 55: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 45

Coastal Environmental Management Plan

PROJECT CODE : 93-00800 PROJECT SITE : Nationwide PROJECT OBJECTIVES : To come up with a coastal environmental management plan for Macajalar Bay, Philippines, addressing the following sectors/aspects: Socio-economic and resource profile Geomorphology and coastal processes Fisheries and aquaculture Forestries and Wildlife Management Water resources Energy Industrial development Tourism Ports and Shipping Water supply sanitation and environmental health Environmental quality and pollution Regulatory measures and institutional aspects of environment management PROJECT DESCRIPTION: Review of existing development policies, plans, programs and projects in the project areas in the field of agriculture forestry and wildlife, fisheries, water resources, industry transport, energy, ports and harbours, and tourism sectors. Identification of existing and potential environmental problems associated with the development plans, programmes, and projects in the area and to recommend strategy and management (preventive and curative) measures to ensure long-term sustainability of resource and to minimize environmental degradation in the project area. Drafting and finalization of the CEMP in consultation with the Government of the Philippines. FUNDING AGENCY : UN-ESCAP TYPE OF FUNDING : Grant END DATE : December 1993 PROJECT DIRECTOR/MANAGER : Renato Cruz/Davina Gonzales TELEPHONE NUMBER : 962666 local 2127 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB

Page 56: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 46

Coastal Zone Environmental and Resource Management Project (CZERMP)

PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES:

1. To establish National Environmental and Resource Information Center (NERICs) in the ASEAN region.

2. To facilitate information flow to support critical decisions development issues. 3. To carry out data identification, integration and processing benefits from

national and regional databases contributing to ecological sustainable to a similar standard of technical capability sufficient to fulfill their assigned roles.

PROJECT DESCRIPTION: The Coastal Zone Environment and Resource Management Project (a five-year project) aims to establish National Environmental and Resource Information Centers (NERICs) in the ASEAN Region. NAMRIA will take up the role of NERIC in the Philippines. A NERIC is a national "agent of change" located within the national government and tasked with the primary mission of facilitating information flow to support critical decisions about major sustainable development issues. PROJECT ACTIVITIES/COMPONENTS:

1. Institutional strengthening through the establishment of National Environmental Information Centers (NERICs)

2. Proof of concept work through the development and population of national

directories of coastal and marine data, the creation of a regional oil spill risk spatial information system, and the utilization information technology in resolving national identified priority issues in coastal zone resource management.

FUNDING AGENCY : AusAID PROJECT COST (IN US$ '000) TOTAL COST : 100 TOTAL FOREX : 100 TOTAL GOP : 0 TYPE OF FUNDING : Grant

Page 57: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 47

PROJECT DURATION START DATE : January, 1995 END DATE : January, 1999 PROJECT DIRECTOR : Benjie Balais OFFICE ADDRESS : Fort Andres Bonifacio, NAMRIA, Makati TELEPHONE NUMBER : 810-54-66 or 810-48-31 IMPLEMENTING AGENCY : NAMRIA TARGET BENEFICIARIES : NERIC staff and end-users in coastal resource

management

Page 58: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 48

Community Based Development and Management of Logged-Over Areas

Pilot Project

PROJECT CODE : 89-23100 PROJECT TYPE : Plantation Development PROJECT SITE : Presentacion, Camarines Sur (R5); Lison Valley,

Pagadian City, Zamboanga del Sur (R9) PROJECT OBJECTIVES: To conserve, develop, manage and protect logged-over areas (LOA) identified for protection and production purposes in support of the national goal of economic growth and providing employment opportunities to the people within and around the upland communities. PROJECT ACTIVITIES/COMPONENTS: 1. Validation of New Project sites 2. Establishment of ecological benchmarks profiles for each project areas 3. Come-up with a data base for the logged-over forest 4. Technical assessment of project sites 5. Design and formulate comprehensive scheme of incentives to encourage active

people's participation 6. Prepare technical feasibility of the project 7. Prepare TOR for a subsequent consulting services of Consultants who will

prepare the logged-over forest implementation plan FUNDING AGENCY : Sweden-BITS PROJECT COST (IN US$ '000) TOTAL COST : 80 TOTAL FOREX : 80 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1990 END DATE : 1990 IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR

Page 59: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 49

Conceptual Approach to the Development of Exploration Strategies for

Gold Precious and Base Metal Mineralization in the Island of Catanduanes

PROJECT CODE : 92-01500 PROJECT SITE : Catanduanes Island and Lahoy Island PROJECT OBJECTIVES: The project will explore and assess the mineral potential of the survey area. PROJECT DESCRIPTION: The project shall be carried out in three phases namely: 1. The first phase deals mainly with reconnaissance geological mapping of various

lithologic units into 1:1,000,000 scale map. This involves traverses along first to third order streams. It will delineate the various rock watts and will discern their stratigraphic as well as structural relationships.

2. The second phase of the project will involve the characterization of findings in the

initial phase. This involves semi-detailed/detailed geological survey; detailed rock and soil sampling and;

3. The third and last phase of the project deals with actual subsurface geological

probe. This involves mainly drilling and test pitting, and trenching when warranted. This portion will reveal more or less the three dineasional shape of the onebody, extent of the onebody at depth and partially perhaps volume of the ones.

A comprehensive report with various maps outlining the results of each phase will be submitted at the end of the project. PROJECT ACTIVITIES/COMPONENTS: Catanduanes Island Regional Geologic Survey and Geochemical Survey Lahoy Island Detailed Geological Survey and Detailed Geochemical Survey

Page 60: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 50

FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 3,000 TOTAL FOREX : 3,000 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 3 Years START DATE : July 1993 END DATE : December 1995 PROJECT DIRECTOR/MANAGER: Noel Ferrer OFFICE ADDRESS : MGSB-Land and Geology Div., North Ave., Q.C. TELEPHONE NUMBER : 99-85 -44 IMPLEMENTING AGENCY : DENR-MGSB and Metal Mining Agency of

Japan PROPONENT AGENCY : DENR-MGB TARGET BENEFICIARIES : General Public

Page 61: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 51

Debt for Nature Swap Program

PROJECT CODE : 89-10700 PROJECT TYPE : Environmental Protection PROJECT SITE : St. Paul Subterranean National Park & El Nido Marine

Sanctuary, Palawan and Mt. Pulog National Park (Benguet, Nueva Vizcaya

PROJECT OBJECTIVES : To alleviate the burden of servicing large amounts of external debts and likewise control the fast environmental destruction in the country. PROJECT DESCRIPTION: The Program, conceptualized by Dr. Thomas E. Lovejoy in 1984, involves an exchange or cancellation of an external debt obligation for the country's effort at conservation. An environmental group usually buys a developing country's national debt notes from private banks at a discount rate and through the nations Central bank converts them into local currency. In return, the country has to create a nature reserve using the converted amount. The program is expected to help debtor country reduce debt-servicing problems and to protect the environment and consequently develop the rural areas. PROJECT ACTIVITIES/COMPONENTS : A. DENR Component Projects St. Paul Subterranean River National Park El Nido Marine Sanctuary Mt. Pulog National Park CITES B. CITES Monitoring and Analysis of Wildlife Trade Endangered Species Conservation Philippine Eagle Philippine Tarsier Manpower Training and Development Nature Crusaders of the Philippines C. Haribon Component Projects (Projects that are implemented and Administered by Haribon and other local

NGOs) Community Development at Mt Isarog Conservation of Tubattaha Reef National Park Philippine Netsman Project Graduate Students Field Research Fellowships

Page 62: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 52

CITES/Public Awarenes on Trade Issues Indigenous People's Conference Field Survey on critical Plants Sites and Philippine Medicinal Plants Socio-Integrated Coastal Management and Development System for Olango

Island Haribon Chapter Development Asian Wetland Bureau-Philippines NGO/PO Church Forum on Social Equity, Sustainable Development and

Environment Center for Tropical Ecology and Conservation Environmental Education and Research Center C. Program Management Office (PMO) (10% of the total fund credited to DENR) FUNDING AGENCY : World Wildlife Fund (WWF) PROJECT COST (IN US$ '000) TOTAL COST : 2,000 TOTAL FOREX : 2,000 TOTAL GOP : 0 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : FUND 155 (for PMO) PROJECT DURATION : 5 Years START DATE : February 1989 END DATE : May 1993 PROJECT DIRECTOR/MANAGER : Mr Ibarra Poliquit OFFICE ADDRESS : 2nd Floor, DENR BLDG. TELEPHONE NUMBER : 97-66-26 local 254 IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Local communities/villages (farmers and

fisherman)

Page 63: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 53

DENR-Upland Development Program Stage III: Expansion Phase

PROJECT CODE : 93-06500 PROJECT SITE : Benguet(CAR), La Union(R1), Quirino(R2), Zambales(R3), O.

Mindoro and Laguna(R4) Catanduanes(R5), Guimaras(R6), Cebu (R7), Leyte(R8), Zamboanga City and Zamboanga del Norte(R9), Misamis Oriental(R10), Davao del Sur (R11), Sultan Kudarat(R12)

PROJECT OBJECTIVES: The UDP aims to develop effective approaches towards organizing uplanders to protect and manage upland resources while also addressing poverty problems. The program makes use of participatory bottom up strategies in developing capability and empowering upland communities. It is an agency-based action research involving experts from the academe and the non-governmental sectors in documenting implementation processes and culling out lessons which are eventually synthesized and packaged into administrative issuances and manuals of operation. It is a mechanism for generating learnings while developing capacity of the agency to utilize these learnings. PROJECT DESCRIPTION: The Program is now on its expansion phase which is made possible by a grant provided by the Ford Foundation. The limited expansion phase is meant to continue the development of effective participatory approaches to upland management geared towards strengthening FMB-DENR capabilities for more improved upland management and to uplift the socio-economic condition of upland communities. FUNDING AGENCY : Ford Foundation PROJECT COST (IN US$ '000) TOTAL COST : 533 TOTAL FOREX : 280 TOTAL GOP : 253 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : 07/93 END DATE : 06/95 OFFICE ADDRESS : 2nd Floor, DENR Bldg., Visayas Ave., Diliman,

Q.C. IMPLEMENTING AGENCY : DENR/FMB TARGET BENEFICIARIES : Upland communities

Page 64: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 54

Design for an Integrated Protected Areas System for the Philippines

PROJECT CODE : 89-08300 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES : 1. To prepare IPAS design by identifying biophysically significant areas of terrestrial,

wetlands and marine environment. 2. To identify appropriate protected areas categories 3. To delineate the boundaries of and formulate 10 site-specific feasibility studies for

management, and planning purposes. 4. To draw the support of concerned agencies and individuals to the IPAS. PROJECT DESCRIPTION: The project involves the development of an Integrated Protected Areas System Design for the Philippines through the survey and identification of Flora and Fauna of biophysically significant areas in terrestrial, wetland and marineland environment in the country that would consider major biogeographic divisions of the Philippines and include maximum spectrum of the richest undisturbed habitat types on the major ecosystem reserves within each major biounit. A boundary delineation and feasibility study of 10 preselected protected areas will be conducted and full project documents for each will be developed to serve as guidelines for the development and management of these protected areas in the IPAS. A series of seminars will be conducted to draw the support of potential partners of the government i.e., legislators, NGOs, etc. in the management of the IPAS. PROJECT ACTIVITIES/COMPONENTS: IPAS Design Feasibility Studies Seminars

Page 65: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 55

FUNDING AGENCY : WB/OECF PROJECT COST (IN US$ '000) TOTAL COST : 2,900 TOTAL FOREX : 2,900 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 14 months START DATE : 09/90 END DATE : 11/92 IMPLEMENTING AGENCY : PAWB-DENR PROPONENT AGENCY : PAWB-DENR TARGET BENEFICIARIES Communities around the protected areas,

academic and research institution, Filipino people.

Page 66: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 56

Development of Bentonites for Use in Urban Project Bentoda

PROJECT CODE : 98-03200 PROJECT SITE : Pangasinan, Batangas, Albay, Zamboanga del Norte PROJECT OBJECTIVES :

1. Review current data in sue of bentonite and related minerals or environmental control;

2. Develop methodologies for laboratory evaluation of bentonite; 3. Conduct experimental work and formulate appropriate specification and

quality assurance criteria; and 4. Assess performance is use of bentonite for urban waste disposal activities.

FUNDING AGENCY : British PROJECT COST : US$ 50,000 TYPE OF FUNDING : Grant PROJECT DURATION : 33 months

START DATE : June 1996 END DATE : February 1999

IMPLEMENTING AGENCY: MGB

Page 67: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 57

Development of Dessication and Moisture Standards for Selected Mangrove

Species

PROJECT CODE : 93-07700 PROJECT SITE : Pagbilao, Quezon PROJECT OBJECTIVES : To determine reproductive phenology and seed testing standards for selected orthodox and recalcitrant mangrove seeds. PROJECT DESCRIPTION: One of the least studied types of forest communities are the mangroves. The meager information runs from production (seed technology_) to growth and yield down to utilization. They occupy a great deal of spaces in the coastal areas of the tropic and sub-tropical countries of the world. This group of plant community is the most accessible forest types to both the coastal and upland dwellers hence enormous utilization pressures have been exerted on them. In addition to its precarious condition, its production capacity especially in generating reproductive phenology and seed technology standards are wanting. Phenological studies on commercially valuable mangrove tree species are the basic ingredients in understanding their flowering, fruiting and propagule production periodicity and seasonality. Such information is vital for forest managers, foresters and researchers in the development of planting schedules and research programs. PROJECT ACTIVITIES/COMPONENTS : 1. Area Selection and Flower Tagging 2. Seed Sourcing and Collection 3. Statistical Design and Analysis 4. Treatments and Parameters 5. Data Collection

Page 68: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 58

FUNDING AGENCY : ASEAN-CANADA Tree Seed Prog. PROJECT COST (IN US$ '000) TOTAL COST : 5 TOTAL FOREX : 5 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 10 Months START DATE : January 1994 END DATE : October 1994 PROJECT DIRECTOR/MANAGER: Honorato G. Palis OFFICE ADDRESS : ERDB, College, Laguna IMPLEMENTING AGENCY : DENR-ERDB, ASEAN-CANADA TARGET BENEFICIARIES : Research Specialist on Mangrove

Page 69: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 59

Development of Mining Laws and Mineral Investment Promotion

Programme

PROJECT CODE : 91-24500 PROJECT TYPE : Institutional Development PROJECT SITE : Metro-Manila PROJECT OBJECTIVES : To encourage mineral investment in the Philippines, both by national and international investors and thereby to contribute to entrepreneurial efforts, generation of employment, foreign exchange and government revenues in a matter consistent with national policies and environmental objectives. PROJECT DESCRIPTION: The project has the following activities: 1. Drafting of mining law by legal advisers.

2. Presentation to legislative bodies for enactment into law (5 months).

3. Personnel Training

4. Conduct of studies in mineral economics, investment negotiation and law and mineral investment policies and programmes adopted by other appropriate countries.

5. Assessment of organizational requirements for the promotion, programme and issuance of the report of the findings and recommendations (1 month).

6. Design and establishment of the department responsibility for mineral investment promotion (3 months).

7. Preparation of a preliminary investment brochure on mineral investment in the Philippine as a first step at publicizing the investment potential.

8. Collection and assessment of investment related data and information (2 months).

9. Issuance of the report of the findings and recommendations.

10. Drafting and issuance of the mineral investment promotion prospectus together with implementation of the media programme

11. Design, preparation and testing of contents for investment promotion seminars.

12. Identification and invitation of participants to the seminars (1 month).

13. Design of the revised system including preparation of documentation and identification of hardware and software Programming.

Page 70: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 60

FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000) TOTAL COST : 909 TOTAL FOREX : 679 TOTAL GOP : 230 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Grant PROJECT DURATION : 4 years START DATE : July 1988 END DATE : June 1992 IMPLEMENTING AGENCY : DENR MGB PROPONENT AGENCY : DENR MGB TARGET BENEFICIARIES : General Public

Page 71: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 61

Economic Valuation of Impacts of Environmental Degradation in Laguna

Lake

PROJECT CODE : 93-06900 PROJECT SITE : Laguna Lake PROJECT OBJECTIVES: To conduct an economic analysis of the environmental impact of water quality degradation in Laguna Lake in two phases. PROJECT ACTIVITIES/COMPONENTS: 1. Study to determine the extent of water pollution in the lake and provide estimates

of economic costs associated with water pollution. 2. Develop a workplan for a more comprehensive and detailed assessment of

pollution impacts. 3. Workshop to be conducted in the Philippines for the initial presentation of the

study. A regional workshop to review the findings and recommendations of Phase I study in Colombo, Bombay, Metro-Manila and draw up the Terms of Reference of Phase II Work. FUNDING AGENCY : Japan Grant Facility, CTF of Korea, World Bank PROJECT COST (IN US$ '000) TOTAL COST : 90 TOTAL FOREX : 90 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 7 months START DATE : October 1993 END DATE : May 1994 PROJECT DIRECTOR/MANAGER : Elisea Gozun OFFICE ADDRESS : 2nd Floor, DENR Bldg., Visayas Ave., Diliman,

Q.C. IMPLEMENTING AGENCY : DENR/EMB TARGET BENEFICIARIES : Policy makers

Page 72: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 62

Effects of Land Titling on the Adoption and Conservation-Oriented Farming

Technologies in the Uplands

PROJECT CODE : 90-17600 PROJECT SITE : Taloy Sur, Tuba, Benguet; Pangdan, Naga, Cebu PROJECT OBJECTIVES: 1. To determine the effects of land titling on the adoption of conservation-oriented

farming technologies in the uplands. 2. To determine other factors that may hasten or deter the adoption of

conservation-oriented farming technologies. PROJECT DESCRIPTION: This study is basically an action-research type of investigation where involvement of farmers in upland development, specifically their adoption of conservation oriented farming technologies, is the prime objective. The main thesis being tested is - will land titling influence the adoption of conservation-oriented upland farming technologies? The study is being implemented in two upland areas in the province of Cebu and Benguet, specifically in Barangays Pangdan, Naga and Taloy Sur, Tuba, respectively. PROJECT ACTIVITIES/COMPONENTS : 1. Reconnaissance survey prior to actual field implementation and selection of

farmer-participants 2. Coordination with local government offices, NGOs and other cause-oriented groups 3. Gathering of secondary data and information from relevant sources 4. Granting of land titles 5. Conduct of training. 6. Installation of equipment for ecological studies 7. Continuous monitoring and evaluation activities.

Page 73: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 63

FUNDING AGENCY : DRDAP PROJECT COST (IN US$ '000) TOTAL COST : 44 TOTAL FOREX : 44 TOTAL GOP : 0 EXCHANGE RATE : 27.55 TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : June 1990 END DATE : 1995 PROJECT DIRECTOR/MANAGER: Dr. Lope Calanog OFFICE ADDRESS : ERDB, Los Banos, Laguna TELEPHONE NUMBER : 2229 IMPLEMENTING AGENCY : DENR/ERDB TARGET BENEFICIARIES : Farmers

Page 74: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 64

Energy Sector Program Loan (DENR COMPONENT)

PROJECT CODE : 91-23200 PROJECT TYPE : Institutional Development PROJECT SITE : Calaca, Batangas and Los Banos,Laguna (R4); lbay

(R5); & Sucat, Paranaque (NCR), R3, R6, R7, R8, R11, R12

PROJECT OBJECTIVES : 1. Strengthen the DENR Regional Offices and the EMB through provision of manpower

training and modern laboratory equipment /facilities. 2. Establishment of baseline sampling stations for air quality. 3. Enhancement of capabilities to assess, manage, and monitor the environmental

impact of energy projects. PROJECT DESCRIPTION: This program is implemented by several government agencies and the involvement of DENR thru the EMB is the monitoring of the environmental implications of energy resource development. PROJECT ACTIVITIES/COMPONENTS : 1. Air and water Quality monitoring Projects. 2. Pollution control and prevention from stationary sources. 3. Enhance environmental impact assessments. 4. Modernizing laboratory facilities. 5. Manpower training and development.

Page 75: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 65

FUNDING AGENCY : WB/IBRD PROJECT COST (IN US$ '000) TOTAL COST : 10,400 TOTAL FOREX : 10,100 TOTAL GOP : 300 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : IBRD LN 3165 PH PROJECT DURATION : 3 years & 6 months START DATE : July 1992 END DATE : December 1995 PROJECT DIRECTOR/MANAGER : Erlinda Gonzales OFFICE ADDRESS : 99-101 Topaz Bldg., Kamias Rd., Q.C. TELEPHONE NUMBER : 97-32-54 IMPLEMENTING AGENCY : EMB TARGET BENEFICIARIES : DENR Regional Offices

Page 76: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 66

Enhancement of Reference Sections of Sedimentary Basins in the

Philippines

PROJECT CODE : 89-17100 PROJECT TYPE : Research PROJECT SITE : Cagayan, Central Luzon and Visayan Basins,Leyte,

Bohol, Cebu, Negros PROJECT OBJECTIVES : Research and development of reference sections of sedimentary basins of the Philippines to facilitate the search for mineral deposits and energy sources and establishing precise paleontologic and stratigraphic determinants and to conduct stratigraphic section measurements and detailed geological mapping of reference sections. PROJECT DESCRIPTION: 1. To conduct stratigraphic section measurements, detailed geological mapping of

reference sections and detailed mapping of sedimentary sections in the Cagayan basin (Western Limb); Luzon Central Basin;Visayan Sea Basin (Leyte, Bohol,Cebu and Negros);

2. To conduct paleontological, geochemical and sedimentary petrological analysis;

and 3. To interpret and synthesize results of analysis. FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 50 TOTAL FOREX : 34 TOTAL GOP : 16 TYPE OF FUNDING : Grant PROJECT DURATION : 4 years START DATE : 1988 END DATE : 1992 IMPLEMENTING AGENCY : Lands Geology Div.

Page 77: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 67

Environmental and Natural Resources Accounting Project (Phase IV)

PROJECT TYPE : Institutional Building PROJECT OBJECTIVES: To contribute to policy reforms for enhancing environmental and natural resource management, build capacity at the department of Environment and Natural Resources (DENR) in the conduct of environmental economic analysis, and assist in the institutionalization of the Philippine Economic-Environmental and Natural Resources Accounting (PEENRA) System. PROJECT DESCRIPTION: The Government of the Philippines through the Department of Environment and Natural Resources (DENR) has been involved in environmental and natural resources accounting efforts since early 1991, through Phase I and II of the Environment and Natural Resources Accounting Project (ENRAP). The first phase conducted in 1991, focused on modifying the Philippine gross national product through estimates of th e depreciation of forest products. As phase I was being implemented, it came apparent that the scopre of the effort needed to be broadened. This meant developing a comprehensive accounting framework for examining the role of both natural and environmental resources in the economy, and the impact activity on these resources. This was the basic objective of the second phase of ENRAP which was completed in March 1994. More specifically, ENRAP II has built a system of environmental accounts to support economic, natural resource and environmental policy formulation. To assess both economic growth and environmental policy formulation. To assess both economic growth and environmental protection targets, analytical work under ENRAP II designed an economic framework for addressing economy-wide trade-offs and national concerns. The experience from ENRAP I and II strongly indicated that subsequent ENRA activities should sustain and strengthen the institutionalization of the accounting process and enhance its support to policy formulation. During Phase III, several detailed studies were conducted to further refine the accounting framework. Phase II also shed light on policy issues such as declining fish stocks, trade and environment, and on the use of market based instruments for environmental management. Phase IV will implement institutionalization of the PEENRA System as mandated by Exec. Order No. 406 of March 21, 1997. After this phase the GOP instituions (i.e. DENR, NEDA and NSCB) are expected to be in a condition to use ENRA independently and with minimum of outside assistance.

Page 78: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 68

PROJECT CORE ACTIVITIES/COMPONENTS:

1. Policy Studies Assistance to PEENRA Agencies 2. Formal Training 3. Database Development and Management 4. Assistance to Selected LGUs 5. Advocacy, Information, Education and Communications

FUNDING AGENCY : USAID PROJECT COST: TOTAL FOREX ($US ‘000) : 1,611 TOTAL GOP (PESO) : 69,000,000 (for 1998 only) TYPE OF FUNDING : Grant PROJECT DURATION : 33 months START DATE : June 1996 END DATE : August 1998 PROJECT DIRECTOR : Dr. Marian delos Angeles OFFICE ADDRESS : Forest Management Bureau, Visayas Ave., Dil.,

Q. C. TELEPHONE NO. : 929-66-26 Loc. 2094 IMPLEMENTING AGENCY : DENR and International Resources Group, Ltd.

(IRG, USA)

Page 79: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 69

Environment and Natural Resources - Sectoral Adjustment Loan Program

(ENR-SECAL)

PROJECT TYPE : Institutional Building and Natural Resources Management PROJECT SITE : Ilocos Sur, Ilocos Norter, La. Union, Pangasinan, Region 1;

Nueva Vizcaya, Quirino, Cagayan, Isabela, Batanes, Region 2; Palawan, Rizal, Region 4; Negros Occidental, R6; Negros Oriental, Cebu, Bohol R7; Western Samar, Eastern Samar, Northern Samar, Region 8; Zamboangas, Basilan, Tawi-Tawi, Region 9; Bukidnon, Misamis Oriental & Occidental, Region 10; Agusans, Surigao del Norte, Region 13; CAR Region (Benguet, Ifugao, Kalinga, Apayao, Abra and Mt. Province).

FUNDING AGENCY : WB/IBRD PROJECT COST : ENR-SECAL INVESTMENT COMPONENTS RRMP -US$ 64.6 MEC - 14.20 IPAS - 22.20 US$ 101.00 M TYPE OF FUNDING : Loan LOAN NUMBER : LN 3360 PH PROJECT DURATION: 7 years START DATE : 11/10/91 END DATE : 31/12/99 w/ extension December 2000 PROJECT DIRECTOR: Romeo T. Acosta OFFICE ADDRESS: FMB Annex, FMB Cmpd., Visayas Ave., Diliman, Q.C TELEPHONE NUMBER: 929-66-26 Loc. 2124 and 2125 928-72-73, 928-72-93 IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR TARGET BENEFICIARIES: Upland communities PROJECT DESCRIPTION: The project consists of (1) a sector adjustment component aimed at implementing major reforms in the incentives, legal and regulatory structures governing management of Philippine natural resources especially, forests and soils in public lands; and (2) an investment component which would strengthen institutions tasked with monitoring and managing these natural resources.

Page 80: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 70

PROJECT OBJECTIVES: The objectives of the program are to preserve what remains of the biological diversity of the Philippines; where these resources have been degraded or destroyed, to reestablish them wherever practicable and financeable; and elsewhere to introduce sustainable land use practices. Implementation of these objectives will be through the following components:

1. Sector Adjustment- composed of US $266 million 2. Investment with a total cost of US$103 million composed of the following sub-

component: 2.1 Integrated Protected Areas System (IPAS) 2.2 Monitoring and Enforcement (MEC) 2.3 Regional Resource Management Projects (RRMP)

PROJECT ACTIVITIES/COMPONENTS: 1. Regional Resources Management Component A. Local Social Development (LSD) 1. Community Organizing a. BDUs Mobilized (42 units) b. BDUs Maintained (42 units) c. Organizations formed (137) d. Cooperatives registered (92) e. Community Revolving fund established/ operationalized (125) B. Natural Resource Access 1. Survey/Delineation 2. Issuance (CSC, CBFMA, CADC, CALC) C. Community Resource Development (CRD) 1. On-farm Development a. Model Farms Established (1033.5 has.) b. Farmer-Farmlots Developed (7,776 has.)

2. Off-farm Development a. Nurseries Established (70 units) b. Plantations Established (8,680 has.)

Page 81: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 71

D. Infrastructure Development 1. Roads/Bridges

a. Road/trail constructed/repaired/improved (920 kms.) b. Bridge constructed (56 units)

2. Buildings/Pavement a. Multi-purpose building constructed (121 units) b. Multi-purpose Pavement construction (71 units)

3. Water supply systems installed/constructed/ improved (285 units) 4. Other Infrastructure Development

a. RC/Box culvert constructed/installed (74 units) b. River revetment (10,235 lms.)

E. Institutional Strengthening

1. Trainings (38,685 man-days) F. Project Management Support

1. WMUs Established/Maintained (28 units) 2. TA Inputs

a. Installation of all implementation management systems (3) b. Design of LGU capacitation/training programs for RRM Luzon and

Mindanao areas c. Deployment of TA

OIDCI (754 man-months)

ACIPHIL (821 man-months)

WINROCK 3. Deployment of NGOs a. For RRM Mindanao (12) 4. Equipment Support

a. Motor Vehicles (491 units) b. Computer Equipment (161 units)

2. Monitoring and Enforcement Component A. Multi-sectoral Forest Protection Committees (MFPC)

1. Maintenance and Operations of existing MFPCs (19 units) 2. Identification and development of alternative livelihood programs (21

programs) 3. Development of public awareness programs (21) 4. Deployment of TAs (84 man-months) 5. Conduct of Trainings/Workshops (14) 6. Conduct of Meetings (196)

Page 82: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 72

B. Log Control Monitoring System (LCMS) 1. Installation of improved LCMS (1 system) 2. TLAs pilot tested/monitored (1 TLA) 3. Trainings/seminars (2) 4. Communications

a. Finalization of communications designs (5) b. Installation of communications systems (5) c. Trainings/seminars (10)

5. Deployment of TAs (39.23 man-months) C. Operational Services

1. Aircraft deployment a. fixed wing (1,558.7 f/hours) b. rotary wing (604.2 f/hours)

2. Boat deployment

big boat (450 patrol hours)

small boat (2,136 patrol hours) 3. Trainings (4 hours) 4. Deployment of TAs (37.18 man-months)

D. Legal Services

1. Prosecution of on-going cases (36 cases) 2. Prosecution of new cases (20 cases) 3. Preparation of Forestry Laws Enforcement Manual (1 manual) 4. Revision and/or reprinting of Forestry Law Enforcement Manual (300 copies) 5. Legal Workshops/Conferences (4) 6. Institutional Reforms Adm. Orders, MOAs, SOs, etc. (4) 7. Deployment of TAs (117 man-months) Integrated Protected Areas System

(IPAS)

Page 83: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 73

Environmental Quality Criteria - Toxicity Testing Project PROJECT CODE : 94-04200 PROJECT SITE : ASEAN Countries PROJECT OBJECTIVES : To generate toxicity data (both acute and chronic) for the development of marine environmental quality criteria for the Philippines and eventually for the ASEAN region. PROJECT DESCRIPTION: The Project is part of several related activities under the ASEAN countries. Three types of marine organisms will be tested primarily for mercury, nitrate, nitrite, and other heavy metals. PROJECT ACTIVITIES/COMPONENTS : Training in toxicity testing Facilities Development Toxicity Testing Persistence Studies Presentation of Preliminary Results FUNDING AGENCY : ASEAN-Canada TYPE OF FUNDING : Grant PROJECT DURATION : 4 years IMPLEMENTING AGENCY : EMB

Page 84: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 74

EX-SITU Genebank for Philippine Teak (Tectona philipinensis)

PROJECT CODE : 91-25900 PROJECT SITE : Lobo, Batangas and Mts. Palay-palay Mataas na

Gulod NP PROJECT OBJECTIVES : Develop procedures/techniques for Ex-situ conservation of Philippine Teak. PROJECT DESCRIPTION: Philippine Teak (Tectona philippinensis) is a threatened Philippine plant. The species is found only in the municipality of Lobo, Batangas. This species belongs to the famili Verbenaceae where Molave and Teak (Tectona grandis) belong. Philippine Teak is a medium-size tree reaching a height of 15-25 meters. Leaves elliptic ovate-lanceolate, acuminate 8 to 15 cm. long, 3 to 6 cm. wide with rough surface, light greenish above, pale beneath. The fruit is a drupe about 13 cm. long and hairy. The trunk is grayish with thin flaking bark similar to the guava. The Philippine Teak is commonly called Malabayabas in Lobo. It is an endemic, rare and highly threatened tree species. Presently, the population of this species remain in small patches of Molave forest amid the upland farms of Lobo. The threat for Philippine Teak's survival continues due to conversion of habitat into farmlands. Within 5 years or earlier Philippine Teak will surely become extinct because of the pressures brought about by the demand of the local communities to convert adjacent forests in the limited habitat range of the species. The propagation experiment was undertaken to conserve Philippine Teak as a representative sample of the Philippine biodiversity.

Page 85: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 75

PROJECT ACTIVITIES/COMPONENTS : 1. Survey and biophysical study of the species. 2. Review of published articles and documents. 3. Seed germination test. 4. Plantation establishment. FUNDING AGENCY : NAGAO, Nat. Env. Foundat'n Jap PROJECT COST (IN US$ '000) TOTAL COST : 6 TOTAL FOREX : 6 TOTAL GOP : 0 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : June 1991 END DATE : June 1993 IMPLEMENTING AGENCY : DENR/PAWB

Page 86: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 76

Feasibility of the Limited Production Forest Concept In Critical Watersheds

and Forest Reserve Areas

PROJECT CODE : 94-03300 PROJECT SITE : Sta. Fe, Nueva Vizcaya; Binahaan, Pagbilao, Quezon;

Intavas, La Fortuna, Impasug-ong, Bukidnon; Tibolo, Sta Cruz, Davao del Sur

PROJECT OBJECTIVES : The project will determine the feasibility of the Limited Production Forest Concept (LPFC) as to its technical, social, and financial soundness. PROJECT DESCRIPTION: Management of critical watershed areas and other forest reserves needs an in-depth assessment. There are two (2) reasons for this: First, most of these areas are inhabited and their occupants depend heavily on the available forest resources for their livelihood. Most of the time, these occupants resort to illegal activities and indiscriminate extraction due to the relative high demand for these forest resources. Second, the opportunity cost of benefits foregone by not allowing any production activities in these areas need to be locked into for a better management of the scarce resource. Due consideration, of course, must be given on the protection, conservation and sustainability of biological species and other resources found in the area. Presently, some 772,100 hectares have been officially declared as critical watershed areas. These are the areas supporting existing infrastructures such as hydro-electric power, irrigation works and domestic water facilities needing immediate protection or rehabilitation. This study seeks to answer the following; 1) is LPFC technically feasible to ensure a sustainable utilization of minor forest products without impairing the productive capacity of the resource? (2) Is it socially compatible with the cultural and social characteristics of the community? Finally, is it financially viable to encourage investment on a sustained protection and maintenance of the forests? Answers to these questions will provide vital information for policy formulation or reformulation necessary for the DENR to arrive at a better management of the country's critical watersheds and forest reserve areas.

Page 87: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 77

PROJECT ACTIVITIES/COMPONENTS : 1. Pre-implementation workshop 2. Gathering of secondary data 3. Levelling of Field counterpart 4. Site Selection 5. QRA, RMP 6. Preparation of interview schedule 7. Field validation 8. Gathering of primary data/field observation 9. Monitoring and evaluation 10. Training 11. Data Analysis/Policy Review 12. Finalization of management plan 13. Report writing and reproduction of report 14. Submission and defense of report FUNDING AGENCY : NRMP/USAID PROJECT COST (IN US$ '000) TOTAL COST : 76 TOTAL FOREX : 76 TOTAL GOP : 0 EXCHANGE RATE : 27.00 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : January 1994 END DATE : December 1995 PROJECT DIRECTOR/MANAGER: Gregorio D. Reyes OFFICE ADDRESS : ERDB-College, Laguna TELEPHONE NUMBER : 2809,3628,3481 IMPLEMENTING AGENCY : ERDB TARGET BENEFICIARIES : Indigenous Cultural Communities/people

dependent on Forest Resources.

Page 88: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 78

Feasibility Study on the Industrial Air Emission Source Project

PROJECT CODE : 95-00300 PROJECT SITE : Metro-Manila PROJECT OBJECTIVES: The IAES project provides DENR with needed training and assists in identifying major sources of industrial air pollution in Manila. Also, major air pollution sources will be ranked with weighting given to abatement cost compared to improvement of air quality. Because this project is to be integrated into the World Bank's Industrial Environmental Pollution Control (IEPC) project for Manila, financing is available to industries requiring air pollution abatement equipment and related consulting services. Due to the complex nature of the air pollution problem in Manila, several seminars are to be arranged to disseminate information on DENR proposed standards, source rankings and cost effective abatement alternatives. PROJECT DESCRIPTION: The goal of this project is to assist the Philippines in quantifying the air emissions burden from industrial activities, ranking specific industrial categories according to their potential air quality impacts, identifying specific mitigation techniques to improve air quality, and recommending techniques in monitoring, testing, reporting, and record keeping that are needed to ensure compliance with existing air quality regulations. PROJECT ACTIVITIES/COMPONENTS:

1. Institutional Review, Emissions Data Review and Source Ranking Enterprise Level Facility Inspections and Determination of Sampling Needs/Methods

2. Enterprise Level Facility Inspections and Determination of Sampling of

Needs/Methods

3. Source Sampling, Workshops, and Data Evaluation Development of Investment Proposals, Seminars and Technology Demonstrations, and Institutional/Compliance Recommendations

4. Development of Investment Proposals, Seminars and Technology

Demonstrations, and Institutional/Compliance Recommendations

Page 89: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 79

FUNDING AGENCY : U.S. Trade Development Agency PROJECT COST (IN US$ '000) TOTAL COST : 337 TOTAL FOREX : 337 TOTAL GOP : 0 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : August 31 1995 END DATE : July 1, 1997 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB

Page 90: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 80

Fisheries Sector Program Loan - DENR Component

PROJECT CODE : 89-15201 PROJECT TYPE : Coastal Resources Management PROJECT SITE : Bays of Manila, Calauag, San Miguel, Tayabas,

Ragay, Sorsogon, Carigara, San Pedro, Ormoc, Sogod, and Panguil

PROJECT OBJECTIVES : A. Program Objectives 1. Regeneration, conservation and sustained management of aquatic

research with emphasis on balancing fishing effort to maximum sustainable yield.

2. Rehabilitation and protection of the coastal environment. 3. Alleviation of poverty among municipal fishermen. B. Component Objectives 1. On Ecological Assessment: Undertake ecological assessment of the priority

bays, coordinate implementation of Resource and Ecological Assessment (REA), formulate plans to promote the strengthening of environmental units in the field offices

2. On Mangrove Rehabilitation: Conduct mangrove rehabilitation activities on

12 priority bays and support areas and develop a Mangrove Resource Information System.

3. Formulate plans and promote the strengthening of environmental units in

the field offices. PROJECT DESCRIPTION: A. Fishery Resource and Ecological Assessments To provide a scientific foundation for rational management resource and ecological assessments will be undertaken in priority fishing area. This studies will form part of the National Fisheries Information System which will continually monitor fish stocks, habitat, ecological parameters and socio-economic indicators. Aquaculture areas will also be surveyed so that Fishpond Lease Agreements (FLA's) of unproductive pond maybe cancelled and those that are not suitable for further development maybe reconverted into mangroves.

Page 91: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 81

B. Coastal Zone Management This is the core of the resource and environmental rehabilitation thrust of the program. As a basis implementation strategy, community-based initiatives in resource management will be encouraged. In cooperation with NGO's, fishermen will be organized and trained to undertake resource enhancement measure. Likewise, viable alternative livelihood projects will be developed to draw fishermen into other economic activities. C. Research and Extension This includes the preparation of a national Fisheries Research Program, networking and upgrading of existing research facilities, and expansion of fisheries extension services. D. Law enforcement and effective protection of marine resources in the Philippines

requires decentralization efforts, organized and based in individual fishing communities. Thus, assistance in terms of training and logistic support will be given to community based task forces composed not only of local police and government personnel but more importantly of the fishermen.

E. Credit This is to support the income diversification project for small-scale fishermen and intensification of aquaculture production. F. Infrastructure Post-harvest facilities such as fish landing, cold storages and processing center will be made available for the sector. PROJECT ACTIVITIES/COMPONENTS : 1. Fisheries Resources and Related Ecological Assessments (FRREA) a) application of remote sensing technology on ecological assessment of the

10 critical bays. b) IEC Activities Printing of technical and other information campaign

c) Pollution Source Identification and Monitoring (10 bays)

Page 92: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 82

2. Coastal Resources Management a) Ground verification inventory and delineation of existing mangrove areas

potential for CBMFM (42,676 has.) b) Mangrove Rehabilitation Evaluation, Processing and Implementation of CBMFM and Awarding

(20,637 has.) FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 9,988 TOTAL FOREX : 9,988 TOTAL GOP : 0 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 971/972 PHI PROJECT DURATION : 4 yrs and 6.5 months START DATE : June 1990 END DATE : December 1995 PROJECT DIRECTOR/MANAGER : Beatriz Dar OFFICE ADDRESS : DENR Annex, Visayas Ave., Q.C. TELEPHONE NUMBER : 97-66-26 loc 2111 IMPLEMENTING AGENCY : DA/DENR TARGET BENEFICIARIES : Coastal residents in the 12 priority bays and

support areas.

Page 93: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 83

Forest Fire Management Project

PROJECT CODE : 89-26300 PROJECT TYPE : Plantation Development PROJECT SITE : Baguio, Benguet (CAR) PROJECT OBJECTIVES : The project aims to strengthen the DENR capabilities in fire management through the provision of guidelines for a national fire control/management program, training and equipment including the preparation of a research program on fire management. FUNDING AGENCY : FAO PROJECT COST (IN US$ '000) TOTAL COST : 393 TOTAL FOREX : 135 TOTAL GOP : 258 EXCHANGE RATE : 21.00 TYPE OF FUNDING : Grant START DATE : 1987 END DATE : 1989 PROJECT DIRECTOR/MANAGER : Manuel Pogeyed

Page 94: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 84

Forestry Master Plan Phase I

PROJECT CODE : 89-26100 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES : To prepare a long term (25 year) Master Plan for the forestry sector development including identification of priority programs, investment needs and implementation proposals to be incorporated in the annual and five-year development plans. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 1,356 TOTAL FOREX : 1,317 TOTAL GOP : 39 TYPE OF FUNDING : Grant START DATE : 1989 END DATE : 1990

Page 95: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 85

Forestry Sector Project (ADB)

PROJECT TYPE : Reforestation and Watershed Rehabilitation & Forest

Resources Development PROJECT SITE : Nationwide

PROJECT OBJECTIVES: The project aims to 1) reverse the process of upland and mangrove resource degradation and ensure long term sustainability of activities begun under the sectoral investment component, and 2) to improve the material well-being of rural communities. The Second Forestry Sector Project further intended to support the following priority concerns: 1. Sustainable management of forest resources. This is expected to be achieved by

the adoption of successful community-based approach where the rural poor, with the help of the local NGOs; will be directly involved in planning and implementing sustainable forestland management and protection alternatives.

2. Poverty alleviation and the promotion of social justice and equity. These would be

achieved by policies aimed at providing security of tenure and use rights to community members over the forest lands they manage, and the implementation of alternative income generating activities to improve family income in the short, medium and long term.

3. Prevention of further degradation of the forest resources and protection of

biodiversity. These are expected to be accomplished through policies on protection of virgin forests, control of illegal logging, management of critical watersheds, and community-based management of residual forest.

4. Ensuring financial sustainability of forest management. This would entail the

adoption of policies that would prescribe the conditions and incentives for recycling of profits into productive activities and the establishment of a forest management and development fund.

5. Refinement of existing policies under the Forestry Sector. PROJECT DESCRIPTION: The Second Forestry Sector Project emanates from the initial successes gained under the First Forestry Sector Program (FFSP) which enabled the Philippine Government to address the root causes of forest destruction and environmental degradation. This project would like to continue the momentum brought by the success of FFSP to accomplish more in alleviating poverty in the uplands and instituting the application of sustainable forest land development and management practices by upland farmers.

Page 96: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 86

PROJECT ACTIVITIES/COMPONENTS: Due to various problem which resulted to slow project implementation, the ADB and DENR agreed to reduce project scope, reduce project cost and extend project duration, as follows:

A. Reforestation (from 55,000 has. to 20,060 has.) Survey, Mapping and Planning (87,620 has.) Appraisal of Sub-Projects (183/87,620 has.) Community Organizing (56,117 has.), Comprehensive Site Development (20,060 has.), and Monitoring and Evaluation (20,060 has.)

B. Watershed Rehabilitation (from 22,000 has. to 4,464 has.) Survey, Mapping

and Planning (26,807 has.), Appraisal of Sub-projects (42 projects/26,807 has.), Community Organizing (14,207 has.), Comprehensive Site Development (4,464 has.), and Monitoring and Evaluation (4,464 has.)

C. Community-Based Forest Management

Upland (from 59,000 has. to 10,477 has.) Perimeter Survey (34,000 has.), Appraisal of Sub-Projects (76 projects/100,275 has.), Community Organizing (35,226 has.), and Comprehensive Site Development (10,477 has.)

D. Forest Protection and Law Enforcement

Demarcation of Old Growth Forest (from 800,000 has to 630,744 has.)

Forest Protection Committee

Task Force on ICC

Enforcement Support

E. Consulting Services (72 man months) F. Project Management and Supervision (60 mos.)

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : about $55 M TOTAL FOREX : reduced to about $41.7 M TOTAL GOP : about $13.3 M EXCHANGE RATE : P26.80 = $1.00

Page 97: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 87

TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 1191(SF)/1192(OCR)PH PROJECT DURATION : from 5 yrs to 6 1/2 yrs.

START DATE : May 31, 1993 END DATE : December 31, 1999

PROJECT DIRECTOR : Dir. Dionisio S. Tolentino OFFICE ADDRESS : NFDO, DENR Annex, Visayas Ave., Diliman, Q.C. TELEPHONE NUMBER : 929-66-26

Local 2104/2105 IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR TARGET BENEFICIARIES : Upland communities nationwide.

