    P

    hil Ester CorporationADDURU | BACAY | GONZALES | LORA | PUNO | TIBRE

    Criteria for Plant

    Location

    San Carlos Ecozone (SCE)

    Negros Occidental

    Mactan Export Processing

    Zone (MEPZ)

    Cebu

    First Philippine Industrial

    Park (FPIP)

    Batangas

    Discussion

    1. 

    Transportationfacilities

    available

    Mode of transportation is by

    road. Nearest source of

    ethanol will be the San Carlos

    Bioenergy Inc. located on the

    same ecozone.

    Ports are available fortransportation by sea.

    Offers wide concrete roadsystem.

     Availability of transportation

    facilities makes transportation

    of materials to and from plant

    more convenient. All locations

    have good transportation

    facilities.

    2.   Accessibility tothe targetmarket

    Distance between San Carlos

    City and Manila is 698.4

    kilometers. Travelling by sea

    will take 15 hours.

    Distance from Mactan to

    Manila is 851.2 kilometers.

    Will take 18 hours of travel

    Bataan, compared to Cebu

    and Negros, is closer to

    Manila and other part of

    Luzon where targetconsumers may be found.

    Some of the target industries

    are located in Luzon. SCE is

    nearer to Manila by

    approximately 150 km.However, majority of the client

    industries are located in within

    Cebu City making MEPZ more

    advantageous.

    3.  Water Sourcequality andquantity There are eight major rivers in

    the city.

    It has water potable

    waterlines with 400-cubic

    meter water tank and non-

    potable waterlines with 800-cubic meter water tank.

    It has a centralized

    distribution system backed

    up by standby generators.

    SCE has more sources of

    water which is an advantage

    to a manufacturing plant.

    4. 

    Specialbusinessincentives

     An enterprise that is registered to PEZA is entitled to special business incentives as

    follows:

      Income Tax Holiday (ITH) for 4 years to a maximum of 8 years

  • 8/9/2019 Comparison of Locations

    2/4

     

    P

    hil Ester CorporationADDURU | BACAY | GONZALES | LORA | PUNO | TIBRE

       After the lapse of ITH, exemption from national and local taxes; in lieu thereof, special5% tax rate on Gross Income

      Exemption from duties and taxes on imported capital equipment, spare parts, materialsand supplies.

      Tax credit for import substitution

      Exemption from wharfage dues, export tax impost or fees

      Tax credit on domestic capital equipment

     

    Tax and duty-free importation of breeding stocks and genetic materials

      Tax credit on domestic breeding stocks and genetic materials

       Additional deduction for training expenses (labor and management)

     

    Permanent resident status for foreign investors and immediate members of theirfamilies

      Employment of foreign nationals

       Additional deduction for labor expense (50 % of wages corresponding to increment innumber of direct labor subject to certain conditions)

    Simplified import –export procedures

     All locations are registered in

    Philippine Economic Zone

     Authority.

    5. 

    Climaticconditions

    There are basically two

    pronounced seasons in

    the area, the wet and dry

    season. The average

    temperature is 32 oC.

    The average temperature in Cebu is

    28°C.

    It experiences two types of

    seasons: dry from

    November to April and wet

    for the rest of the year.

    The production of ethyl

    acetate requires moderate to

    low temperature due to its low

    flash point and volatility.

    Therefore, climatic condition

    in Cebu City is more

    favorable.

    6. 

    Utilities cost and

    availability

    The cost of electricity in

    Negros Occidental is

    10.9125 pesos per

    kilowatt-hour as

    supplied by Northern

    Negros Electric

    Corporation (NONECO).

    The cost of electricity in Lapu-lapu

    City, Cebu is 9.0239 pesos per

    kilowatt-hour as supplied by Mactan

    Electric Company (MECO). The

    leading water distributor in Cebu is

    the Metropolitan Cebu Water

    The cost of electricity in

    Batangas as supplied by

    Batangas II Electric

    Cooperative Incorporated is

    9.4693 php. The minimum

    water rate as supplied by

    Batangas Water Supply

    Electricity is cheaper in Cebu

    than the other two locations.

