compendium fire
TRANSCRIPT
Government of India Ministry of Home Affairs
NATIONAL FIRE SERVICE COLLEGE Plam Road , Civil Lines, Nagpur-44 0 001 site- nfscnaqpu r.nlc.tn
Ph. No.: 0712-2560179, 2565074 Tele Fax- 0712-2560075, email- nfscnagpur-mha @nic.in
MESSAGE
am delighted to note that Inspection Circle, Jabalpur is publishing the Compendium on Fire.
I find that Inspection Circle, Jabalpur has really made a good effort to collect the complied instructi ons on Fire safety measures and different orders issued by the Governmen t of India and B.S.N.L. together with its own experi ence of fire investigations in
B.S.N.L. I am sure that this effort will be very useful as reference guide for general awareness of the B.S.N.L. staff.
I wish that Inspection Circle, Jabalpur will continue with same in itiative and zeal to publish the compendium on Fire at such time when latest technol ogies are being inducted in B.S.N.L. As it is said prevention is better that cure, the implementation of fire safety measures, are ardent need of the hour.
I congratulate the co-ordinator for making such an excellent effort for the benefit of B.S.N.L. The compendium on Fire will be useful for others who will like to deplo y the instructions contained in the compendium on fire in their organization.
I wish this effort achieves grand success .
:;e ~
DIRECTOR
NFSC, NA GPUR
tlmf 'ff<rn 'l<R, l;fuJ ~~ <'R, "R'lll, ~ ~-IJOOOl ~,~ , 91- 1J -23372424Wm , 91- 11-23372444 E-mail : [email protected]
Bharat Sanchar Shawan, H.C. Mathur Lane, Janpath, New Delhi - 110001 Tel: (0) : 91- 11-23372424 Fax : 9 1-11-23372444 e-mail : cmdbsn\@bsnl.co.in
m«f ~Wm fC;JflR;\S rllffi'l""""""'3mo
HARAT SANCHAR NIGAM LIMITED (A Govt , or India Enterprise)
MES S AG E
~~ ~&l ~ ll<i\.l ~f'li
Kuldeep Goyal Date d : November 9,2009Chairman & Managing Director
I,
..
I am glad to know that Inspection Circle, Jabalpur is bringing a comprehensive compend ium on the Fire Prevent ion in Telecom Installations which is a very essential handb ook for every Telecom Personnel.
The hazards of Fire in telecom installations are enormous and require to be controlled effectively. More important are the steps required to be taken to prevent occurrences of fires so that maximum protecti on against their out break is available. The ignorance oft he staffin dealing with such hazards cost us dearly.
Th is compendium addresses all necessary requ irement s like safety precautions to be adopted to prevent fire occurrences, action required to be taken immed iately on noticing a fire, steps to be followed during the calamit y etc. There is detailed description about the importance of fire drill / training by Fire bridge personnel which is to be observed in all Telecom Installations involv ing all staff.
The compendium contains check list for inspection of fire safety equipments, fire hazard promoters as well as a comprehen sive questionnaire to assist in accurate fire invest igation. I would like that all officers designated by Circles as fire officers shall carry out annual inspection referring this compendium and Heads of Circles shall personally monitor the status.
I am sure that this compendium will prove to be a usefu l guide to all in dealing with matters concerned with fire hazards .
I convey my best wishes to Inspection Circle team on the occasion of release of this comp endium .
, ~~~~ , t!RO~treR , ~<FSlm~"",,~ , 'fifu<;fi -110001
Regd. & Corporate Office Sharat Sanchar ShawanoH.C. Mathur Lane, Janpath , New Delhi·110001 ~ Website : www.bsnLin
I
<f>lllmm 309. 'Iffilmm""", ~"T-Sl~<tI, ~~WTlT f{;t 1ll~'5~,'It~-110001 ~,~ , 91-11 -13734064. Z3037101 (llffil m'IiR'" '3Wl)
m , 91'II-Z3734166 i-it<! , [email protected] HARAT SANCHAR NIGAM LIMITED Room No. 309. Bharal Sanchar Shawano
(A Gov! . of India Enterpr ise) Harish Chandra Mathur Lane, Janpalh, New Delhi · 110001 Ph. : 91·1 1-23734064 . 23037 101 Fax : 91·11-23734166 E-mail : [email protected]
~ft:m ~(~)
Rajendra Singh 9th November. 2009 Director (Enterprise)
MESSAGE
It gives me immense pleasure to learn that the Inspection Circle ja balpur is releasing a 'Comp endium on Fire' .
There have been many mishaps in telecom network due to the sudden outbreak of fire and huge losses which were incurred'could have been minimized ifadequate knowhow about the different protective measures to be ado pted were known to the sta ff on duty .
There is increased risk of fire inciden ces in today's telecom netw ork due to the high concentration ofdifferent types of equipments/e lements at a single pla ce. The staff on duty reacts differently on witnessing the panic created on the outbreak of fire and their efforts in extinguishing the fire are not fruitful to the desired effect.
I am sure that this Compendium will prove to be a highly necessary reference handbook to all the telecom officials.
I convey my best wishes to the Inspection Circle on the occasion of release ofthis Compendium.
~J (Raje~;Ji~lghytJ i
~1!'if.mffro~ '\:lffilWmm.R,m<l'll~Wr.~."lf~ -11000I Regd. & Corporate Olli ce : Bharat Sanchar Shawan, H.C. Mathur Lane , Janpat h, New Delhi-110001
Website : www.bsnl.in
'Iffilmm""" ,~"T-Sl~~, ~~ f.:Im:f D. ~,? .. ~,'It~-110001 ~,~ , 91-II -Z3718493 m, 91-II -Z37334H3 (llffil m<IiT('" '3Wl)
i-it<! : [email protected] HARAT SANCHAR NIGAM LIMITED (A Gov! . of India Enl"rprise)Bharat Sanchar ShawanoH.C . Mathur Lane .
Janpath, New Delhi - 11000 1 Ph.: 91·11-23718493 Fax : 91-11-23734223 E·mail : [email protected]
~.3TR.~ ~~(m)
S.R. Kapoor Executive Director (Finance)
MESSAGE
I am extremely happy to know that Inspection Circle Jabalpur has compiled a
'Compend ium on Fire' in Telecom Installations.
A fire incident in a telecom netw ork causes unimaginable havo c in terms of
disruption ofserv ices, great inconvenience to customers and public in general and requires
huge expenditure to revert back to norm al working conditions. Even a few hours of
disruption oftelecom network incurs a mammoth loss ofrevenue.
H is very es sential that all staff must have awareness about the precaut ions to be
taken on regular basis to avoid any fire incident and in case ofany mishap , they mu st know
the correct way to deal with such situations to minimize the loss. Thi s compendium on Fire
gives an apt description about actions to be taken on outbreak offir'e. Simple precautionary
measures to be adopted by staff for prevention of fire incidents would go a long way in
main taining the network in perfect ord er.
I am certain that this compendium will prove to be a very useful reference to
every Telecom official.
I congratu late Inspection Circl e on the occasion of release of this very useful
compendium.
~s -<" - -(SitKa~r)
~1!'i~~ :\:lffil~m.R,m<l'll~Wr,~ ."lffcr.;<;ft-lI0001 Regd . & Corporale Office : Sharal Sanchar Shawan , H.C. Mathur Lane, Janpalh, New Delhi-110001
Webs ite: www.bsnl.in
.f.~l~ 308 ,1lRO*'mll'R, ~~ll1'P<'R , ~~~D,rx~ .. iiRlI>l , ~~' 1I000 1 ~ ~.~ . 91- 11-23738999 (tlffiI lmiR """""')
iii'Rl . 91- 11-23734242 i-ir.I . [email protected] HARAT SANCHAR NIGAM LIMITED Room No. 308, Bharat Sanchar Bhawan.
(A GoV!. of India Enterp rise) Harish Chandra Mathur Lane. Janpath, New Delhi · 110001 Ph, : 91-11-23738999 Fax : 91-11-23734242 E-mail : [email protected]
~qtrq[ ~ (m~.'I< )
Rajesh Wadhwa Dated : 9~ November, 2009 Director (CFA)
ME SS AGE
I am happ y to learn that Inspection Circle, Jabalp ur has compiled a compendium on 'Fire in Telecom Installations'.
There have been num erous instance of heavy losses to equi pments and sever disrup tion is services due to sudden outbreak offire in telecom prem ises. Effort s put is by our ded icated staff over the years in insta lling and astutely maintaining the telecom systems are abruptly nullified during such nightmares .
Due to pressi ng day-to-day opera tiona l requirements in today 's challenging telecom scenario, preparedness to seriou sly understand the nuances of fire protection and what to do in case of a sudden and unexpected fire incident often takes back sea t. Th is compendium prepared by Inspect ion Circle is comprehensive and contains very usefu l informa tion about fire protection methods and what to do iffire takes place.
What to-do methods have been devised in the compendium in a mann er which is very easy to understand and follow even by a non professio nal? Various protective measures have been highlighted , including demonstrating it practica lly through regu lar fire dri lls by Fire Bridge personne l. Inclusion of a very good questionna ire on fire investigations will really help in accurate findings on the caus e of the fire.
I am sure that this compendium will be a very useful reference to every telecom officials.
I wholeheartedly place on record my appreciation to Inspection Circle on the occasion ofrelease ofthis compendium.
~
IlRO *'m ll'R, ~~ ll1'P"fR, ~~~D,f(I)" 'OFIQ'l,~~-IIOOO I ~ ~.~ , 91- 11-23734073iii'Rl . 9 1- 11-2373 4075 (tlffiIlmiR""""')
E-mail : [email protected] HARAT SANCHAR NIGAM LIMITED (A GoV!, of India Enterprise)
Janpath, New Delhi -110001 Ph. : 91-11-23734073 Fax: 91-11·23734075
Bharat Sanchar Bhawan. H.C. Mathur Lane.
a-mail : [email protected]
~~~ ~(~~) ;ft .~,lfol ,1f<'I.~
R. K. Agarwal Director (Consume r Mobility) B.S.N.L. Board
MESSAGE
It gives me great pleas ure to learn that Inspection Circle, Jabalpur is bringing out
a compendium on Fire in Telecom Installations. This assumes more importance as
telecom munication has become one of the most essential infrastructure for the economic
growt h. There is co ncentration of state of the art switches both for fixed lines as well as
mobile in a compact space. Thi s requires all precautions to be taken to prevent fire hazards
which may invo lve not on ly huge losses but also disrupt ion of communication for long
periods.
I am sure this compendium by Inspection Circle covers various aspects to
analyse likely causes offi re and the preven tion measures to be taken. I am certain that this
will prove to be a very useful refere nce book to all telecom officials.
I convey my best wishes to Inspec tion Circle on the occasion of release of this
compe ndium.
~~rw~
~ 'QOi ~~ , '1lT« Hi'<lR 11cA, -.mr ~ llT~ iR, 'iR'l"J , "Ii~ -110 001 ~'QOi~~ ' 'l:il'\<l #<m:11cA , -.mr~llT~ iR,~, ''Ii~ -11 00 01 Regd. & Corporate Office : Bha rat Sanchar Bhawan , H.C. Mathu r Lane. Janpath, New Delhi-110001 Regd . & Corpo rate Office : Bharal San cha r Bhawan, H.C. Mathur Lane , Janpath, New Delhi-110001
Website : www .bsnl.in Website: www.bsnl.in
' C
Bharat Sanchar Bhawan, H.C. Mathur Lane, llffif ~Wm ~rn) .. Janpath. New Delhi - 110001
('Ilffillm'R"""""')Ph. : 91-11-23329690. Fax : 23329691 Email : [email protected] BHARAT SANCHAR NIGAM LIMITED
(A Gov! . of India Enterprise)
J.K.Roy Executive Director (Corporate Affairs) B.S.N.L.
MESSAGE
It gives me immense pleasure to learn that Inspection Circle, Jabalpur is releasing
a compendium on Fire hazards in Telecom Installations.
In the past heavy losses were incurred due to fire hazards in Telecom Installations.
In most of the cases, it has been observed that there is lack of knowledge on fire methods
and also lack of preparedness to handle such incidents.
This compendium from Inspection Circle addresses the causes, which are likely
to induce fire and the methods to be take n to counter the same . It also deals with the
precautions to be taken to prevent occ urrence of such incidents. The importance of
attending fire safety drill given by Fire Brigade perso nnel as well as a questionnaire to be
used during investigation on fire incide nts are included in this doc ument.
I wish the release ofthis compend ium a great success and congratu late Inspection
Circle for bringing out this highly useful handbook which will be beneficial to each and
every Telecom officials.
k( J . K. Roy)
m«l""" ",,",. ~~~~. llffif ~Wm F::.f'?,) .. ~. 'lf~-11000 1 ~,~ , 91 -11 - 23714070<!;<m , 91 -11 -23734072 ('Ilffil~""=)
Ecrnail : dirhrd@bsnl. co.in BHARAT SANCHAR NIGAM LIMITED (A Govt . of Ind ia Enterpr ise) •
Janpath. New Delhi - 110001 Ph. : 91-11-23734070 Fax : 91-11-23734072 e-mad: [email protected] .in
Bharat Sanchar Shawan, H.C. Mathur Lane,
~~ ~(1fi'.l . 3l'R .)
<ft.IRl.tF!.lf<'!. .m Dated : 5~ November, 2009
Director (HR) Gopal Das
B.S.N.L. Board
MESSAGE
I am very happy to know that Inspection Circle, Jabalpur is releasing a very useful and ideal compendium on fire in Telecom Installation.
Fire is the most lethal destruc tive element known and inflicts unimaginabl e damage and loss to Telecom Installations which is very hard to recover. It is, therefore, important that everyo ne should have a sound knowledge about various methods on prevention of the fire and the immediate actions to be initiated on noticing a fire, etc.
Operation and maintenance staff who keep busy in their allotted works somet imes do not possess enough knowledge about fire prevention and its consequences and tend to act in a hurry on the first outbreak of fire, resulting in further escalation to damages. This compendium on fire brought out by Inspection Circle is an exce llent reference book dealing with all concerns about fire incidence in Telecom Installations.
This compendium also highlights required details on personnel safety during outbreak offire which is highly appreciable. In addit ion to fire drill, I would sugges t the Heads of the Circles to depute their staff for training on the subject regularly.
I congratulate Inspection Circ le on the occasion of release of this very essential compendium.
>----(GOPALDAS)
~~f.P1flr<I~ ' 1ffii!~~,~~ 1!T~ iA,~,'li~- I I O OO l Regd. & Cor porate Office : Bharat Sanchar Bhawan , H.C. Mathur Lane. Janpath, New Delhi-110001
, Web site : www.bsnl.in
'"
.// '0 ..:>
r ---- ---------------- ',, r~ ~"'~
:(1; ;':11-"
/\ .-\ {;- 1-CIb/II WI \( ;! . ~ .._ f(i: 'J. ~:~~ O'~l
r-r-» -- N :;/\ \1 ~ - J.II 'e ! A<I /' SORvfR ,OJIPV[\ T"V. I ; 5.l15XiS25
I
(): '~ ) i\ I ~ ' I ( '1<S )I _it: ~ I):ll)l i:ll1tN 00.£ -..~ •. ss (J I3~·.;S q~) , ~ ¥N ~ J.H:O 3 ")':'~ 'JII ~rv r- fA...:i:: .1. &'0) F ~ :lI,l F!lI!
i
us !!lA' flII1 [St~ PAtx..a: 1l.000000 >"'Cl:. 1.11$1 'LlF'1
!
I I j ).,l'; I~ ~'\U':O Il : S
· ' ' ' 'IX~:~i:~ i ,;",t ;; ~:, .~ r ~~,~~ ; ~A)1{~i;;gf~~ ~~ ~ i~i I I.IP S"l "'R '" ....;» ~. 4f. l"-'5-.l:) l.OP.:: ~ 6 '.
Ii ~~:=~ ~;= .'~:: :" =~~'=t;~;, ~; I :""av [l..A;( J C:)lr,I ;) cc , 1';56~:c ~ . " 2
I~~-~ei'''--- r~:~ !71~ -.-.~:~9---··--t~~~}~~LI I', l~ e-: (l • ; ;:r f\(; ~ cc·':<J c. r.c ::...- 1)' lc- rc , -:; ":1O... .=: I :.5. ::»<.A Q:. "' ".' ,!J ~ ; ;"r:; lj';"~",,"~ I X k VO\ u::- n~ ...~ ..'