Page 98: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 88

Formulation of a Master Plan for Mineral Resources Development in the

Philippines

PROJECT CODE : 91-02000 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES : To formulate a master plan for Mineral Development as basis for short to long term planning with complimentary social and environmental options and strategies. PROJECT DESCRIPTION: The project was considered a priority issue because of the need to integrate the mineral sector and its development into the broader context of the economic and social development of the Philippines and people. It is considered essential in terms of providing the broader and longer term policy and planning context that would supplement the already large and positive charges being made to increase the development of the present mining activity. PROJECT ACTIVITIES/COMPONENTS: Nationwide mineral resources inventory and assessment inventory of mineral resources and its potential Comparative Study Master Plan Development FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 432 TOTAL FOREX : 408 TOTAL GOP : 24 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : 1993 END DATE : 1995 IMPLEMENTING AGENCY : MGB PROPONENT AGENCY : MGB TARGET BENEFICIARIES : Mining Public

Page 99: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 89

Geological and Geo-Chemical Exploration of Panaon Island, Leyte

(RP-Korea Project)

PROJECT CODE : 92-00100 PROJECT TYPE : Research PROJECT SITE : Panaon Island, Leyte PROJECT OBJECTIVES : The project will develop the gold and base metal mineralization in the island of Panaoan. PROJECT DESCRIPTION: The project has the following Activities namely: 1. Literature research and compilation 2. Field Survey 3. Laboratory analysis 4. Compilation of acquired data PROJECT ACTIVITIES/COMPONENTS : 1. Literature research and compilation; 2. Field Survey 3. Compilation and Report Writing 4. Laboratory Analysis FUNDING AGENCY : KOICA PROJECT COST (IN US$ '000) TOTAL COST : 100 TOTAL FOREX : 100 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 1 year START DATE : March 92 END DATE : December 1992 IMPLEMENTING AGENCY : MGSB PROPONENT AGENCY : MGB TARGET BENEFICIARIES : General Public

Page 100: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 90

Geological Assessment of Chromite, Platinum and Related Precious Metal

Occurences in South Central Palawan and Northeastern Panay

PROJECT CODE : 90-17300 PROJECT TYPE : Research PROJECT SITE : R4, South Central Palawan, Northeastern Panay PROJECT OBJECTIVES : To define in terms of both quality and quantity the chromite-platinum and related precious metal deposits In South Central Palawan/Northeastern Panay with the end view of putting these resources into productive exploitation in the near future. PROJECT DESCRIPTION: The project is a joint undertaking between the governments of Japan and the Philippines with the aim of further exploring possible metal deposits in the area and putting it into productive use in the future. The project will be carried out in three (3) phases. The first phase (1990) deals mainly with systematic semi-detailed mapping of various lithologic units into 1/25,000 scale map. The second phase (1991) of the project pertains to the characterization of findings in the initial phase. And the third and the last Phase (1992) will deal with the actual subsurface geological probe. The project during the initial stage would hope to stimulate mineral exploration activities of private mining companies in the areas covered by providing them with initial data and grass root information on the potentials of the areas. During the 3 year period of implementation, the project will directly utilize the local labor force for its undertakings. FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 2,024 TOTAL FOREX : 2,000 TOTAL GOP : 24 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Grant PROJECT DURATION : 3 years START DATE : 1990 END DATE : 1993 IMPLEMENTING AGENCY : DENR-MGSB, JICA-Metal Mining Agency of

Japan

Page 101: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 91

Human Resources Development in Environmental Planning and

Management for Sustainable Development in the Philippines

PROJECT CODE : 91-10500 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES : To upgrade and promote national capabilities for sustainable development planning and management at the regional and local levels as a part of the overall strategy for governmental decentralization by promoting regional self-reliance.

PROJECT DESCRIPTION:

The program is an intensive information dissemination campaign to mobilize people's participation as custodian of the environment and for the development of consensual resources, development programs, through the provision of support such as training for upgrading the quality of manpower resources, development communication and technology transfer.

PROJECT ACTIVITIES/COMPONENTS :

1. Conduct of orientation courses, sensitization seminars and training courses. 2. Establishment of regional training center 3. Conduct of fellowships/study tours 4. Production of audio-visual training materials

FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000) TOTAL COST : 693 TOTAL FOREX : 693 TOTAL GOP : 0 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : PHI 89020 PROJECT DURATION : 3 years START DATE : September 1991 END DATE : September 1994 PROJECT DIRECTOR/MANAGER : Isagani Potes OFFICE ADDRESS : EMB, 99-101 Topaz Bldg., Camias Rd., Q.C. TELEPHONE NUMBER : 97-32-54/97-56-98 IMPLEMENTING AGENCY : EMB TARGET BENEFICIARIES : DENR,NEDA,HLURB,Regional & Prov'l Gov't.

Staff, Local Gov't. Official, NGOs, People's Organization

Page 102: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 92

IGCP 246 - Project PANETS (International Geological Correlation Program)

PROJECT CODE : 89-26600 PROJECT TYPE : Research PROJECT SITE : Southern Mindanao PROJECT OBJECTIVES : 1. To evaluate major Neogene Events in Southeastern Mindoro through a study on

the paleontologic, stratigraphic and tectonic aspects of its Neogene sequences/sediments.

2. To correlate and/or establish relationships of major Neogene events, processes,

and sequences between Southeastern Mindoro and those recognized in other well-studied regions of the Philippines.

3. To provide precise dating of Neogene sequences/sediments in Southeastern

Mindoro based primarily on the fossil content. FUNDING AGENCY : IGCP TYPE OF FUNDING : Grant START DATE : 1989 END DATE : 1990

Page 103: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 93

Implementation of the Forestry Master Plan for the Philippines (2nd Phase)

PROJECT CODE : 89-23000 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES : To change the ongoing environmental degradation and deforestation to a more positive development and in order to make the plan implementable, the macro level programs will be broken down to regional levels and action plans. PROJECT DESCRIPTION: The second phase of the masterplan will involve mainly on: the preparation of regional action plans. This activity comprises implementation of the master plan recommendations on the regional level taking the actual situation in respective region into considerations: Packaging program/projects in order to suit implementors and donors preference within the scope of the Master Plan - a priority activity will be to pack and present the community organizing and training components of the plan for different donors as a massive input of training is foreseen in order to make masterplan implementable, and Legislative Review to properly evaluate all existing and proposed legislation, order, etc. for sustainable forest management for the purpose of setting up of a proper environment for implementation of policies envisioned in the master plan. PROJECT ACTIVITIES/COMPONENTS : Preparation of regional action plans Packaging programs/projects Legislative Review FUNDING AGENCY : ADB/FINNIDA PROJECT COST (IN US$ '000) TOTAL COST : 1,200 TOTAL FOREX : 1,200 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 18 months START DATE : 1991 END DATE : 1992 IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR

Page 104: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 94

Improved Productivity of Man-made Forest thru Application of

Technological Advances in Tree Breeding and Propagation (Forest Tree

Improvement Project - FORTIP)

PROJECT CODE : 93-01300 PROJECT TYPE : Technology Transfer and Training PROJECT SITE : Three regions PROJECT OBJECTIVES : To help stem deforestation and resulting environmental degradation leading to economic loss and hardships for local populations through the establishment of more productive and well-adapted plantations of a range of species meeting the socio-economic needs of the countries in question and maximize the benefits possible through exchange of information know-how and germplasm between the countries in the region, thus avoiding overlaps of effort and dilution of limited national resources. PROJECT DESCRIPTION: The UNDP/FAO project is a regional network covering ten (10) countries hosted by the Philippines. The ten countries are: Bangladesh, Bhutan, India, Indonesia, Malaysia, Pakistan, Nepal, Philippines, Sri Lanka and Thailand. The participating countries in the region are very much aware of the problems of deforestation and of the opportunities now available to rectify the worsening situation. Almost all of them have devoted considerable resources to reforestation but the rate and quality of planting is still too low to meet future demands. Consequently, government policies have been instituted to markedly increase the areas of plantation and rural tree planting and to maximize gains through better growth and higher yields. Until now the emphasis with the available resources has been on achievement of quantitative targets (area planted) with little regard to quality. The return on investment is far from optimal because of poor genetic and physiological quality of seed used. The value of genetically improved planting materials assumes special importance in the face of increasing requirements for wood and the growing concern with problems of the environment which will, inevitably restrict production-oriented plantation forestry to smaller areas in the future, from which an increasing demand for forest products will have to be met. Forest plantations, which provide more timber from smaller areas of land, therefore, will have to be established increasingly. In this respect, the choice of genetic material is critical. PROJECT ACTIVITIES/COMPONENTS:

1. Establishment of a national network in each of the participating country.

2. Coordination of activities of the forestry authorities and the forestry research organizations

Page 105: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 95

3. Extension activities between forestry authorities, forestry research organizations and end-users, private sector and NGO

4. Establish arrangements for the transfer of appropriate technological

advances made in specialized areas of tree breeding and propagation from institutions of excellence to selected institutions in the region.

5. Promote the exchange of information and the communication of relevant

data related to tree breeding and propagation to national forest services and seed centres of the participating countries through correspondence and the publication of information materials.

6. Establishment of demonstration centres in the participating countries to

illustrate the recent advancement made in the fields of tree breeding and propagation

7. Provide training through national and regional workshops; training courses

on selected topics on tree improvement, and propagation; study tours; fellowships; and attachment of selected scientists at centres of excellence both within and outside the region.

8. Provide support to national forestry organizations to upgrade their research

and development efforts to increase the production of quality seed and planting materials.

FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000) TOTAL COST : 78 TOTAL FOREX : 38 TOTAL GOP : 40 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : RAS/91/004/ PROJECT DURATION : 5 years START DATE : 1991 END DATE : 1996

PROJECT DIRECTOR/MANAGER: Dir. Emilio A. Rosario OFFICE ADDRESS : ERDB, College, Laguna TELEPHONE NUMBER : 2809,3628,3481 IMPLEMENTING AGENCY : Ecosystems Research and Development

Bureau (ERDB) PROPONENT AGENCY : ERDB

Page 106: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 96

Improving the Implementation of Environment Impact Assessment Project,

Philippines

PROJECT CODE : 93-00900 PROJECT SITE : Nationwide PROJECT OBJECTIVES : To improve the process by which the affected communities, NGOs, academe and the general public are encouraged to participate in the conduct of EIA PROJECT DESCRIPTION: PROJECT ACTIVITIES/COMPONENTS: Communication Manual - which will address the lack of proper communication among developers, regulatory agencies and the general public, and therefore, resolve conflicts in project operationalization. The manual shall incorporate communication strategies at both institutional and grassroots levels that allow understanding and accommodation among the key actors and beneficiaries of the EIA process. Environmental Monitoring Manual - to improve compliance with the EIA requirement, provide methodologies for cost effective environmental compliance monitoring, and present guidelines to promote involvement of local communities/NGOs academe in compliance monitoring. Improved professional expertise- to address shortage of appropriate experience and technical and managerial expertise to stimulate public awareness in order to ensure public involvement in the EIA process to carry-out the studies and decide on appropriate action on EIA. FUNDING AGENCY : ADB TYPE OF FUNDING : Grant PROJECT DURATION : 1 year START DATE : 1992 END DATE : 1993 PROJECT DIRECTOR/MANAGER: Reynaldo Alconces/Romeo Tarray IMPLEMENTING AGENCY : EMB

Page 107: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 97

Industrial Efficiency and Pollution Control Project

PROJECT CODE : 91-22200 PROJECT SITE : Metro Manila and Metro Cebu PROJECT OBJECTIVES : 1. To improve, process efficiently, minimize waste and abate pollution in the highly

pollution urban-based industrial subsectors such as metal finishing, electronics, batteries, paints and solvents, petrochemicals and pharmaceuticals, foods and beverages, tannings, and dyes and textiles.

2. To stimulate demands from industries to improve their production process and

reduce pollution through economic incentives. 3. To strengthen environmental planning, services programming and management

capabilities of government agencies for effective in environmental and living conditions in Metro Manila and Cebu.

PROJECT DESCRIPTION: Methodology 1. The consultants will help GOP develop the policies and strategy for industrial

pollution abatement and pollution control, through review of existing regulations and subsequent recommendations for changes and improvement.

Scope of Work 1. Analysis of macro and micro economic incentives to industry and proposals for

specific policy changes. 2. Analysis of industrial subsectors technical and economic capability for waste

minimization and pollution control and estimates of expected demands under alternative economic and regulatory policies.

3. Outline pollution reduction strategies for MM Cebu as pilot areas. 4. Identify environmental needs and proposals for linkages and strengthening of

development policies and plans. 5. Institutional and management analysis of pollution control authorities and

recommend for changes in structure, strategy, staffing, training and career development and motivational incentives.

6. Review of pollution control strategy, standards, regulations enforcement systems and proposals for improvements.

7. Design a pollution control fund and institutional management arrangements for its operations

Page 108: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 98

PROJECT ACTIVITIES/COMPONENTS: Components: a. Pollution Control Policy and Strategy. Sector work at the onset will be undertaken to reduce pollution through industrial

management and technology and improving the systems of government regulation and management. Review of existing policies and formulation of proposed changes for the following areas:

i) Production of pollution control technologies in key industry sub-sectors with

costs and benefits components. ii) Promotion of local technology development and technology transfer. iii) Review of macro economic and micro economic policies of its implication

on pollution control. iv) Formulation of pollution reduction strategies for highly urbanized areas such

as Metro Manila and Metro Cebu. b. Investment Component - A revolving loan fund will be established to

be lent to enterprises to finance their needs for infrastructure, equipment and know-how.

c. Institutional Building Component - the project would assist in strengthening institutional capabilities and responsibilities in operations and management for environmental protection, pollution control.

FUNDING AGENCY : WB-IBRD PROJECT COST (IN US$ '000) TOTAL COST : 600 TOTAL FOREX : 600 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1991 END DATE : 1992 PROJECT DIRECTOR/MANAGER: Marissa David OFFICE ADDRESS : EMB, DENR Phil Heart Center IMPLEMENTING AGENCY : DENR/EMB, DTI/BOI, LLLD, DOF, DOST,

NEDA, MMC PROPONENT AGENCY : EMB, BOI, LLLD, DOF, DOST, NEDA, MMC

Page 109: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 99

Industrial Environmental Management Project (IEMP)

PROJECT CODE : 91-18900 PROJECT TYPE : Environmental Protection PROJECT SITE : Nationwide PROJECT OBJECTIVES: The IEMP's goal is to encourage sustained economic growth in the industrial sector, while reducing pollution from industrial activities, and improving human health. PROJECT DESCRIPTION: The project is designed to reduce industrial pollutants at minimum private and social costs. This will be achieved through a three-part strategy which (i) prevents or reduces pollutants at their source, (ii) reclaims industrial wastes when such reclamation is technically and financially feasible, and (iii) encourages cost-effective pollution abatement technologies for pollutants which are neither avoided nor reclaimed. The project shall have the following components: (i) Pollution Reduction Initiative - will conduct Pollution Reduction Appraisals

(PMAs) in selected industries and establishments (to begin initially with agro-industries and semi-conductor plants). Outputs of these PMAs are recommendations on methods to prevent or reduce pollutants at their sources, reclaim or exchange industrial by-products, and install pollution control technologies.

(ii) Investment Opportunities - Feasibility and/or market studies for industries willing to invest in

pollution control technologies. - technical assistance to DENR in preparing projects on industrial

pollution for multilateral and bilateral donor funding. (iii) Policy Analysis and Public/Private Dialogue - aimed at rationalizing policies

on industrial pollution, and to foster constructive communications and participation on issues of industrial pollution.

(iv) Institutional Strengthening to build up capability in PMAs, EIAs, compliance

audits, pollution control technologies, environmental monitoring and risk assessment, etc.

PROJECT ACTIVITIES/COMPONENTS: 1. Pollution Reduction Initiative 2. Policy studies and Public/Private Dialogue 3. Institutional Capability Building

Page 110: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 100

FUNDING AGENCY : USAID PROJECT COST (IN US$ '000) TOTAL COST : 20,000 TOTAL FOREX : 20,000 TOTAL GOP : 0 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : AID Proj No 492-0465 PROJECT DURATION : 5 ½ years START DATE : September 1991 END DATE : September 1997 PROJECT DIRECTOR/MANAGER: Mr. Geri Sañez OFFICE ADDRESS : 9th Flr, JMT Corporate Condo., ADB Ave.,

Pasig, Metro Manila TELEPHONE NUMBER : 634-16-17 to 19 IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR TARGET BENEFICIARIES : Industrial firms nationwide

Page 111: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 101

Industrial Forest Plantation Program

PROJECT CODE : 89-04800 PROJECT TYPE : Plantation Development PROJECT SITE : Nationwide PROJECT OBJECTIVES:

1. To complement and reinforce on-going efforts to slow down and even reverse the process of deforestation and environmental degradation in the Philippines.

2. To safeguard the foreign exchange and employment generating potential of the Philippine forest-based industry.

3. To widen the income earning opportunities in rural areas. PROJECT DESCRIPTION: Subject to certain criteria, the loan will finance about 40 to 50 subprojects averaging about 3,000 hectares to be undertaken by several types of investors led by TLA holders. Credit assistance to these investors will be channeled thru two identified conduit banks, i.e. Land Bank of the Philippines and the Development Bank of the Philippines. Initially species to be covered are fast growing species such as Albizzia falcataria, Acacia mangium, Acacia deglupta, giant ipil-ipil, etc. and lesser-used species such as bamboo, rattan and rubber tree. PROJECT ACTIVITIES/COMPONENTS: The DENR would perform the following functions: 1. Issue, administer, and if necessary cancel IFP leases;

2. Rank individual IFP applications or apply pre-qualification standards to IFP investors;

3. Advise DBP and LBP on any technical aspects relating to the proposed

development;

4. Jointly with DBP and LBP, monitor the sub-borrowers performance. DBP's and LBP's responsibilities would be:

a. Perform own evaluation of pre-qualified IFP investor's loan

applications and adequacy of proposed marketing and collateral arrangements;

b. Set grace periods and interest capitalization; c. Disburse sub-loans in tranches according to the progress of work;

and d. Monitor the sub-borrowers' performance.

Page 112: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 102

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 25,000 TOTAL FOREX : 25,000 TOTAL GOP : 0 TYPE OF FUNDING : Loan PROJECT DURATION : 5 years START DATE : 1992 END DATE : 1997 PROJECT DIRECTOR/MANAGER: Mrs. Venia T. Rayala OFFICE ADDRESS : 2nd Floor FMB Bldg. Visayas Avenue, Diliman,

Q.C. TELEPHONE NUMBER : 927-13-24 IMPLEMENTING AGENCY : DENR, Land Bank, Development Bank of the

Phils. PROPONENT AGENCY : DENR

Page 113: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 103

Industrial Restructuring Program (Environmental Management Phase II)

PROJECT CODE : 91-23501 PROJECT TYPE : Environmental Protection PROJECT SITE : Nationwide PROJECT OBJECTIVES : 1. To assist industry in meeting environmental regulations and cope with increasing

market demand for environmentally safe products and processes. 2. To promote the concept of industry self-monitoring and control. 3. To identify and develop realistic subsector management plans. 4. To develop a system for keeping the industrial sector informed of developments

and trends in the environmental field. PROJECT DESCRIPTION: This project is being implemented by the EMB-DENR in collaboration with the Development Bank of the Philippines. The IRP is aimed at improving the efficiency and international competitiveness of Philippine industries. A sub-component of this is the Environmental Management Project, which aims to strengthen the capability of DENR-EMB staff in the evaluation, scrutiny and approval of investment proposals as to their compliance with environmental standards, the conduct of environmental audits, and in assisting industries in their efforts to develop environmentally sound projects. This project is one innovative approach in bridging the gap between what is required by the DENR and what can be achieved by the industries given the present state of technology. PROJECT ACTIVITIES/COMPONENTS : The project shall cover four (4) major areas of activities: a. Promotion of Environmental Self-Monitoring and Control b. Development/formulation of Subsector Environment Plans c. Training of DBP accounts officer on evaluation of environmental aspects of project

proposals. d. Establishment of environmental information system for industrial sectors.

Page 114: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 104

FUNDING AGENCY : Sweden-BITS TYPE OF FUNDING : Grant PROJECT DURATION : 3 years START DATE : January 1993 END DATE : December 1995 PROJECT DIRECTOR/MANAGER: Moreno Penalba/Reynato Morente OFFICE ADDRESS : 99-101 Topaz Bldg., Kamias Rd., Q.C. TELEPHONE NUMBER : 97-56-98 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB TARGET BENEFICIARIES : Industries

Page 115: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 105

Industrial Restructuring Program: Environment Component

PROJECT CODE : 91-23500 PROJECT TYPE : Training PROJECT SITE : Nationwide PROJECT OBJECTIVES : 1. To enable the subsector environmental planning to take place. 2. To allow appraisal of integrated pollution control facilities and transfer of needed

technology through training to institutionalize and ensure the sustainability of project implementation.

3. To ensure that credit extended under the project will result in upgrading of pollution

control technologies in supported subsectors so that environmental protection standards for factory emissions are met.

PROJECT ACTIVITIES/COMPONENTS: 1. Establishment of industrial environmental database 2. Formulation of generic pollution control plan 3. Monitoring programs for selected subsectors FUNDING AGENCY : Sweden-BITS PROJECT COST (IN US$ '000) TOTAL COST : 400 TOTAL FOREX : 400 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : October 1991 END DATE : April 1992 PROJECT DIRECTOR/MANAGER: Ella S. Deocadiz/M. Penalba IMPLEMENTING AGENCY : EMB TARGET BENEFICIARIES : EIA Project Proponents

Page 116: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 106

Industrial Waste Exchange in the Philippines (IWEP)

PROJECT CODE : 87-10300 PROJECT TYPE : Environmental Protection PROJECT SITE : NCR, Cebu and Iligan PROJECT OBJECTIVES : 1. To update the inventory of industries with particular emphasis on processes and

waste generated 2. To conduct detailed physical, chemical characterization of waste samples where

necessary 3. To set up an information center to serve as clearing house for inventory update

and maintenance of wastes available and wasted materials in the Philippines 4. To conduct pilot studies for selected industries PROJECT DESCRIPTION: This project was established through the collaborative effort of the DENR/EMB with Geo-Technical Research Center of McGill University, Canada to reduce environmental impacts from industrial waste disposal while generating economic returns through the promotion of resource-recovery from industrial wastes. PROJECT ACTIVITIES/COMPONENTS : 1. Establishment and maintenance of an information center 2. Preparation of publication and distribution of Bulletin and primer 3. Conduct survey for the different industrial firms 4. Conduct monitoring activity for the possible waste exchange 5. Update the listing forms received and processed by the project 6. Conduct of study missions, case studies and conferences 7. Preparation of final report writing

Page 117: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 107

FUNDING AGENCY : IDRC PROJECT COST (IN US$ '000) TOTAL COST : 155 TOTAL FOREX : 71 TOTAL GOP : 84 EXCHANGE RATE : 21.50 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : 3-8-86-1040-2 PROJECT DURATION : 4 years and 6 mos. START DATE : 1987 END DATE : June 1991 PROJECT DIRECTOR/MANAGER: Clarissa Arida IMPLEMENTING AGENCY : DENR/EMB

Page 118: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 108

Information Technology Strategic Plan (ITSP)

PROJECT CODE : 93-01500 PROJECT SITE : NAMRIA PROJECT OBJECTIVES : 1) To help ensure that NAMRIA is making best use of its current and future IT

resources to improve its operations and services. 2) To develop an overall systems plan and implementation strategy to improve its

operations and services; while 3) Building towards a national cooperative mapping and resource information system

through collaboration with its customer agencies. PROJECT DESCRIPTION: This project aims to develop and define an overall medium-term (five-year) information technology structure for NAMRIA to include the proposed technology (hardware/software), data, application, and service (business) models in order to address the agency's information needs at both management and operational levels. The ITSP will provide a design on the optimum utilization of the existing IT resources in NAMRIA and what IT resources more are needed and applicable in such important activities of NAMRIA as topographic base mapping, resource inventory acquisition, and image processing in order to effectively and efficiently carry out its mandates. Furthermore, the ITSP will provide for NAMRIA a design on interfacing of its functions and activities including data communication facilities and/or network requirements, data holdings, and hardware/software strategies, and manpower strategies. The ITSP is expected to create a framework for an efficient and cost-effective integrated information system (IS) that will support NAMRIA's various functions such as surveying, mapping, remote sensing and NR and GIS development. Moreover, with the proposed one-stop-shop concept of information storing and sharing in NAMRIA, the agency hopes to improve the timeliness and accuracy of its outputs, improve its conduct of operations, and facilitate its planning and decision-making processes thus contributing to improved services by NAMRIA to its various stakeholders and clients. The ITSP is a joint undertaking between CIDA and NAMRIA.

Page 119: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 109

PROJECT ACTIVITIES/COMPONENTS : 1. Assessment report 2. Business/Info Models 3. Application/Database Concept 4. Technology Strategy and Rationalization 5. NAMRIA/FMSS Rationalization 6. Transition Plan 7. GRC/1-STOP Concept 8. National Concept Systems 9. Benefits Analysis 10. Implementation Plan 11. Training/Visit Program FUNDING AGENCY : Macdonald Dettwiler and CIDA PROJECT COST (IN US$ '000) TOTAL COST : 587 TOTAL FOREX : 504 TOTAL GOP : 84 EXCHANGE RATE : 27.00 TYPE OF FUNDING : Grant PROJECT DURATION : 6 months START DATE : February 1993 END DATE : September 1993 PROJECT DIRECTOR/MANAGER: Linda Papa OFFICE ADDRESS : NAMRIA, Fort Bonifacio, Makati, Metro-Manila TELEPHONE NUMBER : IMPLEMENTING AGENCY : NAMRIA PROPONENT AGENCY : NAMRIA TARGET BENEFICIARIES : NAMRIA and Costumer agencies.

Page 120: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 110

Integrated Environmental Management for Sustainable Development

(IEMSD)

PROJECT TYPE : Institutional Strengthening PROJECT SITE : Nationwide PROJECT OBJECTIVES: The Programme seeks to promote the systematic integration of environmental considerations and sustainable development principles into socio-economic policies and strategies. Its emphasis will be on the strengthening of policy-making processes and on enhancing the roles and capabilities of public agencies, non-government organizations and the citizenry in general in accomplishing the goals of the Philippine Strategy for Sustainable Development (PSSD) within the framework of Agenda 21. The overall objective of the Programme is to assist the government in the realization of systematic integration of environment and development in the decision-making and planning processes and help develop and test out means to make such integration possible-in effect, to enable the operationalization of PSSD and the Philippine Agenda 21. PROJECT DESCRIPTION: IEMSD is a five-year programme assistance signed between the government of the Philippines and UNDP on October 14, 1994 as part of the UNDP Fifth Country Programme. IEMSD is designed to enhance national capability for operationalizing the Philippine Strategy for Sustainable Development (PSSD) and the Philippine Agenda 21. The PSSD aims to balance development and environmental goals by incorporating sustainable development principles in national policies and development plans. PROJECT ACTIVITIES/COMPONENTS: IEMSD incorporates seven capacity-building components. These are grouped according to macro (upstream), meso (midstream), and micro(downstream) level of programme support. Macro Component (1) Environment and natural resources accounting and applications; (2) Environmental Impact Assessment; and (3) Integration of environment and socio-economic development policies. Meso Components (4) Capacity building for integrated environmental planning and management; (5) Environment and natural resources database/directory, and (6) Environmental information, education and communication support.

Page 121: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 111

FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000) TOTAL COST : 4,526 TOTAL FOREX : 3,886 TOTAL GOP : 640 EXCHANGE RATE : P25.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : PHI/93/007/E/01/99 PROJECT DURATION : 5 years START DATE : January 01, 1994 END DATE : June 30, 1998 PROJECT DIRECTOR/ MANAGER : USEC Delfin J. Ganapin, Jr. OFFICE ADDRESS : 2nd Floor, DENR Bldg., Visayas Ave., Quezon City TELEPHONE NUMBER : 926-55-95, 928-49-69, 926-25-35 IMPLEMENTING AGENCY: DENR TARGET BENEFICIARIES : Policy makers, GO personnel, NGOs and

private sector

Page 122: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 112

Integrated Forest Protection Pilot Project

PROJECT CODE : 90-17500 PROJECT TYPE : Plantation Development PROJECT SITE : Doña Remedios Trinidad, Bulacan; Sta. Fe, Aritao,

Dupax del Norte, Dupax del Sur, Nueva Vizcaya PROJECT OBJECTIVES : To develop a model for the effective protection of forest against destructive activities thru the application of sound watershed and forest occupancy management principles. PROJECT DESCRIPTION: The Integrated Forest Protection Pilot Project is a component of the Watershed Management and Erosion Control Project of the National Irrigation Administration under Loan Agreement No. 1890PH with IBRD. This component would provide detailed planning and implementation by the Bureau of Forest Development in two project areas of a three-year pilot operation in which forest occupancy (kaingin management), forest guarding, forest fire control, and watershed management/rehabilitation would be considered in an integrated effort. PROJECT ACTIVITIES/COMPONENTS: 1. Settlement of some 800 forest occupants/families including the improvement of their

farms and provision of social services. 2. Physical protection of the entire 127,000 has. of forest land. 3. Fire control of over 27,000 has. forest fire areas. 4. Vegetative rehabilitation of about 2,300 has. of denuded erodable land and

construction of soil erosion control structures in critical locations. 5. Construction and maintenance of 20 kms. of access roads 6. Provision of buildings, vehicles and equipment for BFD staff implementing the works.

Page 123: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 113

FUNDING AGENCY : WB-IBRD PROJECT COST (IN US$ '000) TOTAL COST : 3,985 TOTAL FOREX : 1,240 TOTAL GOP : 2,745 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 1890-PH PROJECT DURATION : 7 years START DATE : July 1981 END DATE : July 1988 PROJECT DIRECTOR/MANAGER : Nicanor Sapla IMPLEMENTING AGENCY : Burean of Forest Development and NIA TARGET BENEFICIARIES : Upland Farmers

Page 124: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 114

IPAS Training Program

PROJECT CODE : 90-03300 PROJECT SITE : Nationwide PROJECT OBJECTIVES : 1. To train in protected areas management approximately eight hundred and fifty

(850) DENR employees assigned in the Protected Areas and Wildlife Bureau. 2. To train representative of NGOs involved in wildlife conservation to be able to

support the government in the management of protected areas. 3. To prepare a handbook or protected areas management for use by DENR field

personnel. PROJECT DESCRIPTION: 1. Identification and grouping into four (4) major trainee groups and development of

a corresponding training module for each. 2. Training of each group through executive briefing, training courses on supervisory

development and protected area management, and park protection and park interpretation and management.

3. Develop a standard handbook in protected area management 4. Develop and conduct post-training monitoring and evaluation scheme. PROJECT ACTIVITIES/COMPONENTS : 1. Executive Briefing 2. Supervisory Training Course 3. On-site Training Course on Protected Area mgt. 4. Park Rangers Training 5. Production of Handbook FUNDING AGENCY : WB/OECF PROJECT COST (IN US$ '000) TOTAL COST : 539 TOTAL FOREX : 539 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 1 year, 2 months START DATE : September 1990 END DATE : November 1991 IMPLEMENTING AGENCY : PAWB-DENR PROPONENT AGENCY : PAWB-DENR TARGET BENEFICIARIES : Philippine Flora, Fauna, and Protected Areas

and Communities near protected areas

Page 125: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 115

Lake Bato Watershed Rehabilitation Pilot Project

PROJECT CODE : 89-26000 PROJECT TYPE : Plantation Development PROJECT SITE : Buhi, Camarines Sur; and Polanqui, Albay PROJECT OBJECTIVES : To improve the overall environmental condition of the Bicol River Basin Area and upgrade the socio economic conditions and quality of life of upland farmers through watershed rehabilitation and logistics support. PROJECT DESCRIPTION: The Project is a component of the ADB-assisted Bicol River Basin Irrigation Development Project. Activities under the project include the construction of riverbanks and other soil stabilization structures, establishment of tree farms, and the conduct of seminars and trainings for project beneficiaries. PROJECT ACTIVITIES/COMPONENTS: 1. Development of 1,563 has. of orchards lots, tree farms and soil conservation

farmlots; 2. Production of 10 million seedlings for planting and distribution to

farmer-participants; 3. Construction of 81 units of soil and water conservation structures; 4. Stabilization of 9,666 square meters of roadside and stream-bank; 5. Conduct of 112 assemblies/seminars/trainings involving project staff and

farmers-participants; 6. Establishment of 4 units of demonstration farms and bunkhouses; 7. Construction and stabilization of 15.7 km. of access roads and trails; and 8. Contruction of 1 multi-purpose building. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 1,556 TOTAL FOREX : 236 TOTAL GOP : 1,320 EXCHANGE RATE : 9.00 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 417-PHI PROJECT DURATION : 9 years START DATE : January 1981 END DATE : December 1989 PROJECT MANAGER : Pepito L. Asis IMPLEMENTING AGENCY : Bureau of Forest Development, NIA (as lead agency) TARGET BENEFICIARIES : Upland Farmers

Page 126: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 116

Leachate Pollution from Open Dumping Sites in Metro Manila (Main Study)

PROJECT CODE : 89-23201 PROJECT TYPE : Research PROJECT SITE : Pasig, Payatas and San Mateo disposal sites PROJECT OBJECTIVES : 1. To study and monitor the effects on ground and surface waters of leachate from solid

waste disposal sites in different locations in Metro-Manila 2. To provide solutions for the prevention and control of the possible contamination by

leachates 3. To formulate guidelines and strategies regarding leachate control to be adapted in the

planning and management of waste disposal sites. PROJECT ACTIVITIES/COMPONENTS : 1. Preparation of monitoring program and design of wells; 2. Drilling of monitoring wells; 3. Geological mapping and well inventory; 4. Testpumping, hydraulic modelling and prognosis; 5. Design of dykes, surface drains and leachate drains; 6. Design of final elevations, configuration, intermediate and final cover; 7. Design of retention dam and recirculation system; 8. Treatability studies and design of the treatment system; 9. Waste disposal plan. FUNDING AGENCY : Sweden-BITS PROJECT COST (IN US$ '000) TOTAL COST : 950 TOTAL FOREX : 950 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1991 END DATE : 1992 PROJECT DIRECTOR/MANAGER: Ella S. Deocadiz IMPLEMENTING AGENCY : EMB

Page 127: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 117

Legislative Studies for the Integrated Protected Areas System of the

Philippines

PROJECT CODE : 89-12100 PROJECT SITE : Nationwide PROJECT OBJECTIVES : 1. Formulation of a draft legislation in support of the IPAS. 2. Formulation of a draft supporting policies and guidelines on protected areas

management and development. PROJECT DESCRIPTION: 1. Compilation, collation, review, analysis of all existing rules, regulations and

policies pertaining to protected areas, ancestral lands and land uses. 2. Formulation of a draft legislation supporting policies and guidelines on protected

areas management and development; development of brochures and briefing materials on laws, rules and guidelines covering the Philippine IPAS.

3. Holding of consultation meetings with concerned institutions, agencies, groups and

individuals to discuss and review the draft legislation, rules, regulations and guidelines.

PROJECT ACTIVITIES/COMPONENTS : 1. Compilation and analysis of existing rules 2. Drafting of IPAS legislation and implementing guidelines 3. Public Hearings 4. Preparation of IPAS briefing materials/brochures FUNDING AGENCY : JICA TYPE OF FUNDING : Grant PROJECT DURATION : 6 months START DATE : September 15, 1990 END DATE : March 15, 1991 IMPLEMENTING AGENCY : PAWB-DENR PROPONENT AGENCY : PAWB-DENR TARGET BENEFICIARIES : Philippine biodiversity and communities near

protected areas

Page 128: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 118

Livelihood Project for the On-Going Community Forestry Program (FS)

PROJECT CODE : 92-02200 PROJECT TYPE : Institutional Strengthening PROJECT SITE : Region II-Penablanca, Cagayan, Region III - Palawing,

Zambales, Region V- Sta. Elena, Camarines Norte PROJECT OBJECTIVES : 1. To identify potentially viable forest and non-forest based livelihood support project for

the 3 CFC sites 2. To determine the feasibility and package one priority livelihood project. PROJECT DESCRIPTION: 1. Data collection and analysis covering the bio-physical and socio-economic condition of

the three pilot sites. 2. Identification and prioritization of Livelihood Support Activities 3. Feasibility analysis of priority Livelihood projects. 4. Identify potential environmental impact, whether positive or negative, of priority

projects in the all and recommend measure to mitigate adverse consequences. 5. Prepare an implementation, providing for a lot of activities and their respective timing

that needsto be initiated in order to ensure the implementation of the livelihood project.

FUNDING AGENCY : USAID PROJECT COST (IN US$ '000) TOTAL COST : 6 TOTAL FOREX : 6 TOTAL GOP : 0 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Grant PROJECT DURATION : 3 months START DATE : October 1992 END DATE : December 1992 IMPLEMENTING AGENCY : DENR - Region- II, III, V PROPONENT AGENCY : DENR - Region- II, III, V

Page 129: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 119

Local Development Assistance Program (Environment Sector)

PROJECT CODE : 91-25100 PROJECT TYPE : Institutional Development PROJECT SITE : Pangasinan,Quirino, Iloilo, Negros Occidental,

Zamboanga del Norte, Bukidnon PROJECT OBJECTIVES: 1. To improve the capability of local government units in environmental management

as an integral part of local development plans and programs. 2. To develop in LGUs an increased appreciation and understanding of the value of

natural resources management, conservation and development. PROJECT DESCRIPTION: The program was aimed at enhancing capability of local government units (LGUs) in environmental and land use planning and monitoring, and the basic Environmental Impact Assessment process in their respective localities PROJECT ACTIVITIES/COMPONENTS : 1. Conduct 8 orientation dialogues and consultation agenda. 2. Trainors training of 30 participants on Environmental Impact Assessment. 3. Conduct 8 series of training on Capability Building on Local Government

Environmental Management Planning. 4. Evaluation of 8 training outputs. 5. Documentation of 8 Training Workshop results. 6. Preparation of two process documentation. FUNDING AGENCY : USAID PROJECT COST (IN US$ '000) TOTAL COST : 154 TOTAL FOREX : 0 TOTAL GOP : 154 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : A.I.D. No. 492-0436 PROJECT DURATION : 2 years START DATE : March 1992 END DATE : December 1993 PROJECT DIRECTOR/MANAGER : Hilda Hamoy OFFICE ADDRESS : DENR Central Office IMPLEMENTING AGENCY : DENR-EMB TARGET BENEFICIARIES : Local Government Units, PENRO, CENROs

and NGOs

Page 130: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 120

Magat Smallholder Agroforestry Pilot Project

PROJECT CODE : 88-00700 PROJECT TYPE : Plantation Development PROJECT SITE : Aritao, Dupax del Sur, Diadi PROJECT OBJECTIVES : To develop and test community-based agroforestry strategies for general application to the Magat Watershed FUNDING AGENCY : WB-IBRD PROJECT COST (IN US$ '000) TOTAL COST : 3,676 TOTAL FOREX : 785 TOTAL GOP : 2,891 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 1890 PH PROJECT DURATION : 6 years START DATE : August 1982 END DATE : December 1988 PROJECT DIRECTOR/MANAGER : Rolando Suetos TARGET BENEFICIARIES : Upland Farmers

Page 131: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 121

Management, Supervision and Institutional Support to the IFP Program

(Piggy-backed to the IFP)

PROJECT CODE : 89-04802 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES : 1. To advise the Executing Agency on the application of eligibility criteria, formulated

under the Industrial Forest Plantations (IFP) project of the Government, to IFP investors;

2. To advise the Executing Agency on the identification of suitable sites for IFP

establishment on a case to case basis; 3. To help establish the data base facilitating the monitoring of all existing Timber

License Agreement (TLA) Industrial Tree Plantation (ITP) and Timber Production Sharing Agreement (TPSA) operations.

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 728 TOTAL FOREX : 683 TOTAL GOP : 45 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : TA 1577 PHI START DATE : 1992 END DATE : 1994 IMPLEMENTING AGENCY : DENR

Page 132: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 122

Mangrove Development Project (FS)

PROJECT CODE : 89-10001 PROJECT SITE : Nationwide PROJECT OBJECTIVES : To effectively carry-out a mangrove reforestation and management plan that will involve rehabilitation and replanting of mangrove areas that have been severely depleted, promotion of sustainable yield management of existing mangrove forest and poverty alleviation of coastal communities. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 640 TOTAL FOREX : 640 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 6 months START DATE : April 1990 END DATE : October 1990 TARGET BENEFICIARIES : Low income groups, principally fishing families,

in some 1,000 coastal barangays.

Page 133: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 123

Manila Bay Monitoring Program (PART II)

PROJECT CODE : 92-04400 PROJECT TYPE : Research PROJECT SITE : Manila Bay PROJECT OBJECTIVES : To continue the Manila Bay Monitoring Program and Tondo Outfall, Monitoring in order to fill-in gaps and obtain complete observations of some critical parameters to the desired level of time. To collect samples of sessile organisms for trace metal residues and bacteriological quality. To assess the impact of MWSS marine outfall on the water quality of Manila Bay. To predict the long-term effects of the outfall on the integrity of the Bay. PROJECT ACTIVITIES/COMPONENTS: 1. Bathing water quality and beach surveillance. 2. Tondo outfall monitoring 3. Bacteriological and trace metal analysis of sessile organisms (shellfish) 4. Offshore water and sediment quality studies 5. Monitoring of rivers discharging into Manila Bay. 6. Southern outfall monitoring. FUNDING AGENCY : WB-IBRD PROJECT COST (IN US$ '000) TOTAL COST : 104 TOTAL FOREX : 104 TOTAL GOP : 0 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Loan PROJECT DURATION : 2 years START DATE : 1992 END DATE : 1994 PROJECT DIRECTOR/MANAGER : Lesa Acorda OFFICE ADDRESS : 99-101 Topaz Bldg. Kamias Rd., Q.C. TELEPHONE NUMBER : 97-32-54 IMPLEMENTING AGENCY : EMB and MWSS TARGET BENEFICIARIES : Residents in the Manila Bay Region

Page 134: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 124

Marikina Watershed Development Project, FS

PROJECT CODE : 91-12900 PROJECT TYPE : Plantation Development PROJECT SITE : Marikina PROJECT OBJECTIVES : To promote the rehabilitation, development and management of the Marikina Watershed. PROJECT DESCRIPTION: Marikina Watershed is located approximately 30 kilometers northeast of Manila. The watershed area covers about 28,000 hectares, a large portion of which is already devoid of forest cover. The Marikina watershed is considered as one of the most critical watersheds in the country. It used to supply Metro Manila with water for domestic and industrial uses. Due to forest depletion, the watershed can no longer supply Metro Manila with water for such uses. Therefore, it is expedient to restore its functions as a major source of water supply for Metro Manila. In this regard, the project aims to prepare a detailed feasibility study and a comprehensive development and management plan to rehabilitate the watershed and bring back its capability to supply water for Metro Manila and its surrounding municipalities. The project will look into the feasibility of reforesting 8,000 hectares of denuded/open areas in the watershed including the introduction of social forestry and agro-forestry as project components. PROJECT ACTIVITIES/COMPONENTS: 1. Preparation of inception reports 2. Data gathering 3. Data analysis 4. Community Organizing 5. Extension work 6. Preparation and submission of final report

Page 135: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 125

FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 1,473 TOTAL FOREX : 1,400 TOTAL GOP : 73 TYPE OF FUNDING : Grant PROJECT DURATION : 23 months START DATE : October 1992 END DATE : September 1994 IMPLEMENTING AGENCY : DENR-FMB PROPONENT AGENCY : FMB TARGET BENEFICIARIES : Communities within the Marikina Watersheds

Page 136: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 126

Marine Environmental Masterplan for the Philippines

PROJECT SITE : Nationwide PROJECT DESCRIPTION:

The Project with the technical assistance from the Netherlands will develop the Marine Environmental Master Plan for the Philippines. FUNDING AGENCY: Netherlands PROJECT COST (IN US$ '000) TOTAL COST : 346 TOTAL FOREX : 346 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 3 months START DATE : 1998 END DATE : 1998 IMPLEMENTING AGENCY: DENR PROJECT DIRECTOR : Ma. Lourdes Sioson (TWG Chairman) OFFICE ADDRESS : Undersecretary for Environment & Programs Development, 2nd Floor, DENR Bldg. Visayas Ave., Quezon City TELEPHONE NUMBER : 926-55-95, 928-49-69 IMPLEMENTING AGENCY: DENR PROPONENT AGENCY : DENR

Page 137: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 127

Metropolitan Environmental Improvement Programme (MEIP)

PROJECT TYPE : Pollution Control PROJECT SITE : Beijing, Manila, Colombo, Jakarta, Bombay and Katmandu PROJECT OBJECTIVES: To assist governments, industries and community organizations in reversing the environmental degradation in and around major cities of Asia. PROJECT DESCRIPTION: The MEIP was established as a regional programme by UNDP and the World Bank to support and learn from the environmental management efforts of Asia's large metropolitan areas. The program began in 1989. By the end of 1990 five cities had joined: Beijing, Bombay, Colombo, Jakarta, and Manila. Future Directions:

Assist the Bank in the preparatory work for the investment package for industries as a follow up to the IEPC.

Support NGO, school and community efforts on solid waste management which has been identified as the principal environmental problem in the metropolis.

An extensive Information, Education and Communication (IEC) campaign to be carried out jointly by government and the NGOs to support the Pollution Prevention/Minimization, Solid Management and Anti-Air Pollution Programs.

A pilot demonstration project of a municipal-wide waste resource recovery, recycling and re-use as a follow up of the study now being undertaken in San Juan and Mandaluyong.

Support for the Youth Environment Network to carry out their action plans and expand/strengthen the network.

Training for the private sector (industry and NGOs) and government personnel on various aspects of environmental management (such as waste minimization) to address the urgent need for institutional strengthening.

Work with the Task Force to Clean and Green Metro-Manila (Mayor Bunye)

Transform the ADB Vehicular Emission Control Study into an Action Plan for Clean Air Metro-Manila 2000

Page 138: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 128

PROJECT ACTIVITIES/COMPONENTS:

1. Preparation of an Environmental Management Strategy (EMS) and a set of Action Plans for each sector.

2. Strengthening the management and industrial pollution control capabilities of the agencies involved in urban/industrial environmental management.

3. Feasibility and investment studies for emerging high priority environmental management and pollution control projects.

