complements and accessories handling units/gold... · wire the 400 v (5-conducter system) incoming...

103
20200221 We reserve the right to alter specifications. GOLD 259 Complements and Accessories Chillers/heat pumps .........................................................................................................260 GOLD RX/HC, Reversible heat pump ......................................................................................................... 260 COOL DX/COOL DX Top, Cooling unit ....................................................................................................... 275 Chiller, Echos + .............................................................................................................................................. 282 Blue Box, Chiller/Heat pump ...................................................................................................................... 284 Air handling unit section .................................................................................................285 TCBR Air recirculation section.................................................................................................................... 285 Solutions for fire bypass ............................................................................................................................. 286 Smoke extraction adapter.......................................................................................................................... 288 Duct crossover section ................................................................................................................................ 289 Multisection ................................................................................................................................................ 290 Duct Accessories...............................................................................................................292 Uninsulated ................................................................................................................................................ 292 In insulated casing ..................................................................................................................................... 313 Roof hoods and exterior wall hoods ..............................................................................352 Component box ...............................................................................................................353 Outdoor installation ........................................................................................................354 Mechanical Equipment ....................................................................................................355 Electrical and Control Equipment ...................................................................................359 Contents

Upload: others

Post on 05-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

259

Complements and Accessories

Chillers/heat pumps .........................................................................................................260GOLD RX/HC, Reversible heat pump .........................................................................................................260 COOL DX/COOL DX Top, Cooling unit .......................................................................................................275Chiller, Echos+ ..............................................................................................................................................282Blue Box, Chiller/Heat pump ......................................................................................................................284

Air handling unit section .................................................................................................285TCBR Air recirculation section ....................................................................................................................285Solutions for fi re bypass .............................................................................................................................286Smoke extraction adapter ..........................................................................................................................288Duct crossover section ................................................................................................................................289Multisection ................................................................................................................................................290

Duct Accessories ...............................................................................................................292Uninsulated ................................................................................................................................................292In insulated casing .....................................................................................................................................313

Roof hoods and exterior wall hoods ..............................................................................352

Component box ...............................................................................................................353

Outdoor installation ........................................................................................................354

Mechanical Equipment ....................................................................................................355

Electrical and Control Equipment ...................................................................................359

Contents

Page 2: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221260

GOLD RX/HC

GeneralRX/HC is a complete reversible heat pump, fully inte-grated in the GOLD air handling unit.

Mechanical DesignRX/HC replaces the GOLD air handling unit’s ordinary heat exchanger section.

RX/HC is available in all variants to match the equivalent GOLD air handling unit’s different fan placements and right respective left-hand designs.

RX/HC consists of one section with sorption rotor and one section on each side of this that contains heating/cooling engineering components.

All components from a cooling and electrical standpoint are pre-wired.

The RX/HC section can be delivered in a variant with split refrigerant circuit. The RX/HC section can be divided into three units for transport into the work site. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

The casing is composed of cover panels and inspection doors. The outer skin is made of galvanized sheet steel, pre-painted in Swegon’s grey metallic colour (closest com-parable: RAL, 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environmental Class C4. Panel thickness of 52 mm with intervening insulation consisting of mineral wool.

The evaporator and condenser consist of copper tubes and profiled aluminium fins.

RX/HC is test run prior to delivery.

RX/HC are designed and tested for ambient temperatures from -40°C to +40°C. The heat pump function with-stands temperatures from -25°C to +35°C.

Control and RegulationHeating/cooling engineering components have a separate integrated electrical cabinet which are operated via the GOLD air handling unit’s hand-held micro terminal.

The refrigerant circuit contains a variable speed controlled compressor (all sizes) that regulates the output. Size 040-080 also comprises an on/off compressor for increased capacity.

Completely direct-acting systemThe RX/HC has a completely direct-acting system. It has an evaporation coil for direct-evaporating refrigerant on the cold side and a condenser coil on the hot side.

RX/HC, size 012

RefrigerantThe refrigerant circuit is charged with refrigerant on deliv-ery. The volume of refrigerant for each size is tabulated in the Technical Data Table.

Type R410A refrigerant is used. At present, this refriger-ant has no known influence on the ozone layer and no known future restrictions are anticipated.

Inspection of the installation, obligation to report and periodic leakage tracing must be carried out according to the F-Gas Regulation EU/517/2014 and associated local legislation, also refer to the separate Installation and Maintenance Instructions for GOLD RX/HC.

Installation tipsWhen positioning the cooling unit, bear in mind that it must be possible to open the inspection doors as well as connect drainage pipework and power supply and control wiring without difficulty.

To drain the air coolerThe coils in RX/HC are equipped with a condensate drain tray and a drainage connection (condensate forms in the evaporator). The condensate discharge pipework must be connected across a water trap (accessory) to the drain connections of the cooling unit and must run with contin-uous slope to a drain gulley. The air handling unit must be raised at least 50 mm to provide space for the water trap, ideally this is done with the support feet (accessory).

Complements and Accessories

Page 3: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

261

GOLD RX/HC

DefrostThere are three options to defrost the exhaust coil (for the heat pump function), see below. For sizing, the product selection program AHU Design proposes suitable defrost-ing options for the specifi c operating case.

Reversing the refrigerant circuit. Reversing the refrigerant circuit increases the temperature of the refrigerant in the exhaust coil, which means that the coil defrosts from the inside.

Reversing the refrigerant circuit + Electric air heaterReversing the refrigerant circuit increases the temperature of the refrigerant in the exhaust coil, which means that the coil defrosts from the inside.

An electric air heater (accessory) is placed in front of the rotating heat exchanger, see diagram.

For defrosting, the electric air heater increases the tem-perature of the air before the heat exchanger. The heat exchanger transfers heat energy to the exhaust air. The temperature across the exhaust coil increases.

Reversing the refrigerant circuit + Air recirculation section RX/HCReversing the refrigerant circuit increases the temperature of the refrigerant in the exhaust coil, which means that the coil defrosts from the inside.

An air recirculation section RX/HC (accessory) is placed on the air handling unit’s outdoor air/exhaust side, see diagram.

For defrosting, the air recirculation damper opens fully and the outdoor air/exhaust air damper closes fully. The warm extract air is recirculated. The temperature across the exhaust coil increases.

Electrical air heater placed in RX/HC (accessory)

Air recirculation section RX/HC (accessory)

Depending on the version, the damper can be mounted in the upper or lower level.

H100

L52*B

For GOLD B H L kg End conn. panel, if required kg/pc.

011/012 1199 1295 565 92 13

014/020 1400 1551 565 110 19

025/030 1600 1811 565 125 23

035/040 1990 2159 565 142 34

050/060 2318 2288 565 168 34

070/080 2637 2640 565 229 40

* End connection panel selectable.

Air recirculation section RX/HC (accessory)

Complements and Accessories

Outdoor air Supply air Extract air Exhaust air

Page 4: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221262

Complements and Accessories

GeneralThe RX/HC is internally fully wired and trial run prior to delivery.

Equipment for heating/cooling engineering components are collected in an integrated electrical cabinet.

The safety isolating switch is located on the connection hood (size 011-020) or the air handling unit’s inspection side (size 025-080).

Power supplyWire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch.

Wire the electrical power supply connections according to the technical data tabulated above. Use delayed fuses! In applications where automatic circuit breakers are used, the circuit breakers must have C-characteristic.

Electrical and Control Equipment Control and RegulationA ready-to-use communication cable with quick connec-tor for on/off switching, cooling capacity control as well as in-operation indication and alarms is used. The com-munication cable is supplied together with the unit.

StandardsThe RX/HC is CE labelled in accordance with PED and the provisions of the EMC Directive for interference levels defined in SS-EN-50081-1 and SS-EN-61000-6-2 Standards (electromagnetic emissions in dwellings, office buildings, shops and similar environments as well as for immunity in industrial environments).

Applicable to installations in Sweden:The unit meets the provisions of the ELSÄK-FS 1999:5 and SS-EN 60,204-1 and other applicable Swedish electri-cal safety standards and rules.

Hand-held terminalSettings can be entered, readings can be viewed and pos-sible alarms are displayed in the hand-held micro terminal of the GOLD air handling unit.

GOLD RX/HC

Sizing in AHU DesignFor correct sizing we refer to our AHU Design air handling unit selection program.

1) For an outdoor temperature of 26°C, 50% RH, extract air temperature of 22°C, supply air temperature 16°C. Cooling capacity: rotating heat exchange / coil HC.2) For an outdoor temperature of -20°C, 95% RH, extract air temperature of 22°C, supply air temperature 20°C. Heating capacity: rotating heat exchange / coil HC.

Technical data

SizeAirflow at SFPv

1.8 (m3/s)Min. airflow

(m3/s)Cooling cap.

(kW)1)

Heating cap. (kW)2)

Refrigerant (kg) Power supply EER1) COP2)

011 0.89 0.45 14.8 / 8.2 44.0 / 4.1 6 3 x 400V ±10%, +N +PE 16A 4.7 3.5

012 0.97 0.50 15.9 / 8.9 47.4 / 4.8 8 3 x 400V ±10%, +N +PE 25A 4.6 3.5

014 1.48 0.75 24.2 / 13.6 72.0 / 7.9 8 3 x 400V ±10%, +N +PE 25A 5.3 3.6

020 1.53 0.75 25.0 / 14.1 74.1 / 8.4 10 3 x 400V ±10%, +N +PE 25A 4.4 3.4

025 2.07 0.95 33.7 / 19.1 100.1 / 11.5 10 3 x 400V ±10%, +N +PE 25A 4.4 3.4

030 2.10 0.95 34.1 / 19.4 101.4 / 11.8 13 3 x 400V ±10%, +N +PE 32A 4.9 3.4

035 3.12 1.50 51.2 / 28.5 152.0 / 16.4 18 3 x 400V ±10%, +N +PE 50A 4.5 3.2

040 3.30 1.58 53.8 / 30.3 159.7 / 18.3 20 3 x 400V ±10%, +N +PE 50A 4.9 3.3

050 4.22 2.05 68.8 / 38.9 204.4 / 23.2 17.5 3 x 400V ±10%, +N +PE 63A 4.3 3.1

060 4.25 2.08 69.3 / 39.2 205.7 / 23.5 20 3 x 400V ±10%, +N +PE 63A 3.9 3.0

070 5.51 2.87 90.5 / 50.5 268.8 / 28.7 25 3 x 400V ±10%, +N +PE 63A 4.0 2.9

080 5.52 2.92 90.6 / 50.6 269.2 / 28.8 30 3 x 400V ±10%, +N +PE 80A 4.0 2.9

Page 5: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

263

Complements and Accessories

Dimensions and weightsRX/HC 011

45 45J

K76

5245 45J

K 76380 18

52

16

E

/HC

ø ø

350 350

= =

Size A B C D E F G H J K L Ø Weight, kg

011 647 1199 324 565 1695 324 647 1295 953 551 2989 500 737-845

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the E-measurement.Placement of the air handling unit sections, duct connections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

The unit can be divided into three air handling unit sec-tions at the building site.Dimensions: See A and E in the table above.Weight: A = 135-175 kg, E = 467-495 kg.

Division into sections for transport

A AE

Power connection RX/HCPower connection GOLD

GOLD RX/HC

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 6: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221264

Complements and Accessories

Dimensions and weightsRX/HC 012

45 45J

K76

5245 45J

K 76380 18

52

16

E

/HC

ø ø

350 350

= =

Size A B C D E F G H J K L Ø Weight, kg

012 647 1199 324 565 1695 324 647 1295 953 551 2989 500 765-879

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the E-measurement.Placement of the air handling unit sections, duct connections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected.

The AHU can also be supplied with full face end connection panel (accessory).

The unit can be divided into three air handling unit sec-tions at the building site.Dimensions: See A and E in the table above.Weight: A = 146-189 kg, E = 473-501 kg.

Division into sections for transport

A AE

Power connection RX/HCPower connection GOLD

GOLD RX/HC

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 7: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

265

Complements and Accessories

EF

52

F

52

11

M

M

76

45 45J

380 18

C

/HC

Dimensions and weightsRX/HC 014

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 190-244 kg, C = 554-586 kg.

Division into sections for transport

Size A B C D E F G H I J K L M Weight, kg

014 757,5 1400 1695 565 205 400 1000 1551 375 1154 200 3210 188 934-1074

A AC

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

Power connection RX/HCPower connection GOLD

GOLD RX/HC

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 8: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221266

Complements and Accessories

EF

52

F

52

11

M

M

76

45 45J

380 18

C

/HC

Dimensions and weightsRX/HC 020

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 200-264 kg, C = 564-596 kg.

Division into sections for transport

Size A B C D E F G H I J K L M Weight, kg

020 757,5 1400 1695 565 205 400 1000 1551 375 1154 200 3210 188 964-1124

A AC

Power connection RX/HCPower connection GOLD

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

GOLD RX/HC

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 9: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

267

Complements and Accessories

M

35

M

45 45J

C

52

E

52

/HC

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 249-333 kg, C = 740-779 kg.

Division into sections for transport

A AC

Power connection RX/HCPower connection GOLD

Size A B C D E F G H I J K L M Weight, kg

025 848 1600 1695 565 200 500 1200 1811 405 1354 200 3391 203 1238-1445

Dimensions and weightsRX/HC 025

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

GOLD RX/HC

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 10: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221268

Complements and Accessories

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 275-345 kg, C = 750-789 kg.

Division into sections for transport

A AC

Size A B C D E F G H I J K L M Weight, kg

030 848 1600 1695 565 200 500 1200 1811 405 1354 200 3391 203 1300-1479

Dimensions and weightsRX/HC 030

M

35

M

45 45J

C

52

E

52

/HC

Power connection RX/HCPower connection GOLD

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

GOLD RX/HC

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 11: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

269

Complements and Accessories

Dimensions and weights

GOLD RX/HC

M

M

45 45J

/HC

40

C

52 52

Division into sections for transport

A AC

Size A B C D E F G H I J K L M Weight, kg

035 1038,5 1990 1695 565 245 600 1400 2159 479 1744 295 3772 240 1664-1922

RX/HC 035Power connection RX/HC Power connection GOLD

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 377-482 kg, C = 910-958 kg.

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 12: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221270

Complements and Accessories

Dimensions and weights

GOLD RX/HC

M

M

45 45J

/HC

40

C

52 52

Size A B C D E F G H I J K L M Weight, kg

040 1038,5 1990 1695 565 245 600 1400 2159 479 1744 295 3772 240 1740-2016

RX/HC 040Power connection RX/HC Power connection GOLD

Division into sections for transport

A AC

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 390-504 kg, C = 960-1008 kg.

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Support feet (accessories) can be used for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 13: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

271

Complements and Accessories

Dimensions and weights

GOLD RX/HC

M

M

40

C

52 52

78 782162

123 835 83545402J J

/HC

Size A B C D E F G H I J K L M Weight, kg

050 1038,5 2318 1815 565 145 800 1600 2288 344 625 359 3892 172 2138-2445

RX/HC 050Power connection RX/HC Power connection GOLD

Division into sections for transport

A AC

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 444-572 kg, C = 1250-1301 kg.

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

Supplied on 100 mm high transport feet. Removed when the unit is at its final location. If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Adjustable support feet (accessories) can be appropriately fitted to the base beams for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D and J in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 14: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221272

Complements and Accessories

Dimensions and weights

GOLD RX/HC

M

M

40

C

52 52

78 782162

123 835 83545402J J

/HC

Division into sections for transport

A AC

Size A B C D E F G H I J K L M Weight, kg

060 1038,5 2318 1815 565 145 800 1600 2288 344 625 359 3892 172 2322-2611

RX/HC 060Power connection RX/HC Power connection GOLD

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A = 511-630 kg, C = 1300-1351 kg.

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

Supplied on 100 mm high transport feet. Removed when the unit is at its final location. If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Adjustable support feet (accessories) can be appropriately fitted to the base beams for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D and J in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 15: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

273

Complements and Accessories

40

M

M

C

52 52J J

76

121 1150 120045

762485

/HC

RX/HC 070Power connection RX/HC Power connection GOLD

GOLD RX/HC

Dimensions and weights

Division into sections for transport

A AC

Size A B C D E F G H I J K L M Weight, kg

070 1273,5 2637 1815 565 162 1000 1800 2640 320 625 418,5 4362 160 3322-3645

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A =786-911 kg, C = 1750-1823 kg.

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Adjustable support feet (accessories) can be appropriately fitted to the base beams for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D and J in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 16: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221274

Complements and Accessories

40

M

M

C

52 52J J

76

121 1150 120045

762485

/HC

RX/HC 080Power connection RX/HC Power connection GOLD

GOLD RX/HC

Dimensions and weights

Division into sections for transport

A AC

Size A B C D E F G H I J K L M Weight, kg

080 1273,5 2637 1815 565 162 1000 1800 2640 320 625 418,5 4362 160 3426-3785

The unit can be divided into three sections at the building site.Dimensions: See A and C in the table above.Weight: A =813-956 kg, C = 1800-1873 kg.

The diagram shows RX/HC integrated in a GOLD standard air handling unit set-up. The installation length for RX/HC corresponds to the C-measurement.Placement of the air handling unit sections, connection hood, drain pipe, etc. may vary depending on the selected variant.

* The air handling unit is supplied without end connection panel if a duct accessory housed in an insulated casing will be connected. The AHU can also be supplied with full face end connection panel (accessory).

If a water trap (accessory) is fitted, the air handling unit must be raised at least 50 mm to provide space for the water trap. Adjustable support feet (accessories) can be appropriately fitted to the base beams for this purpose.

In addition to this, the middle section (RX/HC) can be delivered in a variant with split refrigerant circuit. The RX/HC section is then delivered assembled from the factory, but can be divided into three units on site, see D and J in the table above. Assembly of the RX/HC section may only be performed by certified refrigeration technicians.

Page 17: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

275

Plug and Play with COOL DX!

Extremely quick and simple installation.

Built-in control equipment operated from the GOLD.

Variable comfort control or economy control in 3 steps.

Cooling capacity

Tem

per

atu

re r

edu

ctio

n

Economy or comfort controlEconomy controlCooling in 3 stepsWhen cooling is required, cooling compressor 1 starts up. On an increasing ccoling load, cooling compressor 2 starts up and cooling compressor 1 is switched out. If the cool-ing load increases even more, both cooling compressors are started.

Advantage: Each cooling compressor is switched in and out in pace with the amount of cooling required and this shortens the overall in-operation period.

Consequence: Cooling in 3 steps

Comfort control (not COOL DX Top)Cooling and variable temperature controlAs a form of economy control but when there is a cooling load, the heat exchanger of the air handling unit is also activated and this controls the temperature within the cooling step.

Advantage: Variable control of the cooling capacity and uniform supply air temperature.

Consequence: Each cooling compressor operates for a longer period when cooling is needed.

Cooling capacity

Tem

per

atu

re r

edu

ctio

n

Cooling compressor Heat exchanger

Ready for communication via the GOLD.

Its location inside the GOLD prevents the extract air fan motor from being subject to

high temperatures.

The CoolDX Top cooling unit fi ts in well in the concept of the GOLD air handling unit and really stands for Plug and Play.

All the equipment is housed in one and the same unit and can be docked to the GOLD. The COOL DX can also be installed as a stand-alone unit.

In addition to the above, only an electric power supply and a communication cable (with quick-fi t connector)

between the COOL DX/COOL DX Top and the GOLD as well as the connection of drainage pipework are required.

The GOLD has ready-to-use cooling functions for control-ling and regulating the COOL DX/COOL DX Top. This also includes communication via web or traditional perfor-mance monitoring systems.

The COOL DX/COOL DX Top thus means minimal invest-ment for project designing, procurement and installation.