)'.: I I SC'·t'R )~,-(s·
f::1;;l.Sm R(~;\nV 1$.;.'1 ~ 1J : i "'<- S " x S l H'It.~S
·R;), I}.' d *. I-l'V':. ~S
':, \' ~ hl( , ~-;;-~_;;c ,_.; ~~
i ~;'- i3.,~~ ;. ~j' ~'rrR
I r . ~aUCi l :ll 'lOll rl..'l ~t
' \ C-· :~ s
:1. iU JI \'E';S1 C~ 5 ARc i ~ ~IJ .UI"ES5 O Tli , R;~ s( SlA'I0. I . 1'<R1I1EN D1 V ,~ S:O~ O~,Y ' H._LL :Jl: FO LLO~~D
;3. lOP Q; Cf'mEL \"-LE, 'l L;,@ WT,! If< i Fl. uv I ~ C(llR IG~R
i•. ~:v CNJ "A C-H d C-'5 su OF I ,'jS; ~ LrD IN,Ii, fI, LEY . & uPS R~ . R£S:JfCTVt:, -. C- '6 ~\ I OC fO, ftiU,[ , ~: s rHA~ CI
:5. PAC /Ill :" 8( lE ~ ALLEr: to: ]{) ~ 8 ~'5 R~) , q~S T RlJ 'J .3Rll f ... ,~ uPS R~ , INGR f, ~ 2 \ 0, >00 fU T, RE I\S'l llAll)i.
6 ,,\~S ~C' : ;~ cs 100G, U' SEGO & F ~O RAf,I(S£ ~~ u:TEO & '0 ,[ R:FlR Te' II-[ lll ,l~ 'JiG S" U,' TIOBIlL ~ IE.02.08
i CHA~ ~ E L DIV.(WCliXD< ;>'H) « NO A1 CC RROCfl S·CR AGE F0, - 3OJXI OC - CO,RDCR - 2 NO.
TApt LERARY La - 1:0X75 - CO,RDOR -- 1NO. ~nW~RK 'ill. UIP - nlXIOO - CO,ROaR - 5 NO rApt L:BRARYUfP. - JO] 11 OC - CO,ROCR - I NO.
; I ~ C4,:): K.J > .:J , ~,: I\."~ l \ : ltt R":' .it ,.t~ n~ Ii ·tJ..~ ' ~OC r: ;\ CUWX ; ,
~ ~ C., ;)~ 1\.i1 : l lJ,')- t.OC r, ~r sr ;\ IV I il .oll)\.- r.... ':r 3lJS. ):;; ~.N <; 1~ , J;, 1\ rs: P. .L,q R'J.
! l~ P< )].O?' K.fl ~. ' :J. :1" Ii\ P .i ,'; ( } F, f r;.J(:'.';A":' :'llr Ii \ ;: ;;. i I C'. 08 1\.0 '\. : ~ no·.j t.F ~ Xl? ), ~ :Ci RIJ(R, P.ol( ~ CC....·.
: ,: r:: f1~R ~ :~ ~ ;- I.e.rr~ tl1W: ,f: .\;Y (l \j»i c: K,:). ,. IP ~} ,·~,n !k'LtJ ~ 1< '.t '? }.."' H <{ H)
. :1; C ~ nBR ~ :;,:" ~ .~~ rn: ~r. !t ,I,; .')-{lN
OI ! ICl 'IAU 1 v: .)01IK,'..). :lP (f,~1:'., rR ~'j ;ru, A'. ff.< 1( ' I) . . & C,\BIN ' ;U C' ;\AA . C:' '; :, ,lS ~l{ ~'~ C & :'.DI ' (l!-j
:.'4 ' 7.0.' K.S!. . IF C!-.t.>lf : FRW ~ Ri ~ J..'1 FB ~'0.
1:.12.: l K.1 .\.::rlO\ C ~m£ 0 ,; .[ ~~ ;J.~ ' PRer i:-:J..:":S ~. r" ,~n l J~ ~ _:.. ... .~~-( S ~h l~ l .s..C.Rt IU{'': IlJCI MJ:>IJ .~ FlK1:1C CI 1I.: .i .1I:
" 2, ~) I K.D. I.L' (II;.
fie'!, N·:; cv t I c '&-lTlli:lN R:<S
S~ t\ I:)\ ",RC!-'TEC II, ~ OL K I"l i\.
) ,\-1! J S~ _ /KC ; :: C)/19Q/
OR ~ K0, - 1] S-:"ll : - ' rc
C:F/ ~:. - :.: MJ3-lj( el.~:. . ~ICV Ci
CD'\ B:LLI NG DJl,TA CLNTm AI S)~ - ~: to S,/H - r ~ I -' Silo' --H" 10 K;nJ" -- ~ ~ : -- -1 i:'~') 1 ~' i V n£ .l. i<1,s :::XCHANGE BULi)ING AT SALT LAKE ii:J: - IO~ :: RX - ~ J'3 " " :"-0
~jY: ~ , ~~ ~'( l :rw~~\il ~~~~ -i.~ ~ I LAYOJ T CF WN.. i S SHO\\Ii\G CA3J CC N.~f C TiON fN "1 ) '- R~': l D H~~ ii )..~ . RS':,; l
:;H/,'I.lNLS "/11{' :1.0 ~\ll 4+ ,8/_)
SCI ;,',<:J:/ S- 'l ~ t-~.: : -\ ~ C I;JI")- il' CIt..:[ :.R~ )
f C~ :'5\,. ~ ei '1 .C_. fC" Y: 'RO
This handbook contains essentials for fire protection, detection,extinguishing and utilization procedures. For new installation,fire protection manual issued by the Govt. of India Ministry ofcommunication, New Delhi dated 22nd November,1997 andBureau of Indian standard IS 2189-1988 shall be consulted.
COMPENDIUM ON FIRE[Essential Handbook for every Telecom building in-charge]
[No. BSNL/INS/COMPENDIUM ON FIRE, Dated 02.12.2009]INSPECTION CIRCLE,
BHARAT SANCHAR NIGAM LIMITED,SANCHAR VIKAS BHAWAN,
BUILDING INFORMATION(for fire )
BUILDING NAME :
ADDRESS :
CONTACTS :
NAME PHONE NO. MOBILE
FIRE OFFICER
BUILDING INCHARGE
FIRE RELATED OTHER OFFICERS
NAME PHONE NO. MOBILE
FOREWORD
Fire protection is the study and practice of mitigating the unwanted effects offires. It involves the study of the behavior, compartmentalization, suppression andinvestigation of fire and its related emergencies, as well as the research and de-velopment, production, testing and application of mitigating systems. There havebeen numerous instance of heavy losses to telecom equipments and sever dis-ruption in services due to sudden outbreak of fire in telecom premises.
Fire protection has three major goals:
l Continuity of operations-on a public scale, this is intended toprevent the interruption of critical services necessary for thepublic welfare.
l Property protection-on public, this is intended to prevent areawide conflagrations.
l Life safety.
This compendium contains very useful information about fire protection meth-ods and also suggests what to do if fire takes place. The methods have beendevised in the compendium in a manner which is very easy to understand. Vari-ous protective measures have been highlighted. Inclusion of a very good question-naire on fire investigations may be useful in accurate findings on the cause of thefire.
This assumes more importance as telecommunication has become one ofthe most essential infrastructure for the economic growth. There is concentrationof state of the art switches both for fixed lines as well as mobile in a compactspace. This requires all precautions to be taken to prevent fire hazards which mayinvolve not only huge losses but also disruption of communication for long periods.
This compendium covers various aspects to analyse likely causes of fireand the preventive measures to be taken.. We have complied instructions on Firesafety measures and different orders issued by the DOT/ B.S.N.L. This compen-dium addresses all related issues like safety precautions to be adopted to preventfire occurrences, action required to be taken immediately on noticing a fire, stepsto be followed during the calamity etc.
I am sure that the compendium will prove to be a very useful reference bookto all telecom officials
JAMUNA PRASADCHIEF GENERAL MANAGER,
INSPECTION CIRCLE.
ACKNOWLEDGEMENTS
Inspection Circle, Jabalpur expresses deep regards to Shri Kuldeep
Goyal, CMD, BSNL and Shri Rajesh Wadhawa, Director(Operation), BSNL board
for giving opportunity to publish this “Compendium On Fire”. Also, sincere thanks
to the Directors and Executive Directors of BSNL board for their valuable sugges-
tions and instructions for publication of the Compendium. MSE Cell has provided
related letters & circulars for protection of fire which very helpful to publish this
compendium.
National Fire Service College, Nagpur, Ministry of Home Affairs at Nagpur
university has actively co-ordinated during preparation of manuscript. In addition,
Shri Shamim, Director and Shri D.K.Saha, Asstt Director, has added the chapter
on 'Safety for office building'. Inspection Circle thankfully acknowledges their con-
tribution.
We are specially thankful to Shri Gautam Guha, GM(IT Project Circle),
Calcutta and Shri H.L.Agrawal, EE(Electrical), Telecom Electrical Division, Nagpur
Telephones, for providing diagrams of fire protection in Data Centre,Kolkatta and
model rural telephone exchanges,Nagpur respectively.
Shri Manish Shukla, DGM(RTTC), Nagpur and Shri Manish Hairat,
DE(E), has enriched the manuscript with latest orders from DOT and Ministry of
Home Affairs.
Shri Ram Krishna, GM(North), New Delhi coordinated with BSNL Corpo-
rate Office for important suggestions and comments. Shri A.K.Upadhyay,
GM(South), Inspection Circle, Jabalpur also coordinated from time to time and
extended valuable suggestions.
Shri Jamuna Prasad, Chief General Manager, Inspection Circle, Jabalpur
had kindly extended moral support for publication of the compendium.
Shri C.P.Gathibandhe, AGM(A), Shri S.Ejazuddin, SDE and Shri
R.B.L.Shrivastava ,Sr.SDE was instrumental in preparation of the basic document.
Shri J.S.Tomar, DGM(A), has compiled and corrected the document.
Shri I.K.Dutta, AGM(TR/SW), Shri A.Malla, A.O.and Shri S.N.Singh, JTO(IT),
responsible for generation of printable format and preparation of printing.
I shall specially thank Shri H.L.Badgainya, JTO(PTCC), who had co-
ordinated all the jobs upto publication of the compendium.
G.C.MannaGeneral Manager(HQ)
Inspection Circle, Jabalpur.
Compiled and issued by Inspection Circle, Jabalpur in November 20095
CONTENTS Page
CHAPTER - I
INTRODUCTION 7
CHAPTER - II
ELECTRICAL INSTALLATIONS, PRECAUTIONS AND CHECK POINTS 9
CHAPTER – III
FIRE EXTINGUISHING APPARATUS 11
CHAPTER – IV
MAINTENANCE OF FIRE FIGHTING APPLIANCES 13
CHAPTER – V
FIRE DETECTION AND ALARM 15
CHAPTER-VI
AWARENESS AND RESPONSE TO FIRE 19
CHAPTER-VII
ADMINISTRATIVE INSTRUCTIONS 21
CHAPTER – VIII
GENERAL PRECAUTIONS / SAFETY MEASURES FOR PREVENTION OF FIRE 23
CHAPTER – IX
LIGHTNING PROTECTION AND EARTHING 28
CHAPTER – X
INSPECTION SHEET SCHEDULE FOR FIRE OFFICERS/INSPECTION OFFICER 30
CHAPTER – XI
SAFETY INSTRUCTIONS AND ACTIONS ON FIRE 33
CHAPTER – XII
QUESTIONNAIRE FOR FIRE INVESTIGATIONS 38
ANNEXURE-I
LIST OF ORDERS 44
ANNEXURE-II
SAFETY FOR OFFICE BUILDING 69
ANNEXURE-III
MAJOR FIRE INCIDENCES 70
ANNEXURE-IV
MODEL FIRE EQUIPMENT PLAN FOR RURAL EXCHANGES 74
ANNEXURE-V
MODEL FIRE DETECTION AND SURVEILLANCE FOR DATA CENTRES
Compiled and issued by Inspection Circle, Jabalpur in November 20096
BUILDING MAINTENANCE RECORD
1. FIRE DRILL INCHARGE DATE SIGNATURENAME
2. INSPECTION — — “ — — - — — “ — — -
3. REFILLING ——“——- — — “ — — -DONE
Compiled and issued by Inspection Circle, Jabalpur in November 20097
CHAPTER I
INTRODUCTION
1.1 Scope:
Compendium on Fire covers the following aspects:
(i) Surveillance in general
(ii) Fire detection and alarm.
(iii) Fire Extinguishing apparatus.
(iv) Safe exit for occupants in the case of fire.
(v) Information of Fire and Fire fighting.
(vi) Role of Inspection Circle.
(vii) Reporting and recommendations.
1.2 Preamble:
The geographical and climatic condition of the country
makes many different disciplines and attitudes in regard to design
of buildings and selection of materials. Good housekeeping, gen-
eral tidiness, control on combustible materials and awareness about
surroundings may certainly minimize the fire risks. In case of fire
incidence, provisioning of efficient fire detection and alarm system
helps in initiating timely action to control the fire. Good quality and
proper quantity of fire fighting apparatus provides strength against
fight with fire. Fixed and portable fire extinguishing apparatus fully
charged and in working condition should be available in sufficient
number at convenient locations to check the fires in incipient stage.
The norms for fire fighting apparatus should strictly be adhered to.
Fire never discriminates between living and non living. The
living build future and it must be saved on first priority. The building
design must have provision of adequate escape routes for safe
and expeditious exit for the occupants. There should be a system
to broadcast and communicate the information of fire to the agen-
cies concerned immediately. Correct and proper information facili-
tate the fire fighters to take prompt and relevant action. In spite of
many precautions, fire damages properties and lives. Telecom sec-
tor is also a witness of such hazards. To prevent the future occur-
rences of fire incidences in telecom, especially in BSNL, the inci-
dent must be investigated thoroughly for root cause. The Inspection
Circle of BSNL investigates and finds out the cause. An over view
on recent fire cases are given in Appendix A. Inspection Circle is
also reporting to head quarter along with recommendations to pre-
vent fire in future.
(Reference BSNL DO No 19-2/2009-PHM/MSE dated 25/07/2009)
1.3 Different Types of Telecommunication Systems:
BSNL has got mainly the following types of Exchanges/Systemsworking at present:
(1) C-DOT- RAX/ SBM/ MBM/ RSU, E 10B, OCB, EWSD,
FETEX-150, 5 ESS, AXE – 10 along with their remote units,
WLL systems (MSC,BSC & BTS), GSM systems (MSC,BSC
& BTS), NIB and Broad Band equipments – BNG, Tier one
two switches / DSLAM etc.
(2) Transmission Equipments- VMUX / 8Mbps / 34Mbps / PDH
/ SDH / STM-1 / STM-4 / STM-16 / STM64 / DMDM and
many other OFC and Microwave systems
(3) CDR Data Centre / NIB Data Centre / Mobile Data centre
and CSR routers etc.
This compendium is based on the need of the above sys-
tems for protection against fire hazards, considering the factors such
as design of building, environmental requirements, and presence
of persons at work place etc.
1.4 Reference:
The Standards/Codes/Reports etc which are referred in this com-
pendium are listed in Annexure-I.
CHAPTER II
ELECTRICAL INSTALLATIONS, PRECAUTIONS AND CHECK POINTS
2.1 General:
In most of the cases it is observed that the fire had taken place due
to low insulation of wirings, faulty installation or improper use of
apparatus etc. Hence the electrical installations shall generally con-
form to Indian Electricity Rules 1956 as amended up to date. All
Electrical equipments / accessories shall conform to the relevant
BIS standards.
2.2 Wiring:
l All wiring shall be in metallic conduits.
l Joint boxes, Inspection bends, drawing in boxes shall be cov-
ered at all times with metal covers.
l T-joints in power wiring shall not be permitted.
l Temporary wiring or extension circuits shall not be ordinarily
permitted.
l Lightning/power and telephone system wiring should not run
together, regarding necessary spacing relevant specification
must be followed.
l All the wirings above the false ceiling shall run in metal conduit.
The wiring used for electrical circuits should be of rating 660
volts grade of insulation.
(Indian Electricity Rules 1956 as amended up to date)
2.3 Earthing:
All earthing leads and earth connections shall be tested for electri-
cal resistance to ensure efficient earthing before electrical supply
line or apparatus is energized. In addition, earth resistance shall
be tested at least once in every year during dry season in addition
to routine testing of earth. Resistance measured shall be recorded
in log book. Earth continuity tests should be performed as per IS-
3043 as amended up to date.
Compiled and issued by Inspection Circle, Jabalpur in November 20098
Compiled and issued by Inspection Circle, Jabalpur in November 20099
2.4 Insulation:
Electrical circuits shall be tested between each live conductor and
earth with a 500v megger for a period of one minute and the result
should be at least one Mega Ohm or as specified by BIS from time
to time.
2.5 Essential circuits:
Separate circuits for water pumps, Lifts, Staircase & corridor light-
ing and blowers for pressurization systems shall be provided di-
rectly from main LT panel and these circuits shall be laid in sepa-
rate conduits so that fire in one circuit will not affect the others. All
switches controlling essential services shall be clearly labeled.
2.6 Fuses and Fuse Boxes:
Adequate protection/isolation should be available in the AC and
DC distribution systems by provision of fuses / circuit breakers.
The circuit breakers shall have manual tripping facility also. Only
cartridge fuses or HRC fuses shall be used.
It is absolutely essential to ensure that fuse wire of correct rating
only to be used in A.C. distribution system. The Officer in charge of
electrical installations should carry out routine check for fuses once
in a month. The SDE/Building Incharge should check the fuses
once in a year. Senior Officers on routine inspections may also
insist on test check of the fuses. Records of all such inspection by
the officer-in-charge, SDE and remark of the Senior Officers should
be noted in log book maintained in the sub-station.