4. Inter-country research and workshops on important urban environmental management issues.

5. Country-based research and demonstration projects undertaken by local research organizations and NGOs.

6. Study visits, workshops, and information sharing networks among MEIP cities. FUNDING AGENCY : UNDP & other multi-/bilateral PROJECT COST (IN US$ '000) TOTAL COST : 4,600 TOTAL FOREX : 4,600 TOTAL GOP : TYPE OF FUNDING : Grant PROJECT DURATION : 7 1/2 years START DATE : October 1991 END DATE : April 1999 PROJ. DIRECTOR/ MANAGER : Ms. Emelita Aguinaldo OFFICE ADDRESS : 2nd Floor, DENR Bldg., Visayas Ave., Dil., Q.C. TELEPHONE NUMBER : 928-29-65, 929-66-26 loc. 2029 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB

Page 139: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 129

Mineral Exploration and Tectonics of Two Contrasting Geologic

Environments in the Philippines

PROJECT CODE : 85-00200 PROJECT TYPE : Research PROJECT SITE : Nationwide PROJECT OBJECTIVES : The project was designed to obtain basic knowledge and information regarding geology particularly mineralization of the less explored regions of the Philippine Islands, thereby provide a basis for future exploration and development of mineral resources. FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 1,090 TOTAL FOREX : 1,090 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : 1985 END DATE : 1989

Page 140: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 130

Mini-Project Type Technical Cooperation in Hydrographic Surveying and

Nautical Charting

PROJECT CODE : 91-26100 PROJECT SITE : Port of Puerto Princesa and approaches PROJECT OBJECTIVES : To start a new era of good relationships between the hydrographic authorities of Japan and the Philippines through complete transfer of technology in hydrography, oceanography and nautical charting. PROJECT DESCRIPTION: The CGSD (formerly BCGS) has been receiving assistance from Japan, specifically through experts and group training courses in Hydrography, oceanography and nautical charting. But because of scarcity of modern equipment, CGSD personnel have very little opportunity to apply what they learn from these undertakings. Hence, this project was conceived in order provide practical experience to CGSD personnel. FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : TOTAL FOREX : TOTAL GOP : EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant PROJECT DURATION : 3 years START DATE : April 26, 1991 END DATE : April 30, 1994 PROJECT DIRECTOR/MANAGER : Commo. Renato Feir OFFICE ADDRESS : Coast and Geodetic Survey Department,

NAMRIA IMPLEMENTING AGENCY : CGSD, NAMRIA TARGET BENEFICIARIES : Shipping industry

Page 141: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 131

Mining Titles Computerization Project (MTCP)

PROJECT CODE : 89-29000 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES : To upgrade the management and information system for mining titles records of the Mines and Geo-Science Bureau and the Regional Offices of the DENR. PROJECT DESCRIPTION: The Project, a sub-component of the Natural Resources Management Development Project, involves the introduction of micro-computers and systems to an initial term of 4 DENR members, one from MGB and one from each of Luzon (Region IV office), the Visayas (Region VII office) and Mindanao (Region X office). These 4 will be given intensive training. Their data will form the basis of a "pilot" project, and they will act as tutors for members of the remaining ten regions in the later phase. The project will be carried out by a team of the Australian experts who are in micro-computer data base management systems and in mining title administration. PROJECT ACTIVITIES/COMPONENTS : The Mining Titles Computerization Project has one component but is proposed to include closely related phases namely: 1. Preliminary Research and Development This is one-week period in Australia involving the two Australian experts to consider the technical implementations of the project, possible software and hardware options and systems prototype possibilities with the aim of determining resource and information expected to be unavailable in the Philippines. The subsequent activities will be carried out in the Philippines. 2. Organization, Planning, System specification and Procurement This phase involves 2 consultants and 4 DENR staff to plan initial training courses and to define and put to tender the purchase of 5 hardware and software units.

Page 142: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 132

3. Initial Training Basic training courses in a micro-computer "Operating System" and a Relational Data Base management systems" are proposed. The consultant systems specialist would be involved for 3 weeks, and training would occur in Manila. 4. System Development and On-going Training A prototype systems developed and tested and a working system implemented

and on the job training for DENR staff begins. 5. Initial System Implementation and Data Entry Implementation consists essentially

of data entry on a regular basis. This is a period in which constraints imposed by the source data are likely to be discovered. The system would be amended as required and document and preparation of "How to Use" manual will commence.

6. National Implementation Following of completion of software development, training in the new system and the introduction of implementation in Region I, IV and VII, begins. This phase would include a 1-week training course in Manila in which representations from the remaining regions will be trained, following implementation of the system in each of the regions. FUNDING AGENCY : AIDAB PROJECT COST (IN US$ '000) TOTAL COST : 289 TOTAL FOREX : 289 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : 1991 END DATE : 1992 IMPLEMENTING AGENCY : DENR-MGB PROPONENT AGENCY : MGB TARGET BENEFICIARIES : General Public

Page 143: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 133

Monitoring of Land-use and Land Cover Using Remote Sensing and

Geographic Information System

PROJECT CODE : 94-04500 PROJECT SITE : Magat Watershed Area-Nueva Vizcaya PROJECT OBJECTIVES: To provide better empirical understanding of the stages, processes, as well as the driving forces for land use cover changes, specifically on forest areas, which may effect the global environment. PROJECT DESCRIPTION: The International Geosphere-Biosphere Programme has initiated a program, the System for Analysis, Research and Training Programme (START) to enhance the scientific understanding of global environment change. Southeast Asian countries, namely Malaysia, Thailand, Indonesia and the Philippines have been identified as the major participants in this Project. The Project will undertake a macro and micro scale study using remotely sensed data and GIS technology for analysis. The Magat Watershed in Nueva Vizcaya has been chosen for the micro scale study. PROJECT ACTIVITIES/COMPONENTS: 1. Study of watershed area, secondary materials and systems analysis. 2. Identification of additional requirements based on model 3. Gathering of additional requirements 4. Mapping and remote sensing 5. Database build-up 6. Analysis of data using GIS, modeling future trend analysis FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000) TOTAL COST : 124 TOTAL FOREX : 124 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : January 1995 END DATE : December 1996 PROJECT DIRECTOR/MANAGER: Joe Alba/Lita Laquigan OFFICE ADDRESS : NAMRIA, Fort Bonifacio, Makati, Metro-Manila TELEPHONE NUMBER : 810-54-59/810-48-31 IMPLEMENTING AGENCY : NAMRIA TARGET BENEFICIARIES : Southeast Asian countries: Malaysia, Thailand,

Indonesia, Philippines

Page 144: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 134

Motor Vehicle Emission Control and Establishment of Testing Center

PROJECT CODE : 90-14600 PROJECT TYPE : Environmental Protection PROJECT SITE : First and Second Districts, Davao City PROJECT OBJECTIVES : 1. To support the regional objective to make Region XI a leading agro-industrial

region and trade center; 2. To substantially reduce regional levels of poverty and unemployment; 3. To equitably distribute economic opportunities and fruits of production; and 4. To have a balanced ecology PROJECT DESCRIPTION: The project is envisioned to minimize or check the mobile air pollution derived mostly from the diesel-fueled motor vehicles in Davao City. The project shall complement and strenghten the pollution control program of the environment sector of DENR XI. PROJECT ACTIVITIES/COMPONENTS : Establishment of a Testing Center. Apprehension & testing of apprehended smoke-belching vehicles. Issuance of Certificate of Compliance for those who pass the standard. Issuance of grounding order for those who fail the standard test. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 768 TOTAL FOREX : 768 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1991 END DATE : 1992 IMPLEMENTING AGENCY : DENR-R11 PROPONENT AGENCY : DENR-R11 TARGET BENEFICIARIES : Owners and operators of motor vehicles.

Page 145: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 135

Muleta-Manupali Watershed Development Project

PROJECT CODE : 88-00600 PROJECT TYPE : Plantation Development PROJECT SITE : Malaybalay Bukidnon covering the Municipalities of

Valencia, Lantapan, Talkag, Maramag and Pangantucan PROJECT OBJECTIVES : To rehabilitate the twin watersheds of Muleta and Manupali in support of NIA's irrigation project downstream PROJECT DESCRIPTION: In 1975, the Philippine Government and the Asian Development Bank entered into an agreement to undertake the Mindanao Irrigation Study I and II (MIS I and II). The MIS II generated the Bukidnon Irrigation Project which has a five-year implementation period. In the implementation of the multi-component project, the National Irrigation Administration (NIA) was named the lead agency. The Bureau of Forest Development was assigned to execute the soil conservation component, hereinafter referred to as Muleta-Manupali Watershed Development Project (MMWDP). Other cooperating agencies and their assigned components are: (1) Bureau of Public Works (rural water supply); (2) Ministry of Health (public health services) and Schistomiasis Control and Research Service (schistomiasis control). PROJECT ACTIVITIES/COMPONENTS : 1. Reforestation 2. Agroforestry 3. Forestry Occupancy Management 4. Forest Protection FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 3,938 TOTAL FOREX : 822 TOTAL GOP : 3,116 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : ADB 406-PHI SF PROJECT DURATION : 8 years START DATE : 1980 END DATE : 1988 IMPLEMENTING AGENCY : DENR-FMB TARGET BENEFICIARIES : Upland Farmers

Page 146: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 136

National Cartographic Center Project

PROJECT CODE : 81-00100 PROJECT TYPE : Institutional Development PROJECT SITE : NCR PROJECT OBJECTIVES : 1. To continue the joint project of the RP-FRG in order to enable NAMRIA to fulfill its

responsibility for the production and updating of Topo maps. 2. To assist NAMRIA to produce updated maps needed for National Development. 3. To update the Topographic maps of the country. 4. To formulate and adopt a national mapping program to serve as masterplan for all

mapping activities in the Philippines. FUNDING AGENCY : FRG/GTZ PROJECT COST (IN US$ '000) TOTAL COST : 5,734 TOTAL FOREX : 5,734 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 11 years START DATE : 1981 END DATE : June 1992 IMPLEMENTING AGENCY : NAMRIA TARGET BENEFICIARIES : Government and Non-Government Org.; Private

Agencies

Page 147: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 137

Natural Resources Accounting Phase II

PROJECT CODE : 93-08000 PROJECT SITE : Nationwide PROJECT OBJECTIVES: The project will develop a system of environmental accounts to support the development of natural resource and environmental policy that will promote the attainment of economic, natural resource, and environmental objectives in the Philippines. PROJECT DESCRIPTION: The NRAP thus proposes the development of an accounting system that rectifies the deficiencies of the conventional national income accounts as it will take into account those inputs and outputs that are not bought and sold in markets and thus lacks observable market price. The conventional accounting system also ignore the value of the degradation and depletion of other forms of wealth such as natural resources. PROJECT ACTIVITIES/COMPONENTS: A. Data Identification. B. Data Assembly and Preparation C. Data Assessment c.1. Assessment of the quality of current accound data, especially concerning

issues of coverage c.2. Assessment of the quality of asset data, especially concerning issues of

coverrage and internal consistency c.3. Preparation of data assessment report. c.4. Implementation and Imputation c.5. Implementation of current accounts for industrial and household sectors c.6. Report on implementation subtasks c.7 Assembly of Preliminary Accounts c.8 Preparation of Main Report D. Second Iteration E. Identifying Directions for Second Iterations

Page 148: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 138

FUNDING AGENCY : USAID TRP PROJECT COST (IN US$ '000) TOTAL COST : 669 TOTAL FOREX : 669 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 14 months START DATE : December 1992 END DATE : March 1994 IMPLEMENTING AGENCY : International Resources Group, Ltd. (IRG, USA) TARGET BENEFICIARIES : Policy makers

Page 149: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 139

Natural Resources Accounting Project (Phase I)

PROJECT CODE : 91-25700 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: 1. Review and critique methods for measuring the value of the stock and depreciation

of natural resources. 2. Inventory available Philippine data that would support an accounting of the

changes in these resources. 3. Develop a set of accounts applicable to Philippine forest resources in both physical

and value terms. 4. Assess the feasibility of incorporating measures of natural resources and

environmental degradation into the Philippine national economic accounts. 5. Assess the potential for using modified accounts to improve environmental policy

and decision-making in the Philippines; and 6. Prepare a study plan for Phase II of the Project. FUNDING AGENCY : USAID-TRP PROJECT COST (IN US$ '000) TOTAL COST : 473 TOTAL FOREX : 473 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 12 months START DATE : January 1992 END DATE : January 1993

Page 150: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 140

Natural Resources Accounting Project (Phase III)

PROJECT CODE : 93-08100 PROJECT SITE : Nationwide with pilot projects PROJECT OBJECTIVES: To develop an analytical basis for measuring the impact of unsound environmental and natural resources management practices by the industrial and agribusiness sectors, among others, on Philippine economic development as measured by the national income accounts. PROJECT DESCRIPTION: The Government of the Philippines through the Department of Environment and Natural Resources (DENR) has been involved in environmental and natural resources accounting efforts since early 1991, through Phase I and II of the Environmental and Natural Resources Accounting Project (ENRAP). The first phase conducted in 1991, focused on modifying the Philippine gross national product through estimates of the depreciation of forest products. As Phase I was being implemented , it came apparent that the scope of the effort needed to be broadened. This meant developing a comprehensive accounting framework for examining the role of both natural and environmental resources in the economy, and the impact of economic activity on these resources. This was the basic objective of the second phase of ENRAP which was completed in March 1994. More specifically, ENRAP II has built a system of environmental accounts to support economic, natural resource and environmental policy formulation. To assess both economic growth and environmental policy formulation. To assess both economic growth and environmental protection targets, analytical work under ENRAP II designed an economic framework for addressing economy-wide trade-offs and national concerns. The experience from ENRAP I and II strongly indicated that susbsequent ENRA activities should sustain and strengthen the institutionalization of the accounting process and enhance its support to policy formulation. Phase III will conduct the data refinement and pursue further iterations on the accounts established in the previous phases. PROJECT ACTIVITIES/COMPONENTS : 1. Refinement of 1988 accounts and preparation of 1992 accounts 2. Training/orientation 3. Policy simulation exercises 4. Regional ENRA accounting 5. Preparation of technical papers 6. Dissemination and networking 7. Institutionalization 8. Preparation of final report

Page 151: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 141

FUNDING AGENCY : USAID PROJECT COST (IN US$ '000) TOTAL COST : 815 TOTAL FOREX : 815 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 18 months START DATE : April 1994 END DATE : October 1995 PROJECT DIRECTOR/MANAGER : Dr. Marian delos Angeles OFFICE ADDRESS : Unit402, Mla. Luxury Cond.,Pearl Dr.Cor. Gold

Loop IMPLEMENTING AGENCY : International Resources Group, LTd. (IRG,

USA) TARGET BENEFICIARIES : Policy makers

Page 152: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 142

Natural Resources Management and Development Project (NRMDP)

PROJECT CODE : 89-10500 PROJECT TYPE : Institutional Development PROJECT SITE : Quirino (R2); Pampanga (R3); Cebu (R7) and all Regional

Offices PROJECT OBJECTIVES : The overall goal of the project is to contribute to better economic and social condition through the management of natural resources and land utilization. This would involve the protection and enhancement of the quality of the environment and equitable access to the country's natural resources. PROJECT DESCRIPTION: The project consists of six (6) major components which are tasked to address specific technical and institutional aspects of environmental and natural resources management in the Philippines, namely: NRMDP Management, Strategic Planning and Management, Resource Management, Geodetic Survey, Land Administration and Land Laws. 1. NRMDP Management This component is primarily concerned with the provision of support to the apropriate units of the DENR and other participating agencies in the preparation of downstream projects and supervision of project training activities, in addition to the overall management and monitoring of NRMDP itself. 2. Strategic Planning and Management (SPM) The focus of this component centers on the development of improved approaches to policy formulation, organizational management, planning coordination, performance monitoring and information dissemination on natural resources and the environment. It is also involved in the assessment of DENR's communication needs and the installation of necessary equipment at Central Office and in region II, III and VII 3. Resource Management This component is tasked to develop and pilot test improved approaches to management information systems, environmental monitoring and resource-use planning at both national and regional levels.

Page 153: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 143

4. Geodetic Survey (GS) This component is involved in the establishment of a first-order geodetic control network of 210 stations throughout the country using the Global Positioning System (GPS) which will serve as a common reference for all future surveying and mapping operations. It will also undertake tidal observations on each of twenty five (25) tide stations to be established throughout the country, leveling in selected GPS stations, gravity survey in Luzon and Mindanao to supplement existing gravity data, and Electronic Distance Measurements (EDM) between intervisible stations. The GPS technology will be used to survey the ground control points for photogrammetric/cadastral mapping in three (3) NRMDP pilot areas. 5. Land Administration This component is concerned with the development of a speedier and more efficient land titling process to accelerate the registration and distribution of rights in public lands. It will likewise develop a better means of identifying and assessing real property for taxation purposes. 6. Land Laws The primary task of land laws component include the development of a broad legal framework for the reform of environment and natural resource laws, including cadastral laws and the preparation of downstream project proposals and the drafting of proposed new laws designed to implement recommended changes to this laws. PROJECT ACTIVITIES/COMPONENTS : 1. NRMDP Component Project management Project preparation Training 2. Strategic Planning and Management Policy Formulation Management and Organization Information, Education and Communication Planning Coordination Performance Monitoring 3. Resource Management Resource Use Planning Environmental Monitoring Natural Resources Management Information System

Page 154: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 144

4. Geodetic Survey Establishment of Standard Reference Point Across the Country 5. Land Administration Cadastral Surveys Agrarian Reform Integrated Social Forestry Real Property Tax Assessment 6. Land Laws Cadastral Land Laws Natural Resources Management and Environmental Protection Laws 7. Mining Titles Computerization Development of Micro-computer based Mining

Titles Database and Administration System 8. Mt. Pinatubo Rehabilitation Planning Assistance Project Strengthening NEDA's Region III planning office to provide support to Mt. Pinatubo

Task Force FUNDING AGENCY : AIDAB PROJECT COST (IN US$ '000) TOTAL COST : 20,150 TOTAL FOREX : 16,900 TOTAL GOP : 3,250 EXCHANGE RATE : 21.50 TYPE OF FUNDING : Grant PROJECT DURATION : 4 years and 2 months START DATE : January 1989 END DATE : December 1993 PROJECT DIRECTOR/MANAGER : Bresilda Gervacio OFFICE ADDRESS : DENR Annex, Visayas Ave., Q.C. IMPLEMENTING AGENCY : DENR

Page 155: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 145

Network for Industrial Environment Management

PROJECT CODE : 91-22700 PROJECT TYPE : Institutional Development PROJECT SITE : Metro-Manila PROJECT OBJECTIVES : To characterize the wastewater discharge by the United Pulp and Paper Company (UPPC) as to flow rate, pollutant load, physical and chemical constituents and toxicity in relation to raw material consumption; product mix, production volume, and other cooperating variables. To evaluate the effects of the UPPC wastewater on the quality of the body of water receiving these discharges. FUNDING AGENCY : UNEP PROJECT COST (IN US$ '000) TOTAL COST : 14.70 TOTAL FOREX : 14.70 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : January 1990 END DATE : March 1992

Page 156: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 146

Ozone Depletion Substances Phase-out Country Program Preparation

PROJECT CODE : 91-23300 PROJECT SITE : Nationwide PROJECT DESCRIPTION: The preparation of the country program (CP) is part of the requirements set by the Executive Committee to qualify for assistance from the Multilateral Fund. It contains an analysis of ODS consumption and structure of end users. The CP presents the country's preferred phase-out strategy which takes into account the socioeconomic conditions within the country and at the same time the Philippines commitments to the Montreal Protocol. The Action Plan, which translates the Program into specific activities and timetables, hopes to make the CP implementable. The Philippine Government however does not consider the preparation of the CP as a mere compliance to get assistance from the Multilateral Fund. The process itself is seen as an opportunity for the Government to be more familiar with an environmental problem, establish realistic goals to solve the problem by optimizing limited resources within the country and assistance from multilateral and bilateral agencies, and learn from the entire exercise in order to apply some general principles in attacking another environmental concern. For this purpose, the Government of the Philippines had taken the responsibility of formulating the Country Program for the ODS phase-out. FUNDING AGENCY : EEC PROJECT COST (IN US$ '000) TOTAL COST : 150 TOTAL FOREX : 150 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1992 END DATE : 1992

Page 157: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 147

Palawan Integrated Area Development Project - Land Classification

Component

PROJECT CODE : 89-14903 PROJECT TYPE : Institutional Development PROJECT SITE : Mainland Palawan PROJECT OBJECTIVES: To complete the land classification work, sub-classify the remaining unclassified public lands in mainland Palawan, delineate the different land uses and to provide data on the natural resources in the province for use in the planning and management aspects. FUNDING AGENCY : EEC PROJECT COST (IN US$ '000) TOTAL COST : 959 TOTAL FOREX : 959 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1982 END DATE : 1988 PROJECT MANAGER : Arthur Palatino IMPLEMENTING AGENCY : DENR

Page 158: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 148

Palawan Integrated Area Development Project - Upland Stabilization

Component

PROJECT CODE : 89-14901 PROJECT TYPE : Plantation Development PROJECT SITE : Aborlan, Quezon and Brooke's Point, Palawan

PROJECT OBJECTIVES :

The primary objective of the program is to control shifting cultivation by providing assistance for the following:

1. social and physical infrastructure such as water supply, access trails and housing materials;

2. farm development involving animals and tree crops; 3. reforestation using local participation; 4. issuance of land rights; and 5. development of community organizations and clientele training in resource

conservation and proper land use PROJECT DESCRIPTION: The intensity of slash-and-burn (Kaingin or Swidden farming) type of farming in the hilly lands and mountain slope of Palawan compounded by logging and mining activities contributes to accelerated degradation of province fragile ecosystem. Already, physical manifestations of adverse effects of indiscriminate resource utilization and exploitation are becoming evident: e.g. decline in land productivity as a result of soil fertility loss and irrigation water contamination. This is worsened by the continuous influx of settlers who continually push the tribal groups into the hinterlands. To mitigate the adverse effects of this existing farming system, the project, through the Department of Environment and Natural Resources in association with other agencies, developed a program-oriented Upland Stabilization Component. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 2,681 TOTAL FOREX : 1,190 TOTAL GOP : 1,491 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : ADB 528/529-PH PROJECT DURATION : 7 years START DATE : 1982 END DATE : 1989 PROJECT DIRECTOR/MANAGER : Raymundo Crisostomo IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Upland Farmers

Page 159: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 149

Palawan Integrated Area Development Project - Land Surveys and Titling

Component

PROJECT CODE : 89-14902 PROJECT TYPE : Institutional Development PROJECT SITE : Palawan PROJECT OBJECTIVES: 1. To assist agricultural development of Palawan through issuance of titles; 2. To provide an inventory of timber, mineral, agricultural and other lands of public

domain; 3. To define the municipal and barangay boundaries. PROJECT DESCRIPTION: A. Land Surveys

1. Special and isolated surveys shall be conducted by detailed personnel of the Bureau, assisted by contractual employees. Five (5) survey teams with five (5) personnel complement each are organized to execute subdivision surveys of large Public Land Survey lots and emancipation patent surveys of areas identified by the Department of Agrarian Reform. They shall likewise be tasked with the survey of priority areas of other participating agencies.

These teams shall be supervised by the Project Officer for Surveys. 2. Monthly narrative and statistical reports of accomplishments shall be

prepared by the Assistant Project Manager's Office for submission to the Project Manager, for consolidation and submission to PIADPO, the separate Project Monitoring agency and, thru the Regional Executive Director, to FASPO-DENR.

B. Land Titling: 1. Titling and other related activities shall be undertaken by five (5) operating

Community Environment and Natural Resource Offices, based at Roxas, Puerto Princesa City, Quezon, and Brooke's Point, Palawan.

2. The five (5) CENROs operating within the project area may not be able to

attain its work goals on titling without direct support from the Region and Central office. Approval/signing of Patent shall follow the delegation of authority as issued by the DENR secretary.

Page 160: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 150

3. Claims and conflict cases are heard in the CENROs and upon termination, same shall be forwarded to the Regional Legal Service staff for preparation of the decision and signature by the Regional Executive Director.

PROJECT ACTIVITIES/COMPONENTS: A. Surveys Boundary Survey Cadastral Survey Special and Isolated Surveys B. Land Titling FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 2,759 TOTAL FOREX : 1,385 TOTAL GOP : 1,374 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 528/529 PHI PROJECT DURATION : 7 years 1 year extension START DATE : 1982 END DATE : 1990 PROJECT DIRECTOR/MANAGER: Raymundo Crisostomo IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Farmers and local Government

Page 161: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 151

Pasig River Rehabilitation Program (Project Component-River

Rehabilitation Secretariat)

PROJECT CODE : 92-00800 PROJECT TYPE : Institutional Strengthening/Research PROJECT SITE : Pasig River and its environs PROJECT OBJECTIVES : To improve the living conditions in and around Pasig River System, by improving the water quality in the river system and improving the surrounding environment in the area. PROJECT DESCRIPTION: Pasig River was once a pristine river system. In a span of about one century, the river's condition deteriorated due to population and other pressures. The strategic location of Pasig River offers far-reaching economic and ecological potentials. The river's rehabilitation should be a pressing concern before it irreversably deteriorates. The Government of Denmark agreed on Oct. 30, 1989 with the Government of the Philippines to extend a grant of 100 million Danish Kroner financial assistance to the economic development of the Philippines. The Pasig River Rehabilitation Secretariat (PRRS) is one of the nine (9) priority projects included in the plan of operations formulated during the Feasibility Study Phase for the implementation of the Pasig River Rehabilitation Program. The PRRS is a grant project carried out by the Philippine Government through the Department of Environment and Natural Resources with the financial assistance from the Danish International Development (DANIDA) in the amount of DKK 14.9 million (1 DKK= P4.2) and P7.985 million from the GOP to coordinate efforts of the DENR and other agencies and and non-government organizations in the rehabilitation of the Pasig River. The PRRS will have a duration of two years from June 1993 to May 1995. Coordinating agencies are the following: DECS, DA, DILG, DOH DOTC, DPWH, DTI, LLDA, MMA, PIA, MWSS, NEDA, NHA, NIA, NWRB, PCG, PCUP, HLURB, HUDCC. Mun. of: Mandaluyong, Makati. and Marikina. Cities of : Quezon, Manila, Pasay, and Caloocan. PROJECT ACTIVITIES/COMPONENTS : 1. Coordination/dialogue with participating agencies 2. Manpower Development and Training Programs 3. Public information 4. Public mobilization 5. Riverside development and historical site preservation 6. Modeling and water quality monitoring 7. Preparation of reports. 8. Relocation and resettlement of squatters along the Pasig River 9. Waste Minimization Programs 10. Solid Waste Management

Page 162: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 152

FUNDING AGENCY : DANIDA PROJECT COST (IN US$ '000) TOTAL COST : 2,943 TOTAL FOREX : 2,623 TOTAL GOP : 319 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : Note No. 36/93 PROJECT DURATION : 2 yrs and 3 mos. START DATE : June 1993 END DATE : September 1995 PROJECT DIRECTOR/MANAGER : RTD Ramon Aguilar, Jr. OFFICE ADDRESS : Old HRDS Bldg., DENR, Visayas Ave., Diliman,Q.C. TELEPHONE NUMBER: 99-66-26 local 2099 IMPLEMENTING AGENCY : Environmental Management Bureau (EMB),

DENR PROPONENT AGENCY : EMB TARGET BENEFICIARIES : Policy makers, planners, technical staff and

residents within the project area

Page 163: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 153

Pasig River System Rehabilitation and Restoration Project Preparation

PROJECT CODE : 89-04100 PROJECT TYPE : Institutional Development PROJECT SITE : Metro-Manila PROJECT OBJECTIVES : 1. To restore and rehabilitate the Pasig River System and surrounding environment

to improve and monitor its river water quality. PROJECT DESCRIPTION: Scope of work: 1. The main priority of the project is development of a master plan for the river's

rehabilitation as well as the development of its catchment basin and the surrounding area.

2. Corollary to this, the transport and commercial potentials of the river system will also be addressed. TWG's will be organized to assist in master plan development and to coordinate its implementation.

3. A preliminary survey and assessment of the existing condition in the river system will be conducted, including preliminary mapping of the following: water quality; point sources of pollution; human settlements; built-up areas; existing road networks; and major infrastructures such as; bridges, ports and ferry facilities, hydraulic gates, sewerage outfalls. Navigational hazards such as sunken wrecks and shallow mud banks will likewise be charted.

4. The masterplan is expected to include the physical improvement of the river system and its immediate vicinities including: pollution abatement; transport and commerce; physical restoration and improvement; squatter clearance; planning and development; and public information and education.

5. Concurrent with these activities, an information dissemination and educational campaign will be undertaken. This will raise the environmental awareness of the populace and educate them of the consequences of polluting the river system.

FUNDING AGENCY : Denmark/DANIDA DKK PROJECT COST (IN US$ '000) TOTAL COST : 1,488 TOTAL FOREX : 1,392 TOTAL GOP : 96 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant START DATE : March 1990 END DATE : August 1991 PROJECT DIRECTOR/MANAGER : Ella Deocadiz IMPLEMENTING AGENCY : DENR-EMB

Page 164: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 154

Pasig River Rehabilitation Program (Project Component- River

Rehabilitation Secretariat) Phase II

PROJECT TYPE : Pollution Control/Solid Waste Management PROJECT SITE : Pasig River and its environs PROJECT OBJECTIVES: To improve the living conditions in and around the Pasig River System, by improving the water quality in the river system and improving the surrounding environment in the area. PROJECT DESCRIPTION: The Pasig River Rehabilitation Programme was approved by the National Economic Development Authority in August 1992. The River Rehabilitation Secretariat with the task of coordinating implementation of the programme was one of the projects with the highest priority. The Department of Environment and Natural Resources established the River Rehabilitation Secretariat with technical assistance, both during an interim period and for a two year Phase I starting June 1993, when the River Rehabilitation Secretariat officially started. DANIDA support to the River Rehabilitation Secretariat Phase I terminated 31 May 1995: After a short bridging period DANIDA decided to continue the support for River Rehabilitation Secretariat with the: River Rehabilitation Secretariat, Phase II The start of the project was 1 September 1995. The secretariat will strengthen the planning and coordinating capacity of the Department of Environment and Natural Resources’ Environmental Management Bureau and other agencies and organizations involved in the implementation of the Pasig River Rehabilitation Programme. The project will coordinate and monitor the implementation of projects aimed at improving the water quality of the Pasig River and the general environment in its vicinity. The project will support community based projects aimed at improving the living conditions of the population and the management of solid and liquid waste. The duration of the project is 3 ¾ year.

Page 165: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 155

PROJECT ACTIVITIES/COMPONENTS: The working groups established for the PRRP are institutionalized and all partner organizations give priority to the assignment. Pre-Feasibility studies for four selected river systems finalized. Continuous monitoring of the environmental situation in the Pasig river system and Manila Bay established. Waste minimization plans prepared for four major polluting industrial sectors. Improvement of the environmental condition of the Pasig River and its main tributaries. Participation and capacity building of the private sector, NGOs and communities along the Pasig River System in the rehabilitation effort. FUNDING AGENCY : DANIDA PROJECT COST (IN US$ '000) TOTAL COST : 6,323 TOTAL FOREX : 5,330 TOTAL GOP : 993 EXCHANGE RATE : TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : EON-RRS(08-10-95) PROJECT DURATION : 3 ¾ years START DATE : September 1995 END DATE : August 1999 PROJECT DIRECTOR : Secretary Antonio Cerilles PROJECT MANAGER : Renato Cruz OFFICE ADDRESS : Old HRDS Bldg. DENR, Visayas Ave., Diliman, Q.C. TELEPHONE NUMBER : 929-66-26 local 2093, 920-62-14, 920-62-15 IMPLEMENTING AGENCY: DENR-EMB PARTICIPATING AGENCIES: DPWH, NHA, MMDA, DILG, DOT, DOH, DECS, DTI,

NEDA, DA, MWSS, NIA, PCCI, PCUP, PCG, PIA, HUDCC, LGUs, HLURD

TARGET BENEFICIARIES: Policy makers, planning staff and residents within the project area

Page 166: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 156

Philippines-Australia Human Resources Development (HRD) Project

PROJECT TYPE : Institutional Strengthening PROJECT SITE : Department of Environment and Natural Resources

(DENR), HRD Service Central Office and HRD staff at Regional Offices (Nationwide)

PROJECT HISTORY:

In March 1989, the Philippines Department of Environment and Natural Resources (DENR) requested Australian assistance to bring about a series of institutional reforms, thought necessary following an internal reorganization in 1987.

This initial request was primarily to support human resource development (HRD) initiatives within the forestry sector. In June 1989, The Australian Agency for International Development (AusAid) representatives recommended that the original project concept be broadened to develop the capacity and capability of the HRD service within DENR. A feasibility study/design team was mobilized in 1990 and the Project Design Document (PDD) revised in October 1991. Later that year, the Government of the Philippines (GOP) produced a revised PDD to incorporate many changes which were taking place in the Philippines and to more fully demonstrate the benefits of HRD to DENR.

In September 1993, AusAID selected ACIL Australia Pty Ltd. (ACIL) as their Managing Contractor to implement the project over a four and a half year period. The first six months of the project was allowed for the production of the Project Implementation Document (PID).

A contract between AusAID and ACIL was signed on 23 March 1994 and mobilization to the Philippines commenced on April 2, 1994. PROJECT GOAL: Original Goal:

To strengthen the capacity of the DENR to implement development programs in natural resources by upgrading DENR staff at all levels, and to establish and institutionalize training and development system at the central and Regional offices. New Project Goal:

To strengthen the capacity of the DENR to achieve its mandate by improving its human resource development.

Page 167: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 157

PROJECT PURPOSE:

To enhance the ability of HRDS to deliver appropriate and sustainable human resource development systems and services to DENR; and To develop appropriate support functions that best meet development needs of DENR. PROJECT OBJECTIVE: 5. To develop an appropriate strategy and capacity to meet the human resource

development needs of DENR; 6. To develop human resource development systems for the specified target

groups. 7. To review human resource development procedures and, if appropriate,

recommend changes. 8. To provide relevant staff with support services and development to conduct

sustainable human resource functions. PROJECT COMPONENTS: Organizational Strategy and Structure. This component is to develop an appropriate strategy and capacity to meet the human resource development needs of DENR. System. This component is to design human resource development systems for the specified target groups. Human Resource Management Procedures. This is for the DENR to review those human resource management procedures which have an impact upon HRD and, if appropriate, to recommend changes. Development and Support Services. This component is to provide relevant staff with support services and personal development opportunitites, which will enable them to do their jobs more effectively. In addition the project will provide limited infrastructure support and equipment to both the central and regional offices of DENR. Project Management. This component is concerned with the development and implementation of suitable management and reporting systems. FUNDING AGENCY : Australian Agency for International Development

(AusAID)

Page 168: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 158

PROJECT COST (IN US$ '000) TOTAL COST : 5.010 TOTAL FOREX : 4.241 TOTAL GOP : 769,230 EXCHANGE RATE : 1 US$ = 26 PHP 1 AU$ = 20 PHP TYPE OF FUNDING : Grant PROJECT DURATION : 4 years START DATE : January 1995 END DATE : September 1998 PROJECT.DIRECTOR : Gregorio Texon OFFICE ADDRESS : DENR Central Office, Visayas Ave., Q.C. TELEPHONE NUMBER : 929-66-26, 929-66-26 Loc. 2110 IMPLEMENTING AGENCY: DENR through HRDS PROPONENT AGENCY : DENR TARGET BENEFICIARIES: staff of HRDS (central, bureau & regional offices); the

executive; middle managers; and Regional technical trainers within DENR.

Page 169: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 159

Philippine Forestry Development Project in Ilocos Norte (PFDPIN)

PROJECT CODE : 89-13100 PROJECT TYPE : Plantation Development PROJECT SITE : Vintar, Pasuquin, Burgos, Dumalneg and Bangui,

Ilocos Norte (Luzon) PROJECT OBJECTIVES : To restore the protective forest cover within the upper watersheds of Vintar and Banban Rivers through the establishment of tree plantation on open and public lands and to uplift the socio-economic conditions of farmers/people through the introduction of improved practices for agriculture and forest production. PROJECT DESCRIPTION: The PFDPIN is an eight-year integrated forestry development project implemented by DENR through the financial assistance of ADB in cooperation with the provincial government of Ilocos Norte. PROJECT ACTIVITIES/COMPONENTS : 1. Reforestation of 13,200 hectares of denuded areas; 2. Construction of 100 kms. of main roads and 65 kms. of spur road; 3. Development of 2,780 hectares of agro-forestry areas through controlled

open-grazing, communal tree farms, communal nurseries and two-tire farms; 4. Construction of 26 units building and procurement of equipment./vehicles. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 32,300 TOTAL FOREX : 25,150 TOTAL GOP : 7,150 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 677 PHI PROJECT DURATION : 9 years & 3 months START DATE : March 1984 END DATE : June 1993 PROJECT DIRECTOR/MANAGER : Oscar Suguitan OFFICE ADDRESS : Giron St. Laoag City TELEPHONE NUMBER : 220549 and 220947 IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Upland Farmers

Page 170: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 160

Philippine-Korea Project On The Exploration Of Submarine Placer Mineral

Deposits Off Surigao Del Norte and Agusan Del Norte, Mindanao

PROJECT TYPE : Research and Development PROJECT SITE : Nearshore and Offshore areas of Surigao del Norte

and Agusan del Norte FUNDING AGENCY : Korea International Cooperation Agency (KOICA) PROJECT COST : US$300,000 TYPE OF FUNDING : Grant (Technical Assistance) PROJECT DURATION : 3 years

First Phase : Preliminary Survey (12 months) Second Phase: Regional Survey (12 months) Third Phase : Detailed Survey & Mining Evaluation (12 months)

START DATE : January 1998 END DATE : December 2000

PROJECT DIRECTOR : Horacio C. Ramos ASSISTANT PROJECT

DIRECTOR : Edwin G. Domingo PROJECT MANAGER : Angel A. Bravo PROJECT LEADER : Joel A. Natividad OFFICE ADDRESS : Marine Div. BMGS, North Ave., Diliman, Q.C. TELEPHONE NUMBER : 928-86-59 or 926-09-36 IMPLEMENTING AGENCY: Marine Geological Survey Division

Mines and Geosciences Bureau Department of Environment & Natural Resources

TARGET BENEFICIARIES: Other nearshore/offshore areas in the Philippines with potential submarine placer mineral deposits.

PROJECT DESCRIPTION: The proposed Project, is geared toward the assessment of possible nearshore and offshore submarine placer mineral deposits particularly gold, chromite and other equally important associated minerals including Platinum Group of Elements; and of the geophysical marine environment of the area particularly the offshore characteristics of the extension of the Philippine Fault in these areas. PROJECT OBJECTIVE: The objective of the project is to explore the peripheral seas of Surigao del Norte in order to delineate, characterize and assess potential occurrence of submarine minerals - particularly gold, chromite and other equally important associated mineral deposits of the area as well as to promote the development of the country’s submarine mineral resources.

Page 171: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 161

Philippine Tarstier Conservation Project

PROJECT CODE : 91-26000 PROJECT SITE : Dinagat and Siargao Islands in Surigao del Norte

Province and in Davao del Sur. PROJECT OBJECTIVES : The study aims to determine the distribution, population and habitat requirement of T. syrichta in Dinagat and Siargao Islands in Surigao del Norte and Davao del Sur FUNDING AGENCY : NAGAO TYPE OF FUNDING : Grant PROJECT DURATION : 1 year START DATE : 1991 END DATE : 1992 IMPLEMENTING AGENCY : DENR/PAWB

Page 172: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 162

Pilot Project on Community Based Management of Logged-Over Areas

PROJECT CODE : 89-23101 PROJECT TYPE : T.A. on Resources Management PROJECT SITE : Presentacion, Camarines Sur (R5); Lison Valley,

Pagadian City, Zamboanga del Sur (R9) PROJECT OBJECTIVES : To conserve, develop, manage and protect logged-over areas (LOA) identified for protection and production purposes in support of the national goal of economic growth and providing employment opportunities to the people within and around the upland communities. PROJECT DESCRIPTION: The project was designed to develop and test procedures and processes for the successful implementation of the CFP so that the latter's aims of improving the quality of life of upland farmers through sustainable management of forest resources can be achieved. PROJECT ACTIVITIES/COMPONENTS : 1. Studies (Socio-Economics, Agroforestry, Marketing and Monitoring and Evaluation). 2. Workshops. 3. Management Plan Preparations 4. Community Meetings 5. Conduct of Training Needs Assessment 6. Community Organizing 7. Monitoring 8. Report Preparation 9. On the job training on Agroforesty and Social Conservation FUNDING AGENCY : Sweden-BITS PROJECT COST (IN US$ '000) TOTAL COST : 8,293 TOTAL FOREX : 8,276 TOTAL GOP : 17 EXCHANGE RATE : 27.00 TYPE OF FUNDING : Grant PROJECT DURATION : 4 years START DATE : 1992 END DATE : 1996 PROJECT MANAGER : Wilfredo Obien OFFICE ADDRESS : DENR Training Center, Visayas Avenue, Diliman, Q.C TELEPHONE NUMBER : 97-66-26 loc.2098-99 IMPLEMENTING AGENCY: DENR/JAAKKO Poyry Consulting AB TARGET BENEFICIARIES : Upland marginal farmers

Page 173: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 163

Plantation Establishment of Cashew, Fuelwood Species and Essential Oil

Producing Grass Following an Agroforestry Scheme for Profit and

Conservation

PROJECT TYPE : Research PROJECT SITE : Regions 3, 4 and 6 PROJECT OBJECTIVES :

To demonstrate the technical and economic feasibility of establishing cashew plantation following an Agro-forestry scheme and help conserve the country's natural resources by rehabilitating marginal grassland communities, using cashew, Japanese acacia and other essential-oil grasses for reforestation crops. PROJECT DESCRIPTION:

The Project will be established in 5 sites representing 3 regions. Priority will be given to the different experimental forests of the Department of Environment and Natural Resources, provincial government reserved forest and Alienable and Disposable Lands as classified by the Forest Management Bureau (FMB). The area shall be accessible from existing roads to minimize establishment cost and maintenance. It shall be chosen based on the site adaptability of the species. PROJECT ACTIVITIES/COMPONENTS: Boundary survey and delineation Plantation Establishment spacing propagating cashew culture management plantation maintenance propagating Japanese acacia care and harvest of Japanese acacia propagating lemon grass harvesting Introduction of new technology and concept soil amendment with perlite application of integrated pest management Marketing strategies and scheme Training

Page 174: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 164

FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 6,061 TOTAL FOREX : 5,837 TOTAL GOP : 224 EXCHANGE RATE : 27.00 PROJECT DURATION : 2 years START DATE : 1997 END DATE : 1998 IMPLEMENTING AGENCY: ERDB PROPONENT AGENCY : ERDB

Page 175: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 165

Population-Environment IEC Programme

PROJECT CODE : 89-21000 PROJECT TYPE : Information, Education and Communication PROJECT SITE : all provinces in regions; R3, R6, and R10 PROJECT OBJECTI VES : To contribute to the improvement of the quality of life of forest communities by heightening the awareness of leaders and grassroots communities of the inter-relationships among population, resources and environment. PROJECT DESCRIPTION: The project seeks to mount an IEC (Information, Education, and Communication) integrated strategy to highlight problems of upland population which now constitutes 18% of the total Philippine population of 60 million. PROJECT ACTIVITIES/COMPONENTS: 1. IEC Materials Development and Production Production of 19 Printed Materials Production of 22 Audio-Materials 2. Conduct of 2 National Expert Symposium 3. Conduct of 18 Trainings/Workshops 4. Conduct of 15 Meetings 5. Conduct of baseline survey FUNDING AGENCY : UNFPA PROJECT COST (IN US$ '000) TOTAL COST : 982 TOTAL FOREX : 624 TOTAL GOP : 358 EXCHANGE RATE : 20.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : PHI 89/P05 PROJECT DURATION : 5 years START DATE : January 1990 END DATE : December 1994 PROJECT DIRECTOR/MANAGER : Ricardo Serrano OFFICE ADDRESS : PAO, DENR Central Offiice TELEPHONE NUMBER : 98-66-66/99-99-10 IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Upland Communities/Families as well as

National and Grassroots Leaders

Page 176: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 166

Potential Non-Traditional Forest Products (NTFP) in Muleta-Manupali

Watersheds

PROJECT CODE : 93-07800 PROJECT TYPE : Research PROJECT SITE : Bukidnon PROJECT OBJECTIVES: To determine the potential NTFP in the watershed PROJECT ACTIVITIES/COMPONENTS : Survey and identification of NTFP FUNDING AGENCY : SANREM/USAID PROJECT COST (IN US$ '000) TOTAL COST : 8 TOTAL FOREX : 8 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 9 months START DATE : 1994 END DATE : 1994 PROJECT DIRECTOR/MANAGER : Dr. Honorato Palis OFFICE ADDRESS : ERDB, College, Laguna IMPLEMENTING AGENCY : ERDB, SANREM/USAID TARGET BENEFICIARIES : Watershed/mangrove researchers

Page 177: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 167

Preparation of Industrial Common Treatment Facilities and Waste

Abatement for Individual Enterprises

PROJECT CODE : 94-03800 PROJECT SITE : Metro-Manila PROJECT OBJECTIVES : 1. To establish a pipeline of potential investment projects by individual enterprises to

be financed under the proposed World Bank project through local commercial banks;

2. Identify 5 to 10 cost-effective Common Treatment Facilities (CTF) schemes which

will achieve lower unit costs of waste-water treatment than if undertaken on an individual bases, and subsequently develop 2 to 4 of these schemes to the stage of preliminary engineering and appraisal;

3. To prepare pollution action plans for the individual enterprises and 2 to 4 CTFs,

suitable for permit approval by the DENR. PROJECT DESCRIPTION: The Government of the Philippines (GOP) is concerned that the increasing levels of air and water pollution and environmental degradation in the nation's cities is affecting the health and productivity of the work force, the efficiency of industry, the availabiIity of clean water, and also resulting in a decline in attractiveness of the Philippines as locus for investment. As part of the effort to rectify this situation, the DENR and the DTI, with the assistance of the World Bank, are spearheading an effort to improve the environmental conditions in the Metro-Manila Region (MMR) . Over the past two years and Environmental Sector Study of the Philippines has been prepared for the MMR and preparation work undertaken for an Industrial Efficiency and Pollution Control Project (IEPC). An Environmental Sector Study of the Philippines analyzed policy studies related to Industrial Pollution and a World Bank mission in September 1993 undertook further study work on components for the proposed IEPC project. Detailed work has been undertaken on industries polluting the Pasig River. Other work on industrial pollution outside Metro-Manila is underway with assistance from USAID and GTZ. The DENR and DTI now wish to undertake further preparation work for the IEPC project to prepare for Government endorsement and appraisal by the World Bank.

