Manufacturing Process of Process Skid Trusted Fabricator for Oil & Gas, Petrochemical and Energy Industries ASTURI METAL BUILDERS (M) SDN. BHD. www.asturi.com.my Insulation Blasting Painting & Inspection Welding Design Strength & Capabilities Company Profile Pneumatic Test

Upload: others

Post on 31-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Manufacturing Processof Process Skid

Trusted Fabricator forOil & Gas, Petrochemicaland Energy Industries ASTURI METAL BUILDERS (M) SDN. BHD.

www.asturi.com.my

Insulation

Blasting Painting

&

Inspection

Welding

Design

Strength& CapabilitiesCompany Profile

Pneumatic Test

Page 2: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Rear ViewFront View

Inside Factory View

1

Page 3: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Contents

2 - 71. Corporate Information : 1.1 Asturi Growth 1.2 Financial Performance 1.3 Mission Statement 1.4 Asturi Business & Growth 1.5 Organisation Structure 1.6 Quality Policy 1.7 Quality Certifications 1.8 Accrediatation In Progress 1.9 Awards & Recognitions

82. Safety & Health 2.1 Safety & Health Policy

3212. Manpower

3313. Clients

34- 3614. Growth & Expansion : 14.1 Factory Layout 14.2 Factory Buildings 14.3 Incubators Factory

24 - 3111. Assets, Machineries & Equipments : 11.1 Heavy Transport & Lifting 11.2 Plant Maintenance Services 11.3 Well Services

125. Design Capabilities

114. Registration & Licensing

19 - 2310. Products : 10.1 Pressure Vessels 10.2 Heat Exchangers 10.3 Process Skids 10.4 Non Pressure Vessel

157. Completed Products

17 & 189. Records & Special Achievements

168. Manufacturing Experience

13 & 146. Asturi Progress : Before & Present

9 - 103. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

2

Please come and visit us in order to know our

operation and strength- Managing Director

Page 4: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

December Company was incorporated.

December Office building and Block 1of the factory were completed.

June Commencement of Operation.

December Extension of Block 2 & 3factory buildings.

August Visit by The Right Honourable Dato’ Sri Adnan Yaakob,Chief Minister of Pahang.

February Authorization of ‘U’,’U2’,’S’,’R’ STAMPS from the American Society of Mechanicals Engineer (ASME).

September Certified ISO 9001 : 2000 by BVQI.

February Visit by The Right HonourableDato’ Sri Mohd Najib Tun Razak, Minister of Defence, currentlyPrime Minister of Malaysia.

October Obtained Civil Class A License from the Malaysian Government(PKK).

September Extension of Block 4,5,6,7 & 8factory buildings.

October Winner of National QualityEnvironment (5S) Award 2008(Malaysia Productivity Corporation).

November Winner Petronas’ Best Vendor in Continuous Improvement for2007 - 2008.

March Winner MITI’s Industry Excellence Award 2008 for category Quality Management Award (MPC).

April Certified ISO 14001:2004, UKAS, DSM,OHSAS 18001:2007 by BVQI

September Formation of first 2 subsidiaries1. Asturi Truck & Crane. (Rental of Hydraulic Multi Axle Trailer, Heavy Truck & Crane Services). 2. Lapisan Warna. (Blasting & Painting Works).

June Obtained Manufacturing Licenseof Special Equipment (Pressure Vessel) from People’s Republic of China.

February Awarded as Vendor to PETRONAS for Shell & Tube Heat Exchanger.

MayWinner of National Productivity Award 2005 (Ministry of InternationalTrade & Industry).

September Winner of Human Resource Minister Award 2006 (Human ResourceDevelopment Council).

December Certified 5S Japanese Management System (National Productivity Corporation).

April Awarded as Vendor to PETRONAS for Unfired Pressure Vessel Class II and III.

NovemberWinner of Pahang Chief MinisterQuality Award 2007.

July Visit by Honourable Tan SriMuhyiddin Yassin, Minister ofInternational Trade and Industry.

January First incubator programme company was launched (Siklon Separators).

December Winner of NationalOccupational Safety & Health Malaysia (DOSH).

January Extension of Block 9,10,11,12 and 13 factory building.

January Establishment ofAsturi Well Services Division.

March Opening of Asturi Labuan Office :Well Services Division.

June Establishment of Property Division.First project is development of72 units of houses at Pekan, Pahang

August Establishment of subsidiaryEverest Roofing.

November Winner of Petronas’ VendorDevelopment Programme (VDP)Special Award.