Dock the COOL DX Top on top of the GOLD RX Top air handling unitDock the COOL DX to the GOLD air handling unit

Page 18: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221276

COOL DX/COOL DX Top

Complements and Accessories

GeneralThe COOL DX/COOL DX Top is a complete cooling unit for comfort cooling in the air handling system. The COOL DX is produced in seven sizes with cooling capacity from 10 to 134 kW. The seven sizes are capacity-wise matched to the size 007-080 GOLD air handling units.The COOL DX Top is produced in three sizes with cooling capacity from 6.8 to 20.4 kW. On the basis of capacity, the three sizes are matched to the size 004 - 012 GOLD air handling units.

Mechanical DesignThe COOL DX cooling unit is designed for installation against the outdoor air and exhaust air side of the GOLD unit.Place the COOL DX Top cooling unit on top of the GOLD RX Top air handling unitAll electrical and control equipment is prewired and col-lected inside a common casing. Composed of cover panels and inspection doors. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environmental Class C4. Panel thickness of 52 mm with intervening insulation consisting of mineral wool.The cooling coil and condenser are fabricated of copper tubing and profi led aluminium fi ns.The cooling unit is test run prior to delivery.

Control and regulationThe COOL DX/COOL DX Top cooling unit has a built-in control system. Only an electric power supply and a communication cable are required for the transmission of information between the COOL DX/COOL DX Top and the GOLD control sys-tems. The communication cable is supplied together with the unit. All in-operation status and other information is readily available for viewing in the hand-held terminal of the GOLD air handling unit. The cooling capacity is controlled by operating one or both compressors. Cooling is controlled in 3 steps in binary mode.On receiving an on/off control signal, compressor M1 starts up. On an increasing cooling load, compressor M2 starts at the same time that compressor M1 stops. If the cooling load increases even more, both compressors M1 and M2 operate.

Completely direct-acting systemThe COOL DX/COOL DX Top has a completely direct-acting system. It has an evaporation coil for direct-evapo-rating refrigerant on the cold side and a condenser coil on the hot side.

RefrigerantThe COOL DX/COOL DX Top has double refrigerant circuits, which are charged with refrigerant on delivery. The volume of refrigerant for each size is tabulated in the Technical Data Table.Type R410A refrigerant is used. At present, this refriger-ant has no known infl uence on the ozone layer and no known future restrictions are anticipated.

Inspection of the installation, obligation to report and periodic leakage tracing must be carried out according to the F-Gas Regulation EU/517/2014 and associated local legislation, also refer to the separate Installation and Maintenance Instructions for COOL DX/COOL DX Top.

Duct connectionThe end connection panel for outdoor and/or exhaust air is optional for the Cool DX cooling units. If an end con-nection panel is selected, slip-clamps (sizes 020-080) or rubber ring seals (sizes 008-012) are used for connection to the ducting. If no end connection panel has been selected, the profi led frame members on the cooling unit should be connected to the ducting across an adapter (not supplied by Swegon).Connect the COOL DX Top to duct connections with rubber seal ring.

COOL DX

COOL DX TopCOOL DX Top

Page 19: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

277

Complements and Accessories

Sizing in AHU DesignThere are many factors that influence what size of cooling unit is required. For correct sizing we refer to our AHU Design air handling unit selection program.

COOL DXSize

Capa-city vari-ant

Nom. air-

flowm3/s

Min. air-

flowm3/s

Nom. cooling capa-city1)

(kW)

Nom. Power

re-quired(kW)

Refri-gerant

(kg)Power supply

Weight excl. end

conn. panel(kg)

Weight of each end

conn. panel, if required2)

(kg)Circuit

1

Circuit

2

008 1 0.55 0.22 9.8 2.39 1,20 1,30 3-ph.+N, 400 V ±10%, 16 A 194 8

2 0.70 0.3 13.9 4.33 1,20 1,30 3-ph.+N, 400 V ±10%, 20 A 215 8

012 1 0.85 0.35 15.4 3.95 1,50 1,70 3-ph.+N, 400 V ±10%, 20 A 260 10

2 1.05 0.4 20.9 6.53 1,50 1,70 3-ph.+N, 400 V ±10%, 25 A 287 10

020 1 1.1 0.45 15.4 4.06 1,20 1,50 3-ph.+N, 400 V ±10%, 25 A 247 11

2 1.3 0.5 23.3 5.73 2,50 2,80 3-ph.+N, 400 V ±10%, 25 A 287 11

3 1.6 0.6 31.0 9.15 2,10 2,40 3-ph.+N, 400 V ±10%, 40 A 318 11

030 1 1.8 0.7 25.0 6.33 1,80 2,00 3-ph.+N, 400 V ±10%, 32 A 327 17

2 2.0 0.8 35.8 9.34 3,00 3,20 3-ph., 400 V ±10%, 25 A 379 17

3 2.4 1.0 46.2 13.5 2,90 3,30 3-ph., 400 V ±10%, 40 A 419 17

040 1 2,9 1,1 38,6 8,40 3,30 4,00 3-ph., 400 V ±10%, 25 A 498 22

2 3,1 1,3 48,4 12,3 3,30 4,50 3-ph., 400 V ±10%, 40 A 506 22

3 3,6 1,5 67,0 17,5 5,50 4,50 3-ph., 400 V ±10%, 50 A 559 22

060 1

2

3

3,9

4,1

5,0

1,5

1,6

2,0

56,2

66,7

97,5

11,8

17,1

26,3

4,50

5,00

6,00

5,50

5,20

7,50

3-ph., 400 V ±10%, 40 A

3-ph., 400 V ±10%, 50 A

3-ph., 400 V ±10%, 80 A

715

786

859

32

32

32

080 1

2

3

5,2

6,0

7,0

2,0

2,4

2,8

67,0

96,5

134,0

13,3

24,8

36,4

6,60

6,50

9,00

7,30

9,00

11,50

3-ph., 400 V ±10%, 50 A

3-ph., 400 V ±10%, 80 A

3-ph., 400 V ±10%, 100 A

852

979

1035

38

38

381) For an outdoor temperature of 26°C, 50% RH (capacity variant 1), 27°C, 50% RH (capacity variant 2) or 28°C, 50% RH (capacity variant 3), and an extract air temperature of 26°C. 2) The first weight applies to a small end connection panel; the second weight applies to a large end connection panel. COOL DX can be supplied completely without end connection panels or with a maximum of 2 small and two large end connection panels depending on the variant selected.

COOL DX/COOL DX Top

COOL DX

Technical data

COOL DX TopSize

Capa-city vari-ant

Nom. air-

flow(m3/s)

Min. air-

flow(m3/s)

Nom. cooling

capacity1)

(kW)

Nom. power required

(kW)

Refrigerant (kg)

Power supplyWeight

(kg)Circuit

1Circuit

2

005 1 0.40 0.10 6.77 1.66 0.95 1.00 3-ph.+N, 400 V ±10%, 16 A 200

2 0.55 0.20 9.30 2.48 1.02 1.03 3-ph.+N, 400 V ±10%, 20 A 200

008 1 0.55 0.22 9.31 2.38 1.15 1.20 3-ph.+N, 400 V ±10%, 20 A 280

2 0.70 0.3 13.5 4.34 1.29 1.30 3-ph.+N, 400 V ±10%, 20 A 280

012 1 0.85 0.35 14.8 3.95 1.60 1.70 3-ph.+N, 400 V ±10%, 20 A 340

2 1.05 0.40 20.4 6.69 1.75 1.92 3-ph.+N, 400 V ±10%, 25 A 340

COOL DX Top

1) For an outdoor temperature of 26°C, 50% RH (capacity variant 1) or 28°C, 50% RH (capacity variant 2), and an extract air temperature of 26°C.

Page 20: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221278

GeneralThe COOL DX/COOL DX Top cooling unit is internally fully wired and trial run prior to delivery.

All electrical and control equipment is collected inside an electrical equipment cubicle inside the COOL DX/COOL DX Top.

The safety switch is positioned on the front panel of the cooling unit.

Power supplyThe incoming power supply for 400 V (4-wire system for size 030, capacity variants 2 and 3, and sizes 040-080, all capacity variants, 5-wire system for other sizes) should be connected directly to the safety isolating switch.

Wire the electrical power supply connections according to the technical data table on the previous page. Use delayed fuses! In applications where automatic circuit breakers are used, the circuit breakers must have delta characteristic.

Electrical and control equipmentControl and regulationA ready-to-use communication cable with quick connec-tor for on/off switching, cooling capacity control as well as in-operation indication and alarms is used. The com-munication cable is supplied together with the unit.

StandardsThe COOL DX/COOL DX Top is CE labelled in accord-ance with PED and the provisions of the EMC Directive for interference levels defined in SS-EN-50081-1 and SS-EN-61000-6-2 Standards (electromagnetic emissions in dwellings, office buildings, shops and similar environ-ments as well as for immunity in industrial environments).

Applicable to installations in Sweden:The unit meets the provisions of the ELSÄK-FS 1999:5 and SS-EN 60,204-1 and other applicable Swedish electri-cal safety standards and rules.

Hand-held micro terminalSettings can be entered, readings can be viewed and pos-sible alarms are displayed in the hand-held micro terminal of the GOLD air handling unit.

Complements and Accessories

COOL DX/COOL DX Top

Page 21: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

279

Complements and Accessories

COOL DX/COOL DX Top

Installation TipsThe cooling unit can be positioned against the outdoor air/ex-haust air side of the GOLD air handling unit: See the illustration above. The COOL DX cooling units can be docked directly to the GOLD air handling unit, with so-called full face connection (without end connection panels). The COOL DX can also be installed as a stand-alone unit. If you order a stand-alone COOL DX, select version D as a variant with end connection panels.

When positioning the cooling unit, bear in mind that it must be possible to open the inspection door as well as connect drain-age pipework and power supply and control wiring without difficulty.

To drain the cooling coilThe cooling coil in the cooling unit is equipped with a conden-sate drain tray and a drainage connection (condensate forms on coil surfaces). The condensate discharge pipework must be connected across a water trap (accessory) to the drain connec-tions of the cooling unit and must run with continuous slope to a drain gulley.

Height adjustment to the height of the GOLD/water trap

COOL DX, size 008

In combination with the GOLD RX 008The GOLD air handling unit can be mounted on base beams, a stand or some other form of foundation. Base beams and stands are available as accessories.

Appropriate base beams and stands are also available as accessories for the COOL DX. The base beams/stands are matched to one another in terms of height. The stands also provide space for accommodating a possible water trap in the lower level (right-hand unit version).

In combination with the GOLD PX 008 The air handling unit is supplied with base beams. A set of legs (accesssory) can be mounted in the base beams.

Appropriate base beams and set of legs are also available as accessories for the COOL DX. The base beams/sets of legs are matched to one another in terms of height. The sets of legs also provide space for accommodating a possible water trap in the lower level (right-hand unit version).

COOL DX, sizes 012-080

The GOLD air handling unit and the COOL DX chiller are supplied with a 100 mm high base beam.

Applicable to a cooling coil in the lower level:If a water trap (accessory) is fitted, the GOLD air handling unit and the chiller must be raised at least 50 mm to provide space for the water trap. Adjustable support feet (accessories) can be appropriately fitted to the base beams for this purpose.

Supply air filterThe COOL DX is supplied without supply air filter. Consequently, the supply air filter in the GOLD unit should be dismantled and moved to the COOL DX.

Variants

COOL DX 008 COOL DX 012-080

Right-hand version

Left-hand version

Right-hand version

Left-hand version

Outdoor air Supply air Extract air Exhaust air

Cooling coil, lower level/ GOLD supply air fan, right-hand,

lower level

Air cooler, upper level/ GOLD supply air fan, right-hand,

upper level

Air cooler, upper level/ GOLD supply air fan, left-hand,

upper level

Air cooler, lower level/ GOLD supply air fan, left-hand,

lower level

Page 22: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221280

COOL DX/COOL DX Top

Installation tipsThe cooling unit can be positioned on top of a GOLD RX Top unit equipped with a docking module. See illustration above.

When positioning the cooling unit, bear in mind that it must be possible to open the inspection door and con-nect the drainage pipework and power supply without difficulty.

To drain the air coolerThe air cooler in the cooling unit is equipped with a con-densate drain tray and a drainage connection (condensate forms on air cooler coil surfaces). The condensate dis-charge pipework must be connected across a water trap (accessory) to the drain connections of the cooling unit and must run with continuous slope to a drain gulley.

Variants

COOL DX Top, 005 - 012

Right-hand versionLeft-hand version

Outdoor air Supply air Extract air Exhaust air

Page 23: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

281

Complements and Accessories

COOL DX/COOL DX Top

DimensionsCOOL DX 008

Size L B H K M Duct connection2)

008 900 995 1085 749 709 Ø 400

COOL DX 012

Size L B H K M Duct connection2)

012 900 1199 1395 953 709 Ø 500

1) End connection panel, optional.

2) For particulars on how to arrange the duct connections, see the cor-

responding GOLD air handling unit

Base beams are accessories. 1) End connection panel, optional.

2) For particulars on how to arrange the duct connections, see the cor-

responding GOLD air handling unit

COOL DX Top, 005, 008, 012

Size L B H Duct connection2)

005 1500 825 600 Ø 315

008 1600 995 600 Ø 400

012 1860 1199 600 Ø 500

1) When calculating the total plant height, use the height of the GOLD air handling unit + the H dimension from the illustration above.

2) For particulars of the locations of the duct connections, see the corre-

sponding GOLD air handling unit

454516 K

1)

M

1)

16

1)

M

1)

4545 K

16

28

1)

454521 K

1)

M

1)

COOL DX 020, 030, 040, 060, 080

1) End connection panel, optional.

2) For the locations of the duct connections, see the corresponding

GOLD air handling unit

Size L B H K M Duct connection2)

020030040060080

900900110011001100

14001600199023182637

15511811215922882640

11541354174420722395

709709884884884

1000 x 4001200 x 5001400 x 6001600 x 8001800 x 1000

Size 060: Supplied on 100 mm high transport feet. Removed when the unit is at its final location.

Page 24: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221282

Echos+ in version LE/HP is a energy-effi cient air-cooled and reversible chiller with direct expansion.

The chiller has a frequency-controlled compressor that steplessly operates at exactly the right speed for produc-ing just the right evaporation temperature to meet the immediate need. This means signifi cant energy savings compared with a traditional compressor controlled only by On or Off switching.

The chiller is controlled in a simple way from a GOLD unit via SMART Link DX.

VersionsLE: For direct expansion LN: Sound attenuatedLE/HP: Reversible heat pump

Quick facts5 sizes with rated cooling capacity up to 26 kWSpeed-regulated scroll compressor with DC inverter, type R410A refrigerant Condenser fan control as standardElectronic expansion valve as standard4-way reversing valve as standard to version HPEnergy class A as standardSmart and simple control via the GOLD

Control via SMART Link DXThe Echos+ has integrated SMART Link technology. This enables control of the chiller from the GOLD air handling unit.

The Echos+ is controlled from the GOLD via internal communication, where the rotational speed of the chiller compressor is regulated to meet immediate needs.

The Echos+ is reversible and can therefore also be used for reheat in winter. Up to three units can be connected each with its own circuit to the cooling/heating coil for the required cooling/heating demand.

The integrated control system makes the installation very simple. Only one data cable is needed between the GOLD and the Echos+.

Reversible chiller for direct expansion, Echos+ LE, LE/HP

GOLDEchos+

SMART Link DX

Page 25: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

283

Operating limits, heat(compressor speed 90 rps)

Echos+ LE/HP 9 15 20 26 30

Rated cooling capacity (ambient temperature 35°C, evapo-ration temperature7.5°C, compressor speed 90 rps)

kW 6,9 12,1 18,2 25,0 29,6

Power consumption, cooling (compressor + fans) kW 1,9 3,2 5,1 6,9 8,2

EER (to EN 14511-3:2011) 3,69 3,74 3,59 3,63 3,61

Rated heating capacity (ambient temperature 7°C, con-densation temperature7.5°C, compressor speed 90 rps)

kW 7,0 12,5 18,7 24,4 28,9

Power consumption, heat (compressor + fans) kW 1,76 2,95 4,68 6,20 7,44

COP (to EN 14511-3:2011) 3,98 4,22 3,99 3,94 3,88

Length mm 925 925 1105 1305 1305

Width mm 375 375 505 505 505

Height mm 1350 1350 1385 1585 1585

Weight in operation kg 146 149 217 262 268

Power supply 1x230V 3+N x 400 V

Ambient temperature (°C)

Con

dens

atio

n te

mpe

ratu

re (

°C)

1. In this area, the compressor can be regulated for

controlling the condensation temperature

Echos+ LE/HP chiller

Complements and accessories

Technical data

Large operation range

Ambient temperature (°C)

Evap

orat

ion

tem

pera

ture

(°C

)

Operating limits, cool(compressor speed 90 rps)

Page 26: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221284

Blue Box chiller

Ex: OXFORD

Blue Box heat pump

Ex: MAROON 2 HWS

AQUA Link

Blue Box chiller

Ex: OXFORD

Blue Box heat pump

Blue Box Chiller/Heat pump

Complements and Accessories

GeneralA wide range of Swegon’s chillers/heat pumps of Blue Box type are available. See separate catalogue.

Blue Box chillers/heat pumps are of the highest quality and are leading products in their segment.

AQUA LinkThe AQUA Link hydraulic module supplies both air han-dling units and comfort modules with cooling power. See separate catalogue.

Control and regulationThe BlueBox unit control system includes functions in-tended for controlling the times, temperatures, etc. and also for reading the alarms and settings of a Blue Box chiller/heat pump via the hand-held micro terminal and web page in a GOLD air handling unit.

An optimisation function for waterborne chillers/heat pumps is also incorporated into the GOLD air handling unit’s control system. The optimisation function optimizes the position of the valve for the water coil, so that the valve always strives to be fully open. The water tempera-ture is controlled instead and this saves energy.

See separate Guide to the SMART Link Functions for waterborne chillers/heat pumps and the Guide to the SMART Link DX Functions respectively for the Echos+ DX chillers/ heat pumps.

InstallationThe installation work is quick and simple compared with other systems.

All the necessary control functions are ready to be acti-vated.

One supplier for all the equipment

Page 27: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

285

Complements and Accessories

Unit sectionsTCBR Air recirculation sectionThe air recirculation section is an extra unit section that has a motor-driven damper (on/off or modulating) in the intermediate level. The air recirculation section is available for the size 011 and larger GOLD RX, PX and CX units. The air recircula-tion section is also available for GOLD RX/PX size 004-008 in split version. The GOLD PX/CX cannot be used for the ReCO function2.

Included in the delivery: Air recirculation section. Mounted actuator for damper. Necessary extension wiring for the supply air fan.

Delivery version: Sizes 004-080: The air recirculation section is fi tted to at least one of the other unit sections, see the section entitled: Air Handling Unit/Delivery Confi guration RX/PX/CX, sizes 004-080.Size 120: The air recirculation section is supplied as an individual item in two sections.

Additional equipment required: Depending on how the air recirculation section is to be used, it may also be necessary to install extra sensors for reading e.g. the pressure, room temperature or CO2

content, heating and/or cooling coil temperatures and the status of shut-off dampers for exhaust air and outdoor air.

Work to be carried out at the building site: Sizes 004-080: Fitting together/splitting of unit sections to the extent required.Size 120: Assembly of the air recirculation section to be-come one unit. The air recirculation section is then fi tted together with the other unit sections.

Operation:Recirculation, on/off: Can be used when it is desirable to heat an unoccupied room with recirculated air; an economic solution for e.g. factory buildings, shopping centres, etc.The intermittent night-time heating function stops the ex-tract air fan and heat recovery, closes the shut-off damp-ers for outdoor air and exhaust air and opens the damper in the air recirculation section. See also previous section “Control Functions”.Recirculation, modulating: Can be used for the demand-controlled and economical operation of fans, heating and cooling, especially in buildings in which the load condi-tions vary. The patent-pending ReCO function2 adjusts the air quality (in response to signals from CO2 sensors) and tempera-ture by variably controlling the shut-off dampers and the damper in the air recirculation section as well as the speed of the fans. See also previous section “Control Functions”.