Page 178: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 168

PROJECT ACTIVITIES/COMPONENTS: The project focuses primarily on industry in Metro-Manila and is expected to include the following:

a. A policy component to support among others; the introduction of a pollution charge for industry, tax and tariff on pollution control equipment, and adjustments to industrial waste discharge standards.

b. An institutional component to strengthen the capabilities of regulatory

agencies and laboratories. c. An investment component to make funds available for pollution abatements

by (i) individual industries, (ii) industrial common collection and treatment facilities (CTF), and (iii) an initial program for control of toxic and hazardous wastes (THW) and

d. A technical assistance component to provide a source of advice to industry,

education and training, and additional work on policy issues. FUNDING AGENCY : Japan TA Grant PROJECT COST (IN US$ '000) TOTAL COST : 320 TOTAL FOREX : 320 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 8 months START DATE : November 1994 END DATE : June 1995 PROJECT DIRECTOR/MANAGER : Elisea Gozun OFFICE ADDRESS : 2nd Floor, DENR Bldg., Visayas Ave., Diliman,

Q.C. TARGET BENEFICIARIES : Industries

Page 179: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 169

Preparation of Regional Resource Management Studies (ENR-SECAL)

PROJECT CODE : 89-16701 PROJECT TYPE : Institutional Development PROJECT SITE : R1, CAR, R2, R9, R10 FUNDING AGENCY : Japanese grant thru WB PROJECT COST (IN US$ '000) TOTAL COST : 1,432 TOTAL FOREX : 1,432 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1991 END DATE : 1992

Page 180: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 170

Preparation for the Samar Island Biodiversity Project

PROJECT TYPE : Research PROJECT SITE : Samar PROJECT OBJECTIVES :

To develop a full project proposal to implement a breakthrough biodiversity conservation project for the island of Samar in the Eastern Visayas region of the Philippines. PROJECT DESCRIPTION:

The Project is to develop a project proposal to implement a breakthrough in biodiversity conservation for the island of Samar and in the Eastern Visayas region of the Philippines. PROJECT ACTIVITIES/COMPONENTS :

1. Creation of Steering Committee and development of detailed timetable and workplan

2. Logistical preparation 3. Information gathering, consultations, meetings 4. Community workshop, participatory research, rural appraisal 5. Baseline data consolidation, project designing, on going consultations 6. Drafting of project brief/critiquing 7. Final brief preparation and submission

FUNDING AGENCY : UNDP-GEF PROJECT COST (IN US$ '000)

TOTAL COST : 350 TOTAL FOREX : 350 TOTAL GOP : 0

EXCHANGE RATE : 35.00 TYPE OF FUNDING : Grant PROJECT DURATION : 10 months

START DATE : Aug. 1997 END DATE : May. 1998

IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR

Page 181: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 171

Preparatory Assistance for the Empowerment of IPs for Sustainable

Management of Ancestral Domains

PROJECT TYPE : Institutional Development PROJECT OBJECTIVES :

The objective of the programme which will be supported by the preparatory assistance is to empower indigenous people to effectively pursue their right to self determination, thereby alleviating poverty among them, and strengthen the capacity of government to provide the needed support for sustainable management of ancestral domains. PROJECT DESCRIPTION:

The preparatory assistance (PA) aims to develop a programme of assistance that will empower the indigenous peoples to pursue their right to self determination and strengthen the capacity of government and NGOs to provide support for sustainable management of ancestral domains. FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000) TOTAL COST : 70 TOTAL FOREX : 70 TOTAL GOP : 0 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : PHI/97/016/A/01/99 START DATE : July 1997 IMPLEMENTING AGENCY: DENR, OMA, ONCC, OSCC, LGUs PROPONENT AGENCY : DENR TARGET BENEFICIARIES: Indigenous Peoples

Page 182: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 172

Program Loan for the Forestry Sector

PROJECT CODE : 89-12701 PROJECT TYPE : Plantation Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: The overall goal of the program loan for the forestry sector is to arrest the ecological imbalances brought about by the rapid denudation of the country's forests. This is through the rehabilitation of the watersheds. Another is the sustainable development of the forest land for the continuous supply of forest goods and services. PROJECT DESCRIPTION: Forestation This component which will establish protection and production forest is accorded the highest priority in the program. To carry on with forestation activities, the DENR taps the private sector, non-government organizations, local government units and other government agencies through contract reforestation. About 85% of DENR's reforestation activities are being contracted out while the rest are being done by the Department. Contract Reforestation as the strategy used in forestation covers four major activities namely: infrastructure establishment, nursery establishment and seedling production, plantation establishment, maintenance and protection. The first, concerning the construction of access roads, bridges, trails, fire towers and other related infrastructures. The second, concerns the production of seedlings and planting materials. The third, site preparation and planting, and the fourth, the care and production of the plantations. There are three types of reforestation contracts. Family, Community and Corporate Contracts. Activity - specific contracts are allowed for any of the activities mentioned above.

Page 183: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 173

Integrated Social Forestry This component addresses the upliftment of socio-economic conditions in the uplands by mobilizing forest-based people resources. Security of tenure is provided through stewardship contracts to families within areas covered by forestation projects. Moreover, employment opportunities are generated by this component particularly in areas where the promise of wage income from forestation projects do not hold or where the land and relevant bio-physical conditions at the kaingin are not adequate to support reasonable living needs. Watershed Rehabilitation The watershed rehabilitation component focuses on the improvement of critical watersheds. Rehabilitation work calls for construction of structural measures and provision of forest cover. These are the following: Ambuklao-Binga Watershed (CAR) Balog-balog Watershed (Region III) Bued River WAtershed (CAR) Sta. Cruz Watershed (Region III) Talavera River Watershed (Region III) Lake Balisansayao Watershed (Reg. VII) Ganano River Watershed (Reg.II) Sablayan Watershed (Region IV) O'Donnel River Watershed (Region III) Curuan Watershed (Region IX) San Fernando Watershed Saug Watershed Marbel Watershed (Reg. 11) Pulangi Watershed (Reg. 10) Banga Watershed (Reg. 11) Timber Stand Improvement The timber stand improvement component focuses on the silvicultural practices to improve the composition of secondary forests and density and improve species composition and density of favored species in secondary forests. The objectives are to refine composition of the economic portion of the stand; concentrate potential increment in trees of good forms through the removal of undesirable species; and to improve growth and yield of the stand at reasonable cost. PROJECT ACTIVITIES/COMPONENTS: 1. Forestation (145,428 has.) 2. Integrated Social Forestry (13,280 has.) 3. Watershed Rehabilitation (26,152 has.) 4. Timber Stand Improvement (1,654 has.)

Page 184: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 174

FUNDING AGENCY : ADB/OECF PROJECT COST (IN US$ '000) TOTAL COST : 240,000 TOTAL FOREX : 240,000 TOTAL GOP : 0 EXCHANGE RATE : 21.50 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 889/890 PHI & PH-C11 PROJECT DURATION : 6 years START DATE : September 1988 END DATE : December 1993 PROJECT DIRECTOR/MANAGER : Dr. Eduardo Principe OFFICE ADDRESS : NPCO, DENR C.O. IMPLEMENTING AGENCY : DENR

Page 185: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 175

Project on Waste Minimization and Pollution Control for Small and Medium

Enterprises (IWEP Phase II)

PROJECT CODE : 94-04100 PROJECT SITE : Nationwide PROJECT OBJECTIVES: To identify and examine the best practicable waste management options in selected industry sectors in the Philippines and only deals with waste exchange as one component of an overall system for industrial waste management. PROJECT DESCRIPTION: The Project is a follow-up activity of the Industrial Waste Exchange Project (IEWP), funded by IDRC of Canada. It is one innovative approach to industrial waste management that was recently launched by the EMB. PROJECT ACTIVITIES/COMPONENTS: 1. Identification of Key Industry Sectors 2. Re-operationalization of the IWEP Information Center 3. Conduct of Seminar-Workshops on Pollution Prevention Planning for SMEs. 4. Preparation of Pollution Prevention Plan FUNDING AGENCY : IDRC TYPE OF FUNDING : Grant START DATE : June 1994 PROJECT DIRECTOR/MANAGER: Clarissa Arida OFFICE ADDRESS : 99-101 Topaz Bldg., Kamias Rd., Q.C. TELEPHONE NUMBER : 924-75-40/0973757011 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB

Page 186: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 176

Quarternary Geological Research Project/ Geoscience for Coastal

Environmental Study in the Philippines (GEOCES)

PROJECT CODE : 94-04300 PROJECT TYPE : Institution Building/Research & Development PROJECT SITE : Lingayen Gulf(preferably along La Union, Damortiz,

Dagupan, Lingayen, and Ragoza; Coastal areas facing Manila Bay(along Bulacan, Pampanga and Bataan); Western Visayas (along Eastern Panay and Western Negros Islands

PROJECT OBJECTIVES:

1. To establish and develop a pool of national geo-scientific experts to promote in-depth, advanced and multi-disciplinary approaches to coastal environmental studies.

2. To pursue and develop an inter-agency mechanism to lead to an integrated

formulation of geohazard and risk zonation of potentially destructive geologic/geomorphic phenomena associated with the coastal environment.

3. To develop and transfer modern sophisticated geo-scientific knowledge and

technology for increased self-reliance and geo-environmentally sound coastal development in the country.

PROJECT DESCRIPTION: The Memorandum of Understanding (MOU) between the MGB, Philippines and the ITC, the Netherlands emphasizes the collaborative effort on environmental geology, applied geomorphology and earth observation survey of the environmentally sensitive areas within the Philippine Mobile Belt. PROJECT ACTIVITIES/COMPONENTS:

1. Literature Research 2. Land Form Mapping and Land Use Evaluation 3. Lithoprofile Investigation 4. Grain Size Analysis

Page 187: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 177

FUNDING AGENCY : Netherlands PROJECT COST (IN US$ '000) TOTAL COST : 2,687 TOTAL FOREX : 2,228 TOTAL GOP : 459 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant PROJECT DURATION : 7 years START DATE : January 1993 END DATE : 1997 PROJECT DIRECTOR/MANAGER : Ric Javelosa OFFICE ADDRESS : Lands Geogology Div., MGSB, North Ave., Q.C. TELEPHONE NUMBER : 99-85-44 IMPLEMENTING AGENCY : MGB-DENR, Int. Inst. for Aerospace & Earth

Science

Page 188: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 178

Rainfed Resources Development Project

PROJECT CODE : 89-13600 PROJECT TYPE : Plantation Development PROJECT SITE : CAR, Region 3,4,5,6,7,8,10,11,12 PROJECT OBJECTIVES: 1. To test and implement appropriate agroforestry farming practices which both

increase agricultural productivity per unit area and improve environmental condition.

2. To develop the capability of the upland farmers to conserve upland resources. PROJECT DESCRIPTION: Cycle II of RRDP is an extension of the original project approved in 1982. The first cycle , completed in December 1986 undertook institutional development, policy analysis and the pilot testing of agro-forestry technologies and management approaches in four upland sites. Under cycle II, The project is tasked to implement agroforestry and contract reforestation activities aimed at controlling soil erosion and reducing surface run-off. At present, 31 projects on agro-forestry, contract reforestation, clonal nurseries and mangrove rehabilitation are being implemented by this project over a total area of 7,410 hectares nationwide. PROJECT ACTIVITIES/COMPONENTS: Agroforestry Development (20 sites.) Development of agroforestry Organize communities/groups Conduct trainings Distribute Seedlings Distribute work animals and livestock Certificate of Stewardship Contract (CSC) issuances Construct graded trails Construct roads Construct multi-purpose buildings and training halls Construct drinking water faucets Contract Reforestation (5 sites ) Rehabilitate 360 has. of mangroves Install 240 artificial reefs Reforest 2,380 has. of unsettled and denuded areas Clonal Nursery, Seedling Production and Species Trial Establish 7 Nurseries Produce 1,087,000 seedlings Institutional Development Conduct Human Resources Development Program

Page 189: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 179

Develop/document technologies Training of Staff Conduct Seminars/worksops Technical Assistance Provide 4,101.5 man-days of consultancy services Production Nurseries, Clonal Seed Orchard and Species Trial (7 sites) Institutional Development Technical Assistance FUNDING AGENCY : USAID PROJECT COST (IN US$ '000) TOTAL COST : 11,051 TOTAL FOREX : 7,312 TOTAL GOP : 3,739 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : 492-T-068 START DATE : 1984 END DATE : 1991 PROJECT DIRECTOR/MANAGER : Eduardo Tan IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Upland Farmers

Page 190: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 180

Regional Office Environment Project

PROJECT TYPE : Training PROJECT SITE : EMB and the regional offices of the DENR PROJECT OBJECTIVES :

To strengthen capacity of the DENR to efficiently and consistently administer the environmental impact assessment legislation of the Philippines. PROJECT DESCRIPTION:

AIDAB's Strengthening Environmental Assessment Project (SEAP) was completed in October 1993. The goal of SEAP was to strengthen the capacity of the Environment Management bureau (EMB) of the Department of Environment and Natural Resources (DENR) to efficiently administer Environmental Impact Assessment (EIA) through the introduction of improved administrative and management procedures". This was largely achieved by staff training, the establishment of a computer data base retrieval and checklisting of procedures which provides accurate information on the EIA review process and the computerization of the MEB's screening guidelines.

On completion of SEAP in October 1993, the Government of the Philippines

(GOP) implementing agency, the EMB, requested AIDAB to consider extending SEAP to the regional offices of the DENR. It was suggested that this extension should be known as the Strengthening Environmental Assessment at Regional Offices Project (ROEP). It was proposed that ROEP should aim to improve the capacity of the regional offices to process EIAs to uniform national standards. This would be in keeping with the devolution of administrative functions in accordance with the Local Government Code. PROJECT ACTIVITIES/COMPONENTS : The components correspond to the major tasks of the project:

1. Establishing nationwide EIA procedures 2. Planning and preparing equipment, administration systems and training

courses 3. Implementing the training and installing the equipment and systems 4. Corporate planning to promote sustainability of systems 5. Managing the project

Page 191: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 181

FUNDING AGENCY : AUSAID PROJECT COST (IN US$ '000)

TOTAL COST : 1,987 TOTAL FOREX : 1,987 TOTAL GOP : 0

TYPE OF FUNDING : Grant PROJECT DURATION : 4 years

START DATE : 1996 END DATE : 1999

IMPLEMENTING AGENCY : DENR

Page 192: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 182

Research on Exploration Techniques for Rare and Precious Mineral

Resources

PROJECT CODE : 87-10400 PROJECT TYPE : Research PROJECT SITE : Baguio, Zambales, Bicol, Cebu, Davao, and Surigao

Mineral Districts PROJECT OBJECTIVES: To further increase the discovery and exploration of the country's precious and rare metallic mineral resources, particularly the gold-silver and platinum bearing deposits PROJECT DESCRIPTION: The project is a joint research and development program on exploration techniques for rare and precious metals being conducted by the Mines and Geo-Sciences Bureau, US Geological Survey and Geological Survey of Japan under the framework of the Institute for Transfer of Industrial Technology (ITIT) Programme organized by the Ministry of International Trade and Industry (MITI) Japan. PROJECT ACTIVITIES/COMPONENTS : The project is envisioned to encompass five (5) major activities: 1. conduct of detailed geological mapping and geochemical sampling; 2. detailed petrological, mineralogical and geochemical analysis of rock, mineral, soil and

water samples;. 3. data processing and interpretation; 4. data synthesis and report writing; 5. field and laboratory training. FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 420 TOTAL FOREX : 420 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : 1987 END DATE : June 1992 IMPLEMENTING AGENCY : Land Geology Division, MGB

Page 193: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 183

RP-Australian Remote Sensing Project

PROJECT CODE : 89-25500 PROJECT TYPE : Research PROJECT SITE : Nationwide PROJECT OBJECTIVES: 1. To improve the availability of economic planning, management and national

productivity improvement information through more extensive application of remote sensing technology.

2. To transfer technologies on remote sensing through the participation of Australian

consultants and supply of appropriate hardware and software to make NAMRIA and PAGASA operational centers for Remote Sensing;

3. To upgrade the existing facilities and capabilities of the country's remote sensing

technologies through the provision of training on softwares and hardwares; 4. To maximize the economic benefits that remote sensing technology applications

can offer to the national recovery program. PROJECT DESCRIPTION: The project which is under the administration of the Department of Science and Technology (DOST) addresses the government's efforts to enhance inter-agency cooperation and regional and international relations in the field of remote sensing technologies as applied to land use planning, natural resources management, climatological and other related environmental assessments. It is desired to provide NAMRIA and PAGASA with remote sensing computer-based facilities in order to undertake on-going research and development programs on image processing software and applications. PROJECT ACTIVITIES/COMPONENTS: 1. Remote Sensing for Natural Resources Management 2. Remote Sensing Training and Manpower Development (Both Operational and

Computer Image Processing) 3. Coastal Zone Applications 4. Remote Sensing Applications in Agriculture 5. Technology for Tropical Sensors and Laser Airborne Depth Sounder System 6. Integrated Management Program 7. Evaluation of Mineral Deposits

Page 194: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 184

FUNDING AGENCY : AIDAB PROJECT COST (IN US$ '000) TOTAL COST : 9,405 TOTAL FOREX : 8,365 TOTAL GOP : 1,040 EXCHANGE RATE : 22.80 TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : February 1990 END DATE : June 1994 PROJECT DIRECTOR/MANAGER : Dir. Virgilio Santos OFFICE ADDRESS : NAMRIA, Fort Bonifacio, Makati IMPLEMENTING AGENCY : NAMRIA TARGET BENEFICIARIES : Government and private development

programs, NAMRIA other agencies involved in Resource Use Planning and Utilization.

Page 195: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 185

RP-EC Cooperation Project for the Development of Marble

PROJECT CODE : 93-00600 PROJECT TYPE : Technical Assistance/Training PROJECT SITE : Zambales, Bulacan, Romblon, Mindoro, Palawan,

Camarines Sur, Camarines Norte, Catanduanes, Panay Island, Cebu, Negros, Siquijor/Bohol, Samar, Leyte, Zamboanga and Davao.

PROJECT OBJECTIVES: The main concern of the project is to provide TA and training. To give the Philippine dimension stone industry the opportunity to increase both value added and foreign exchange earning capability in the medium and long term. PROJECT DESCRIPTION: The Project is a joint undertaking between the Philippines and the European Communities towards the development of the Philippine marble and other dimension stone resources. The Project features the conduct of actual diamond drilling, reserve estimation, technology transfer in quarrying and processing and promotion of the dimension stone products in local and international markets. It also involves the identification of selected areas as pilot projects, which would mean opening up dimension stone quarries therein and disposing the quarry product to local and international markets. PROJECT ACTIVITIES/COMPONENTS: a) Inventory - to develop a systematic inventory and classification of both

economically mineable deposits and quarrying activities; b) Quarrying optimization - to facilitate the transfer of know-how and technology to

optimize quarrying activities; c) Processing Optimization - to facilitate the transfer of technology to optimize

processing activities; d) Marketing Management - training in marketing management to enhance market

positioning and competitiveness; e) International Promotion - promoting the Philippine dimension stone products in the

domestic/regional/international market to strengthen market penetration and to attract foreign investment;

f) Training - training of personnel both in the public and private sectors especially for

developers, contractors, architects, quarry engineers, etc.

Page 196: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 186

FUNDING AGENCY : EC PROJECT COST (IN US$ '000) TOTAL COST : 698 TOTAL FOREX : 698 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : 1993 END DATE : 1995 PROJECT DIRECTOR/MANAGER: Jose Ronan OFFICE ADDRESS : Lands & Geology Div., North Ave., Q.C. TELEPHONE NUMBER : 95-21-83 IMPLEMENTING AGENCY : Technical Working Committee Coordinator by

the Bureau of Exports and Trade Promotion TARGET BENEFICIARIES : MGB staff

Page 197: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 187

RP-France Geodynamics and Metallogenesis at Northern Luzon

PROJECT CODE : 88-00200 PROJECT TYPE : Research PROJECT SITE : Luzon, Central Cordillera, Sierra Madre, Cagayan

Valley PROJECT OBJECTIVES : 1. To determine the geologic structure of Northern Luzon, which includes:

Ilocos-Dagupan stretch, Cordillera, Quezon, Aurora, Rizal, Nueva Ecija and Nueva Vicaya.

2. To determine the mechanism and tectonic events involved in the generation of

specific types of mineralization; 3. To develop conceptual models on the mineralization and tectonics in the region

upon which exploration strategies can be used. PROJECT DESCRIPTION: The project is a collaborative scientific research undertaking between the Mines and Geosciences Bureau and French academic institutions namely the University of Brest and the University of Nice. A major component of the project is the provision of scholarship grants for filipino project participants for the French party, and the provision of logistical support during geological fieldwork in French counterpart geoscientists in the Philippines by MGB. The major activities under this project include field studies incorporating the tectonic, stratigraphic, petrologic, and mineralization aspects; LANDSAT and SPOT imagery interpretation, laboratory analysis of samples; data processing and interpretation, and report writing. The Project also includes a training component wherein Filipino technical personnel will undertake courses (leading to Phd and masteral degrees) in tectonics and petrogenesis, geochemistry and modern laboratory methods of rock and mineral analysis in academic institutions in France. Together with French geoscientists from the same academic institutions in France, these Filipino trainees will be working on Philippine data. FUNDING AGENCY : France TYPE OF FUNDING : Grant PROJECT DURATION : 5 years START DATE : 1987 END DATE : 1994 IMPLEMENTING AGENCY : LMB (Geology Div.), MGSB,RI ,II, and IV

Page 198: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 188

RP-German Cebu Upland Project

PROJECT TYPE : Upland Development & Poverty Alleviation PROJECT SITE : Municipalities of Alcoy, Boljoon and Oslob, Cebu (R7) PROJECT OBJECTIVES: The project aims to improve the standard of living of the upland population and to rehabilitate the ecological condition of the area. PROJECT DESCRIPTION: The Project is an integrated rural development project implemented by the Department of Environment and Natural Resources in cooperation with the Department of Agriculture and the provincial government of Cebu, it receives grant assistance from the Federal Republic of Germany (FRG) through the German Agency for Technical Cooperation (GTZ). Distinct from other projects, CUP use the participatory approach in planning and implementation of the project. The project commenced last July 3, 1986 (3 years orientation phase) followed by implementation phase from August 1989 to July 1993, then the second implementation phase designed for the period August 1993 to July 1996. And ongoing is the final extension phase from August 1996 to July 1998 which is geared toward to the LGU capacitation and shifting of project responsibilities to the identified partners. PROJECT ACTIVITIES/COMPONENTS: Community/Group Organizing Watershed Rehabilitation Fruit and forest trees plantation Seedling Production Nursery Development Target Group Development Information Dissemination Agricultural Production/Development and Livestock Dispersal Community facilities and infrastructure development LGU Capacitation Related Activities

Page 199: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 189

FUNDING AGENCY : FRG though GTZ PROJECT COST (IN US$ '000) TOTAL COST : 5,887 TOTAL FOREX : 4,015 TOTAL GOP : 1,871 EXCHANGE RATE : $1=P24.00/1 DM=P15.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : 93.2535.8.01.100 PROJECT DURATION : 12 years START DATE : July , 1986 END DATE : August, 1998 July 1986 - July 1989 : Orientation Phase August 1989 - July 1993 : 1st Implementation Phase August 1993 - July 1996 : 2nd Implementation Phase August 1996 - July 1998 : Final extension phase or phasing out period August 1998 - Dec. 1998 : Time extension PROJECT MANAGER : Crisologo Tagupa OFFICE ADDRESS : 2nd Flr. BAEX Bldg., Cebu Capitol, Cebu City TELEPHONE NUMBER : 255-5149, 253-1536, FAX 2549882 IMPLEMENTING AGENCY: DENR PROPONENT AGENCY : DENR TARGET BENEFICIARIES: Upland Farmers

Page 200: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 190

RP-German Dipterocarp Management

PROJECT CODE : 89-12900 PROJECT TYPE : Institutional Development PROJECT SITE : Nagtipunan, Quirino and Carmen, Surigao del Sur PROJECT OBJECTIVES: Introduction and further development of socially-acceptable sustained yield management systems for the dipterocarp forest. FUNDING AGENCY : FRG/GTZ PROJECT COST (IN US$ '000) TOTAL COST : 1,893 TOTAL FOREX : 1,075 TOTAL GOP : 819 EXCHANGE RATE : 21.50 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : PN 88.2047.4 PROJECT DURATION : 3 years START DATE : November 1988 END DATE : November 1991 PROJECT DIRECTOR/MANAGER : Antonio Manila IMPLEMENTING AGENCY : DENR-FMB

Page 201: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 191

RP-German Forest Resources Inventory

PROJECT CODE : 88-00400 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: To collect, analyze, and provide adequate and up-to-date data for policy formulation, decision making and preparation of workable plans and programs in the development and conservation of forest lands. FUNDING AGENCY : FRG/GTZ PROJECT COST (IN US$ '000) TOTAL COST : 2,525 TOTAL FOREX : 1,129 TOTAL GOP : 1,396 EXCHANGE RATE : 11.75 TYPE OF FUNDING : Grant START DATE : 1984 END DATE : 1988 PROJECT DIRECTOR/MANAGER : Conrado Gulmatico

Page 202: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 192

RP-German Industrial Pollution Control - Cebu Project

PROJECT TYPE : Pollution Control PROJECT SITE : Cebu PROJECT OBJECTIVES: To promote industrial pollution control in Metro Cebu with a view of creating the necessary conditions for the environmentally-friendly disposal of hazardous wastes from industries and trade in Cebu through the institution of mechanisms for the proper and adequate disposal of industrial wastes.

PROJECT DESCRIPTION:

The project will have a run-time of seven (7) years. It will be implemented by the Environmental Management and Protected Areas Services (EMPAS) of the Department of Environment and Natural Resources Region 7, Cebu. The project has two (2) phases. The first phase (1991-1993) involves the laying out of the baseline information for the proper management and handling of toxic and hazardous substances and the general foundation for the design and operation of treatment plant for toxic and hazardous wastes. The second phase (1994-1995) will involve the design and establishment of the treatment plant. PROJECT ACTIVITIES/COMPONENTS: Phase I (1991-1993)

1. Training of DENR staff on proper management and control of industrial pollution. 2. Development of environmental profile of Metro Cebu. 3. Establishment of an upgraded environmental laboratory at the University of San

Carlos. 4. Establishment of an advisory service within the Cebu Chamber of Commerce and

Industry. 5. Information dissemination on the proper management of toxic and hazardous

wastes.

Phase II (1994-1998) 1. Training on Toxic/Hazardous Waste (THW) Management of Concerned GOs in

Metro Cebu. 2. Demonstration of "Low Waste Technologies" in a model factory. 3. Upgrading of Advisory Service to industry in Cebu Chamber of Commerce Industry

(CCCI). 4. Establishment and operation of a common treatment facility for THW from Metal

Finishing Industry. 5. Creation of an Environmental Quality Council for Metro Cebu. 6. Upgrading of the University of San Carlos laboratory and technical skills of

analysts. 7. Continuos information dissemination on the proper management of toxic and

hazardous wastes.

Page 203: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 193

FUNDING AGENCY : FRG/GTZ-BMZ PROJECT COST (IN US$ '000) TOTAL COST : 4,500 TOTAL FOREX : 3,792 TOTAL GOP : 708 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant PROJECT DURATION : 7 years START DATE : June 1991 to Dec. 1993 (PHASE I) END DATE : Jan. 1994 to June 1998 (PHASE II) July 1998 to June 1999 (final extension) PROJECT MANAGER : Ms. Maria Victoria Ricaña OFFICE ADDRESS : DENR, Mandaue City, Cebu TELEPHONE NUMBER : 032-3460-624 IMPLEMENTING AGENCY : DENR, EMPAS, Region 7 PROPONENT AGENCY : DENR, EMPAS, Region 7 TARGET BENEFICIARIES : Small and medium scale industries in Metro-Cebu,

and DENR staff.

Page 204: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 194

RP-Japan Crocodile Farming Institute Project

PROJECT CODE : 89-10600 PROJECT TYPE : Research PROJECT SITE : Irawan, Puerto Princesa City, Palawan PROJECT OBJECTIVES: 1. To promote the preservation of the two (2) endangered species of crocodile in the

Philippines, (Crocodylus mindorensis and C. porosus) through research, farming and breeding in captivity;

2. To promote the socio-economic well-being of the rural communities through the

introduction and development of crocodile farming. PROJECT DESCRIPTION: The Project is a joint undertaking of the DENR and JICA concerned in the sourcing/acquisition of crocodile breeders; conduct of researches on breeding, farming, ecology, parasitology, nutrition and other related fields of study necessary in the generation of a suitable crocodile farming technology. PROJECT ACTIVITIES/COMPONENTS : 1. Population Dynamics and Ecology of Wild Crocodiles 1.1. Taxonomy of Crocodiles in the Philippines Based on Morphological

Characteristics (1000 crocodiles) 1.2. Ecological Study of Selected Crocodile Habitat 1.3. Meteorological Observation (1128 observations) 1.4 Distribution and Abundance of Crocodiles in the Philippines (5 areas) 2. Conservation of Wild Crocodiles 2.1. Environmental Assessment of Suitable Crocodile Sanctuaries (4

sanctuaries) 2.2 Sanctuaries Proposed(1) 3. Captive Breeding and Rearing 3.1 Crocodile Handling (Crocodylus mindorensis handled stock (485 heads) 3.2 Study the Use of Succinylcholine in the Restraint of Crocodile (95

crocodiles) 3.3 Rearing studies (6) 3.4 Feed Digestibility Determination (240 tests) 3.5 Identification of Tract Encymes (55 samples) 3.6 Water Management in Tanks and Pens (27 )

Page 205: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 195

3.7 Values of Major Components of Crocodile Blood Serum (500 sera with 2,500 tests)

3.8 Study the Normal Tissue Structure of Crocodiles (55 specimens) 3.9 Study the Pathological Tissue of Crocodiles (55 specimens) 3.10 Toxicological Determination in Crocodile Derivatives (300 test) 3.11 Study of Crocodile Blood Cells (1300 crocodiles) 3.12 Survey Potential Blood Parasites of Crocodile 3.13 Analysis of Infertile Eggs (300 samples with 1500 tests) 3.14 Identification of Potential Parasites in the Gastrointestinal Tract of

Crocodiles (20 parasites) 3.15 Survey of the Microbial Flora in the Buccal Cavity, Cloaca and feces (330

samples) 3.16 Development of Health Care Program for Crocodiles in Captivity (50 cases)

4. Promotion of Crocodile Farming and Ranching Management 4.1 Successful Reproduction of Crocodylus Mindorensis (21 bred) 4.1a Eggs produced (570) 4.1b Eggs fertilized (535) 4.2 Successful Reproduction of Crocodylus porosus (40 bred) 4.2a Eggs produced (1830) 4.2b Eggs fertilized (1575) 4.3 Management of Breeding Pens (6 pens) 4.4 Maintenance/Feeding of C. mindorensis Breeder Stock (10) 4.5 Maintenance/Feeding of C. porosus Breeder Stock (26) 4.6 Artificial Incubation (18 studies) 4.7 CFI Bred C. mindorensis (190 heads) 4.8 CFI Bred C. porosus (750 heads) 4.9 Feed Procurement (60 tons) 4.10 Feed Analysis (55 feed samples with 825 tests)

4.11 Varying levels of Vit. E in C. mindorensis and C. porosus (150 samples) 5. Dissemination of Crocodile Farming Technology Establishment and Operation of a Demonstration Farm at CFI Establishment of Pilot Farms Control scheme for c. porosus farms Training of Farmers Dispersal of Captive-Bred Hatchlings 6. Public Information and Training Information Campaign (200 campaigns) Conduct Seminar for promoting crocodile farming (22 seminars) Production of Informative Materials (50,000) Production and Broadcast of Audio-Visual materials (100) FUNDING AGENCY : JICA PROJECT COST (IN US$ '000)

Page 206: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 196

TOTAL COST : 4,292 TOTAL FOREX : 2,662 TOTAL GOP : 1,630 EXCHANGE RATE : 21.50 TYPE OF FUNDING : Grant PROJECT DURATION : 7 years START DATE : August 1987 END DATE : August 1994 PROJECT DIRECTOR/MANAGER: Gerardo Ortega OFFICE ADDRESS : Irawan, Puerto Princesa, Palawan IMPLEMENTING AGENCY : DENR TARGET BENEFICIARIES : Rural Communities within Palawan

Page 207: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 197

RP-Japan Forestry Development Project and Watershed Management

PROJECT CODE : 89-13200 PROJECT TYPE : Plantation Development PROJECT SITE : Carranglan, Nueva Ecija PROJECT OBJECTIVES : To develop and improve the techniques on afforestation and forest conservation, to dissiminate those techniques by means of technical training and to develop a system of active participation of the rural community in afforestation and thus contribute to the development of the integrated forest management system and rehabilitation of the Pantabangan Watershed. PROJECT DESCRIPTION: The Project is undertaking the following activities, among others: afforestation of 2,596 hectares of plantations; protection of approximately 7,500 hectares of plantations; research activities geared towards the development of techniques in afforestation and social forestry and establishment of soil conservation measures/structures. PROJECT ACTIVITIES/COMPONENTS : 1. Seedling production (5,930,000 seedlings) 2. Plantation establishment (896 has.) 3. Replanting (948 has.) 4. Forest Protection (8100 has.) 5. Agroforestry (275 has) 6. Hillside works (2.2 has) 7. Streamworks (1,200 cu. m.) 8. Road construction (18.2 kms.) 9. Road maintained (540 kms.)

Page 208: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 198

FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 9,442 TOTAL FOREX : 4,747 TOTAL GOP : 4,695 TYPE OF FUNDING : Grant PROJECT DURATION : 5 years and 5 months START DATE : July 1987 END DATE : December 1992 PROJECT DIRECTOR/MANAGER : Maximo Soriano Jr. IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : JICA TARGET BENEFICIARIES : Communities within and around the

Pantabangan and Carranglan Watershed

Page 209: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 199

RP-Japan Technical Cooperation Project

PROJECT CODE : 87-10500 PROJECT TYPE : Plantation Development PROJECT SITE : Pantabangan watershed PROJECT OBJECTIVES : To reforest the critical Pantabangan Watershed to lengthen the life span of the multimillion peso Pantabangan Dam in Nueva Ecija and provide Technical support through the establishment of the Afforestation Technical Cooperation Center and the Training Center for Forest Conservation. FUNDING AGENCY : JICA PROJECT COST (IN US$ '000) TOTAL COST : 9,232 TOTAL FOREX : 2,904 TOTAL GOP : 6,328 TYPE OF FUNDING : Grant PROJECT DURATION : 11 years START DATE : June 1976 END DATE : July 1987

Page 210: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 200

RP-NZ Bukidnon Industrial Plantation Project (Phases I & II)

PROJECT TYPE : Plantation Development PROJECT SITE : Malaybalay, Malitbog, Impasug-ong, Manolo Fortich,

Bukidnon PROJECT OBJECTIVES: To operate as a commercially viable enterprise in the business of plantation forestry through the establishment of 25,000 hectares of sustainable forest plantation in Bukidnon that will provide an alternative wood resource to the rapidly depleting indigenous timber supply thereby helping remove exploitation pressures from the remaining natural forests. PROJECT DESCRIPTION: One of the most serious problems facing the country is the rapid depletion of forest rescues and the consequent deterioration of the environment. Previous efforts have not been sufficient to reforest and rehabilitate denuded areas and as a result, extensive areas of forestlands have turned into barren and unproductive grasslands. The project is jointly implemented with New Zealand to help address the issues on reforestation and development of alternative wood resource. It is a pioneering effort of the Government on establishment of industrial plantations while rehabilitating severely denuded lands. PROJECT ACTIVITIES/COMPONENTS: a. Establishment and management and use of approximately 25,000 has. of commercial

forests. b. Management and utilization and development of Malaybalay Refo Project. c. Encouragement of local participation. d. Provision of extension services to establish Tree Farmer Woodlot. e. Development of commercial forests on other land areas in Bukidnon. f. Upon successful privatization of the corporation, a Trust Fund will be established

which will be used to replicate the projects. g. Implementation of training programme.

Page 211: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 201

FUNDING AGENCY : New Zealand PROJECT COST (IN US$ ‘000) TOTAL COST : 18,613 TOTAL FOREX : 5,839 TOTAL GOP : 12,773 EXCHANGE RATE : 27.40 TYPE OF FUNDING : Grant PROJECT DURATION : Phase I : February 1989 - February 1993 Phase II : March 1993 - December 1996 Extension Phase : January 1997 - December 1998 Transition : January 1999-December 1999 CONTACT PERSON : Engr. Roberto David, OIC President, BFI OFFICE ADDRESS : BIPP Compound, Malaybalay, Bukidnon TELEPHONE NUMBER : 221-2115 / 221-2175 IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR TARGET BENEFICIARIES : Upland farmers

Page 212: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 202

RP-US Non Government Environmental Organizational Linkages

PROJECT CODE : 89-14400 PROJECT SITE : Nationwide PROJECT OBJECTIVES : 1. To bring about increased activity by NGO's at all levels including policy formulation,

project planning and implementation, community organizations in the uplands, monitoring and evaluation.

2. Strengthen linkages with US-based NGO's that can offer building capability and

increase participation in environmental management program. 3. Establish oversee linkages that can improve access to financial and technical

resources that Philippine NGO's need to carry out their program. PROJECT DESCRIPTION: The Technical Assistance would fund a major environmental conference among Philippine and US NGO's working in the environmental sector. The conference would legitimize the role of NGO's in the ENR sector. An interchange of experience and sharing of problems could strengthen NGO capability (linkages, clearer understanding of issues and developing contracts with potential new source of financial and technical support). A series of in-country small-scale NGO workshops would take place, along with cross-visits to NGO implemented projects. Two direct benefits are envisioned: (1) the chance to share hands on experience and (2) oppurtunity to explore the possibilities of NGO joint venture in project implementation. Lastly, in broader understanding of environment and natural resources problem and challenges, sharing lessons learned in various situation. FUNDING AGENCY : USAID PROJECT COST (IN US$ '000) TOTAL COST : 432 TOTAL FOREX : 432 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 1 year START DATE : 1990 END DATE : 1991 IMPLEMENTING AGENCY : DENR

Page 213: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 203

Safety and Control of Toxic Chemical and Hazardous Wastes

PROJECT CODE : 91-22600 PROJECT TYPE : Environmental Protection PROJECT SITE : Nationwide PROJECT OBJECTIVES: To enhance national capabilities for controlling toxic chemicals and hazardous wastes and providing protection against associated environmental health hazards. Efforts will be directed towards strengthening the legal and technical capabilities of the responsible institutions; developing mitigative measures to deal with specific problems; and manpower training and development. PROJECT ACTIVITIES/COMPONENTS : Assessment of the country-level situation with regard to source/problem identification, monitoring, inspection and enforcement. FUNDING AGENCY : Korea,Sing.,China,Malay.Phils. PROJECT COST (IN US$ '000) TOTAL COST : 612 TOTAL FOREX : 612 TOTAL GOP : 0 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : RAS/89/063 START DATE : 1991 END DATE : 1993 PROJECT DIRECTOR/MANAGER: Angelita Brabante IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB TARGET BENEFICIARIES : LGUs, NGOs, Other government agencies

Page 214: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 204

Seagrass Habitat Restoration Project

PROJECT CODE : 89-13400 PROJECT TYPE : Environmental Protection PROJECT SITE : Talim Bay (Lian, Batangas), Batangas Bay

(Batangas City) PROJECT OBJECTIVES: To restore Seagrass Habitat as a coastal rehabilitation/enhancement measure, and to use seagrass as a means to lessen pollution & erosion at degraded silts of the Philippines. PROJECT DESCRIPTION: Within the framework of the Coastal Zone Management Program, the Seagrass Transplantation Project was initiated in 1987 with the aim to try seagrass restoration and conservation as a tool for coastal rehabilitation and enhancement. The current stage of project implementation represents the continuous effort of the Bureau to generate coastal rehabilitation measures for potential country-wide applications. PROJECT ACTIVITIES/COMPONENTS: 1. Conduct seagrass planting during the wet and dry season on the different planting

sites. 2. Conduct monitoring for both wet and dry season seagrass transplant on the

different test plots. 3. Conduct surveying for the possible/alternative test sites FUNDING AGENCY : IDRC-CANADA PROJECT COST (IN US$ '000) TOTAL COST : 154 TOTAL FOREX : 66 TOTAL GOP : 88 EXCHANGE RATE : 21.50 TYPE OF FUNDING : Grant PROJECT DURATION : 3 years 1 year exten START DATE : 1987 END DATE : 1990 PROJECT MANAGER : Renato Cruz TARGET BENEFICIARIES : Coastal Communities and fisherman

Page 215: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 205

SEAMEO-France: Methodology and Training and Monitoring of

Deforestation Using Satellites

PROJECT CODE : 91-24400 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: 1. To provide rapid and accurate techniques of evaluation the current state of

deforestation in the region thru: a) NOAA Satellite data for small scale information over large areas; and b) Detailed operational info at medium to large scales through spot satellite.

2. To transfer to the SEAMEO countries the know how required to carry out surveys

on the state of deforestation at an operational level thru the formation of national operators and users (planners, scientist, etc.)

PROJECT DESCRIPTION: The project is for four member countries namely; Brunei Darussalam, Indonesia, Malaysia and the Philippines. The methodology has been defined in the preliminary study in Sumatra, Indonesia. The training which will be conducted consists of two (2) courses which complement each other. A course will be done in Asian Institute of Technology (AIT) Bangkok, Thailand and the other will be in Biotrop, Bogor, Indonesia. The project's main activities are training and carrying out a pilot project specific to each participating country. As far as training is concerned, each training participant has to undertake three training courses. After completing the first two (2) they have to return back to their country and apply transfer the technology they acquired. The technology transfer involve but not limited to the application of remote sensing in monitoring deforestation or land use cover changed through the use of SPOT satellite imageries, i.e. visual and digital interpretation. FUNDING AGENCY : France PROJECT COST (IN US$ '000) TOTAL COST : 630 TOTAL FOREX : 630 TOTAL GOP : 0 EXCHANGE RATE : 22.71 TYPE OF FUNDING : Grant PROJECT DURATION : 3 years and 4 months START DATE : February 1989 END DATE : October 1992

Page 216: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 206

Second Palawan Integrated Area Development Project Survey and Land

Titling

PROJECT TYPE : Institutional Development PROJECT SITE : Mainland and island municipalities of Northern

Palawan PROJECT OBJECTIVES:

1. To improve land tenure through upgraded and continuing land surveys; 2. To assist in the development of Palawan Province through intensified and

accelerated issuance of land patents thereby providing landowners with an opportunity to make productive use of their respective lands and consequently uplift their standard of living;

3. To establish a systematic, organized and modern land data-bank PROJECT DESCRIPTION: The project is envisioned to discourage or minimize encroachment on the remaining forested areas and to facilitate the issuance of land titles under the government's Agrarian Reform Program. Cadastral surveys covering about 18,600 has. and Isolated Surveys of 54,000 has. will be undertaken in the island municipality of Busuanga and mainland Palawan, respectively. Also included in the surveys are those areas which have not been completed during the implementation of PIADP-I. A total of about 20,000 patents award, contracts, leases and proclamation is envisioned to be issued. PROJECT ACTIVITIES/COMPONENTS: A. Land Surveys

Isolated Survey Research of Technical Data (421 lots) Control Station Establishment (16,391 lots) Survey of lots (10,000) Preparation of survey returns (20,000 lots) Submission of survey returns (20,000 lots) Verification and approval (20,000 lots)

Cadastral Survey (3,345 lots) B. Land Titling

Acceptance of Public Land Applications (20,000 PLA)

Records Management (20,000 PLA)

Prep./Research/Verification of Technical Description Patents (20,000 PLA)

Issuance of Patents (20,000 PLA) C. Land Resource Inventory System (34,000)

Page 217: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 207

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 2,455 TOTAL FOREX : 1,338 TOTAL GOP : 1,117 EXCHANGE RATE : 25.90 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 1033/1034 PHI PROJECT DURATION : 7 years START DATE : January 25, 1991 END DATE : June 30, 1999 PROJECT MANAGER : Raymundo Crisostomo OFFICE ADDRESS : Peneyera Road, San Pedro, Puerto Princesa,

Palawan TELEPHONE NUMBER : (048) 433-73-21 IMPLEMENTING AGENCY : DENR, LGU PROPONENT AGENCY : DENR TARGET BENEFICIARIES : 1,364 families/upland dwellers of Palawan

Page 218: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 208

SSC Topo Mapping

PROJECT CODE : 88-00300 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: To produce Topo base maps with a scale of 1:50,000 (Cebu, Siquijor, Bohol) from spot satellite date and technology to provide basic materials for CARP. PROJECT DESCRIPTION: The Project is a coopeartive undertaking between the Government of the Philippines and the Government of Sweden concerned with the use of SPOT satellite data for topographic mapping project. PROJECT ACTIVITIES/COMPONENTS: 1. Ground truthing 2. Production of Orthophoto maps 3. Trainings FUNDING AGENCY : Sweden-BITS PROJECT COST (IN US$ '000) TOTAL COST : 982 TOTAL FOREX : 973 TOTAL GOP : 9 TYPE OF FUNDING : Grant PROJECT DURATION : 8 months START DATE : August 1988 END DATE : May 1989 PROJECT DIRECTOR/MANAGER: Dr. Galo Isada OFFICE ADDRESS : NAMRIA, Fort Bonifacio IMPLEMENTING AGENCY : NAMRIA TARGET BENEFICIARIES : NAMRIA and other government agencies

including private entities.

Page 219: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 209

Strengthening Environmental Impact Assessment Project

PROJECT CODE : 91-03700 PROJECT TYPE : Institutional Strengthening PROJECT SITE : Nationwide PROJECT OBJECTIVES: To strengthen the environmental assessment through improved administrative and management procedures, introduction of equipment to assist database retrieval and checklisting of procedures, and training of staff at Manila and regional level. PROJECT DESCRIPTION: The Project has an objective of strengthening environmental assessment through improved administrative and management procedures, introduction of equipment to assist data base retrieval and checklisting of procedures, and training of staff at Manila and regional level. It is expected to cost approximately A$1,099,000 of which A$772,000 would be funded by Australia with inputs from the Government of the Philippines being on-going costs for environmental assessment activities. The project is planned as a two-year intervention. PROJECT ACTIVITIES/COMPONENTS: 1. Strengthening EIA Procedures 2. Database/Decision Making 3. Staff Training FUNDING AGENCY : AIDAB PROJECT COST (IN US$ '000) TOTAL COST : 968 TOTAL FOREX : 968 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 2 years START DATE : 1992 END DATE : 1993 PROJECT DIRECTOR/MANAGER : Reynaldo Alcances OFFICE ADDRESS : EMB TELEPHONE NUMBER : 97-32-54 IMPLEMENTING AGENCY : EMB/Regional Offices PROPONENT AGENCY : DENR-EMB TARGET BENEFICIARIES : DENR-EMB, Regional Offices

Page 220: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 210

Study of the Leachate Pollution from Open Dumping Sites in Metro Manila

PROJECT CODE : 89-23200 PROJECT TYPE : Environmental Protection PROJECT SITE : NCR,R04 PROJECT OBJECTIVES: 1. To study and monitor the effects on ground and surface waters of leachate from

solid waste disposal sites in different locations in Metro-Manila 2. To provide solutions; and 3. To formulate guidelines and strategies regarding leachate control to be adapted in

the planning and management of waste disposal sites. PROJECT DESCRIPTION: The project consists of a pre-study and a main study. Activities in the pre-study include data collection and the evaluation of, among others, the hydrogeological conditions, water chemistry in existing wells, and the methods of dumping and waste disposal. Provision of expert advice is also a component of the pre-study. The main study would involve the design of structures and schemes to upgrade the dumpsites and to collect and treat the leachate emanating from the dumpsites. FUNDING AGENCY : Sweden-BITS PROJECT COST (IN US$ '000) TOTAL COST : 91 TOTAL FOREX : 91 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 3 months START DATE : April 1990 END DATE : July 1990 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB TARGET BENEFICIARIES : Residents in the impact areas of the

dumpsites.