1. Corporate Information

1.1 Asturi Growth

3

1994

2004

2005

2006

2008

2010

2011

2012

2013

2009

2007

2008

1995

1996

1998

1999

2000

2002

2003

1994

1995

1996

1998

1999

2000

2002

2003

2004 2008 2010 2013

2014

2014

2015

2015

2011

20122009

2005

2006

2007

2008

February Establishment of Asturi Maintenance Services.

July Establishment of subsidiaryGebeng EngineeringService Centre.

October Establishment of subsidiaryCross Border Inspection Services.

September Commissioning of CNC AutoPipe Cutting and Welding machine.

August Commissioning of Auto Blasting machine.

March Commissioning of 150mmthickness Plate Rolling machinefrom Italy.

January Purchase of 40 acres ofindustrial lands @Gebeng Industrial area,Kuantan, Malaysia

Page 5: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Paid up Capital Movement

TOTALPROJECTFUNDINGRM 94 M

BANKERS :

0

5

10

15

20

RMMillion

2.8 2.8 2.8

8.8

20 20 2023 23.3

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

23.3 23

Bank IslamRHBHong Leong

HSBCOCBCCIMB

1.2 Financial Performance

4

A trusted fabricatorfor oil & gas andenergy industry

- By our clients

ASSETVALUE

RM250M(USD 62M)

@

2016

PAID UP CAPITAL RM 23.3 M @ 6.5M USD

Hydraulic Multi Axle Trailer Plate Rolling Machine (150mm T)

Page 6: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

ASTURI is a Mechanical & Civil Engineering based company. Our aim is to be one of the best company in the country by : Producing high quality products and services that meet international standards. Meeting all customers regulatory requirements. Our hope is to see company grow and at the same timecontribute meaningfully to the stakeholder and country. 2

4

6

8

10

12

1

3

5

7

9

11

Board of Directors

Tender

ProjectManagement

Purchasing

Health, Safety & Environment

Civil Works

Admin & IT

Marketing

Design

QA/QC

Finance

Maintenance

Services

Well Services

1.5 Organisation Structure1.3 Mission Statement

1.4 Asturi Business & Growth

1. FABRICATIONOF PROCESSEQUIPMENTS

6. HEAVY TRANSPORT,MULTI AXLE & CRANESERVICES

7. PLANT MAINTENANCESERVICES

8. WELL MAINTENANCESERVICES

4. ENGINEERING DESIGNSERVICES

11. PROPERTYDEVELOPMENT

9. ENGINEERING SERVICECENTRE

3. CIVIL ENGINEERINGWORKS

5. MANPOWER SUPPLY

2. BLASTING & PAINTING

10. PIPING WORKS(CNC AUTO)

2006 2010 - 2012 2012 - 2017

starts

5

Page 7: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

ASME 'U', 'U2', 'S', 'R',’NB’ Stamps by ASME.

DOSH Malaysia.

ISO 9001 : 2008, by BVQI

ISO 14001 : 2004, UKAS,DSM (Environment)

OHSAS 18001 : 2007, by BVQI

ETQM (Electronic Total Quality Management) since 2001.

Japanese 5S Management System since 2006.

Products

Systems

1.7 Quality Certifications

N’ Stamps

PED (Pressure Equipment Directive)

(CE Stamps)

1.8 Accreditation In Progress

Asturi’s quality policy focuses on the following actions :

To ensure all products are manufactured with International Standards.

To ensure our products are delivered on time.

To ensure all our customers are happy with our products and services.

1.6 Quality Policy

6

ISO 9001 : 2008 ISO 14001:2004(UKAS, DSM)

OHSAS 18001:2007ISO 9001 : 2008(UKAS, DSM)

ASME ‘U’, ‘U2,’S’,’R’,‘NB’ Stamps

5S Management System

DOSH Malaysia

Currently Asturi has 400 staffs, which are committed to

Quality Assurance- Managing Director

To ensure all staff are efficient, effective and responsible in carrying out their duties.

To ensure that excellent working culture is practiced, in line with current changes.

To ensure all work carry out are in line with strict safety and enviroment requirements.

Page 8: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

MD receiving Pahang Chief Minister Quality Award from Honourable Dato’ Sri Adnan Yaakob, Chief Minister of Pahang.

MD receiving Industry Excellent Award from Honourable Dato' SeriAbdullah Ahmad Badawi, former Prime Minister.