Depending on the version, the damper can be mounted in the upper or lower level (for GOLD size 120 the damper is always mounted in the upper level).

H10

0

LB

For GOLD B H L kg004/005 825 920 400 50

007/008 995 1085 400 57

011/012 1199 1295 565 90

014/020 1400 1551 565 103

025/030 1600 1811 565 118

035/040 1990 2159 565 142

050/060 2318 2288 565 168

070/080 2637 2640 565 195

100/120 3340 3340 1070 547

Recirculation, on/off.Extract air fan stopped, outdoor air and exhaust air dampers fully closed, damper in the air recircu-

lation section fully open.

Normal operation.

Outdoor air Supply airRecirculation, modulating.

Supply air fan runs at higher speed, outdoor air damper and air recirculation section open when-

ever required.

Extract air Exhaust air

Placement/design of the base beam, see the equivalent size of the GOLD air handling unit.

The ReCO function2 requires the accessory, complete set for control of the mixing function (ReCO2), TBLZ-2-51. Pressure sensors and IQlogic+ are included. Air quality sen-sor must be ordered separately.

Page 28: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221286

Complements and accessories

Unit sections Solutions for fi re bypassThe air bypass section is used when you want the extract air to bypass the heat exchanger and fi lter, e.g. as a com-ponent in a system for smoke extraction. See the example for respective variants/sizes. The fans of the air handling unit are tested for, and can manage operation for one hour at 70°C.

The air bypass section is available for GOLD RX/PX size 011-080. The air bypass section is also available for GOLD RX/PX sizes 004-008 and GOLD SD extract air handling unit sizes 004-012 in split version.

Solution for fi re bypass (upward) for GOLD RX 004-080.

Necessary components required (apart from GOLD units):The TCBP air bypass section is supplied fi tted together with at least one of the other unit sections, see the section entitled: Description of the Air Handling Unit/Delivery Confi guration RX/PX/CX, sizes 004-080.The required splitting/fi tting together of unit sections is performed at the building site.

Extra dampers may be required depending on the application.Should be controlled via TRITON control and supervisory unit or the like.

Solution for fi re bypass (rear, inspection side or upward) for GOLD PX 004-040.

Necessary components required (apart from GOLD units):The TCBP air bypass section is fi tted together with at least one of the other unit sections, see the section entitled: Description of the Air Han-dling Unit/Delivery Confi guration RX/PX/CX, sizes 004-080. Required splitting/fi tting together of unit sections is performed at the building site.Extra dampers may be required depending on the application.Should be controlled via TRITON control and supervisory unit or the like.

GOLD RX, sizes 004-080 GOLD PX, sizes 004-040

TCBP

Intake, upward

TCBP

Intake: rear or inspection side

Outdoor air Supply air Extract air Exhaust air

Solution for fi re bypass (upwards, back or inspection side) for GOLD SD 004-012 extract air handling unit in split version.

Necessary components required (apart from GOLD units):Air bypass section, TCBP. The air handling unit can be supplied as one single unit or in an optional division of sections. Required splitting/fi tting together of unit sections is performed at the building site.Extra dampers may be required depending on the application.Should be controlled via TRITON control and supervisory unit or the like.

GOLD SD extract air handling unit, sizes 004-012

Intake, upward TCBP

Intake rear or inspection side as an option

Page 29: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

287

H10

0

L

P

O

Q

N

B

H10

0

L

J K

B

G I

For GOLD B H L G I J K kg004/005 825 920 400 500 140 300 30 42

007/008 995 1085 400 650 150 300 30 49

011/012 1199 1295 565 1000 100 400 82.5 87

014/020 1400 1551 565 1000 200 400 82.5 103

025/030 1600 1811 565 1200 200 400 82.5 112

035/040 1990 2159 565 1400 295 400 82.5 123

050/060 2318 2288 565 1600 359 400 82,5 168

070/080 2637 2640 565 1800 418,5 400 82,5 246

Complements and accessories

Unit sections

Air bypass section, TCBP, intake upward

For GOLD B H L N O P Q kg004/005 825 920 400 77 300 300 30 47

007/008 995 1085 400 130 300 300 30 56

011/012 1199 1295 565 110 500 400 82.5 70

014/020 1400 1551 565 110 500 400 82.5 85

025/030 1600 1811 565 100 600 400 82.5 96

035/040 1990 2159 565 110 800 400 82.5 123

Placement/design of the base beam, see the equivalent size of the GOLD air handling unit.

Placement/design of the base beam, see the equivalent size of the GOLD air handling unit.

Air bypass section, TCBP-xxxx, rear intake or on inspection side (GOLD PX)

For GOLD

B H L G I J K N O kg

004/005 825 460 400 500 162.5 300 50 80 300 25-26

007/008 995 542.5 400 650 173 300 50 121 300 30-32

011/012 1199 647.5 565 1000 99.5 400 82.5 74 500 43-45

Air bypass section TCBP, intake: upward, rear or inspection side (GOLD SD)

Placement/design of the base beam, see the equivalent size of the GOLD air handling unit.

B L

G I

100

HON

J K

Page 30: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221288

B

ø

For GOLD B ø004/005 320 250

007/008 385 315

011/012 477 400

014/020 477 400

025/030 577 500

035/040 700 630

Complements and accessories

Unit sections Smoke extraction adapterThe air bypass section is used when you want the extract air to bypass the heat exchanger and filter, e.g. as a com-ponent in a system for smoke extraction. See the example for respective variants/sizes.

The fans of the air handling unit are tested for, and can manage operation for one hour at 70°C.

The smoke extraction adapter is designed for use with GOLD PX, size 004-040.

Normal operation. The extract air is routed to bypass the heat exchanger and filter

Example

Page 31: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

289

Complements and accessories

Unit sections TCRS duct crossover sectionThe duct crossover section for GOLD PX units is designed for use when you need to have the extract air fan and/or the supply air fan in the upper level. This may be neces-sary if space available is restricted or for example when replacing older AHUs with new ones that have fans in the upper level. It is also possible to use the duct crossover section as a fi re bypass.The duct crossover section is available for GOLD PX size 011-040. The duct crossover section is also available for GOLD PX size 004-008 in split version.

Delivery version: The duct crossover section is fi tted to at least one of the other unit sections, see the section entitled: Description of the Air Handling Unit/Delivery Confi guration RX/PX/CX, sizes 004-080.

Work to be carried out at the building site: Fitting together/splitting of unit sections to the extent required.

Fire bypass, if required

TCRS duct crosso-ver section

Outdoor air Supply air Extract air Exhaust air

Duct connection dimensions for fi re bypass, if requiredThe illustration shows the Duct crossover section viewed from above.

H10

0

LB

For GOLD B H L kg004/005 825 920 565 66

007/008 995 1085 625 84

011/012 1199 1295 750 120

014/020 1400 1551 750 146

025/030 1600 1811 750 169

035/040 1990 2159 750 248

TCRS 030, 040TCRS 005, 020

Placement/design of the base beam, see the equivalent size of the GOLD air handling unit.

==

A

D

DC

A B

==

A

D

DC

A B

For GOLD A D004/005 210 315

007/008 250 400

011/012 300 500

014/020 300 500

For GOLD A B C D025/030 400 78 450 700

035/040 506 74 592 806

Page 32: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221290

Complements and accessories

Unit sections

TCFE multisectionThe multisection is an extra unit section, available in two lengths, with intermediate deck and optional combina-tions of cover panels/inspection doors on the inspection side, see illustrations on the next page. The cover panels are easy to dismantle.

Up to two multisections can be used in one air handling unit.

The multisection is available for the size 011 and larger GOLD RX, PX and CX units. The multisection is also avail-able for GOLD RX/PX size 004-008 in split version. The multisection can be located between the other unit sec-tions of the GOLD unit. See example below.

The multisection is available, as a special version, with installed accessories from the factory, for example an air heater/air cooler, dampers, etc..

Delivery version: Sizes 004-080: The multisection is fi tted to at least one of the other unit sections, see the section entitled: Descrip-tion of the Air Handling Unit/Delivery Confi guration RX/PX/CX, sizes 004-080.

Size 120: The multisection is supplied as an individual item in two sections.

Work to be carried out at the building site: Sizes 004-080: Fitting together/splitting of unit sections to the extent required.

Size 120: Assembly of the multisection to become one unit. The multisection is then fi tted together with the other unit sections.

Supply air

Heat exchanger section

Up to two multisections can be used for one air handling unit. The illustration shows possible locations of the multsection.

ExampleUnit section contain-ing extract air fan and supply air fi lter

Unit section contain-ing supply air fan and

extract air fi lter

Page 33: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

291

For GOLD B H kg004/005 825 920 74

007/008 995 1085 77

011/012 1199 1295 90

014/020 1400 1551 104

025/030 1600 1811 119

035/040 1990 2159 143

050/060 2318 2288 189

070/080 2637 2640 258

100/120 3340 3340 492

Complements and accessories

Unit sections

The possible combinations of cover panels/inspection doors, see above.

For GOLD B H kg004/005 825 920 110

007/008 995 1085 120

011/012 1199 1295 142

014/020 1400 1551 167

025/030 1600 1811 189

035/040 1990 2159 202

050/060 2318 2288 243

070/080 2637 2640 347

100/120 3340 3340 640

Possible combinations, cover panels/inspection doors

Multisection, short (565 mm) Multisection, long (850 mm)

H10

0

285850

B

H10

0

565B

Placement/design of the base beam, see the equivalent size of the GOLD air handling unit.

Placement/design of the base beam, see the equivalent size of the GOLD air handling unit.

Page 34: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221292

Complements and Accessories

Common for duct accessoriesThe duct accessories must be positioned outside the GOLD unit in the ductwork. The unique Wing+ fans in the GOLD air handling unit also make it possible to connect duct accessories directly to the duct connec-tions of the air handling unit without pressure losses or non-uniform air distribution.

GOLD with standard end connection frame: The duct accessories for GOLD sizes 004/005, 007/008 and 011/012 are fitted with a rubber ring seal.

The duct accessories for GOLD sizes 014/020, 025/030, 035/040, 050/060, 070/080 and 100/120 are equipped with connection frames for slip-clamp jointing (slip-clamps must be ordered separately).

Type METU connection frames are available as acces-sories. Insulating, if required, must be done at the site.

GOLD with full face connection frame: Full face connection frames are available as acces-sories for further reduction of the pressure drop in the ventilation system. See the section on Mechanical equipment.

The duct accessories are equipped with connection frame for slip-clamp jointing (slip clamps must be ordered separately). Insulating, if required, must be done at the site.

Other particulars for sizing can be computed in the AHU Design air handling unit selection program.

Duct accessories, uninsolated

Page 35: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

293

TBSA DampersThe TBSA 000-031, 000-040, 060-030 and 080-040 dampers are used as shut-off dampers or boosting damp-ers. The dampers of other sizes can also be used for other applications, such as an outdoor air damper for the ReCO2 control function.

Shut-off dampers are normally used if the air handling unit is idle during some period, for example at night, or if a water coil without anti-frost protection is used.

Can be mounted in a horizontal or vertical duct.

Complete with damper actuator for 24 V. The actuator can be selected with spring return or on/off actuation. TBSA 000-050 and TBSA 100-040 – 250-080 are also available with an actuator of modulating type with spring return.

Technical dataCircular dampers made of galvanised sheet steel, rectan-gular dampers made of aluminium-zinc plated sheet steel. Tightness class 3 to EN 1751.

InstallationWire the control and power supply cables to the appro-priate wiring terminal on the air handling unit.

GOLD with standard end connection frame: TBSA 000-031, is compatible with GOLD sizes 004, 005TBSA 000-040, is compatible with GOLD size 007, 008TBSA 000-050, is compatible with GOLD size 011, 012

���

��

����

Complements and Accessories

Duct accessories, uninsolated

GOLD with standard end connection frame: TBSA 100-040, matches GOLD sizes 014, 020TBSA 120-030, matches GOLD RX/PX Top sizes 014, 020 (for air intake)TBSA 120-050, matches GOLD sizes 025, 030TBSA 140-030, matches GOLD RX/PX Top sizes 025, 030 (for air intake)TBSA 140-060, matches GOLD sizes 035, 040TBSA 160-080, matches GOLD sizes 050, 060TBSA 180-100, matches GOLD sizes 070, 080TBSA 240-120, matches GOLD sizes 100, 120 (for air intake resp. fan outlet for forward air discharge)TBSA 250-080, matches GOLD sizes 100, 120 (for fan outlet for upward air discharge)

GOLD with full face connection frame (accessory TBXZ): TBSA 060-030, matches GOLD sizes 004, 005 TBSA 080-040, matches GOLD sizes 007, 008 TBSA 100-040, matches GOLD sizes 011, 012 TBSA 120-050, matches GOLD sizes 014, 020 TBSA 140-060, matches GOLD sizes 025, 030 TBSA 160-080, matches GOLD sizes 035, 040 TBSA 180-100, matches GOLD sizes 050, 060 TBSA 240-120, matches GOLD sizes 070, 080

TBSA A B kg

2-000-031 Ø 315 140 5

2-000-040 Ø 400 210 7

2-000-050 Ø 500 210 8

TBSA A B C D H kg4-060-030 300 640 600 220 340 10

4-080-040 400 840 800 220 440 15

6-100-040 400 1040 1000 220 440 20

1-120-030 300 1240 1200 120 340 11

6-120-050 500 1240 1200 220 540 25

1-140-030 300 1440 1400 120 340 13

6-140-060 600 1440 1400 220 640 32

6-160-080 800 1640 1600 220 840 42

4-180-100 1000 1840 1800 220 1040 63

4-240-120 1200 2440 2400 220 1240 105

4-250-080 800 2540 2500 220 840 93

Page 36: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221294

Complements and Accessories

TBDA Unit silenserTBDA 000-031, 000-040 and 000-050Sound attenuators TBDA 000-031, 000-040 and 000-050 are circular sound attenuators for GOLD sizes 004–012 with standard end connection frame and are intended for installation in the ductwork.

Technical dataGalvanized sheet steel.

Sound attenuating material consisting of 100 mm thick long-fibred glass wool slabs that offer excellent sound attenuation, especially in the mid-frequencies. Glass wool covered with a layer of EUROLON that withstands sub-stantially higher air velocities and mechanical strain than staple fibre. Sound attenuating material covered with perforated sheet steel outside the EUROLON layer.

InstallationProvision for inspection and cleaning must be guaranteed.

Duct accessories, uninsolated

GOLD with standard end connection frame: TBDA 000-031, is compatible with GOLD sizes 004, 005TBDA 000-040, is compatible with GOLD size 007, 008TBDA 000-050, is compatible with GOLD size 011, 012

L

BH

TBDA B H L kg1-000-031 315 520 915 19,5

1-000-040 400 600 1200 29,5

1-000-050 500 700 1200 63

Page 37: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

295

Complements and Accessories

TBDA Unit silencerTBDA 060-030 to 240-120Sound attenuators TBDA 060-030 to 240-120 are rectan-gular sound attenuators for the GOLD sizes 004–120 and are intended for installation in the ductwork or directly to air handling units with standard end connection frames or full face connection frames.

Technical dataGalvanized sheet steel.

Sound absorption material of type Cleanolon-AL. Cleano-lon-AL consists of mineral wool covered with perforated aluminium foil. Type approved with regard to suitability for cleaning, emissions and fibre entrainment. The materi-al conforms to the provisions of Surface Layer Class 1 (the highest class). Type approved with regard to cleanability, emissions and fibre entrainment. The material conforms to the provisions of Surface Layer Class 1 (the highest class).

InstallationProvision for inspection and cleaning must be guaranteed.

H

B

D L

TBDA-1-160-080 TBDA-1-180-100

TBDA B D H L kg1-160-080 1800 1600 800 650 72

1-180-100 2000 1800 1000 1250 115

H

B L

Duct accessories, uninsolated

GOLD with standard end connection frame: TBDA 100-040, matches GOLD sizes 014, 020 TBDA 120-050, matches GOLD sizes 025, 030 TBDA 140-060, matches GOLD sizes 035, 040 TBDA 240-120, matches GOLD sizes 100, 120

GOLD with full face connection frame (accessory TBXZ): TBDA 060-030, matches GOLD sizes 004, 005 TBDA 080-040, matches GOLD sizes 007, 008 TBDA 100-040, matches GOLD sizes 011, 012 TBDA 120-050, matches GOLD sizes 014, 020 TBDA 140-060, matches GOLD sizes 025, 030 TBDA 240-120, matches GOLD sizes 070, 080

TBDA-1060-030 TBDA-1-080-040 TBDA-1-100-040 TBDA-1-120-050 TBDA-1-140-060 TBDA-1-240-120

GOLD with standard end connection frame: TBDA 160-080, matches GOLD sizes 050, 060 TBDA 180-100, matches GOLD sizes 070, 080

GOLD with full face connection frame (accessory TBXZ): TBDA 160-080, matches GOLD sizes 035, 040 TBDA 180-100, matches GOLD sizes 050, 060

TBDA B H L kg1-060-030 600 300 650 13

1-080-040 800 400 650 22

1-100-040 1000 400 650 26

1-120-050 1200 500 650 33

1-140-060 1400 600 650 39

1-240-120 2400 1200 1250 180

Page 38: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221296

Complements and Accessories

TBLA Air heater for hot waterThe TBLA air heater uses hot water for post-heating the supply air

The GOLD air handling unit’s control system and its efficient rotary heat exchanger make it often possible design ventilation systems without downstream air heat-ers according to the ERS model if the air handling unit is operated in the temperature control mode.

Air heaters for the GOLD, size 004-040 can be installed for horizontal or vertical airflow, other sizes only for hori-zontal airflow.

The TBLA air heater, capacity variant 1, is available with Thermo Guard anti-frost tension protection for the size 004-040 GOLD units.

Technical dataUninsulated casing made of galvanized sheet steel.

Finned-tube heat exchangers fabricated of copper tubes and profiled aluminium fins. The headers and the pipe-work to the water connections are made of copper. The male threaded pipe connections are made of brass.

The TBLA air heater for hot water is available in three capacity variants. Capacity variant 1 provides the low-est capacity and capacity variant 3 provides the highest capacity.

All the coils are equipped with individual plugs for venting and drainage. A separate connection is provided for an anti-frost monitor sensor.

Valve setThe TBVL valve set with 2(3)-way valve, actuator, freeze protection sensor and connection cable with quick con-nector can be ordered.

If you install a valve of your own, you can instead select a set of electrical connection components. This set contains the connection cable with quick connector, resistor and insertion-type or strap-on sensor.

Extra accessoriesCirculation pump used for protecting the freeze protec-tion monitor function if air heaters without anti-frost bursting protection are used.

Supplied with T coupling, non-return valve and adjust-ment valve. The automatic pump control system is built into the control equipment of the GOLD unit.

InstallationProvision for inspection and cleaning must be guaranteed.Electrical connection.

Installation principle with Thermo Guard

Installation principle without Thermo Guard

1) The anti-frost sensor for the TBLA sizes 000-031, 000-040, 000-050, 060-030 and 000-050 should be fitted to the return pipework and for the TBLA sizes 100-040 and 240-120 in the connection on the coil.

T-piece

Anti-frost sensor

Shut-off valve

HotWater

Shut-off valve

2 (3)-way valve

Adjustment valve

Non-return valve

Applicable to TBLA 000-031, 000-040, 000-050, 060-030 and 080-040

Anti-frost monitor sensor. Applicable to TBLA 100-040 to 240-120

Secondary pump

ThermoGuard

Swegon

Thermo Guardconnection

T-pieceAnti-frost protection sensor

Shut-off valve (must not be closed if freezing is likely – to relieve pressure).