(Reference BSNL DO No 19-2/2009-PHM/MSE dated 25/07/2009)
CHAPTER – III
FIRE EXTINGUISHING APPARATUS
3.0 Fire fighting apparatus :
Broadly there are two types of fire fighting apparatus namely:
1. Fixed fire apparatus
2. Portable fire apparatus
3.1 Fixed fire apparatus :
All buildings above 15m in height shall be protected by wet
riser system conforming to relevant specifications/ NBC/BIS code/
City fire Bye-Laws.
3.2 Portable fire Apparatus :
Sufficient number of portable fire extinguishers shall be
provided at conspicuous locations in the building after considering
the type of fire probability. The extinguishers shall be hung on brack-
ets and shall have their bottoms 750 mm above the floor levels.
Some of the extinguishers shall be mounted on wheels to facilitate
movement. Extinguishers shall not to be kept too close to the equip-
ment.
The extinguishers shall be so provided that a person does
not have to travel more than 20m to reach the nearest extinguisher
in case of office building and small Exchanges. However, for the
main telecom buildings, the travel distance should not be more than
15 meters.
The operating instructions shall be legible and preferably
bi-lingual clearly printed on the body of the extinguisher. The in-
tended use of the extinguisher i.e. the type of fire for which it is
suitable shall be marked on it. Extinguishers with ISI markings only
shall be provided and the refills shall also be of ISI marking. (Fire
Protection Manual GOI, MOC, DOT, ND Dated 22.11.1997)
(Reference BSNL DO No 19-2/2009-PHM/MSE dated 25/07/2009)
Compiled and issued by Inspection Circle, Jabalpur in November 200910
Compiled and issued by Inspection Circle, Jabalpur in November 200911
3.3 Fire Buckets:
Four round bottom buckets painted red and lettered “FIRE”
on it having two filled with water and two filled with sand shall be
hung on stand outside the equipment rooms, sub-stations and in
lift lobbies/staircase lobbies of office building at each floor.
(Reference BSNL letter No 19-30/2008-PHM/MSE dated 18/12/2008)
3.4 Medical Equipment:
Generally in telecom buildings following medical equip-
ments shall be provided and kept in glass covered metal cabinets
at conspicuous locations for emergency use in case of fire.
Gas Mask Respirators-1 Nos. on each floor
Resuscitators – 2 Nos. on each floor
Breathing apparatus – 2 Nos. in each multi storied building
The above medical equipment shall be placed in glass front
metal cabinets at conspicuous locations. In addition, first aid box
shall also be provided at conspicuous locations at each floor and in
fire control room. The expiry date of medicines in the first aid box
be checked and replaced periodically if required.
3.5 Latest developments and research:
Constant research is throwing new smoke sensing tech-
nology and new smoke suppression technologies and end prod-
ucts which are adding to earlier detection of fire incidences as well
as ensuring faster suppression of fire hazards.
(Fire Protection Manual GOI, MOC, DOT, ND Dated 22.11.1997)
CHAPTER- IV
MAINTENANCE OF FIRE FIGHTING APPLIANCES
The firefighting equipment shall be kept in good working order at all
times.
4.1 Fire alarm & Detectors :
Maintenance schedule of the fire alarm and detection sys-
tem should be drawn up in consultation with the manufacturers.
A log-book to record the inspection notes, details of replace-
ment, modifications, abnormal behavior observed, corrective mea-
sures etc. should be maintained.
Following points should be checked during inspection to be
carried out once a month by the Fire Safety Officer –
(i) Check the working of the fire alarm points
(ii) Control panels clean and free from dust
(iii) All relay contacts to be cleaned by CTC or similar
cleaning agent
(iv) Detectors heads to be free from spider webs, birds’ nests
and other insects.
(v) Back up batteries in charged condition
(Reference BSNL DO No 19-2/2009-PHM/MSE
dated 25/07/2009),
4.2 Fire Telephone :
The non-exchange line fire telephone for communicating with the
fire brigade shall be checked daily by the respective floor warden.
(Reference BSNL DO No 19-2/2009-PHM/MSEdated 25/07/2009),
4.3 Monthly Inspection of fire extinguishers :
Following procedure should be followed for monthly inspection,
testing and maintenance.
Compiled and issued by Inspection Circle, Jabalpur in November 200912
Compiled and issued by Inspection Circle, Jabalpur in November 200913
Sr. ITEM TO BE CHECKED OBSERVATION/No. REMARK
1 Check the exterior of the extinguisher;polish the painted portion with waxpolish, brass parts with metal polish,and chromium plated parts with silverpolish.
2 Check the nozzle outlets and ventholes and the threaded portion of thecap for clogging and check that theplunger is in fully extended position.
3 Check the cap washer, grease thethreads of the cap plunger rod andwipe clean.
4 Check all mechanical and movingparts thoroughly.
5 Make sure that the extinguisher is inproper working condition and is not ac-cidentally discharged.
6 In case of CO2 type fire extinguisher,
check the weight of the extinguisheras per periodicity mentioned. If thereis a loss of more than 10% in weight,send the cylinder for refilling.
4.4 Annual Inspection
(i) A more thorough inspection of the extinguishers shouldbe carried out annually. Any extinguisher showing corrosion of thebody internally and externally should be replaced. Faulty, damagedor corroded parts should be replaced. Illegible label should be re-placed.
(ii) Pressure and leakage test of each extinguisher should becarried out.
CHAPTER – V
FIRE DETECTION AND ALARM
5.0 General:
Prompt detection of an out-break of fire in its incipient stage
and simultaneous operation of fire alarm for quick and correct ap-
plication of fire fighting media, minimizes the loss from fire up to a
great extent. Primary purpose of fire detection system is to respond
to a fire and to transform this information into a visible and audible
alarm which should alert the building occupants. Auto SMS alerts
to concerned senior officers, if available, should be extended.
5.1 Manual Fire Alarm:
Small and medium capacity exchanges not exceeding 2k
lines shall have manual fire alarm system. For the purpose of de-
sired alarm system, the building shall be divided in to a no. of zones.
Where ever manual fire alarm system is provided, the building shall
be divided into number of zones. In multi-storied buildings, each
floor shall constitute one or more zone depending on the area of
the floor.
Fire alarm switches/call boxes shall be mounted at conve-
nient locations in the zones. The call boxes shall be accessible to
all occupants without having to travel more than 22.5 m. The call
boxes shall be so installed that their location is easily noticed from
either direction. The base of call boxes shall be at a height of 1.2 1
m. above the floor level. The manual call boxes shall be colored
RED.
5.2 Automatic Fire Detection System:
All buildings above 15 m. in height and all Digital Elec-
tronic Exchanges shall be provided with an automatic fire detec-
tion system. The zoning shall be as per latest guidelines over the
Compiled and issued by Inspection Circle, Jabalpur in November 200914
Compiled and issued by Inspection Circle, Jabalpur in November 200915
subject. In case of Electronic Exchanges, false floor plenum and
false ceiling (attic spaces) if provided, shall constitute separate
zones.
The layout of the detection system shall generally be in
accordance to guidelines contained in IS 2189-1976 as amended
up to date.
The detectors should be of rate of rise heat type and smoke
type. Wherever smoke detectors are provided, a mixture of photo-
electric & Ionization type, will be used. The heat detectors shall
satisfy the tests laid down in IS 2175 as amended up to date (Speci-
fication for heat sensitive fire detectors). The smoke detectors shall
conform to relevant NFPA/UL Standards.
The detector density of smoke detectors in the switch rooms
and OMC room of Electronic Exchanges shall not exceed 25 Sq m.
per detector. In ventilated floor voids, the detector density shall not
exceed 20 Sq m. per detector. In other areas where heat detectors
are used the detector coverage shall be as per IS 2189-1976 as
amended up to date. Rooms divided into sections by walls or parti-
tions reaching within 300mm of the ceiling shall have a detector for
each section.
Hoists, Elevators or similar openings and supply & return
air ducts of air conditioning system shall also be covered by detec-
tors. In return ducts, the detectors should be located directly after
the last air extract aperture before the air enters a common duct. In
supply air ducts the detectors should be located sufficiently away
from points of turbulence such as bends, junctions and air inlets.
Detectors in supply & return air ducts shall be connected to sepa-
rate zones.
Whenever automatic fire extinction system is adopted suit-
able cross zoning shall be done in the detection system in order to
avoid unnecessary action in case of accidental triggering of any of
the detectors.
Photo –electric detectors sense the light emitted by the
flames and trigger the fire alarm where as the ionization detectors
sense the smoke and trigger the fire alarm. The Heat detectors
sense due to heat and trigger the fire alarm system. Heat detec-
tors should be installed in the E/A rooms.
The supply air duct of centralized A/C system should be
provided with fire damper and the same should be inter linked elec-
trically with the fire alarm panel. Whenever there is a fire alarm the
fire damper should close and the entire air conditioning system
should shut down.
In the multi-storied building each floor should have a con-
trol panel and along with the diagram indicating the differed zones
and the detectors. Any alarm in the control panel of any of the floor
will be repeated in the Main control panel provided in the fire con-
trol panel or in the entrance lobby of the building.
There are mainly following three functional entities in fire
detection systems
a) Manual call point / (MCP)By breaking the manual call points the
attention of the other people are drawn. This is connected to the
Main control panel. This should be tested periodically.
b) Response Indicators / (RI). Response indicators are to be pro-
vided outside the locked rooms, for detectors in the false floor &
false ceiling areas and they are to be properly sign written.
c) Hooters: Function of all the hooters are to be tested periodically
(Reference BSNL DO No 19-2/2009-PHM/MSE dated 25/07/2009),
5.3 Control Panel :
Each floor of the building shall be provided with a control
panel and indicating panel. A central indication panels (Main panel)
to which detectors, circuits in all the zones are connected shall be
installed in the fire control room or in the main entrance lobby on
the ground floor of the building. Light indications on the panels shall
enable the fire crew to identify the fire site/ location..
Compiled and issued by Inspection Circle, Jabalpur in November 200916
Compiled and issued by Inspection Circle, Jabalpur in November 200917
The alarm system shall provide both alert alarm and evacu-
ation alarm with different Distinctive tones and should be extended
to all floors and switch room locations.
The alarm system shall have a battery back up so that in
case of mains failure, the battery can take over and feed the power
to the system.
The alarm system shall also incorporate following faults signals:
(i) A.C. failure – To indicate mains and take over by back up
batteries.
(ii) Battery condition to indicate low battery voltage
(iii) Circuits fault – To indicate fault in a particular circuit.
The central indication panel shall be connected to a Public
Address system.
5.4 Public Address system:
For the whole Fire detection system there should be single
Public Address system having amplifier, Mike, Sounder at different
places, No. of sounders should be decided so that every occupant
sitting at any place in the building should be capable of listening the
sound easily. PA system is controlled through main control panel.
Periodic checking of the PA system is to be conducted to ensure its
correct operation.
5.5 Fire Telephones:
A non-exchange line of telephone, connected directly to
fire emergency manage system should be provided in the equip-
ment rooms in all Telecom buildings for direct communication with
the Fire Brigade. One of the extensions of this non-exchange line
shall also be provided at the ground floor, in the Security Cabin or at
the Reception. The fire telephone shall be tested once a week. In
recent, mobile technology like GSM and CDMA WLL, the Fire Bri-
gade number 101 can directly be dialed.
(Reference BSNL DO No 19-30/2008-PHM/MSE dated 30/04/2009)
BSNL letter No 19-30/2008-PHM/MSE dated 18/12/2008)
CHAPTER - VI
AWARENESS AND RESPONSE TO FIRE
6.1 Fire safety instructions including the instructions for response to
fire by the occupants of the building should be displayed promi-
nently in all buildings. A brief of Fire safety measures/instructions
should be supplied to all the staff members for their guidance. Im-
portant fire instruction should be displayed inside each room. This
will ensure reading of instructions by the occupants of the building.
Periodic fire safety drill exercise should be conducted at all Telecom
Exchange premises involving selected staff.
6.2 A fire safety plan for the building should be drawn up which should
specify the method of systematic and safe evacuation of the build-
ing in case of fire or emergency in the least possible time.
6.3 All technical staff in the Telephone Exchanges shall be trained to
use the fire extinguishers and other appliances. In office building a
group of staff in each floor shall be selected and trained to use fire
extinguisher and other appliances. Only those who are familiar with
the operation of fire fighting appliances shall operate them.
6.4 Identification of Fire Warden for each building along with a deputy
should be done. He has to ensure that Fire Prevention, Detection
and Fighting systems are kept in proper shape. As far as possible
the Fire warden shall be provided accommodation in the building
complex
6.5 The decision to evacuate the affected floor or floors or the whole
building shall be taken by the Fire safety Officer/Floor Warden/Dy.
Floor Warden according to the following guidelines:
Compiled and issued by Inspection Circle, Jabalpur in November 200918
Compiled and issued by Inspection Circle, Jabalpur in November 200919
(a) The most critical area for evacuation are- the fire floor and floors
immediately above.
(b) Evacuation should be through uncontaminated exists and stairs.
(c) If the stairways became unserviceable due to contamination, El-
evators may be used if they are unaffected by fire.
6.6 An up-to-date list of physically disabled occupants on each floor
shall be kept by the Floor Warden. Arrangements shall be made by
the fire warden to assist in moving the disabled persons to the lower
floors.
6.7 In the event of fire the overall command of the fire fighting opera-
tions and evacuation of personnel etc. shall be taken by the fire
safety officer or in his absence by deputy fire safety officer. He shall
take position at the control room to supervise and direct all opera-
tions during fire.
6.8 In the event of fire the power supply to the equipment from mains
as well as from battery shall be immediately cut off. This decision
shall be taken by the senior most officers/officials available in the
Exchange.
6.9 Automatic arrangements of cutting off-blowers on receipt of first fire
alarm shall be incorporated in the controls. In case the floor warden
notices that the automatic cutting off system has not operated, he
shall himself manually switch off the blower.
6.10 Till the arrival of the Fire Brigade, the fire fighters should attempt to
extinguish the fire with available means.
(Reference BSNL DO No 19-30/2008-PHM/MSE dated 30/04/2009) &
BSNL letter No 19-30/2008-PHM/MSE dated 18/12/2008)
CHAPTER-VII
ADMINISTRATIVE INSTRUCTIONS
7.1 Acceptance testing of fire protection installations:
The fire alarm and fire extinction installations shall be completed
in all respects and shall be offered for acceptance testing to In-
spection Circle, erstwhile T&D Circle before commissioning of
equipment.
7.2 Display:
(a) Emergency telephone numbers: In every Telecom building a
board containing the following details should be displayed.
Sr. Name& Telephone Telephone MobileNo. Designation of Officers ( O ) ( R )
1 Fire Brigade Station
2 Ambulance Service
3 Fire safety officer
4 Deputy Fire safety officer
5 Floor warden
6 Deputy Floor warden
7 Head of SSA
8 Head of Circle
9 CGM Inspection Circle
10 GM (NW-OPS)Fixed Access, BSNL CO, Delhi
(b) A display board which should tell the next due date for Fire drillshould be provided at least at two places in the room of G.M/Dy.G.M/DET/Senior most officers. The due date should be painted(i.e. recorded on a permanent basis and not to be written withchalk). When on the due date exercise is conducted the next duedate can be painted.
(c) Display of Instructions: The instructions which are to be displayedin the telecom buildings – are given at Annexure I
Compiled and issued by Inspection Circle, Jabalpur in November 200920
Compiled and issued by Inspection Circle, Jabalpur in November 200921
7.3 Role of SSA/ Territorial Circle:
In all events of outbreak of Fire in Telecom Buildings the
DGM in charge of concerned telecom building/ exchange will in-
form in writing to the CGM Inspection Circle Jabalpur immediately.
The DGM should also inform to the GM (NW-OPS) MSE Section
BSNL C.O. Bharat Sanchar Bhawan, Janpath, New Delhi (Fax No.
011-23766033) on telephone in case of serious interruption to com-
munications or extensive damage to equipments.
7.4 Role of Inspection Circle
One of the important function assigned to Inspection circle
is to carryout independent investigation in case of fire in Telecom
installations. On receipt of information of fire incident from DGM or
appropriate authority of the respective circle, the Chief General
Manager, Inspection Circle will register a case and appoint a fire
investigator to know the probable cause of fire and loss to the prop-
erty.
Investigation of fire is carried out in parallel without dis-
turbing the restoration process of services. The answers of all the
questions of questionnaire (given at Annexure-I) are carefully ob-
tained and recorded. Written statements and photographs of the
affected and suspected locations are also being taken in support
of the evidences. The General part of the questionnaire deals with
the action to be taken by the officer on duty. The Engineering part
of questionnaire is dealt with the senior most Engineering Officer
in charge at the time of occurrence of the fire. Clear photographs
of fire incident are invariably being taken prior to any replacement
or repairs.