1.9 Awards & Recognitions

7

2005 2006 2007 2008

2008 2008 2009 2012

Asturi staffs with the longest Pressure Vessel, Splitting Column (2007)

NPCProductivity Award

Human Resource Minister Award

Pahang Chief Minister Quality Award

National Quality Environment (5S)

Award

Petronas Best Vendorin Continuous

Improvement Award

Industry Excellence

Award

National Occupational Safety & Health (DOSH)

Award

Petronas Vendor Development

Programme (VDP) Special Award

Page 9: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

2.1 HSE Policy

Prevention of Pollution and Injuries

Legal Compliance

Continual Improvement

Environment

Awareness of Employees

Asturi is committed towards maintaining of Occupational Safety and Health Management System (OHSAS 18001). We are committed to :

2. Safety & Health

8

Instill HSE awareness among our employees about importance of managing their safety and health.

Provide training in the relevant environmental aspects and Occupational Safety and Health hazard in order to improve their awareness abut applicable impacts & risks from our activities, products and services.

To enable each employee performing their duties and responsibility accordingly.

Promote green and healthy environment for the staffs.

Communication Communicate our HSE policy and practices to all employees,

contractors, suppliers and interested parties.Minimize the potential pollution to environment,injuries from our activities,services and products.

Maintained proactive system to report, record and take the appropriate action about the accident, incident and near-misses in order to prevent injuries and damage of our properties.

Commit to comply with all Environment & Occupational Safety and Health laws, regulation and other requirements.

Implement and periodically review our HSE Management System for continual improvemet.

“SAFETY IS EVERYONE RESPONSIBILITY”

Certified ISO 14001 : 2004 (UKAS, DSM), OHSAS 18001 : 2007 and 5S Management System from Malaysia Productivity Corporation (MPC).

Use of Proper PPE Use of Tubular ScaffoldingNatural Lighting for Conducive Working

Compulsory Training forMachine Operators

Working in confine space

Project Cumulative Safe Manhour

@ June 20177.2 m

Safety is our top priority.At the same time we care

for the environment- Managing Director

Page 10: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Standing From Left : Ms. Fatiha Sharif (Executive Director), Dato’ Dr. Yahya Nordin (Director),Ms. Teoh (Secretary), Mr. Kamal Nor (Technical Director)

Sitting From Left : Dato’ Sri Md Sharif Shamsuddin (Managing Director),Dato’ Ramlan Othman (Chairman)

Board of DirectorsPicture 2013

3.1 Organisation Structure

9

3. Structures

ChairmanDato’ Ramlan Othman (67)Master of Public Administration University of Southern, California

Managing DirectorDato’ Sri Md Sharif (67) B.A (Hons) Anthropogy &Sociology, University Malaya, Malaysia

Executive DirectorFatiha Sharif (39)B.A (Hons) Commerce (Marketing) Deakin University, Australia

Technical DirectorKamal Nor (45)B.Eng.(Hons) Chemical Process,University Kebangsaan Malaysia

DirectorDato’ Dr. Yahya Nordin (67)PHD (Local Govt.)University of Wales Institute of Science & Technology, UK

Board of Directors

ST 02- 17 (R20)Effective Date : February 2017

FinanceChief Finance Officer : Suraiya MSc in International FinanceWestminster University, London, UK

Member of ACCA

QA / QCManager : Firdaus Dip. Mechnical EngineeringInstitut Teknologi Pertama, Malaysia

Project ManagementTechnical Director: Kamal NorB.Eng.(Hons) Chemical Process,University Kebangsaan Malaysia

HSEManager : AndyDiploma Computer ScienceStanford College, Malaysia

Executive Director : FatihaB.A (Hons) Commerce (Marketing)Deakin University, Australia

1 Marketing

TenderManager : Mahamud B.A. (Hons) Mechanical EngineeringUniversiti Islam Antarabangsa, Malaysia

2

DesignManager : Nik AzmiraB.Eng. (Hons) Mechanical EngineeringUniversiti Teknologi Mara, Malaysia

3

PurchasingManager : Nazif Anuar, B.Sc. (Hons) Information Technology(Software Engineering)Universiti Utara Malaysia

4

5

6

7

8

Admin & ITExecutive Director : FatihaB.A (Hons) Commerce (Marketing)Deakin University, Australia

9

Maintenance ServicesManager : Nazif Anuar, B.Sc. (Hons) Information Technology(Software Engineering)Universiti Utara Malaysia

11

10 Well ServicesTechnical Director : Samsudin Mat30 years experience

Page 11: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

3.3 VIP Visits

10

Visit by YB Dato’ Sri Mohd Najib Tun Abdul Razak, Minister of Defence, currently Prime Minister of Malaysia in 2003

Visit by YB Tan Sri Muhyiddin Yasin, Minister of International Trade & Industries in 2008

Visit by YB Dato’ Sri Mustapa Mohamed, Minister of Ministry of International Trade and Industry in 2016

3.2 Corporate Structure

INCUBATORSSUBSIDIARIESASSOCIATES & AGENCIES

LOCAL WORLDWIDE

17861-V

Logistic

112036-P

Logistic

143951-P

Logistic

Logistic

TOTAL LOGISTICSRESOURCES (KL) SDN.BHD. 713788-T

Logistic

510506-DSDN.BHD.