Pressure limiting device, if required

HotWater

Shut-off valve

Control valve

Duct accessories, uninsolated

Page 39: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

297

Complements and Accessories

H

G

60 60300

A

BF

GOLD with standard end connection frame: TBLA 000-031, is compatible with GOLD sizes 004, 005TBLA 000-040, is compatible with GOLD size 007, 008TBLA 000-050, is compatible with GOLD size 011, 012

Without Thermoguard

With Thermoguard

TBLA A B H R kg* 4-000-031-1-1 Ø 315 488 428 DN 15 14

4-000-040-1-1 Ø 400 588 528 DN 15 19

4-000-050-1-1 Ø 500 688 628 DN 15 24

* Excluding water.

50

H

60 60300

A

B

210 C E

H

50 100B

A60

Conn. R male

threads.

GOLD with standard end connection frame: TBLA 000-031, is compatible with GOLD sizes 004, 005TBLA 000-040, is compatible with GOLD size 007, 008TBLA 000-050, is compatible with GOLD size 011, 012

* Excluding water.

Conn. R male

threads.

Duct accessories, uninsolated

TBLA A B F G H R kg* 5-000-031-2-1 Ø 315 490 225 192 405 DN15 17

7-000-040-2-1 Ø 400 590 277 250 500 DN20 16

5-000-040-2-2 Ø 400 590 277 250 500 DN20 18

5-000-050-2-1 Ø 500 690 327 300 600 DN20 21

7-000-050-2-2 Ø 500 690 327 300 600 DN20 22

Page 40: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221298

Without Thermoguard

* Excluding water.

Conn. R male

threads.

Conn. R male

threads.

Without Thermoguard

* Excluding water.

Complements and Accessories

Duct accessories, uninsolated

GOLD with standard end connection frame: TBLA 100-040, matches GOLD, sizes 014, 020TBLA 120-050, matches GOLD, sizes 025, 030TBLA 140-060, matches GOLD, sizes 035, 040

GOLD with full face connection frame (accessory TBXZ): TBLA-1-060-030, matches GOLD sizes 004, 005 TBLA-1-080-040, matches GOLD sizes 007, 008 TBLA-1-100-040, matches GOLD sizes 011, 012 TBLA-1-120-050, matches GOLD sizes 014, 020 TBLA-1-140-060, matches GOLD sizes 025, 030

TBLA A B C E H L R F kg* 4-060-030-2-1 300 728 600 80 338 148 DN15 47 6

4-060-030-2-2 300 728 600 80 338 148 DN15 47 7

4-080-040-2-1 400 928 800 80 438 148 DN15 47 8

4-080-040-2-2 400 928 800 80 438 148 DN15 47 10

5-100-040-2-1 400 1119 1000 90 438 148 DN15 40 14

5-100-040-2-2 400 1126 1000 90 438 170 DN20 40 18

5-120-050-2-1 500 1319 1200 90 538 148 DN15 40 17

5-140-060-2-1 600 1526 1400 90 638 148 DN20 40 23

GOLD with standard end connection frame: TBLA 100-040, matches GOLD, sizes 014, 020TBLA 120-050, matches GOLD, sizes 025, 030TBLA 140-060, matches GOLD, sizes 035, 040TBLA 160-080, matches GOLD, sizes 050, 060TBLA 180-100, matches GOLD, sizes 070, 080TBLA 240-120, matches GOLD, sizes 100, 120

GOLD with full face connection frame (accessory TBXZ): TBLA 100-040, matches GOLD, sizes 011, 012TBLA 120-050, matches GOLD, sizes 014, 020TBLA 140-060, matches GOLD, sizes 025, 030TBLA 160-080, matches GOLD, sizes 035, 040TBLA 180-100, matches GOLD, sizes 050,060TBLA 240-120, matches GOLD, sizes 070, 080

TBLA A B C E H L R F kg* 5-100-040-2-3 400 1250 1000 85 605 300 DN25 125 53

5-120-050-2-2 500 1590 1200 85 700 300 DN20 195 72

5-120-050-2-3 500 1590 1200 85 755 300 DN32 195 78

5-140-060-2-2 600 1815 1400 85 840 300 DN25 208 94

4-140-060-2-3 600 1850 1400 85 880 300 DN32 225 101

4-160-080-2-1 800 2210 1600 85 1020 300 DN25 280 97

4-160-080-2-2 800 2210 1600 85 1020 300 DN32 274 114

4-160-080-2-3 800 2210 1600 85 1020 300 DN50 259 127

4-180-100-2-1 1000 2530 1800 85 1220 300 DN25 340 127

4-180-100-2-2 1000 2530 1800 85 1220 300 DN32 329 152

4-180-100-2-3 1000 2530 1800 85 1220 300 DN50 319 168

4-240-120-2-1 1200 3240 2400 85 1520 300 DN40 389 187

4-240-120-2-2 1200 3240 2400 85 1520 300 DN50 374 235

4-240-120-2-3 1200 3240 2400 85 1520 300 DN65 358 264

Page 41: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

299

Complements and Accessories

Duct accessories, uninsolated

30 L C E

H

30 75B

A60

TBLACapacity variant 1

B H L A C E R kg*4-060-030-1-1 789 381 180 300 600 125 DN15 13

4-080-040-1-1 989 481 180 400 800 125 DN15 18

GOLD with full face connection frame (accessory TBXZ): TBLA 060-030, matches GOLD sizes 004, 005 TBLA 080-040, matches GOLD sizes 007, 008

Conn. R male

threads

* Excluding water.

TBLACapacity variant 1

B H L A C E F R kg*4-100-040 1213 580 210 400 1000 100 100 DN15 50

4-120-050 1568 680 210 500 1200 100 100 DN20 68

4-140-060 1818 820 210 600 1400 100 100 DN20 90

4-160-080 2173 1020 300 800 1600 100 254 DN25 121

4-180-100 2493 1195 300 1000 1800 100 310 DN32 159

4-240-120 3154 1510 300 1200 2400 100 356 DN50 195

With Thermoguard

GOLD with standard end connection frame: TBLA 100-040, matches GOLD, sizes 014, 020TBLA 120-050, matches GOLD, sizes 025, 030TBLA 140-060, matches GOLD, sizes 035, 040TBLA 160-080, matches GOLD, sizes 050, 060TBLA 180-100, matches GOLD, sizes 070, 080TBLA 240-120, matches GOLD, sizes 100, 120

GOLD with full face connection frame (accessory TBXZ):TBLA 100-040, matches GOLD, sizes 011, 012TBLA 120-050, matches GOLD, sizes 014, 020TBLA 140-060, matches GOLD, sizes 025, 030TBLA 160-080, matches GOLD, sizes 035, 040TBLA 180-100, matches GOLD, sizes 050,060TBLA 240-120, matches GOLD, sizes 070, 080

Conn. R male

threads

50

H

60 60300

A

B 25

L C E

H

50 FB

A60

* Excluding water.

Page 42: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221300

TBLF A B H kg*1-000-031 Ø 315 488 405 12

1-000-040 Ø 400 588 528 16

1-000-050 Ø 500 688 628 19

TBLF A B C E H L R F kg*1-060-030 300 728 600 80 338 148 DN15 47 5

1-080-040 400 935 800 80 438 148 DN20 47 7

1-100-040 400 1135 1000 100 438 148 DN20 47 13

1-120-050 500 1335 1200 100 538 148 DN20 47 16

1-140-060 600 1545 1400 100 638 148 DN25 47 20

1-160-080 800 1757 1600 100 838 148 DN32 47 27

1-180-100 1000 1957 1800 100 1038 148 DN32 47 31

1-240-120 1190 2568 2400 80 1238 148 DN32 47 43

Complements and Accessories

TBLF Air heater for preheating, hot water The TBLF air heater is used for preheating the supply air and uses hot water as the heating medium. The TBLF is installed in the outdoor air duct.

Reheating the air when the outdoor air is cold and the humidity is high can prevent condensate from forming in the filters. The function can also be used when it is extremely cold outdoors and you want to heat the air up to -20°C for instance.

Used in combination with a plate heat exchanger, it may be of interest to preheat the air in order to avoid having to by-pass the heat exchanger.

Technical dataThe air heater is sized for heating from -4°C to + 4°C using 82/71°C heating water.

Uninsulated casing made of galvanized sheet steel.

Finned-tube heat exchangers fabricated of copper tubes and profiled aluminium fins. Fin pitch: 5.5 mm. The head-ers and the pipework connected to the water connections are made of copper.

The pipe connections have male threads and are made of brass.

Valve set

The TBVL valve set with 2(3)-way valve, valve actuator, freeze protection sensor and connection cable with quick-fit connector can be ordered. If you use a valve of your own, you can instead select a set of electrical connection components. This set contains a connection cable with quick-fit connector, resistor and insertion type or strap-on sensor.

50

H

60 60300

A

B 25

L C E

H

50 FB

A60

Conn. DN 15

male threads

Extra accessoriesControl system including temperature sensor for instal-lation in a duct and the IQlogic+ with a 0.25 metre long cable, with or without freeze protection sensor.

Circulation pump used for protecting the anti-frost moni-tor function if coils without anti-frost bursting protection are used. Supplied with T coupling, non-return valve and adjustment valve. The automatic pump control system is built into the control equipment of the GOLD unit.

InstallationProvision for inspection and cleaning must be guaranteed.Electrical connections.

Conn. R male

threads.

* Excluding water.

Duct accessories, uninsolated

GOLD with standard end connection frame: TBLF 000-031, matches GOLD, sizes 004, 005TBLF 000-040, matches GOLD, sizes 007, 008TBLF 000-050, matches GOLD, sizes 011, 012

GOLD with standard end connection frame: TBLF 100-040, matches GOLD, sizes 014, 020TBLF 120-050, matches GOLD, sizes 025, 030TBLF 140-060, matches GOLD, sizes 035, 040TBLF 160-080, matches GOLD, sizes 050, 060TBLF 180-100, matches GOLD, sizes 070, 080TBLF 240-120, matches GOLD sizes 100, 120

GOLD with full face connection frame (accessory TBXZ): TBLF 060-030, matches GOLD sizes 004, 005 TBLF 080-040, matches GOLD sizes 007, 008 TBLF 100–040, matches GOLD, sizes 011, 012TBLF 120-050, matches GOLD, sizes 014, 020TBLF 140-060, matches GOLD, sizes 025, 030TBLF 160-080, matches GOLD, sizes 035, 040TBLF 180-100, matches GOLD, sizes 050, 060TBLF 240-120, matches GOLD sizes 070, 080

* Excluding water.

Page 43: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

301

Air heater TBCE/TBRE, electricAir heater TBCE/TBRE is used for reheating of the supply air or for certain preheating needs of outdoor air.

In many applications it is possible to omit the air heater for reheat if the air handling unit control system is oper-ated in the temperature regulation mode according to the ERS model and when the efficient rotary heat exchanger is in use.

The air heater can be installed for horizontal or vertical airflow.

The integrated thyristor is controlled via signals from the GOLD air handling unit. The four, five or six series-coupled overheating protections and control signals are connected by means of a quick connector to the GOLD air handling unit.

Technical dataUninsulated casing made of galvanized sheet steel.

Air heater TBCE/TBRE is available in several capacity vari-ants.

The electrical equipment conforms to the provisions of Degree of Protection IP44.

The air heater is approved for operating temperatures, in the surroundings and the air stream, from -25°C to +40°C.

InstallationTBCE 000-031, 000-040 and 000-050: The end panel on the connection side can be dismantled for inspection and connection.

For air heaters with circular duct connection, the distance from or to a duct bend, damper, filter or the like, should be at least the distance that is equivalent to double (triple recommended) the diameter of the duct. For air heaters with a rectangular duct connection the distance should be at least the equivalent to the air heater’s diagonal dimension (double recommended), i.e. from corner to corner in the duct section of the air heater. Otherwise there is risk that the airflow through the air heater will be non-uniform, involving risk that the overheat protection device will trip.

Electrical connection. Power must be supplied directly from the electrical distribution box. An isolating switch is recommended.

Complements and accessories

Duct accessories, uninsulated

TBCE

TBRE

Page 44: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221302

GOLD with standard end connection frame: TBCE 000-031, corresponds to GOLD sizes 004, 005TBCE-000-040, corresponds to GOLD sizes 007, 008TBCE-000-050, corresponds to GOLD sizes 011, 12

Complements and accessories

Duct accessories, uninsulated

ØA

41 41CEB

90

D

TBCE ø A B C D E kg-1-000-031-002-2 315 375 293 405 344 8

-1-000-031-004-1 315 375 293 405 344 9

-1-000-031-004-2 315 375 293 405 344 9

-1-000-031-007-1 315 500 418 405 344 10,5

-1-000-031-007-2 315 500 418 405 344 10,5

-1-000-031-010-1 315 500 418 405 344 11,5

-1-000-031-010-2 315 500 418 405 344 11,5

-1-000-040-004-1 400 375 293 490 428 10,5

-1-000-040-004-2 400 375 293 490 428 10,5

-1-000-040-007-1 400 500 418 490 428 12,5

-1-000-040-007-2 400 500 418 490 428 12,5

-1-000-040-012-1 400 630 548 490 428 15

-1-000-040-012-2 400 630 548 490 428 15

-1-000-040-018-1 400 770 688 490 428 19,5

-1-000-040-018-2 400 770 688 490 428 20,5

-1-000-050-006-1 500 375 293 590 528 12,5

-1-000-050-006-2 500 375 293 590 528 12,5

-1-000-050-012-1 500 630 548 590 528 17,5

-1-000-050-012-2 500 630 548 590 528 17,5

-1-000-050-021-1 500 880 798 590 528 26

-1-000-050-021-2 500 880 798 590 528 26,5

-1-000-050-027-1 500 1150 1068 590 528 34

-1-000-050-027-2 500 1150 1068 590 528 34

Page 45: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

303

GOLD with standard end connection frame: TBRE 100-040, corresponds to GOLD sizes 014, 020TBRE 120-050, corresponds to GOLD sizes 025, 030TBRE 140-060, corresponds to GOLD sizes 035, 040TBRE 160-080, corresponds to GOLD sizes 050, 060 TBRE 180-100, corresponds to GOLD sizes 070, 080 TBRE 240-120, corresponds to GOLD sizes 100, 120

GOLD with full face end connection panel (accessory TBXZ): TBRE 060-030, corresponds to GOLD sizes 004, 005 TBRE 080-040, corresponds to GOLD sizes 007, 008 TBRE 100-040, corresponds to GOLD, size 011, 012TBRE 120-050 corresponds to GOLD sizes 014, 020TBRE 140-060 corresponds to GOLD, size 025/30TBRE 160-080 corresponds to GOLD, size 035/040TBRE 180-100 corresponds to GOLD, size 050/060TBRE 240-120 corresponds to GOLD, size 070/080

Complements and accessories

Duct accessories, uninsulated

TBRE A B C H L1 L2 kg1-060-030 300 600 710 338 378 420 15 - 18

1-080-040 400 800 880 438 378 420 19 - 25,5

1-100-040 400 1000 1084 438 378 420 22 - 37

1-120-050 500 1200 1285 538 378 420 25 - 42

2-120-050 500 1200 1285 538 478 520 44 - 47,5

1-140-060 600 1400 1482 638 378 420 32 - 48

2-140-060 600 1400 1482 638 478 520 49 - 53,5

1-160-080 800 1600 1737 838 378 420 39 - 64

2-160-080 800 1600 1737 838 478 520 61 - 70,5

1-180-100 1000 1800 2017 1038 378 420 56 - 85

2-180-100 1000 1800 2017 1038 478 520 84 - 93

1-240-120 1200 2400 2521 1238 378 420 69,5 - 105

2-240-120 1200 2400 2521 1238 558 600 106

21 L1 21L2 C

B

H A

Page 46: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221304

TBKA Air cooler for chilled water TBKC (direct expansion)The TBKA/TBKC air cooler is used for cooling the supply air with chilled water or evaporative refrigerant as the cooling medium.

The TBKA/TBKC air cooler is available in several capacity variants that cover existing needs for each size of GOLD unit.

The air cooler must be installed for horizontal airflow.

Technical dataSizes 004-040 have an uninsulated casing made of galva-nized sheet steel.

The TBKA/TBKC air coolers consist of copper tubes and profiled aluminium fins. The TBKA has headers and water connections made of copper/brass, with male connec-tion threads. The TBKC has headers and distributor tubes made of copper. The connections are designed for brazed joints.

Valve setThe TBVL valve set with 2(3)-way valve, actuator and connection cable with quick-fit connector can be ordered for air cooler water. Temperature sensor water for reading incoming or outgoing cooling medium temperatures as an option.

If you use a valve of your own, you can instead select a set of electrical connection components. This set contains a connection cable with quick-fit connector, resistor and insertion type or strap-on sensor.

InstallationTBKA/TBKC 000-031, 000-040 and 000-050: The end panel on the connection side can be dismantled for inspection and connection. TBKA/TBKC 060-030 to 240-120: Provision for inspection and cleaning must be guaranteed.Connecting the drainage pipework.Electrical connections.

Complements and Accessories

Duct accessories, uninsolated

Page 47: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

305

50060 60 B

A ø D

B50060 60 E

A

F

ø D

50060 60 B

A ø D

Drain pipe conn. DN 15 male threads

Outer

diameter

du ext.

Outer

diameter

di ext.

Drain pipe conn. DN 15 male threads

Conn. R male

threads.

* Excl. cooling medium

TBKA A B D R kg* 5-000-031-1 430 490 315 DN15 37

5-000-031-2 430 490 315 DN20 39

* Excl. cooling medium

TBKA A B D E F R kg* 5-000-040-1 475 590 400 255 238 DN20 36

5-000-040-2 475 590 400 255 238 DN20 38

5-000-050-1 575 690 500 295 288 DN25 50

5-000-050-2 575 690 500 295 288 DN25 54

4-000-050-5 755 770 500 358 378 DN25 44

4-000-050-6 755 770 500 358 378 DN32 52

Drain pipe conn. DN 15 male threads

Conn. R male

threads.

* Excl. cooling medium

* Excl. cooling medium

B50060 60 E

A

F

ø D

Outer

diameter

du ext

Outer

diameter

di ext.

Drain pipe conn. DN 15 male threads

Complements and Accessories

Duct accessories, uninsolated

TBKC A B D di du kg*4-000-031-1-1 430 490 315 12 12 37

TBKC A B D E F di du kg*3-000-040-1-1 455 590 400 255 228 12 22 28

4-000-050-1-1 575 690 500 295 288 22 22 50

3-000-050-3-1 755 770 500 358 378 22 42 46

GOLD with standard end connection frame: TBKA 000–031, matches GOLD, sizes 004, 005 TBKA 000-040, matches GOLD, sizes 007, 008TBKA 000-050, matches GOLD, sizes 011, 012

GOLD with standard end connection frame: TBKC 000–031, matches GOLD, sizes 004, 005 TBKC 000-040, matches GOLD, sizes 007, 008TBKC 000-050, matches GOLD, sizes 011, 012

Page 48: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221306

Drain pipe conn. DN 25 male threads

* Excl. cooling agent** The connection dimensions of the air cooler are not the same as those of the GOLD unit. Some form of transition piece must be installed between the air handling unit and the air cooler.

Complements and Accessories

Conn. R male

threads.