After receipt of report and after being satisfied on its ex-
amination, the CGM Inspection Circle, Jabalpur forwards the re-
port to the GM (NW-OPS) Fixed Access BSNL C.O. Bharat Sanchar
Bhawan, Janpath, New Delhi (Fax No. 011-23766033) and also
sends a copy of report to the CGM telecom circle concerned.
(Reference BSNL DO No 19-2/2009-PHM/MSE dated 27/07/2009),
CHAPTER –VIII
GENERAL PRECAUTIONS / SAFETY MEASURES FORPREVENTION OF FIRE
Guide line and instructions received vide various circulars issuedfrom time to time with reference to fire are summarized below:
8.1 General:
k Ensure proper storage, utilization and quantity of store items.
k All broken furniture, Empty drums, Wooden packing cases andall other un-usable items which are liable to induce fire maybe disposed off after observing due formalities.
k Provision of Building Monitoring system (B.M.S) through sur-veillance system and round the clock monitoring at securityloopholes.
k To create awareness, fire safety day and periodic fire safetydrill should be observed.
k The Fire audit of major Telecom installation may be got con-ducted through the Fire Department
k Equipment/ Materials used in the Telecom building should beof I.S.I specifications.
k Ensure the availability of basic and up-to-date fire fighting ar-rangements at the site.
k The maintenance staff should be well educated about the firealarm panel and how to locate the fire zone even if it is a falsealarm.
k Sand buckets should be available in every exchange near theswitch room at a reasonable accessible place.
k A non-exchange line to the nearest fire station should be pro-vided and check for its function on daily basis.
k The key of the locked rooms where technical installation areprovided should be kept in a very easy accessible place. Thekeys of all the equipment rooms which are kept locked at nightshould be available in security room.
Compiled and issued by Inspection Circle, Jabalpur in November 200922
Compiled and issued by Inspection Circle, Jabalpur in November 200923
k Protective devices in MDF (IPM etc.) must be used.
k Providing automatic small independent fire quenching systems
at important fire prone locations in addition to fire extinguish-
ers as per norms.
k Promptness of staff in reporting the incidence to the fire de-
partment/ higher authorities of BSNL
k Way to the Emergency exit on each floor should be properly
displayed and free from any obstruction.
k Partitions for office space should be restricted to 4 ft height in
order to have clear visibility. Partitions for office area should
not be extended up to false ceiling height
k Concentration of large number of important telecom installa-
tion should be avoided in one particular building
k Major traffic routes carrying Inter Circle traffic (especially meant
for IN, Billing, and SMSC etc.) should be directly fed from NTR
transmission room to respective locations instead of bringing it
to SSA transmission Room and distributing it to other loca-
tions.
k The concept of Auxiliary transmission room/ Centre needs to
be evolved to enable restoration of important systems with mini-
mum down time.
k The switch room and the transmission room should not be made
with have any fire hazardous materials like wood. In case of
rented buildings the doors and windows should be painted with
fire retardant paint.
8.2 Building:
As per CPWD norms the following fire fighting arrangements shouldbe made:
k Provision of wet raiser system with adequate water storage asper requirement.
k Provision of fire extinguisher of latest technology.
k Instead of fixed glass, panel window type glass panels may be
provided so that the smoke can be evacuated immediately.
k Provisioning of adequate space should be there for the move-
ment of Fire Brigade personnel’s around the building. There
should be free access inside the buildings also to enable the
fire personnel to control the fire
8.3 Electrical Fitting:
As far as possible it is better to avoid taking the run way below or
above the window AC units. Or sufficient gap of more than one
meter space should be given.
· All Electrical fittings and wirings should follow the proper specifica-
tion. Any wiring which is being overheated should be specifically
got checked and remedial action be taken.
k Main distribution of A.C supply must be provided with suitable
rating of fuses.
k DCDB panel must be provided in exchange as a part of instal-
lation.
k AC power supply to be provided through power distribution panel
at incoming power feeder.
(Reference BSNL DO No 19-30/2008-PHM/MSE dated 02/03/2009)
8.4 Air Conditioners :
k Clean the filters of the window A/C units periodically. Choking
the in the filter causes over load to the compressor and many
A/C units get fire due to this problem.
k The window AC should be replaced with split type AC units.
k Where ever window AC is still in use, check that all the window
air –conditioners are properly functional and are being main-
tained properly. Ensure that :
Compiled and issued by Inspection Circle, Jabalpur in November 200924
Compiled and issued by Inspection Circle, Jabalpur in November 200925
k They do not draw excessive current and the temperature is
maintained in the switch room at an appropriate level. Such
air-conditioners are not supposed to run continuously.
k The change over arrangement between AC units should be
operational.
k The air-conditioners are to be serviced regularly as per sched-
ule.
k As for as possible the inter-locking arrangement with Window /
split AC should also be provided with fire alarm system.
(Reference BSNL DO No 19-30/2008-PHM/MSE dated 30/04/2009),
8.5 Telecom Equipments:
k Power cables for A.C and D.C both, inter-suit wiring and sub-
scriber cables should be laid separately, so that short circuit-
ing and fire does not spread to other cables also.. For laying of
cables, relevant engineering instructions should be followed.
k Barriers should be created at suitable intervals in addition to
the requirement of normal Fire Bye-laws while laying cables.
k Fixing a plate in the MDF room and also in a room of senior
officer mentioning the next date for earth and surge lightening
protector check
8.6 Mock Fire Drill
This will help in identifying any weakness in the evacuation strat-
egy.
Necessary Fire drill should be conducted to ensure proper mobili-
zation of resources and to educate the staff against unfortunate
event of fire and that they understand the emergency action plan.
Side by side, it will cross check the adequacy of the building and
precautions available for prevention of fire accidents.
Nomination of Fire safety officer for each building and conduction
of fire drill exercise once in a quarter is to be monitored by a JAG
level officer. During such drill, they will be able to assess the appro-
priateness of actions and identify problems
Where there is more than one escape route, the fire drills shouldassume conditions in which one or more than one escape routeare obstructed by smoke.
(Reference BSNL DO No 19-30/2008-PHM/MSE dated 02/03/2009)
8.7 Furniture
All furniture in the equipment rooms shall be of steel.
Use of plastic or wooden furniture shall not be permitted in techni-
cal buildings.
Compiled and issued by Inspection Circle, Jabalpur in November 200926
Compiled and issued by Inspection Circle, Jabalpur in November 200927
CHAPTER IX
LIGHTNING PROTECTION AND EARTHING
9.1 Lighting Protection
Lightning is a natural hazard, being the discharge of static
electricity: generated in parts of storm clouds. Some of them dam-
age buildings and a few are injuring people either directly or indi-
rectly by causing fire and explosion.
An Earthing System is an essential part of any electric/
electronic system. The objective of an Earthing System may be
summarized as follows :
(i) To provide safety to personnel during normal and fault condi-
tions by limiting step and touch potential.
(ii) To assure correct operation of electrical/electronic devices.
(iii) To prevent damage to electrical/electronic apparatus.
(iv) To dissipate lightning strokes.
(v) To stabilize voltage during transient conditions and therefore
to minimize the probability of flashover during the transients.
(vi) To divert stray RF energy from sensitive audio, video, control
and computer equipment.
9.2 Requirement for effective Earting
An Earthing system must meet the following specifications :
(i) The resistance to earth must be within the allowable limits for
the particular application.
(ii) The electrodes buried in the ground must be :
a) Having good electrical conductivity to carry highest specified
load current.
b) Immune to the corrosive action of the soil all along the period.
c) Of sufficient mechanical strength to enable them to be in-
stalled without any damage, and
d) Inert, i.e. must not be a source of galvanic corrosion current,
within the system to be protected.
(iii) The earth electrode must provide as much of the area of
contact as possible with the soil to reduce the resistance of
the current path to earth.
(iv) The resistance of the earth connection must remain within
the allowable specified limit throughout the various seasons
of the year.
All telecom buildings shall be protected against lightning
in accordance with the provisions of IS 2309:1989 as amended
and as per the departmental specifications in this regard.
For further reference please refer Engineering Instructions
no. I-001 on Earthing issued by Inspection Circle.
Compiled and issued by Inspection Circle, Jabalpur in November 200928
Compiled and issued by Inspection Circle, Jabalpur in November 200929
Compiled and issued by Inspection Circle, Jabalpur in November 200931
CHAPTER X : INSPECTION SCHEDULE FOR FIRE
General
Fire buckets filled with sand and water at suitable location.
Fire
Availability of fire extinguishers, and type of extinguisher with suitability
fighting
aspects.
a pp ar at us
Validity & working condition
Protection
Fire alarm system, hooter this may be verified at each floor in case of
multi storied building
Non exchange line to fire station is provided, and working properly.
Air
AC units are working alright unit.
conditioner
Action to replace window type AC with split type AC unit.
Protection
Inter locking arrangement with fire alarm is provided
Protective devices/IPM are used in MDF
Routine Inspection Schedule is followed by Territorial Circle
Air conditioner
AC units are working alright unit.
Action to replace window type AC with split type AC unit.
Protection
Inter locking arrangement with fire alarm is provided
Protective devices/IPM are used in MDF
Routine Inspection Schedule is followed by Territorial Circle
Equipment Room 1 Equipment Room 2Fire Protection
Compiled and issued by Inspection Circle, Jabalpur in November 200930
Name of Circle
Name of SSA
Location
NAME OF THE EXCHANGE:
DATE:
Type& Make of Exchange
Items
Sub Items
Points of observation
Marks (M)
Total
(a,b,c,d & x
Marks
as specified
of each
at bottom)
sections
(TM)
Cleanliness
Management of garbage, waste, inflammable materials or store items
Building
Safe emergency exit way. Whether the way is properly marked by arrows.
Keys of locked rooms are kept at a easily accessible place
Awareness
Instructions, contact numbers of nodal officers are displayed in the premises
and it is given to staff in the form of card etc.
Staff knows about handling of fire fighting equipments
Action
Mock fire drill is being conducted regularly
Earth and its
Measured Earth value and date of measurement for AC & DC both. and
distribution
Proper distribution to Sub station Transformers & electrical equipments, And
DC distribution to DC equipments and MDF etc
Protection
Lighnting spike, lightning arestors, Tower other open equipments connected
to EGP
proper rating of fuses and MCBs
General Electrical
Compiled and issued by Inspection Circle, Jabalpur in November 200933
CHAPTER XI
SAFETY INSTRUCTIONS AND ACTION ON FIRE
A - FIRE SAFETY INSTRUCTIONS
11.1 For your own safety you should know:
(i) Operating instructions are given on the body of thefire extinguishers.
(ii) Push button fire alarm boxes are provided on eachfloor. These are coloured red and provided with glasson the front face.
(iii) Fire escape routes are marked with red arrows.
(iv) Your Floor Warden/Dy. Floor Warden are:—-
(a) Floor Warden: Name:Designation:Normal workingTelephone /Mobile NumberRoom No:
(b) Dy. Floor Warden: Name:Designation:Normal workingTelephone /Mobile NumberRoom No:
11.2 For your own protection report to your Floor warden:
(i) If any exit door/escape route is obstructed by loosematerials, goods, boxes, cupboards etc
(ii) If any staircase door or lift lobby door is damaged anddoes not close or open properly.
(iii) If any push button fire alarm point or fire extinguisheris damaged, obstructed or apparently out of order.
(iv) If any loose wiring, loosely fitted plug or socket or tem-porary extension point is noticed.
(v) If any sparking is observed in the electrical circuits.
Air conditioner
AC units are working alright unit.
Action to replace window type AC with split type AC unit.
Protection
Inter locking arrangement with fire alarm is provided
Protective devices/IPM are used in MDF
Routine Inspection Schedule is followed by Territorial Circle
Total Marks obtained
Percentage of fire protection
Equipment Room3
TM
M/
TM
x10
0∑
∑∑
M
∑
Guide lines for
marking items / sub
items (as code a,b,c,d
& X )
Code
weitage
Max marks
Not Installed
a0 (Zero)
10
Installed but not working
b3
10
Working but not satisfactory
c6
10
satisfactory condition
d10
10
Not applicable
x10
10
Signature
Inspection Officer
Inspection Circle
Compiled and issued by Inspection Circle, Jabalpur in November 200932
Compiled and issued by Inspection Circle, Jabalpur in November 200934
Compiled and issued by Inspection Circle, Jabalpur in November 200935
11.3 For minimizing fire Risks:
(i) Dispose the waste properly. Use only waste baskets fordisposal of waste paper.
(ii) Do not store packing cases/packing materials in operationalareas or office spaces or terraces. Store the packing ma-terials in the space earmarked in the open yard.
(iii) Do not smoke in NO SMOKING zones. In smoking zones,do not throw cigarette end or match stick indiscriminately.Use only Ash Trays / Spittoons.
(iv) Avoid using temporary extension circuits for electrical fit-tings.
(v) Keep power points switched off, plugs removed from sock-ets, when not in use.
11.4 If you discover Fire:
(i) Break the glass of the nearest call point.
(ii) Attack the Fire with the nearest accessible Fire extinguisher.Handle the extinguisher only if you know to operate it.
(iii) Inform your Floor Warden or Dy. Floor Warden.
(iv) Use Non Exchange line Fire telephone / Mobile set to in-form to the Fire Brigade on 101.
(v) In case of fire in the main electrical riser inform sub-stationon Telephone Number _____________ to switch off powersupply to the riser.
11.5 If you Hear Evacuation instructions :
(i) Leave the floor immediately, Follow the nearest fire es-cape route unless Otherwise instructed.
(ii) Do not create panic or shout; be calm.
(iii) Do not crowd in the staircase lobby. Do not create stam-pede.
(iv) Do not use lifts for escape unless otherwise instructed.
(v) Do not go to toilets.
(vi) Keep staircase and life lobby doors in closed positions butnot bolted.
B — INSTRUCTION IN CASE OF FIRE (GENERAL)
(i) Break the glass of the nearest call point
(ii) Attack the Fire with the nearest accessible Fire extinguisher.Handle the extinguisher only if you know to operate it.
(iii) Do not use water for extinguishing fire in electrical installa-tions unless power supply is disconnected.
(iv) Inform your Floor Warden or Dy. Floor Warden.
(v) Use Non Exchange line Fire telephone / Mobile set to in-form to the Fire Brigade on 101.
(vi) In case of fire in the main electrical riser inform sub-stationon Telephone Number _____________ to disconnectpower supply to the riser.
(vii) If you hear evacuation alarm/instructions, leave the floorimmediately. Follow the nearest escape route unless oth-erwise instructed. Do not create panic. Do not crowd instaircase lobby. Do not use lifts for escape unless instructed.Do not go to toilets.
C—TYPICAL ACTION PLAN IN CASE OF FIRE INTELEPHONE EXCHANGES
1. Action By staff (General)
(i) On discovering fire, break the glass of the nearest call point.
(ii) Attack the fire with the nearest accessible extinguisher.Handle the extinguisher only if you know how to operate it.
(iii) Do not use water for extinguishing fire in electrical installa-tions unless power supply is disconnected.
(iv) Inform your Floor Warden or Dy. Floor Warden.
(v) Report to the senior officers.
(vi) Use Non Exchange line Fire telephone / Mobile set to in-form to the Fire Brigade on 101.
(vii) In case of fire in the main electrical installations informsub- station Telephone to disconnect mains supply.
(viii) In case of fire in Telecom equipment/ power distributionsystem inform the on Officer on duty for action to cut offmains as well as battery supply.
Compiled and issued by Inspection Circle, Jabalpur in November 200936
Compiled and issued by Inspection Circle, Jabalpur in November 200937
(ix) If you hear evacuation alarm/instructions, leave the floorimmediately. Follow the nearest escape route unless oth-erwise instructed. Do not create panic. Do not crowd instaircase lobby. Do not use lifts for escape unless instructed.Do not go to toilets.
2. Action By Floor Warden / Dy. Floor Warden :
In addition to the above general instructions, follow the following
action plan.
(i) If the fire is on your floor, take charge of the fire fighting
operations.
(ii) Ensure that all staff members on the floor are alerted.
(iii) If the fire is on any other floor send one of the representa-
tives to the warden of the affected floor and rush extra
manual help / first aid equipment, if required.
(iv) Switch off air-conditioning blowers. In case automatic cut-
ting off arrangements of A.C blowers, exit check whether
blowers have stopped, if not, switch off manually.
(v) In case of fire in Telecom. Equipment/power distribution
system inform power room to disconnect both mains as
well as batteries.
(vi) On getting evacuation instructions/alarm examine the es-
cape route on the floor and arrange to evacuate the staff in
an orderly manner. Do not leave the staff till the staff mem-
bers are evacuated.
(vii) If no evacuation instruction/alarm is received and in case
fire is not extinguished and there is danger to the person-
nel, takes action to evacuate the floor.
(viii) After fire is extinguished inform all the other floor wardens/
Fire safety Officer and Building in charge.
(ix) In absence of the Fire safety Officer/ Dy. Fire safety Of-
ficer, the senior most available Floor warden shall take over
all command of the fire fighting /evacuation operation.
