On May 20, 2010, Mary Raulerson of Kittelson & Associates held a workshop in Portland, OR which introduced and illustrated best practices in the field of Complete Streets using case studies she has been directly involved with around the country. During the workshop, special attention was given to the obstacles that had to be overcome and the solutions that worked. The goal of this session was to help identify and tailor practices that will further strengthen the region’s move toward creating, connecting and complimenting great places with great multimodal rights-of-way.

TRANSCRIPT

Page 1: Complete Streets workshop presentation

A Complete Streets Approach to Getting from Place to Place

Transportation Education Series – Kittelson & Associates, Inc.

Mary Taylor Raulerson May 20, 2010

Transportation Education Series – Kittelson & Associates, Inc.

Mary Taylor Raulerson May 20, 2010

Page 2: Complete Streets workshop presentation

What are Complete Streets?

Page 3: Complete Streets workshop presentation

practicaldesign

pedestrians

Multi-modalContext sensitive

green streets

network

mobilitytransit

accessboulevardsEconomic development

sustainable

bicyclists

Page 4: Complete Streets workshop presentation

What are complete streets?

Complete streets are designed and operated to enable safe access for all users. Pedestrians, bicyclists, motorists, transit riders of all ages and abilities must be able to safely move along and across a complete street.

Source: Complete Streets Coalition website; Dan Burden - photograph

Page 5: Complete Streets workshop presentation

Where do they stop?

Page 6: Complete Streets workshop presentation

How do they differ along the transect?

Drawings by James Wassell

T1 T2 T3

T4 T5 T6

Page 7: Complete Streets workshop presentation

What is the role of the street?

Page 8: Complete Streets workshop presentation

Conventi

onal A

ppro

ach

MoreEfficiency

Syst

em

M

an

ag

em

ent

More Pavement

More

Lanes

More

Roads

ITS

More

Cars

Page 9: Complete Streets workshop presentation

A Balanced Transportation Approach

Lateral Approach

Impr

ove

Qualit

y of

Tra

vel

User View and Comfort

Context-Sensitive Design

Traffic Calming

Personal Security

Move Less People, Fewer M

iles

Intensify land use densities

Promote Mixed Use Development

Pedestrian Oriented Design

Demand Management – Pricing, e-commerce, telecommuting, etc…

Lane Limits

Change Standards

Manage, Not “Solve”

Conventi

onal A

ppro

ach

MoreEfficiency

Syst

em

M

an

ag

em

ent

More Pavement

More

Lanes

More

Roads

ITS

More

Cars

Transit

Bicycling

Walking

HOV/HOT Lanes

Mov

e Pe

ople

, Not

Car

s

Page 10: Complete Streets workshop presentation

Great Streets

Developed by Steve Price in association w/ Dover Kohl & Partners

& Glatting Jacksonfor Johnson City Tennessee

Page 11: Complete Streets workshop presentation

Developed by Steve Price in association w/ Dover Kohl & Partners

& Glatting Jacksonfor Johnson City Tennessee

Transportation Principles

Page 12: Complete Streets workshop presentation

Developed by Steve Price in association w/ Dover Kohl & Partners

& Glatting Jacksonfor Johnson City Tennessee

Transportation Principles

Page 13: Complete Streets workshop presentation

Developed by Steve Price in association w/ Dover Kohl & Partners

& Glatting Jacksonfor Johnson City Tennessee

Transportation Principles

Page 14: Complete Streets workshop presentation

The Transportation World is Changing

Page 15: Complete Streets workshop presentation

“Sustainability must be reflected in all our infrastructure investments…

… it implies a commitment to the principles of livability...

The era of one-size-fits-all transportation projects must give way to one where preserving and enhancing unique community characteristics, be they rural or urban, is a primary mission of our work rather than an afterthought.”

Secretary Ray LaHood, US DOTJanuary 21, 2009

Page 16: Complete Streets workshop presentation

• Enhance integrated planning and investment. integrate housing, transportation, water infrastructure, and land use planning and investment.

• Redefine housing affordability. Develop housing affordability measures that include housing and transportation costs.

• Redevelop underutilized sites. Target development to locations with infrastructure and transportation choices.

• Develop livability measures and tools.

• Align HUD, DOT, and EPA programs.