Duct accessories, uninsolatedGOLD with standard end connection frame: TBKA 100-040, matches GOLD, sizes 014, 020 TBKA 120-050, matches GOLD, sizes 025, 030TBKA 140-060, matches GOLD, sizes 035, 040TBKA 160-080, matches GOLD, sizes 050, 060TBKA 180-100, matches GOLD, sizes 070, 080TBKA 240-120, matches GOLD, sizes 100, 120

GOLD with full face connection frame (accessory TBXZ): TBKA 060-030, matches GOLD, sizes 004, 005 TBKA 080-040, matches GOLD, sizes 007, 008 TBKA 100-040, matches GOLD, sizes 011, 012 TBKA 120-050, matches GOLD, sizes 014, 020 TBKA 140-060, matches GOLD, sizes 025, 030 TBKA 160-080, matches GOLD, sizes 035, 040 TBKA 180-100, matches GOLD, sizes 050,060 TBKA 240-120, matches GOLD, sizes 070, 080

L

TBKA A B C E G H L R kg*5-060-030-1 300 754 600 47 19 361 240 DN15 13

5-060-030-2 300 754 600 47 19 361 240 DN20 15

5-060-030-3 300 754 600 47 19 361 300 DN20 17

5-080-040-1 400 954 800 47 19 461 240 DN20 19

5-080-040-2 400 954 800 47 19 461 240 DN25 22

5-080-040-3 400 954 800 47 19 461 300 DN25 26

5-100-040-0 400 1225 1000 77 64 527 500 DN32 52

5-100-040-1 400 1295 1000 148 113 625 500 DN32 58

5-100-040-2 400 1295 1000 148 113 625 500 DN32 60

5-100-040-3 400 1295 1000 148 113 625 500 DN32 64

5-120-040-4** 400 1495 1200 148 113 625 500 DN40 82

5-120-050-0 500 1425 1200 62 62 623 500 DN32 70

5-120-050-1 500 1595 1200 198 168 835 500 DN40 80

5-120-050-2 500 1595 1200 198 168 835 500 DN50 90

5-120-050-3 500 1595 1200 198 168 835 500 DN50 100

5-140-050-4** 500 1790 1400 195 168 835 500 DN50 122

5-140-060-0 600 1625 1400 62 62 723 500 DN32 91

5-140-060-1 600 1885 1400 243 170 940 500 DN50 106

5-140-060-2 600 1885 1400 243 170 940 500 DN50 118

5-140-060-3 600 1885 1400 243 170 940 500 DN65 134

5-160-060-4** 600 2085 1600 243 170 940 500 DN65 154

5-160-080-1 800 1794 1600 47 19 846 240 DN32 66

5-160-080-2 800 2180 1600 290 110 1020 500 DN50 174

5-160-080-3 800 2180 1600 290 110 1020 500 DN50 223

5-160-080-4 800 2180 1600 290 110 1020 500 DN65 211

5-180-100-1 1000 1994 1800 47 19 1051 240 DN50 88

5-180-100-2 1000 2500 1800 350 110 1220 500 DN65 232

5-180-100-3 1000 2500 1800 350 110 1220 500 DN65 228

5-180-100-4 1000 2500 1800 350 110 1220 500 DN65 250

5-240-120-1 1200 2644 2400 47 19 1256 240 DN65 138

5-240-120-2 1200 3210 2400 405 160 1520 500 DN65 309

5-240-120-3 1200 3210 2400 405 160 1520 500 DN80 406

5-240-120-4 1200 3210 2400 405 160 1520 500 DN100 454

Page 49: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

307

240

G

E C

B

H A

Drain conn. DN 25 male

threads

Ext. conn. to

be brazed.

* Excl. cooling agent

TBKC A B C E G H di du kg* 3-100-040-0-1 400 1154 1000 49 19 461 22 28 24

3-100-040-0-2 400 1154 1000 49 19 461 12/16 16/22 25

3-120-050-0-1 500 1394 1200 49 19 561 28 35 33

3-120-050-0-2 500 1394 1200 49 19 561 16/28 22/35 34

3-140-060-0-1 600 1594 1400 49 19 661 28 35 41

3-140-060-0-2 600 1594 1400 49 19 661 22/28 28/35 42

Outer

diameter

du ext.

Outer

diameter

di ext.

Complements and accessories

Duct accessories, uninsulated

GOLD with standard end connection frame: TBKC 100-040, matches GOLD, sizes 014, 020 TBKC 120-050, matches GOLD, sizes 025, 030TBKC 140-060, matches GOLD, sizes 035, 040

GOLD with full face connection frame (accessory TBXZ): TBKC 100-040, matches GOLD, sizes 011, 012 TBKC 120-050, matches GOLD, sizes 014, 020 TBKC 140-060, matches GOLD, sizes 025, 030

Capacity variant 0

Page 50: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221308

500 3030

G

E C

B

H A

Drain pipe conn. DN 25 male threadExt. conn. to be brazed.

* Excl. cooling agent

Outer

diameter

du ext

Outer

diameter

di ext.

Complements and Accessories

Duct accessories, uninsolatedGOLD with standard end connection frame: TBKC 100-040, matches GOLD, sizes 014, 020 TBKC 120-050, matches GOLD, sizes 025, 030TBKC 140-060, matches GOLD, sizes 035, 040TBKC 160-080, matches GOLD, sizes 050, 060TBKC 180-100, matches GOLD, sizes 070, 080TBKC 240-120, matches GOLD, sizes 100, 120

GOLD with full face connection frame (accessory TBXZ): TBKA 060-030, matches GOLD, sizes 004, 005 TBKA 080-040, matches GOLD, sizes 007, 008 TBKC 100-040, matches GOLD, sizes 011, 012 TBKC 120-050, matches GOLD, sizes 014, 020 TBKC 140-060, matches GOLD, sizes 025, 030 TBKC 160-080, matches GOLD, sizes 035, 040 TBKC 180-100, matches GOLD, sizes 050, 060 TBKC 240-120, matches GOLD, sizes 070, 080

Capacity variants 1 – 3

TBKC A B C E G H di du kg* 3-060-030-1-1 300 880 600 62 50 401 12 19 10

3-060-030-2-1 300 880 600 62 50 401 22 22 11

3-060-030-3-1 300 880 600 62 50 401 22 28 13

3-080-040-1-1 400 1080 800 62 50 501 22 22 15

3-080-040-2-1 400 1080 800 62 50 501 22 28 17

3-080-040-3-1 400 1080 800 62 50 501 28 28 20

3-100-040-1-1 400 1350 1000 175 112,5 650 28 35 81

3-100-040-1-2 400 1350 1000 175 112,5 650 16/22 22/28 84

3-100-040-2-1 400 1350 1000 175 112,5 650 28 35 86

3-100-040-2-2 400 1350 1000 175 112,5 650 16/22 22/28 89

3-120-050-1-1 500 1590 1200 195 170 840 28 35 108

3-120-050-1-2 500 1590 1200 195 170 840 16/28 22/35 112

3-120-050-2-1 500 1590 1200 195 170 840 35 42 116

3-120-050-2-2 500 1590 1200 195 170 840 22/28 28/35 121

3-120-050-3-1 500 1590 1200 195 170 840 35 42 123

3-120-050-3-2 500 1590 1200 195 170 840 22/35 28/42 128

3-140-060-1-1 600 1950 1400 275 175 950 35 42 147

3-140-060-1-2 600 1950 1400 275 175 950 22/28 28/35 152

3-140-060-2-1 600 1950 1400 275 175 950 35 42 156

3-140-060-2-2 600 1950 1400 275 175 950 22/28 28/35 161

3-140-060-3-1 600 1950 1400 275 175 950 42 54 169

3-140-060-3-2 600 1950 1400 275 175 950 28/35 35/42 175

3-160-080-1-1 800 1794 1600 47 19 861 35 42 55

3-160-080-1-2 800 1794 1600 47 19 861 22/28 28/35 56

3-160-080-2-1 800 2210 1600 305 110 1020 42 54 181

3-160-080-2-2 800 2210 1600 305 110 1020 28/35 35/42 182

3-160-080-3-1 800 2210 1600 305 110 1020 35 54 199

3-160-080-3-2 800 2210 1600 305 110 1020 22/28 35/42 200

3-180-100-1-1 1000 1994 1800 47 19 1061 42 54 80

3-180-100-1-2 1000 1994 1800 47 19 1061 28/35 35/42 81

3-180-100-2-1 1000 2530 1800 365 110 1220 54 76 237

3-180-100-2-2 1000 2530 1800 365 110 1220 28/42 35/54 238

3-180-100-3-1 1000 2530 1800 365 110 1220 42 76 254

3-180-100-3-2 1000 2530 1800 365 110 1220 28/35 42/54 255

3-240-120-1-1 1200 2594 2400 47 19 1261 42 54 121

3-240-120-1-2 1200 2594 2400 47 19 1261 28/35 35/42 122

3-240-120-2-1 1200 3240 2400 420 160 1520 42 76 383

3-240-120-2-2 1200 3240 2400 420 160 1520 28/35 42/54 384

3-240-120-3-1 1200 3240 2400 420 160 1520 42 76 413

3-240-120-3-2 1200 3240 2400 420 160 1520 28/35 42/54 415

Page 51: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

309

Complements and Accessories

Duct accessoriesTBBD Mixing Section The TBBD mixing section is available for the GOLD SD in sizes 004-080.

The mixing section can be used when it is desirable use recirculated air for completely or partially heating a build-ing while it is unoccupied.

The TBBD consists of a spiral tubular T-piece (sizes 000-031 – 000-050) or a rectangular duct with three connec-tions for slip-clamp jointing (sizes 060-030 – 180-100).

The spiral duct joints (sizes 000-031 – 000-050) in re-quired quantity and the sets of slip clamps (sizes 060-030 – 180-100) respectively are included in the supply.

The dampers are always supplied with mounted damper actuator. These have modulated action.

The mixing section can be ordered with two or three dampers depending on its range of application. See the example on the next page.

Additional equipment required: Supply air units should be provided with a downstream electric air heater or air heater for hot water.

Work to be carried out at the building site: Install the mixing section securing it to the air handling unit/duct Install dampers for the mixing section or duct Wire elec-trical connections to the GOLD unit’s control equipment (separate power supply is not required) Install insulation conforming to local regulations

Page 52: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221310

Complements and Accessories

Duct accessoriesDuct accessories, uninsulatedCircular duct connectionsExample 1, two dampersThe mixing section consists of two unmounted dampers, two joints and one spiral tubular T-piece. The connect-ing rod for the common damper motor is included in the supply.

Example 2, three dampers

As example 1 + one unmounted damper with its own damper motor, two joints and one spiral tubular T-piece.

Rectangular duct connectionsExample 1, two dampersThe mixing section consists of two unmounted damp-ers and one rectangular duct with three connections for slip-clamp jointing. The connecting rod for the common damper motor is included in the supply of sizes 060-030 – 120-050. Dampers in sizes 140-060 – 180-100 each have their own damper motor. The mixing section can be installed for connection on the right-hand or left-hand side.

Example 2, three dampers

As example 1 + one unmounted damper with its own damper motor and one rectangular duct with three con-nections for slip-clamp jointing.

Normal operation

Mixing

Normal operation

Mixing

Example 1 (two dampers)

Example 2 (three dampers)

The items supplied from

Swegon are shaded in grey.

Outdoor air Extract air Exhaust air Supply air

Page 53: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

311

Complements and Accessories

øD

øD

L3 L2 L1

H

L1L2

F x G

H

Duct accessories, uninsulated

Three dampers

The dimensions of the component parts supplied by Sw-egon can be read in the sketch to the left.

Two dampers

Three dampers

The dimensions of the component parts supplied by Sw-egon can be read in the sketch to the left.

GOLD with standard end connection frame: TBBD 000-031, matches GOLD, size 004/005 TBBD 000-040, matches GOLD, size 007/008 TBBD 000-050, matches GOLD, size 011/012Three dampers

Two dampers

GOLD with standard end connection frame: TBBD 100-040, matches GOLD, size 014/020TBBD 120-050, matches GOLD, size 025/030TBBD 140-060, matches GOLD, size 035/040TBBD 160-080, matches GOLD, size 050/060TBBD 180-100, matches GOLD, size 070/080

GOLD with full face connection frame (accessory TBXZ): TBBD 060-030, matches GOLD, sizes 004, 005 TBBD 080-040, matches GOLD, sizes 007, 008 TBBD 100–040, matches GOLD, sizes 011, 012TBBD 120-050, matches GOLD, sizes 014, 020TBBD 140-060, matches GOLD, sizes 025, 030TBBD 160-080, matches GOLD, sizes 035, 040TBBD 180-100, matches GOLD, sizes 050, 060

TBBD L1 L2 H F x G060-030 420 220 570 300 x 600

080-040 520 220 670 400 x 800

100-040 520 220 670 400 x 1000

120-050 620 220 770 500 x 1200

140-060 720 220 870 600 x 1400

160-080 920 220 1070 800 x 1600

180-100 1120 220 1270 1000 x 1800

TBBD L1 L2 L3 H øD000-031 363 140 140 620 315

000-040 510 180 210 825 400

000-050 552 180 210 930 500

Page 54: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221312

Complements and Accessories

TBFA PrefilterThe prefilter should be installed in the outdoor air duct and/or the extract air duct.

The prefilter is used in ventilation systems in which the extract air and/or the outdoor air is heavily polluted and it is desirable to prevent the fine filter located in the GOLD unit from becoming clogged after a short period of use.

Technical dataThe TBFA has an uninsulated casing made of galvanized sheet steel. Insulated Inspection door.

Filter of type woven aluminium filter or class G3 compact filter.

Extra accessoriesThe pressure sensor can be selected; alarm limit and current filter pressure can then be read in the hand-held micro terminal of the GOLD unit.

InstallationProvision for inspection and cleaning must be guaranteed.Install insulation conforming to local regulations.

TBFA 000-031, is compatible with GOLD sizes 004, 005TBFA 000-040, is compatible with GOLD size 007, 008TBFA 000-050, is compatible with GOLD size 011, 012

TBFA 100-040, is compatible with GOLD sizes 014, 020TBFA 120-050, is compatible with GOLD sizes 025, 030TBFA 140-060, is compatible with GOLD sizes 035, 040TBFA 160-080, is compatible with GOLD sizes 050, 060TBFA 180-100, is compatible with GOLD sizes 070, 080TBFA 240-120, is compatible with GOLD sizes 070, 080

Outdoor air

Extract air

Supply air

Exhaust air

TBFA A B C H kg100-040 400 1200 1000 600 26

120-050 500 1500 1200 600 36

140-060 600 1800 1400 900 48

160-080 800 2475 1600 1000 59

180-100 1000 2400 1800 1200 68

240-120 1200 3000 2400 1800 140

TBFA B D H kg000-031 500 315 500 18

000-040 600 400 600 22

000-050 900 500 600 24

Duct accessories, uninsolated

B 40

C 320

380

HA

50

50

ø D

B 40

320

380

H

50

50

Page 55: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

313

Complements and Accessories

Common for duct accessories in an insulated casingThe duct accessories are to be positioned outside the GOLD unit. The unique Wing+ fans in the GOLD air handling unit also make it possible to connect duct ac-cessories directly to the duct connection of the GOLD air handling unit without pressure losses or non-uni-form air distribution.

Duct accessories in an insulated casing must be used if the unit is installed outdoors.

Duct accessories for the GOLD are equipped with bolt joints and/or expansion-type locking devices for dock-ing them to the air handling unit and/or other duct accessories (does not apply to type TBFK carbon filter sections).

Type METU connection frames are available as an ac-cessories for the size 014 – 120 units.

One duct accessory can be mounted on top of another duct accessory.

Other particulars for sizing can be computed in the AHU Design air handling unit selection program.

Duct accessories, in insulated casing

Page 56: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221314

TCSA Damper section TCSA dampers are used as shut-off dampers or forced air-fl ow dampers. Sizes 012 - 120 can also be used for other applications, such as outdoor air dampers for the ReCO2

control function.

Shut-off dampers are normally used if the air handling unit is idle during some period, for example at night, or if an air heater for hot water without anti-frost burst protec-tion is used.

To be installed for horizontal airfl ow.

Complete with damper actuator for 24 V. The actuator can be selected with spring return or on/off actuation. TCSA sizes 012 - 120 are also available with modulating type actuator with spring return.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental class C4.Tightness class 3 to EN 1751.

InstallationThe damper section should be mounted directly against the air handling unit or insulated duct accessory. Wire the control and power supply cables to the appropri-ate wiring terminal on the air handling unit.

Complements and Accessories

Duct accessories, in insulated casing

Page 57: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

315

BL

16

52*

H

100

Connection dimensions to duct:TCSA 012 ø 500

TCSA B H L kgEnd connection panel, if required

kg-012 1199 647,5 400 60 13

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Connection dimensions to duct:TCSA 005 ø 315TCSA 008 ø 400

TCSA B H L kgEnd connection panel, if required

kg-005 825 460 400 41 7

-008 995 542,5 400 47 10

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Complements and accessories

Duct accessories, in insulated casingBL52*

H

100

16

BL

21

52*

H

100

Connection dimensions to duct:TCSA 020 1000 x 400 mmTCSA 030 1200 x 500 mmTCSA 040 1400 x 600 mm TCSA 060 1600 x 800 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCSA B H L kgEnd connection panel, if required

kg-020 1400 775,5 400 74 19

-030 1600 905,5 400 83 23

-040 1990 1079,5 400 102 34

-060 2318 1144 400 142 34

Page 58: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221316

Complements and Accessories

Duct accessories, in insulated casing

Connection dimensions to duct:TCSA 080 1800 x 1000 mm

TCSA B H L kgEnd connection panel, if required

kg-080 2637 1320 400 192 40

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct acces-sory farthest out facing the ductwork.

52* L B

21

H

100

56* L B

21

H

100

Connection dimensions to duct:TCSA 120 2400 x 1200 mm

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCSA B H L kgEnd connection panel, if required

kg-120 3340 1620 500 337 59

Page 59: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

317

Complements and Accessories

Spacer section, TCGA/Inspection section, TCIA.The TCGA spacer section/TCIA inspection section is used when provision for spacing or inspection is required.The TCIA inspection section is available in two variants, with inspection door the entire length of the section (sizes 005-120), or split cover panel/inspection door (sizes 005-040).The spacer section/inspection section must be installed for horizontal airfl ow.Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental Class C4.InstallationThe spacer section/inspection section should be fi tted directly to the air handling unit or other insulated duct accessory. Provision for inspection and cleaning the spacer section must be guaranteed. The cover panel is easy to remove.

Duct accessories, in insulated casing

Spacer Section, TCGA

TCIA inspection section. Inspection door the entire length of the section.

TCIA inspection section. Split cover panel/inspection door.

BL52*

H

100

16

Connection dimensions to duct:TCGA 005 ø 315TCGA 008 ø 400

TCGA B H L kgEnd connection panel, if required

kg-005 825 460 565 37 7

-005 825 460 850 54 7

-008 995 542,5 565 43 10

-008 995 542,5 850 63 10

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Spacer Section, TCGA

Page 60: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221318

Complements and accessories

Duct accessories, in insulated casing

BL

21

52*

H

100

Connection dimensions to duct:TCGA 020 1000 x 400 mmTCGA 030 1200 x 500 mmTCGA 040 1400 x 600 mmTCGA 060 1600 x 800 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCGA B H L kgEnd connection panel, if required

kg-020 1400 775,5 565 61 19

-020 1400 775,5 850 86 19

-030 1600 905,5 565 69 23

-030 1600 905,5 850 96 23

-040 1990 1079,5 565 78 34

-040 1990 1079,5 850 113 34

-060 2318 1144 565 110 34

-060 2318 1144 850 141 34

Spacer Section, TCGA

Connection dimensions to duct:TCGA 012 ø 500

TCGA B H L kgEnd connection panel, if required

kg-012 1199 647,5 565 52 13

-012 1199 647,5 850 74 13

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

BL

16

52*

H

100

Page 61: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

319

Complements and accessories

Duct accessories, in insulated casing

Connection dimensions to duct:TCGA 080 1800 x 1000 mm

TCGA B H L kgEnd connection panel, if required

kg-080 2637 1320 565 129 40

-080 2637 1320 850 174 40

Spacer Section, TCGA

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct ac-cessory farthest out facing the ductwork.