3. Action By Fire safety Officer/ Dy. Fire safety Officer
(i) On hearing fire alarm/information about fire takes over all
command of the fire fighting /evacuation operations. If not
available in the building, rush to the building on getting in-
formation about the fire.
(ii) Ensure that Fire Brigade is notified.
(iii) Ensure that all air-conditioning blowers are switched off.
(iv) Ensure that mains as well as battery supply is switched off
in case of fire in the equipment/Power distribution system.
(v) Ensure that mains supply is cut off from the Sub-station in
case fire in electrical installations.
(vi) Ensure that fire pump starts running.
(vii) Ensure that all vehicles parked inside the building are taken
out in open.
(viii) On arrival of Fire Brigade, direct the fire personnel to the
affected areas.
(ix) Be in touch with the Floor Warden of the affected floor, In
case fire is not extinguished and there is danger to the
personnel, order evacuation from the affected floor.
(Reference BSNL DO No 19-30/2008-PHM/MSE dated 30/04/2009)
Compiled and issued by Inspection Circle, Jabalpur in November 200938
Compiled and issued by Inspection Circle, Jabalpur in November 200939
CHAPTER-XII
QUESTIONNAIRE FOR INVESTIGATING FIRE CASES
12.1 General:
(i) At what time, date and place was the firenoticed? (Accuracy of time is essential)
(ii) Who did notice the fire? When and where?
(iii) What is the exact location in the board, rack,runway or any other place where the fire wasfirst detected?
(iv) Who were on the duty at the time of fire?
(v) Was action taken to remove the battery fusesand the mains supply?
(vi) What was the type of fire extinguisher used?
(vii) When was the fire brigade informed? Whendid they arrive?
(viii) How long did they take to extinguish out thefire?
(ix) When was the JTO, SDE or DE informed ofthe accident?
(x) What was the type of smell that was noticedwhen the fire was on? Give the type of smellas per following example: Smell of burningof paper, rubber, hair, kerosene or petrol,wax, candle or oil, sulpher etc. What wasthe colour of flame, smoke and also thesparks in the fire? Give the answer of fol-lowing examples: Greenish or Yellowishflame, thick black cloud like smoke or gray-ish smoke, etc.
(xi) How did the fire spread? Was any other firereported simultaneously in any other part ofthe exchange, e.g. in the battery & PowerPlant room, mains distribution chamber, In-verter, Generator room GD Tubes, etc.,?
(xii) Whether AFD System in the exchange wasin working condition and whether any peri-odical checking was conducted. If so, thedetails may be furnished.
(xiii) Was there any audible/visual alarm just priorto the outbreak of fire? Was there any au-dible alarm during or after the outbreak of fire?
(xiv) Who resetted the alarm bell and what actionwas taken by him?
(xv) What was the extent of damage caused tothe equipment racks and equipment like rack,sub rack, plug in unit etc.,
(xvi) Were the air-conditioning blowers stopped?
(xvii) Are there any fuses used in the neutral ofmains switch? Was there any rewiring donefor electrical appliances at the time prior tothe incident?
(xviii) Was the insulation of the mains wiring testedrecently? If so, what were the results?
(xix) Whether photographs have been taken for theburnt equipments if so it must be numberedserial to mark events?
Note:
1. Do not allow anybody to go out of the exchange or off duty immediatelyafter the fire until and unless written statement signed by him or her istaken by the competent authority or the senior-most official present andalso until the official is fully interrogated by the competent officer.
2. A crowd should not be allowed to collect around the place of accidentsotherwise valuable evidence is liable to be destroyed.
3. Nothing should be disturbed before the enquiry is completed.
12.1 Technical:
Switch Room/ OMC Room/ Exploitation Room/Equipment Room:
(i) Did the fuses/MCCB of the affected rack/module/ frame/ card/ board etc. blow at all?
(ii) What were the fuses that were noticed to haveblown out in room wise/ rack module/ frame/PCB wise?
(iii) What were their ratings?
(iv) Did the fuse alarm lamp fuse blow before theincident?
Compiled and issued by Inspection Circle, Jabalpur in November 200940
Compiled and issued by Inspection Circle, Jabalpur in November 200941
(v) What were the ratings of the fuses that werenormally used for the circuits affected?
(vi) Was there any occasion to note the failureof the alarm fuse? If so, did the visible andaudible alarms operate satisfactorily?
(vii) Was there any occasions to note any heavyarcing in board / rack/PDP/PCB/Module etc.
(viii) Are the correct functioning of all the alarmschecked regularly?
- Was there any logbook to note downthe frequency of fuses blown and re-placed? If so, who maintains the log-book and in whose custody does itusually remain?
Automatic alarm energizes in case of anytype of failure
(ix) Are the frames of racks/ Switch Board/ Powerboard/ charging board etc., earthed?
(x) Was there any frequent blowing out of fusespreviously in any particulars circuits?
(xi) Was there any trouble experienced previ-ously due to any external height voltage con-tact in any of subscriber line? If so, whataction was taken to rectify it? Is a register ofpower guarding maintained, in the Exchangeas per rules? Did the power supply authori-ties complaint previously at any of there subdistribution fuses blowing due to contact withphone wires? Whether the officer in-chargevisited the locality where such falls werenoticed? or mis-operation of relays, falseclearing or calling signals in
(xii) Previously has anybody suffered from se-vere shock or electric burns while handlingthe power connections in the rack?
(xiii) Was the print out of the exchange messageduring the incident available? (Fault mes-sage report during the period to be exam-ined and indicated)
(xiv) Whether temperature in SW-Room/ OMC/Computer room is recorded regularly? Thereading of temperature recorded before theincident to be indicated.
12.1 Power Room:
(i) Was the main battery discharge fuse intactprior to and after the fire?
(ii) What were their ratings?
(iii) What were the ratings of the fuses that werenormally used for the circuit affected?
(iv) Are the blown out fuses MCCB repaired andre-used elsewhere?
(v) Was there any occasion to note the failure ofthe alarm fuse? ? If so, did the visible andaudible alarms operate satisfactorily?
(vi) Are the inverters, power plant etc., earthed?
(vii) What are the ratings of the fuses used at theoutput of the battery and rectifier?
(viii) Are the correct functioning of all the alarmschecked daily?
(ix) Previously, has anybody suffered from severeshock or electric burns while handling thepower connections in the mains?
12.2 MDF:
(i) Are the MDF etc., earthed?
(ii) Where the fuses/GD tubes of the MDF blown/affected at all?
(iii) What are the GD tubes/ fuses that were no-ticed to have blown out?
(iv) What were their ratings?
(v) What are the ratings of the fuses/ GD tubesthat are normally used for the circuit affected?
(vi) Are the blown out fuses repaired and reusedthem elsewhere?
(vii) Who issued the fuse wires to the techniciansand was it ensured that the fuse wires issuedof correct ratings?
Compiled and issued by Inspection Circle, Jabalpur in November 200942
Compiled and issued by Inspection Circle, Jabalpur in November 200943
(viii) Was there any logbook to note down the fre-quency of fuses blown and replaced? If so,who maintains the logbook and in whose cus-tody does it usually remain?
(ix) Was there any occasion to notice that any ofthe components either getting unduly hot orgetting burnt out altogether? If so, what werethe reasons for this occurrence and what pre-cautionary measures were taken to preventthis?
(x) Was there any blowing up of IPM GD tube inany particular strip?
(xi) In the damaged line was the
(a) IPM /GD tube intact
(b) fuses intact and
(xii) Was there any soldering to wiring work beingcarried out near the place of fire prior to or atthe time of fire?
(xiii) What were the types of GD tubes (model andmake) used
(xiv) Whether GD tubes were physically fitted inMDF at the time of incidence ( to be sup-ported by statement etc.,)
(xv) Whether earth resistance value and continu-ity to mother earth board were being checkedat prescribed intervals and the value thereof.( To be verified from records)
12.3 A/C Plant:
(i) Previously has anybody suffered from severeshock or electric burns while handling thepower connections in the window/ package/central AC?
(ii) Which type of A.C. Plant was installed? E.g.,Window AC, Package, Split A/C and whetherit was running at the time of incident?
(iii) If the A/C plant is window type, whetherproper distance is maintained between ex-change run cables and window A/C unit cable
(iv) Whether automatic fire and smoke detectorswere provided and working alright
(v) Whether the blower is switched off automati-cally on detection of fire?
(vi) In case of blowers switched off automatically,whether any alarm message has occurred ?If so proof of alarm message may be fur-nished?
(vii) If window A/C is available what action hasbeen taken to replace the window type A/Cby split type A/C unit. This information is re-quired in view of latest BSNL guidelines
12.4 External Plant:
(i) Did the mains supply authorities carry outany re-wiring or changing the loads or chang-ing of poles on the mains leads to the ex-change prior to or at the time of fire?
(ii) Was there any trouble in the exchange ex-perienced previously due to any external highvoltage contact in any of the subscriber’slines? If so, what action was taken to rectifyit? Is the register of power guarding main-tained, in the exchange as per rules? Didthe power supply authorities complain previ-ously of any of their sub- distribution fusesblowing due to contact with phone wires?Was the locality visited where such faultswere noticed and checked up?
Signed by
Officer-in-charge of Mtce/Exchange
Dated:
Name:
Designation:
Compiled and issued by Inspection Circle, Jabalpur in November 200944
Compiled and issued by Inspection Circle, Jabalpur in November 200945
ANNEXURE – I
REFERENCES
1. Office Orders:
I. MSE Section, Corporate Office, ND. F.No. 19-30/98-PHM dt.21/4/08
II. MSE Section, Corporate Office, ND. F.No. 19-30/98-PHM dt.28/4/08
III. MSE Section, Corporate Office, ND. F.No. 19-30/2008-PHM/MSE dt. 2/5/08
IV. MSE Section, Corporate Office, ND. F.No. 19-30/2008-PHM/MSE dt. 25/8/08
V. MSE Section, Corporate Office, ND. F.No. 19-30/2008-PHM/MSE dt. 18/12/08
VI. MSE Section, Corporate Office, ND. F.No. 19-30/2008-PHM/MSE dt. 2/3/09
VII. MSE Section, Corporate Office, ND. F.No. 19-30/2008-PHM/MSE dt. 30/4/09
VIII. The Director Operation, Corporate Office, ND. 19-2/2009PHM/MSE dt. 25/7/09
IX. The GM (NW-OPS), Corporate Office, ND. 19-2/2009-PHM/MSE dt. 27/7/09
X. The GM (NW-OPS), Corporate Office, ND. 19-2/2009-PHM/MSE dt. 29/9/09
2. Fire Protection Manual
3. Fire Protection Manual dated 22.11.1997 issued by GOI, MOC,DOT ND.
4. Bureau of Indian standard IS 2189-1988
No. 19-30/98-PHM Dated the 21st April, 2008
To,All Chief General Manager,Telecom Circles / Districts / Projects / Regions
Subject : Precautions against fire incidence in telephoneexchanges / buildings
Ref. : (1) No. 19-30/98-PHM dated 30.1.2004(2) No. 19-30/98-PHM dated 11.9.2001(3) No. 17-2/97-PHM dated 24.3.1998
Kindly refer to the letter cited at Sr. No. 3 above (copy enclosed) whereindetailed instructions have been issued on precautions against fire incidence intelephone exchanges / buildings followed by reminders at Sr. No. 1 & 2 above.
It has come to the notice of BSNL HQ that the above said instructionsare not being followed strictly resulting in fire incidents in various telephone ex-changes / buildings consequently a huge loss / damage of the assets.
This has been viewed very seriously. It is required that at least activitiesmentioned in the above referred letters are performed and results are kept readlyaccessible to officer - in - charge of the exchange / building for effective monitor-ing of performance parameters.
In view of the just concluded Fire Safety Week (14-20th April, 2008), youare requested to complete all the ativities mentioned in the above referred letterand send compliance by 30th April, 2008 for the appraisal of Director (O), BSNL.
(Piyush Chand Gupta) q
Jt. DDG (MSE) qCopy for information to :1. Sr. DDG(Elec.) / DDG (SW) / DDG (BW) / DDG (TX) / DDG (RN) / DDG
(LTP) / DDG (NM)2. CGM, T*D Circle, Jabalpur3. CGM, NCES, New Delhi4. CGM, ALTTC, Ghaziabad / CGM, BRBRAITT, Jabalpur
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
O/o Sr. DDG (MS)MSE Cell, Corporate Office,Bharat Sanchar BhawanJanpath Road, New DelhiTel No. 011-23710421Fax No. 23766033Email : [email protected]
REFERENCES (Office Orders)
Compiled and issued by Inspection Circle, Jabalpur in November 200946
Compiled and issued by Inspection Circle, Jabalpur in November 200947
s àÊm y Þj àÊ âÂàªàt âv ât ¹çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
MSE Cell, Corporate Office,616 B, Sanchar Bhawan20, Ashoka Road, New Delhi-110001Tel No. 23716688, Fax 23372530
No. 19-30/98-PHM Dated : 30.01.2004
To,
All CGM Telecom/Districts
CGM Telecom Project Delhi / Mumbai / Kolkata / Chennai
CGM Maintenance Regions Delhi / Mumbai / Kolkata / Chennai
Sub : Precautions against fire incidents in telephone exchanges / building.
Ref. : 19-30/98-PHM dated11.09.2001
Kindly refer to this office letter of even no. dated 11.09.2001 where in
detailed instructions have been issued on precautions against fire incidents in
telephone exchanges/ building.
It has come to the notice of BSNL HQ that the aforesaid instructions are
not strictly followed, fire alarms detection systems are not being tested regularly
and its sirens are not located properly particularly in unmanned exchanges.
This has been viewed very seriously. It is required that the activities
mentioned in the above referred letter are performed and results are kept readily
accessible to officer in-charge of the exchange for effective monitoring of perfor-
mance parameters.
It is therefore requested that all concerned may be instructed to follow
the referred instructions and the compliance of the instrucions may be sent to this
office latest by 15.02.2004 for appraisal of Director (O), BSNL.
(Shubha N. Bhambhani)
Jt. Dy. Director General (MSE)
Copy for information to :
1. Sr. DDG (SW)Sr. DDG (BW)/Sr. DDG (TX)/Sr. DDG(RN)/DDG/(LTP)/
Sr. DDG(E)/DDG(NM)
2. CGM T&D Circle Jabalpur
3. CGM NCES New Delhi
4. CGM ALTTC, Ghaziabad/CGM BRABRAITT, Jabalpur
No. 19-30/98-PHMBharat Sanchar Nigam Ltd.(A Govt. of India Enterprise)
Sanchar BhavanNew Delhi - 110001
Dt. 11-9-2001
To,All CGMs Telecom/TelephonesCGM Chennai / Calcutta TelephonesChief Engineer Electrical Delhi / Bombay / Chennai / Calcutta/ Chandigarh/Ahmedabad/ Trivandrum / Lucknow
Subject : Precautions against fire incidents in telephoneexchanges / buildings.
Kindly refer to this office letter No. 17-2-97-PHM dt. 19/24/3/96 (Copyenclosed for ready reference) wherein detailed instructions have been issued onthe above subject.
It has come to the notice of BSNL Hq. that the aforesaid instructions arenot strictly followed resulting in fire incidents and consequently loss / damages ofproperty.
It is once again emphasised and reiterated that the aforesaid instructionsmay please be strictly adhered to in order to avoid recurrence of fire incidents.
This may please be circulated to all concerned engaged to operation andmaintenance of electronic exchanges.
Compliance and receipt of this letter may please be send to this office onFax No. 3032508 / 3372530.
Sd/-Jt. DDG (MSE)
Tel : 3716688 / 3032712
Enclosers : as above
Copy to1. CGM T & D Circle2. CGM BRABRAITT
3. ALTTC, Ghaziabad
4. CGM Projects Bombay / Delhi / Calcutta / Madras
5. CGM Mtce. Bombay / Delhi / Calcutta / Madras
6. CGM NCES New Delhi
7. Sr. DDG (Switching)
8. Sr. DDG (TX)
9. Sr. DDG (NM)
Compiled and issued by Inspection Circle, Jabalpur in November 200948
Compiled and issued by Inspection Circle, Jabalpur in November 200949
Department of TelecomPHM Section
No. 17-8/97-PHMDated : 19.3.98
To,
1. All CGMs, Telecom Circles/
Telephone Districts
2. CGM, MTNL, New Delhi / Mumbai
3. CGM, T&D Circle, Jabalpur
4. Chief Engineer (Electrical), Delhi /
Bombay / Chennai / Calcutta / Chandigarh/
Ahmedabad / Trivandrum / Lucknow
Subject : Precautions against Fire incidents in TelephoneExchanges / buildings.
During the recent past a number of cases of fire in Telephone exchangebuildings have taken place in different parts of the country. This has resulted intohuge losses of material and disruption of communication services.
Time to time several instructions have been issued by DOT in this regard aspreventive measures and to avoid such incidences in future.
Recently a committee was constituted by Member(s) for through examina-tion of the cases of fire in telecom buildings and to suggest steps to be taken foravoiding such incidences in future.