Abu Dhabi, UAE

Libya

Blasting & Painting

Heavy Liftingand Transport 5/16 Braided Line

Fishing & Slickline Services

WILD WELL SERVICES

SDN.BHD. 980969-D

Construction &Project Management

SDN.BHD. 771613-X

Design, Manufacturing & Installation of

Roof Truss

Maintenance Services

NDE / NDT Inspection Services

Engineering SupportServices

Saudi Arabia

Kuwait

Burgan Combined General Trading & Constructing

Qatar & Oman

MUSANDUM GROUP OF COMPANY

891026 KEDES TECHNOLOGYSdn.Bhd.

Design EngineeringServices

Ship Building and Engineering Works

KEJURUTERAAN PERKUAT

Page 12: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

4. Registration & Licensing

11

PetronasDOSH MOF

TNB

FGV Boustead Naval Shipyard Johor Port

GWPC CIDB G7

1. PETRONAS (L-326994-M)

2. ASME U (31,613) , U2 (31,614), S (31,612), R (R-5885), NB

3. Department of Occupational Safety and Health (DOSH) - Manufacturing of Pressure Vessel (JKKP IS 127/682/1-320) - Manufacturing of Heat Exchanger (JKKP IS 127/682/1-320)

4. Ministry of Finance (MOF) : - Bumiputra Company Certificate of Registration (357-00038134) - Public Company Certificate of Registration (357-00038134)

5. Goverment Work Procurement Certificate (GWPC) (1970305 PH 024261)

6. CIDB Certificate of Registration (G7) (1970305 PH 024261)

7. Tenaga National Berhad (TNB) : - Contract of Works (3003100) - Supply and Services Contractor (3003100)

8. Felda Global Ventures Holding Berhad (FGV)

9. Malaysia Shipyard and Engineering (MSE)

10. Boustead Naval Shipyard Sdn. Bhd.

11. Johor Port Berhad

12. TH Heavy Engineering Berhad

13. Ministry of International Trade Industry (MITI)

14. National Film Development Corporation Malaysia (FINAS)

15. Business Premises License / Advertising (MPK)

16. Water Services Industry Act 2006 (Act 655)

We are serious about quality,even in a small issue

- Managing Director

Page 13: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Engineering Code / Standard:• 3 Softwares

Engineering Software:• 3 Softwares

Software Structure:• 8 Softwares

Mechanical Software:• 9 Softwares

Engineering Scope:• Process / Thermal Design• Mechanical Design• Structural & Piping Design• Transportation / Heavy Haulage Analysis

5. Design Capabilities

Our design capabilities are supported by our in-house design department and our subsidiary company, EDES Technology which are able to perform complete process facilities design for on shore and off shore.

Our softwares include :

12

Page 14: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Asturi Progress

1. Fabrication Facilities • Fabrication Area • 13,635m² • 33,000m² (covered)

• Land Area • 81, 000m² • 110,000 m²

• Fabrication • Bay 1, 2, 3,4, 5 • Bay 6, 7, 8, 9, 10, 11, 12, 13 Workshop (unit) 14, 15

• Clean Room

Asturi Before1996 - 2006

Asturi Present2007 - 2016

2. Plate Rolling • 85mm thickness • 150mm thickness

3. Piping Capabilities • Manual • CNC Auto Pipe Cutting, Welding & Bevelling (10 time faster)

4. Coating Capabilities

5. Fabrication Scope Category

• Manual

• PV / Column :- Class I (thick <32mm)- Class II (33mm < thick < 50mm)

• Shell & Tube Heat Exchanger

• Auto Blasting & Painting

• Pressure Vessel / Column - Thickness (>200mm) - Heavy Wall (470mT)

• Air Cooled HEX

• Process Skid (800mT)

6. Design Strength • Mechanical Design

• Structural Design

• Process Design : - Thermal HEX - Thermal Air Cooled - Hysis /Hysim (Plant Design) - Package Design (Produce Water / Deareator)

• Piping Design : - Ceaser II 5.3

• Advanced Structural : - Modelling 3D Rhinoceros - Building Information Modelling - Telka

• Transportation / Heavy Haulage Analysis

Asturi Progress Asturi Before1996 - 2006

Asturi Present2007 - 2016

7. Material of Construction

• Carbon Steel

• Stainless Steel

• Duplex / Clad

• Titanium (SB 338)

