SINOSEFENTERPRISES
PRIVATE LIMITED
ENGINEERS BUILDERS CONTRACTORS(QUALITY AND SPEED REDEFINED)
NATURE :
All Type of civil works (Construction,
Maintenance and Renovation)
External development & hardscaping.
Roads (Specialized in bituminous paving).
Sewer, Storm, External Plumbing.
Development of Lakes for Golf Course, i.e.
Lake lining.
All types of Buildings construction, structure
and finishing works.
Finishing & Interior works.
CLIENTS LIST DLF TATA BHARTI REALITY LTD ANSALS EMAAR MGF WAVE IREO SILVERGLADE EROS JAYPEE ELDECO PANTALOON PURI NIRMAL BHARTI PUBLIC SCHOOL DURALINE NHAI GOMBER EDUCATION PARAS M3M ITC CHD INDIABULLS
AND MANY MORE…………
GENERAL INFORMATION
1. Name of Company : SINOSEF ENTERPRISES (P) LTD
2 Construction and Legal Status : Pvt Limited
3. Address of Registered Office : C-270 Shushant Lok, Phase-1 Gurgaon-Haryana-122002
4. Telephone : 0124- 4817000 (30 lines)
5. Fax : 0124-4272253
6. E-Mail : [email protected] ,[email protected]
7. Country and Year incorporated : INDIA,CALCUTTA 13 Dec 1996
Name of Contact Person : Mr. Avinash Kr Gupta
With their Mobile Nos. : 9811191750
8. Has black-listing or de- registration action been : NO Initiated or taken against the applicant by any Government or Public Sector Undertaking or a Private Organisation during the last 10 years? If Yes, give: details and outcome as Annexure.
9. Information on current litigation in which the : N O Applicant is involved (To be given in proforma Below).
Pary with Whom the dispute arose and nature
of disputeCause
Amount involved (Rs, Crore)
Present position and remarks
(1) (2) (3) (4)
N/A N/A N/A N/A
A. SUMMARY OF ASSETS, LIABLITIES, PROFIT/LOSS AND T URNOVER ON THE BASIS OF THE AUDITED FINANCIAL STATEMENTS OF THE LAST THREE FINANCIAL YEARS :
S. NO. DESCRIPTION YEAR 2011-2012 YEAR 2012-2013 YEAR 2013-2014 (RS. IN CRORE) (RS. IN CRORE) (RS. IN CRORE)(1) (2) (5)
TOTAL ASSETS 14.78 15.39 20.76 CURRENT ASSETS 12.27 12.48 16.57 TOTAL LIABILITIES 12.14 12.09 16.42 CURRENT LIABILITIES 10.81 10.76 14.82 NET WORTH (1-3) 2.64 3.30 4.34 WORKING CAPITAL (2-4) 1.46 1.72 1.75 PROFIT 0.64 0.66 1.04 TOTAL VALUE OF CONSTRUCTION WORK DONE 28.23 28.14 47.40
PROVISIONAL TURNOVER FOR THE YEAR 2014-15 IS 44 CRORES APPROX.
B. FINANCIAL RESOURCES
1. TOTAL AMOUNT OF FINANCIAL RESOURSES AND CREDIT LINE :(PROVIDE EVIDENCE OF FINANCIAL RESOURCES CASH IN HAND, LINES OF CREDIT ETC, LIST THEM IN ANNEXURE WITH COPIES OF SUPPORT DOCUMENTS):
i. PAID UP CAPITAL 50 LAKHS ii. OD LIMIT WITH KARNATAKA BANK 300 LAKHS
iii. CREDITORS ( SUPPLIERS) 300 LAKHSiv. BG LIMIT 500 LAKHSv. CORPORATE GUARANTEE 100 LAKHS
vi. UNSECURED LOAN 400 LAKHS
2. NAME, ADDRESS, TELEPHONE AND FAX NUMBERS OF BANKERS WHO MAY PROVIDE REFERANCE IF REQUIRED:
KARNATKA BANK LIMITEDSECTOR-14, GURGAONPHONE: 0124-2391088,2303088MR. PATEL (BRANCH MANAGER)
3. REGISTRATION WITH P.F. AUTHORITIES
P.F. NO. HR/GGN/26039
4. C.S.T/L.S.T NOS
C.S.T/L.S.T (DELHI) 07186893678C.S.T/L.S.T (GURGAON-HARYANA) 06031929317C.S.T/L.S.T (NOIDA-UP) 09366001380C.S.T/L.S.T (RAJASTHAN) 08710702636C.S.T/L.S.T (PUNJAB) 03052058899
ON GOING PROJECTS (SINOSEF ENTERPRISES PVT. LTD.)