The findings and recommandations of the committee are as follows:-
A. Major causes of Fire :-
The major causes of fire in telephone exchanges were identified as below :
(i) Short circuit in switching racks.
(ii) High voltage reaching MDF on account of telephone lines coming incontact with high voltage lines and also on account of lightning.
(iii) Short circuit / loose connection / over loading in DC power cables/system;
(iv) Storage of hazardous materials.
(v) Indiscriminate addittion to existing Electrical wiring without propertechnical communication.
(vi) Improper maintenance of Electrical Safety Devices like Over Loadrelays, Inter locking devices.
B. Preventive Measures :
As per norms the following preventive measures are being provided.
(1) Automatic fire detection system and alarm.
(2) Fire extinguishers.
(3) Wet risers in buildings more than 15 meters high.
(4) Fire Manual which gives details regarding fire drills and other pre-
cautions to prevent fires.
It is felt that the above measures in themselves are quite comprehensive but
what in generally missing is compliance of instructions given in manual of mainte-
nance of services & on continuous basis.
C. In addition to above, the committee identified one of the major causes
of SPREAD OF FIRE was the insulation of DC power and subscriber cables.
Following four actions to eliminate/minimise the spread of fire/smoke on
account of cables were identified.
(i) Power cables, both A.C. & D.C., intersuit wiring and subscriber cables should
be laid separately, so that short circuiting and fire prone set of cables does
not spread to other cables also. While laying cables it should be ensured
that cables are not laid on sharp edges which can, with the passage of time,
damage the insulation and causes short circuit and also not subjected to
any other mechanical Strain, Engineering instructions should be strength-
ened if required.
(ii) In order to isolate MDF from higher voltages, Engineering instructions should
be examined for further strengthening this area. Importance of regular check
of earthing and lightening protection to be emphaised. Next check due on...
Kind of notice can be maunted in MDF and exchange incharge's room to
draw attention and enforce regular check.
(iii) Barriers should be created at suitable intervals in addition to the require-
ment of normal fire byelaws while laying cables so that fire in one section
does not travel freely along the cables. As per fire byelaws, barriers are
already required at the floor crossings. It is felt that barriers should also be
created along the horizontal runs of the cables. Details of barrier recom-
mended are as per drawing-1.
(iv) The specifications of the insulating material of the cables should be reviewed
and strengthened with an objective to ensure that the burning of the insula-
tion is confined to barest minimum length of the cable and also it generates
minimum smoke.
Compiled and issued by Inspection Circle, Jabalpur in November 200950
Compiled and issued by Inspection Circle, Jabalpur in November 200951
C. Snggestions for minimising fire
incidences and also losses on this account.
1. Identification of a Fire Warden for each building alongwith a Deputy. He has
to ensure that fire prevention, detection and fighting systems are kept in
proper shape. This is specified in Departmental Fire Manual also. As far as
possible the fire warden shall be provided accommodation in the building
complex.
2. A Display Board which should tell the next due date for fire drill should be
provided at least at two places in the rooms of GM/Dy. DM/DET/Senior Most
Officer. The due date should be painted (i.e. recorded on a permanent basis
and not to be written with chalk). When on the due date, exercise is con-
ducted, the next date can be painted - Ref. drawing-2.
3. Fixing a plate in the MDF room and also in room of senior officer mentioning
the next date for earth and surge lightening protector check. (as per Ref.
drawing-2(2/3).
4. Issuing a perosnal card to each occupant of the building having instructions
regarding steps to be taken in case of fire. (as per Annex-A)
5. Fixing the important fire instructions inside each room. This will ensure reading
of the instructions by the occupants of the building. Fixing these in common
areas is not considered an effective solution.
6. Provision of Fire Barrier as per drawing enclosed at all floor/wall crossings
of all cables laid in exchange.
7. Out of the staff available ensuring human presence round the clock in switch
room for early detection and fire fighting during initial stages of fire.
8. Exploring the possibilities of improving/ strengthening the specifications in
regard to the quality of insulation of D.C. power and telephone cables so as
to further retard the spread of fire and generation of smoke.
9. Providing automatic small independent fire quenching systems at imprtant
fire prone locations in addition to fire extinguishers as per norms.
10. Maintenance of fire delection and fire fighting systems in working through
specialised agencies by entrusting the same to Electrical wing and ensuring
fire drill at regualr intervals and certificate (As per annexure-D).
In addition to the above, aiready existing instructions on fire control particu-
larly in the following areas need to be scrupulously followed.
(i) Observing Engineering instructions with regard to the cable laying particu-
larly in regard to safety from mechanical damage, Earthing continuity at
joints.
(ii) Making additions / alterations in the existing system and use of new gadgets
only after clearance from electrical maintenance unit as well as building
incharge.
(iii) Following the guidelines inclouded in the Fire Manual particularly in regard
to keeping building free from hazardous materials (dry grass, packing cases,
thermocol etc.) and ensuring passages, emergency exits and area around
the building clear of any obstructions.
12. Asking ALTTC to prepare :
(i) A film to highlight the looses on account of fire in Telecom building
and also importance of an individual towards its containment. This
film should form part of fire drill.
(ii) effective slogens for display in building and instructions for perosnal
cards.
(iii) a course module on fire safety in Telecom. Buildings.
13. Making Fire Course compulsary in all the Entry Leval Training courses in
- ALTTC, BRBRAITTC Jabalpur, Regional Training Centres, Circle Telecom
Training Centers and District Telecom Training Centres of the Department.
Kindly acknowledge the receipt.
(Dev Kumar)
Director (MSE)
Compiled and issued by Inspection Circle, Jabalpur in November 200952
Compiled and issued by Inspection Circle, Jabalpur in November 200953
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
MS Section806, Bharat SancharBhawan, JanpathNew Delhi-110001Phone : 23714455Fax : 23354549
No. 19-30/98-PHM Dated : 28.04.2008
To,
All CGMs of Telecom Circles/
Districts/Projects/Regions.
Subject : Fire incidence in telephone exchanges.
Kindly refer to letter from this office dated 21st April 2008 wherein the
precautions to prevent fire incidences were relterated. In addition the Switch Main-
tenance Handbook includes the copies of correspondence with reference to mea-
sures to be taken to prevent fire and actions to be taken in the unfortunatc event of
a fire taking place.
In a recent incident, huge fire has engulfed large quantities of stores.
From an initial review, it appears that measures to prevent fire and due precau-
tions for fighting fire like fire extingushers, water buckets etc. were not taken.
CMD BSNL, during a review, has desired that immediate action should
be taken by all the CGMs to ensure that :-
- All Broken furnture, empty drums, wooden packing cases and all such items
which are liable to catch fire but at the same time are of no practical utility
may be disposed off after observing due formalities.
- All electrical fittings and wiring should be checked. Any wiring which can
be cause of fire due to over-heating should be specifically got checked and
remedial actions taken.
- In view of the ensuing summer season, all air conditioner units should be
got checked for their serviceability and operationalized.
- Necessary fire drills should be conducted to ensure proper mobilization of
resoures in the unfortunate event of fire. Side by side, fire detection sys-
tems (as per instructions on the subject and fire prevention system) be
readily available to combat fire in case of unforeseen event.
- The fire audit of major telecom installation may be got conducted through
the Fire department.
- Equipment/materials used in the telecom building should preferably be of
ISI specifications of reputed makes.
- Equipment/materials used in the telecom building should preferably be of
ISI specifications of reputed makes.
- For each and every exchange/telecom installation one unit Administrative
officer should be designated who will ensure that the unattended instru-
ments (i.e. wooden paking cases, cable drums etc.) are not available in the
telecom equipment rooms.
- If such items are found in any of the telecom equipment room/(s) during
inspections by the higher authority, stringent action must be taken against
Administrative officer and his controlling officer.
- Periodie inspections to see that the possibility of fire is minimized should be
taken.
CMD has desired that all CGMs should submit a certificate before the
next HOCC, that due precautions have been taken in their units as per prevailing
instructions on fire safety.
(R.K. Sharma)
DDG (MS)
Copy for information to :
1. PPS to CMD, BSNL C.O. New Delhi
2. Director (O) for information.
3. Sr. DDG(Electrical) BSNL C.O New Delhi for information and neccessary
action please.
Compiled and issued by Inspection Circle, Jabalpur in November 200955
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
O/o Sr. DDG (MS)MSE Cell, Corporate Office,Rajesh Chander Mathur Lane, New DelhiTel No. 23710299, Fax No 23766033Email : [email protected]
No. 19-30/2008-PHM-MSE dated : 25-08-08
To,
All Chief General Managers,
Telecom Circles/Metro Districts / Regions,
BSNL.
Subject : Regarding safety from fire incidents.
A fire incident has occurred recently in one of the telephone exchanges.
The investigation committee of T & D Circle, has recorded that the incident has
occurred due to short circuit caused by a tree falling on HT line feeding AC supply
to exchange. It has been suggested by the committee that the following measures
be taken to avoid such fire incidents in Telecom buildings :-
i) Main Distribution of AC supply must be provided with suitable rating
of fuses.
ii) DCDB panel must be provided in exchange as a part of installation.
iii) AC power supply to be provided through power distribution pannel
at incoming at incoming power feeder.
The above instructions may be followed strictly to avoid any such inci-
dent in future and compliance to this effect may be sent to this office.
(Rajesh Kumar)
Jt. DDG (MSE)
Corporate & Registered Office : Bharat Sanchar Bhawan, Janpath, New Delhi-1
Compiled and issued by Inspection Circle, Jabalpur in November 200954
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
MSE Section, MS cell,8th Fl., Corporate Office,Bharat Sanchar BhawanJanpath Road, New DelhiTel No. 011-23716688,Fax No. 23766033Email : [email protected]
No. 19-30/2008-PHM/MSE dated : 02.05.08
To,
All Chief General Managers,
BSNL, Telecom Circles/Metro Districts,
Subject : Regarding fire incidents.
Recently a fire incident has occurred in one SSA store in which assets
worth crores of rupees have been damaged.
Preliminary investigations reveal :
(1) The non-availability of basic firefighting arrangements at the site.
(2) No proper storage of the store items.
(3) Non utilization of huge quantities of store itmes since long.
(4) Non disposal of unserviceable and obsolete material.
In this regard, instrucitons have been issued from this office which may
be referred to, wherein detailed guidelines have been issued on the subject.
CMD BSNL has taken a serious view of the matter and has desired that
all the CGMs should get all the stores / Tecom equipment rooms inspected in their
Circles / SSAs. to avoid any such incident, keeping in view the prevailing summer
season.
Compliance to this may be reported urgently for onward submission to
BSNL management.
(R.K. Sharma)
DDG (MS)
Corporate & Registered Office : Bharat Sanchar Bhawan, Janpath, New Delhi-1
Compiled and issued by Inspection Circle, Jabalpur in November 200956
Compiled and issued by Inspection Circle, Jabalpur in November 200957
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
O/o GM (MS)MSE Cell, Corporate OfficeBharat Sanchar BhawanJanpath Road, New DelhiTel No. 011-23716688Fax No. - 23766033Email : [email protected]
No. 19-30/2008-PHM-MSE dated : 18-12-2008
To,
All Chief General Managers,
Telecom Circles/Metro Districts/ Regions,
BSNL
Subject : Regarding safety from fire incidents.
A fire incident has occurred recently in one of the telephone exchanges.
The investigation committee of T & D Circle, has recorded that the incident has
occurred due to spark or loose connection in electrical circuit of the exchange. It
has been suggested by the committee that the following measures be taken to
avoid such fire incidents in Telecom buildings :-
1. Whenever a run way is provided above or near to A/C units, some guarding
arrangements are to be done for the run way with reasonable separating
distance from the A/C units.
2. Instead of fixed glass panels window type glass panels may be provided
so that the smoke can be evacuated immediately.
3. The maintenance staff should be well educated about the fire alarm panel
and how to locate the fire zone etc..
4. The maintenance staff should be well educated about the fire alarm panel
even it if is a false alarm.
5. Sand buckets should be availabe in every exchanges near the switch room
and at a reasonable access place.
6. Formation of fire safety officers for each building and conduction fire drill
exercise once in a quarter are to be monitored by a JAG level officer.
7. A non exchange line to the nearest fire station should be provided as far as
possible.
8. The key of the locked rooms where technical installations are provided should
be kept in a very easy accessible place.
The above instructions may be followed strictly to avoid any such incident
in future and compliance to this effect may be sent to this office.
(Rajesh Kumar)
DGM (MSE)
Registered & Corp Office : Bharat Sanchar Bhawan, Janpath, New Delhi-1
Page - 2
Compiled and issued by Inspection Circle, Jabalpur in November 200958
Compiled and issued by Inspection Circle, Jabalpur in November 200959
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
O/o GM (MS)MSE Cell, Corporate OfficeRajesh Chander Mathur Lane, New DelhiTel No. 011-23710299, Fax No. 23766033Email : [email protected]
No. 19-30/2008-PHM-MSE dated : 02-03-2009
To,All Chief General Managers,Telecom Circles/Metro Districts/ Regions,BSNL
Subject : Regarding safety from fire incidents.
A fire incident had occurred recently in one of the telecom buildings. Theinvestigation committee of T & D Circle, has recorded that the incident had oc-curred due to short circuit in the electrical raiser (cable chamber) between thirdand first floor of B.S.N.L. building. It has been suggested by the committee that thefollowing measures be taken to avoid such fire incidents in Telecom buildings infuture :-
1) Implementation of AFD for fire detection.
2) As per CPW norms the fire fighting arrangement should be made.
I) Provision of wet raiser system. (Minimum water storage as per require-ment)
II) Provision of fire extiguisher of latest technology.
3) Provision of storage shelves in the computer cell.
4) Fire drill to be conducted for equipping the staff to reach in such a situation.
5) Phase failure alarm to be fixed in each floor and one excluively for comptuercell in case of phase failure to UPS wiring and connections.
6) Provision of emergency exit in the building.
7) Floor warden should be nominated (main and standby) for Electrical / othermaintenance associated with it.
8) Action to be taken for weeding out unusable item in each floor.
It is reiterated that the above instructions along with the other instructionsissued from time to time by this office may be got adhered to strictly andcompliance to this effect may be sent to this office.
(Rajesh Kumar)
DGM (MSE)
Registered & Corp Office : Bharat Sanchar Bhawan, Janpath, New Delhi-1
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
O/o GM (MS)MSE Cell, Corporate OfficeBharat Sanchar BhawanJanpath Road, New DelhiTel No. 011-23710299,Fax No. 23766033Email : [email protected]
URGENT
No. 19-30/2008-PHM-MSE dated : 30-04-2009
To,
All Chief General Managers,
Telecom Circles/Metro Districts/ Regions,
BSNL
Subject : Regarding safety from fire incidents.
This office has issued Guidelines for safety from the incidents from time
to time vide letters dated 11.09.2001 (available on intranet), 25.08.2008, 18.12.2008
and 02.03.2009. However it seems that these guidelines are not being followed as
fire incidents are occurring quite frequently. The guidelines to be followed strictly
are being reiterated as following :-
1. Implementation of AFD for fire detection.
2. As per CPW norms the fire fighting arrangement should be made as fol-
lowing.
I. Provision of wet raiser system. (Minimum water storage as per
requirment.
II. Provision of fire extinguisher of latest technology.
3. Provision of storage shalves in the computer cell.
4. Fire drill to be conducted for equipping the staff to reach in such a situa-
tion.
5. Phase failure alarm to be fixed in each floor and one exclusively for com-
puter cell in case of phase failure to UPS wiring and connections.
6. Provision of emergency exit in the building.
7. Floor warden should be nominted (main and standby) for Electrical / other
maintenance associated with it.
Compiled and issued by Inspection Circle, Jabalpur in November 200960
Compiled and issued by Inspection Circle, Jabalpur in November 200961
8. Action to be taken for weeding out unnsable item in each floor.
9. Stores to be inspected regularly and should be on raised platforms. Stores
should also be inspected by fire department of the building and fire fighting
equipments should be provided.
10. The proper rating fuse should be used in the main distribuion of AC supply.
11. DCDB panel should be used mandatory at the time of installation of Tele-
phone Exchange.
12. AC power supply should be through power distribution panel of incoming
power feeder.
13. Safe working of air-conditions should be ensured.
CMD has desired that all steps for prevention of fire incidents be com-
pleted within two weeks & a report be sent to the Corporate Office.
(Rajesh Kumar)
DGM MSE
Registered & Corp Office : Bharat Sanchar Bhawan, Janpath, New Delhi-1
Precautions/causes against Fire incidents in Telephone Exchanges/buildinds.
Major causes of Fire :1. Short circuit in switching racks.
2. High voltage reaching MDF on account of telephone lines coming in con-tact with high voltage lines and also on account of lightening.