21

B

H

100

L52*

56* L B

21

H

100

Connection dimensions to duct:TCGA 120 2400 x 1200 mm

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCGA B H L kgEnd connection panel, if required

kg-120 3340 1620 720 244 59

Page 62: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221320

Complements and accessories

Duct accessories, in insulated casing

BL52*

H

100

16

Connection dimensions to duct:TCIA 012 ø 500

TCIA B H L kgEnd connection panel, if required

kg-012 1199 647,5 565 52 13

-012 1199 647,5 850 74 13

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Connection dimensions to duct:TCIA 005 ø 315TCIA 008 ø 400

TCIA B H L kgEnd connection panel, if required

kg-005 825 460 565 37 7

-005 825 460 850 54 7

-008 995 542,5 565 43 10

-008 995 542,5 850 63 10

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

BL

16

52*

H

100

BL

21

52*

H

100

Connection dimensions to duct:TCIA 020 1000 x 400 mmTCIA 030 1200 x 500 mmTCIA 040 1400 x 600 mm TCIA 060 1600 x 800 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCIA B H L kgEnd connection panel, if required

kg-020 1400 775,5 565 61 19

-020 1400 775,5 850 86 19

-030 1600 905,5 565 69 23

-030 1600 905,5 850 96 23

-040 1990 1079,5 565 81 34

-040 1990 1079,5 850 117 34

-060 2318 1144 565 103 34

-060 2318 1144 850 143 34

The TCIA inspection section, inspection door in the entire length of the section

Page 63: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

321

Complements and accessories

Duct accessories, in insulated casing

Connection dimensions to duct:TCIA 080 1800 x 1000 mm

TCIA B H L kgEnd connection panel, if required

kg-080 2637 1320 565 129 40

-080 2637 1320 850 174 40

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct acces-sory farthest out facing the ductwork.

The TCIA inspection section, inspection door in the entire length of the section

21

B

H

100

L52*

56* L B

21

H

100

Connection dimensions to duct:TCIA 120 2400 x 1200 mm

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct ac-cessory farthest out facing the ductwork.

TCIA B H L kgEnd connection panel, if required

kg-120 3340 1620 500 200 59

-120 3340 1620 720 247 59

Page 64: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221322

Complements and accessories

Duct accessories, in insulated casing

BL52*

H

256

100

16

Connection dimensions to duct:TCIA 012 ø 500

TCIA B H L kgEnd connection panel, if required

kg-012 1199 647,5 850 74 13

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Connection dimensions to duct:TCIA 005 ø 315TCIA 008 ø 400

TCIA B H L kgEnd connection panel, if required

kg-005 825 460 850 54 7

-008 995 542,5 850 63 10

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam. * If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

BL

16

52*

H

100

256

TCIA inspection section, split cover panel/inspection door

Page 65: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

323

BL

21

52*

H

100

256

Connection dimensions to duct:TCIA 020 1000 x 400 mmTCIA 030 1200 x 500 mmTCIA 040 1400 x 600 mmTCIA 060 1600 x 800 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCIA B H L kgEnd connection panel, if required

kg-020 1400 775,5 850 86 19

-030 1600 905,5 850 96 23

-040 1990 1079,5 850 117 34

-060 2318 1144 850 143 34

Complements and accessories

Duct accessories, in insulated casing

TCIA inspection section, split cover panel/inspection door

Connection dimensions to duct:TCIA 080 1800 x 1000 mm

TCIA B H L kgEnd connection panel, if required

kg-080 2637 1320 850 174 40

21

B

H

100

L52*

256

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Page 66: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221324

Complements and Accessories

TCDA Unit sound attenuatorThe TCDA sound attenuator is a rectangular sound at-tenuator designed for mounting directly against the air handling unit.To be installed for horizontal airfl ow.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental class C4.Sound absorption material of type Cleanolon-AL. Cleano-lon-AL consists of mineral wool covered with perforated aluminium foil. Type approved with regard to suitability for cleaning, emissions and fi bre entrainment. The mate-rial conforms to the provisions of Surface Layer Class 1 (the highest class).InstallationThe sound attenuator should be mounted directly against the air handling unit or insulated duct accessory. Provi-sion for inspection and cleaning must be guaranteed. The cover panel is easy to remove.

Duct accessories, in insulated casing

BL52*

H

100

16

Connection dimensions to duct:TCDA 012 ø 500

TCDA B H L kgEnd connection panel, if required

kg-012 1199 647,5 975 106 13

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Connection dimensions to duct:TCDA 005 ø 315TCDA 008 ø 400

TCDA B H L kgEnd connection panel, if required

kg-005 825 460 975 75 7

-008 995 542,5 975 89 10

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

B

16

52*

H

100

L

Page 67: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

325

Complements and accessories

Duct accessories, in insulated casing

BL

21

52*

H

100

Connection dimensions to duct:TCDA 020 1000 x 400 mmTCDA 030 1200 x 500 mmTCDA 040 1400 x 600 mmTCDA 060 1600 x 800 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCDA B H L kgEnd connection panel, if required

kg-020 1400 775,5 975 130 19

-030 1600 905,5 975 154 23

-040 1990 1079,5 975 199 34

-060 2318 1144 975 234 34

Connection dimensions to duct:TCDA 080 1800 x 1000 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCDA B H L kgEnd connection panel, if required

kg-080 2637 1320 975 295 40

21

B

H

100

L52*

Connection dimensions to duct:TCDA 120 2400 x 1200 mm

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct ac-cessory farthest out facing the ductwork.

TCDA B H L kgEnd connection panel, if required

kg-120 3340 1620 1070 452 59

56* L B

21

H

100

Page 68: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221326

Complements and Accessories

TCLA Air heater, hot waterThe TCLA air heater is used for reheating the supply air. The heater uses hot water as the heating medium.

In many applications it is possible to omit the air heater for reheat if the air handling unit control system is oper-ated in the temperature regulation mode according to the ERS model and when the effi cient rotary heat exchanger is in use.

To be installed for horizontal airfl ow.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental class C4.

Finned-tube heat exchangers fabricated of copper tubes and profi led aluminium fi ns. The headers and the pipe-work to the water connections are made of copper. The male threaded pipe connections are made of brass.

The TCLA air heater is available in three capacity vari-ants. Capacity variant 1 provides the lowest capacity and capacity variant 3 provides the highest capacity.

All the air heaters are equipped with individual plugs for venting and drainage. A separate connection is provided for an anti-frost monitor sensor.

Valve set The TBVL valve set with 2(3)-way valve, actuator, anti-frost protection sensor and connection cable with quick-fi t connector can be ordered. If you use a valve of your own, you have the option of instead selecting a set of electrical connection components. This set contains a connection cable with quick-fi t connector, resistor and insertion or strap-on sensor.

Extra accessoriesA circulation pump is used for guaranteeing the frost guard function, if air heaters without anti-frost burst protection are used. Supplied with T coupling, non-return valve and adjustment valve. The automatic pump control system is integrated into the control equipment of the GOLD unit.

InstallationThe air heater should be mounted directly against the air handling unit or insulated duct accessory. Provision for inspection and cleaning must be guaranteed.Electrical connection.

Basic Installation Diagram

T piece

Anti-freeze sensor

Shut-off valve

Airwater

Shut-off valve

2(3)-way valve

Commission-ing valve

Non-return valve

Applicable to TCLA 005-012

Anti-freeze monitor sensor. Applicable to sizes 014-120

Secondary pump

1) The anti-frost protection sensor for the size 005-012 TCLA should be installed in the T-piece on the return pipework and for the size 014-120 TCLA in the con-nection on the air heater.

Duct accessories, in insulated casing

Page 69: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

327

B 84L52*

H

100

16

B 84L

16

52*

H

100

Complements and accessories

Duct accessories, in insulated casing

Conn. R male threads.

Conn. DN 8Connection dimensions to duct:TCLA 012 ø 500

TCLA B H LCap.variant 1 Cap. variant 2 Cap. variant 3 End connection panel, if required

kgR kg1) R kg1) R kg1)

-012 1199 647,5 400 DN20 50 DN20 53 DN25 56 131) Not filled with water.

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Conn. R male

threads.

Conn. DN 8

Connection dimensions to duct:TCLA 005 ø 315TCLA 008 ø 400

TCLA B H LCap. variant 1 Cap. variant 2 Cap. variant 3 End connection panel, if required

kgR kg1) R kg1) R kg1)

-005 825 460 400 DN15 33 DN15 34 DN20 36 7

-008 995 542,5 400 DN15 41 DN20 43 DN20 45 101) Not filled with water.

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam. * If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

BL

21

52*

H

100

84

Connection dimensions to duct:TCLA 020 1000 x 400 mmTCLA 030 1200 x 500 mmTCLA 040 1400 x 600 mmTCLA 060 1600 x 800 mm

1) Not filled with water.

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Conn. R male

threads.

Conn. DN 8

TCLA B H LCap. variant 1 Cap. variant 2 Cap. variant 3 End connection panel, if required

kgR kg1) kg2) R kg1) kg2) R kg1) kg2)

-020 1400 775,5 400 DN20 60 - DN25 65 - DN25 70 - 19

-030 1600 905,5 400 DN25 70 - DN32 78 - DN32 86 - 23

-040 1990 1079,5 400 DN32 89 - DN40 100 - DN40 114 - 34

-060 2318 1144 565 DN32 150 112 DN50 161 112 DN50 175 112 34

Page 70: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221328

21

B 95

H

100

L52*

Complements and accessories

Duct accessories, in insulated casing

TCLA B H LCapacity variant 1 Capacity variant 2 Capacity variant 3 End connection panel, if required

kgR kg1) kg2) R kg1) kg2) R kg1) kg2)

-080 2637 1320 565 DN50 181 132 DN65 197 132 DN65 217 132 40

Conn. R male

threads.

Conn. DN 8

Connection dimensions to duct:TCLA 080 1800 x 1000 mm

1) Including casing, not filled with water.2) Casing only.

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

9556* L B

21

H

100

TCLA B H LCapacity variant 1 Capacity variant 2 Capacity variant 3 End connection panel, if required

kgR kg1) kg2) R kg1) kg2) R kg1) kg2)

-120 3340 1620 720 DN50 339 256 DN65 384 256 DN65 429 256 59

Conn. R male threads.

Conn. DN 8Connection dimensions to duct:TCLA 120 2400 x 1200 mm

1) Including casing, not filled with water.2) Casing only.

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct ac-cessory farthest out facing the ductwork.

Page 71: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

329

Complements and Accessories

TCLF Air heater, hot waterThe TCLF air heater is used for preheating the supply air. The heater uses hot water as the heating medium. Install the TCLF against the outdoor air duct.

When it is cold outside and the humidity is high, preheat-ing the incoming outdoor air will prevent condensation in the air fi lters. The function can also be utilised when it is extremely cold outdoors and it is desirable to heat the air up to -20°C, for instance.

In combination with the counterfl ow heat exchanger, it can also be of interest to preheat the air to be spared having to let it bypass the heat exchanger.

To be installed for horizontal airfl ow.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental class C4.

Finned-tube heat exchangers fabricated of copper tubes and profi led aluminium fi ns. Fin pitch: 4.0 mm. The head-ers and the pipework to the water connections are made of copper. The male threaded pipe connections are made of brass.

Valve set The TBVL valve set with 2(3)-way valve, valve actuator, freeze protection sensor and connection cable with quick-fi t connector can be ordered. If you use a valve of your own, you can instead select a set of electrical connection components. This set contains a connection cable with quick-fi t connector, resistor and insertion type or strap-on sensor.

Extra accessoriesControl system, including temperature sensor for duct and IQlogic+ with a 0.25 metre long cable, with or with-out frost guard sensor.

A circulation pump is used for guaranteeing the frost guard function, if air heaters without anti-frost burst protection are used. Supplied with T coupling, non-return valve and adjustment valve. The automatic pump control system is integrated into the control equipment of the GOLD unit.

InstallationThe air heater should be mounted directly against the air handling unit or insulated duct accessory. Provision for inspection and cleaning must be guaranteed.Electrical connection.

Duct accessories, in insulated casing

Page 72: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221330

B 84L52*

H

100

16

B 84L

16

52*

H

100

Conn. R male

threads.

Conn. DN 8Connection dimensions to duct:TCLF 012 ø 500

1) Not filled with water.

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory far-thest out facing the ductwork.

Conn. R male

threads.

Conn. DN 8

Connection dimensions to duct:TCLF 005 ø 315TCLF 008 ø 400

TCLF B H L R kg1)

End connection panel, if requiredkg

-005 825 460 400 DN15 33 7

-008 995 542,5 400 DN15 40 101) Not filled with water.

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Complements and accessories

Duct accessories, in insulated casing

TCLF B H L R kg1)

End connection panel, if requiredkg

-012 1199 647,5 400 DN20 49 13

BL

21

52*

H

100

84

Connection dimensions to duct:TCLF 020 1000 x 400 mmTCLF 030 1200 x 500 mmTCLF 040 1400 x 600 mm

1) Not filled with water.

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory far-thest out facing the ductwork.

Conn. R male

threads.

Conn. DN 8

TCLF B H L R kg1)

End connection panel, if requiredkg

-020 1400 775,5 400 DN20 58 19

-030 1600 905,5 400 DN20 65 23

-040 1990 1079,5 400 DN20 76 34

Page 73: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

331

Complements and Accessories

TCLE-02 Electric air heaterAir heater TCLE is used for reheating of the supply air or for certain preheating needs of outdoor air.

In many applications it is possible to omit the air heater for reheat if the air handling unit control system is oper-ated in the temperature regulation mode according to the ERS model and when the efficient rotary heat exchanger is in use.

To be installed for horizontal airflow.

The integrated thyristor is controlled via signals from the GOLD air handling unit. The four, five or six series-coupled overheating protections and control signals are connected by means of a quick connector to the GOLD air handling unit.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental class C4.

The TCLE air heater is available in several capacity variants.

The electrical equipment conforms to the provisions of Degree of Protection IP44.

The air heater is approved for operating temperatures, in the surroundings and the air stream, from -25°C to +40°C.

InstallationThe air heater should be mounted directly against the air handling unit or insulated duct accessory. The space necessary for obtaining a uniform air stream is provided inside the TCLE. Therefore other duct accessories can be fitted downstream of the TCLE without risk of overheat-ing.Electrical connection. Power must be supplied directly from the electrical distribution box.

Duct accessories, in insulated casing

Page 74: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221332

BL

21

52*

H

100

BL

16

52*

H

100

B52*

H

L

100

16

Complements and accessories

Duct accessories, in insulated casing

Connection dimensions to duct:TCLE 012 ø 500

TCLE B H L kgEnd connection panel, if required

kg-012 1199 647.5 625 80-95 13

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Connection dimensions to duct:TCLE 005 ø 315TCLE 008 ø 400

TCLE B H L kgEnd connection panel, if required

kg-005 825 460 625 55-58 7

-008 995 542.5 625 66-72,5 10

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out fac-ing the ductwork.

Connection dimensions to duct:TCLE 020 1000 x 400 mmTCLE 030 1200 x 500 mmTCLE 040 1400 x 600 mmTCLE 060 1600 x 800 mm

TCLE B H L kg kg1)

End connection panel, if requiredkg

-020 1400 775,5 625 93-115,5 - 19

-030 1600 905.5 625 109-130,5 - 23

-040 1990 1079.5 625 131-163,5 - 34

-060 2318 1144 625 175-213 121 34

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

1) Casing only.

Page 75: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

333

56* L B

21

H

100

H

BL52*

21100

Complements and accessories

Duct accessories, in insulated casing

1) Casing only.

TCLE B H L kg kg1)

End connection panel, if requiredkg

-080 2637 1320 625 212-248 156 40

Connection dimensions to duct:TCLE 080 1800 x 1000 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

1) Casing only.

TCLE B H L kg kg1)

End connection panel, if requiredkg

-120 3340 1620 720 336,5-373 267 59

Connection dimensions to duct:TCLE 120 2400 x 1200 mm

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Page 76: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221334

Complements and Accessories

TCKA Air cooler (water), TCKC (direct expansion)The TCKA/TCKC air coolers are used for cooling the sup-ply air with chilled water or evaporative refrigerant as the cooling medium.

The TCKA/TCKC air cooler is available in several capacity variants that cover existing needs for each size of GOLD unit.

The TCKA air coolers are equipped with connections for insertion sensors and can be used as a multi-purpose coil (cooling and heating).

To be installed for horizontal airfl ow.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental class C4.

The TCKA/TCKC air coolers are composed of copper tubes and profi led aluminium fi ns. The TCKA has headers and water connections made of copper/brass, with male connection threads. The TCKC has headers and distributor tubes made of copper. The connections are designed for brazed joints.

Valve setThe TBVL valve set with 2(3)-way valve, actuator and connection cable with quick-fi t connector can be ordered for air cooler water. Temperature sensor water for reading incoming or outgoing cooling medium temperatures as an option.

If you use a valve of your own, you can instead select a set of electrical connection components. This set contains a connection cable with quick-fi t connector, resistor and insertion type or strap-on sensor.

InstallationThe air cooler should be mounted directly against the air handling unit or insulated duct accessory. Provision for inspection and cleaning must be guaranteed.Connecting the drainage pipework.Electrical connection.

Duct accessories, in insulated casing

Page 77: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

335

B 82L52*

H

100

16

Conn. R male

threads.

Conn. DN 8Connection dimensions to duct:TCKA 005 ø 315TCKA 008 ø 400

TCKA B HCap. variant 1 Cap. variant 2 Cap. variant 4 End connection panel, if required

kgL R kg1) L R kg1) L R kg1)

-005 825 460 475 DN20 49 475 DN25 51 625 DN25 66 7

-008 995 542,5 475 DN25 60 475 DN25 64 625 DN32 83 10

1) Excl. cooling agent

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Drain conn.

ø 28 male

threads

Duct accessories, in insulated casing

Complements and accessories

B 72L52*

H

100

16

TCKC B H LCapacity variant 1 Capacity variant 2 End connection panel, if required

kgdi du kg1) di du kg1)

-005 825 460 475 1/2" 22 49 5/8" 28 51 7

-008 995 542,5 475 5/8" 28 60 5/8" 35 64 10

1) Excl. cooling agent

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Drain conn.

ø 28 male

threads

Outer diameter

du male threads

Outer diameter

di male threads

Connection dimensions to duct:TCKC 005 ø 315TCKC 008 ø 400

Page 78: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221336

B 82L

16

52*

H

100

Conn. R male threads.

Conn. DN 8Connection dimensions to duct:TCKA 012 ø 500

TCKA B HCapacity variant 1 Capacity variant 2 Capacity variant 4 End connection panel, if required

kgL R kg1) L R kg1) L R kg1)

-012 1199 647,5 475 DN25 73 475 DN32 79 625 DN40 106 131) Excl. cooling agent

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Drain conn.

ø 28 male threads

Duct accessories, in insulated casing

Complements and accessories

B 72L

16

52*

H

100

Connection dimensions to duct:TCKC 012 ø 500

TCKC B H LCapacity variant 1 Capacity variant 2 End connection panel, if required

kgdi du kg2) di du kg2)

-012 1199 647,5 475 5/8"1) 351) 731) 191) 421) 801) 13

1) If there are two sections: depending on the division of sections

2) Excl. refrigerant

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Drain conn.

ø 28 male threads

Outer diameter

du male threads

Outer diameter

di male threads

Page 79: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

337

Duct accessories, in insulated casing

Complements and accessories

BL

21

52*

H

100

82

TCKA B H D

Cap. variant 1 Cap. variant 2 Cap. variant 3 Cap. variant 4 End conn. panel if

required, kgL R kg1) kg2) L R kg1) kg2) L R kg1) kg2) L R kg1) kg2)

-0201400 775,5 28 male

threads475 DN32 91 - 475 DN32 100 - 625 DN40 123 - 625 DN50 132 - 19

-0301600 905,5 28 male

threads475 DN32 110 - 475 DN40 126 - 625 DN50 156 - 625 DN60 173 - 23

-0401990 1079.5 28 male

threads475 DN40 138 - 475 DN50 160 - 625 DN65 199 - 625 DN60 223 - 34

-060 2318 1144 DN25 565 DN65 199 108 565 DN65 211 108 565 DN65 225 108 565 DN65 242 108 34

1) Excl. cooling agent 2) Only casing.