EXTERNAL DEVELOPMENT AND LAND SCAPING WORK: AS ON 01.12.2015
S.NO.
NAME OF WORK/CONTRACT
NAME OF EMPLOYER AND ADDRESS
VALUE (RS. IN
CORORES)
VALUE OF WORK STILL
TO BE COMPLETED (RS. IN CRORES)
DATE OF COMMENCE
DATE OF COMPLETION
1
EXTERNAL DEVELOPMENT WORK INCLUDING BOUNDARY
CHD DEVELOPERS Ltd., Avenue 71, Sector-71, Gurgaon, Haryana.
13.00 0.5 20.09.12 31.10.15
2EXTERNAL DEVELOPMENT( ROAD WORK) AT DLF NTH
DLF Ltd., Village Hyatpur, Sector-86,90,91 at Manesar, Gurgaon.
11.00 0.5 01.04.12 30.09.15
3EXTERNAL DEVELOPMENTAT ELDECO JALLANDHAR
ELDECO JALANDHAR PROPERTIES PVT LTD.
3.00 0.70 01.05.14 31.10.15
4ROADS & PHE WORKS SOHNA, GURGAON
TATA HOUSING, GURGAON
9.5 4.5 01.05.14 30.12.15
5EXTERNAL DEVELOPMENT WORK, GURGAON
DLF New Gurgaon Home Developers (P) Ltd., Express Green-I, Sector M1, Gurgaon.
1.90 1.00 25.09.12 31.12.15
6EXTERNAL DEVELOPMENT WORK, GURGAON
DLF New Gurgaon Home Developers (P) Ltd., Express Green-II, Sector M1A, Gurgaon.
2.09 1.2 01.09.13 31.12.15
7EXTERNAL DEVELOPMENT WORK, NOIDA
Eldeco Mystic Green, Greater Noida.
1.84 0.80 15.04.13 31.10.15
8 EXTERNAL DEVELOPMENT
DLF Universal Limited 2.84 0.50 01.09.13 30.09.15
WORK AT CORPORATE GREENS, SECTOR-74A, GURGAON
9
EXTERNAL DEVELOPMENT WORK AT AMANTRAN SITE, SECTOR-119, NOIDA.
Eldeco Properties Ltd 5 0.5 01.07.13 30.09.15
10
EXTERNAL & HARDSCAPE DEVELOPMENT OF SAMPLE VILLAGE GURGAON
IREO GURGAON 6.0 1.00 01.03.14 30.09.15
11
EXTERNAL DEVELOPMENT OF PRIMANTI, GURGAON
TATA HOUSING, GURGAON
11 9.00 01.05.14 31.12.15
12EXTERNAL DEVELOPMENT OF NEEMRANA
ELDECO NEEMRANA 6.0 4.5 01.03.14 31.12.15
13
EXTERNAL DEVELOPMENT AT IREO UPTOWN IREO LTD GURGOAN 3.5 0.25 01.10.14 30.10.15
14
EXTERNAL DEVELOPMENT AT IREO VICTORY VALLEY
L&T GURGOAN 18.0 17.00 15.02.14 31.12.15
15DRAINAGE & SEWERAGE WORK AT ULLAWAS
IREO LTD GURGOAN 0.90 0.30 01.02.14 31.09.15
16
HARDSCAPE,ROAD AND BOUNDARY WORK AT DLF TWO HORIZON
JJRS,GURGOAN 3.5 2.5 01.03.15 30.09.15
17SEWERAGE DRAINAGE WORKS AT CHD 106
CHD DEVELOPMENT LTD ,NEW DELHI
1.10 0.75 01.10.14 31.12.15
18PHE WORKS AT CENTRUM,GURGOAN
INDIA BULLS GURGAON
1.6 1.55 30.04.15 31.12.15
19PHE WORKS AT ENIGMA,GURGOAN
INDIA BULLS GURGAON
2.4 2.4 01.04.15 31.09.15
20HARDSCAPE WORK AT PARAS,IRENE
PARAS BUILDTECH,GURGOAN
2.7 2.66 01.05.14 31.12.15
CIVIL AND FINISHING WORK:
S.NO.