    This can directly affect the

    cost of utilities thus increasing

    profit.

    http://en.wikipedia.org/wiki/Cebuhttp://en.wikipedia.org/wiki/Cebu

  • 8/9/2019 Comparison of Locations

    3/4

     

    P

    hil Ester CorporationADDURU | BACAY | GONZALES | LORA | PUNO | TIBRE

    Sipalay Water District

    distributes water to the

    city charging 27.90

    pesos per cubic meter.

    District. Water rate costs 15.23

    pesos per cubic meter.

    System costs 18.70 pesos

    per cubic meter.

    7.  WasteTreatmentfacility

     A centralized waste

    water treatment facilitiesis provided by the San

    Carlos Ecozone.

    Mactan Export Proccessing Zone

    has a sewage system of wastewatertreatment plant with treatment

    capacity of 400 cubic meters per

    day.

    FPIP has a centralized

    sewerage collection andtreatment facility for the

    secondary treatment of

    industrial and domestic

    waste.

     All has good built-in waste

    reatment facility. In addition, All locations are adjacent or

    near to bodies of water.

    Therefore, disposal of treated

    wastewater will be easier.

    8.  Constructioncost

    Cost for industrial land in

    San Carlos Ecozone is 9

    pesos per square meter.

    Industrial land at the Mactan Export

    Processing Zone is available at 8.50

    pesos per square meter.

    The cost of land in Batangas

    is 12 php per square meter.

    The greater the construction

    cost, the bigger investment

    will be required. In this case,

    construction in Cebu City is

    cheaper than the other two

    locations.

    9.  Operating labor

    The updated daily

    miminum wage rate in

    Region VI to where

    Negros Occidental is

    contained within is 287

    Php

    The mandated minimum wage in

    Region 7 under Class A is 340 Php

    for non-agricultural sectors.

    The most recent minimum

    wage for Region IV-A is

    335.50 pesos.

     All has good supply of

    manpower. The cost of labor

    in Cebu City, however, is

    comparably higher than in

    Negros. This is

    disadvantageous as it mayreduce the income of the

    company.

  • 8/9/2019 Comparison of Locations

    4/4

     

    P

    hil Ester CorporationADDURU | BACAY | GONZALES | LORA | PUNO | TIBRE

    10. Taxes The Local Government Code of 1991 allocated the taxing powers among local government

    units to prevent double and multiple taxation. If the land is used for commercial and industrial

    purposes, an assessment level amounting to 50% is applied.Same tax rates are applied.

    11. 

    Expansionpossibilities

    San Carlos Ecozone is a

    212-hectare property.7

    Mactan Export Processing Zone is a

    119.37-hectare property.

    First Industrial Park is a

    331.85 hectare property

    therefore providing enoughspace for future expansion.

    Future expansions are

    possible provided by the

    spacious area.

    Summary:

    Comparing the three locations, Mactan Export Processing Zone offers lower power rates than San Carlos Ecozone and First Philippine Industrial Park, however,

    the cost of labor is way bigger in Mactan than the other two locations. Considering the distance from Manila where some of the target markets are located, Negros is

    nearer and therefore can reach Luzon the shortest time. An Ethyl Acetate plant should be located in a place with good climate condition which is provided by all of the

    locations proposed. What makes Mactan Export Processing Zone outstanding is that it has lower average temperature, therefore reducing the risk of having possibleexplosion of the product due to its low flash point. Taking the proximity of the source of ethanol, SCE is more advantageous than MEPS and FPIP because it is nearer

    to San Carlos Bioenergy and other Ethanol plant like Roxol Bioenergy Corp. and Canlaon Alco Green Inc. The cost of utilities such as water and electricity are cheapest

    in Cebu City. This is advantageous as is may reduce the cost of production thus increasing the profit. Considering these comparisons, Mactan Export Processing Zone

    is the best location for Phil-Ester Corporarion.