Partnership on Livability

Source: EPA website (http://www.epa.gov/dced/2009-0616-epahuddot.htm)

Page 17: Complete Streets workshop presentation

EPA, HUD, and DOT Partnership on Livability

1. Provide more transportation choices

2. Promote equitable, affordable housing

3. Enhance economic competitiveness

4. Support existing communities

5. Coordinate and leverage federal policies and investment

6. Value communities and neighborhoods

Source: EPA website (http://www.epa.gov/dced/2009-0616-epahuddot.htm)

Page 18: Complete Streets workshop presentation

What is Livability?

Page 19: Complete Streets workshop presentation

Choices

family

Opportunitiesresource efficiency

healthy living

diversity

communityJobs

educationparksEconomic development

sustainability

infrastructure

Page 20: Complete Streets workshop presentation

Mobility options for all.

Page 21: Complete Streets workshop presentation

Housing choice.

Page 22: Complete Streets workshop presentation

Access to jobs.

Page 23: Complete Streets workshop presentation

Healthy and active living.

Page 24: Complete Streets workshop presentation

Strong neighborhoods.

Page 25: Complete Streets workshop presentation

Great gathering places.

Page 26: Complete Streets workshop presentation

Vibrant Town Centers.

Page 27: Complete Streets workshop presentation

Thriving Rural Villages.

Page 28: Complete Streets workshop presentation

Access to local food.

Page 29: Complete Streets workshop presentation

Environmental Stewardship.

Page 30: Complete Streets workshop presentation

Free-range learning.

Page 31: Complete Streets workshop presentation

Free-range learning.

Page 32: Complete Streets workshop presentation

Working ports.

Page 33: Complete Streets workshop presentation

Well-maintained infrastructure.

Page 34: Complete Streets workshop presentation

So…. what is Livability?

Page 35: Complete Streets workshop presentation

Conventi

onal A

ppro

ach

MoreEfficiency

Syst

em

M

an

ag

em

ent

More Pavement

More

Lanes

More

Roads

ITS

More

Cars

. . . we were asked to move more cars.

Page 36: Complete Streets workshop presentation

A Balanced Transportation Approach

Lateral Approach

Impr

ove

Qualit

y of

Tra

vel

User View and Comfort

Context-Sensitive Design

Traffic Calming

Personal Security

Move Less People, Fewer M

iles

Intensify land use densities

Promote Mixed Use Development

Pedestrian Oriented Design

Demand Management – Pricing, e-commerce, telecommuting, etc…

Lane Limits

Change Standards

Manage, Not “Solve”

Conventi

onal A

ppro

ach

MoreEfficiency

Syst

em

M

an

ag

em

ent

More Pavement

More

Lanes

More

Roads

ITS

More

Cars

Transit

Bicycling

Walking

HOV/HOT Lanes

Mov

e Pe

ople

, Not

Car

s

Page 37: Complete Streets workshop presentation
Page 38: Complete Streets workshop presentation

• Transportation agencies and/or their partners do not have a clear or unified vision of what they want (Visioning)

• Established project development processes and organizational structures may limit transportation projects from achieving today’s livability goals (Planning and Process)

• Transportation policies may not support livability goals and objectives (Policy)

• Difficult decisions and livable projects require long-term and trusting partnerships (Partnership)

• Delivering livability at the project level requires new design approaches (Design)

Challenges to implementing livable transportation projects

Page 39: Complete Streets workshop presentation

• Transportation agencies and/or their partners do not have a clear or unified vision of what they want (Visioning)

Albany Visions Plan

Route 1 Vision

Overcoming challenges - Visioning

Page 40: Complete Streets workshop presentation

Albany Visions Plan

• Regional-level visioning

• Attract growth by leveraging investments

• Aligned LRTP with a broad set of community-responsive project types

• Emphasized a broad range of modes and community needs in project definition and programming

Page 41: Complete Streets workshop presentation

Albany Visions Plan

• Developed 25 guiding principles that:• Plan and build for all modes of transportation• Preserve and manage the existing investments• Develop the region’s potential to grow into a “uniquely

attractive, vibrant and diverse metropolitan area”• Link land use and transportation planning

• Linkage forum – mandatory regional roundtable of municipal planners to address regional planning issues at the local level (state has no oversight or approval functions for local plans)