NAME OF WORK/CONTRACT
NAME OF EMPLOYER AND
ADDRESS
VALUE (RS. IN
CORORES)
VALUE OF WORK STILL
TO BE COMPLETED (RS. IN CRORES)
DATE OF COMMENCE
DATE OF COMPLETION
1FINISHING WORK AT SPORTS VILLA
JAYPEE GREENS, NOIDA.
13.00 4.38 01.06.11 31.12.15
2CIVIL AND FINISHING WORK AT ELDECO MANSIONZ, LUDHIANA
ELDECO, N.D. 6.00 0.5 15.09.09 30.09.15
3FINISHING WORK JAYPEE GREENS, NOIDA
JAYPEE GREEN, Sector-128,.NOIDA
12.5 8.0 01.06.13 31.12.15
4BASEMENT FINISHING WORK AT PALM SPRING PLAZA,
EMAAR MGF, GURGAON
0.67 0.05 01.05.11 31.09.15
5FINISHING WORK AT SUNCOURT GREATER NOIDA
JAYPEE GREEN, GREATER NOIDA
6.5 6.5 01.06.15 31.12.17
6CONSTRUCTION OF FOUNDATION,EMERALDS HILLS,GURGOAN
EMAAR MGF PVT.LTD GURGOAN
0.48 0.25 01.04.15 30.09.15
7
CONSTRUCTION OF BOUNDARY WALL,EMERALDS HILLS,GURGOAN
EMAAR MGF PVT.LTD GURGOAN
0.51 0.51 01.06.15 31.10.15
EXPERIENCE RECORD
LIST OF WORK COMPLETED IN LAST FIVE YEARS
A: SINOSEF ENTERPRISES (P) LTD.
S NO
NAME OF WORK WITH LOCATION AND NAME & ADDRESS OF “EMPLOYER” AS WELL ENGINEER INCHARGE
VALUE OF
WORK AWARD
ED
VALUE OF WORK AT
COMPLETION
CONTRACTSTIPULATED
DATE OFCOMPLETION
PERIODACTUAL DATE OF
COMPLETION
REASONFOR DELAY
IF ANY
PRIN-CIPLE FEAT-URES IN BRIEF
(1) (2) (3) ( 4) (5A) (5B) (6) (7)
1)
EXTERNAL DEV WORK AND BUILDING WORK AT NEEMRANA CLIENT HINDUSTAN AND DURALINE, MR J P SHARMA
1.20 2.20 01.07.07 31.03.08SCOPE OF WORK INCREASED
2)
ROAD AND SEWERAGE WORK AT RAFFEL INTERNATIONAL SCHOOL, BEHROR, RAJASTHAN, MR RAJNISH BHARADWAJ
2.15 2.40 30.07.08 31.12.08SCOPE OF WORK INCREASED
3)
EXTERNAL DEV WORK OF EMAAR MGF CORPORATE OFFICE AT ACTIVE SECURITY, GURGAON, MR JOSHI
1.25 1.55 31.03.08 31.10.08
SCOPE OF WORK INCREASED AND DEPENDENCY ON OTHER WORKS
4)
ROAD WORK AT SECTOR-75, FARIDABAD, BPTP, MR SHARMA
4.50 3.50 10.01.07 20.10.09SITE CLEARANCE
5)
BOUNDARY WALL AT RAFFEL INTERNATIONAL UNIVERSITY, NEEMRANA, RAJASTHAN, MR RAJNISH BHARDWAJ
1.02 1.50 01.01.08 30.11.08SITE CLEARANCE
6)
ROAD WORK, STRUCTURE AND FINISHING WORK OF VILAS AT JAYPEE GREENS, GREATER NOIDA, MR GIRISH