Page 221: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 211

Study on the Philippine Fault and Metallogenesis

PROJECT CODE : 86-00100 PROJECT TYPE : Research PROJECT SITE : R4,Bondoc Peninsula, R5,Masbate (incl. Ticao and

Burias), R8,Samar,Leyte (incl. Biliran and Panaon), and R10, North. Mindanao

PROJECT OBJECTIVES: The cooperation between MGB and UPMC for its objectives, the joint and coordinated implementation of research programs as well as the corresponding exchanges related to the descipline concerned. PROJECT ACTIVITIES/COMPONENTS: 1. Remote sensing 2. Regional Geologic Mapping 3. Brittle Deformation Studies 4. Ground Deformation Studies FUNDING AGENCY : France PROJECT COST (IN US$ '000) TOTAL COST : 568 TOTAL FOREX : 470 TOTAL GOP : 98 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Grant PROJECT DURATION : 6 years START DATE : 1987 END DATE : 1994 IMPLEMENTING AGENCY : MGSB, Universite Pier

Page 222: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 212

TA for the Evaluation on Environmental Standards for Selected Industry

Subsector

PROJECT TYPE : Research PROJECT SITE : Nationwide PROJECT OBJECTIVES :

The main objective of the Technical Assistance is to assist the Environmental Management Bureau in the implementation of sound environmental management programs through the development of rational and enforceable environmental standards and regulations for industries in consonance with the Government's policies and strategies for sustainable development. PROJECT DESCRIPTION:

The TA will (i) review the rationale and enforcement of the existing environmental quality, emission, and effluent standard; (ii) using three major industry subsectors power, cement and food processing, determine the appropriateness of the existing environmental standards in terms of their enforcement and the capability of the industries to meet the standards; (iii) examine economic and financial incentives and disincentives to improve compliance with EMB's standards; (iv) review state of-the-art and environmentally sound technologies and to phase out energy-inefficient and high waste-generating technologies; (vi) develop effluent and emission standards for the three industry subsectors studied; (vii) examine the existing management of the database and the procedures for permits, licensing, and monitoring used by DENR and EMB; and recommend procedures to streamline and improve them; and (viii) evaluate the potential involvement of the private sector and environmental NGOs in the various aspects of environmental management, specifically in sampling, laboratory analysis, and monitoring of violators. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000)

TOTAL COST : 540 TOTAL FOREX : 296 TOTAL GOP : 244

TYPE OF FUNDING : Grant PROJECT DURATION : START DATE : 1998 END DATE : 1999 IMPLEMENTING AGENCY : EMB-DENR PROPONENT AGENCY : EMB, DENR

Page 223: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 213

TA for Metro Manila Air Quality Improvement Sector Development Program

PROJECT SITE : Metro Manila PROJECT OBJECTIVES: To develop air emission policies and enhance public awareness to support the abatement of air pollution. PROJECT DESCRIPTION: A Technical assistance grant in the amount of $950,000 will provide to undertake Air Emission Policy Studies and strengthen DENR's capability and capacity to address a range of air emission policies. PROJECT ACTIVITIES/COMPONENTS: FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 950 TOTAL FOREX : 0 TOTAL GOP : 0 TYPE OF FUNDING : Grant IMPLEMENTING AGENCY : DENR PROPONENT AGENCY : DENR

Page 224: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 214

TA on Industrial Tree Plantation

PROJECT CODE : 89-29400 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: To assist the government in formulating a comprehensive scheme for the promotion of industrial tree plantations in the private sector. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 221 TOTAL FOREX : 206 TOTAL GOP : 15 TYPE OF FUNDING : Grant START DATE : 1989

Page 225: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 215

TA on Rattan Plantation Development

PROJECT CODE : 89-29500 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: To help the government in formulating a rattan plantation development program focusing on increasing output of high quality rattan and involvement of upland communities. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 364 TOTAL FOREX : 364 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1989

Page 226: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 216

TA on the Rationalization of the Wood-Based Industries

PROJECT CODE : 89-29800 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: To assist the government in formulating a program for rationalization and modernization of its wood-based industries PROJECT DESCRIPTION: PROJECT ACTIVITIES/COMPONENTS: FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 392 TOTAL FOREX : 392 TOTAL GOP : 0 TYPE OF FUNDING : Grant START DATE : 1989

Page 227: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 217

TA on Waste Management Plan for Cebu

PROJECT TYPE : Solid Waste Management PROJECT SITE : Metro Cebu (Cebu City, Mandaue, and Lapu-Lapu) PROJECT OBJECTIVES:

The Project will have as an objective the improvement of operational aspects in the field of solid waste collection in Cebu City and strengthening of the know-how of EMB employees in the field of solid waste management resulting in the improved living conditions; reduction of the risks to public health; improved efficiency; generation of additional income and savings. PROJECT DESCRIPTION:

The Project will prepare the Masterplan for the operational improvement of the waste collection system in Cebu City. FUNDING AGENCY : Netherlands PROJECT COST (IN US$ '000)

TOTAL COST : 607 TOTAL FOREX : 607 TOTAL GOP : 0

EXCHANGE RATE : 27.00 TYPE OF FUNDING : Grant PROJECT DURATION : 20 months

START DATE : 1998 END DATE : 1999

IMPLEMENTING AGENCY : EMB, LGUs PROPONENT AGENCY : EMB

Page 228: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 218

Third Davao Del Norte Irrigation Project Soil Conservation and Watershed

Management Component

PROJECT CODE : 83-00100 PROJECT TYPE : Plantation Development PROJECT SITE : Kapalong, Davao del Norte PROJECT OBJECTIVES: 1. To reforest severely eroded areas lying in the forest brushlands and openlands in the

Libuganon Watershed; 2. To stabilize occupied and cultivated/kaingined forest lands through the practice of

agroforestry; 3. To intensify forest protection activities against destructive activities such as illegal

logging, kaingin-making and forest fire in order to minimize and avert forest destruction;

4. To educate and inform Project participants of the importance of forest resources and their proper conservation through seminar/trainings, publication and distribution of pamphlets through mass media and other forestry extension services; and

5. To conduct forest researches as basis for determining appropriate conservation and development approaches, methods and schemes.

PROJECT DESCRIPTION: A. Reforestation The project aims to reforest 600 hectares of erosion-prone areas in the open and denuded forest lands of the Libuganon Watershed. To attain this objective, three (3) nurseries are presently being maintained. Various forest tree species currently propagated in these nurseries are Acacia auriculaeformis, Swietenia macrophylla, Acacia Mangium, Gmelina arborea, rubber tree, narra, coffee and assorted kinds of other fruit trees. B. Agroforestry As an alternative land-use practice for the forest occupants in the watershed and to dissuade them from the usual "slash-and-burn" method of cultivation as well as to promote the rehabilitation of the watershed, the practice of agroforestry is adopted. The project is introducing the establishment of coffee and cacao plantations, the practice of the Sloping Agricultural Land Technology (SALT), establishment of woodlots and the planting of various fruit trees like guava, durian, rambutan and the like in agroforestry farmlots. At present, four agroforestry demonstration farms had already been established and are already productive.

Page 229: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 219

C. Forestry Extension Forest conservation, the various forestry rehabilitation activity of the project, appropriate upland farming technologies and cropping systems, etc. are part of a sustained information dissemination campaign of the project. Emphasis is placed on forestry extension through home visits, farmers trainings/seminars, school visits, farmers classes and publications. The project publishes the "Tubig-Tuburan", a quarterly newsletter in the Visayan dialect. Moreover, the project is maintaning a radio program ehich is being aired on a weekly basis through a local radio station. PROJECT ACTIVITIES/COMPONENTS: 1. Reforestation of a total area of 600 has. 2. Development of 1,200 has. through agroforestry 3. Construction of 45 kms. of road 4. Conduct of forestry extension drive through radio broadcast, publication, barangay

assembly and farmer's class/meetings. 5. Construction of 28 units of silt detention dams and other erosion control structures. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 2,440 TOTAL FOREX : 953 TOTAL GOP : 1,487 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 580-PH PROJECT DURATION : 7 years START DATE : November 1983 END DATE : November 1990 IMPLEMENTING AGENCY : Bureau of Forest Development and NIA TARGET BENEFICIARIES : Rural Dwellers

Page 230: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 220

Timber Stand Improvement Project

PROJECT CODE : 88-00500 PROJECT TYPE : Institutional Development PROJECT SITE : R03, R11 PROJECT OBJECTIVES : To hasten timber growth that will improve timber quality and yield of dipterocarp logged-over areas covering 200,000 hectares nationwide. FUNDING AGENCY : FRG/GTZ PROJECT COST (IN US$ '000) TOTAL COST : 415 TOTAL FOREX : 176 TOTAL GOP : 239 TYPE OF FUNDING : Grant START DATE : 1982 END DATE : 1988 PROJECT DIRECTOR/MANAGER : Arnulfo Z. Hernandez TARGET BENEFICIARIES : Concession Holders and BFD Personnel

Page 231: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 221

Toxic Chemicals and Hazardous Wastes Management

PROJECT CODE : 89-02600 PROJECT TYPE : Environmental Protection PROJECT SITE : Metro-Manila PROJECT OBJECTIVES: To support the EMB's development study of ensuring the quality of the environment so as to support sustained agricultural and industrial general objectives, and at the same time to promote the well-being of the people and preserve the quality of life and environmental health and human settlements. The Project will contribute further in strengthening the basic organizational infrastructure facilities and in satisfying the present and future skilled manpower requirements necessary to achieve this objective. PROJECT DESCRIPTION: 1. Establishment of a Toxic Chemicals and Hazardous Waste Management Center at

EMB to plan, facilitate, operationalize, integrate and coordinate all activities in this sector: a). Development of an integrated Action Plan for Toxic chemicals and hazardous waste management; b.) Development of a contingency plan to tackle emergencies and catastrophes; c.) Construction of two pilot modules to demonstrate the techniques, efficacy and benefits of two different types of hazardous waste treatment processes; and d. Facilitation, execution and coordination of the legislative, training and public awareness activities as entailed below.

2. Establishment of an Information and Data Bank at the Management Center with the

necessary computer hardware and software for the development and execution of an information management system for systematic collection, evaluation, analysis, interpretation, processing, storage, retrieval and wide dissemination to achieve maximization of its utilization.

a. Collection of data facilitated and channelized through a network of focal points at

all agencies, departments and industries concerned; b. Development of NRPTC using the IRPTC filing system for compilation and

storage; and c. Dissemination mainly based on a system of queries and inquiries for all target

groups and individuals. NRPTC will be linked up with the IRPTC international network to facilitate free flow of information internationally (This will be two-way flow). The Data Bank will also act as the main information base for all activities under the project, particularly legislative developments, training and promotion of public awareness.

Page 232: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 222

3. Development through the Inter-Aagency Task Force, in collaboration with the EMB Inter-agency Legal Committee, of a comprehensive legislative mechanism to monitor and regulate all toxic and hazardous substances throughout their life history through a system of notification, permit and licensing requirements.

4. Development and execution of a scientific program 5. Development of a long range monitoring program to monitor the trends of toxic and

hazardous substances in the environment and the establishment of a network of permanent reference stations for this purpose.

6. Survey of technologies and publications of technical handbooks on the most suitable methodologies for chemical analysis, toxicity tests, bioassays and treatment, recycling, reuse or alternative utilization of hazardous substances.

7. Execution of manpower development program through training workshops and fellowships

8. Execution of public information program to achieve Development Support Communication through a series of activities.

PROJECT ACTIVITIES/COMPONENTS : 1. Establishment of toxic chemical and hazardous waste management center 2. Establishment of an information and data bank 3. Development of a comprehensive legislative mechanism 4. Development and execution of Scientific Program 5. Development of long range monitoring program 6. Survey of technologies and publication of technical books 7. Execution of manpower development program thru workshops 8. Execution of public information system FUNDING AGENCY : EEC PROJECT COST (IN US$ '000) TOTAL COST : 950 TOTAL FOREX : 950 TOTAL GOP : 0 EXCHANGE RATE : 27.00 TYPE OF FUNDING : Grant PROJECT DURATION : 4 years START DATE : 1991 END DATE : 1995 PROJECT DIRECTOR/MANAGER: Elisea Gozun OFFICE ADDRESS : 2ND Floor, DENR BLDG., Visayas Ave.,

Diliman,. Q.C TELEPHONE NUMBER : 97-66-26 loc. 2019 IMPLEMENTING AGENCY : EMB PROPONENT AGENCY : EMB

Page 233: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 223

Tree Improvement in Industrial Forest Plantation (Piggy-backed to IFP)

PROJECT CODE : 89-04801 PROJECT TYPE : Institutional Development PROJECT SITE : Nationwide PROJECT OBJECTIVES: (1) To formulate, on the basis of an assessment of existing technical resources and

institutional structure of the Executing Agency, a program of systematic improvement of quality of Industrial Forest Plantations (IFPs) based on the introduction of superior genetic material and better management techniques;

(2) To conduct training with application-oriented instructions to selected DENR staff;

and (3) To improve and promote, throughout the Philippine commercial forestry sector,

methods of plantation performance evaluation and a cumulative approach to evaluating plantation targets.

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 80 TOTAL FOREX : 535 TOTAL GOP : 45 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : TA 1578 PHI START DATE : 00/00/92 END DATE : 00/00/94 IMPLEMENTING AGENCY : DENR

Page 234: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 224

UNDP/FAO Bamboo Research and Development Project

PROJECT CODE : 89-13000 PROJECT TYPE : Research PROJECT SITE : Los Baños, Laguna (Region 4); Loakan, Baguio City,

Benguet (CAR);Rosario, La Union (R1);Magalang, Pampanga(R3), Capiz, Iloilo City (R6);Minlanilla, Cebu City (R7); Malaybalay, Bukidnon (R10); Bislig, Surigao (R11)

PROJECT OBJECTIVES : To assist the Government create new sources of employment and thereby raise income levels in appropriate rural areas of the country through research and development and promotion of bamboo production. PROJECT DESCRIPTION: The project was designed to develop, research and experiment, pilot scale bamboo plantation and package sets of technology for construction, cottage and pulp and paper industry. PROJECT ACTIVITIES/COMPONENTS : 1. Establishment, maintenance and protection of bamboo plantations in 7 sites (57 has.)

throughout the Philippines. 2. Implementation of research studies and packaging of research results into sets of

technology in order to perfect the existing bamboo technologies and improve/verify known technologies.

3. Establishment, maintenance and protection of 3 Bambuseta. 4. Conduct of farmers training on bamboo production and harvesting. 5. Production of bamboo planting stocks. 6. Production of manuals, proceedings and other publication related materials. 7. Training of researchers through post graduate fellowships and other non-degree

training.

Page 235: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 225

FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000) TOTAL COST : 1,666 TOTAL FOREX : 885 TOTAL GOP : 781 EXCHANGE RATE : 26.00 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : PHI 85/008/A/01/12 PROJECT DURATION : 7 yrs & 9 mos START DATE : July 1987 END DATE : December 1995 PROJECT DIRECTOR/MANAGER: Dr. Emilio Rosario OFFICE ADDRESS : EDRB, Los Banos, Laguna TELEPHONE NUMBER : 3320,3221,2269 . IMPLEMENTING AGENCY : DENR-ERDB, DENR-ERDS of CAR, Regions

1,6,2,10,11 PROPONENT AGENCY : TARGET BENEFICIARIES : Farmers, Researchers, Decision Makers.

Page 236: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 226

UNDP-FAO Strengthening of the ISF Programme

PROJECT CODE : 89-13700 PROJECT TYPE : Plantation Development PROJECT SITE : Atimonan, Quezon (R4), Cauayan, Negros Occidental

(R6), Cabadbaran, Agusan del Norte (R10) PROJECT OBJECTIVES: To promote a more equitable distribution of benefits from forest resources as well as improved upland productivity and environmentally sound land-use practices through community-based forest management and the development of these communities into more self-reliant units. PROJECT DESCRIPTION: The ISF Programme is an upland development strategy and is conceived as a people-oriented programme - an attempt for integrated development of forest land and forest communities. It is designed to develop and strengthen the existing reforestation efforts of the government. PROJECT ACTIVITIES/COMPONENTS: 1. Institution Building (In-service training, fellowship and seminar/workshop for

DENR-FMB personnel) 2. Nursery establishment for the propagation of planting stocks. 3. Establishment of demonstration farms in the 3 project sites. 4. Organization and development of forest occupants through cross-farm visits, farmers

training and seminar/workshop. 5. Processing and issuance of Certificate of Stewardship Contract 6. Establishment of institutional linkages with government agencies, institutions,

non-government organizations and other relevant foreign assisted projects 7. Strengthening/establishment of social forestry organizations/associations in the 3

project sites.

Page 237: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 227

FUNDING AGENCY : UNDP/FAO PROJECT COST (IN US$ '000) TOTAL COST : 1,734 TOTAL FOREX : 1,046 TOTAL GOP : 688 EXCHANGE RATE : 22.80 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : PHI 87/005 PROJECT DURATION : 3 years and 7 months START DATE : June 1988 END DATE : December 1992 PROJECT DIRECTOR/MANAGER : Sirilo Serna/Reynaldo Bayabos OFFICE ADDRESS : FMB, Visayas Ave., Q.C. TELEPHONE NUMBER : 98-59-34 IMPLEMENTING AGENCY : FMB TARGET BENEFICIARIES : Upland Farmers

Page 238: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 228

Urban Air Quality Management Strategy in Asia (URBAIR)

PROJECT CODE : 93-06800 PROJECT SITE : Asian Metropolitan regions PROJECT OBJECTIVES: To assist leaders in Asian metropolitan regions in developing policy, monitoring and management tools to restore air quality in their regions. PROJECT ACTIVITIES/COMPONENTS: 1. Workshop to gather pertinent data 2. International consultants to prepare a draft guidebook using all available data 3. Research and analysis work in air quality assessment, dispersion modeling and

economic valuation of air pollution. 4. Technical working group to discuss and guide the work of local consultants. 5. Finalize and disseminate the final guidebook which contains the comprehensive air

quality management strategy and specific action plans to cope with air pollution problems.

FUNDING AGENCY : CTF of Norway &Netherlands, PROJECT COST (IN US$ '000) TOTAL COST : 80 TOTAL FOREX : 80 TOTAL GOP : 0 TYPE OF FUNDING : Grant PROJECT DURATION : 9 months START DATE : July 1993 END DATE : April 1994 PROJECT DIRECTOR/MANAGER : Elisea Gozun OFFICE ADDRESS : 2nd Floor, DENR Bldg., Visayas Ave.,

Diliman, Q.C. IMPLEMENTING AGENCY : DENR/EMB,WHO, ADB, USEPA, US Asia Env.

Partnership TARGET BENEFICIARIES : Leaders in Asian metropolitan regions

Page 239: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 229

Urban Forestry Program (FS)

PROJECT CODE : 89-27000 PROJECT TYPE : Environmental Protection PROJECT SITE : Metro Manila PROJECT OBJECTIVES: To enhance environmental and greening for Metro-Manila PROJECT ACTIVITIES/COMPONENTS : Activities undertaken include, among others: 1. Review, assessment and improvement of existing Metro Manila regreening plan; 2. Determination of criteria for the identification and, prioritization of sites to be

developed for urban forestry within the city; 3. Identification of particular sites where urban forestry is to be implemented; 4. Preparation of a detailed development program for the establishment and

management of forest parks/nature centers in Metro-Manila taking into consideration spatial and environmental impact assessments, soil acidity, microclimatic factors, species selection as well as aesthetic consideration;

5. Draw up a landscaping plan with primary consideration for the control of dust pollution; 6. Preparation of detailed costings for the establishment and maintenance of the urban

forestry area. FUNDING AGENCY : Singapore PROJECT COST (IN US$ '000) TOTAL COST : 406 TOTAL FOREX : 310 TOTAL GOP : 96 EXCHANGE RATE : 25.00 TYPE OF FUNDING : Grant PROJECT DURATION : 7 months START DATE : October 1992 END DATE : August 1993 IMPLEMENTING AGENCY : DENR-NCR TARGET BENEFICIARIES General Public

Page 240: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 230

Vehicular Emission Control Planning in Metro-Manila (Phase I)

PROJECT CODE : 90-17400 PROJECT TYPE : Environmental Protection PROJECT SITE : Metro-Manila PROJECT OBJECTIVES: To assess and describe the problem in quantitative terms so that immediate and long-term measures can be prescribed which would result in the control of vehicular emissions to a level of a safe ambient air quality. FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 768 TOTAL FOREX : 757 TOTAL GOP : 11 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : TA1414-PHI START DATE : June 1991 END DATE : April 1992 PROJECT DIRECTOR/MANAGER : Erlinda Gonzales/Ramon Aguilar TARGET BENEFICIARIES : Public sector

Page 241: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 231

Vehicular Emission Control Planning in Metro-Manila (Phase II)

PROJECT CODE : 92-01100 PROJECT TYPE : Environmental Protection PROJECT SITE : Metro-Manila PROJECT OBJECTIVES : The Technical Assistance (TA) is to assist the Government in preparing an appropriate investment program to implement a vehicular emission control program in Metro-Manila. PROJECT DESCRIPTION: The TA will evaluate the financial, economic and institutional feasibility of the following suggested measures to reduce vehicular emissions. a). Inspection and maintenance sub-project which will essentially replace the

anti-smoke belching campaign with a much more effective program to reduce emissions from the current stocks of vehicles.

b) clean two-stroke motorcycles sub-project which will eliminate the two-stroke motorcycles over a period of two years.

c) Low lead/low sulfur sub-project Manila has one of the dirtiest fuels in the

Asia-Pacific region if not the world. This sub-project will phase-in low lead and low sulfur gasoline over a period about two years.

d) Gasoline fueled jeepney sub-project - The on-going study has shown that the risk

for lung cancer due to exposure to diesel engine exhaust is serious and is high in Metro-Manila, and that, without doubt, the diesel particulates pose acute, serious health/respiratory hazards. This sub-project will result in a gradual shift of jeepneys to use gasoline engines and will involve a change in the price subsidy given to diesel fuel and incentives for the conversion of diesel jeepneys to gasoline.

e) Non-catalyst standard sub-project - This project will be implemented over a

five-year period and will improve engine design and maintenance measures to reduce carbon monoxide, hydrocarbons and nitrogen oxide emissions.

Page 242: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 232

FUNDING AGENCY : ADB PROJECT COST (IN US$ '000) TOTAL COST : 100 TOTAL FOREX : 100 TOTAL GOP : 0 TYPE OF FUNDING : Grant LOAN/GRANT NUMBER : TA 1723-PHI START DATE : January 1993 END DATE : December 1993 PROJECT DIRECTOR/MANAGER: Erlinda Gonzales IMPLEMENTING AGENCY : EMB

Page 243: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 233

Low-Income Upland Communities Project (LIUCP)

PROJECT TYPE : Integrated Area Development PROJECT SITE : Oriental and Occidental Mindoro FUNDING AGENCY : ADB PROJECT COST (IN US$) TOTAL COST : 34,353,000 TOTAL FOREX : 26,353,000 TOTAL GOP : 8,000,000 TYPE OF FUNDING : Loan LOAN/GRANT NUMBER : 999 PHI (SF) PROJECT DURATION : 10 years START DATE : February 15, 1990 END DATE : October 30, 2001 IMPLEMENTING AGENCY : DENR, LGU,NGO PROPONENT AGENCY : DENR, LGU TARGET BENEFICIARIES: 18,000 families directly benefiting 7,500 upland

families, 4,500 of which are Mangyans and 3,000 are lowland migrant families.

PROJECT DESCRIPTION: The project is one of the many efforts of the DENR, in partnership with the Local Government Units (LGUs) and Non-Government Organizations (NGOs), to address, in a pilot and integrated approach, the Philippines' priority development concerns such as: Resources depletion; Environmental Degradation; Inequitable Distribution and Allocation of Lands and Natural Resources; Poverty in the Uplands and the Continuous influx of Migrants from Lowlands; and Tenurial Problems in Public Domain. PROJECT OBJECTIVES: To achieve sustainable upland socio-economic development through self reliance and the provision of improved government services such as provision of security of tenure, improved agroforestry technologies, adoption of diversified income generating activities, easy market access, education, health, and other basics. To accelerate the sustainable development and management of critical watersheds with and through the cooperation of the upland communities, particularly tribal groups.

Page 244: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 234

PROJECT ACTIVITIES/COMPONENTS:

Community Organization and Cooperatives Development

Setting-up of Site Management Unit (SMU) and Fielding Community Organizers to organize and train the beneficiaries for purposes of developing simple based socio-economic development plans and initiating community efforts.

Establishing a multi-purpose building for SMU.

Resource Access and Resource Management

Surveys and provision of tenurial instruments

Resolving existing land disputes

Training beneficiaries in community-based resource management techniques

Establishing Watershed Management Units in each of the central watersheds per province for linking with other government service agencies.

Agroforestry, Reforestation, and Livelihood

Establishment and operation of community nurseries

Extension/training of target beneficiaries on new agroforestry technologies

Extension of credit and technical assistance for alternative income sources

Reforestation of 10,501 hectares denuded areas

Infrastructure and Social Services

Labor intensive construction of around 147 kms. and rehabilitation of another 166 kms. farm to market roads

Facilities for water supply, health, and environmental education.

Irrigation where feasible areas.

Institutional strengthening of related services in support to project implementation

Project Management and Institutional Building

Establishment of a National Project Office, and the Provincial Project Management Office

Strengthening of the DENR PENROs and CENROs

Provision of Consulting Services

Page 245: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 235

Private Sector Participation in Managing the Environment (PRIME)

PROJECT TYPE : Capacity Building PROJECT SITE : Metro-Manila FUNDING AGENCY : UNDP PROJECT COST (IN US$ '000)

TOTAL COST : 1,743 TOTAL FOREX : 1,523 TOTAL GOP : 220

EXCHANGE RATE : US$1 = PhP39.80 TYPE OF FUNDING : Grant PROJECT DURATION : 3 years START DATE : April 1998 END DATE : December 2001 PROJECT MANAGER : Joy Esguerra OFFICE ADDRESS : DENR Comp., EMB Bldg. Visayas Ave. Q.C. EXECUTING AGENCY : Board of Investments-Department

of Trade & Industry (BOI-DTI)

IMPLEMENTING AGENCY : DENR-EMB PROPONENT AGENCY : DENR PROJECT DESCRIPTION:

The Project is to strengthen the role of the private sector in environmental management and enhance private sector initiatives in minimizing industrial environmental impacts. It is expected to promote cleaner industrial production in the country's growth centers and framework of less government regulatory intervention. PROJECT OBJECTIVES :

The PRIME project is to encourage the private sector to take more responsibility in managing the environment by adopting production and management systems that will reduce overall environmental impact of industries as the Philippines intensifies its industrialization process.

Page 246: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 236

PROJECT ACTIVITIES/COMPONENTS :

a) Development of Business Agenda 21 that will serve as a blueprint for the role of the private sector in environment as the country joins the club of newly industrializing countries in the region (Philippine Business for the Environment);

b) Industrial Ecology support to cleaner production and waste minimization through the adoption in the development of industrial estate (Board of Investments;

c) Environmental Management Systems promotion of industry self-regulation (Bureau of Product Standards); and

d) Environmental Enterpreneurship encouragement of private investments (Environmental Management Bureau).

Page 247: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 237

Swedish International Development Cooperation Agency (SIDA) Project

Technical Assistance to Develop GIS for Local Government Units

Sector : Multisectoral

Sites Covered : San Juan, Metro Manila; Zamboanga City; Guimaras, Iloilo

City; Ormoc City, Leyte; Surigao City; Laurel, Batangas; Tanay, Rizal; Nueva Ecija; and Pangasinan

Objective/s:

Develop customized municipal base maps with the national digital map database as basis Duration : 1999 – 2001 Funding Source : Swedish International Development Cooperation Agency

(SIDA)

Budget : PhP 20 M

Page 248: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 238

Technical Assistance for Improving Biodiversity Conservation in Protected

Areas in the Philippines (TABC) – Phase II

PROJECT SITE : 21 Protected Areas under the CPPAP Project (i.e. Batanes,

Northern Sieara Madre, Bataan, Apo Reef, Mt. Kanlaon, Mt. Kitanlad, Mt. Apo, Siargao & Agusan Marsh); NIPAP Project (i.e. Malampaya, El Nido, Mt. Iglit-Baco, Mt. Isarog, Mt. Pulag, Mt. Guiting-guiting & Mt. Malindang); and PAWB (i.e. Samar Taft, Pasonanca Watershed, Manleluag, Rajah Sikatuna & Naujan Lake)

FUNDING AGENCY: DANIDA/World Bank PROJECT COST : US$ 1,500,000.00 EXCHANGE RATE : US $ 1 = PHP 40.00 TYPE OF FUNDING: Grant GRANT NO. : TF-020792 PROJECT DURATION: 3 Years and two months

DATE START: January 01, 1999 DATE END : February 28, 2002

IMPLEMENTING AGENCY : Nordic Agency for Development and Ecology (NORDECO)

in cooperation with PAWB-DENR and GEF-CPPAP PROJECT BACKGROUND: The Government of Denmark through the World Bank and its implementing agency, the Nordic Agency for Development and Ecology (NORDECO), is providing technical assistance on biodiversity conservation and local participatory protected area (PA) management to the Department of Environment and Natural Resources (DENR). The project focuses on improving monitoring of trends in biodiversity of Pas of the Philippines; enhancing the capacity of protected area staff and management board (PAMB), local communities and DENR in biodiversity monitoring; and improving biodiversity conservation and participatory PA management in the Northern Sierra Madre Natural Park (NSMNP).

The project provides training and capacity-building to PAWB on its management and implementation of the DENR Biodiversity Monitoring System and follow-up supervision in sites covered by the GEF CPPAP, the EU NIPAP, the GEF Samar project and the DENR regional offices. Direct project field supervision takes place in 8 of the GEF CPPAP sites and in Naujan Lake.

In NSNMP technical assistance is provided to the GEF CPPAP and its includes training in PA natural resource management, participatory community resource

Page 249: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 239

management planning and mapping including tenurial assistance to the indigenous people, and comprehensive conservation awareness raising and educational activities among the park management, communities and school children. OBJECTIVES: General: To enhance biodiversity management and integrated biodiversity conservation with local development. Specific:

1. Improved monitoring of trends in biodiversity of PAs of the Philippines, and enhanced capacity of PA staff, PA communities and the GOP in biodiversity monitoring.

2. Biodiversity conservation and participatory PA management improved in he Northern Sierra Madre Natural Park, and enhanced capacity of the DA staff, the Protected Area Management Board, local decision-makers and the park communities in shared management of resources.

Page 250: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 240

The Study on Mapping and Land Cover Assessment of Mangrove Areas in

the Philippines

Sector : Multisectoral Sites Covered : Lamon Bay, Quezon; Aparri, Cagayan; Ulugan Bay,

Palawan; Sibugeuy Bay & Sacol Island, Zamboanga del Sur; Eastern/Western Samar; Camarines Sur & Norte

Description: This development study project was a joint undertaking with JICA. It aims to acquire recent and accurate information on the status, extent and distribution of remaining mangrove forests in the country. Medium format aerial photography was employed, complimented by ground survey to map remaining mangroves, identify their ecological characteristic, and study land use and socio-economic conditions of adjacent areas. The data generated will be useful inputs for resource managers in formulating mangrove development plans and issuance of government policies. This 3-year project was implemented staring November 1997 covering intially 3 pilot sites. The Study can be replicated to other coastal areas nationwide. A joint venture formed by JOFCA and Aero Asahi Corp. was commisioned to undertake the study for JICA, with NAMRIA and local DENR offices as counterparts. Objective/s:

1) Conduct mapping and survey of remaining mangrove forests and determine their status, extent and distribution.

2) Delineate land cover classification of mangrove forests and surrounding areas.

3) Study and identify typical distribution and zonation patterns of mangrove

vegetation, including stand structure (identification of ecological characteristics).

4) Provide maps and statistics to resource managers, policy-makers and other sectors of society, for planning and project development.

Page 251: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 241

Components: 1. Preparatory work 2. Aerial photography and film/photo-processing 3. Photo-interpretation and photo-mosaic 4. Base and thematic mapping 5. Field surveys (validation, transect, plot, socio-eco) 6. Data processing, analysis, and GIS 7. Technology transfer (OJT, seminar) 8. Preparation of final report/s and technical manuals Duration : Two years (1998-2000; extended to 2002) Funding Source : Japan International Cooperation Agency (JICA) Budget : FOREX - ¥ 195 M

GOP Counterpart - PhP 13.7 M

Page 252: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 242

Developing Tropical Forest Resources Through Community-Based Forest

Management (ITTO Project No. PD 21/97 Rev. 2F)

SECTOR : Forestry / Upland SITES COVERED : Bayombong, Nueva

Vizcaya OBJECTIVE/S: General :

Improve the productivity of degraded and regenerating forestlands through CBFM, complemented by the application of research validated methods Specific :

1. Establish forest plantations and manage regenerating and mature natural forests by using research validated methods

2. Manage forest resources through the community-based forest management strategy

COMPONENTS: The project involves the ff. activities:

1. Conduct bi-annual remeasurements and analysis of growth parameters of experimental plantations;

2. Present annual progress report of growth performance of experimental plantations;

3. Present final report on cumulative growth performance at last year of project; 4. Repair and expand nurseries; 5. Produce planting stocks in annual production cycles; 6. Prepare planting sites, outplant in annual cycles; 7. Maintain and protect forest plantations; 8. Construction and maintenance of trails; 9. Construction and fire look-out stations; 10. Construction and maintenance of firebreaks; 11. Forest protection; 12. Forest resources inventory and preparation of management plan; 13. Forest protection and management; 14. Forest land use planning through community mapping; 15. Participatory development planning involving the organized communities, local

government, DENR, and other relevant institutions;

Page 253: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 243

16. Consolidate management plans for plantations, regeneration forests, and mature forest into a Community-Based Forest Management Agreement;

17. Conduct capability-enhancement trainings for communities; 18. Conduct FS; and 19. Link up with potentials markets, corporate forestry entities.

EXPECTED OUTPUTS :

1. Experimental plantations established, maintained and growth parameters measured and analyzed

2. At least 100 hectares of new forest plantations established 3. At least 100 hectares of regenerating natural forests placed under appropriate

silvicultural treatment 4. At least 1,500 hectares of natural dipterocarp forests protected and managed for

production of timber and non-timber products 5. About 1,300 hectares of grasslands/brushlands placed under management by

organized communities for development into productive use 6. About 3,000 hectares of public forest lands placed under community

management 7. Community organizations formed 8. Training for community organization conducted 9. Forest based community enterprise organized

FUNDING SOURCE : International Tropical Timber Organization (ITTO) BUDGET : GRANT PROCEEDS: US$ 0.814 M (PHP 30.957 M)/ITTO exclusive of US$ 0.98 M

retained at ITTO headquarters, Yokohama, Japan, for ITTO administrative and M & E cost

GOP COUNTERPART : US$ equivalent of 0.43 M (PHP 1.66 M)/DENR (in kind,

e.g. field facilities, DENR personnel time, etc.) over a 3-year period

DURATION : Three (3) years FROM : July 15, 1998 TO : July 15, 2001 (extended to June 2002)

Page 254: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 244

RP-ERSDAC: “The Cooperative Study on the Applications and Techniques

using Remote Sensing Data for Monitoring and Mapping the Environment

and Natural Resources in the Philippine Archipelago” Sector : Mines/Minerals Sites Covered : Bicol and Leyte Island

Description: To develop the methodology for analyzing geological features and to monitor the geological and morphological changes such as topographical deformation by active fault, volcanic activities, landslides and other related activities using satellite data. Objective/s: Develop the methodology for analyzing geological features and monitor the geological and morphological changes, such as, topographical deformation by active fault, volcanic activities, landslides and other related activities using satellite data. Components/Activities:

1. Field Verification of Satellite Images 2. Literature Compilation and Review

Implementing Agency: Mines and Geosciences Bureau (MGB), DENR Duration : Three years (2000 – 2002) Funding Source : Earth Remote Sensing Data Analysis Center (ERSDAC) Budget : Grant Proceeds : ¥ 30 M GOP Counterpart : PhP 700,000

Page 255: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 245

Strengthening Local Environmental Planning and Management (LOCAL-

EPM)

SECTOR : Multi-Sectoral SITES COVERED : Lipa City, Tagbilaran City, and Cagayan De Oro City PROJECT DESCRIPTION : The LOCAL-EPM project focuses on nurturing and strengthening capacities for urban environmental management and planning at the local level, particularly in secondary cities, and on enhancing the capacity of national institutions to support LGUs. Using the experiences gained and strengthened capacities of these key secondary cities, the project will be expanded systematically to other cities on a regional basis and supported by appropriate national and international resources. OBJECTIVE/S : Strengthen Local Government Units (LGUs) and their ability to function effectively in the protection of the environment as the basic units of local governance Enhance LGUs’ capacities for participatory planning and management thereby fostering development, which is equitable and sustainable EXPECTED OUTPUTS:

1. The Local Component

Three (3) demonstration cities strategically representing the 3 major islands of the country selected

2. The National Component

Project Management and Coordination Unit (PMCU) with DENR as executing agency established

Environmental Coordinating Office by the League of Cities of the Philippines established

3. The Global Component

Link between the national and local experience of the project on environmental planning and management established by the United Nations Centre for Human Settlements (UNCHS)

TARGET BENEFICIARIES : Local Government Units/Government Organizations FUNDING SOURCE : United Nations Development Programme (UNDP)

Page 256: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 246

BUDGET TOTAL COST : US$ 2.584 M

GRANT PROCEEDS : US$ 2.184 M GOP COUNTERPART : US$ 0.400 M (in-kind)

EXCHANGE RATE : US$ 1=38.80 DURATION : (Original) (Revised) Three (3) years

FROM : April 1998 June 1998 TO : March 2001 December 2000 EXTENSION : June 2001 (extended in principle

until June 2002)

Page 257: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 247

Conservation of Priority Protected Areas Project (CPPAP)

SECTOR : Biodiversity REGIONAL & PROVINCIAL SITES COVERED:

Region II - Batanes Landscape & Seascape,

Northern Sierra Madre Natural Park

Region III - Subic National Park, Bataan Natural

Park

Region IV - Apo Reef Marine Natural Park

Region VI - Mt. Kanlaon Natural Park

Region IX - Turtle Island

Region X - Mt. Kitanglad Range Natural Park

Region XI - Mt. Apo Natural Park

Region XIII - Agusan Marsh Wildlife Sanctuary,

Siargao Island and Wildlife Sanctuary DESCRIPTION: The project is an implementation of the National Integrated Areas System (NIPAS) Law of 1992 of Republic Act No. 7586 which has the twin goals of biodiversity conservation and sustainable development. OBJECTIVE/S: 1. Establish the ten IPAS priority sites as PAs pursuant to the NIPAS Law 2. Protect the biodiversity value and future sustainability of the PAs 3. Incorporate local communities and NGOs into the PA management structure 4. Confirm the tenure of indigenous cultural communities and long established residents of PAs 5. Establish a permanent funding mechanism for PA management and development

COMPONENTS/ACTIVITIES:

A. Site Development: biodivesity protection, infrastructure development, facilities construction, provision of equipment, provision of technical assistance to DENR in the establishment of Protected Areas.

B. Resource Management: Preparation of management plan, preparation of time-

based action plan in support to protected area management board operations.

C. Socio-Economic Development: preparation, appraisal and monitoring of sub-project guidelines; provision of sub-grant/sub-loan, IEC.

Page 258: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 248

D. TA Coordination and Monitoring and Evaluation: Project coordinating Unit, steering committee, management plan preparation, PAMB and overall organization of the project.

EXPECTED OUTPUTS: 1. Biodiversity protection programs developed; infrastructure established 2. PAs demarcated/delineated/monumented and proclaimed 3. Livelihood assistance to communities provided 4. Technical assistance to PASu offices provided TARGET BENEFICIARIES : PA residents; local communities FUNDING SOURCE : Global Environment Facility (GEF) through the World Bank (WB) BUDGET : US$ 22.87 M DURATION : Seven (7) years

GRANT PROCEEDS : US$ 20.0 M FROM : October 1994

GOP COUNTERPART: US$ 2.87 M TO : June 30, 2002

December 31, 2002

(Revised)

Page 259: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 249

Metro Manila Solid Waste Management Program (Support to Republic Act 9003 -

Solid Waste Management Act)

SECTOR : Environment

SITES COVERED: Metro Manila

DESCRIPTION:

The growing problem on solid waste has become a national concern and is affecting almost every member of the society. The rapid rate of population growth, continuous industrialization as well as the low level of environmental awareness and literacy has all contributed to the garbage crisis.

Thus, the Government of the Philippines requested an advisory technical assistance to address the urgent and critical solid waste management problem in Metro Manila.

The project will support efforts of both public and private sector to improve the solid and medical waste management in Metro Manila. The scope consists of planning, design, training and other assistance in developing and strengthening an integrated SWM system.

The project is a joint undertaking of the Asian Development Bank (ADB), the National Government through the DENR and the local government units in Metro Manila. It is financed on a grant basis from the Asian Currency Crisis Support Facilities (ACCSF), which is a program of the Government of Japan. The project will also provide the establishment of at least ten (10) pilot material recovery centers/facilities, reclamation and buy-back centers and multi purpose cooperatives. DENR as chair of the NSWMC will be the executing agency, with DOH and MMDA through the Local Government Units as co-implementing agencies.

OBJECTIVES :

The objective of the TA Project is the overall improvement in Metro Manila solid and

medical waste management for increased environmental quality and public health.

Page 260: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 250

Specific objectives: 1. supporting and strengthening LGU SWM systems, including CBSWM as required by

RA 9003; 2. improving medical waste management 3. capacity building for DENR, NSWMC, MMDA, other agencies and LGU’s; and 4. assistance to support efforts to resolve interim and long term disposal needs. TARGET BENEFICIARIES: Metro Manila constituents/communities COMPONENTS/ACTIVITIES: 1. Capacity building and RA 9003 Implementation Support for Selected Metro Manila LGU's 2. Medical Waste Management 3. Capacity building and RA 9003 Implementation Support for DENR NSWMC, DOH, MMDA and other agencies. 4. Waste disposal

EXPECTED OUTPUTS :

1. Solid Waste Management Plan formulated; 2. Materials Recovery Facilities (MRFs) established

TYPE OF FUNDING : Grant

FUNDING SOURCE : Asian Currency Crisis Support Facility of the Gov’t. of

Japan through Asian Development Bank (ADB)

BUDGET : US$ 1.800 M

GOP COUNTERPART: US$ 0.550 M

GRANT PROCEEDS : US$ 1.250 M

DURATION : July 2002 – July 2003 (1 year)

Page 261: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 251

Natural Resources Management Program (NRMP )

SECTOR : Forestry/Upland; Environment; and Coastal SITES COVERED: Regions II, IVA, IVB, V, VII, X, XI, XII & XIII OBJECTIVE/S: Enhance management of renewable natural resources through forest and coastal management and industrial initiatives for a sustainable environment Broad Sector Goal :

Strengthen the capacity of DENR to make effective policies, and to enhance the roles of non-government organization, communities and the private sector in the protection and sustainable management of natural resources TARGET BENEFICIARIES : NGOs, NGAs, Fisherfolk, LGUs, Academe, Upland

communities, DENR, local agencies & business organizations, industries, international organizations

EXPECTED OUTPUTS:

1. At least 500,000 hectares of residual forest covered with CBFMA.

2. At least 3,000 kilometers of shoreline brought under improved management.

3. Minimum of 300 firms with Environmental Management System (75 firms Certified to ISO 14001 or other internationally recognized EMS standards).