3. Short circuits / loose connection/over loading in DC power cables/sys-tem.
4. Storage of hazardous materials.
5. Indiscriminate additions to existing Electrical wiring without proper tech-nical organization.
6. Improper maintenance of Electrical Safety Devices like Over load relays,Interlocking devices.
Preventive Measures :-
1. Automatic fire detection system and alarm
2. Fire Extingushers.
3. Wet risers in buildings more than 15 meters high.
4. Fire Manual which given details regarding fire drills and other precautionsto prevent fires.
Spread of Fire1. Power cables, both A.C. &D.C., intersuit wiring and subscirber cables should
be laid separately, so that short circuiting and fire prone set of cablesdoes not spread to other cables also. While laying cables does not spreadto other cables are not laid on sharp edges which can with the passage oftime damage the insulation and cause short circuit and also not subject toany other mechanical strain. Engineering instructions should be strength-ened if required.
2. In order to isolate MDF from higher voltages, Engineering instruction shouldbe examined for further strengthening this area. Importance of regularcheck of earthing and lighening protection to be emphasized. Next checkdue on... kind of notice can be mounted in MDF and exchange incharge'sroom to draw attention and enforce regular check.
3. Barriers should be created at suitable intervals in addition to the require-ment of normal fire byelaws while laying cables so that fire in one sectiondoes not travel freely along the cables. As per fire byelaws barriers arealready required at the floor crossings. It is felt that barriers should alsobe created along the horizontal runs of the cables. Details of barrier rec-ommended are as per drawing-I.
4. The specifications of the insulating material of the cables should be re-viewed and strengthened with an objective to ensure that the burning ofthe insulation is confined to barest minimum length of the cable and alsoit generates minimum smoke.
Compiled and issued by Inspection Circle, Jabalpur in November 200962
Compiled and issued by Inspection Circle, Jabalpur in November 200963
Minimising fire incidences and also losses on this account
1. Identification of a fire Warden for each building along with a Deputy. Hehas to ensure that fire prevention, detection and fighting systems are keptin proper shape. As far as possible the fire warden shall be provided ac-commodation in the building complex.
2. A Display Board which should tell the next due date for fire drill should beprovided at least at two places in the rooms of GM/Dy. GM/DET/SeniorMost Officer. The due date should be painted (i.e. recorded on a perma-nent basis and not to be written with chalk). When on the due date exer-cises is conducted, the next date can be painted. Ref. drawing-e.
3. Fixing a plate in the MDF room and also in room senior officer mentioingthe next date for earth and surge lightening protector check.
4. Issuing a personal card to each occupant of the building having instruc-tions regarding sets to be taken in case of fire.
5. Fixing the important fire instructions inside each room. This will ensurereading of the instructions by the occupants of the building. Fixing thesein common areas is not considered an effective solution.
6. Provision of Fire Barrier as per drawing enclosed at all floor/wall cross-ings of all cables laid in exchange.
7. Out of the staff available ensuring human presence round the clock inswitch room for early detection and fire fighting during initial stages of fire.
8. Exploring the [prossibilities of emproving/strengthening the specificationsin regard to the quality of insulation of D.C. power and telephone cablesso as to further retard the spread of fire and generation of smoke.
9. Providing automatic small independent fire quenching systems at imprtantfire prone locations in addition to fire extingushers as per norms.
10. Maintenance of fire detection and fire fighting systems in working throughspecialized agencies by entrusting the same to Electrical Wing and en-suring fire drill at regular intervals and certificate.
Fire control particularly in the following areas need to be scrupulouslyfollowed :
1. Observing Engineering instrucions with regard to the cable laying par-ticularly in regard to safety from mechanical damage. Earthing continuityat joints.
2. Making additions / alterations in the existing system and use of new gad-gets only after clearance from electrical maintenance unit as well as build-ing incharge.
3. Following the guidelines including in the Fire Manual particularly in re-gard to keeping building free from hazardous materials (dry grass, pack-ing cases, thermocol etc.) and ensuring passages, emergency exits andarea around the building clear of any obstructions.
Preliminary investigations reveal :
1. The non-availability of basic firefighting arrangements at the site.
2. No proper storage of the store items.
3. Non utilization of huge quantities of sotre items since long.
4. Non disposal of unserviceable and obsolete material.
5. Whenever a run is provided above or near to A/C units, some guardingarrangements are to be done for the run way with reasonable separatingdistance from the A/C units.
6. Instead of fixed glass panels window type glass panels may be providedso that the smoke can be evacuated immediately.
7. The maintenance staff should be well educated about the fire alarm paneland how to locate the fire zone etc..
8. The maintenance staff should be well educated about the fire alarm paneleven it if is a false alarm.
9. Sand buckets should be available in every exchange near the switch roomand at a reasonable access places.
10. Formation of fire safety officers for each building and conduction fire drillexercise once in a quarter are to be monitored by a JAG level officer.
11. A non exchange line to the nearest fire station should be provided as faras possible.
12. The key of the locked rooms where technical installations are providedshould be kept in a very easy accessible place.
Compiled and issued by Inspection Circle, Jabalpur in November 200964
Compiled and issued by Inspection Circle, Jabalpur in November 200965
D.O. No. 19-2/2009-PHM/MSEDated 25th July 2009
Dear Shri
It is observed that there has been a spurt in fire incidents in the recent past.Some of them have caused extensive damage to the telecom equipments anddisrupted the telecommunication services. One such incident took place at Cir-cus Telephone Exchange at Kolkata. The entire transmission room was burnt,most of the long distance modems redued to ashes, service from the main ex-change and associated RSUs and DLCs to around 64,000 telephone customers,12000 broadband customers and 3,000 leased line customers were interrupted.It caused a huge financial loss and also adversely affected the goodwill of BSNL.
2. An analysis of various fire incidents that took place in the past reveals thatthe following are found to be the main reasons for fire incidents :
i) Fire starting from window air conditioners;ii) External surge of voltage passing through to exchanges equipments;iii) Overloading of electrical wires and short circuits in electrical installa-
tions;iv) Inadequate protective devices in the eletrical installations.
Many of these fires could have been prevented/ contained and the damagescaused reduced if appropriate precautions had been taken as conveyed by thisoffice from time to time and contained in the Fire Protection Manual issued byT&D Circle (copy already sent)
To prevent occurrence of fire and contain its spread, I would like you to takethe following steps immediately :
Constitute special teams to carry out the inspection of all the vital buildingshousing exchanges and transmission equuipment to check whether the mea-sures taken are appropriate. The team should make special checks on the follow-ing immediately.
(i) Check that all the window air conditions are properly functions and arebeing maintained properly, they do not draw excessive current and thetemperature is maintained in the switch room at an appropriate level.Such air conditioners are not supposed to run continuously. Theswitchover arrangement. should be operational. The air conditioners areto be serviced regularly as per schedule and AMC is properly main-tained/ implemented.
§ýÕà y Þ©uà 308, s àÊm y Þj àÊ ÇàwÂà, ÑÊãÎà j Âô t àn äÊ v çÂà,k Âàqn , Âà¢ê âÀÌ v ã- 110001ÀåÊs àx ß §ýàuàêv u ß 91- 11- 23738999Äèý̈ y ß 91- 11- 23734242 ¢ê- t çv ß [email protected] No. 308, Bharat Sanchar Bhawan, Harish Chandra Mathur Lane,Janpath, New Delhi - 110001Ph. : 91-11-23738999 Fax : 91-11-237342429E-mail : [email protected]
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
Êàk çÎà wo wàâÂàÀçÎà§ý ( qPj àv Âà)
Rajesh WadhwaDirector (Operation)
CONFIDENTIAL
(ii) Circuit breakers, HRC and other fuses wherever they exist are of speci-fied/matching capacity, which would give proper protection to the equip-ments and the electrical wirings. None of these protective devices is tobe by-passed by copper wires etc. Electric wiring should not be over-loaded beyond its capacity. Insulation should be proper and earth wiresshould be properly provided and used.
(iii) Protective devices in MDF (IPM etc.) are fully provided.(iv) Fire alarm system functions properly. All the fire detection points are
tested to sense the fire within a prescribed time and give alarm.(v) It has been noticed that in some of the fire cases, the keys of the trans-
mission room are sometimes not avalable. Keys of all the equipmentrooms which are kept locked at night should be available in the securityroom.
(vi) Inflammable material/store are not kept in the telephone exchange build-ings.
(vii) Fire extingushers are sufficiently provided and that they are refilled fromtime to time before their expiry date.
(viii) There should be free access in buildings to the fire personnel to controlthe fire, adequate passage should be made available for movement ofFire Brigade and their personal. Availability of sufficient water (watertank) etc. for firefighting is to be ensured.
(ix) The local fire authorities should be contacted to ensure that they areproperly equipped to reach the higher floors of our multistoried build-ings.
(x) The instructions of MS Cell and those contained in T&D Circle's FireProtection Manual are fully followed.
3. The inspection of all the electrical and other installations as mentioned abovemust be completed within one month and a confirmation be sent to me that all thecorrective actions have been taken. A few exchange buildings may please beinspected personally at your level to ensure that appropriate actions have beentaken and there is no slackness in this regard.
4. I would further like you to go through the reports for fire incidents which hadoccurred in your Circle during the last two years and see why they were notprevented/ contained. Also if there were any lapses on the part of the officer/staff,the responsibility must be fixed and suitable action taken against the erring of-ficer/staff. Please send me a special report on it within a month.
With best wishes.Yours sincerely,
[Rajesh Wadhwa]Chief General ManagerAll Telecom Circles/DistrictsBSNL
Copy to : CMD-BSNL
Compiled and issued by Inspection Circle, Jabalpur in November 200966
Compiled and issued by Inspection Circle, Jabalpur in November 200967
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
NOW CellMSE Section, Corporate Office,Bharat Sanchar Bhawan,Janpath Road, New DelhiTel No 011-23714455,Fax No. 23766033Email : [email protected]
D.O. No.19-2/2009-PHM/MSEDated 27th July 2009
Dear Sir,
It is observed that there has been an increase in number of fire incidentsin BSNL buildings/exchanges. Some of them have caused extensive damage tothe telecom equipments and disrupted the telecommunication services. T & D Circleis the nodal unit to carry out investigations for all fire incidents and also to suggestcorrective actions in time. There has generally been a long delay in submission ofthe reports. Hance it is requested that the final inspection reports on fire incidentsmay be submitted within a month of occurrence of fire.
The fire protection manual were issued by T&D Circle(presently Inspection Circle)in 1985 and the same needs to be revised/updated keeping in view the findings ofvarious investigation reports of fire incidents that have occurred in current andprevious years. Copy of the various instructions issued from this office to field unitsare attached for your reference. The updated fire protection manual may be recir-culated in the field units.
Also during Inspection Circle's inspection of the exchanges, special emphasis onfire detection, fire protection mechanism, fire protection devices as well as electri-cal/short circuit devices and protection at MDF may be given. The inspecion reportshould contain specific observations/recommendations in this regard.
I would like to bestow your personal attection on the matter and submit compli-ance.
With regards.
Yours sincerely,
R.K. Sharma
GM (NW-Ops)
Shri Yamuna PrasadChief General ManagerInspection CircleJabalpur
s àÊm y Þj àÊ âÂàªàt âv ât ¹ çþ»þ( s àÊm y ʧýàÊ §ýà £ ù t )
BHARAT SANCHAR NIGAM LIMITED(A Govt. of India Enterprise)
O/o GM (MS)MSE Cell, Corporate OfficeBharat Sanchar BhawanJanpath Road, New DelhiTel No. 011-23710299,Fax No. 23766033Email : [email protected]
URGENTNo. 19-2/2009-PHM-MSE dated : 29/09/2009
To,
All Chief General Managers,
Telecom Circles/Metro Districts/ Regions,
BSNL
Subject : Regarding precautions to be taken for prevention of fire incident.
Recently a severe fire incident took place in one of the telephone exchage
of Calcutta Telecom District and destroyed equipments. Committee constituted by
the competent authority for investigating the cause of incident has suggested in
its report the following precautions to be taken for preventing occurrence of such
incidents in future which may be followed strictly :-
1. Keys of all the rooms in a building shall always be made available with the
security personnel with distinct tag with each key for easy identification of
the room/door, floor etc.
2. Fire detecion and fire fighting systems must be maintained in fully func-
tional condition and the same shall be as ascertained conducting periodi-
cal inspection/testing.
3. During holidays and after office hours, one person out of the staff available
on duty shall take a round of the entire building at frequent interval, ensur-
ing human presence for early detecion and fire fighting at the initial stage
of fire.
4. All existing guidelines regarding prevention and fire fighting, including In-
dian P & T Department Engineering instructions on prevention of fire in
Telecommunication buildings should be strictly followed.
5. Provision of fire barrier with Bakelite sheet of suitable thickness/glass wool/
pebbles etc. at all floor / wall crossings of all cables laid in exchanges to
prevent spread of fire from one room to another.
6. Fixing the important instructions related to fire including telephone num-
Compiled and issued by Inspection Circle, Jabalpur in November 200968
Compiled and issued by Inspection Circle, Jabalpur in November 200969
ANNEXURE – IISAFETY FOR OFFICE BUILDING
Building other than telephone exchange buildings shall be providedwith automatic fire detection system as per local fire by-laws. In casethere are no fire by-laws, buildings 15 mts in height shall be providedwith automatic fire detection system.
The area to be protected by ionization and photoelectric detectorsshall be generally in accordance with the standards laid down below.Additional detectors if any shall be provided as per user’s require-ment.
(a) Each detector shall cover an area not exceeding 25 sq. meterin case of air conditioned equipment room.
(b) Each detector shall cover an area not exceeding 40 sq. meterin case of non-air conditioned technical rooms.
(c) Each detector shall cover an area not exceeding 50 sq. meterin case of rooms having no equipment.
(d) Each detector shall cover an area not exceeding 10 sq. meterwhen provided above false ceiling or below false flooring orover fully covered cable network.
(e) Area separated by beams having depth of minimum 450 mmshall have separate detectors irrespective of area.
(f) Maximum horizontal distance between centre to centre of heatdetector and smoke detector when provided in corridor shallnot exceed 10 meters.
bers of fire brigade, police and senior officers inside rooms/ common space.
This will ensure reading of the instructions by all concerned.
7. The fire-drills must be conducted at regular intervals. The date of last fire-
drill as well as the next due date shall be permanently displayed in common
places.
8. Issuing a personal card to each staff containing instructions regarding steps
to be taken in case of fire.
9. Exchange equipment earth measurement shall be conducted regularly and
the same shall be maintained as per standard norms.
10. Equipment rack spacing standard shall be maintained even at the time of
installing additional equipment to avoid congestion and excessive genera-
tion of head causing fire.
11. Fire-audits may be conducted for the buildings and suggestions of the audit
be implemented without delay.
12. Providing automatic independent fire extinetion systems at important fire
prone locations in addition to fire extinguishers.
13. Suitable isolation of battery power supply to equipment in the event of fire
should be provided through HRC fuses/knife switches.
14. The MCB feeding power to the equipment and DCDB should be checked
with fixed preiodicity.
15. Loose wiring and sub-standard wiring specially for pedestal fans, heaters
and testing equipment should be avoided.
16. Pedestal fan should no be operated unattended.
17. Electrical inspection as per Indian Electrical Rules 1963, Section 44A, 46A
and 47 are mandatory and to be conducted by designated electrical inspec-
tion of BSNL.
18. Fire inspection to be conducted as per National Electricity code, Local Mu-
nicipal fire byelaws and fire protection manual and instructions issued from
time to time.
19. Energy Audit to be conducted by energy auditors/managers as per Energy
Conservation Act 2001.
(Rajesh Kumar)
DGM, (N.W.-Ops.-MSE)
Compiled and issued by Inspection Circle, Jabalpur in November 200970
Compiled and issued by Inspection Circle, Jabalpur in November 200971
ANNEXURE-III
List of Major Fire cases reported to Inspection Circle, Jabalpurduring last three years
S.No.
ExchangeName
Date ofincident/Date ofintimationreceived
Date ofinvestiga-tion reportreceived
Probablecause offire
Loss ofproperty interms ofamount
Remarks
01. Achnera
Tele/Exch
in Agra
SSA.
02. Araria T/E
in Katihar
SSA,
Patna.
03. Sector-17
T.E.,
Chandigarh
01.04.06
03.04.06
19.04.06
23.12.06
30.06.07
02.07.07
29.06.06
23.12.06
27.07.07
Due to
short
circuit in
the AC
unit
Due to
short cct.
In DC
power
cable.
Due to
short cct.
In split AC
Rs.
51,55,056/-
Rs.
5,50,865/-
Rs.
1,80,80000
1. Same from extra
load.
2. Check proper
functioning of Mains
supply.
3. Water tank should
be provided in
exchange.
4. Fire drills must be
conducted at regular
intervals.
1. All the cable entry
holes should be
properly sealed
prevent entry of
rodents.
2. Proper mainte-
nance and routing
inspection of AFD
system should be
ensure log book
should be main-
tained for the same.
3. Separation should
be maintained while
laying power and
telecom cables.
Suggestions are
annexed at Ann-I
04. Shankosal
T.E.,Jharkhand,
Jumshedpur
05. KodiawadaTE,
Kodiawada.
06. JambusarTE,
Bharuch,Gujrat.
10.10.07
10.10.07
26.04.0828.04.08
13.04.0911,05.09
19.02.08
30.06.08
30.06.09
Due to
induce inpower
cable.