1.44 2.00 31.12.08 31.12.08
7)
EXTERNAL DEVELOPMENT WORKS, IGL,NOIDA, MR JP SHARMA
1.46 3.50 30.06.08 30.09.09SCOPE OF WORK INCREASED
8)
SEWERAGE WORK AT BIKANER, ANSAL, NEW DELHI.MR. VORA
1.17 1.65 04.09.10 31.10.10
SCOPE OF WORK INCREASED AND SITE CLEARANCE
9)
STRUCTURE AND FINISHING OF VILLAS, EROS NEW DELHI, MR. NIRMAL
1.00 3.65 31.03.08 30.11.10
SCOPE OF WORK INCREASED AND SITE CLEARANCE
10)
CIVIL AND FINISHING STRUCTURE OF HOSTEL BLOCK RIS BEHROR, GOMBER EDUCATION, NEW DELHI. MR. RAJESH BHARDWAJ.
1.13 2.70 02.04.09 31.06.10SCOPE OF WORK INCREASED.
11)
STRUCTURE AND LAKE WORK OF SALE AND SAMPLE APARTMENT, M3M INDIA GURGAON. MR. VIKAS AGGARWAL.
1.50 2.80 30.04.10 31.10.10SCOPE OF WORK INCREASED.
12)
ROAD AND SEWERAGE WORK IN LUDHIANA AT ANSAL API, C.P., N.D.- MR CHARANJEET
1.5 3.50 30.04.11 31.03.12SCOPE OF WORK INCREASED
13)
ROAD,SEWERAGE WORK, EXTERNAL WORK AND WATER SUPPLY IN SECTOR-83, FARIDABAD IN BPTP CONNAUGHT CIRCUS, N.D.
2.35 1.00 30.06.07 30.06.12SITE CLEARANCE
14)
EXTERNAL DEV WORKS METOPOLIS MALL GURGAON IN MGF DEVELOPMENT ASAF ALI ROAD, N.D.- MR CHAUHAN
3.25 3.00 28.08.09 30.09.11SITE CLEARANCE
15)
EXTERNAL DEV WORKS VILAS , GURGAON IN MGF DEVELOPMENT, ASAF ALI ROAD, N.D.- MR SHAKEEL
1.50 0.50 1406.09 30.06.12
SITE CLEARANCE AND SCOPE OF WORK DECREASE
16)
ROAD AND SEWERAGE , LUDHIANA IN ELDECO INFRASTRUCTURE-MR R.K. SINGH
1.00 2.5 31.12.09 31.03.12SCOPE OF WORK INCREASED
17)
DRAINAGE AND SEWERAGE WORK, EXTERNAL RACE TRACK, GREATER NOIDA IN JPSK, G.NOIDA.-MR. MISHRA
2.55 2.00 30.10.10 30.10.12SITE NOT CLEARED
18)
ROAD FINISHING WORK AT PALM SPRING, GURGAON EMAARMGF, GURGAON.-MR JOSHI
2.25 2.60 25.04.11 31.12.12SITE NOT CLEARED
19)
BOUNDARY WALL WORK AT SECTOR-72, GURGAON IN TATA HOUSING AND DEVELOPMENT CO. LTD., GURGAON. MR S.K. SINGH
1.72 1.2 15.09.2011 30.06.12
SITE NOT CLEARED AND SCOPE OF WORK DECREASE
20)
FINISHING WORKS OF 17 STOREY TOWER , PALM SPRING IN EMAARMGF, GURGAON- MR CHITTRANJAN
4.00 3.25 31.04.09 31.03.12SITE NOT CLEAR
21)