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Connection dimensions to duct:TCKA 020 1000 x 400 mmTCKA 030 1200 x 500 mmTCKA 040 1400 x 600 mmTCKA 060 1600 x 800 mm

Conn. R male threads.

Conn. DN 8

Drain conn. D

Connection dimensions to duct:TCKC 020 1000 x 400 mmTCKC 030 1200 x 500 mmTCKC 040 1400 x 600 mmTCKC 060 1600 x 800 mm

BL

21

52*

H

100

72

Drain conn. D

Outer diameter

du male threads

Outer diameter

di male threads

TCKC B H L D

Cap. variant 1 Cap.variant 2 Cap. variant 3 End conn. panel, if required

kgdi du kg2) kg3) di du kg2) kg3) kg2) kg3)

-020 1400 775,5 475 28 male threads 221) 421) 941) - 281) 541) 1041) - - - 19

-030 1600 905,5 475 28 male threads 281) 541) 1151) - 281) 541) 1281) - - - 23

-040 1990 1079.5 475 28 male threads 281) 541) 1471) - 281) 541) 1671) - - - 34

-060 2318 1144 565 DN25 - - 210 108 - - 230 108 248 108 34

1) If there are two sections: depending on the division of sections

2) Excl. refrigerant 3) Only casing

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCKA B H DCap. variant 1 Cap. variant 2 End connection panel if required,

kgL R kg1) kg2) L R kg1) kg2)

-060 2318 1144 DN25 565 DN65 210 108 565 DN65 230 108 34

Page 80: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221338

21

B 95

H

100

L52*

21

B

H

100

L 10552*

Duct accessories, in insulated casing

Complements and accessories

TCKA B H L

Cap. variant 1 Cap. variant 2 Cap. variant 3 Cap. variant 4 End connection panel, if requiredkgR kg1) kg2) R kg1) kg2) R kg1) kg2) R kg1) kg2)

-080 2637 1320 565 DN65 263 135 DN65 282 135 DN65 302 135 DN65 324 135 40

Connection dimensions to duct:TCKA 080 1800 x 1000 mm

Connection dimensions to duct:TCKC 080 1800 x 1000 mm

TCKC B H L

Cap. variant 1 Cap. variant 2 Cap. variant 3 End connection panel, if requiredkgkg1) kg2) kg1) kg2) kg1) kg2)

-080 2637 1320 565 280 135 316 135 332 135 40

1) Including casing, not charged with refrigerant.2) Casing only.

1) Including casing, not charged with refrigerant.2) Casing only.

Conn. R male

threads.

Conn. DN 8

Drain conn. DN 25

male threads

Drain conn. DN

25 male threads

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Page 81: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

339

Complements and accessories

Duct accessories, in insulated casing

56* L B

21

H

100

105

TCKA B H L

Capacity variant 1 Capacity variant 2 Capacity variant 3 Capacity variant 4 End connection panel, if requiredkgR kg1) kg2) R kg1) kg2) R kg1) kg2) R3) kg1) kg2)

-120 3340 1620 720 DN65 414 260 DN80 461 260 DN80 513 260 DN100 568 260 59

Connection dimensions to duct:TCKA 120 2400 x 1200 mm

1) Including casing, not charged with refrigerant.2) Casing only.3) The flange is included.

Conn. R male

threads.

Conn. DN 8

Drain conn.

DN 25 male

threads

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct acces-sory farthest out facing the ductwork.

Page 82: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221340

Complements and accessories

TCCC Air heater/air cooler (direct expansion)TCCC air heaters/air coolers are used for heating and cooling the supply air in combination with a Echos+chiller/heat pump and SMART Link DX control function. Evaporating cooling medium.

To be installed for horizontal airfl ow.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental Class C4.

TCCC air heaters/air coolers are composed of copper tubes and profi led aluminium fi ns. The TCCC coils have headers and distributor tubes made of copper. The con-nections are designed for brazed joints.

InstallationThe air heater/air cooler should be mounted directly against the air handling unit or insulated duct accessory. Provision for inspection and cleaning must be guaranteed.Connecting the drainage pipework.

Duct accessories, in insulated casing

Page 83: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

341

B 72L

16

52*

H

100

B 72L52*

H

100

16

TCCC B H L kg1)

End connection panel, if required kg

-005 825 460 475 43 7

-008 995 542,5 475 50 - 53 10

1) Excl. cooling agent

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Drain conn.

ø 28 male threads

Outer diameter d1u male threadsd2u ext.

Outer diameter d1i male threadsd2i male threads

Connection dimensions to duct:TCCC 005 ø 315TCCC 008 ø 400

Connection dimensions to duct:TCCC 012 ø 500

1) Excl. cooling agent

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Drain conn.

ø 28 male threads

Echos+ size di du

9 16 22

15 22 28

TCCC B H L kg1)

End connection panel, if required kg

-012 1199 647,5 475 58 - 60 13

Echos+ size di du

9 16 22

15 22 28

Outer diameter d1u male threadsd2u ext.

Outer diameter d1i male threadsd2i male threads

Connection diameter varies depending on combination of quantity/sizes of Echos+ chillers/heat pumps.

Connection diameter varies depending on combination of quantity/sizes of Echos+ chillers/heat pumps.

Complements and accessories

Duct accessories, in insulated casing

Page 84: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221342

BL

21

52*

H

100

72

Connection dimensions to duct:TCCC 020 1000 x 400 mmTCCC 030 1200 x 500 mmTCCC 040 1400 x 600 mmTCCC 060 1600 x 800 mm

1) Excl. cooling agent

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Echos+ size di du

9 16 22

15 22 28

20 22 28

26 28 35

30 28 35

Connection diameter varies depending on combination of quantity/sizes of Echos+ chillers/heat pumps.

Outer diameter d1u male threadsd2u ext.d3u male threads

Outer diameter d1i male threadsd2i male threads d3i male threads

Complements and accessories

Duct accessories, in insulated casing

Drain pipe

conn. D

TCCC B H L D kg1)

End connection panel, if required

kg-020 1400 775,5 475 28 male threads 71 - 75 19

-030 1600 905,5 475 28 male threads 81 - 87 23

-040 1990 1079,5 475 28 male threads 98 - 106 34

-060 2318 1144 565 DN25 130-148 34

Page 85: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

343

TCEK-02 Coil section Electric heating and water-borne coolingThe TCEK coil section is used for heating/cooling the supply air. The air heater runs on electric power and its type designation is TCLE. The cooling coil is a type TCKA air cooler for chilled water or a type TCKA air cooler for evaporative refrigerant. The type TCKA air coolers are equipped with connections for insertion sensors and can be used as a multi-purpose coil (cooling and heating).

To be installed for horizontal airflow.

The integrated thyristor is controlled via signals from the GOLD air handling unit. The four, five or six series-coupled overheating protections and control signals are connected by means of a quick connector to the GOLD air handling unit.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental class C4.

The electric air heater is available in several capacity vari-ants; the electrical equipment conforms to the provisions of Degree of Protection IP44.

The air heater is approved for operating temperatures, in the surroundings and the air stream, from -25°C to +40°C.

The air cooler is composed of copper tubes and profiled aluminium fins. The air cooler for chilled water has head-ers and water connections made of copper/brass, with male connection threads.

The air cooler for evaporative refrigerant has headers and distributor tubes made of copper. The connections are designed for brazed joints.

The air cooler is available in several capacity variants that cover existing needs for each size of GOLD unit.

Valve setThe TBVL valve set with 2(3)-way valve, actuator and connection cable with quick-fit connector can be ordered for air cooler water. Temperature sensor water for reading incoming or outgoing cooling medium temperatures as an option.

If you use a valve of your own, you can instead select a set of electrical connection components. This set contains a connection cable with quick-fit connector, resistor and insertion type or strap-on sensor.

Complements and Accessories

Duct accessories, in insulated casing

InstallationThe coil section should be mounted directly against the air handling unit or insulated duct accessory. Provision for inspection and cleaning must be guaranteed.Electrical connection. Power must be supplied to the electric air heater directly from an electrical distri-bution box.

Page 86: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221344

B

16

52* L

H

100

B52* L

H

100

16

Complements and accessories

Duct accessories, in insulated casing

Connection dimensions to duct:TCEK 012 ø 500

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

Connection dimensions to duct:TCEK 005 ø 315TCEK 008 ø 400

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCEK B H L kg 1)

End connection panel, if requiredkg

-005 825 460 1400 123-132 7

-008 995 542.5 1400 142-161,5 10

TCEK B H L kg 1)

End connection panel, if requiredkg

-012 1199 647.5 1400 176-194 13

1) Excl. cooling agent.For particulars of the pipe dimensions, see the corresponding TCKA or TCKC.

1) Excl. cooling agent.For particulars of the pipe dimensions, see the corresponding TCKA or TCKC.

Page 87: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

345

H

100

BL52*

21

Complements and accessories

Duct accessories, in insulated casing

Connection dimensions to duct:TCEK 020 1000 x 400 mmTCEK 030 1200 x 500 mmTCEK 040 1400 x 600 mmTCEK 060 1600 x 800 mm

1) Including casing, not charged with refrigerant.2) Casing only.3) Dimension L = 1,775 mm applies to capacity variants 3 and 4 in versions with waterborne air cooler (type TCKA). For the others, L = 1625 mm. 4) Dimension L = 1,965 mm applies to capacity variants 3 and 4 in versions with waterborne air cooler (type TCKA). For the others, L = 1755 mm. For particulars of the pipe dimensions, see the corresponding TCKA or TCKC.

TCEK B H L kg 1) kg 2)

End connection panel, if requiredkg

-0203) 1400 775.5 1625 237 - 268,5 - 19

-0203) 1400 775.5 1775 255 - 286,5 - 19

-0303) 1600 905.5 1625 271 - 308,5 - 23

-0303) 1600 905.5 1775 300 - 338,5 - 23

-0403) 1990 1079.5 1625 339 - 402,5 - 34

-0403) 1990 1079.5 1775 400 - 465,5 - 34

-0604) 2318 1144 1755 481 - 535 336 34

-0604) 2318 1144 1965 543 - 593 362 34

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

1) Including casing, not charged with refrigerant. 2) Casing only. 3) Dimension L = 1,965 mm applies to capacity variants 3 and 4 in versions with waterborne air cooler (type TCKA). For the others, L = 1755 mm. For particulars of the pipe dimensions, see the corresponding TCKA or TCKC.

TCEK B H L kg 1) kg 2)

End connection panel, if requiredkg

-0803) 2637 1320 1755 618 - 714 425 40

-0803) 2637 1320 1965 702 - 831 456 40

Connection dimensions to duct:TCEK 080 1800 x 1000 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

BL

21

52*

H

100

Page 88: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifi cations. 20200221346

Coil section TCLK Waterborne heating and coolingThe TCLK coil section is used for heating/cooling the sup-ply air. The air heater is for hot water and its type desig-nation is TCLA. The air cooler is of type TCKA for chilled water or of type TCKC for evaporative refrigerant. The type TCKA air coolers are equipped with connections for insertion sensors and can be used as a multi-purpose coil (cooling and heating).

To be installed for horizontal airfl ow.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental Class C4.The air heater is a fi nned-tube heat exchanger fabricated of copper tubes and profi led aluminium fi ns. The headers and the pipework to the water connections are made of copper. The male threaded pipe connections are made of brass.

The air heater is available in three capacity variants. Ca-pacity variant 1 provides the lowest capacity and capacity variant 3 provides the highest capacity.

The air heaters and air coolers are equipped with individ-ual plugs for venting and drainage. A separate connection is provided for an anti-frost monitor sensor.

The air cooler is composed of copper tubes and profi led aluminium fi ns. The air cooler for chilled water has head-ers and water connections made of copper/brass, with male connection threads.

The air cooler for evaporative refrigerant has headers and distributor tubes made of copper. The connections are designed for brazed joints.

The air cooler is available in several capacity variants that cover existing needs for each size of GOLD unit.

Valve set The TBVL valve set with 2(3)-way valve, actuator, con-nection cable with quick-fi t connector and temperature sensor water if required can be ordered for air heaters and air coolers water. For 2-pipe systems, (1 valve set) the valve set should be ordered with temperature sensor water. For 4-pipe systems, (2 valve sets) one valve set should be ordered with temperature sensor water (heat-ing circuit) and one valve set without temperature sensor water (cooling circuit).

If you use a valve of your own, you can instead select a set of electrical connection components. This set contains a connection cable with quick-fi t connector, resistor and insertion type or strap-on sensor.

Complements and Accessories

Duct accessories, in insulated casing

Extra accessoriesA circulation pump is used for guaranteeing the frost guard function, if air heaters without anti-frost burst protection are used. Supplied with T coupling, non-return valve and adjustment valve. The automatic pump control system is integrated into the control equipment of the GOLD unit.

InstallationThe coil section should be mounted directly against the air handling unit or insulated duct accessory. Provision for inspection and cleaning must be guaranteed.

Electrical connection.

Page 89: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

347

Complements and accessories

Duct accessories, in insulated casing

B52* L

H

100

16

Connection dimensions to duct:TCLK 012 ø 500

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory far-thest out facing the ductwork.

Connection dimensions to duct:TCLK 005 ø 315TCLK 008 ø 400

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

B

16

52* L

H

100

TCLK B H L kg 1)

End connection panel, if requiredkg

-005 825 460 1150 93-103 7

-008 995 542,5 1150 115-131 10

TCLK B H L kg 1)

End connection panel, if requiredkg

-012 1199 647,5 1150 140-165 13

1) Excl. water/cooling agent.For particulars of the pipe dimensions, see the corresponding TCLA and TCKA or TCKC.

1) Excl. water/cooling agent.For particulars of the pipe dimensions, see the corresponding TCLA and TCKA or TCKC.

Page 90: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221348

Complements and accessories

Duct accessories, in insulated casing

BL

21

52*

H

100

Connection dimensions to duct:TCLK 020 1000 x 400 mmTCLK 030 1200 x 500 mmTCLK 040 1400 x 600 mmTCLK 060 1600 x 800 mm

1) Including casing, excluding water/cooling agent.2) Casing only3) Dimension L = 1475 mm applies to air heaters in the capacity variants 1-3 in combination with air coolers in the capacity variants 3-4. For the others, L = 1325 mm. 4) Dimension L = 1475 mm applies to air heaters in the capacity variants 1-3 in combination with air coolers in the capacity variants 3-4. For the others, L = 1325 mm.5) Dimension L = 1475 mm applies to air heaters in the capacity variants 1-3 in combination with air coolers in the capacity variants 3-4. For the others, L = 1325 mm. For particulars of the pipe dimensions, see the corresponding TCLA and TCKA or TCKC.

TCLK B H L kg 1) kg 2)

End connection panel, if required

kg-0203) 1400 775,5 1325 192 - 212 - 19

-0203) 1400 775,5 1475 225 - 245 - 19

-0304) 1600 905,5 1325 228 - 259 - 23

-0304) 1600 905,5 1475 275 - 308 - 23

-0405) 1990 1079.5 1325 228 - 329 - 34

-0405) 1990 1079.5 1475 343 - 392 - 34

-060 2318 1144 1695 452-520 353 34

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

1) Casing only. 2) Including casing, not filled with water/not charged with refrigerantFor particulars of the pipe dimensions, see the corresponding TCLA and TCKA or TCKC.

TCLK B H L kg 1) kg 2)

End connection panel, if requiredkg

-080 2637 1320 1695 395 572 - 677 40

Connection dimensions to duct:TCLK 080 1800 x 1000 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

H

100

BL

21

52*

Page 91: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifi cations.

GOLD

349

Complements and Accessories

Duct accessories, in insulated casingFinal fi lter section, TCFBThe TCFB fi nal fi lter section should be installed in ventila-tion systems where further fi ltration of the supply air is required.

Install the fi nal fi lter section in the supply air downstream of the air handling unit.

Prefi tted pressure sensor is standard. The alarm limit and current fi lter pressure can be read on the hand-held micro terminal of the GOLD unit.

To be installed for horizontal airfl ow.

Technical dataInsulated casing. The outer skin is made of galvanized sheet steel, re-painted in Swegon's own grey metallic paint (closest comparable RAL colour: 9007). The inner skin is made of aluminium-zinc plated sheet steel. Environ-mental Class C4. Bag fi lters to fi lter class ePM1 50% (F7) or ePM1 85% (F9) can be selected.

InstallationThe fi nal fi lter section should be mounted directly against the air handling unit or an insulated duct accessory. Con-nect the pressure sensor.

Provision for inspection and cleaning must be guaranteed.

Connection dimensions to duct:TCFB 012 ø 500

TCFB B H L kgEnd connection panel, if required

kg-012 1199 647,5 720 72 13

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct acces-sory farthest out facing the ductwork.

Connection dimensions to duct:TCFB 005 ø 315TCFB 008 ø 400

TCFB B H L kgEnd connection panel, if required

kg-005 825 460 720 52 7

-008 995 542,5 720 58 10

Base beam is optional on duct accessories in the lower duct. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

BL52*

H

100

16

BL

16

52*

H

100

Page 92: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221350

BL

21

52*

H

100

Complements and accessories

Duct accessories, in insulated casing

Connection dimensions to duct:TCFB 020 1000 x 400 mmTCFB 030 1200 x 500 mmTCFB 040 1400 x 600 mmTCFB 060 1600 x 800 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCFB B H L kgEnd connection panel, if required

kg-020 1400 775,5 720 88 19

-030 1600 905,5 720 103 23

-040 1990 1079,5 720 119 34

-060 2318 1144 720 150 34

Connection dimensions to duct:TCFB 080 1800 x 1000 mm

Duct accessories in the lower duct are always delivered with mounted base beam. Duct accessories in the upper duct are always delivered without base beam.* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct accessory farthest out facing the ductwork.

TCFB B H L kgEnd connection panel, if required

kg-080 2637 1320 720 198 40

21

B

H

100

L52*

56* L B

21

H

100

Connection dimensions to duct:TCFB 120 2400 x 1200 mm

* If several duct accessories are arranged in succession, the end connection panel is supplied only on the duct acces-sory farthest out facing the ductwork.

TCFB B H L kgEnd connection panel, if required

kg-120 3340 1620 720 297 59

Page 93: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

351

c

Carbon cartridges

TBFK Carbon filter sectionThe TBFK has activated carbon filter medium designed for improving the air quality indoors by adsorbing gaseous, harmful or foul-smelling substances from the air.

Note that we cannot guarantee one hundred percent elimination of odours due to variations in the impurities and mixtures of various chemical substances arrested in the filter.

The carbon filter cartridges are disposable. They are sea-ted in mounting frames and can be locked in their bayo-net socket by simply turning them by hand. The cartridges contain a filter mat made of polyester, which encloses the activated carbon.

The frame structure consists of 38 mm galvanized (Send-zimir) square profiled sections, painted in RAL 7032. The profiled sections are held together by corner pieces made of plastic.

The outer and inner skins of the cover panels and inspec-tion doors consist of galvanized sheet steel. An interven-ing 45 mm thick slab of thermal and sound-attenuating insulation is sandwiched between the skins.

The cover panels can be dismantled from the unit.

The inspection doors have hinges and handles.

After fabrication the panels and inspection doors are given powder painted, min. 60 µm finish, RAL 7032. This leaves no open sectional areas and provides excellent cor-rosion resistance.

Note that the TBFK carbon filter is available in

six sizes and that the slip-clamp connection

dimensions follow the connection dimensions

of the GOLD air handling units.