• High Tensile (SA 533)

• High Nickel (SA 203)

8. Welding Procedure • 100 WPS • 430 WPS

9. Welding Repair • 5% - 7% • Less than 5%

10. MDR • 20 - 30 weeks • 3 - 6 weeks

• Dedicated room for MDR

11. Project Management • 1 department only • Project divided into 2 groups consisting of 4 teams

12. Project Monitoring • Weekly Project meeting

• Progress meeting

• Pre-Tender meeting• Kick-off-meeting• Post Kick-off-meeting• Pre-Hydrotest meeting• Delivery meeting• Collection meeting

13. DCC • Project basis • Centralised documentation

14. Auditing & Expediting

• Based on ISO

• Project basis

• Dedicated internal auditor

• Dedicated expeditor

15. Store Management • Store inside workshop

• Centralized storage system (ETQM)

• Controlled material issue system

6. Asturi Progress Before & Present

13

Page 15: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Asturi Progress

16. Transportation

Asturi Before1996 - 2006

Asturi Present2007 - 2016

• 3T Lorry • 7T Lorry

• Low Loader - 4 units 5 axle - 1 unit 3 axle

• Hydraulic Multi Axle (Cometto) - 24 axle line (4 modular with 192 wheelers) - 2 unit prime mover - 1 unit SPMT (max. capacity 800T & max. length 60m)

• Other Support System - Dragon Skidding (max. capacity 300T) - RORO ramp - 3 units - Heavy Lift Stool - Step jacking - 1000T

17. Lifting Equipment • Mobile crane - 1 unit 25T

• Mobile crane - 3 units 25T - 2 units 45T - 1 unit 120T

Asturi Progress Asturi Before1996 - 2006

Asturi Present2007 - 2016

18. Quality System • ISO 9001 : 2001

• ASME U,U2,S,R Stamps

• ISO 9001 : 2008

• ISO 14001 : 2004

• OHSAS 18001 : 2007

• ASME N Stamp (in progress)

• 5S Management System

19. Strength • AMB alone • 10 Subsidiaries & 2 Incubators

20. Business Area • Domestic only • Oman, Qatar, UAE, Saudi Arabia

21. Awards and Recognitions

• 7 National Awards (Quality, Productivity and Management)

• 2 National Awards (Quality, Productivity and Management)

14

INCUBATORSSUBSIDIARIES

Blasting & Painting

Heavy Liftingand Transport 5/16 Braided Line

Fishing & Slickline Services

WILD WELL SERVICES

SDN.BHD. 980969-D

Construction &Project Management

SDN.BHD. 771613-X

Design, Manufacturing & Installation of

Roof Truss

Maintenance Services

NDE / NDT Inspection Services

Engineering SupportServices

891026 KEDES TECHNOLOGYSdn.Bhd.

Design EngineeringServices

Ship Building and Engineering Works

KEJURUTERAAN PERKUAT

Page 16: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Pressure Vessel48%Heat Exchangers

37%

Maintenance8%

Process Skids3%

Structural2%

Type of Products

7. Completed Products

15Delivery of Inlet Separator at Pasir Gudang Port, Johor, Malaysia

PressureVessels

Shell & Tube Exchangers

Launcher &Receiver

Process Skids

Tank

OthersPiping &Structure

1,305(Updated as @ June 2017)

59

7320129

400

623

Page 17: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

8. Manufacturing Experience

THICKEST

PRESSURE VESSEL200 mm thick x 2,500 mm ID x 4,000 mm TL with 90 tons at 4,167 psi test pressure,ASME Section VIII, DIV.2

CLADDED PRESSURE VESSEL140 + 3 mm thick x 3,450 mm ID x 9,000 mm TL with 160 tons at 1,885 psi test pressure, ASME Section VIII, DIV.2

SPECIAL MATERIALS

CLADDED MATERIALS• Cladded SS304L/SS316L/ SS317L• Cladded Duplex 2205 (UNS31803)• Cladded Super Duplex 2507 (UNS32750)• Cladded Inconel 600

DUPLEX MATERIALS• Solid Duplex 2205 (UNS31803)• Solid Super Duplex 2507 (UNS32750)

CHROMO MATERIAL• Solid SA387Gr5

MODIFIED AUSTENISTICMATERIALS• SS316L (2.5% >mo)• SS321• SS410

NON FERROUSMATERIALS• Inconel 600/625/825• CuNi SB 70600• Hastelloy–B/C

• Titanium–SB 338 Gr. 2• High Temp MTRL – SA533 Type B Class II / SA533 Type B Class II + SS316L

