Complete Streets InitiativeUpdate
Council Transportation andEnvironment Committee
April 23, 2012
UrbanAdvantage
-
8/2/2019 Complete Streets April 23 2012
3/45
22
Presentation Purpose
Update the Council Committee oncommunity workshops results and
preliminary concept proposals forComplete Street Pilot Projects
-
8/2/2019 Complete Streets April 23 2012
4/45
33
Complete Streets InitiativeScope and Anticipated Outcomes
Complete Streets Design Manual: Flexible, easy-to-use complete street design guidelines
and standards for the engineering community
Citywide vision and policies
Implementation Program: Recommendations for phased implementation of new
policies and standards
Pilot projects
-
8/2/2019 Complete Streets April 23 2012
5/45
44
Potential Pilot Projects
Opportunities to engage the communityin exploring new complete street designconcepts on specific streets
Real case studies to provide input to theComplete Streets Design Manual Conceptual designs and rough cost
estimates to enable pilot projects to beconsidered for funding through the 2012Bond Program and other sources
-
8/2/2019 Complete Streets April 23 2012
6/45
Potential PilotProjects
Pro jec t D is t r i c t
Alpha Road 11
Buckner Boulevard 5
Camp Wisdom Drive 8
Davis Street 1,3
Grand Avenue 7
Henderson Avenue 2
Knox Street 14
Lancaster Road 4,5
Meadowcreek Drive 12
Northcliff Drive 9
Ross Avenue 14,2
Royal Lane 6,13
Skillman Street 10
Park Lane 13
Pearl Street 14
5
-
8/2/2019 Complete Streets April 23 2012
7/45
66
CommunityWorkshops
Communityworkshops focusedon potential pilotprojects held inNovember and
December 2011 atseven locationsthroughout the city
Variety of activitiesand interactive waysto provide input
Over 375communityparticipantsprovided input ondesired streetimprovements
6
-
8/2/2019 Complete Streets April 23 2012
8/45
77
Channel 8 News Video ClipDavis Street Workshop
-
8/2/2019 Complete Streets April 23 2012
9/45
88
Preliminary Design Conceptsfor Potential Pilot Projects
Community input on desired improvements andpreferences for street design elements was usedto guide preliminary design concepts
The following preliminary design concepts forthe potential pilot projects are works in progressand will be modified and refined based onfurther community input
If funding for implementation is secured, there
will be additional opportunities for communityinput through detailed design and theThoroughfare Plan amendment process
-
8/2/2019 Complete Streets April 23 2012
10/45
Priority Design ElementsAlpha Road
9
Low Medium High
-
8/2/2019 Complete Streets April 23 2012
11/45
10
Preliminary Design ConceptsAlpha Road
-
8/2/2019 Complete Streets April 23 2012
12/45
Priority Design ElementsBuckner Boulevard
11
Low Medium
li i i C
-
8/2/2019 Complete Streets April 23 2012
13/45
Preliminary Design ConceptsBuckner Blvd
12
East f ie ldCol lege
-
8/2/2019 Complete Streets April 23 2012
14/45
Priority Design ElementsCamp Wisdom Road
13
Low Medium High
P li i D i C t
-
8/2/2019 Complete Streets April 23 2012
15/45
Preliminary Design ConceptsCamp Wisdom
14
UNT-Dallas Campus
ProposedDART Station
-
8/2/2019 Complete Streets April 23 2012
16/45
Priority Design ElementsDavis Street
15
Low Medium High
P li i D i C t
-
8/2/2019 Complete Streets April 23 2012
17/45
Preliminary Design ConceptsDavis Street
16
Bishop Arts District
-
8/2/2019 Complete Streets April 23 2012
18/45
Priority Design ElementsGrand Avenue
17
Low Medium High
P li i D i C t
-
8/2/2019 Complete Streets April 23 2012
19/45
Preliminary Design ConceptsGrand Avenue
18
New Billy DadeMiddle School Site
-
8/2/2019 Complete Streets April 23 2012
20/45
Priority Design ElementsKnox and Henderson
19
Low Medium High
P li i D i C t
-
8/2/2019 Complete Streets April 23 2012
21/45
Preliminary Design ConceptsHenderson Avenue
20
P li i D i C t
-
8/2/2019 Complete Streets April 23 2012
22/45
Preliminary Design ConceptsKnox Street
21
-
8/2/2019 Complete Streets April 23 2012
23/45
Priority Design ElementsLancaster Road
22
Low Medium
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
24/45
Preliminary Design ConceptsLancaster Road
23
-
8/2/2019 Complete Streets April 23 2012
25/45
Meadowcreek Road
Priority Design ElementsMeadowcreek Road
24
Low Medium High
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
26/45
Preliminary Design ConceptsMeadowcreek Road
DRAFT25
-
8/2/2019 Complete Streets April 23 2012
27/45
Priority Design ElementsNorthcliff Road
26
Low Medium
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
28/45
27
Preliminary Design ConceptsNorthcliff Road
-
8/2/2019 Complete Streets April 23 2012
29/45
Priority Design ElementsPark Lane