STRUCTURE AND FINISHING WORK OF 12 VILAS AT PALM SPRING, IN EMAAR MGF, GURGAON – MR CHIITRANJAN
4.25 4.20 31.12.09 30.06.12SITE NOT CLEAR
22)
SEWERAGE WORK AT BHILWARAANSAL COLONISER, C.P., N.D. MR RAJIV ARORA
3.50 3.40 06.10.11 31.03.13NON CLEARANCE OF SITE
23)
EXTERNAL DEVELOPMENT WORK AT PARK PLACE, GURGAON, MR AJAY ARORA
6.86 4.50 15.05.12 31.03.13NON CLEARANCE OF SITE
24)ROAD WORK AT SECTOR-25A, WAVE CITY, NOIDA, MR PREM
1.15 1.04 30.06.12 30.06.13NON CLEARANCE OF SITE
25)
TRIMIX AND FINISHING WORK AT PALM SPRING , GURGAON EMAARMGF LAND LTD., MR. JOSHI
2.10 2.05 15.08.11 31.12.12NON CLEARANCE OF SITE
26)ROAD WORK SEZ , SECTOR-31, GURGAON, DLF LTD., MR YADAV
3.5 2.5 31.12.12 31.03.13NON CLEARANCE OF SITE.
27
STRUCTURE AND FINISHING VILLAS GURGAON CLUB. ( MGF DEVELOPMENT ASAF ALI ROAD, NEW DELHI. MR. SHAKIL
2.3 9.6 16.12.06 30.11.13SCOPE OF WORK INCREASED
28EXT DEVELOPMENT ELDECO, JALANDHAR MR. R. K. SINGH
1.5 5.25 31.03.12 31.10.13SCOPE OF WORK INCREASED
29ROAD AND SEWER WORK, ANSAL MOHALI MR. DAGAR
1.5 2.5 30.06.13 31.12.13SLOW PAYMENT
30FINISHING WORK DLF PARK PLACE, GURGAON MR. AJAY ARORA
2.84 2.8 20.11.11 31.06.13NON CLEARANCE OF SITE
31
DEVELOPMENT OF SURFACE PARKING IN DLF CYBER CITY,GURGOAN
MR.ANTONY
12 16.10 31.12.13 30.06.14SCOPE OF WORK INCREASED
32
ROAD & SEWERAGE WATER AT ANSAL MEGAPOLIS GREATER NOIDA
MR.SUNIL
1.0 6.5 30.11.10 31.05.14SCOPE OF WORK INCREASED
33
EXTERNAL DEVELOPMENT WORK AT TATA RAISINA GURGOAN
MR.SANJEEV SURI
3.5 6.5 31.03.14 31.12.14SCOPE OF WORK INCREASED
34
EXTERNAL DEVELOPMENT WORK AT GENESIS GLOBAL SCHOOL (WAVE GROUP),NOIDA
MR.ARVIND AGGARWAL
3.5 4.5 31.03.13 30.06.14SCOPE OF WORK INCREASED
35
EXTERNAL DEVELOPMENT WORK AT OLYMPIA,NOIDA
MR.RAJESH KHANDURI
1.5 2.5 30.06.12 31.07.14SCOPE OF WORK INCREASED
36
EXTERNAL DEVELOPMENT WORK AT WALMARK AEROCITY BHARTI,DELHI
MR.ANIL NAIR
1.5 2.5 30.04.14 31.12.14SCOPE OF WORK INCREASED
37
ROAD WORK ITC CLASSIC GOLF RESORT GURGOAN
MR.ANIL NAIR
1.65 2.9 30.04.14 31.10.14SCOPE OF WORK INCREASED
38
EXTERNAL DEVELOPMENT WORK AT PAVILION MALL OF BHARTI AT LUDHIANA