LARGESTHEX

5000 numbers of tubes(10,000 nos of tubes holes),strength weld + light expansion

SCOPE OF WORK

• Engineering Design (Process & Mechanical)• Static Equipments (Vessel, Heat Exchanger, Filter, others)• Piping and Structure• Electrical and Instrumentation• Insulation

LARGEST QUANTITY OF

HEX DELIVERY18 units ofHeat Exchangers

LARGEST QUANTITY OFPV DELIVERY

18 units ofPressure Vessel

LARGEST PROCESS

SKID

10.4m L x 7.6m W x 5.7m H(4 units) - 800 tons

HEAVIEST

PRESSURE VESSEL148 mm thick x 5,300 mm ID x 19,000 mm TL with 470 tons

NON PRESSURE VESSEL (FLARE STACK)22 mm thick x 5,800 mm ID x 6,540 mm TLwith 165 tons

LONGEST

PRESSURE VESSEL (SPLITTING COLUMN)39 + 3 clad mm thick x 1,800 mm ID56,000 mm OL, weight 106 tons

NON PRESSURE VESSEL (ROTATING EQUIPMENT) 60,000 mm OL x 3.5 m ID, weight 210 tons

SIZING

PRESSURE VESSEL29+3 clad mm thick x 6,040 mm ID x 9,500 mm TL with 110 tons

NON PRESSURE VESSEL• Site Built Tank size 15,000 mm ID• Flare Stack to 65,400 mm L

Forging materials inside Material Store (Bay 13)

16

Page 18: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

9. Records & Special Achievements

Item : Slug CatcherDimension : 148 mm Thick x 5,300 mm ID x 19,000 mm TLWeight : 470 tonsDelivery : September 2010

Item : Recycle Gas Compressor Dimension : 200mm Thick x 2,500 mm ID x 4,000 mm TLWeight : 90 tonsDelivery : June 2009

Item : Splitter Reboiler Heat Exchanger Dimension : 32 mm Thick x 1,950 mm ID x 12,390 mm TLWeight : 65.5 tonsDelivery : June 2006

Item : Flash KO Drum Dimension : 29+3 clad mm Thick x 6,040 mm ID x 9,500 mm TLWeight : 110 tonsDelivery : August 2002

Item : Splitting ColumnDimension : 39+3 clad mm Thick x 1,800 mm ID x 56,000 mm OLWeight : 106 tonsDelivery : April 2007

Record of delivery against contractual delivery from 20 weeks ARO to 13 weeks ARO(Amine Stripper for Ethylene Malaysia Sdn. Bhd.)

(5000 tubes)

17

HEAVIEST: PRESSURE VESSEL

BIGGEST: PRESSURE VESSEL LONGEST: PRESSURE VESSEL BEST DELIVERY ACHIEVEMENT

THICKEST: PRESSURE VESSEL LARGEST: HEAT EXCHANGER

Page 19: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Item : Acid Gas Removal Skid (Membrane Skid)Dimension : 10.4 m L x 7.6 m W x 5.7 m HWeight : 400 tons / 4 unitsDelivery : April 2007

Item : Rotary Kiln Dimension : 20 mm Thick x 3,500 mm ID x 60,000 mm OL

Weight : 210 tonsDelivery : July 2012

Item : Pressure VesselQuantity : 18 unitsDelivery : February 2012

Item : Heat ExchangerQuantity : 18 unitsDelivery : September 2008

LARGEST: PROCESS SKID

LONGEST: NON-PRESSURE VESSEL

LARGEST: DELIVERY

18

Page 20: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

10.1 Pressure Vessel 1/2

10. Product Experience

Condensate Surge Drum

Sponge Oil Absorber

Naphta Recovery Drum

Splitting Column

Recycle KO Drum

Fractionation Column

Amine Stripper

Flash Drum

Dearator ET-V-703

Reactor Vector

Natural Gas Drier

Dehydrator Guard Bed

19

Page 21: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Inlet Separator

Charge Gas Dryer Vessel

Volume Air Tank

Slug Catcher

Slug Receiver

Suction Scrubber

Gas Scrubber Stabilization Column

Contactor Inlet Scrubber

10.1 Pressure Vessel 2/2

20

Page 22: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Gas Cooler ReboilerDepropanizer

EDC Quencher Cooler Tube Bundle HE MPA/Steam Exchanger Splitter Reboiler

Heat Exchangers ready for delivery

Feed/Steam/Viss Exchangers Regen Gas Heater

Plate Heat Exchanger LP Production Cooler

HP Gas Cooler

Tube Bundle

Condensate Sub-Cooler (Titanium)