28
Low Medium High
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
30/45
Preliminary Design ConceptsPark Lane
29
-
8/2/2019 Complete Streets April 23 2012
31/45
Priority Design ElementsRoss Avenue and Pearl Street
30
Low Medium High
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
32/45
Preliminary Design ConceptsPearl Street
31
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
33/45
32
Preliminary Design ConceptsRoss Avenue
-
8/2/2019 Complete Streets April 23 2012
34/45
Priority Design ElementsRoyal Lane
33
Low Medium
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
35/45
Preliminary Design ConceptsRoyal Lane
34
-
8/2/2019 Complete Streets April 23 2012
36/45
Priority Design ElementsSkillman Road
35
Low Medium
Preliminary Design Concepts
-
8/2/2019 Complete Streets April 23 2012
37/45
Preliminary Design ConceptsSkillman Street
36
-
8/2/2019 Complete Streets April 23 2012
38/45
3737
Preliminary Cost Estimates
Design concepts focus improvements withinexisting right-of-way to avoid land acquisition
Typical costs included: Sidewalks and sidewalk landscaping
Enhanced crosswalks Pedestrian lighting
Medians and median landscaping (where relevant)
Bike facilities
Lane restriping (where necessary)
Typical costs not included: Roadway reconstruction and resurfacing
Burying overhead utilities (electrical, phone, cable)
Potential maintenance cost increase
-
8/2/2019 Complete Streets April 23 2012
39/45
Preliminary Capital Cost EstimatesCor r ido r Leng th (miles) Cost (millions)
Alpha Road 0.83 $ 2.4
Buckner Boulevard 1.04 $ 2.1
Camp Wisdom Drive 3.60 $ 1.8
Davis Street 1.80 $ 1.6
Grand Avenue 0.85 $ 2.0
Henderson Avenue 1.16 $ 1.6
Knox Street 0.30 $ 0.6
Lancaster Road 1.68 $ 3.8
Meadowcreek Road 1.25 $ 1.8
Northcliff Road 1.16 $ 0.9
Park Lane 1.29 $ 4.3
Pearl Street 0.18 $ 2.9
Ross Avenue 2.08 $ 5.3
Royal Lane 2.39 $ 6.0
Skillman Road 1.86 $ 1.9
To ta l $38 .9
3838
-
8/2/2019 Complete Streets April 23 2012
40/45
3939
Potential Phased Approach
Staff can explore cost reduction through a phasedapproach:
Limit higher cost design elements to theidentified focus areas within each corridor: Enhanced/wider sidewalks and sidewalk landscaping
Enhanced crosswalks
Pedestrian lighting
median landscaping
Include moderate cost elements for full corridorextents Bike facility street markings
Basic sidewalk improvements and crosswalk markings
-
8/2/2019 Complete Streets April 23 2012
41/45
4040
Funding Considerations
These Complete Street pilot projects will beincluded in the City of Dallas Needs Inventoryfor consideration in the 2012 Bond Program
Projects to be proposed in the 2012 Bondpackage will be determined by City Councilpriorities
Potential opportunities for collaborations withDallas County, DART and TXDOT to be explored
Public-private partnership opportunities to beexplored for handling the increased operationand maintenance responsibilities associatedwith complete street enhancements
-
8/2/2019 Complete Streets April 23 2012
42/45
4141
Partnership Opportunities
Collaboration with DART on enhanced transitstops and related improvements
Opportunities for collaboration with DallasCounty
Opportunities to work with Public ImprovementDistricts (PIDs) and other public/private entities
to partner on sharing capital and operation andmaintenance costs.
-
8/2/2019 Complete Streets April 23 2012
43/45
Other Complete Street Projects
Add i t i ona l Com p le te St r ee t Pro j ects D ist r i ct
Bishop from Jefferson to 8th * 1
Main Street from Good Latimer to Exposition * 2
Commerce Street from Good Latimer to Exposition * 2
Greenville from Belmont to Bell and from Alta to Ross 2, 14
Fort Worth Avenue from Westmoreland to Beckley ** 3, 6M.L.K. from R.B. Cullum to S.M. Wright 7
M.L.K. from S.M. Wright to Gould 7
S. Pearl Street from Canton Street to Marilla Street 14
42
The following additional complete streetprojects in need of funding are also underconsideration for the Bond Program
* Detailed design for these projects is already funded and underway** Conceptual design for this project is funded and underway
C l S I i i i
-
8/2/2019 Complete Streets April 23 2012
44/45
4343
Complete Streets InitiativeNext Steps
Conduct two temporary demonstration projectsto test feasibility of alternative complete streetroadway configurations in real conditions andget additional community input
Draft Complete Streets Design Manual fortechnical review
Explore alternative funding options for pilotproject implementation
-
8/2/2019 Complete Streets April 23 2012
45/45
Complete Streets InitiativeUpdate
Council Transportation andEnvironment Committee
April 23, 2012