MR.VISWAJEET
1.7 2.25 31.08.13 30.06.14SCOPE OF WORK INCREASED
39
CONSTRUCTION OF HARVESTING PITS AT WAVE MOHALLI
MR.SATINDER
1.6 0.80 31.08.14 28.02.15NON PAYMENT
40
CONSTRUCTION OF BOUNDARY WALL AT WAVE MOHALLI
MR.SATINDER
2.4 2.2 31.12.13 31.12.14
41CONSTRUCTION OF ROAD AT RAMGARH VILLAGE,GURGOAN
0.25 0.25 28.02.15 28.02.15
42
BISON BOARD PANELLING WORK AT PARAS SCHOOL ,GURGOAN
0.07 0.67 30.04.15 30.04.15
RESOURCES/PLANT & EQUIPMENTS
A. CONSTRUCTION EQUIPMENTS
a. CONCRETING EQUIPMENT
1 CONCRETE MIXER 15
2 VIBRATORS 30
B. SHUTTERING AND SCAFFOLDING MATERIALS
1MS ADJUSTABLE PROPS 30000 SFT
2 STEEL RAFFLERS ( 3 MT-6 MT) 30000 SFT
3 STEEL SCAFOLDING 150000 SFT
4 STEEL PLATES 10000 PCS
5 STEEL COLUMN FORMS 30 PCS
C. POWER GENERATORS 25 KW 3 NOS.
D. FABRICATION AND WELDING EQUIPMENTS
1 DRILL MACHINE 7 NOS.
2 WELDING MACHINE 4 NOS.
E. ROAD ROLLERS AND ROAD MAIKING EQUIPMENTS
1 ROAD ROLLERS AND ROAD MAIKING EQUIPMENTS 5 NOS.
2 VIBRATOR ROLLER 3 NOS.
3 COMPUTERISED HOTMIX PLANT 2 NOS.
4 AUTOMATED GSB PLANT 1 NO.
5 SENSOR PAVER 2 NOS.
6 MECHANICAL PAVER 3 NOS.
F. TRANSPORTATION EQUIPMENTS
1 TRACTOR 5 NOS.
2 ASHOK LEYLAND TRUCK 5 NOS.
3 TATA 1612 TRUCK 5 NOS.
G. TESTING EQUIPMENTS
1 TOTAL STATIONS 2 NOS.
2 AUTOLEVELS 20 NOS.
3 THE DOLITE 3 NOS.
4 CUBE TESTING MACHINE 8 NOS.
5 CUBE MOULDS 10 SET
6 SIEVE SETS 12 NOS
7 CYLINDERICAL JAR 10 NOS.
RESOURCES DEPLOYED IN ON GOING PROJECTS-PERSONNEL
A.HEAD OFFICE & SITE AS ON: 01.12.2015
SECTOR NAME(S) AGE TOTAL YRS EDUCATION DESIGNATION OF EXPERIENCE
(1) (2) (3) (4) (5) (6)
GENERAL MANAGEMENT AVINASH GUPTA 41 17 BE, MBA MANAGING DIRECTOR
OPERATIONS NEHA GAROO 31 06 B.E.(COMP) MANAGER (OPERATIONS)
SUBHASH CHANDRA 36 11 INTER OPERATIONS ASSTT.
ACCOUNTS SRAVAN YADAV 34 08 B. COM MANAGER (ACCTS)
NIRANJAN MOHANTA 41 11 B. COM ASSTT. MANAGER-ACCOUNTS
RAM BABU 27 04 B.COM ACCOUNTS EXECUTIVE
AMAN KAUSHIK 25 01 B.COM ACCOUNTS ASSTT.
SANJEEV 29 07 B.A (HONS) ACCOUNTS EXECUTIVE
HR & COMPLIANCES VANDANA 46 22 M.A. MANAGER–HR&COMPLIANCE
ANKESH KUMAR 33 04 MBA COMPLIANCE ASSTT.