FUNDING AGENCY : U.S. Agency for

International Development (USAID)

BUDGET : US$ 164.487 M GRANT PROCEEDS : US$ 127.852 M GOP COUNTERPART : US$ 36.635 M DURATION : 12 years (Phase I) (Phase II) FROM : 1990 1995 TO : 2002 2002

Page 262: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 252

PROJECT

COMPONENTS

AREAS OF

ASSISTANCE

REGIONAL

COVERAGE

PROJECT

DURATION

A. FOREST RESOURCES MANAGEMENT (FRM)

Community Based Forest Management

Region II, IVA&B, V, X, XI and XIII

Sept. 1990 – March 1995 (Phase I) April 1995-Dec. 2002 (Phase II)

B. COASTAL RESOURCES MANAGEMENT (CRM)

Community Based-Coastal Resource Management

Region IV, V, VI, VII, XI, XII and XIII (Davao del Sur, Saranggani; Negros Oriental, Bohol, Cebu and Palawan)

March 1996 – Dec. 2002

(w/ two years extension)

C. INDUSTRIAL INITIATIVE FOR A SUSTAINABLE ENVIRONMENT (IISE)

Environment Protection

Region VII, X and XI (Cebu, Bohol, Davao, Cagayan de Oro, and General Santos)

1998-2002

Page 263: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 253

Philippine-German Community Forestry Project - Quirino (CFPQ)

SECTOR : Forestry / Upland SITES COVERED: Region II – Quirino Municipality of Nagtipunan - Brgys. Asaclat, Anak, Mataddi and Disimungal (Agta area) Municipality of Diffun - Brgys. Baguio Village, Don Mariano Perez, and Ifugao Village Municipality of Maddela - Brgy. Villa Agullana Municipality of Cabarroguis – Brgy. Tucod Municipality of Aglipay – Brgys. Dumabel, Cabugao, Diodol, Damsite, and Pinaripud Sur

PROJECT DESCRIPTION: The project is a joint undertaking of the DENR, Provincial Government of Quirino, Kredistanlt fur Wiederaufbau (KfW-Financial Arm of the German Government) and the German Technical Cooperation (GTZ) to ensure the sustainable Development of the Province of Quirino through the adoption of Community-Based Forest Management (CBFM) strategies and approaches. OBJECTIVE/S : Conserve and protect the forest within the project area, through sustainable management practices, and through community organization and self-help BENEFICIARIES : Upland farmers with a total of 1,858 households in the 10 Project

sites (Asaclat, Anak, Don Mariano Perez, Baguio Village, Villa Aguillana, Ifugao Village, Tucod, Agta Area, Mattadi, Addalam Micro-Watershed)

LGUs for Land Use Planning and Natural Resources Management

EXPECTED OUTPUTS: 1. Land Tenure Instrument (LTI) Issued 2. Sustainable Agriculture/Agro-forestry Practices Adopted 3. Sustainable Community Forestry (CBFM) Strategies/Approaches Implemented 4. Participatory Land-Use Planning/Natural Resources Management Developed 5. Community-Implemented Infrastructure Constructed (Horizontal and Vertical) 6. Rural Financing Generated

Page 264: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 254

MAJOR COMPONENTS: 1. Cross-Sectoral Consultation and Coordination 2. Experiences Gained on the Sustainable Resources Management 3. Improved Methods and Instruments to Implement Sustainable Resource Management 4. Monitoring of Program Measures Under the KfW Assistance EXTERNAL ASSISTANCE : Kredistanlt fur Wiederaufbau (KfW) and German Agency

for Technical Cooperation (GTZ) BUDGET : US$ 8.589 M GRANT PROCEEDS (Kfw/GTZ ): US$ 7.563 M GOP COUNTERPART : US$ 1.026 M PROV’L. GOV’T. OF QUIRINO : minimum of PhP 9.0 M DURATION : Seven (7) years FROM : 1997 TO : 2001 EXTENSION : 2002-2003

Page 265: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 255

Quirino Community - Based Forestry Program: A Debt-For-Nature Swap

Initiative (DFNSI)

SECTOR : Forestry / Upland SITES COVERED: Quirino Province

(10 barangays in the municipalities of Maddela, Nagtipunan, Aglipay and Diffun)

DESCRIPTION:

The German Government offers the Philippines to carry out debt conversion claims from financial cooperation on the basis of Paris Club Agreed Minute "Philippines IV" which was signed on June 20, 1991 and amended on November 30, 1992. This was implmented on a bilateral basis by means of the debt consolidation agreement of July 30, 1992, and the amendment agreement of June 6, 1993 whereby a total of DM 12,775,044.82 has been made available as debt conversion to implement projects for the protection and conservation of the environment (Note Verbale 425/95). Taking advantage of this opportunity, the DENR proposes for this purpose the project "Quirino Community Based Forestry Program: A Debt-for-Nature-Swap Initiative" covering six (6) barangays in the municipality of Maddela with a project area of about 40,677 has. OBJECTIVE/S: Plan and implement measures for the protection of the environment and sustainable use of natural resource-base with emphasis on biodiversity conservation COMPONENTS/ACTIVITIES: The four (4) major components area: 1. Community Organization 2. Participatory Land Use Planning 3. Forest Management and Biodiversity Conservation 4. Sustainable Agriculture/Agroforestry Support Activities include: 1. Rural Industry Development (Livelihood Generation) 2. Marketing 3. Community-Implemented Infrastructure 4. General Administration 5. Tree Plantation and Forest Rehabilitation

Page 266: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 256

EXPECTED OUTPUTS: 1. Marketing cooperatives/opportunities provided to communities 2. Infrastructure support to CBFM constructed and established 3. Security of land tenure provided to communities 4. Open degraded areas reforested and rehabilitated 5. Peoples’ Organizations strengthened and empowered 6. Appropriate agroforestry and sustainable farming methods practiced 7. Income-generating activities implemented 8. Management/operational plans developed in the sites FUNDING AGENCY : KFW (Financing Cooperation Agency of the Federal Republic of Germany) BUDGET : Thirty per cent (30%) of the DM12,775,044.82 Philippine debt

from the FRG has been made available as debt conversion to implement the program. Peso cost shall depend on the prevailing foreign currency exchange rate.

DURATION : Four (4) years FROM : 1998 TO : March 2002 EXTENSION : December 2003

Page 267: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 257

National Integrated Protected Areas Programme (NIPAP)

SECTOR : Biodiversity

SITES COVERED : El Nido Marine Reserve, Palawan, Region 4 Coron Island, Palawan, Region 4 Malampaya Sound, Palawan, Region 4 Mt. Guiting-Guiting National Park, Sibuyan Island, Romblon, Region

4 Mt. Iglit-Baco National Park, Mindoro, Region 4 Mt. Pulag National Park, Benguet, CAR Mt. Isarog National Park, Camarines Sur, Region 5 Mt. Malindang National Park, Misamis Occidental, Region 10 PROJECT DESCRIPTION: The National Integrated Protected Areas Programme (NIPAP) is a joint project of the Government of the Philippines (GOP) and the European Union (EU), which aims to promote conservation of nature and sustainable use of natural resources through the establishment of protected areas (PAs) within the framework of the NIPAS Act. The operations of the NIPAP will focus on establishing effective protection and management of the protected areas, with full participation of the local communities in the eight (8) priority protected areas in the Philippines. OBJECTIVE/S: Help protect, conserve, and manage natural habitats and biodiversity in eight selected protected areas in the Philippines TARGET BENEFICIARIES : Protected Areas, Indigenous Cultural Communities &

Tenurial Migrants EXPECTED OUTPUTS: 1. Appropriately designed and legally established Protected Areas 2. Well-established infrastructure and mechanism for effective protection, management

and administration of Protected Areas 3. Increased public awareness on the need to protect ecosystems and biodiversity and

highly involved resident-communities in natural resources protection and sustainable management

Page 268: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 258

MAJOR COMPONENTS: 1. Establishment of Protected Areas within

rationalized and delineated boundaries 2. Establish effective mechanisms for protection, management and administration of

Protected Areas 3. Increase involvement of resident communities in natural resource protection and

sustainable management EXTERNAL ASSISTANCE : European Union BUDGET : Euro 12.7 M

GRANT PROCEEDS : Euro 11.0 M GOP COUNTERPART : Euro 1.7 M FOREX RATE : ranging from PhP33.00 to PhP49.00 per Euro 1.0 DURATION : Seven (7) years

FROM : October 1995 TO : March 31, 2001 (Original) December 31, 2002 (Revised) March 31, 2003 (Revised per Rider No. 2)

GOP extended up to December 2003

Page 269: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 259

Master Plan Study for Integrated Watershed Management in Upper Magat

and Cagayan River

SECTOR : Forestry/Upland

SITES COVERED : Region 2 (Quirino, Nueva Vizcaya, Isabela), CAR (Ifugao) DESCRIPTION: A thorough study on the condition of the entire watershed and formulation of a master plan for integrated watershed management is urgently required to efficiently rehabilitate and sustainably manage the watershed. The Study is composed of two (2) phases: The Master Plan Study and the Piloy Study. A Watershed Plan will be prepared in Phase I and Pilot Schemes and related investigations will be carried out in Phase II. OBJECTIVE/S:

1. To formulate a master plan for watershed rehabilitation and management giving priority to areas for reforestations based on the results of a natural and socio-economic conditions survey and the findings of a Pilot Study in Model sites; and

2. Transfer relevant technology to the Philippine counterpart personnel through on-the-job training course of the Study.

CONPONENTS/ACTIVITIES:

A. Phase I (Master Plan Study)

- Collect and review the existing data and information relevant to the Study and conduct field survey and interviews

- Analyze the collected data and information and identify major constraints and potentials for the rehabilitation of the watershed

- Analyze satellite data and prepare a land use & vegetation map with a scale of 1:50,000

- Conduct workshop for People's Organizations

- Formulate the master plan for watershed management

B. Phase II (Pilot Study)

- Model Sites Selection

- Conduct pilot Study for watershed management in the model sites

- Evaluate and assess the pilot study and feed back the results to further refine the master plan

Page 270: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 260

FUNDING SOURCE: Japan International Cooperation Agency (JICA)

BUDGET :

Grant Proceeds : To be determined

GOP Counterpart: In kind

DURATION : 3 years (2001-2003)

Page 271: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 261

International Coral Reef Initiative (ICRI) Secretariat

SECTOR : Coastal / Marine SITES COVERED : Worldwide PROJECT DESCRIPTION: The Initiative is an informal mechanism that allows representation of over 80 countries with coral reefs to sit in equal partnership with donor countries and development banks, international environmental and development agencies, scientific organizations, the private sector and NGOs to decide on the best strategies to conserve the world’s coral reef resources. The implementing ICRI authorities are the Coordinating and Planning Committee (CPC) and its Secretariat. The first Secretariat was hosted by the Department of State of the US Government (1994-1996). It was followed by the Australian Government (1996-1998), and the French Ministry (1999-2000). For the year 2001-2002, the Philippines co-chaired the ICRI Secretariat with Sweden. It was extended for one year (2003) with the re-scheduling of one major activity – International Tropical Marine Ecosystems Management Symposium 2 (ITMEMS 2) OBJECTIVE/S: The purpose of the joint hosting of the Philippine-Sweden Secretariat is to continue the expansion of the ICRI network, mobilization of more developing countries, strengthening of IEC maintenance and content development of the ICRI Forum Website and discussion areas started by the Government of France as previous host of the ICRI Secretariat. The Secretariat will also reflect the perspective of developing and developed countries on the needs to address issues and problems relating to coral reef management, research and capacity building.

TARGET BENEFICIARIES : Policy makers, researchers and general public

worldwide EXPECTED OUTPUTS : 1. Continued focus on global attention on the declining status of the world’s coral reefs

and promote practical solutions that must be implemented to reverse this decline; 2. Operational networks at international and regional levels, to promote the

implementation of integrated coastal zone management, building of capacity, implementation of relevant research and monitoring, building awareness among all stakeholders established;

3. Funding of regional programmes and projects that can be implemented through these networks promoted and catalyzed;

4. Partners of ICRI and others to cooperate in the conservation and sustainable utilization of coral reefs and associated ecosystems encouraged;

5. Problems faced by developing countries in relation to the management and protection of coral reefs and related coastal ecosystems highlighted;

Page 272: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 262

6. Issues related to research and capacity building in developing countries and organizations promoted;

7. More partners in ICRI among countries and organizations mobilized; 8. Development of National ICRI Committee among participating countries promoted; 9. Network of ICRI focal points in countries and organizations around the world

formalized; 10. Web-site maintained and encouraged partners and other organizations to supply

information; 11. Development of a project list promoted; 12. Host and conduct ICRI Coordination and Planning Committee Meeting; and 13. Conduct regional workshops MAJOR COMPONENTS/ACTIVITIES: 1. Conduct of international/regional workshops, symposium, meetings and conferences 2. Maintenance of a website on coral reef management 3. Development and implementation of plans for the proposed Adopt-a-Reef Program 4. IEC on Coral Reef Management 5. Institutionalization of the Philippine National Coral Reef Initiative Committee

(PNCRIC) 6. Support to implementation of International Coral Reef Action Network (ICRAN)

projects EXTERNAL ASSISTANCE : Swedish International Development Assistance (SIDA) BUDGET :

GRANT PROCEEDS : SEK 4.195 M SEK 3.245 M (Other donors) GOP COUNTERPART : SEK 0.890 M (equivalent) FOREX RATE : 10 SEK = 1 US$ = P48.00

DURATION : Three (3) years FROM : January 2001 TO : December 2003

Page 273: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 263

Initial Assistance to the Philippines to Meet its Obligations under the Stockholm

Convention on Persistent Organic Pollutants

SECTOR : Environment SITES COVERED: Nationwide PROJECT DESCRIPTION : The Global Environment Facility (GEF) through the United Nations Development Programme (UNDP) has granted an initial assistance to the Philippines to develop a National Implementation Plan of the Stockholm Convention on Persistent Organic Pollutants (POPs). The Implementation Plan will describe how the Philippines will meet its obligations under the Convention to phase-out POP sources and remediate POPs contaminated sites in the country. OBJECTIVE/S: To create sustainable capacity and ownership in the Philippines to meet their obligations under the Stockholm Convention, including initial preparation of a Philippine POPs Implementation Plan, and broader issues of chemical safety and management as articulated in Chapter 19 of Agenda 21. EXPECTED OUTPUTS: 1. POPs Implementation Plan task team established; 2. Barriers to POPs phase-out identified; 3. Awareness raising and information exchange mechanisms identified; 4. Necessary capacity building activities identified; 5. National Implementation Plan for the reduction and elimination of POPs. PROJECT ACTIVITIES/COMPONENTS:

Establishment of Enabling Activity Coordinating Mechanism

Capacity Building in support of Project Implementation

Assessment of National Infrastructural and Institutional Capacity

Preparation of Initial POPs Inventories

Setting of Objectives and Priorities for POPs Reduction and Elimination Options FUNDING AGENCY : UNDP – GEF

IMPLEMENTING AGENCY/OFFICE : DENR-EMB

Page 274: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 264

BUDGET : US$ 500,000.00 GRANT PROCEEDS: US$ 500,000.00 DURATION : FROM : 2002 TO : 2003

Page 275: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 265

RP-JICA: Capacity Building for Environmental Management in Mining

SECTOR : Mineral / Mines Sites Covered : MGB – Central Office Description: A technology transfer in mine environmental management monitoring and chemical analysis techniques in the field of soil and water pollution to MGB personnel. Objective: Strengthen the capacity and capability of the Mines and Geosciences Bureau (MGB) in mine environmental management and monitoring technologies and chemical analysis techniques in the field of water and soil pollution (not only on technical capability but also on equipment and facilities. Components: 1. Dispatch of Japanese experts 2. Organizational Development 3. On-the-job training of technical counterparts/trainings 4. Provision of various office, laboratory and field equipment Expected Outputs: 1. Establishment of the Mine Environmental Laboratory 2. DENR-MGB will be more technically-equipped with scientifically trained personnel; 3. Revitalization and sustainability of the Mineral Industry Target Beneficiaries: MGB Central and regional Offices, Private Companies and

other Government Agencies Duration : Three years (1999-2001) Funding Source : Japan International Cooperation Agency (JICA) Budget : Grant Proceeds : PhP 127 M GOP : PhP 39.50 M

Page 276: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 266

RP-Japan: Application of Integrated Exploration Strategy for Precious and Base

Metal Mineralization in the North Bicol Area (A Follow-up Study)

Sector : Mines/Mineral Site Covered : North Bicol Area (Camarines Norte/Sur, Quezon) Description: Cooperation project between the governments of the Philippines and Japan in exchanging and sharing of technical expertise in the field of Mineral Exploration and Mining Techniques. Objectives:

Systematically explore and assess the mineral potential of the Bicol Area particularly in areas delineated earlier on previous RP-Japan Mineral Exploration Project.

Provide a Base-Line Geochemical Data. Expected Outputs:

1. Geochemical Maps 2. Geophysical Maps 3. Geological Maps 4. Mineral Alteration Maps 5. Mineralization Model

Component:

1. Production of a revised geologic map and processing of geochemical and geophysical map of the area;

2. Production of a mineral alteration map.

Duration : Three years (1999 – 2002) Funding Source: Japan International Cooperation Agency (JICA) Budget : Grant Proceeds : US$ 2 M GOP PhP 0.50 M

Page 277: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 267

DOST-NASA PACRIM2 Project, MGB Component: “MASTER and AirSAR Data

Integration for Environmental Studies in Cebu, Philippines”

Objective: Develop operational methodologies on the use of advanced remote sensing technology for three applications of national importance, namely: food security, environmental management, and natural hazards monitoring Site Covered : Cebu Duration : Two years (2000 – 2002) Funding Source : National Aeronautics and Space Administration (NASA) Budget : PhP 3.2 M (for year 2000 only)

Page 278: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 268

RP-ERSDAC: “The Cooperative Study on the Applications and Techniques using

Remote Sensing Data for Monitoring and Mapping the Environment and Natural

Resources in the Philippine Archipelago”

Sector : Mines/Mineral Sites Covered : Bicol and Leyte Island Description: A research and development collaboration for the application of remote sensing data to geology, environmental issues and related issues. Objective: Develop the methodology for analyzing geological features and monitor the geological and morphological changes, such as, topographical deformation by active fault, volcanic activities, landslides and other related activities using satellite data. Duration : Three years (2000 – 2002) Funding Source : Earth Remote Sensing Data Analysis Center (ERSDAC) Budget : Grant Proceeds : ¥ 30 M GOP : PhP 0.70 M

Page 279: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 269

Pilot Study on the Formulation of Ecological Solid Waste Management Plan for

Local Government Units in the Philippines

SECTOR : Environment

SITES COVERED: Region 3 – Muñoz City, Nueva Ecija; Region 5 – Legaspi City,

Albay; Region 13 – Butuan City, Surigao OBJECTIVE/S: 1. Formulate a City/Municipality SWM Plan in three LGUs for the improvement of solid

waste management 2. Develop a waste recycling action program which could serve as a model for other

LGUs 3. Assist the three LGUs in the organization and operationalization of City/Municipality

SWM Board TARGET BENEFICIARIES : LGUs

FUNDING SOURCE : Japan Bank for International Cooperation (JBIC) DURATION : Six (6) Months (July 2002-Februay 2003)

Page 280: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 270

Assessment of Capacity Building Needs For Biodiversity Conservation and

Management in the Philippines (Add-On EA Project on Biodiversity)

SECTOR : Biodiversity Sites Covered : Description: It envisaged to reinforce the multi-sectoral collaboration and input into various biodiversity conservation projects, particularly capacity building activities, and strengthen the operation of the clearing house mechanism. Objective: General: To assess the capacity needs of the Philippines to implement and update the NBSAP and fulfill its commitment to CBD. Specific: Assess the capacity needs to undertake the following tasks:

a. Implementation of general measures for in-situ and ex-situ conservation and sustainable use, including national plans, strategies and legislations;

b. Initial assessment and monitoring programs, including taxonomy; c. Conservation and sustainable use of biological diversity important to

agriculture; d. Preservation and maintenance of biodiversity-related knowledge,

innovations and practices of indigenous and local communities embodying traditional lifestyles;

e. Preparation of the Philippine Second National Report to the CBD; and f. Maintenance and updating of Clearing House Mechanism (CHM)

Components:

a. PA Management Capacity Assessment b. Clearing House Mechanism (CHM) c. Indigenous Knowledge, Systems and Practices (IKSP) d. Agrobiodiversity e. Second Philippine National Report

Page 281: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 271

Expected Outputs:

a. Identification of capacity constraints and capacity development strategies, human resources and training, information for planning and decision-making needed to effectively manage and monitor protected areas;

b. Mechanism to build capacity for effective assessment and monitoring of the status of biodiversity

Duration : 15 months Start Date : January 2, 2002 End Date April 1, 2003 Funding Source : United Nations Development Programme/Global

Environment Facility (UNDP/GEF) Budget : US$ 0.197 M Grant Proceeds : US$ 0.157 M GOP US$ 0.040 M IMPLEMENTING AGENCY: PAWB, DENR

Page 282: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 272

Forest Resources Assessment Project

SECTOR: Forestry SITES COVERED: Nationwide (Philippines) PROJECT DESCRIPTION: The FRA Project is a grant agreement between the Food and Agriculture Organization of the United Nations (FAO) and the Forest Management Bureau (FMB) for the pilot- implementation of the FAO-NFA approach to carry out national forest assessment, in support of the FRA Programme of FAO. OBJECTIVE/S:

The project aims at attaining the following development objective: Enhance the social, economic and environmental functions of forest and trees resources through their sustainable management on the basis of better knowledge of their qualitative and quantitative importance. The project also aims at improving the contribution of these resources in national economy.

The project will contribute in achieving the development through the implementation of the activities of the following specific objectives:

a) to develop and reinforce capacities of the national forestry institutions in the

Philippines to design, plan, implement forest inventory projects, and manage

information;

b) to design and carry out a forest inventory project that satisfies national needs in

information and reliability and set up a monitoring system for future surveys; and

c) to design and set up a forestry information system to process field data and

manage the generated information. EXPECTED OUTPUTS: The expected outputs are the following:

a) National capacities of forestry institutions to plan and implement forest inventory

projects at national level reinforced and consolidated.

b) National inventory of forests and trees outside forest resources initiated, and

monitoring system of these resources set up and materialized in the covered areas by the survey.

Page 283: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 273

c) National information system on forests and trees outside forests and knowledge

on the state and changes of resources for future management and updating of baseline information developed. Website with inventory findings and reports, training material and field manual created.

MAJOR COMPONENTS/ACTIVITIES: Activity 1: Plan, in collaboration between FMB and FAD, the national forest and trees

resources inventory project on the basis of the methodology proposed by FRA. This activity I-includes review and adjustment of sampling design, organization bf the fieldwork, and preparation of the required field equipment and human resources.

Activity 2: Prepare, in collaboration with FAG, the Field Forms and FRA Manuals

including list and definitions of forest and tree variables. The list of variables proposed by FRA would be used as basis for adjustments to meet national data requirements. I

Activity 3: Participate in training of field teams that should take place at the start of the

fieldwork.

Activity 4: Provide to field teams the logistical support and supervision of field

activities.

Activity 5: Collect through fieldwork at all sample plots in all sample sites, including

measurement/observation of biophysical properties, as well as interviews

with local stakeholders as to the uses and management of forest/trees. Activity 6: Assist the national institution to deign and set up an information system on

forests and trees outside forest to process the field data and manage the generated information base for future use in policy formulation, activity planning and resources monitoring.

Activity 7: Report to FAG on the progress of the project activities. TARGET BENEFICIARIES: a) DENR

b) Other government agencies and stakeholder c) FAO

EXTERNAL ASSISTANCE: (Funding agency/source) Food and Agriculture Organization of the United Nations (FAO) IMPLEMENTING AGENCY/OFFICE:

Page 284: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 274

The Project is spearheaded by the Forest Management Bureau (FMB) and implemented in the field by the DENR operating units (RENRO), in collaboration with the Forestry Department of FAO. BUDGET: GRANT PROCEEDS: US$194,OOO

TOTAL GRANT PROCEEDS AVAILED OF (as of Sept. 2003) : US$159,OOO FOREX: GOP CONTRIBUTION: US$10,OOO DURATION: First Letter of Agreement (1st LOA) FROM: August 2002

TO: March 2003 Second Letter of Agreement (2nd LOA) FROM: July 2003

TO: December 2003

PROJECT MANAGER/COORDINATOR:

National Coordinator: Director Romeo T. Acosta

Executive Officer: Forester Carlo P. Consolacion

CONTACT NUMBER'S: FMB Director's Office: 928-9313 FRA Office: 925-2135 OFFICE ADDRESS: Forest Management Bureau, Visayas Avenue, Diliman, Quezon City

Page 285: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 275

Sustainable Forest Management, Poverty Alleviation and Food Security in

Upland Communities in the Philippines (Project PHI/O1/010) Review/Revision of Philippine Forestry Master Plan

Sector: Forestry Sites Covered: National in Scope Project Description:

The review and revision of the 1990 Master Plan for Forestry Development was conducted primarily to reassess the situation of the forestry sector in consideration of the observed need to strengthen the institutions and the sector's policy environment and refocus its thrusts and directions in view of the current realities and emerging trends in the field of forestry and environment, both locally and internationally. The product of this review is the Revised Master Plan for Forestry Development which is envisioned to guide the long term development of the forestry sector in the Philippines. The planning process has been carried out through participatory consultations and workshops with the relevant stakeholders of the sector particularly the DENR central and regional offices, representatives from local government units, other government agencies, donor agencies, people's organizations, private sector, non-governmental organizations, and respected professionals in the fields of forestry, environment, natural resource economics and related fields.

The Revised Master Plan focuses on four strategic programs namely: programs on policy and institutions development, programs on watershed and forest management, programs on livelihood and poverty eradication, and programs on forest-based industries development. Among the subprograms identified, attention is centered on ten (10) priority subprograms as follows: a) policy reforms and institutions development, b) prioritization of watersheds together with integrated land use planning and forest boundary delineation, c) enhancement of management information system; information, education and communication; and research and development, d) sustainable management of residual forests and other natural forests and forest protection, e) forest area expansion through plantation development, assisted natural regenerations, and other means, protected area and biodiversity conservation, g) forest industries rationalization and development, h) sustainable management of grazing lands, i) full development of monitoring and evaluation system and the criteria and indicators for all forest types and management systems, and j) community-based forest management as a cross cutting strategy in all forest management systems.

Page 286: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 276

Objectives:

The project has the following specific objectives:

a. To develop a clear framework plan for review and revision of the MPFD;

b. To assess the accomplishment of MPFD relative to its six objectives, namely; i) conservation of the forest ecosystem and its diverse genetic resources; ii) promotion of social justice and equity; iii) placement of the country's production forests under sustainable management; iv) proper land management; v) proper management of watersheds; and, iv) contribution to employment and growth of the local and national economies;

c. To ascertain the extent to which achievement of the MPFD's objectives has contributed to the alleviation of poverty and improvement of food security among rural poor, particularly those located in forestlands/upland areas;

d. To re-evaluate, revise and/or update the MPFD as appropriate, taking into consideration the need for strong partnership with relevant and major stakeholders;

e. To identify and recommend needed remedial measures, including further strengthening of policies and institutions, to hasten the full attainment of MPFD's objectives.

Expected Outputs:

a. Assessment reports along the following subsectors in terms of resource situation, policy and institutional issues and problems and accomplishments under MPFD implementation:

Policy and Institutions

Watershed

Forest plantations

Natural Forests

Community-Based Forest Management

Monitoring and Evaluation, Communications

Information, education and communication, training

Grazingland management

Forest industries and utilization

Urban Forestry

b. Regional consultations/workshop proceedings

c. Revised Master Plan for Forestry Development

Component Activities:

Page 287: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 277

The Project was carried-out using the methodology as follows:

1. Review of the objectives of the Master Plan for Forestry Development;

2. Assessment of the achievements and extent of implementation of MPFD programs and effectiveness of supporting policies;

3. Conduct of field programs reviews and consultations;

4. Policy analysis and assessment; and

5. Preparation of MPFD programs and policy revisions.

A project team was organized to implement the Project and worked hand-in-hand with a counterpart FMB staff. Other organizations were contracted to assist in the conduct of regional workshops/consultations and in the conduct of special studies related to overall assessment of forestry accomplishments under MPFD.

Basic to the overall process of project implementation is consultation with various stakeholders. Emphasis was given to this participatory approach where a great majority of different stakeholders in the sector were consulted.

Target Beneficiaries:

The target beneficiaries of the Revised Master Plan include the forestry sector itself, particularly the Philippine Public Forest Administration (PFA), the communities, the different stakeholders and the country in general.

External Assistance:

The Project was implemented through a funding support from the United Nations Development Program (UNDP).

Implementing Agent: FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS (SPPD)

Project Coordinator: FOREST MANAGEMENT BUREAU - DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES

Budget:

Grant - The Project has a Total funding of USD 165,000 including budget for the international consultant, 9 Regional workshops and consultations and implementation of additional 4 sub-studies on forest industries, forest utilization, grazingland management and urban forestry.

GOP Counterpart -The Gap contribution was mainly in kind in the form of office space, and the time of the six (6) FMB counterparts and one support staff.

Project Duration: The project had a duration of 12 months. From: 26 September, 2002 To: 21 September, 2003

Page 288: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 278

FS in the Philippine Projects & Activities Pursuant to the Country’s Maritime

Claims under the Law of the Sea

SECTOR : Coastal/Marine OBJECTIVE/S : 1. Review of current Philippines claims and options vis-à-vis LOSC provisions. Assess the

present status of base-points/baselines, territorial borders; 2. Identify all (UN e.g.) data and chart requirements to support Philippine claims under

LOSC; 3. Identify Philippine obligations within its maritime jurisdiction; 4. Conduct inventory of existing hydrographic, geological and resource data; 5. Assess hydrographic surveying and charting capabilities of NAMRIA, and capabilities of

other Philippine agencies with responsibilities on Philippine claims, and of local surveying and mapping industry. Identify needs for transfer of technology and institutional strengthening;

6. Identify other risks and constraints including security geopolitical risks; 7. Identify needed activities or projects to complete the UN requirements; 8. Assess alternative data acquisition and presentation techniques. Consider methods

and approaches employed by other countries; 9. Design and propose a project to fulfill the LOSC requirements. This will include a

Scope of Work and its distribution among the existing institutions and potential national and international contractors as may be necessary;

10. Provide full specifications for a comprehensive project including priorities, organization, plans for progress, cost and project economy;

11. Propose a concept for a national marine database; FUNDING SOURCE : Norwegian Agency for International Development (NORAD) BUDGET : US $ 0.25 M DURATION : 2003 (Three (3) months)

Page 289: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 279

Forestry Sector Project (FSP)

SECTOR : Forestry / Upland SITES COVERED :

CAR – Benguet, Ifugao Region I – Ilocos Norte, Pangasinan Region II – Nueva Vizcaya Region III – Bataan, Pampanga, Tarlac Region IV – Puerto Princesa, Coron Region V – Camarines Norte, Masbate Region VI – Maasin & Carles, Iloilo Region VII – Negros Oriental, Cebu, Bohol Region VIII – Leyte, Northern Samar Region IX – Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay Region X – Bukidnon Region XI – Davao del Norte Region XII – North Cotabato, Sultan Kudarat Region XIII – Agusan del Norte, Surigao del Norte, Surigao del Sur ARMM – Sulu, Maguindanao

DESCRIPTION:

The FSP is a 10-year nationwide project aimed at addressing the root causes of forest degradation-poverty and insecurity of land tenure. The FSP adopted the Community-Based Forest Management (CBFM) as its main strategy of implementation in pursuing the win goals of rehabilitating the environment alongside the empowerment of beneficiary communities and upgrading of heir living status. The Project covers a total of 68,748 hectares of which 57,573 hectares are critical watershed areas covering 24 subproject site and 11,175 hectares of degraded mangrove areas involving 12 subproject sites. The implementation phases of FSP are the following: Site Selection; Survey, Mapping and Planning; Appraisal; Community Organizing; Comprehensive Site Development; Infrastructure Development and Monitoring and Evaluation. OBJECTIVE/S:

1. Reverse the process of upland and mangrove degradation through policy and institutional reform

2. Ensure long-term sustainability of the Sector’s investments through broad-based community participation

3. Enhance environmental rehabilitation through forest protection and law-enforcement 4. Reduce poverty and augment income-generating opportunities in the project areas

TARGET BENEFICIARIES : Upland and lowland communities

Page 290: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 280

EXPECTED OUTPUTS: 1. Survey, mapping and planning of 100,000 hectares of degraded watersheds 2. Communities within the project areas organized (70 Pos) 3. Comprehensive site development (68,663 has.) 4. Establishment of 68,663 hectares of plantation and monitoring & evaluation of other

activities related to its implementation FUNDING SOURCE : Japan Bank for International Cooperation (JBIC) BUDGET : (Original) (Revised) TOTAL : US $ 100 M US $ 80 M LOAN PROCEEDS : ¥9.294 B ¥ 6.638 B GOP COUNTERPART : US $ 25 M US $ 25 M DURATION : Eight (8) years FROM : August 19, 1993 TO : Dec. 16, 2000 (Original) Dec. 16, 2003 (Revised) June 30, 2004 (Extension)

Page 291: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 281

NRMP-Philippine Environmental Governance Program (ECOGOV)

SECTOR : Forestry/Upland Coastal/Marine Environment SITES COVERED : Region 2 – Quirino, Isabela, Nueva Vizcaya Region 3 – Aurora, Nueva Ecija Region 7 – Bohol, Cebu, Negros Oriental Region 9 – Basilan, Zamboanga del Sur, Sibugay Region 10 – Lanao del Norte Region 11 – Davao del Sur, Davao del Norte Region 12 – Sarangani, South Cotabato, Sultan Kudarat, North Cotabato, Maguindanao ARMM – Basilan, Lanao del Sur PROJECT DESCRIPTION: The ECOGOV is a nationwide program with emphasis on Western and Central Mindanao. It supports the goal of the GOP and the United States Agency for International Development (USAID) to revitalize the economy by fostering improved management of the environment and natural resources that provide key inputs to the long-term economic development of the country. Building upon USAID’s extensive experience in environmental conservation and local governance, the ECOGOV Program focuses on three main areas which aims to strengthen the ability of local communities (including LGUs and other stakeholders such as civil society group, private business sector, academe, local leaders and indigenous people’s groups) to manage coastal resources, forests and solid wastes. OBJECTIVE/S :

1. Address critical threats to the country’s coastal resources and forests, primarily over-

fishing and use of destructive fishing practices and illegal logging and conversion of natural forest; and

2. Strengthen the ability of local government and communities to implement integrated

solid waste management TARGET BENEFICIARIES: LGUs, coastal communities, upland farmers, and other

concerned stakeholders

Page 292: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 282

EXPECTED OUTPUTS : 1. Maintained 100,000 hectares of forest cover with 75% of this placed under

community-based forest management; 2. Improved management of 520 kilometers of coastlines; 3. At least 25 community-managed marine sanctuaries established, protecting over 250

has. of coastal resources; and 4. At least 42 LGUs diverting 15% of waste stream from disposal facilities through waste

recovery and recycling techniques. FUNDING SOURCE : United States Agency for International Development (USAID) BUDGET : US $11.83 Million GOP COUNTERPART : US $ 3.58 Million (cash & in-kind) GRANT PROCEEDS : US $ 8.25 Million FOREX RATE : US $ = P45.00 DURATION : Three (3) Years FROM : 2001 TO : 2004

PROGRAM DIRECTOR : Marcial C. Amaro, Jr. ADDRESS : DENR Compound, Visayas Avenue, Diliman, Quezon City TELEPHONE NO. : 927-6896 / 926-0550 / 926-0504 / 929-6626 loc.

2023/2024 E-MAIL ADDRESS : [email protected] / [email protected] TECHNICAL ASSIST. TEAM : Development Alternatives Incorporated (DAI)

Page 293: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 283

Public & Private Sectors Convergence for Solid Waste Co-Governance in

Urban Poor Communities (PHI/02/G58)

SECTOR : Environment SITES COVERED : Region 4 – Calamba, Laguna ( District II) Barangays Sampiruha, Lingga and Palingon OBJECTIVE/S : Develop a co-governance policy and institutional arrangement prototype for cluster-type barangay MRF.

ACTIVITIES: 1. Engage the private and public sectors ina discourse to draw out the public policy on

cluster MRF 2. Conduct bottom-up SWM cluster planning 3. Conduct a feasibility Study, formulate business plan for and set up cluster MRF 4. Define protocols for the provision of continuing TA on ENRPM functions by the

government to the private sector

OUTPUTS:

1. Co-governance policy and guidelines on MRF establishment and operation 2. MRF FS and Business Plan 3. Prototype MRF 4. TA protocols on SWM

FUNDING SOURCE : UNDP-Public and Private Partnership for Urban Environment (PPPUE)

BUDGET : PhP 5 M DURATION : One (1) years & six (6) months FROM : August 2002 TO : January 2004 PROJECT MANAGER : Mr. Albert A. Magalang ADDRESS : NSWM Secretariat, 2/F HRD Bldg., DENR Compound,

Visayas Avenue, Q.C. Tel. No. : (632) 920-22-52

Page 294: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 284

MGB-NASDA ALOS Project: “Analysis of Topographic and Geologic Terrain

Features in Relation to Rapidly Developing Urban Areas in the Philippines”

Sector : Mineral/Mines

Sites Covered: Metro Cebu and Metro Davao Description : This is the use of remotely sensed data in classifying and analyzing terrain features with alevation data as well as changes in terrain and water courses to provide an important basic geologic and topographic data that is need during the planning stages of the development projects in urban areas. Objective/s : 1) Demonstrate how the same geo-scientific data and related studies can benefit both

geologic research and land use management; and

2) Generate orthophoto images and digital elevation models (DEMS) for analyzing and classifying geologic and topographic terrain features.

Components:

1. Image Analysis 2. Field Verification

Duration : Three years (2001 – 2004) Funding Source : National Space Development Agency of Japan (NASDA) Budget : In-kind PROJECT LEADER: Gerry Gervacio Salvador ADDRESS : LGS Div., MGSB, North Ave., Dil., Quezon City TELEPHONE NO. : 928-86-82/920-91-32 FAX NO. : 928-85-44

Page 295: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 285

National Biosafety Framework for the Philippines (NBFP)

Sector : Biodiversity Sites Covered: Description : In January 2000, agreement was reached on the Cartagena Protocol on Biosafety, which aims to contribute to ensuring an adequate level of protection in the field of the safe transfer, handling and use of living modified organisms resulting from modern biotechnology that may have adverse effects on the conservation and sustainable use of biological diversity, taking also into account risks to human health, and specifically focusing on transboundary movements. In November 2000, the 16th GEF Council approved the "Initial Strategy for assisting countries to prepare for the entry into force of the Cartagena Protocol on Biosafety"(GEF/C.16/4). At the same meeting the GEF Council also approved the UNEP/GEF Global Project entitled "Development of National Biosafety Frameworks", aimed at Assisting up to 100 eligible countries to prepare their national biosafety frameworks, Promoting regional and sub-regional collaboration and exchange of experience on issues of relevance to the national biosafety frameworks. The overall objective of this UNEP/GEF Global Project is to prepare countries for the entry into force of the Protocol. (With the deposit of the 50th instrument of ratification by Palau in June 2003, the 90-day countdown to the Protocol's entry into force has started. The Protocol will enter into force in September 2003). The implementation of this National Project, described hereafter, is aimed at assisting the Philippines to develop its National Biosafety Framework, and will be undertaken in accordance with the overall objective of the UNEP/GEF Programme for Development of National Biosafety Frameworks, as approved by the November 2000 GEF Council meeting. Objective/s : The main objective of this National Project is the evaluation/review of existing national policies on modern biotechnology/biosafety, integration and updating and/or revision of these policies to come up with a National Biosafety Framework (NBF) that is consistent with the relevant provisions of the Cartagena Protocol on Biosafety.

Page 296: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 286

Components: 1. Assessment and Inventory of Biotechnology/Biosafety

This component will conduct an assessment and survey of biotechnology and biosafety in the Philippines. It will carry out and produce an inventory of the following: (1) current use of modem biotechnology, (2) existing legislation or legal instruments related to biotechnology/biosafety; (3) active or planned national projects for capacity building related to the safe use of biotechnology, (4) relevant experts within the country; and, (5) a report on existing sub regional biosafety frameworks and mechanisms for harmonization of risk assessment/management. A report analyzing the results of the inventory gaps, needs and priorities will likewise be made. 2. Development and Generation of a National Biosafety Database. Based on the results of the assessment and inventory, a National Biosafety Database will be developed and generated. This database will be linked to the Biosafety Clearing (OCR) of the Convention on Biological Diversity (CBD) Secretariat. 3. Development of a National Biosafety Framework for the Philippines As a major output of the project, the National Biosafety Framework (NBF) will be developed and prepared through a series of multistakeholder consultative workshops at the regional and national levels. The NBF will consist of a regulatory system, an administrative system,' a decision-making system, and mechanisms for public participation and information, consistent with the provisions of the Cartagena Protocol on Biosafety (CPB). TARGET BENEFICIARIES: Government, academic and research communities, civil society, private sector Duration : 18 months Start Date : October 2002 End Date : March 2004 Funding Source : United Nations Environment program-Global Environment

Facility (UNEP-GEF) TOTAL COST : US$ 275,790 GP : US$ 174,650 GOP : US$ 101,140

Page 297: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 287

PROJECT MANAGER/COORDINATOR:

Dr. Theresa Mundita S. Lim OIC, Director, PAWB/National Executing Agency

Ms. Mary Jean A. Caleda National Project Coordinator

ADDRESS : PAWB, Ninoy Aquino Park and Wildlife Nature Center Quezon Ave. Diliman, Q.C. TELEPHONE NO.: 924-60-31 to 35

Page 298: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 288

Development and Implementation of the Pilot Project of the Forestry

Statistics Information System (FSIS) - Phase I

SECTOR : Forestry Sector

SITE COVERED : Forest Management Bureau and DENR Regions 2 and, 3 (Pilot Regions)

OBJECTI'VES:

DEVELOPMENTAL OBJECTIVES:

To provide a facility for the efficient management of forestry data and for the

effective statistical system which will provide adequate data support for decision

making and policy formulation;

To organize the tremendous amount of forestry data that is being generated by the

current system and present this is manner that is more user-friendly and

understandable to stakeholders; and

To integrate all data vertically along the government hierarchy and horizontally across the forestry administrative functions to provide a total view of the Philippine Forestry Sector.

SPECIFIC OBJECTIVES:

To establish and operationalize a computer-based Forestry Statistics Information System (FSIS) that shall make timely, reliable and relevant information for policy formulation and decision-making;

To implement manpower development programs for the forestry sector information analysis to support the installation and operationalization of the FSIS and its computer facilities; and

To provide the organization the facilities to activate and sustain forestry sector information systems development program.

MAJOR COMPONENTS:

The Project strategy has two components:

Improvement of the Forestry Statistical Data and Procedures

Improvement of data capture and processing

Database build-up

Improvement of Statistical procedures

Page 299: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 289

Automation of the Functional Divisions of the Bureau in a Local Area Networking (LAN) infrastructure

Automation from data collection up to data consolidation and integration at all levels of hierarchy

Users are provided with work and user-centered applications that are easy to

operate and understand

TARGET BENEFICIARIES

The primary stakeholders of the Philippine Forestry Statistics are the policy and decision-makers Of the Department of Environment and Natural Resources.

Other stakeholders include both national and international organizations and investors that includes but not limited to:

International stakeholders include International Timber Trade Organization (ITTO)

, Food an~ Agriculture Organization (FAO), United Nation/ECE, European Union

(EU), Foreign Investors, etc.

National stakeholders include Government Agencies like the Congress, National

Economic and Development Authority (NEDA), National Statistical Coordination

Board (NSCB), Private Sectors like the Philippine Wood Producers Association

(PWPA), Non-government Organizations (NGO), Local Investors, the Academe,

students, researchers, etc. ,

EXTERNAL ASSISTANCE : International Tropical Timber Organization (ITTO)

IMPLEMENTING AGENCY: Forest Management Bureau, DENR

BUDGET:

GRANT PROCEEDS : $261,081.00

GOP CONTRIBUTION : $164,200.00

Exchange Rate : US$ 1 = P52.50 average

DURATION

FROM : JULY 2002

TO : JUNE 2004

EXTENDED TO : DECEMBER 2004

PROJECT MANAGER: Ms. Mayumi Ma. Quintos-Natividad

ADDRESS : Forest Economics Div., FMB, Visayas Ave., Q.C.

TEL. NO. : 926-2141

Page 300: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 290

Pilot Study on Participatory Control of Burning and Timber Pouching in the

Philippines

SECTOR : Forestry/Upland

PURPOSE :

The study aims to examine CBFM methodologies and proper control models of burning (kaingin) and timber pouching. Through the examination, the study shall develop methodologies and recommendations that enable the CBFM projects including FSP and other similar community forestry management projects to be more effective.

PROJECT DESCRIPTION :

The study is conducted in 4 barangays in Nueva Vizcaya and undertake among other, the following:

1. Conduct general study of natural and socio-economic conditions

2. Review and analyze laws, regulations, local decrees, institutional settings and current strategy at the field level concerning CBFM, burning and timber pouching and conduct policy consultation with various stakeholders.

3. Study present condition and local social system, social norms, shared values and trust in respect of collective action for natural resource management.

4. Conduct CBFM campaigns, environmental education, workshops and consensus building activities.

5. Prepare micro-planning for the control of burning and timber pouching.

6. Develop methodologies for the effective implementation of CBFM projects.

IMPLEMENTING AGENCY/UNIT: DENR/PENRO Nueva Vizcaya

IMPLEMENTING SCHEDULE : October 2003 – August 2004

FUNDING AGENCY : JBIC

ESTIMATED TOTAL COST: US$180,000

Page 301: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 291

ENR Shell Program: Environment and Natural Resources (ENR)

Framework Development and Implementation

SECTOR: Multisectoral

LOCATION: Nationwide

DESCRIPTION:

The DENR and other cooperating/implementing entities, in partnership with the UNDP, will combine their relevant experiences in dealing with and managing environment and natural resources, in order to achieve the overall goal of environmental sustainability.

OBJECTIVES:

GENERAL:

The main objective of the project is to develop an ENR framework that would guide the planning and implementation of interventions for the protection of the environment and the sustainable development of natural resources. The framework development involves defining the policy environment and capacity building needs to implement such a framework and its corollary plans and programs.

SPECIFIC:

a. Review and assess the imperatives of the ENR sector, as enunciated existing policies, experiences of stakeholders, implementation of sub-sectoral plans, programs and projects, taking into account the global developments and the current state of the environment;

b. Rationalize ENR planning and implementation by providing an integrating mechanism to guide plan preparation and implementation assessment in the various sub-sectors;

c. To provide a clear basis and guide for development of sectoral thrusts and direction;

d. Assist in the development/refinement of specific sectoral strategies and plans that are considered gaps such as the National Coastal and Marine Strategy;

e. Assist in the further definition of the ENR legislative agenda; and

f. Assist in the capacity building of the DENR and key stakeholders in the implementation of the ENR framework process.

Page 302: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 292

COMPONENTS/ACTIVITIES:

1. Framework Planning

2. Policy Development Support

3. Strategy Formulation and Multi-year Planning for the ENR Sub-Sectors

4. Capacity Development and Advocacy

FUNDING SOURCE: UNDP

TOTAL PROJ. COST: US$ 648,660

DURATION:

START DATE: 2002

END DATE: 2004

Page 303: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 293

Enabling Activity for the Maintenance and Enhancement of National

Capacities to Prepare the National Communication on Climate Change

SECTOR: Environment

SITES COVERED: Nationwide

DESCRIPTION:

It is a follow-up project of the GOP, through the Inter- Agency Committee on Climate Change (IACCC) to the "Enabling the Philippines to Prepare Its First National Communication" in compliance with the country's commitments as a non-Annex I country Party to the United Nations Framework Convention on Climate Change (UNFCCC). The project availed of the additional interim funding of priority activities under the GEF Operation Guidelines for Expedited Financing of Climate Change Enabling Activities, Part II.

OBJECTIVES:

GENERAL:

To maintain and enhance national capacities of concerned agencies to institutionalize the preparation of the country's national communication to climate change.

SPECIFIC:

1. To build capacity including improvement of data management systems and capacity to deal with recent changes in global climate change issues;

2. To identify capacity and technological needs and eventually build capacity to participate in systematic observation networks;

3. To strengthen/improve national activities on public awareness and education, as well as, access to information, including information from international centers and networks.

COMPONENTS/ACTIVITIES:

1. Institutionalization of Greenhouse Gas Inventory

2. Capacity Building for Participation in Systematic Observation Networks

3. Public Awareness and Education Consultative Workshops

4. Development of Project Proposal

Page 304: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 294

FUNDING SOURCE: Global Environmental Facility (GEF) through the UNDP

TOTAL PROJ. COST: US$ 254,500

TOTAL GP : US$ 254,500

EXCHANGE RATE:

DURATION : 2 years

START DATE : 2003

ORIG. END DATE: 2004

PROJECT MANAGER: Joyceline A. Goco

MAILING ADDRESS: 2/F HRD Building, DENR Compound, DENR, Visayas Avenue, Quezon City

TELEPHONE NO.: (632) 920-22-51

Page 305: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 295

Strengthening the Environmental Performance Monitoring and Evaluation

System of the Philippine Environmental Impact Statement System (EIS)

Project

SECTOR: Environment

SITES COVERED: Nationwide but with Regions 3 and 4 as pilot regions

DESCRIPTION:

The Government of the Philippines through the EMB has been granted funding assistance under the World Bank's Institutional Development Facility (IDF) Grant for a Technical Assistance (TA) on "Strengthening the Environmental Performance Monitoring and Evaluation System of the Philippine Environmental Impact Statement System (EIS)".