10.2 Heat Exchanger

21

Page 23: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Test Separator

Seawater Injection Treatment Skid

Membrane Valve Skid

Reboiler Skid

Fuel Gas Skid Membrane Test Skid

Membrane Skids

Primary Membrane Skid

10.3 Process Skids

22

Page 24: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

HP / LP Flare Stack

Installation of Ladder & Platform - PDH Project PDH Steel Structure Flare Stack System

Reheating Furnace Derrick Structure Flare Stack Stainless Steel Storage Tank

10.4 Non Pressure Vessel

23

Page 25: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

11. Asset, Machineries & Equipments 1/4

24

Plate Rolling Machine (85mm T)

Hydraulic Angle Bending Roll (12”)

150 mm thickness

Plate Rolling machine

Plate Rolling Machine (150mm T)

Rotator (5-600 tons)

Page 26: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

25

Auto Mechinized Nozzle Welding CNC Auto Pipe Cutting

Hydraulic Bolt Tensioning

11. Asset, Machineries & Equipments 2/4

Page 27: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Tube Expander Vertical Lathe Machine (1-3m) Flange Facing Machine (18”-74”) Machining Equipment

SAFAN M-Shear

CNC Drilling Machine CNC Laser Cutter

26

CNC equipments11. Asset, Machineries &

Equipments 3/4

Page 28: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Bundle Puller Machining Area

27

Auto Blasting Machine

11. Asset, Machineries & Equipments 4/4

Page 29: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Hydraulic Multi Axle Trailer with Self Propelled Modular

11.1 Heavy Transport & Lifting

MOBILE CRANE

25 T - 45 T

200 T, 400 T & 500 T (JV basis)

LOW LOADER

3 Axle - 5 Axle

LORRY3 T - 7 T

SKYLIFT18 m - 25 m

FORKLIFT1.5 T - 5 T

Equipments

Facilities

28

HydraulicMulti Axle with Self Propelled

Page 30: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Skylift 18m, 25mLow Loader 5 Axle (flat & lower deck)Low Loader 3 Axle (flat & lower deck) Forklift 1, 3, 5 tons

29

Mobile Crane - 120 tons Rough Terrain Crane - 45 tons

Page 31: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

FACILITIES SERVICES

Equipments Capacity 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

On Site Machining

Pipe Cutting

Line Boring

Grinding & Polishing

Flange Facing

Stud Drilling

Control Bolting Works

Valve Servicing

Pipe Insulation & Leak Sealant

Instrumentation & Calibration

11.

12.

13.

14.

15.

16.

17.

18.

19.

Tank Cleaning

Hydrostatic Testing

Engines Overhaul & Servicing

Habitat Rental

Bundle Extractor Servicing

Preheat / PWHT Servicing

Hydraulic Jacking

Air Condition & Cooling Tower

Trouble - Shooting

Bundle PullerHydraulic Jacking

11.2 Plant Maintenance Services

1. Bundle Extractor 45 tons2. Tube Puller 5.5mm to 79.5mm3. Tube Facing Cutter -4. Torque Wrench Max 14000 Nm5. Hydraulic Bolt Tensioning up to 31/2” stud bold6. Portable Magnetic Drill -7. Portable Flange Machine 0” – 72”8. Hydraulic Jacking System 1200 MT9. Gen Set 5500 MW10.Habitat 4m x 4m11.Valve Service equipments Complete Set 12.Mobilization /Transport Lorry13.Scaffolding

30

Demo installation of Habitat

Page 32: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

High Reach TelescopicHydraulic

Wireline Mast(70ft)

Labuan Office (Operation) :Lot 12404, Bestari Warehouse,Jalan Patau-Patau F.T.87000 Labuan, Malaysia

T : +6(016) 921 1424 (Samsudin) E : [email protected]

Tools

11.3 Well Services

1004 G Series Perkin LOVOL 4 Cylinder Hydraulic Power Pack

Wireline Double DrumReel Skid

Triple Ram BOP

Heavy Duty Fishing Unit

Portable Wellhead Control Panel

Equipments : 1. Downhole Slickline Tools

2. Hydraulic Telescopic Wireline Mast Unit

3. Grease Module

4. 5'' ID & 3'' ID Pressure Control Equipment

5. Spare Items for 5'' ID Pressure Control

6. Spare Items for 3'' ID Pressure Control

7. Skid for 5'' & 3'' ID Pressure Control Equipment

8. 5/16 Heavy duty Fishing Unit with 6 Cylinder Zone-2 Power Pack and Accessories