• Match project choice processes to vision

Page 42: Complete Streets workshop presentation

Route 1 Vision

• Project-level visioning

• 110 mile corridor – experiencing significant growth and traffic congestion

• Aligned multiple, interconnected livability issues into a cohesive development and investment strategy

• Supported by state and localities through MOU and policies

Page 43: Complete Streets workshop presentation

Route 1 Vision

• Project-level visioning

• 110 mile corridor with 21 towns

• Experiencing significant growth and traffic congestion

• Aligned multiple, interconnected livability issues into a cohesive development and investment strategy

• Supported by state and localities through MOU and policies

Page 44: Complete Streets workshop presentation

Route 1 Vision

• Lessons learned• Building a vision requires agreement on problems,

solutions and follow-through• Visioning is inspirational and educational, and

requires trust• Visioning is more effective when it incorporates land

use and transportation

• Even in a home rule state, a collaborative visioning process ca be the basis for successfully implementing integrated land use and transportation policies

Page 45: Complete Streets workshop presentation

• Established project development processes and organizational structures may limit transportation projects from achieving today’s livability goals (Planning and Process)

Charlotte Centers and Corridors Plan

Route 1 Plan

Washington DOT CommunityDesign Assistance Office

Overcoming challenges – Planning and Process

Page 46: Complete Streets workshop presentation

Charlotte Centers and Corridors Plan

• Began with comprehensive regional vision, followed by aggressive policy and infrastructure response and organizational structure of city departments

• Integrated Plan and Vision galvanized community support for sustainable growth and transit investments

• Passed sales tax referendum for $1 billion for transit

Page 47: Complete Streets workshop presentation

Charlotte Centers and Corridors Plan

• Began with comprehensive regional vision, followed by aggressive policy and infrastructure response and organizational structure of city departments

• Integrated Plan and Vision galvanized community support for sustainable growth and transit investments

• Passed sales tax referendum for $1 billion for transit

Page 48: Complete Streets workshop presentation
Page 49: Complete Streets workshop presentation

Centers & Corridors Vision

Page 50: Complete Streets workshop presentation

Foster an Integrated Approach

Station Area Planning

Page 51: Complete Streets workshop presentation

Invest Strategically

Station Area Planning

Page 52: Complete Streets workshop presentation

Ensure Stewardship

CATS

Station Area Planning

Page 53: Complete Streets workshop presentation

Scaleybark Road Station

Station Area Planning

Page 54: Complete Streets workshop presentation

WashDOT Community Design Assistance

• Multi-disciplinary teams within Central Office

• Includes planners, engineers, facilitators, and conflict resolution professionals

• Help communities communicate with DOT

• Increases trust, decreases cost

Page 55: Complete Streets workshop presentation

• Transportation policies may not support livability goals and objectives (Policy)

• Difficult decisions and livable projects require long-term and trusting partnerships (Partnership)

• Delivering livability at the project level requires new design approaches (Design)

Challenges to implementing livable transportation projects

Page 56: Complete Streets workshop presentation

1. Money counts

2. Leverage and preserve existing investments

3. Choose projects with high value/price ratio

4. Safety always and maybe safety only

5. Look beyond level-of-service

6. Accommodate all modes of travel

7. Enhance local network

8. Build towns not sprawl

9. Understand the context; plan and design within the context

10. Develop local governments as strong land use partners

Policy, design and partnerships

Page 57: Complete Streets workshop presentation
Page 58: Complete Streets workshop presentation

Land Use Context + Roadway Type

Land Use Context

Page 59: Complete Streets workshop presentation

• Land use context – land area comprising unique combination of land uses, density, building form