OBJECTIVES:

1. To strengthen the monitoring and evaluation aspect of the EIS System by implementing and EIS M& E model based on a comprehensive analysis of the System taking into consideration the various constraints-financial, institutional, regulatory-as well as focusing on the most critical environmental concerns of development projects, minimizing duplication of functions among different government agencies and encouraging cooperation among various stakeholders;

2. To strengthen the capability of the environmental regulatory agency tasked to implement the EIS system, encourage LGUs and communities in the monitoring, evaluation and reporting of compliance to environmental rules and regulations (including the implementation of the EMPs by Project Proponents), especially the World Bank-supported projects;

3. To improve the capacity of the GOP in developing adopting innovative financial and institutional mechanisms including participatory approaches that will ensure continued implementation of EMPs and compliance to environmental covenants.

COMPONENTS/ACTIVITIES:

Component 1: Comprehensive assessment of the policy, legal, regulatory and institutional frameworks governing EIS monitoring and evaluation system and develop and Enhanced EIS Monitoring and Evaluation Model;

Component 2: Determine the effectiveness of the EIS M & E Model through pilot testing and enhancing the capability of the regulatory agency in the implementation of the EIS Monitoring and Evaluation Model; and

Component 3: Develop and implement mechanism to encourage public disclosure of environmental performance and multi-stakeholder participation in EIS monitoring and evaluation.

Page 306: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 296

EXPECTED OUTPUT:

Component 1: Systems Assessment Reports; Enhanced M& E model; Pilot Testing Action Plan.

Component 2: Pilot Testing Report; Enhanced M & E System Handbook; Consolidated Model Institutionalization action Plan; Enhanced M& E system Training Modules.

Component 3: MMT Assessment Report; MMT Handbook; MMT Training Module;

Final Output: Consolidated Final Project Report.

FUNDING SOURCE: World Bank - IBRD-IDF

TOTAL PROJ. COST:US$ 250,000

TOTAL GP : US$ 250,000

EXCHANGE RATE :1 US$ = PhP 51.83

DURATION: 3 years

START DATE: February 2, 2002

ORIG. END DATE: January 31, 2004

REV. END DATE: January 31, 2005

PROJECT MANAGER: Reynaldo P. Alcanses

MAILING ADDRESS: EMB-EIA, DENR Compound, Visayas Avenue, Q.C.

TELEPHONE NO. : (632)920-22-40 to 41

Page 307: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 297

Geology and Mineral Potential of the Malimono-Cabadbaran Area of the

Surigao Mineral District, Philippine: a RP-Korea Joint Investigation Project

SECTOR : Mineral/Mines

SITES COVERED: Malimono-Cabadbaran Area, Surigao del Norte

DESCRIPTION:

A joint exploration survey in northeastern Mindanao between Korea Resources Corporation (KORES) and the Mines and Geosciences Bureau (MGB) to assess the mineral potential of the survey area.

OBJECTIVES:

GENERAL:

To explore and assess the mineral potential of the survey area.

SPECIFIC:

1. To reassess the gold and copper mineral potential of the Malimono-Cabadbaran area in the Surigao mineral District;

2. Elucidate on the Nature and origin of mineralization in the area; and

3. Pinpoint and carry out detailed evaluation of the most promising gold/copper-gold prospect in the area.

COMPONENTS/ACTIVITIES:

A. Field survey and evaluation

1. Geological Survey

2. Geochemical survey

3. Geophysical survey

4. Pilot drilling

5. Resource assessment

B. Laboratory and in-house works

1. Polarizing and ore microsopic studies of rocks and minerals

2. Petrochemical Studies

3. Computerized data processing of the survey result for interpretation and evaluation of ore deposits.

Page 308: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 298

EXPEXTED OUTPUTS:

Phase 1 (1st yr): Regional Geological and Geochemical Survey

Phase II (2nd yr): Detailed Geological Survey

Phase III (3rd yr): Confirmatory Drilling and Preliminary Resource Assessment

Phase IV (4th yr): Pre-Feasibility (Optional)

TARGET BENEFICIARIES : Mineral industry

FUNDING SOURCE : TA from Korea Resources Corporation

TOTAL PROJ. COST : US$ 1.70 M

KORES : US$ 500,000

GOP Counterpart : US$ 1,200,000

DURATION : 3 years

START DATE : 2002

ORIG. END DATE: 2004

PROJECT MANAGER: Fernando G. Sajona

ADDRESS : Mines and Geosciences Bureau, North Ave., Diliman, Quezon City

TELEPHONE NO. : 928-88-19/928-86-82

Page 309: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 299

Governance and Natural Resources Management Sector Study

SECTOR : Multisectoral OBJECTIVE: To develop a sound strategy that is supportive of current and emerging priorities of the country, within an operational watershed and ecosystems management framework, that shall serve as the basis for policy formulation or enhancement, institutional strengthening initiatives, and investments in the NRM sector. TARGET BENEFICIARIES: Local Government Units, Civil Society EXPECTED OUTPUTS:

1. Report on the results of the review of the Forestry, Fisheries and Agricultural Resources management (FFARM) implementation;

2. Inventory and analysis of existing NRM policies, institutional arrangements, plans, sector-specific strategies and programs;

3. Report on the current state of the NRM Sector;

4. Inventory and analysis of the problems, threats and opportunities in natural resources management and development;

5. Implementing Rules and Regulations and other operational guidelines for DAO No. 99-01 that will focus on the interplay of the various sectors in sustainable development and management;

6. Mechanism and/or instruments for harmonizing all NRM policies and legislations;

7. Medium-Term NRM Strategy; and

8. Other comments and recommendations, which are supportive of the DENR’s new priorities (i.e. poverty alleviation, public vigilance and participation, private sector participation, and good governance).

FUNDING SOURCE: World Bank (WB) BUDGET : US$50,000 DURATION : Six (6) months FROM : 2002 TO : 2003 EXTENDED : 2004

Page 310: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 300

Ulot Watershed Model Forest

SECTOR : Forestry

SITES COVERED : Ulot Watershed, Samar Island PROJECT DESCRIPTION:

The Philippine has initially launched its Model Forest Project for Sustainable Forest Management at Ulot Watershed, Samar Island. The project site (Ulot Watershed) is located at the Central Samar Island and the third largest watershed covering an aggregate area of 86,514 hectares. The area covers 23 barangays with a population of 12,632.

The International Development Research Center (IDRC-Canada) thru the International Model Forest Network Secretariat (IMFNS-Canada) extended financial assistance to continue the development of Ulot Model Forest Activities. OBJECTIVES:

1. To develop stakeholder-based sustainable forest management practices within the watershed context for replication in other communities

2. To optimize the development potential of the production forests of Samar island;

3. To create a difference in buffering the protection forests and in providing sustainable use and benefit to the communities within and adjacent to the site;

4. To provide a rational alternative to protect and conserve the remaining lowland dipterocarp forests in the Philippines; &

5. To strengthen the capacities of the stakeholders in sustainably managing their forest resources

EXPECTED OUTPUTS:

Copies of proposals prepared; minutes of the meetings; monitoring reports; and financial statement of funds, accompanied by original receipts and other disbursement, to be submitted not later than one month after completion of the activity.

1. Seminar-workshop on the revisioning of Ulot Watershed Model Forest

a. Proceedings of the workshop including observations, recommendations and an action plan to follow through on the recommendations and a list of participants. The action plan to clearly indicate specific tasks, persons responsible and expected outputs;

b. Financial statement of funds, accompanied by original receipts and other disbursement.

Page 311: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 301

2. Strengthening of Ulot Federation and Collaboration with government agencies and other stakeholders

a. Strengthened Ulot Federation

b. Copies of proposals prepared; minutes of the meetings; monitoring reports; and financial statement of funds, accompanied by original receipts and other disbursement, to be submitted not later than one month after completion of the activity.

3. Establishment of Pili Plantation

a. Planting of 50 ha. of pili plantation completed

b. Monitoring report on survival and performance of seedlings, 6-months and I-year after planting

c. Completion report and financial statement of funds provided, accompanied by original receipts and other disbursement documents, to be submitted not later than one month after completion of the activity

4. Strengthening of Information and Education Campaign for the Ulot Watershed Model Forest Project

a. Report on the completion of the activities along with copies of the information material/publication, and financial statement on the use of funds with original receipts, to be submitted within one month of completion of the activity.

5. Coco fiber and coco peat processing

a. Coco coir and coco peat processing plant established

b. Financial statement of funds provided, accompanied by original receipts and other disbursement documents, to be submitted not later than one month after completion of the activity

c. Documentation on the processes involved and experiences and lesson learnt

d. Detailed profit/loss statement at the end of the year

Page 312: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 302

MAJOR COMPONENTS/ACTIVITIES:

1. Seminar-workshop on the revisioning of Ulot Watershed Mode! Forest

2. Strengthening of Ulot Federation and Collaboration with government agencies and other stakeholders

3. Establishment of Pili Plantation

4. Strengthening of Information and Education Campaign for the Urot Watershed Model Forest Project

5. Coco fiber and coco peat processing

TARGET BENEFICIARIES : Ulot Model Forest Stakeholders

EXTERNAL ASSISTANCE : (funding agency/source)

International Development Research Center (IDRC-Canada) thru International Model

Forest Network Secretariat

IMPLEMENTING AGENCY : Forest Management Bureau

BUDGET

GRANT PROCEEDS : Cad $ 36,710 Cad (US$28,154)

DURATION

FROM : November 2003 TO : November 2004 PROJECT MANAGER/ COORDINATOR : Director Romeo T. Acosta National Coordinator, Philippine Model Forest for Sustainable Forest Management CONTACT NUMBER/S : FMB Director's Office: 927-4788/928-9313

OFFICE ADDRESS : FMB Building, DENR Compound Visayas Avenue,

Diliman, Quezon City

Page 313: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 303

Land Administration and Management Program (LAMP)

SECTOR : Land Sector

SITES COVERED : Region VIII – Leyte Province (6 municipalities)

1st District – Dagami, Palo, Pastrana, Santa Fe, Alang-Alang, and San Miguel

NCR – Quezon City (5 Barangays)

2nd District – Payatas, Bagong Silangan, Commonwealth,Holy Spirit,

and Batasan Hills

DESCRIPTION:

The over-all goal of the program is to alleviate poverty and enhance economic growth by improving the security of

tenure to land and by fostering efficient land markets in rural and urban areas, through the development of an efficient

system of land titling and administration which is based on clear, coherent and consistent policies and laws and is

supported by an appropriate institutional structure.

OBJECTIVE/S:

1. Test alternative approaches to designing programs aimed at improving the protection of rights to land, eliminating

fake titles, introducing an equitable system of land valuation;

2. Formulate and approve policy and regulatory changes; and

3. Formalize the institutional arrangements needed to support the development and implementation of the long term

program

TARGET BENEFICIARIES : General public and line agencies

EXPECTED OUTPUTS:

1. Agreement on the policy changes necessary to implement the long-term LAM Program, supported by draft

legislation, as appropriate

2. Successful implementation of 2 prototypes of the following:

a. procedures in the preparation of cadastral index maps streamlined, field proven and documented; land rights

adjudicated; and land records validated/reconstituted;

b. cadastral index maps into the Register of Deeds (RODs) in Leyte Province and Quezon City integrated;

c. a one-stop-shop that successfully and efficiently serviced the requirements of government and the community

demonstrated; and

d. 30,000 new titles in Leyte produced, and titles in Quezon City reconstituted

3. Detailed design and costing for the second phase of the LAM Program which will scale-up the procedures

developed during the LAM Program

Page 314: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 304

FUNDING SOURCES : Australian Assistance for International Development (AUSAID) and World Bank (WB)

BUDGET : US$ 11.31 M

GRANT PROCEEDS : US$ 5.10 M

LOAN PROCEEDS : US$ 4.79 M

GOP COUNTERPART: US$ 1.42 M

Partial Loan Cancellation : US$ 722.20

DURATION :

FROM : October 2000

TO : December 2004

Extension : Sept. 2005

EXECUTIVE DIRECTOR : ASEC Analiza Rebuelta- Teh

ADDRESS : DENR Bldg., Visayas Ave., Diliman, Quezon City

Page 315: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 305

Water Resources Development Project - Watershed Management

Improvement Component (WRDP-WMIC)

SECTOR : Forestry / Upland

REGIONAL AND PROVINCIAL SITES COVERED:

Region IV – Tanay, Rizal (Brgy. Cayabu, Sta Ines, Sto Nino, Laiban, San Andres)

2nd Congressional District

Gen. Nakar, Quezon-Brgy. Lumutan

4th Congressional District

Region IX – Tigbao, Zamboanga del Sur and Pagadian City

2nd Congressional District

DESCRIPTION:

The Project was conceptualized as the existing policies on watershed management and the

programs/projects have not effectively addressed the alarming rate of watershed degradation. Failure in the

implementation of these policies and programs can be attributed to the following: a) lack of a clear overall strategy; b)

limited financial resources; c) fragmented implementation responsibility; d) lack of properly trained manpower; and e)

increasing socio-economic pressure resulting from the rapid increase of population in the uplands where the vital

watershed are locked.

The Project aimed at creating an environmentally sound, sustainable,productive and equitable resource

utilization system and integrating community participation in the watershed management.

OBJECTIVE/S:

General:

Formulate a national watershed management strategy and a long-term program of investments for the

sustainable management of watersheds, particularly those considered critical, and recommend appropriate policies,

and legislative and institutional measures, to implement the strategy and investment program.

Specific:

1. To establish a sound policy and legislative basis for watershed management in the country.

2. To institutionalize an effective and responsive administrative machinery and procedure for watershed management

and protection.

3. To minimize and control accelerated soil erosion and improve water yield and quality.

4. To promote compatible land uses and enhance productivity.

5. To enhance economic opportunities for and environmental consciousness of watershed communities.

6. To establish a National Watershed Information System in the DENR.

TARGET BENEFICIARIES : Upland Communities

Page 316: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 306

/cont…..WRDP

EXPECTED OUTPUTS:

A. Phase I. Strategy Formulation

1. Handbook on Philippine Strategy for Improved Watershed Resources Management

B. Phase II. Watershed Management Programs

3. Guidelines for Watershed Resource Management and Development

4. National Watershed Information System (NWIS)

C. Phase III. Preparation of Watershed Plans

1. Completed the Kaliwa River Watershed Management & Development Plan (Region IV)

2. Completed the Maragang Watershed Management & Development Plan (Region IX)

3. Preparation of Management Plan for the Bicol River Basin (Region V) (for completion)

D. Phase IV. Investment Components

1. Survey and mapping conducted

2. Reforestation, agroforestry plantations established

3. Communities organized/strengthened

4. Soil control measures established

5. Research on watershed improvement and development and establishment of demo farms conducted

6. Capacity building of stakeholders conducted

7. Infrastructure facilities provided

8. Information, education and communication campaign conducted

9. Enrichment planting/ANR, riverbank stabilization, and boundary plantation maintained and protected

FUNDING SOURCES : Danish International Development Assistance (DANIDA) for Phases I & II

World Bank (Phases III & IV)

(Original) (Revised)

BUDGET : $ 14.84 M $10.84 M

GRANT PROCEEDS : $ 1.24 M $ 1.24 M

LOAN PROCEEDS : $ 8.70 M $ 4.70 M

GOP COUNTERPART: $ 4.90 M $ 4.90 M

DURATION : Seven (7) years

FROM : 1997

TO : 2002

EXTENDED TO : June 2005

PROJECT DIRECTOR : Primitivo C. Galinato, Jr.

ADDRESS : FMB Bldg., Visayas Ave., Diliman, Quezon City

TEL. NO. : 925-21-34

Page 317: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 307

Cordillera Highland Agricultural Resources Management Project (CHARM) -

Reforestation Component

SECTOR : Forestry / Upland

SITES COVERED : Cordillera Autonomous Region

Province of Abra - Municipalities of Boliney,Bucloc and Sallapadan.

Province of Benguet - Municipalities of Atok, Bakun, Buguias, Kapangan, Kibungan, Sabian, Tuba and Tublay.

Mt. Province - Municipalities of Bauko, Bontoc, Sabangan, Sagada and Tadian.

DESCRIPTION:

The activities proposed to enhance natural resource management focus on community-based forest

management and reforestation, forest protection and land use planning, tenurial security and monitoring. First, the project

would provide for environmental awareness and land tenure security training for staff involved in community mobilization

and participatory planning. Second, the capacity of DENR/DAR to issue appropriate tenurial security instruments will be

supported. DENR will award Certificates of Ancestral Domain Claim (CADCs) for about 150,000 ha., and Certificates of

Ancestral Land Claim (CALCs) for about 480 has. DAR will issue Certificates of Land Ownership Award (CLOAs) for

about 26,450 ha. Third, DENR-CAR will receive funding under its budget ceiling to contract with communities to reforest

and manage about 6,150 ha. to be sited on forest and proclaimed watershed reservations and community forest land,

using an approach similar to that of the ADB-financed Forestry Sector Loan Project, involving the use of NGOs to facilitate

community-based implementation of reforestation. The reforestation, in appropriate areas, would also involve agro-

forestry activities, in keeping with the focus of the Project on the Key Commercial Crops Development Program. The

reforestation activity would contribute to soil conservation and watershed protection, thus indirectly supporting the

sustainability of the Key Commercial Crop Development Program. Fourth, a Project Geographical Information System

(GIS) will be established to assist in planning and monitoring of activities under Project implementation, including the

DENR and DAR activities and to provide a long term planning tool on a regional basis.

OBJECTIVE/S :

Reduce poverty in the CAR by increasing the disposable incomes of smallholder farm families in the project area. An

integral part of achieving this objective is the promotion of sustainable resource management practices, the protection of

the environment and the mitigation of any adverse development impacts, the strengthening of existing institutions, and the

involvement of beneficiaries in project planning and implementation activities

TARGET BENEFICIARIES : 16 upland communities of the provinces of Abra, Benguet and Mt. Province

EXPECTED OUTPUTS:

1. Established 3,780 hectares of forest tree species within the selected grassland and brushland areas of the

community, including watersheds;

2. Established 1,397 hectares of agroforestry farm;

3. Enrichment planting of 973 hectares of inadequately stocked forest with forestry species;

COMPONENTS:

The four major components of the project are:

Page 318: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 308

1. Community mobilization and resource management

2. Rural infrastructure development

3. Agricultural support services

4. Project management and Coordination

FUNDING SOURCES : Asian Development Bank (ADB) and International Fund for Agricultural Development

(IFAD)

BUDGET : P 260.949 M (US$ 5.876 M)

LOAN PROCEEDS : SDR 3.480 M (US$ 4.872 M)

GOP COUNTERPART : P 26.094 M (US$ 1.004 M)

DURATION : Five (5) years

FROM : 1999

TO : 2003 (Extended until 2004)

Winding-up : June 2005

PROJECT DIRECTOR : Nicanor Sapla

ADDRESS : DENR-CAR, Baguio City

TELEFAX NO. : (074) 442-82-70

E-MAIL ADDRESS : [email protected]

Page 319: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 309

Sites covered by Visayan Sea Project

Visayan Sea Coastal Resources and Fisheries Management Project (VisSea)

– DENR Component

SECTOR : Coastal / Marine

SITES COVERED:

Region V - Masbate (Balud, Cawayan, Esperanze, Milagros, Placer)

Region VI - Iloilo (Ajuy, Balasan, Carles, Concepcion, Estancia, San Dionisio)

- Negros Occidental (Cadiz, Escalante, Manapla, Sagay)

Region VII - Cebu ( Bantayan, Daanbantayan, Madridejos, Medellin, San Remegio, Sagay)

PROJECT DESCRIPTION:

The Visayan Sea is located centrally in the Philippines surrounded by its inland provinces of Cebu, Masbate, Iloilo and

Negros Occidental. It has been defined as one of the biggest and most productive fishing grounds in the country. The

diversity of its resources has drawn various activities resulting in the decline in marine and coastal resources due to

unabated exploitation.

This scenario calls for the immediate attention of various concerned

sectors in saving the rich resources of the fishing grounds. On September 2001, a Memorandum of Agreement was

executed to bring together different stakeholders to work for effective management of the renewable resources of the

Visayan Sea.

The role and responsibility of the DENR, as specified in the Memorandum of Agreement, is to provide technical

assistance to revert idle, abandoned and unutilized fishponds into mangrove forests, training assistance on mangrove

management, and to provide expertise on addressing environmental issues, siltation, marine and coastal pollution and

deforestation.

The Visayan Sea Coastal Resources and Fisheries Management Project is a joint initiative of the Government of the

Federal Republic of Germany and the Government of the Philippines with the Department of Agriculture-Bureau of

Fisheries and Aquatic Resources (DA-BFAR) as the lead agency, and the Department of Environment and Natural

Resources as one of the participating/coordinating agencies. The Project is an 8-year (2002-2010) technical

assistance project. The 1st three years of project implementation commenced on August 2002. The project covers

twenty two (22) municipalities in the four (4) provinces of regions 5, 6 and 7.

GENERAL OBJECTIVE (VisSea Project):

To bring together different stakeholders to work for effective management of the renewable resources of the Visayan

Sea.

SPECIFIC OBJECTIVE (DENR Component):

To contribute to the sustainable management of the coastal resources, the restoration of destroyed habitats and the

regeneration of depleted living resources of the Visayan Sea.

Page 320: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 310

/cont……VisSea

TARGET BENEFICIARIES: Local Government Units of Masbate, Iloilo, Negros Occidental and Cebu;

Peoples’ Organizations; and Non-Government Organizations

EXPECTED OUTPUTS:

From Vis Sea Project:

1. A plan for sustainably managing the resources of the Visayan Sea is jointly formulated and implemented

by the Visayan Sea Provinces.

2. Improved CRM practices are implemented by LGU’s and local communities.

3. An information base for resource management and monitoring is established and utilized appropriately.

4. A networking System among the different stakeholders is established and increasingly used.

5. Alternative business opportunities for coastal communities are promoted and supported.

From DENR Component:

1. Capabilities of LGUs on mangrove rehabilitation are enhanced.

2. New mangrove plantations are established.

3. Baseline information is established.

4. LGUs are completely aware of ENR laws, rules and regulations.

MAJOR COMPONENTS/ACTIVITIES:

1. Training assistance on mangrove management

2. Training assistance on deputation and capacitation of Environmental and Natural Resource Officers

(ENROs)

3. Technical assistance in addressing environmental issues (i.e. siltation, marine and coastal pollution and

deforestation)

4. Technical assistance in survey, mapping and inventory of mangrove areas

5. Technical assistance in the establishment/rehabilitation of mangrove areas

6. Technical assistance in the establishment of water quality monitoring station for the conduct of water

quality monitoring

7. Technical assistance in the establishment of baseline information (i. e, Municipal Coastal Database and

PCRA) EXTERNAL ASSISTANCE : German Agency for Technical Cooperation (GTZ)

PROJECT COST :

GOP Counterpart : PhP 6.5M (US $ 0.12M- Proposed budget for DENR Component)

GRANT PROCEEDS : EURO 2.0M (US $ 2.16M)- VisSea Project

FOREX RATE : US $ 1 = PhP54.00

DURATION : 3 years (Phase I)

FROM : August 2002

TO : June 2005

Page 321: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 311

/cont….VisSea

PROJECT COORDINATORS (DENR Component)

Project Coordinator : Rebecca Matusalem

Address : Region 5, Legaspi City

Tel. no. : (052) 481-5888

Fax no. : (052) 481-5532

Project Coordinator : Dennis S. Piñosa

Address : Region 6, Iloilo City

Tel. no. : (033) 337-8900

Fax no. : (033) 335-0435

Project Coordinator : Teodorico F. Barral

Address : Region 7, Mandaue City

Tel. no. : (032) 343-9268/346-9177

Fax no. :

Project Director : Sonia V. Seville, CESO V

Address : BFAR 6, 2nd Floor IPFO Bldg.

Muelle Loney St. Iloilo City

Tel./Fax no. : (033) 336-2708

Project Manager : Remia Aparri

Address : Regional Fisheries Office 6

M.H. del Pilar Molo, Iloilo City

Tel./Fax no. : (033) 337-0265/336-9432

Page 322: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 312

ASEAN Regional Centre for Biodiversity Conservation (ARCBC)

SECTOR : Biodiversity

SITES COVERED : ASEAN Member Countries (Brunei Darussalam, Indonesia, Malaysia, Singapore, Thailand,

Vietnam, Cambodia, Lao PDR and Philippines)

PROJECT OFFICE : Los Baños, Laguna, Philippines

(Project Office)

PROJECT DESCRIPTION:

The ASEAN Regional Centre for Biodiversity Conservation is a joint cooperation Project between the European Union

and the Government of the Philippines on behalf of the ASEAN. EU provides the means for networking, applied

research, training and technical assistance while ASEAN provides office space, facilities and support personnel. The

Department of Environment and Natural Resources (DENR) is the project’s executing agency.

ARCBC serves as the focal point for networking and institutional linkage among ASEAN Member Countries (AMCs)

and between ASEAN and European Union (EU) partner organizations to enhance the capacity of ASEAN in promoting

biodiversity conservation.

ARCBC aims to intensify biodiversity conservation through improved cooperation in a comprehensive regional context,

by assisting in setting up a network of institutional links among ASEAN countries and between ASEAN and EU partner

organizations.

OBJECTIVE:

Intensify biodiversity conservation through improved cooperation in a comprehensive regional context, by assisting in

setting up a network of institutional links among ASEAN countries and between ASEAN and EU partner organizations

EXPECTED OUTPUTS: 1. Networking and institution building enhanced

2. Training and extension services provided

3. Research and development conducted

4. Database management and information dissemination strengthened

MAJOR COMPONENTS:

1. Networking and Institution Building

2. Training and Extension

3. Research and Development

4. Database and Information System Management

5. Project Management and Administration

TARGET BENEFICIARIES : ASEAN Member Countries, Institutions, Experts, Scientists, Policy Makers,

Administrators, other stakeholders who are involved in biodiversity conservation and

protected area management

/cont…..ARCBC

EXTERNAL ASSISTANCE : European Union (EU)

Per Original Per Amendment No. 1 Total (Revised)

Financing Memorandum (FM) to FM (additional budget)

Page 323: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 313

BUDGET : Euro 10.3 M Euro 1.214 M Euro 11.514 M

GRANT PROCEEDS : Euro 8.5 M Euro 0.924 M Euro 9.424 M

GOP CONTRIBUTION : Euro 1.8 M Euro 0.290 M Euro 2.090 M

OTHER ASEAN CONTRIBUTION : Running cost of NBRU offices, technical facilities in each ASEAN Country,

counterpart personnel, among others)

FOREX : Euro 1.00 = PhP 45.00

US$ 1 = P 50

DURATION : Five (5) years

FROM : February 1999

TO : February 2004

EXTENSION : December 2004

With approved GOP extension until December 2005

(for winding down activities)

PROJECT DIRECTOR : Dr. Gregorio Texon

ADDRESS : UPLB Compound, Los Baños, Laguna

TEL. NOS. : (049) 536-31-73 / (049) 536-28-65

E-MAIL ADDRESS : [email protected]

Page 324: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 314

Establishment of Clean Development Mechanism (CDM) National Authority,

Operational Framework and Support Systems for the Philippines

Sector : Environment

Sites Covered : Nationwide

Objective/s :

General:

To facilitate the country’s shift to sustainable development through accelerated socio-economic growth, fueled

by investments through mechanisms like the Clean Development Mechanism (CDM) and the global reduction of

greenhouse.

Specific:

To put in place the CDM system of the Philippines through the designation of the National Authority (NA) and

establishing its operational framework and support systems.

Activities/Components:

1. Establishment of the CDM National Authority

2. Development of the Operational Framework of the NA

Expected Outputs:

1. Legal issuance designating the NA for the CDM process in the Philippines

2. National Authority’s Management System established

Target Beneficiaries:

The ultimate beneficiary is the global community and the country’s general public with GHG avoided or

abated worldwide and the achievement of the Philippines sustainable development goals.

The direct beneficiaries are the industries and the private sector which shall be the recipients of improved

technologies and additional project financing, as well as the national government agencies that will be involved in the

CDM process.

Duration :

Start Date : April 2003

End Date : May 15, 2005

Funding Source : Netherlands Government-UNDP

Budget:

The Netherland Gov’t. - US$ 178,500

Philippine Gov’t. - PhP 1.367 M (in-kind contribution)

UNDP - US$ 15,005 (in-kind contribution)

Exchange Rate : US$ 1 = P55.00

PROJECT COORDINATOR: Ms. Joyceline A. Goco

ADDRESS : EEID-EMB, DENR Compound, Visayas Avenue, Quezon City

Tel. No. : (632) 920-22-51

Page 325: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 315

Establishment of an ISO 14001-based Environmental Management System at

the DENR

SECTOR : Environment

DESCRIPTION:

The DENR is currently promoting increased private sector initiatives on environmental management through

issuance of Administrative Order on Phil. Environmental Partnership Program (PEPP) which will allow more self-

regulation among industrial establishment through self-monitoring and environmental management system (EMS). To

strengthen itself as the lead institution on environmental management in the Philippines and to demonstrate a role-

model, the DENR through Swedish assistance will implement EMS at its Central Office with the objective of

certification under ISO 14001 Standards. It is expected that both the public and private sector will benefit from the

project because it will enable the DENR to actively support widespread adoption of EMS among the industrial and

commercial establishment and even other government agencies after implementation of an ISO based EMS.

OBJECTIVE:

General:

To create excellent capabilities at the DENR to support Philippine industry sectors that are implementing and

working with ISO 14001-based EMS.

Specific:

To assist and provide DENR with EMS expertise in order to install a platform for ISO based EMS.

PROJECT ACTIVITIES:

1. Planning of project and gaining top management approval including awareness seminar for level

management.

2. Introduction seminar for department heads and other management staff.

3. Train and utilize a number of Environmental Champions. To implement the system.

4. Initial review describing the environmental status of DENR, strengths and areas of improvements versus the

ISO 14001 standards.

5. Identity Environmental aspects and development of environmental objectives, program and activities.

6. Continuous and general support by the consultants to the Champions and other vital parts of the organization

during implementation.

7. Development of a general staff during training program

8. Basic training for selected group.

9. Preparation for certification audit including pre-audit.

DURATION : 2004-2005

FUNDING SOURCE : SIDA

PROJECT COST : SEK 1.7 M

Environment Management Representative : USEC Rolando L. Metin

ADDRESS : DENR Visayas Ave., Dil., Q.C.

Tel. No. : 927-6726

Page 326: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 316

Support to the Implementation of Executive Order No. 247 in the Philippines

SECTOR: Protected Areas, Wildlife and Coastal Zone Management

PROJECT DESCRIPTION:

The Philippines was one of the first countries to implement a regulation to access of Biological and Genetic Resources. Access is regulated starting 1996 upon the inception of Executive Order 247 (EO 247) and its Implementing Rules and Regulations (DAO 96-20) establishing the provisions and legal procedures in the utilization of natural resources for academic and commercial purpose. the Order calls for the development of specific guidelines on benefits, payment of bioprospecting fees, bond and royalties. Thus, the project "Support to the Implementation of Executive Order 247" was conceptualized in year 2000 to develop these guidelines among other secondary outputs.

Regulations for bioprospecting activities was reiterated by the Wildlife Act of 2001. The IRR of the Act, in

particular calls for the formulation of a new bioprospecting guidelines which shall prescribe the procedures and requirements for evaluating and processing bioprospecting in accordance with the Act.

The project was thus given a new direction and its objectives were aligned with the needs arising from the

law.

OBJECTIVES:

1. Develop guidelines for bioprospecting activities in the Philippines in the form of a joint DENR-DA-PCSD

Administrative Order. The guidelines shall prescribe the procedures and requirements for evaluating and approval of bioprospecting proposal for biological resources under the management jurisdiction of the three agencies; standard monitoring scheme to guide the implementing agencies in monitoring compliance of researchers to agreements; the quota for collection amount of bioprospecting fee, performance/rehabilitation bond, payment of royalties sharing;

2. Strengthen the capability of DENR personnel in implementing the guidelines through provision of

trainings/seminars on: bioprospecting guidelines itself and related laws, wildlife identification; 3. Promote awareness of the public on the concert of bioprospecting and related laws; and 4. Identify the terms and reference for a management information system for bioprospecting in the Philippines which

could be develop in the future. EXPECTED OUTPUTS: 1. Joint DENR-DA-PCSD-NCIP Administrative Order Re: Guidelines for Bioprospecting Activities in the Philippines; 2. Trained DENR Regional personnel on the bioprospecting guidelines and related laws; 3. Trained DENR Regional personnel on identification of Wildlife species with focus on threatened species; 4. Field Guide on selected species of Fauna and Flora of the Philippines for the DENR Regional Offices; 5. A Primer to understanding bioprospecting and related laws in the Philippines; and 6. Terms of Reference (TOR) for developing a Management Information System for bioprospecting activities in the

Philippines.

Page 327: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 317

MAJOR COMPONENTS:

I. Development of the Bioprospecting guideliness

II. Training/Seminars

Ill. Development of Publications

IV. TOR for Bioprospecting MIS

TARGET BENEFICIARIES:

3. Implementing agencies of the Wildlife Act (DENT, DA, PCSD) and the NCIP

4. Indigenous People

5. Academic and other scientific/research institution

EXTERNAL ASSISTANCE: German Agency for Technical Cooperation (GTZ)

BUDGET: Euro 99,194 (about P4 million) plus PAWB counterpart

IMPLEMENTING AGENCY: PAWB, DENR

DURATION:

TO : March 1, 2000

FROM : December 31,2001

Revised : March 31, 2005 PROJECT MANAGER/COORDINATOR: Dr. Antonio C. Manila

Chief, Wildlife Resources Division

ADDRESS : Protected Areas & Wildlife Bureau, Ninoy Aquino Parks and Wildlife Nature Center, North Avenue, Diliman, Quezon City TEL. NO. : 925-89-53

Page 328: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 318

Integrated Coastal Resources Management Project - Project Preparation

Technical Assistance

SECTOR : Coastal/Marine

SITES COVERED: Regions II - Cagayan; Region III - Zambales; Region V - Masbate; Region VII - Cebu,

Siquijor; Region XI - Davao Oriental

OBJECTIVE/S :

Assist the Government in formulating an investment project for an integrated coastal resource management project

that will: (i) further develop and implement a comprehensive national policy framework, program strategy and action plan

for CRM; (ii) strengthen the capabilities of government agencies, private sector/NGOs and local communities on CRM; (iii)

promote sustainable management, use and conservation of coastal resources and related ecosystems; (iv) control

coastal environmental pollution; and (v) reduce extensive poverty prevalent among coastal communities and contiguous

upland communities through provision of alternative livelihood and social services.

EXPECTED OUTPUT :

Project design and feasibility study report

COMPONENTS:

1. Coastal resource assessment

2. Policy and institutional study

3. Feasibility study

FUNDING SOURCES : Asian Development Bank (ADB) / Global Environment Facility (GEF)

BUDGET : US $1.3 M

GOP COUNTERPART : US $0.4 M

GRANT PROCEEDS : US $0.93 M

DURATION : One (1) year

FROM : 3RD Qtr. CY 2001

TO : September, 2002

Page 329: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 319

River Basin and Water shed Management Program Project (RBWMP) -

Ligawasan Marsh Biodiversity Conservation Component

SECTOR : Biodiversity/Forestry

SITES COVERED: Liguasan, Ebpanan and Libungan Marshes

(Region XII and ARMM)

DESCRIPTION:

This is part of the River Basin and Watershed Management Program (RBMP) which has a long term objective

of implementing an integrated and comprehensive development and management of water resources in the country

based on hydrological boundaries or river basins. As the pilot area of the RBMP, the Mindanao River Basin was

selected in view of the competitive demands of water within the basin from various sectors/areas, siginificant of which

is the Liguasan marsh.

The Liguasan marsh comprising the larger liguasan marsh and the smaller Libungan and Ebpanan marshes

is one of the country's largest wetlands and occupies about 10% of the Mindanao River Basin area. It supports

significant variety of wild flora and fauna. Because of this, the Marsh has been identified as a distinct and unique

region among the 15 bio-geographic regions of the country. Newertheless, while there is a general desire for

conservation of the area and the Liguasan Marsh Development Master Plan for the period 1999-2025 recommends the

inclusion of the marsh in the NIPA System, there is not enough basis at present to support the recommendation.

Moreover, a considerable part of the marsh area is already under agriculture during the dry season and there is a

demand from farmers to make these areas suitable for two cropping seasons. Hence, the Project which would mainly

entail a protected are suitability assessment (PASA) of the area will have to be undertaken to provide the solid

scientific and statistical basis to resolve conflicting demands for conservation and development of the marsh.

OBJECTIVE/S :

To properly manage the Liguasan Marsh system (which forms part of the Mindanao River Basin) and the

biodiversity therein through a participatory approach with the end view of increasing rural incomes and improving the living

and health conditions of the communities within the area.

TARGET BENEFICIARIES: LGUs, local communities

EXPECTED OUTPUTS :

1. Phase I - Protected Area Suitability Assessment (PASA) for the Liguasan Marsh prepared

2. Phase II – Biodiversity Component - Project Document for the Management and Development of the Liguasan

Marsh prepared

COMPONENTS:

1. Initial orientation and coordination with all stakeholders in the Project;

2. Review of secondary data on the Liguasan, Libungan and Ebpanan marshes;

3. Consultation with and interview of key informants;

4. Participatory community appraisal ;

5. Conduct of ethnographic study;

6. Conduct of biodiversity inventory.

Page 330: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 320

FUNDING SOURCE : Global Environmental Facility (GEF)-World Bank (WB)/UNDP

(under the GEF Project Development Facility)

BUDGET : US$ 0.35 M

GRANT PROCEEDS : Preparation Stage - US $ 0.35 M

DURATION : Four (4) years (including extension)

FROM : December 2000

TO : December 2004

Page 331: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 321

Community-Based Resource Management Project (CBRMP) –Environmental

Technology Transfer Component

(Loan No. 4299 PH)

SECTOR : Multisectoral

SITES COVERED : Reg. V - Albay, Camarines Norte, Camarines Sur, Cantanduanes, Masbate, Sorsogon;

Region VII - Bohol, Cebu, Negros Oriental;

Region VIII - Eastern Samar, Leyte, Northern Samar, Western Samar; Region XIII - Agusan del

Norte, Surigao del Norte

DESCRIPTION:

The Project deals with:

a Promotion of improved management of natural resources and provision of a more secure livelihood for the rural

poor;

b Provision of financial and technical assistance to LGUs and beneficiary communities in the proper management

of natural resources; and

c Strengthening of the capacity of the DOF to transfer resources to LGUs to finance community-based

investments.

OBJECTIVE/S:

General:

Reduce rural poverty and environmental degradation through support for locally-generated and implemented natural

resource management projects

Specific:

a. Improve management of upland and forestry resources indicated by a reduction in deforestation, increased vegetation

cover and reduced soil erosion

b. Improve coastal and near shore fisheries resources indicated by an expansion in mangroves and a reversal of the

decline in catches of fisheries

c. Improve infrastructure in support of management of upland, coastal and near shore natural resources as indicated by

improvements in rural roads, water supply and sanitation facilities, irrigation systems and other small - scale

infrastructure

TARGET BENEFICIARIES : Upland farmers, fisherfolk and other rural people in 120 municipalities

Page 332: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 322

/cont….CBRMP

COMPONENTS:

1. LGU Institutional Development

2. Project Management and Environmental Technology Transfer

3. Development and Implementation of SPs in NRM

EXPECTED OUTPUTS:

1. Trainings on technology transfer conducted

2. Policy study on forestry and CBFM strategy developed

3. Sub-projects in Natural Resources Management developed and implemented

FUNDING SOURCE : World Bank (WB)

BUDGET : US $ 1.0 M DURATION : Five (5) years

LOAN PROCEEDS : US $0.80 M FROM : 1999

GOP COUNTERPART: US $0.20 M TO : June 30, 2004 (original)

June 30, 2006 (with 2 years

extension)

FOCAL PERSON : Ma. Lourdes G. Ferrer

ADDRESS : FASPO Bldg., DENR Comp., Visayas Ave., Q.C.

TEL NO. : 926-26-93

TELEFAX NO. : 926-26-89/926-80-74

E-MAIL ADDRESS : [email protected]

Page 333: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 323

Philippines-Canada Environmental and Economic Management Project

(PCEEM)

SECTOR : Forestry / Upland

SITES COVERED : Metro Cebu and Davao City

PROJECT DESCRIPTION:

The Project will help establish the capacity within the Philippines to conduct strategic planning and integrated ecosystem-

based natural resource management. The Project has two sites – one in Metro Cebu and one in Davao City – both being

managed by multi-stakeholder management boards that will facilitate strategic interventions into various activities of the

watershed.

OBJECTIVE/S :

Improve the management of the watershed ecosystems in Metro Cebu and Davao City by strengthening their capacities to

adopt innovative government, industry and local community governance systems to address natural resource

management problems affecting their respective watershed ecosystems

TARGET BENEFICIARIES : Rural and Urban Population

EXPECTED OUTPUTS :

1. Metro Cebu and Davao City Watershed Management Boards established

2. Integrated Watershed Planning promoted

3. Water Demand Management promoted

4. Watershed Plan Pilot and Demo Activities conducted

5. Community-based Watershed Planning implemented

6. Waste Management and Agroforestry Activities implemented

MAJOR COMPONENTS/ACTIVITIES:

1. Establishment of multi-stakeholder Management Boards to undertake watershed management

2. Promotion of integrated watershed management planning to develop watershed management frameworks

3. Implementation/investments in pilot and administration projects designed to address specific Board-prioritized and

localized issues

4. Project administration and management

EXTERNAL ASSISTANCE : Canadian International Development Assistance (CIDA)

(Original) (Revised)

BUDGET : Cdn $10.7 M Cdn$ 13.5 M

GRANT PROCEEDS : Cdn $ 9.2 M Cdn$ 11.5 M

GOP COUNTERPART: Cdn $ 1.5 M Cdn$ 2.0 M

FOREX RATE : Cdn $ = P32.00

Page 334: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 324

/cont… PCEEMP

DURATION : Seven (7) years

FROM : January, 1998

TO : September 2003

EXTENSION : October 2003 to March 2006

PROJECT DIRECTOR : Marcel M. Goño

ADDRESS : Davao - Rm. 204, Lee Business Center, Juan Luna cor. Juan dela Cruz Sts., Davao City

Cebu - DENR-7 Compound, Greenplains Subdivision, Banilad, Mandaue City

TEL. NO. : Davao - (082) 227-8769

Cebu - (032) 345-7825

FAX NO. : Davao - (082) 227-8769

Cebu - (032) 345-3779

E-MAIL ADDRESS : [email protected]

Page 335: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 325

National Capacity Self-Assessment Project

Sector : Multi-Sectoral (biodiversity, climate change and land degradation)

Sites Covered : Nationwide

Objective/s :

To identify priority capacity needs related to global environment in the Philippines and examine any barriers to

effectively addressing these needs that exist.

Secondary Objectives:

1. Promoting more effective incorporation of environmental issues into national development processes and

sectoral planning and decision-making

2. Raising the awareness and identifying the particular capacity needs of key constituency groups and

decision-makers during the consultation and assessment processes

3. Focusing on the capacity of LGUs and other local stakeholders to contribute to meeting the Philippines'

global environmental obligations and national sustainable development goals.

4. Contributing to more effective implementation of existing environmental laws and policies by exploring

their global environmental dimension

5. Encouraging cross-thematic dialogue and the establishment of mechanisms for information sharing and

collaboration.

Components:

1. Project mobilization

2. Data gathering

3. Multi-stakeholder consultation process

4. Priority-setting

5. In-depth analysis

6. Preparation of NCSA document

Duration :

Start Date : March 2004

End Date : August 2005

Extended up to June 2006

Funding Source : GEF-UNDP

Budget : US$ 299,960

Grant Proceeds: US$ 200,000

GOP-in-kind: US$ 99,960

FOCAL PERSON: : Cristina Regunay/Alma Sequi ADDRESS : FASPO Bldg.,, DENR Comp., Visayas Ave., Q.C. TEL. NO. : 926-26-93/TELEFAX – 926-2689/926-8074

Page 336: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 326

Philippine Enabling Activity: Initial Assistance to the Philippines to Meet Its

Obligations Under the Stockholm Convention on Persistent Organic

Pollutants

SECTOR : Environment

SITES COVERED : Nationwide

PROJECT DESCRIPTION :

The objective of the project is to create sustainable capacity and ownership in the Philippines to meet their obligations

under the Stockholm Convention, including initial preparation of a POPs Implementation Plan, and broader issues of

chemicals safety and management as articulated in Chapter 19 of Agenda 21. The Implementation Plan describes how

the Philippines will meet its obligations under the Convention to phase-out POPs sources and remediate POPs

contaminated sites in the country.

OBJECTIVE/S

The Project aims to

1. Establish enabling activity project coordinating mechanisms;

2. Establish capacity building in support of project implementation;

3. Assess national infrastructural and institutional capacity;

4. Prepare initial POPs inventory;

5. Set objectives and priorities for POPs and POPs reduction and elimination options;

6. Prepare draft implementation plan for meeting Philippine’s obligations under the Stockholm Convention;

7. Review and finalization of implementation plan.

EXPECTED OUTPUTS :

1. POPs implementation plan task teams established;

2. Barriers to POPs phase-out identified;

3. Awareness raising and information exchange mechanisms identified;

4. Necessary capacity building activities identified;

5. National Implementation Plan for the reduction and elimination of POPs.

MAJOR ACTIVITIES :

1. Establishment of Enabling Activity Coordinating Mechanism;

2. Capacity Building in support of Project Implementation;

3. Assessment of National Infrastructural and Institutional Capacity;

4. Preparation of Initial POPs inventories;

5. Setting of Objectives and Priorities for POPs reduction and Elimination Options.

TARGET BENEFICIARIES : Concerned government regulatory agencies, and the general public

EXTERNAL ASSISTANCE : United Nations Development Programme-Global Environment Facility (with the

World

Bank acting as Implementing Agency)

Page 337: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 327

/cont…enabling POPs

BUDGET

GRANT PROCEEDS : US$ 500,000

GOP CONTRIBUTION : US$ 82,925 (In-kind)

TOTAL PROJECT COST : US$ 582,925

DURATION : Dec. 2001 – Dec. 2003

REVISED DURATION : June 2006

PROJECT COORDINATOR : Angelita T. Brabante

ADDRESS : Environmental Quality Division, EMB Bldg., DENR Compound, Visayas Ave., Q.C.