PURCHASE ASHOK GIRI 40 10 B.A. PURCHASE MANAGER
SONU 29 04 B.A. ASST. MANAGER-PURCHASE
DESIGN SMT POOJA GUPTA 38 11 B.COM MANAGER-DESIGN
PLANNING & BILLING MOHD SALEEM 41 16 BE (CIVIL) GM-PLANING
S.K.SINGH 45 23 BE (CIVIL) CONSTRUCTION MANAGER
BAL CHAND 29 06 DIPLOMA (CIVIL) MANAGER-BILLING
RANJAN SINGH 40 12 DIPLOMA (CIVIL) SR. ENGINEER (BILL&PLANNG)
RASHID KHAN 41 0 5 DIPLOMA (CIVIL) BILLING ENGINEER
AMAN KHAN 24 02 DIPLOMA (CIVIL) BILLING ENGINEER
KAUSHAL YADAV 32 04 DIPLOMA (CIVIL) BILLING ENGINEER
FAIZAL KHAN 26 04 DIPLOMA (CIVIL) BILLING ENGINEER JITENDER 23 03 DIPLOMA IN CIVIL BILLING ENGINEER SITE PROJECT INCHARGE VIRENDRA BHARTI 42 17 BE (CIVIL) PROJECT MANAGER RAJESH KUMAR 41 14 BE (CIVIL) PROJECT MANAGER
ASHISH BANSHAL 33 11 BE (CIVIL) PROJECT MANAGER
SENIOR ENGINEERS VIKRAM 33 06 DIPLOMA (CIVIL) SR. ENGINEER
DUSHYANT YADAV 30 06 DIPLOMA (CIVIL) SR. ENGINEER
SANTOSH 32 10 B. TECH (CIVIL) SR. ENGINEER
SITE ENGINEERS AVINASH KUMAR 27 03 DIPLOMA (CIVIL) SITE ENGINEER
JITENDER KUMAR 27 04 DIPLOMA (CIVIL) SITE ENGINEER
DHARMENDRA KUMAR 26 02 DIPLOMA (CIVIL) SITE ENGINEER
MANOJ YADAV 35 08 DIPLOMA (CIVIL) SITE ENGINEER
QUALITY TINKU SINGH 30 05 DIPLOMA (CIVIL) QUALITY OFFICER
SURVEY RAJVEER 34 08 INTER SURVEYOR
SITE STAFF SHUSHIL KUMAR 32 10 INTER SR. FOREMAN
JAI PRAKASH 45 15 BA SR. FOREMAN
UPENDRA PRASAD 45 14 BA SR. FOREMAN
KARAN SINGH 39 14 B.Sc SR. FOREMAN
ADESH KUMAR 32 06 B.A SR. FOREMAN
S.B.SRIVASTAVA 41 15 B.A SR. FOREMAN
SANJAY KUMAR 32 0 6 INTER SR. FOREMAN
AJIT RAY 24 11 INTER SR.FOREMAN
RUPESH KUMAR 37 12 INTER SR. FOREMAN
LAXMAN 35 12 INTER SR.FOREMAN LEELA RAM 34 10 INTER FOREMAN
NARESH 35 08 INTER FOREMAN
MUKESH 32 06 INTER SUPERVISOR MUCHKUND PATHAK 37 05 INTER SUPERVISOR
SUBHAM CHOUDHARY 25 0 2 INTER SUPERVISOR
VINAY KUMAR 30 05 INTER SUPERVISOR CHANDERBUSHAN 21 03 INTER SR.FOREMAN SHUKLA 53 30 B.E CIVIL SITE INCHARGE VIJENDER 21 01 DIPLOMA CIVIL BILLING ENGINEER
MOHD.NASEEM 24 02 DIPLOMA CIVIL BILLING ENGINEER
OTHERS STAFF: 30