Due to fallof 11kv
hightension
wire.
due to
short cctin
windowAC.
Rs.
1,52,0117/-
Rs. 1 Crore
Rs.
10 lacs
1. Provision of IPM &VDRs on subscriber
lines at MDF mustbe made compul-
sory and indepen-dent verification at
regular intervals maybe verified.
1. Main Distribution
for AC supply mustbe provided with
suitable rating atfuses.
2.DCDB panel mustbe provided in
exchange as a partof installation.
3. AC power supplyto be provided
through powerdistribution panel at
incoming powerfeeder.
1. Window ACsshould be replaced
by Split A/Cs.2. Proper distance
should be main-tained between split
A.C. and equipmentrack.
3. A.C. changeover/timer switch must be
provided.4. E/A log book and
other registers maybe kept outside the
E/A room aftermaking entries.
5. Electricalappliances and
wiring may bechecked periodically
to avoid short circuit.
Compiled and issued by Inspection Circle, Jabalpur in November 200972
Compiled and issued by Inspection Circle, Jabalpur in November 200973
07. Circus TE
CalcuttaCTD
Circle.
08.07.09
09.07.09
17.08.09 Due to
short cctcaused
due tooverheat-
ing ofrepaired
wiringmade for
Split AC.
Rs.
1 Crore
H 1. The split A/C units and Window A/C units should be avoided in major telecom
nodes as these lead to major fire hazards. Only package type A/C plant should be
provided for such nodes.
2. If it is unavoidable to provide Split/Window type A/C units, following preventive
steps should be taken:
i) Comprehensive maintenance of the A/C units to be done, consisting of four
to six routine visits in a year for a systematic checkup and overhauling of
units if required. The electrical wing should keep the maintenance log of all
A/C units of the site and it is to be countersigned quarterly by DE in-charge
of the Telecom node for verification.
ii) In major telecom nodes, Programmable Logic control panel should be pro-
vided and properly maintained for rooms having multiple A/C units. This should
work on auto mode.
iii) In case where change over of A/C units is done manually, a register is to be
maintained to log the change-overs. SDE(Electrical) shall be responsible
carry out the same. It is to be ensured that no A/C unit is operated for pro-
longed period which may cause overheating.
iv) The heating load capacity of the telecom installations vis-à-vis the cooling
capacity of the A/C units installed in a room should be regularly assessed by
DE In-charge. If required, additional A/C units, should be provided immedi-
ately.
v) To overcome effects of voltage fluctuation, voltage stabilizers for A/C units
may be provided.
3. Periodical check and maintenance of fire alarm system and fire fighting system
in Telephone exchanges and Transmission centres should be done.
4. All Telephone Exchange building should have fire escape route. This is very
essential for safety of the people present in the building during fire.
5. Regular check of earth as per DOT/BSNL guideline issued from time to time.(Vide
Latest BSNL order no.36-3/2004/PHM dated 21.07.2004)
6. Preventive measures to be adopted to avoid fire incidents in Telephone Exchanges/
Buildings(as per BSNL order no. 19-30/98-PHM dated 11.09.2001)
7. Log book should be maintained in Battery & Power Plant Room, E/A room, A/C
plant etc, properly.
8. Manual Power shut down, if necessary in emergency cases, must be noted in the
log book with start time & restoration time.
9. Fire Brigade can be requested to use suitable material instead of water in case of
Fire in Telephone Exchanges. It is suggested that the matter may be explored after
consultation with both senior officers of Calcutta Telephones and the Fire Brigade
authority, which type of material will be suitable to extinguish the fire caused by the
electronic equipments, foam was used for oil, varnish & paints, CO2 was used for
the fire caused by Electrical equipments, water was used to extinguish the fire
caused by the furniture, paper etc & dry power was used for all type of fire. Nowa-
days probably Halon is not used due to environment pollution. (as suggested by the
Scientists).
H
ANNEXURE - IV
MODEL FIRE EQUIPMENT PLAN FOR RURAL
EXCHANGES
Compiled and issued by Inspection Circle, Jabalpur in November 200974
Compiled and issued by Inspection Circle, Jabalpur in November 200975
PLATFORMAT PLINTH LEVELE/A3000X3000
9705
600
1000
700
900
600
900
600
5760
600 600 700 700 500 500 500
100 100
W
V
W
UP
GROUND FLOOR PLAN
Ionisation DetectorAC Area upto 25 Sq meter per Detector
W
W
W
PLATFORMAT PLINTH LEVELE/A3000X3000
9705
11415
600
600
700700
500500
500
100
100
V
W
UP
WWW
KITCHEN2500X2100
2641
D
DW2
2500
D2
V
V
BATH2100X1200
WC1200X10BATH
DINING5180X4700
BED2825X3300
LIVING2925X3756
+600
OTTA
W
W
UP+ 0.00
8475
GROUND FLOOR PLAN
7631
D2
Ionisation DetectorAC Area upto 25 Sq.meter per DetectorNon AC upto 40 Sq. Meter per Detector
Compiled and issued by Inspection Circle, Jabalpur in November 200976
Compiled and issued by Inspection Circle, Jabalpur in November 200977
A/T OF TRANSMISSION SYSTEMS:
Long distance Transmission systems which form the back-bone of National
Trunk Network consisting of Microwave, Satellite, Optical Fibre Cable are
also subjected to rigorous Acceptance testing to ensure reliable and trouble
free NSD & ISD facilities and Data transmission. All the transmission sys-
tems installed by Telecom Projects at Mumbai, Chennai, Kolkata and New
Delhi and also by Task Force at Guwahati are A/Ted by this unit.
ISSUE OF ENGINEERING INSTRUCTIONS:
INSPECTION Circle issues Engineering instructions on different topics for
use by the field units of the Department, covering latest switching and trans-
mission systems for the benefit and use of the field staff of the Department.
POWER & TELECOM CO-ORDINATION COMMITTEE
In order to ensure safety of Telecom assets & personnel and interference
free working of Telecom systems, Telecom Co-ordination Committee (PTCC)
has been set-up in the year 1949. The main function of PTCC is to examine
all new cases of power and telecom lines and cables and recommend pro-
tection measures in order to ensure safe and satisfactory working of Telecom
systems. Major co-ordination problems in the field are settled in PTCC meet-
ing being held regularly at Central, State and Divisional state levels. At
central level, policy matters are decided and guidelines issued so also the
unsettled cases at state level are discussed and settled.
PUBLISHING TELECOMMUNICATIONS JOURNAL:
INSPECTION Circle is publishing a technical journal titled TELECOMMU-
NICATIONS since 1951. The journal is being published on a bimonthly ba-
sis. The Journal has entered into 59th year of publication. The circulation of
the journal is around 7000 copies and quite popular in the telecom sector.
INVESTIGATION OF FIRE CASES:
INSPECTION Circle is playing important role in investigation of fire inci-
dences in Telecom installations.
FUNCTIONS AND ACTIVITIES OF INSPECTION CIRCLE
Important functions of INSPECTION Circle can widely be classified as fol-
lows:
1) Inspection of various Telecom installation & nodes.
2) Acceptance and Testing (A/T) of Switching Systems more than 2K
capacity.
3) Acceptance and Testing (A/T) of Transmission Systems more than 8
mbps capacity.
4) Issue of Engineering Instructions
5) Power & Telecom Co-ordination Committee
6) Publishing TELECOMMUNICATIONS journal.
7) Investigation of fire cases.
8) Sample check of installations done & Acceptance and Testing(A/Ted)
by Territorial Telecom Circles.
9) Providing Web based Acceptance Testing Offer Management Sys-
tem (ATOMS) for Territorial Circles and Corporate Offices.
This circle has been playing an important role in the introduction of new
Telecom systems and technologies by participating in validation of equip-
ments/ systems and participation in various working groups for preparation
of technical specifications
A/T OF SWITCHING SYSTEMS:
Acceptance testing is carried out for all types of Electronic Exchanges like
E10B, C—DOT MAX, EWSD, NEAX—61E, AXE—10, OCB- 283, FETEX-
150 NIB, ISDN, WLL, IMPCS etc.
Compiled and issued by Inspection Circle, Jabalpur in November 200978
Compiled and issued by Inspection Circle, Jabalpur in November 200979
Circle office- Sanchar Vikas Bhawan, Residency Road,Jabalpur-482001
Name and Designation of Telephone Number FAX Number ResidenceOfficer Office/ Mobile no.
Shri Jamuna Prasad 09425001700 0761-2678592
Chief General Manager,
Shri G.C.Manna, 0761-2622192/ 0761-2678592
GM(HQ) 09425803500
Shri J.S.Tomar, DGM(A) 0761-2622500/ 0761-2678592
09425001225
Shri I.K.Dutta, 0761-2626700/ 0761-2626700
AGM(SW/TR) 09425801073
Shri Prasanna, 0761-2626700/ 0761-2626700
SDE(SW/TR) 09425801173
Shri H.L.Badgainya, 0761-2629250/ 0761-2678592 07612425876
JTO(SW/PTCC) 09425801083
Circle office Telephone Number FAX Number Residence Office/ Mobile no.
Shri H.L.Badgainya, 0761-2629250/ 0761-2678592 07612425876
JTO(SW/PTCC) 09425801083
Contact for further information/suggestions
(Restricted for circulation among BSNL field units)
Officers to be contacted in case of fire for investigations
Inspection Circle Fire Investigators (ICFI)
CIRCLE
1ST OFFICER
NAME & DESGN
MOBILE
2ND OFFICER
NAME & DESGN
MOBILE
AP
A&N
Assam
Bihar
CGRH
CHTD
CTD
ETR
GUJ
HIM P
HR
JK
JKHAND
KERALA
KTK
MH
MP
NE-I
NE-II
ORISSA
PB
RJ
TN
UAL
UP(E)
UP(W)
WBTC
P.V.KONDAL RAO, DET
NURUL ANOWAR, DET
N.J.KAKATI, DET
M.M. CHOWDHARY, DET
DET A/T RAIPUR
G.NAGARAJAN, DET
NURUL ANOWAR, DET
NURUL ANOWAR, DET
M.L.TAILOR, DET
AVINASH OBERAI, DET
M.L.ARORA, DET
S.K.PARIMOO, DET
P.K. JAIN, DET
K N GOPALKRISHNAN DET
K.V.SHASTRY, DET
H.G.TIDKE, DET A/T
U.M.PATHAK, DET
R.PRASAD, DET
K.P.VIJAYAN, DET
N.SATYANARAYANA, DGM
M.L.ARORA, DET
B.S.MEENA DET A/T-II
G.NAGARAJAN, DET
JAGDISH CHANDRA DET
P.K.AGRAWAL, DET
J.C.BAJAJ, DET
NURUL ANOWAR, DET
040-27862229, 09440000204
(033) 2241-0863, 9433000457
0361-2736540, 09435000036
(0612) 2230255, 09431000059
0771-2881555 09425201300
09443100469
(033) 2241-0863, 9433000457
(033) 2241-0863, 9433000457
079-25509050, 09427617454
2626754, 09418015473
0172-2236470 09463602109
0191-25664125 09419120201
(0651) 2201357, 09431103008
09447034567
080-23530607, 09448010366
022-26608409, 09422475553
0755-2600840, 09425201300
0364-2222617, 09436155432
0386-2228432, 094436831226
040-24567788, 09490000638
0172-2236470, 09463602109
0141 2224700 0941400121
09443100469
0522-2710717, 09412998999
0522-2209654, 09415335225
0522-2622600, 09810093163
(033) 2241-0863, 9433000457
N.SATYANARAYANA, DGM
K.P.CHATTOPADHYAY, DGM
A.K.SINHA, DGM
K.P.CHATTOPADHYAY, DGM
P. GOYAL, DGM
V.GANESEN ,DGM
K.P.CHATTOPADHYAY, DGM
K.P.CHATTOPADHYAY, DGM
P. GOYAL, DGM
ROBIN ADAWAL, DGM
S. SINGHAL, DGM
S. SINGHAL, DGM
K.P.CHATTOPADHYAY, DGM
V.GANESEN ,DGM
N.SATYANARAYANA, DGM
P. GOYAL, DGM
P. GOYAL, DGM
A.K.SINHA, DGM
A.K.SINHA, DGM
N.SATYANARAYANA, DGM
S. SINGHAL, DGM
S. SINGHAL, DGM
V.GANESEN ,DGM
ROBIN ADAWAL, DGM
ROBIN ADAWAL, DGM
ROBIN ADAWAL, DGM
K.P.CHATTOPADHYAY, DGM
040-24567788, 09490000638
033-22417955, 9433000681
0361-2601122, 09435000035
033-22417955, 9433000681
022-26610354, 09422475554
044-22300011, 09444000450
033-22417955, 9433000681
033-22417955, 9433000681
022-26610354 , 09422475554
0522-2324730, 09415006100
0172-2728234 ,09463903399
0172-2728234 ,09463903399
033-22417955, 9433000681
044-22300011, 09444000450
040-24567788, 09490000638
022-26610354 ,09422475554
022-26610354 ,09422475554
0361-2601122, 09435000035
0361-2601122, 09435000035
040-24567788, 09490000638
0172-2728234 ,09463903399
0172-2728234 ,09463903399
044-22300011, 09444000450
0522-2324730,09415006100
0522-2324730,09415006100
0522-2324730,09415006100
033-22417955, 09433000681
Compiled and issued by Inspection Circle, Jabalpur in November 200980
A BIMONTHLY TECHNICAL JOURNAL PUBLISHED BY THE CHIEF GENERAL MANAGER, T & D CIRCLE, JABALPUR
SUBSCRIPTION RATES(Effective from July-August 2007)
1. Subscription Per Copy(Postage Rs. 15 extra)(i) Students : Rs. 27.00(ii) DOT & BSNL Employees : Rs. 30.00(iii) Others : Rs. 33.00
2. Annual Subscription (6 Issues in a year)(Inclusive of Postage)(i) Students : Rs. 225.00(ii) DOT & BSNL Employees : Rs. 240.00(iii) Others : Rs. 255.00
3. Annual Subscription (6 Issues in a year) : Rs. 210.00(For more than 5 copies)
4. Life Membership(i) Students : Rs. 1500.00(ii) DOT & BSNL Employees : Rs. 2000.00(iii) Others : Rs. 2200.00
Note :(i) Advance payment should be sent by crossed Demand
Draft payable to Secretary, Telecommunications, Jabalpur.(ii) No discount is allowed to Agencies.
ADVERTISEMENT TARIFF(Effective from September-October 2001)
Particulars Balck & White Multi-colour
Full page Half Page (Up to 4 Colours)
l Back Cover Rs. 3,000/- - Rs. 12,000/-
l Inner Cover Rs. 2,500/- - Rs. 10,000/-
l Inner Pages Rs. 1,500/- Rs. 800/- Rs. 8,000/-
l Wild Card Rs. 2,500/- - Rs. 10,000/-
(On glazed paper)
Note : 1. 15% discount on booking for one year (i.e. six inser-tions) or more.
2. 5% additional discount for Agencies sponsoring two ormore advertisement for one year.
HONORAFIUM
The author(s) whose articles are published in the Journalwill be awarded honorarium @Rs. 2500/- (Rs. Two thou-sand Five hundred only) per article.
COPYRIGHT
The entire contents of ̀ Telecommunications' are coveredunder Copyright Act by the Chief General Manager, T&DCircle, Jabalpur. Special permission is necessary to reprintarticles in part or full.
GUIDELINES FOR AUTHORS
l The articles should bear author's name and designation at the top of the first page. One passport sizephotograph in colour on glossy paper along with bio-data of the author should be sent with the articles. Thearticle should be sent in duplicate to the 'Managing Editor' at least three months before publication date.
l The article should be typerwritten with double spacing and wide margin, using one side of the paper only.Cyclostyled and hand written copies of the articles should be avoided. It is desirable that the authors shouldcarefully read and correct each page of the article and check the diagrams, figures, formulae etc beforedespatch.
l Titles of articles should be concise. Main and sub-headings should be inserted.
l Articles should be prefaced by a summary (synopsis) of 20 to 50 words.
l The use of the first person signular or plural should be avoided.
l The tracings for all the diagrmas contained in the articles should be sent along with the manuscript givingsuitable caption to each diagram. Diagrams may be spaced evenly in the article with proper reference.
l Reference to other articles or sources may be included as footnotes numbered consecutively throughoutthe text. Only the title of the publication in which the article referred to has appeared together with theVolume and number (if any) and page number should in general be given.
CLARIFICATION
l The Editorial Board will be glad to receive articles on telecom technologies and connected activities only.l Articles are selected for publictaion after careful scrutiny by Editorial Board.l Statements made and opinion expressed in the articles published are those of the authors. They do not
represent the views of Editorial Board otherwirse/unless made.l Reference to companies and manufacturer's products does not imply that they are endorsed by the pub-
lisher in preference to others.
COMMUNICATIONS
Readers enquiries, advertising requests and any other information should be sent to :Secretary Telecommunications, O/o Chief General Manager, Technical & Development Circle