TEL. NO. : 928-1212; 920-2263

Page 338: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 328

Management, Risk Assessment and Capacity Building on Persistent Organic

Pollutants

SECTOR : Environment

SITES COVERED: Nationwide

OBJECTIVE/S:

1. To enhance the understanding in the Philippines of the health and environmental impact of persistent organic

pollutants (POPs) and of the Stockholm Convention on POPs (Stockholm Convention);

2. To assist key stakeholders to comply with the Recipient’s Chemical Control Order for Polychlorinated Biphenyls

(PCBs); and

3. To strengthen the Recipient’s technical and analytical capacity to effectively monitor and manage POPs, and

mitigate their adverse impacts.

PROJECT ACTIVITIES/COMPONENTS:

1. Workshop on the Stockholm Convention for the Philippine Legislators;

2. Persistent Organic Pollutants (POPs) and Polychlorinated Biphenyls (PCBs) Management Training for key

stakeholders; and

3. Development of database

FUNDING AGENCY : Canadian International Development Agency (CIDA)

IMPLEMENTING AGENCY/OFFICE : DENR-EMB

BUDGET : C$ 367,296 (US$ 298,428)

C$ 1 = US$ 0.8125

DURATION :

FROM : June 2005

TO : 2006

Page 339: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 329

Study on Capacity Building to Promote Clean Development Mechanism

Projects in the Philippines

SECTOR : Environment

SITES COVERED : Nationwide

PROJECT DESCRIPTION :

The Philippine government established the Inter-Agency Committee on Climate Change (IACCC) in May 1991, to

serve as the agency that coordinates various activities related to climate change, prepares climate change policies,

and negotiates with the UNFCCC on Philippine positions. Subsequently, the Philippines signed the United Nations

Framework Convention on Climate Change (UNFCCC) in July 1992, and the Kyoto Protocol in April 1998. These

agreements are in support of the Clean Development Mechanism (CDM) framework. In June 1994, the DENR was

appointed as the Designated National Authority (DNA). It is expected that projects which have not been realized due

to financial, economic and other difficulties will be implemented as CDM activities. In order to promote CDM projects, it

is necessary to strengthen the DENR.

OBJECTIVE/S :

To develop and strengthen the capacity of the DENR (as Philippine DNA) through: the formulation of CDM promotion

measures, establishment of a helpdesk and clearing house, implementation of workshops at local level, and

formulation of recommendations for CDM promotion.

EXPECTED OUTPUTS :

1) CDM promotion measures

2) Establishment of a Helpdesk

3) Establishment of a clearinghouse

4) Conduct of local workshops

TARGET BENEFICIARIES : National government agencies, industries/private sector, CDM project

proponents, and the general public

EXTERNAL ASSISTANCE : Japan International Cooperation Agency (JICA)

GRANT PROCEEDS (In-Kind) : Local and foreign CDM experts/consultants, one desktop computer, and one multi-

function printer and software

GOP CONTRIBUTION (In-Kind) : Office space with necessary equipment & regular government personnel to serve as

Project Manager

DURATION :

FROM/TO : August 2005 – November 2006

PROJECT MANAGER : Joyceline A. Goco

ADDRESS : EEID-EMB, HRD Bldg., DENR Compound, Visayas Ave., Quezon City

TEL. NO. : 920-22-51

Page 340: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 330

Adoption and Implementation of an Appropriate System of Criteria and

Indicators (C & I) for Sustainable Forest Management

(PD 225/03 REV. I (F))

SECTOR : Forestry

SITES COVERED :

Pilot Areas:

Tiber License Agreement - Surigao Development Corporation

(SUDECOR), Surigao del Sur Province

Community-Based Forest Management Area - Ngan-Panansalan-Pagsabangan

Forest Resources Development

(NPPFRD), Compostela Valley

Province

PROJECT DESCRIPTION:

The project is intended to implement the results and action plan developed during the Pre-project phase. The main

strategy is the adoption and institutjonalization of DENR of C & I system including an appropriate audit mechanism.

This will be achieved through the enactment of implementing measures acceptable to all stakeholders concerned.

Enabling policies for C & I audit system will be formulated and an appropriate database and management system will

be developed to facilitate information processing, analysis and retrieval.

OBJECTIVES:

Development Objective:

Promote and enhance the sustainable management of tropical forest of the Philippines through the adoption and

implementation of an appropriate system of criteria and indicators including auditing and monitoring

Specific Objectives:

1. To adopt and institutionalize appropriate system of criteria and indicators for SFM, at the national and forest

management unit levels, using the results of the ITTO Pre-project on the development of criteria and

indicators.

2. To pilot test and adopt an audit system for criteria and indicators for SFM including institutional arrangements

and future linkage with timber certification.

EXPECTED OUTPUTS:

1. Appropriate system of C & I adopted and institutionalize at the national and FMU levels

2. Audit system for C & I adopted and implemented

Page 341: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 331

/cont… C&I

MAJOR COMPONENTS/ACTIVITIES:

1. Conduct of consultations, workshops, and meetings for the acceptability of the C & I and audit system.

2. Information, Education, and Communication (IEC) activities to level-off understanding on C & I and the need

for auditing.

3. Pilot testing to FMUs representing Timber License Agreement (TLA)/IFMA and CBFMA holders will be done

for the demonstration of the applicability and utility of the system.

4. Capability building activities will be carried out to train government implementers, FMU managers, and third

party qualified NGO/private sector professionals on audit requirements and procedures.

5. Formulation of Manual of Operations and Guidelines.

6. Creation of C & I parameters and verifiers to be installed in a GIS-based data base for both national and FMU

level to monitor, evaluate, and to determine progress towards SFM.

TARGET BENEFICIARIES:

The project will benefit the national economy and the forestry sector In particular, the results of the project will benefit

the following:

1. The government, which will use the C & I system and audit system to monitor the progress of its different

programs/projects towards SFM;

2. People's Organization (PO) under CBFM program to improve the management of the forest lands and

resources under their stewardship;

3. Private forestry investors to improve their efficiencies, resource base, and market access;

4. Civil society, to gain increased understanding on the dynamics of tropical forest management, and to be able

to contribute to the attainment of SFM in the country;

5. Multi-lateral and bilateral development assistance institutions, which would then be in a better position to

assess the impacts of official development assistance in the country;

6. The international market for tropical forest products, which would have a better perception on the

sustainability of the Philippine forest as source of marketed timber and forest products

EXTERNAL ASSISTANCE : International Tropical Timber Organization (ITTO) IMPLEMENTING AGENCY : Forest Management Bureau

BUDGET:

GRANT PROCEEDS : US$ 520,076

GOP CONTRIBUTION : PhP 100,000 (in kind)

DURATION : 30 months

Starting Date: May 2004

PROJECT MANAGER/COORDINATOR : Nonito M. Tamayo

Deputy Project Coordinator -C&I for SFM Project

CONTACTNUMBER/S Tel : 927-4373 Fax: 920-0374

OFFICE ADDRESS : FMB Building, DENR Compound Viasayas Avenue,

Diliman, Quezon City

Page 342: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 332

Establishment of a National Database System for Watershed Information and

Development of Guidelines for Integrated Watershed Management Plans

SECTOR: Forestry/Upland

SITE COVERED: Nationwide

DESCRIPTION:

The project were initiated by the Forest Management Bureau -Department of Environment and Natural Resources

(FMB-DENR) with the assistance of JICA. The conceptualization of the project is in line with one of the four (4)

strategic programs of the Forestry Sector to improve watershed and forest management in the country (2003 Revised

Master Plan for Forestry Development). It is also consistent with the current thrust of the DENR that watershed-based

integrated ecosystem management approach is deemed appropriate for forest sustainable forest management in the

Philippines (Executive Order No. 318, otherwise known as Promoting Sustainable Forest Management in the

Philippines).

The project will be piloted in 18 critical watersheds with initial components of National Protected Areas System

(NIPAS) and four river basins and watersheds prone to ecological disasters and poverty. It shall initiate the updating

and simplification of guideline for watershed management plans which could provide a scheme that encompasses the

total protection, development/rehabilitation and management of the watershed using the ecosystem management or

“landscape approach”.

OBJECTIVE:

To support the DENR GPOA of the Forestry Sector through the development of a National Database System

consisting of both bibliographic and Geographic Information System (GIS) that could provide a comprehensive,

updated and reliable watershed data.

COMPONENTS:

1. Development of guidelines for integrated watershed management

2. Development of a national database system for integrated watershed management

3. Development of guidelines for watershed characterization

4. Development of guideline for project evaluation scheme for integrated watershed management

5. Watershed Characterization and preparation of integrated watershed management plans

EXPECTED OUTPUT:

1. Guidelines for integrated watershed management

2. Developed National Watershed Database System

3. Circularized Guidelines for watershed characterization and planning

4. Developed Guideline for project evaluation scheme for integrated watershed management

5. Digitized Base Maps of the 18 critical watersheds supporting the national irrigation systems

6. Produced digitized topographic Maps of the 140 watershed in 1:50,000 scale

7. Established a national watershed database program

IMPLEMENTING AGENCY: Forest Management Bureau

Page 343: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 333

DURATION:

FROM : May 24, 2004

TO : May 23, 2006

EXTENSION : June 2006

FUNDING SOURCE: Regular Budget/Activities of FMB

BUDGET: JICA – technical support and Office equipment/supplies

PROJECT DIRECTOR: Neria A. Andin

OIC Director, Forest Management Bureau

Page 344: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 334

Strengthening Coordination for Effective Environmental Management

(SEEM)

Sector : Multisector (biodiversity, climate change and land degradation)

Sites covered : Nationwide

Goal : To generate global environmental benefits through the creation of an enabling policy

environment at the national level and through the establishment of coordination

mechanisms at the focal point agencies. This will enable the country to implement its

commitments to the UNCCD, UNCBD and UNFCCC in a coordinated and cost-effective

manner.

Objective : The project aims formulate a medium-sized project that will develop new and/or strengthen

existing coordination mechanisms among the focal point agencies in the Philippines of the

UNCCD, UNCBD and UNFCCC.

Components :

1. Rapid stakeholders analysis

2. Rapid baseline assessment

3. Rapid problem, barrier and opportunity analyses

4. Participatory planning

5. Preparation of project documentation

Duration : January 2006 – March 2006

Funding source : GEF (Project Development Facility A)

GEF Implementing Agency: UNDP

Budget : GEF US $25,000

GOP (in kind) 20,000

FOCAL PERSON: : Socorro Mallare ADDRESS : FASPO Bldg.,, DENR Comp., Visayas Ave., Q.C. TEL. NO. : 926-26-93/TELEFAX – 926-2689/926-8074

Page 345: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 335

Feasibility Study for Community-Based Forest and Mangrove Management

Project in Panay and Negros

SECTOR : Forestry/Upland/Mangrove

SITES COVERED : Province of Aklan, Antique, Capiz , Iloilo, Negros Occidental, Negros Oriental

OBJECTIVES:

The main objectives of the proposed five (5) year project are: 1) to reduce poverty among forest and coastal

dwelling/dependent communities; and 2) to improve environmental condition in the project area. This will be achieved

through capacity building and institutional strengthening; increasing productivity of underutilized and unutilized land

and promotion of livelihood and income generating activities.

COMPONENTS:

1. Multi-product Tree Crops Development

2. Rural Infrastructure

3. Institutional Strengthening

4. Mangrove Rehabilitation

5. Enterprise Development

TARGET BENEFICIARIES: LGUs, poor farmers including indigenous people (IP), POs

FUNDING SOURCE: KfW

BUDGET : US $ 235,000

Exchange Rate : 1 EURO = P 65.00

1 US$ = P51.00

DURATION :

FROM : March 2006

TO : July 2006

FOCAL PERSON: : Conrado Bravante, Jr. ADDRESS : FASPO Bldg.,, DENR Comp., Visayas Ave., Q.C. TEL. NO. : 926-26-93/TELEFAX – 928-0028

Page 346: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 336

Metro Manila Air Quality Improvement Sector Development Program

(MMAQISDP)

SECTOR : Environment SITES COVERED : Metro Manila, Regions III & IV Airshed DESCRIPTION: The Program supports efforts of both the public and private sectors to improve air quality in Metro Manila through the combination of loan and grant assistance from various donor institutions. The Scope consists of policy reforms and investment requirements integrated within an agreed policy matrix of the air quality Action Plan. OBJECTIVE/S :

Promote policy reforms to improve air quality through the abatement of mobile and stationary sources of air pollution. The scope consists of policy reforms and investment requirement integrated within an agreed policy matrix termed “The Air Quality Action Plan.” It focuses on the Metro Manila air shed, where air pollution is mainly concentrated.

TARGET BENEFICIARIES : Population in Metro Manila, Region III & Region IV EXPECTED OUTPUTS : 1. Air pollution from mobile sources mitigated 2. Air pollution from stationary sources substantially mitigated 3. Fuel quality improved 4. Emissions from vehicular use reduced 5. Traffic congestion reduced through improved traffic flow 6. Ambient air quality monitoring, evaluation and reporting strengthened 7. Public on air awareness improved 8. Air sector is appropriately legislated and its management is monitored 9. Capacity building and institutional development plan implemented as planned EXPECTED OUTCOME/IMPACT:

• Effective management structures and systems developed to facilitate appropriate intra and inter-sectoral policy development, coordination and action planning (MMAQMB, Technical Working Groups, and Technical Secretariat) on November 30, 2007

• Sustainable organizational development and funding mechanisms in place by 2007 • Relevant legislation and policies on air quality for sectors and sub-sectors in place and regularly

updated • Measurable reductions in NOx1 CO and O3 and volatile organic compounds (Toluene, Benzene,

Xylene, and THC) by 2008 • 90% elimination of lead from the atmosphere by 2010 • 75% reduction of TSP and PM10 from mobile and stationary sources by 2010. • 85% reduction of SOx from mobile and stationary sources by 2010

Page 347: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 337

FUNDING SOURCES : Asian Development Bank (ADB), Japan Bank for International Cooperation (JBIC), Swedish International Development Assistance (SIDA), and U.S. Technical Development Assistance (USTDA)

BUDGET : US$ 630.845 M

TOTAL FOREX : US$ 603.490 M

Program Loan ADB - $200.00 M JBIC - 300.00 M

Air Pollution Control

Facility Loan (LBP) - $ 25.00 M

Investment Loan (DENR, DOTC,

DPWH,DOH, MMDA) ADB - $ 71.00 M SIDA - 4.50 M

TA Grant ADB - $ 1.50 M SIDA - 0.600 M USTDA - 0.890 M

GOP - $27.355M

DENR SHARE TOTAL : US$ 25.666 M FOREX : 20.212 M GOP : 5.454 M DURATION : Nine (9) years FROM : 1999 TO : December 2003 EXTENSION : December 2007 PROGRAM DIRECTOR : Dir. Luciano G. Hornilla ADDRESS : AQMTC Bldg., DENR Comp., Visayas Ave., Diliman, Quezon City TEL. NOS. : 920-22-58

Page 348: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 338

Southern Mindanao Integrated Coastal Zone Management Project (SMICZMP)

SECTOR : Coastal / Marine/Forestry/Upland

SITES COVERED: Region XI - Malalag Bay -

Balasiao Watershed,

Davao del Sur

Region XII - Sarangani Bay –

Mt. Matutum Watershed,

General Santos City, Sarangani

and South Cotabato

OBJECTIVE/S :

General:

Pursue integrated environmental protection and management for critical ecosystem as an imperative to

sustainable development

Specific:

1. Integrate the management of coastal and watershed ecosystems in the project sites

2. Undertake activities that will sustain resource and environmental management while allowing development in the

area

3. Improve the quality of life of beneficiaries and stakeholders considering the available resources

4. Institutionalize the use of integrated management approach vis-à-vis carrying capacity of the area

5. Develop capability of local government units (LGUs) and stakeholders in the planning and sustainable

management of natural resources and environment

TARGET BENEFICIARIES : Coastal zone dwellers, Upland dwellers, LGUs

COMPONENTS/EXPECTED OUTPUTS:

1. Afforestation

a. Rehabilitation of 250 has. of mangrove areas

b. Planting of 3,500 has. with indigenous species and fast growing species

c. Planting of bamboo species along river banks covering 1,000 has.

d. Establishment of 3,260 hectares of agroforestry areas

e. Establishment of 200 hectares of rattan plantation in the restoration zone and strict protection area

f. Establishment of 500 hectares ANR using fast and slow growing species of

g. Enrichment planting of 500 hectares of dipterocarps in degraded forest brushland

2. Septage Treatment Facilities

- construction of 7 STFs

3. Environmental Conservation and Protection Center (ECPC)

- establishment of a coastal resource management monitoring research and training center

4. Civil Works I

- Slope protection, inland siltation, and erosion prevention structures constructed for Sarangani –Mt Matutum

Page 349: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 339

/cont….SMICZMP

FUNDING SOURCE : Japan Bank for International Cooperation (JBIC)

BUDGET : ¥ 4.268 B (US$ 30.34 M)

LOAN PROCEEDS : ¥ 3.201 B (US$ 23.20 M)

GOP COUNTERPART: PhP 463.013 M / ¥ 1.067 B (US$ 7.14 M)

DURATION : Seven (7) years

FROM : 1999

TO : 2007

PROJECT DIRECTOR : Dr. Romeo Basada

ADDRESS : Door # 5 Felbet’s Bldg., Km. 7, Lanang, Davao City

TELEPHONE NO. : (082) 300-18-95

FAX NO. : (082) 234-94-78

E-MAIL ADDRESS : [email protected]

Page 350: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 340

Study for Mapping Policy and Topographic Mapping for Integrated National

Development Plan

SECTOR: Multisectoral

SITES COVERED: Nationwide

DESCRIPTION:

The study focuses on increasing administrative capacity through: a) improvement of existing national

geographic data production and control system for sustained economic growth, and b) provision/distribution of latest

geographic data and information to the government, private, academe and all other sectors.

The national geographic database is fundamental to the establishment and updating of the integrated national

development plan. It is considered urgent and unavoidable to rationalize the existing system. The establishment of an

integrated national geographic database and its control system will allow not only the government

departments/agencies, but also private sector to plan and program the various activities based on a common updated

data and information.

OBJECTIVE:

General Objective:

To improve the national geographic data production and control system, and strengthen organizational

capability of NAMRIA.

Specific Objectives:

1. Review of existing national mapping and geographic data and information demand and production.

2. Review existing organizational and institutional matter of NAMRIA and make recommendation thereon.

3. Creation of database capable of periodic updating, controlling, operating and maintaining national geographic

data and information for contribution to integrated national development planning.

4. Execution of a pilot digital mapping in a selected area.

5. Formulation of an implementation program for the nationwide application of the national geographic database.

COMPONENTS/ACTIVITIES:

1. Collection and review of data and information

2. Study on capacity building on national geographic data and information services

3. Execution of a pilot program

4. Capability Building

5. Preparation of the implementation program for the national geographic database

Page 351: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 341

//cont…topo_mapping

EXPECTED OUTPUTS:

1. Recommendation on the improvement and strengthening NAMRIA’s organization and institutional concerns.

2. Result from the pilot digital mapping to include the geographic database and information for selected pilot

area/s.

3. Operation, management and distribution plan for the geographic database.

4. Training on the map production process and related activities.

5. Implementation Program for the establishment of the national geographic database.

FUNDING SOURCE : JICA Development Study Program

BUDGET : US$ 4.69

Grant Proceed : US$ 4.08

GOP Counterpart : US$ 0.61

DURATION : February 2006-February 2008

Contact Person : Dir. Galo Isada

Mapping Department

Tel. 810-4831 (TL)

884-2844 (DL)

Page 352: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 342

Enhancement of Hydrographic Capabilities for Navigational Safety

SECTOR : Multisectoral

SITES COVERED: Manila, Batangas, Cebu and Additional sites : Davao and General Santos City Harbors

OBJECTIVES:

General Objective:

CGSD/NAMRIA sufficiently and continuously supplies information needed for safety of maritime transportation and

navigation and environmental protection.

Specific Objective:

Hydrographic capabilities of CGSD for providing adequate nautical charts and information required by users is

enhanced.

Component Activities

1. Data Acquisition and processing of hydrographic surveys

1.1 Examine the progress of hydrographic survey to identify problems to be solved

1.2 Conduct training on the upgraded echo sounder and process system of survey launch

1.3 Proper Maintenance of the above system

1.4 Conduct of launch surveys including control point and coast line in the selected areas such as: Batangas

(4214); Manila (4255); and Cebu harbor and approach (4446 and 4447)

1.5 Process the above mentioned hydrographic data collected

1.6 Monitor the above activities

2. Tidal Observation and data analysis

2.1 Examine the progress of tide data collection to identify problems

2.2 Install tide gauges in selected tide stations

2.3 Upgrade the processing method of tidal analysis

2.4 Conduct tidal observation and data analysis

2.5 Identify the sounding datum level based on the above (2.4) analyzed data

2.6 Correct the sounding data based on the analyzed data

2.7 Monitor the above activities

3. Digital nautical chart compilation and data-basing techniques are improved.

3.1 Examine the progress of nautical charting to identify problems to be solved

3.2 Conduct the training on upgraded digital nautical chart compilation

3.3 Maintain the above mentioned system properly

3.4 Produce/update electronic and paper charts (by plotter) applying the hydrographic data collected,

geodetic datum shift values and tidal corrections

3.5 Monitor the above activities

Page 353: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 343

/cont…EHCNS

4. Follow-ups on the Project

4.1. Examine the progress of ENC Publication Plan” to identify problems to solve

4.2 Conduct echo training to transfer skills and knowledge gained by the counterparts to other CGSD

personnel

4.3. Conduct information campaign to other stakeholders

4.4 Develop partnerships with other maritime agencies for hydrographic data sharing and exchange.

EXPECTED OUTPUT

1. Data Acquisition and processing techniques of hydrographic survey are improved.

2. Tidal observation and data analysis are improved.

3. Digital nautical chart compilation and data-basing technique are improved.

FUNDING SOURCE : JICA

BUDGET : PhP 30 Million (US$ 0.07 M) DURATION : MARCH 2006 -MARCH 2008

Project Contact Person: Dir. Rodolfo Agaton

Coast and Geodetic Survey Department

National Mapping and Resource Information Authority

Tel. 242-2955

Lt. Commander Herbert Catapang

Tel. 241-3494 loc. 110

Page 354: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 344

The Strategy is a window to the future, giving multiple and

diverse stakeholders a glimpse of a vision, and charting a

course for that idyllic prospect.

Partnerships in Environmental Management for the Seas of East Asia -

Manila Bay Environmental Management Project (PEMSEA-MBEMP)

SECTOR : Coastal / Marine

SITES COVERED :

REGIONAL : Governments of Cambodia, Brunei Darussalam, Democratic People’s Republic of Korea,

Indonesia, Japan, Lao People’s Democratic Republic, Malaysia, People’s Republic of China,

Philippines, Republic of Korea, Singapore, Thailand, Timor-Leste and Vietnam

PHILIPPINES : Manila Bay Area (National Capital Region, Region III, Region IV)

PROJECT DESCRIPTION:

The GEF/UNDP/IMO Regional Programme on Building Partnerships in Environmental Management for the Seas of

East Asia is the second phase of the Regional Programme on Marine Pollution Prevention and Management in the

Seas of East Asia which was implemented from 1994-1999.

The Programme integrates two management frameworks: integrated coastal management framework, which

addresses land-water interactions and negative impacts of human activity; and risk assessment or risk management

framework, which focuses on human activities and their impact in sub-regional seas. These activities, reinforced with

appropriate coastal marine policy and environmental investment options, will deploy a programmatic and strategic

approach to address multi-focal environmental concerns through a sustainable regional mechanism, especially trans-

boundary environmental issues arising from population pressure and national economic development.

The Manila Bay is one of the 12 sites under the PEMSEA Regional Programme. The Bay is confronted with complex

environmental issues and it is for this main reason that it is fitting for the Programme’s objective -- shared responsibility

in addressing the complex environmental risks and challenges, as this is beyond the capacity of any single

government, agency, community, group or individual.

OBJECTIVE/S :

PEMSEA Programme:

1. Build national and regional capacity to implement integrated

coastal management programmes;

2. Promote multi-country initiatives in addressing priority trans-

boundary environmental issues;

3. Reinforce and establish a range of function networks

designed;

4. Identify environmental investment opportunities, promote

mechanisms such as public-private sector partnerships, and

package environmental projects for financing and other

forms of developmental assistance;

5. Provide advance scientific and technical input to support

decision-making in coastal and marine management;

6. Develop integrated information management systems

linking selected project sites;

7. Establish an enabling environment to reinforce the delivery

capabilities and advance the concerns of non-government

and community-based organizations, environmental journalists, religious groups and other stakeholders;

8. Strengthen national capabilities for developing integrated coastal and marine policies; and

Page 355: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 345

9. Strengthen regional commitment for implementing international conventions and regional and sub-regional

cooperation.

/cont…pemsea

MBEMP:

The objective of the Project is to develop innovative partnerships to bring together all the stakeholders to plan, develop

and manage under a common framework, the marine and coastal resources of Manila Bay and surrounding watershed

areas.

COMPONENTS:

PEMSEA Programme:

1. Integrated Coastal Management

2. Sub-regional Sea Areas/Pollution Hotspots

3. Capacity Building

4. Environmental Investments

5. Scientific Support

6. Information Management

7. Civil Society

8. Coastal/Marine Policy

9. Collaborative Arrangement

10. Networking

MBEMP:

1. Manila Bay Coastal Strategy

2. Civil Society Participation

3. Risk Assessment

4. Integrated Information Management System/GIS

5. Environmental Investments

6. Development of Operational Plan for the Manila Bay Coastal Strategy

7. Development of Integrated Environmental Monitoring Program

8. Manila Bay Environmental and Resource Valuation

9. Coastal and Land Sea Use Zonation Plan

10. Manila Bay Oil Spill Contingency Plan

11. Institutional Arrangement

TARGET BENEFICIARIES : Private sector, communities, fishermen, LGUs & OGAs

EXTERNAL ASSISTANCE : Global Environment Facility (GEF) through the United Nations Development

Programme (UNDP)

PEMSEA PROJECT COST : US$ 7,855,813 (PhP 392.94 M)

GRANT PROCEEDS : US$ 5,451,466 (PhP 272.57 M)

(Includes local staff salary, consultants, Batangas project, Manila Bay

projects, subcontracts, trainings and building improvement)

GOP COUNTERPART : US$ 2,407,347 (PhP 120.37 M)

(co-financing: Provincial Government of Bataan, Bataan Coastal Care

Foundation, Provincial Government of Cavite, Philippine Government (Manila

Bay), DENR hosting of Working Group Meetings)

Exchange Rate : US$ 1 = P50

Page 356: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 346

MBEMP SHARE TO TOTAL PROJECT COST:

GRANT PROCEEDS : US$ 1.662 M

GOP COUNTERPART : US$ 0.977 M

TOTAL : US$ 2.639 M

EXCHANGE RATE : US$ = P53.00 /cont…pemsea

DURATION : Five (5) years

FROM : January 2000

TO : December 2004

EXTENSION : 2 years (2005-2006)

WINDING DOWN : 2007

NATIONAL FOCAL PERSON : Atty. Analiza R. Teh

PROJECT DIRECTOR (MBEMP) :

PROJ. COORD. (PEMSEA PHILS.) : Mr. Robert S. Jara

PROJECT MANAGER (MBEMP) : Ms. Erlinda Gonzales

ADDRESS : DENR Compound, Visayas Ave., Diliman, Quezon City

TEL. NO. : 929-66-26 LOC. 2102/927-99-20/925-12-25

Page 357: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 347

Samar Island Biodiversity Conservation Project (SIBP)

PROJECT NUMBER: PHI/99/G31 (GEF)

PHI/99/014 (TRAC)

SECTOR : Biodiversity

SITES COVERED : Samar Forest Reserve, Samar Island

OBJECTIVE/S:

Protect a representative sample of the biodiversity of the Philippine

archipelago by expanding conservation coverage in the Eastern Visayas

bio-geographic zone.

PROJECT DESCRIPTION:

The Samar Island Biodiversity Project (SIBP) will be implemented

within the Samar Forest Reserve, which comprises around 360,000 hectares. The Project would establish the Samar

Island Natural Park (SINP), a new protected area zoned for multiple uses centering on protection, but providing for

sustainable harvests of non-timber forest products, and institute a comprehensive range of ancillary conservation

measures to protect the park from human pressures. Park management would be operationalized in partnership with

forest-edge communities with the aim of establishing a “social fence” against threats. Interventions will strengthen

participatory planning, process response monitoring surveillance enforcement functions, enhance the conservation

management capacities of communities, impart conservation values to wider Samareño society, advocacy operations, and

abet development of conservation-compatible village livelihoods.

TARGET BENEFICIARIES : Forest-Edge Communities

PROJECT COMPONENT

1. Adaptive Management Conservation Framework

2. Operationalization of Conservation Function

3. Community-based Conservation Framework

4. Broad-based Awareness of Conservation and Management Needs

5. Internalization of Conservation Objectives in Sectoral Development, Planning, Budgeting and Activity Delivery

6. Conduct of demonstration activities to remove barriers to wild resources

7. Mechanism for Financing the Recurrent Costs of Conservation Activities

EXPECTED OUTPUTS:

1. SINP law enacted ;

2. PAMB meeting regularly and providing inputs into management;

3. Participatory conservation methods being independently applied;

4. PA authorities undertaken operational planning independently;

5. Security of tenure provided and capacity of local communities to manage and utilize buffer areas under the CBFM

framework strengthened;

6. Community outreach program for SINP communities improved;

7. Comprehensive biodiversity conservation awareness-raising strategy implemented ;

Page 358: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 348

/cont…sibp

EXTERNAL ASSISTANCE : United Nations Development Programme/Global Environment Facility (UNDP/GEF)

BUDGET : US $ 12.882 M

GRANT PROCEEDS : US $ 7.283 M

US $ 1.347 M/co-financing

GOP : US$ 4.252 M

DURATION : Eight (8) years

Phase I : July 2000 to March 2005

Extn of Phase I : April 2005-Dec. 2007

Phase II : 2008 to 2010

NATIONAL PROJECT DIRECTOR : OIC-Dir. Theresa Mundita S. Lim

ADDRESS : PAWB, Elliptical Road cor. Quezon Avenue, Diliman, Quezon City

TEL. NO. : 925-89-45

PROJECT MANAGER : RTD Manolito D. Ragub

ADDRESS : Project Management Office , SSPC-MC SRSF Compound, Brgy. Mercedez,

Catbalogan, Samar

TEL. NO. : (055)251-5446

Page 359: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 349

Coastal Hazards Management Program

SECTOR : Mines/Coastal

SITES COVERED : Nationwide

OBJECTIVES :

To strengthened the capability of DENR and other relevant agencies to handle coastal hazards in the

Philippines

ACTIVITIES :

The program will consist of workshops with a mixture of activities such as lectures, study visits, project works,

discussions, hearings and seminars. Among the approaches suggested are the following:

1) National workshop, also includes an international/Asian perspective:

2) Regional Workshops focused on local applications and the design of regional coastal hazards

management programs; and

3) Development and implementation of regional and local sustainable coastal development programs

focused on hazards management.

EXPECTED OUTPUT:

1) Trained identified Philippine stockholders, NGO’s and other stakeholders on management in coastal

hazards, strengthened its risk consciousness, knowledge transferred on risk management in coastal

regions and public awareness;

2) Improved the knowledge of the participants on integrated coastal zone planning and management and

sustainable use and protection of natural resources in order to minimize or eliminate effects of natural

and manmade hazards;

3) Provided the participants with insights and legislation for disaster preparedness, emergency events and

reconstruction;

4) Study tour to Sweden to meet relevant authorities, organizations, municipals and other dealing with and

responsible for coastal and natural sustainable development related to hazards management.

FUNDING SOURCE: SIDA

BUDGET : 2.9 SEK

EXCHANGE RATE : 1 SEK = $ 0.1305

DURATION : January 2006 to Sept. 2007

FOCAL PERSON: : Conrado Bravante, Jr. ADDRESS : FASPO Bldg.,, DENR Comp., Visayas Ave., Q.C. TEL. NO. : 926-26-93/TELEFAX – 928-0028

Page 360: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 350

Itogon Integrated Watershed Management Project

SECTOR : Forestry / Upland

SITES COVERED : Itogon Watershed Areas covering 9 Barangays (Municipality of Itogon- (Ampucao, Dalupirip,

Gumatdang, Loacan, Poblacion, Tinongdan, Tuding, Ucap, and Virac).

CONGRESSIONAL DISTRICT : Loan District of Benguet

DESCRIPTION :

The over-riding goal for the management of the Lower Agno Watershed (which includes Itogon) is to integrate and

harmonize development efforts to ensure a balance between the utilization and conservation of watershed resources.

a. Enhance the hydrological and ecological attributes of the watershed.

b. Improve the socio-economic conditions of the communities.

On the basis of a Memorandum of Agreement (MOA) entered into between and among the government agencies, i.e.,

DENR, DOF, DBM, DA, NIA, DPWH, and NPC on September 11, 1998. An amount of P137.79 million had been

appropriated in the DENR‘s annual budget starting CY 2000 as its share in the interest payment of the NPC loan for

the non-power component of the San Roque Multi-Purpose Dam Project.

The IIWMP was conceptualized in response to the various issues raised by the people of Itogon that were affected by

the construction of the San Roque Multi-Purpose Dam Project, as embodied in Sanggunian Bayan Resolution Nos. 16,

109 and 126 of the Municipality of Itogon. Likewise, to meet the conditionality provided in the amended Environmental

Clearance Certificate (ECC) of the San Roque project, i.e., to adopt a watershed management plan using the bottom-

up approach, provide alternative livelihood opportunities and appropriate tenure instruments for watershed occupants,

and prepare structural plans to avoid environmental degradation.

The DENR annual appropriation for the SRMP was then sourced as fund in the implementation of the Itogon

Integrated Watershed Management Project (IIWMP) due to the absence of a definite funding source to meet the

government’s commitment to the people of Itogon.

OBJECTIVE/S:

Enhance and promote the ecological sustainability of the watershed and address the socio-economic and cultural

concerns of the community

EXPECTED OUTPUTS:

1. Prepared a comprehensive and integrated watershed

conservation management plan for Itogon watershed.

2. Established soil and water conservation (vegetative and

structural measures).

3. Provided livelihood opportunities to the different

communities of Itogon.

4. Issued tenurial instruments to stakeholders.

5. Formed forest protection groups responsible for continuous

maintenance and protection of Itogon watershed.

Page 361: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 351

EXPECTED OUTCOME:

• Erosion rate decreased

• Sedimentation/siltation reduced

• Increase in Itogon household’s knowledge, attitude and behavior towards relevant environmental issues

• Increase in Itogon household’s entry to educational institutions

• Flourishing livelihood projects within the community

• Increase in flora and fauna

• Free patent titles issued

FUNDING SOURCE : GOP (Fund 102)

BUDGET : PhP 745.0 M

DURATION : Seven (7) years (2001-2007)

PROJECT MANAGER : NICANOR SAPLA

ADDRESS : Bua,Tuding,Itogon,Benguet

Page 362: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 352

Research and Development Project on “Improving Financial Returns to

Smallholder Tree Farmers in the Philippines

DESCRIPTION:

The Research and Development Project on “Improving Financial Returns to Smallholder Tree Farmers in the

Philippines” aims to improve financial returns to existing tree farmers and intending smallholder tree farmers.

OBJECTIVES:

1. Assist DENR to overcome policy implementation constraints to tree registration and log transport currently

restricting access to markets;

2. Assist smallholders tree growers to satisfy market requirements and improve productivity; and

3. Identify and promote livelihood systems and policies which incorporate forestry and recognize socio-economic

circumstances of smallholders.

COMPONENTS:

1.1 Survey of smallholders with tree farms

1.2 Improving flow of information about tree registration and harvest & transport approval mechanisms

2.1 Survey of timber processors

2.2 Assessment of existing tree farms

2.3 Pilot scheme to bring together buyers and sellers

2.4 Participatory approach to improve tree farm management

3.1 Identification of tree farming systems and policy implications

EXPECTED OUTPUT:

Greater access of smallholders to higher value markets through increased rates of tree registration, log

transport approval and harvest approvals thus allowing greater access of smallholders to higher value

markets

An improved institutional and regulatory framework for tree registration and transport approvals reasons

Identification of the timber specification required by processors and communications of these to smallholder

tree farmers

Identification of the opportunities for increasing the volume and value of timber produced from smallholder

tree farms and development of strategies for how these opportunities might be realized

Financial models of smallholder tree production systems to be supplied to DENR for policy development

Models of timber flows within Leyte to assist with industry planning

An understanding of the social and economic factors that need to view considered when designing tree

farming systems for smallholders

Pilot program developed and tested for improving communication linkages between smallholders and

sawmillers in the selling of timber

Improved management regimes for existing tree farms

Recommendations to DENR on appropriate tree farming systems matched to the livelihood requirements of

smallholders

Improved research output by local researchers

A detailed analysis of the North Queensland timber value chain to identify opportunities to increase returns to

small-scale foresters

Identification of potential demands for timber from North Queensland, and develop measures to promote the

production and efficient marketing of farm-grown timber to meet these requirements.

Page 363: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 353

EXPECTED OUTCOMES:

1. Improved returns to existing tree farmers from increased volume and quality of merchantable timber

combined with higher stumpage prices flowing from improved market access; calculated to have a net present

value of AU$2.4 M,

2. Improved returns to existing tree farmers from subsequent rotations of tree farms from increased volume and

quality of merchantable timber from better management and prices, calculated to have a net present value of

AU$3.9 M, and

3. Expansion of the area of tree farms planted due to the higher returns available, and attributable to, project

outputs.

Duration: - 2005 – 2008

Funding agency: Australian Government)

Project Cost: AU$ .147 Million – Grant

Page 364: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 354

MAINSTREAMING ECOTOURISM IN THE COMMUNITY-BASED NATURAL RESOURCES MANAGEMENT (National Ecotourism Programme – Phase II Project)

SECTOR: Environment/Ecotourism

SITES COVERED: Northern Luzon: Pangasinan - Hundred Islands National Park

Southern Luzon: Albay - Mayon Volcano Natural Park

Visayas : Bohol – Rajah Sikatuna Protected Landscape (Pamilacan Island Solphin and

Whale Watching

Mindanao : South Cotabato - Lake Sebu Forest Reserve

DESCRIPTION:

The Second Phase implementation of the National Ecotourism Programme (NEPII) is a grant project funded

by the New Zealand Agency International Development (NZAID). It covers the period July 2004 to June 2008. The

Project will continue to build on and extend the institutional development of key partners implementing the National

Ecotourism Strategy (NES). It will focus on strengthening the capacity of the Protected Areas and Wildlife Coastal

Zone Management Services of the DENR through the National Ecotourism Program Office (NEPO), to manage

protected natural areas and provide for visitor services. Four new key sites will be targeted for site level interventions

and new approaches towards public/private partnerships will be pursued. These are the Hundred Island Natural Park,

the Mayon Volcano Park, Bohol and Lake Sebu.

OBJECTIVES:

General Objective:

To mainstream ecotourism into community-based resource management as means to improve livelihoods

and manage natural and cultural resources in a sustainable manner.

Specific Objectives:

1. to establish ecotourism business and visitor services in 4 protected natural areas:

2. to advocate and coordinate implementation of the National Ecotourism Strategy within DENR and DOT and

3. to market ecotourism products at site, regional and national levels

COMPONENIS/ACTIVITIES:

1. Development of visitor services and ecotourism in 4 protected areas

2. Strengthening the institutional mechanisms for ecotourism to develop through industry standards, training,

sharing of lessons learned among the key stakeholders, assisting the LGUs plan and develop ecotourism and

importantly. securing annual budgets for ecotourism within the DENR/PAWB and DOT

3. Marketing ecotourism products to domestic and international markets and providing ongoing support to the

three banner site projects undertaken in Phase I.

Page 365: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 355

/cont… ecotourism

FUNDING SOURCE: NZAID

BUDGET : NZAID Contribution: P42,175,000.00

GOP Contribution: In kind (P4,422,000.00 tentative)

Exchange Rate: US$ 1 = PhP 55.00

DURATION: 2004-2005 Transition from Phase I to Phase II

2005-2007 Implementation

2007-2008 Consolidation, Review and Planning

Page 366: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 356

Enhancement of CBFM Program in the Philippines

SECTOR : Forestry/Upland

SITE COVERED : Region III – Tarlac, San

Fernando, and Nueva Ecija

PROJECT DESCRIPTION:

The project is a joint undertaking of the

Government of the Philippines (GOP) represented

by the DENR and the Government of Japan through

the Japan International Cooperation Agency (JICA),

that shall promote the conservation, rehabilitation,

and sustainable utilization of forest and land

resources within the Community-Based Forest

Management (CBFM) areas in the country.

OBJECTIVES:

To ensure that conservation, rehabilitation, and sustainable utilization of forest and land resources within

CBFM areas are initiated by capacitated People’s Organizations (POs) with support from DENR, Local Government

units (LGUs) and other relevant institutions.

EXPECTED OUTPUTS:

Capacities of key stakeholders (e.g. DENR, LGUs, POs) of CBFM and collaboration among concerned institutions

are enhanced through model sites activities.

Knowledge, skills and attitude of Pos, DENR, LGUs and other relevant institutions of CBFM implementation are

improved through training

Practical Information related to CBFM become available to the people concerned

Recommendations for the improvement of CBFM Program are submitted

MAJOR COMPONENT:

1. Model Site

2. Training

3. Policy Reform

4. Information, Education, and Communication (IEC)

TARGET BENEFICIARIES: DENR, LGUs, Forest Communities, Academe and Community worker

FUNDING AGENCY : Japan International Cooperation Agency (JICA)

PROJECT COST :

GRANT PROCEEDS : In-kind (PhP 175 M)

GOP COUNTERPART: In-kind (PhP 17 M)

Page 367: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 357

/cont… CBFM

PROJECT DURATION : Five (5) Years

FROM : June 2004

TO : June 2009

Page 368: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 358

Advancing the Application of Assisted Natural Regeneration (ANR) for Effective Low-Cost Forest Restoration (2006-2009/Food and Agriculture Organization (FAO)) DESCRIPTION:

The Assisted Natural Regeneration (ANR) is an approach to forest restoration. It has several key advantages. First, it eliminates the high cost of seedling-production; second, biologically diverse mixture of species that materializes is more stable and better able to facilitate rainfall infiltration to replenish underground aquifers; and third, it avoids costly mistakes in species-to-site matching. The dynamics of natural selection and succession ensure that the trees in place are the species appropriate for prevailing conditions.

OBJECTIVES:

The implementation of the project (ANR) in Region III, VII and XI aims at:

a. Catalyzing application of ANR. The project shall demonstrate a simple, low-cost method for improving performance and success rates in forest rehabilitation programmes.

b. Capacity building in implementing ANR. Through the project, DENR Personnel, LGUs and NGOs shall develop skills to implement ANR. It will likewise a venue to strengthen competence and aptitude for DENR and NGO implementation of ANR by creating a core group of "hands-on" trainers; and

c. Increasing productivity and reducing costs in forest restoration. The project will expedite the rehabilitation of degraded lands, improves biodiversity in protected areas; promotes low cost methods of forest restoration and enhance rainfall infiltrations in watersheds as a result of more diversified vegetative cover.

COMPONENTS:

1. Preparatory Activities 2. Trainers Training 3. Promotion of public support 4. Monitoring 5. Documentation 6. Concluding Seminar

Page 369: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 359

EXPECTED OUTCOMES:

1. The Project will build on recent initiatives by local and international donors (including FAO) and by forest scientists, the academe and environmental advocates to promote ANR as a principal component of forest rehabilitation programmes;

2. “Hands-on” training will enable foresters to gain confidence that their forest restoration mandates can be met and their success rates dramatically improved by applying ANR;

3. It will provide DENR with evidence it can present to legislators and finance officers who appropriate and allocate funds, demonstrating that watershed rehabilitation and protected area management targets can be achieved at lower cost and with superior results by using ANR.

EXPECTED OUTPUTS:

1. One hundred eighty (180) government foresters, extension personnel from LGUs and field staff of NGOs "hands-on" trained

2. Three (3) twenty-hectare sites or total of 60 ha applied with ANR 3. Incentives for communities at the three (3) sites created 4. Six (6) field observation sites visits to ANR implementation sites organized

involving key persons from LGUs, NGOs and the local media. 5. Three (3) field observation visits coupled with appropriate presentations and

briefings for national legislators, senior political leaders, donor representatives, and the national media

6. Reports, tables photographs and video presentations documenting the vegetation before and after ANR implementation

7. Brochures promoting ANR implementation prepared and distributed 8. Concluding seminar on ANR

SITE COVERED : Region III, VII and XI TARGET BENEFICIARIES : DENR personnel, LGUs and NGOs PROJECT COST : GRANT PROCEEDS : US$253,000 PROJECT DURATION :

FROM : June 2006 TO : June 2009

Page 370: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 360

Adoption and Implementation of the Forestry Information System (FIS) in the Philippines (2007-2009 / International Tropical Timber Organization (ITTO)) DESCRIPTION :

The Forestry Information System (FIS) Project is an integration of developed computer-based system modules of the major functions of the forestry sector for adoption and implementation nationwide. The generated forestry data is integrated from community, provincial, regional up to the national level in a systematic manner, guided by standards, and supported by the appropriate computer support systems. OBJECTIVES :

Project Development Objective:

To promote and enhance the sustainable development of forest in the country through improved data collection and information processes.

Specific Objective:

To develop and implement a country-wide information system for forest policy and management EXPECTED OUTCOME/IMPACT: Management information system for the Philippine forestry administrative service implemented nationwide providing government policy and decision-makers, people’s organizations, private forestry investors, civil societies, funding agencies, and international market improved access to information COMPONENTS

• Adoption and Institutionalization of Forestry Information System (FIS) at the National and in the FMS Units in the Field Offices

• Set in place IT Infrastructures to activate and sustain FIS at the National and the FMS Units in the Field Offices

• IT Training and Capability Building • Operationalization of the FIS at the National and FMS Units

Page 371: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central

Completed DENR-Foreign Assisted Projects 361

FUNDING SOURCE : International Tropical. Timber Organization (ITTO) Grant No. : PD353/05 Rev.2 (M,F,I) PROJECT COST : US$ 707,889.00 (P 30.08 M) Grant Proceeds : US $ 477,889.00 (P 20.06 M) GOP Counterpart : US$ 230,000.00 (P 10.02 M) DURATION: Signing Date : May 2007 Effectivity Date : July 01,2007 Closing Date : December 2009

Page 372: COMPLETED DENR- FOREIGN ASSISTED PROJECTS PROFILEfaspselib.denr.gov.ph/sites/default/files//DOCUMENTS/Compilation of... · COMPLETED DENR-FOREIGN ASSISTED PROJECTS PROFILE . ... Central