Complements and Accessories

Duct accessories

InstallationThe TBFK carbon filter section has a connection frame for slip-clamp jointing and is designed for installation in the ductwork, see adjacent illustration.

TBFK Slip-clamp

conn.

widthxheigh

B H L kg

without

cartridges

Number of

cartridges

kg

with

cartridges017 850 x 350 1039 546 763 75 17 113

024 1100 x500 1259 656 763 89 24 143

036 1300 x 600 1459 756 763 104 36 185

050 1600 x 700 1759 906 763 120 50 233

072 1800 x 800 1946 1026 763 144 72 307

098 2100 x 1000 2306 1206 763 172 98 393

B

H

L

Page 94: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221352

C

G

A

BD D

E

H

TBHA Outdoor air hood Designed for the intake of outdoor air. The design of the hood obstructs snow and raindrop entrainment. The hood is hinged and has air intake wire screens on both sides. For GOLD sizes 004-040.

TBHB Exhaust air hood Designed for the discharge of exhaust air. The hood can be opened on hinges and is equipped with air deflectors that effectively direct the exhaust air upward and give the air high discharge velocity. To achieve low pressure drop, the air deflectors are rounded off on both their long sides. The hoods are equipped with effective provision for drainage. For GOLD sizes 004-040.

TBHC Dual-purpose hoodThe TBHC is a combination of TBHA outdoor air hood and TBHB exhaust air hood and is available for the size 004 - 012 GOLD units only.

Complements and Accessories

Roof hoods and exterior wall hoods

TBHA Outdoor air hood

TBHB Exhaust air hood

TBHC Dual-pur-pose hood

Common for all roof hoodsThe hoods are made of aluminium-zinc plated sheet steel covered with a Plastisol (black) surface coating that conforms to Environmental Class C4.

The roof duct is made of galvanized sheet steel. It is lined inside with 50 mm thick insulation to Fire-resist-ance Class EI30, with a surface covering of type-ap-proved synthetic woven fabric. Two angle brackets for

connection to the relevant roof having client-specified slope are included.

The hoods for the size 004-012 GOLD units have circu-lar duct connection fitted with type-approved rubber ring seal for jointing to spiral ductwork.

The hoods for the size 014-040 GOLD units have rec-tangular duct connection for slip-clamp joint connec-tion.

H

E

C

DB

A

B

2 angle brackets (unmounted) are included in the supply.

TBHA Outdoor air hood and TBHB Exhaust air hood TBHC Dual-purpose hood

2 angle brackets (unmounted) are included in the supply.

For GOLD A B C D E H kg004/005 500 400 850 Ø315 620 800 31

007/008 600 500 950 Ø400 620 800 44

011/012 820 700 1300 Ø500 850 1200 129

014/020 820 700 1300 600 850 1200 129

025 - 40 1120 1000 1700 900 1150 1200 148

For GOLD A B C D E H G kg004/005 1000 900 850 Ø315 620 800 400 70

007/008 1200 1100 950 Ø400 620 800 500 100

011/012 1600 1500 1300 Ø500 850 1200 700 290

Page 95: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

353

B954

H

100 J45 45

TBHE Exterior wall hoodThe exterior wall hood is designed for the admission of outdoor air and the discharge of exhaust air. The exhaust air is horizontally discharged through a circular wire mesh grille at the front of the hood. Outdoor air is admitted through a wire mesh grille at the bottom of the hood.

This design effectively prevents short-circuit flow between the outdoor air/exhaust air. For GOLD sizes 004 - 012.

The TBHE exterior wall hoods are made of aluminium-zinc plated sheet steel covered with a Plastisol (light grey) sur-face coating that conforms to Environmental Class C4.

Complements and Accessories

Roof hoods and exterior wall hoods

TBHE Exterior wall hoodL

c/c

D

H

D

B

< Can be reversed. >Outdoor airExhaust air

For GOLD B c/c D H L kg004/005 200 420 Ø315 520 950 11

007/008 250 500 Ø400 580 1150 15

011/012 300 600 Ø500 750 1350 20

TCWP Component boxThe TCWP component box is intended for the incorpo-ration of components which must be protected from weather or mechanical damage. Typical components are valves, actuators, etc.

The component box consists of a GOLD-type casing. The component box is enclosed on all sides and has an inspec-tion door that can be selected as a right or left-hinged door.

A roof is available as an accessory for outdoor installation.

The cutting of openings for e.g. pipes and electric cables, if required, must be done at the building site.

Size B H J kg005 825 460 579 69

012 1199 648 953 102

030 1600 906 1354 143

040 1990 1080 1726 160

The base beams are optional extras for the size 005 (Standard on the other sizes).

Page 96: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221354

GeneralThe GOLD air handling units, including optional unit sections and the COOL DX/DXS chiller can be installed outdoors. This presupposes that the roof, air intake section and exhaust air hood accessories are used. GOLD air handling units cannot be installed outdoors in applications that call for the fan outlet/inlet to be positioned on the top of the unit.

TBTB RoofThe roof is supplied in kit form, complete with the necessary as-sembly parts and sealing strips. The cover plates for all the door handles are included as standard.

Visible parts are made of galvanized sheet steel, painted in Swegon's grey metallic paint (nearest comparable RAL colour: 9007).

Dimensions

TBTF Intake air section with pre-filter (sizes 004-040)The TBTF intake air section is made of galvanized sheet steel with visible parts i painted in Swegon's grey metallic paint (near-est comparable RAL colour: 9007). The intake air section has a fixed grille and has a hole for drainage. The intake air section has rectangular connection dimensions and the air handling unit is supplied with full face end connection panel. The intake air section is equipped with slip-clamp connection. It is possible to order a filter and damper installed in the air intake section. The filter is an aluminiumfilter type that conforms to filter class G2, and also works as a water separator. Damper actuators can be ordered with spring return or with modulating function.

TBTA Intake air section (sizes 050-120)The TBTA intake air section is made of aluminium-zinc plated sheet steel. The intake air section has a fixed louvre grille that effectively prevents raindrops from entering the duct and is equipped with holes for drainage. The intake air section has rectangular dimensions for all the sizes of GOLD and has space inside for an intake damper, if required. The intake air section has a flange with predrilled holes and is meant to be secured by means of screws to the end wall panel of the air handling unit.

TBTA Exhaust air hoodThe TBTA exhaust air hood is made of aluminium-zinc plated sheet steel. The exhaust air hood is equipped with a protective screen. For air handling units with standard end connection frame, the exhaust air hoods are circular for unit sizes 004–012 and rectangular with slip-clamp connection for the other unit sizes. For air handling units with full face connection frames, the exhaust air hoods are always rectangular with slip-clamp con-nection. The exhaust air hood of the size 050-120 GOLD units is supplied in loose parts, the other components are assembled.

GOLD CX Cover hoodCover hood that protects the pipework package on the GOLD CX installed outdoors (does not apply to sizes 100/120). Visible parts are made of galvanized sheet steel, i painted in Swegon's grey metallic paint (nearest comparable RAL colour: 9007).

Duct AccessoriesSelect duct accessories housed in insulated casings if they are to be installed outdoors. They can be located outdoors, however the enclosure classes and permissible ambient temperatures of any actuators included must be taken into consideration. See the instructions for the corresponding accessory. If necessary, see to it that required protection is arranged. Water-tight pro-tective bags for valve actuators are available as accessories. The protective bag has a zip fastener and is made of polyester with

internal plastic coating.

Installation TipsGOLD Air handling units should if possible be installed where the most favourable conditions exist from a weather point of view.

The ductwork for supply air and extract air must be insulated in accordance with local standards. If internally insulated ducts are used, the TBLZ-1-65 countersink kit should be used so that the measurement probe of the GOLD unit’s supply air sensor will reach sufficiently far into the duct.

The hand-held micro terminal of the GOLD unit is sensitive to cold and must always be kept in a heated space. If required, use an extension cable or also an extension cable kit (see accesso-ries for electrical and control equipment).

Swegon recommends moving the exhaust air hood a distance from the air handling unit by fitting a straight length of duct be-tween them, especially if the exhaust air leaves the air handling unit from its lower level. This will prevent the risk of exhaust air shortcircuiting to the outdoor air and the risk of water entering the ventilation system.

Complements and accessories

Outdoor installation

GOLD units equipped with the roof, air intake section and exhaust air hood accessories can be installed outdoors. The roof cannot be used on GOLD air handling units with the fan outlet/inlet positioned on the top of the unit.

Exhaust air

Outdoor air

Extract air

Supply air

27

50-200 50-200 5555 76

Page 97: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

355

710 (04/05)745 (07/08)

A

B

Mechanical equipment

Complements and Accessories

GOLD Sizes 004/005 and 007/008StandGOLD RX, rotary heat exchangerGOLD SD, Supply air and extract air handling unitsSpecially designed stand, whose height makes it possible to arrange ducts under the air handling unit.

The stand is made of galvanized sheet steel profiled sec-tions. The stand is supplied in assembly kit form. The long sides (A in the illustration) are used for horizontal installa-tion and the shorter sides (B) are used for vertical installa-tion.

Set of support legsGOLD PX, counterflow heat exchangerSpecially designed set of legs, the height (745 mm, all sizes) of which makes it possible to arrange ducts under the air handling unit.

The set of legs consists of four legs made of galvanized sheet steel profiled sections. The legs are secured by means of bolts in the base beams under the air handling unit.

Base frame, (base beams) for the COOL DX 008Specially designed stand with legs. Also used as base beams in combination with the GOLD PX

Cover holderThe cover holder facilitates the servicing and maintenance of vertically installed units. It consists of a mechanic stay with latch and is supplied in unmounted condition.

Stand for the GOLD RX/SD, Sizes 004/005 and 007/008.

GOLD - all sizesDroplet eliminatorTo prevent the condensate from being entrained by the air flow at velocities exceeding 3 m/s, the cooling coils in the casing can be equipped with droplet eliminators on the extract air side.

The material in the droplet eliminator is GLASdek, which is fire resistant and highly absorbent. The pressure drop across the droplet eliminator is low. The droplet eliminator is mounted on delivery.

The droplet eliminator can easily be inspected and cleaned.

Page 98: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221356

For GOLD A B kg014/020 458 1058 5

025/030 558 1258 5,5

035/040 658 1458 6,5

050/060 858 1658 8

070/080 1058 1858 9

100/120 1258 2458 12

B46

A

7 1431

714

31

ø6,5

ø11ø6,5

105

Support foot

Rubber tile

Type Metu connection frame

Mechanical equipment

Complements and Accessories

GOLD - all sizes Water trapWater trap for drainage of the counterflow heat exchang-er, coil heat exchanger and COOL DX chiller. Supplied with a set of connection fittings. The pipe from the water trap must be run without reduction in pipe dimension to a floor gulley.

Support footAdjustable support foot for taking up unevenness or slop-ing of the floor. The support foot should be mounted on the base beam of the air handling unit.

See the table for the number of support feet for a basic set-up (two filter/fan sections and one heat exchanger section) of GOLD.

Rubber tileDesigned to be glued under the support foot.

Slip-clampsSet of slip clamps in appropriate lengths for one joint.

Metu connectionType METU connection frame with set of bolts, 30 mm wide flange.

Max. 200 mm

GOLD/SILVER C RX Number of support feet

004 - 030 6

035 - 080 10

GOLD/SILVER C PX Number of support feet

004 - 012 6

014 - 030 8

035 - 040 12

GOLD/SILVER CX Number of support feet

035 - 080 12

Page 99: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

357

Complements and accessories

GOLD, all sizes End connection panel, GOLD/COOL DX full faceEnd connection panel for transition between GOLD or COOL DX in full face version and uninsulated duct acces-sories or duct. Version as standard GOLD end connection panel, insulated and pre-painted in Swegon's grey metallic paint (nearest comparable RAL colour: 9007).

Duct accessory with duct connection size corresponding to that of the end connection panel's duct connection size can be ordered (does not apply to sizes 100/120). See section on Uninsulated duct accessories.

The end connection panels are supplied mounted on GOLD units and unmounted on the COOL DX units.

Mechanical equipment

E

21

AC

BD

C x D correspond to the connection dimensions of the duct

For GOLD/ COOL DX

A B C D E kg

004/005 460 825 300 600 52 7

007/008 542,5 995 400 800 52 10

011/012 647,5 1199 400 1000 52 13

014/020 775,5 1400 500 1200 52 19

025/030 905,5 1600 600 1400 52 23

035/040 1079,5 1990 800 1600 52 34

050/060 1144 2318 1000 1800 52 34

070/080 1320 2637 1200 2400 52 40

100/120 1620 3340 1500 3100 56 59

GOLD RX/PX Top, sizes 025/030 Adapter, duct accessoryThe adapter is used as a transition between the fan outlet on GOLD RX/PX Top size 025/030 and duct accessories. Alu-zinc treated sheet steel.

1200

500

400

100

Weight: 5 kg

GOLD RX/PX Top, sizes 014-030 Adapter, duct accessoryThe adapter is used as a transition between the air intake on GOLD RX/PX Top size 014-030 and duct accessories. Alu-zinc treated sheet steel.

B

A

100

D

C

For GOLD A B C D kg014/020 1200 1000 400 300 4

025/030 1400 1200 500 300 5

Page 100: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221358

C

Wall

Pipework

package

B

A

H

GOLD/SILVER C Sizes

TBXZ-42 Size

A B H C

004/005 05 601 669 415 130

007/008 08 601 669 415 130

011/012 12 601 669 415 130

014/020 20 601 669 415 130

025/030 30 772 839 530 128

035/040 40 772 839 530 128

050/060 60 772 839 530 128

070/080 80 772 839 530 128

100/120 120 937 1003 640 141

Complements and Accessories

TBXZ Pipework PackageThe pipework package is used for the GOLD SD with coil heat exchanger and the size 100/120 GOLD CX units. The floor stand for the pipework package is available as an accessory. With the floor stand, the height from floor level to the thermometers on the installed pipework pack-age is approx. 1480 mm.

The following is included in the supply: The pipework package is supplied complete with insulated sheet-metal casing, pump, control valve with actuator, expansion vessel with safety valve and manometer as well as shut-off cocks, thermometers, filling valve and air purging valve. Wall mounting bracket.

Work to be carried out at the building site: Install the shunt, pump and expansion vessel at an appropriate place. Pipe route with insulated pipes to the air handling unit and between shunt, pump and expansion vessel. Electrical connection. Filling water mixed with glycol.

Communication

Communication unit, TBLZ Communication via TCP/IP, EIA 485 and EIA 232 as well as via internal web server is standard in the GOLD. The TBLZ extra communication unit is required for communi-cation via LON FTT-10 - Lon Works. The communication unit must be connected to the communication port of the GOLD unit. Power can be supplied from appropriate terminal connections on the GOLD unit.

The scope available for communication is conditional on the software and its programming. The GOLD unit in itself provides potential for comprehensive communica-tion of readings, settings and functions.

ModemAnalogue or GSM. Can be used when direct connection cannot be made to a network or communication system.

Several units can be connected to the same modem.

Page 101: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

359

Electrical and Control Equipment

Complements and Accessories

Occupant detection sensorInstead of using a timer for controlling the fans to operate in the high speed or low speed mode, TBLZ occupant detection sensors can carry out this control. As soon as the sensor registers the presence of an occupant in the room, it transmits a signal to the control unit to switch the unit to the high speed operating mode. When no occupant is regis-tered in the room, the unit returns to the normal flow mode.Connect via appropriate terminal connections on the control circuit

card.

Pressure transducerFor use in conjunction with the VAV pressure control function, when constant pressure must be kept in the ductwork. Also for use in conjunction with the heat exchanger defrosting function, when the pressure across the heat exchanger must be controlled. The connection cable is included. 1 – 15 m long cable can be selected.Connect via appropriate terminal connections on the control circuit

card.

Air quality sensorFor use in conjunction with the demand-controlled VAV function, when the airflow of the air handling unit must be variably controlled by means of an air quality sensor. Available for duct or room.Connect via appropriate terminal connections on the control circuit card.

VOC sensorFor use in connection with Wise Apartment or demand control of the GOLD. To be mounted inside an air duct.

Wiring is to be done on the control circuit card's communication bus.

Room sensor, outdoor/room sensor Used in conjunction with functions that require temperature readings from outdoors or from rooms. The sensor is designed for wall-mount-ing and is available for degree of protection IP 20 or IP 43.Connect via appropriate terminal connections on the control circuit card.

Internal duct temperature sensorUsed in connection with the extract air regulation function or as a temperature monitor/alarm for the GOLD RX. The sensor is supplied with the length of cable specified by the client in the purchase order, 1 – 10 metres.

Extract air duct, temperature sensor This can be used in conjunction with the evaporative cooling and Xzone extract air regulation functions, for example. The sensor is supplied

with a 7 metre long cable.

TimerThe ELQZ timer is used for overtime operation in conjunction with the external high speed and external low speed functions. For strap-on mounting.Connect via appropriate terminal connections on the control circuit

card.

Timer, electronicThe TBLZ electronic timer can be used for overtime operation in conjunction with the external high speed and external low speed fun-ctions. For strap-on mounting.Connect communication cable leads to appropriate terminal connec-

tions on the control circuit card. Separate power supply

Push buttonThe ELQZ push button can be used for overtime operation in conjunc-tion with the external high speed and external low speed functions. For strap-on mounting. Can be selected with or without indication.Connect via appropriate terminal connections on the control circuit

card.

Extension cables 5 metres long for air heater, water and electric 8 m long for hand-held micro terminal, supply air temperature sensor, pressure sensor and

IQlogic+.

Extension kit for pressure sensor or external temperature sensor For lengthening the cable, 6 - 50 m.

IQnavigator hand-held micro terminal with WLAN IQnavigator hand-held micro terminal with WLAN for wireless con-nection to the IQlogic control card. Net adapter for hand-held micro

terminal

Strap-on sensor Temperature sensor for mounting against the surface where readings

are to be taken.

Fire and smoke protectionThe fire and smoke protection function consists of three separate units:– TBLZ cubicle– TBLZ smoke detector– ELQZ* damper actuator.

the cubicle contains the control unit and connections. the smole detector stops the air handling unit and controls the damper actuators to close the dampers. Am alarm is presented in the hand-held micro terminal of the GOLD air handling unit.

SD card Multi-media circuit card for program transmissions and logging.

230/400V Transformer For connecting the air handling unit to 230V mains power supply.

Transformer, 230/24 V ACFor connecting 24 V AC electrical components to 230 V mains voltage.

IQlogic+ The IQlogic+ functional module is used for extra functions for which the inputs and outputs are not included as standard in which the control

unit of the GOLD air handling unit. 1 – 15 metre long connection cable

Temperature sensor, IQlogic+ Temperature sensor, for the IQlogic+ module

Humidity sensor, IQlogic+

Temperature sensor, for the IQlogic+ module for dehumidification and dew point control.

Page 102: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

GOLD

We reserve the right to alter specifications. 20200221360

Electrical and Control Equipment

Complements and Accessories

IQlogic+ enclosure Enclosure for the IQlogic+ module. Equipped with DIN rail. IP65. Space for 2 IQlogic+ medium-size modules. Outer dimensions: 266 x 200 x 105 mm.

Xzone Control boxControl box for controlling one extra temp. zone, max.

ReCO2Complete set of components for controlling the function for mixing.The pressure sensor and the IQlogic+ are included. Air quality sensor to be ordered separately. The outdoor air damper must be of modulating

type.

Control of the air heater for preheatingIncludes temperature sensor for installation in a duct and the IQlogic+ with a 0.25 metre long cable.

All Year ComfortElectrical equipment cubicle for controlling the primary water circuit for cooling and /or heating. For climate beams, perimeter climate systems, etc.

Page 103: Complements and Accessories handling units/GOLD... · Wire the 400 V (5-conducter system) incoming power supply directly to the safety isolating switch. Wire the electrical power

20200221 We reserve the right to alter specifications.

GOLD

361