• Common place types found in every PennDOT district

RURAL

SUBURBAN CORRIDOR

TOWN / VILLAGE CENTER

TOWN / VILLAGE NEIGHBORHOOD

URBAN CORE

SUBURBAN CENTER

SUBURBAN NEIGHBORHOOD

Land Use Contexts

Page 60: Complete Streets workshop presentation

RURAL SUBURBAN URBAN

Rural Suburban Neighborhood

Suburban Corridor

Suburban Center

Town/Village Neighborhood

Town Center Urban Core

DENSITY UNITS

1 DU/ac - 8DU/ac

1 DU/ac – 8DU/ac

2 – 30 DU/ac 3 – 20 DU/ac4 – 30 DU/ac

8 – 50 DU/ac

16 – 75 DU/ac

BUILDING COVERAGE

NA <20% 20% - 35% 35% - 45% 35% - 50% 50% - 70% 70% - 100%

LOT SIZE/AREA

20 acres5,000 – 80,000 sf

20,000 - 200,000 sf

25,000 – 100,000 sf

2,000 – 12,000 sf

2,000 – 20,000 sf

25,000 – 100,000 sf

LOT FRONTAGE

NA50 to 200 feet

100 to 500 feet

100 to 300 feet

18 to 50 feet25 to 200 feet

100 to 300 feet

BLOCK DIMENSIONS

NA400 wide x varies

200 wide x varies

300 wide x varies

200 by 400 feet

200 by 400 feet

200 by 400 feet

MAX. HEIGHT

1 to 3 stories

1.5 to 3 stories

retail-1 story; office 3-5 stories

2 to 5 stories2 to 5 stories

1 to 3 stories

3 to 60 stories

MIN./MAX. SETBACK

Varies 20 to 80 feet 20 to 80 feet 20 to 80 feet 10 to 20 feet 0 to 20 feet 0 to 20 feet

Defining the Land Use Contexts

Page 61: Complete Streets workshop presentation

Land Use Context + Roadway Type

Transportation Context

Page 62: Complete Streets workshop presentation

Roadways in Context

Page 63: Complete Streets workshop presentation

• Know the land use context

• Know the role of the roadway within the network

• Know the roadway type

• Set the desired operating speed

• Refer to the Matrix for the starting design values

Design Using the Principles

Page 64: Complete Streets workshop presentation

Regional Arterial

Page 65: Complete Streets workshop presentation

Community Arterial

Page 66: Complete Streets workshop presentation

Community Arterial

Page 67: Complete Streets workshop presentation

Definition: The speed of traffic that, in the expert judgments of the highway engineer and community planner, best reflects the function of the roadway and the surrounding land use context.

Simple Definition: The speed at which we would like vehicles to travel.

Desired Operating SpeedAlso Known as “Design To” or “Target Speed”

Page 68: Complete Streets workshop presentation

• Forge a stronger relationship between posted speed limit, design speed and operating speed

• Relate roadway type to land use context

• Use roadway and roadside design elements to encourage compliance with the posted speed

Why Desired Operating Speed?

Page 69: Complete Streets workshop presentation

Transportation + Land Use

Involved in task Partially involved in task Additional Involvement New partial involvement

Page 70: Complete Streets workshop presentation
Page 71: Complete Streets workshop presentation

• Sharing Smart Transportation message

• Strategic discussions with partner agencies and organizations and local municipalities

• Outreach activities and interactive workshops with local officials and professionals

1. Increasing Partnership Efforts

Page 72: Complete Streets workshop presentation

Pennsylvania Community Transportation Initiative

Type of Project# of

Selections% of Total Selections

Total Funding for Selected Projects

% of Total Funding

Bicycle/Pedestrian 9 18% 9,230,405$ 16%Roads/Intersections/Local Network 6 12% 9,937,000$ 17%Intermodal/Transit-oriented Development 13 26% 14,007,200$ 24%Land Use & Transportation Planning/Redevelopment

13 26% 7,666,500$ 13%

Streetscape/Traffic Calming 8 16% 18,158,887$ 31%Regional Planning 1 2% 285,000$ 0%

TOTAL 50 100% 59,284,992$ 100%

• Applications received: 403 requesting $600 million

• Applications selected: 50 granting $59.3 million

Page 73: Complete Streets workshop presentation

Hot Topics – What needs to change for better livability?

• Land use is a local decision, transportation is a state or regional responsibility; but community building should be everyone’s responsibility

• Limited “community planning” skills and expertise in transportation agencies

• Silos created by how transportation and land uses entities are organized

• Mission and Goals of Agencies are very different; partnerships are critical to success

• Limitations are set by Federal Funding Requirements

Page 74: Complete Streets workshop presentation

What are complete streets in your

community? What is livability to you?

Page 75: Complete Streets workshop presentation