9. Single Drum Reel Skid with Zone-2 Power Pack

10. 185 CFM Air Compressor with Accessories and Transportation Skid

11. 15-K High Pressure Test Pump with Accessories

12. Standard Wellhead Control Panel with Accessories

13. Double Drum Reel Skid with Cylinder Zone 2 Engine

14. Wireline Downhole Tools, Spares and Elastomers

15. Portable Wellhead Control Panel with Accessories

16. Slickline Spooling Device Unit with Accessories

17. 5/16'' Braided Line Cable Spooling Unit with Accessories

18. Weight Indicator System

19. Fabricate Tool Box Open Top and Accessories

20. Zeron 100HS Special Alloy, Super Duplex Steel

21. 5M Manual Gate Valve

22. Compacted Strand, 1 x 19 (9/9/1) Special Alloy, Super Duplex Steel

31

5/16 Braided Line Fishing& Slickline Solution

Page 33: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

12. Manpower

32

My task as MD is to ensure product to be delivered on time

with full compliance to customer requirements

- Managing Director

Asturi staffs with the largest Process Skid, Asid Gas Removal Skid (2007)

45% 55%

OfficeStaff

WorkshopStaff

250 Staffs

Page 34: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

13. Clients

33

KENCANA HL

Page 35: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

14

15

FABRICATION AREA :CARBON STEEL

3795 m2

FABRICATION AREA :CARBON STEEL

3430 m2

FABRICATION AREA :CARBON STEEL

3430 m2

• WELD OVERLAY

• MARKING• CUTTING

1790 m2

• BOLTS / NUTS

• BALANCE PLATE STORAGE

1190 m2

OFFICE & STORE

ASTURI TOWER

GUARD HOUSE

TNB

TNB

EMERGENCY ASSEMBLY POINT A

EMERGENCY ASSEMBLY POINT B

MAIN ENTRANCE

FABRICATION AREA : SPECIAL MATERIALS

1280 m2

OFFICE 605 m2

FABRICATION AREA : SPECIAL MATERIALS

1680 m2

FABRICATION AREA :STAINLESS STEEL

2400 m2

FABRICATION AREA :STAINLESS STEEL

2160 m2

COVERED STORAGE AREA 1920 m2

OPEN STORAGE

AREA

OPEN STORAGE

AREA

OFFICE920 m2REST

AREA160 m2

BLASTING & PAINTING720 m2

PWHT720 m2

TUBE BENDING720 m2

SCRAP YARD3100 m2

SCAFFOLDING STORE340 m2

CHEMICAL & WASTE100 m2

FIRE WATER PUMP

WORKERS FACILITIES

160 m2

CAFE295 m2

SURAU

CABIN AREA

P1

P2

P3

DEPARTMENT : • MARKETING• TENDER• PURCHASING

DEPARTMENT : • DESIGN (1st floor)

• HSE (2nd floor)

DEPARTMENT : • QA / QC (2nd floor)

• PROJECT (1st floor)

• MDR ROOM (ground floor)

DEPARTMENT : • FINANCE

14. Growth & Expansion

Bay 14 and 15 at Gebeng Engineering Services Centre

FactoryLayout Plan

34

Page 36: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Block 1 : Storage/Receiving Material Area(1190m²)

Block 2 : Marking & Cutting Area, Store & DN(1790m²)

Block 3 : Fabrication Workshop(3420m²)

Block 4 : Fabrication Workshop(3420m²)

Block 5 : Fabrication Workshop(3795m²)

Block 6 :Tube Bending Area(720m²)

Block 7 :Post Weld Heat Treatment (PWHT)(720m²)

Block 8 :Blasting & Painting(720m²)

14.1 Factory Buildings

Block 9,10,11,12,13 : Fabrication WorkshopFabrication for special materials, exotic and non ferrous materialse.g : titanium, zirconium, alloys and others

35

Rated as cleanest fabricator with beautiful landscape

in Malaysia- By our clients

Page 37: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

Siklon Separators Sdn. Bhd. Gebeng Engineering Service Centre Sdn. Bhd.

10 units of incubator factories

Covered area 25m (L) x 20m (W) x 11.6m (H) = 11,700 sqm

Total land area 45,000 sqm

14.2 Incubators Factory

36

Page 38: Company Profile Strength Capabilities · 2021. 4. 13. · Asturi Progress : Before & Present 9 - 10 3. Structures : 3.1 Organisation Structure 3.2 Corporate Structure 3.3 VIP Visits

+6(09) 5833 888+6(03) 6207 [email protected]

CONTACTCONTACT

Managing DirectorM : +6(019) 986 6027E : [email protected]

Technical DirectorM : +6(013) 980 0150E : [email protected]

QC & QAM : +6(012) 989 0700E : [email protected]

Executive DirectorM : + 6(012) 989 0800E : [email protected]

Project ManagementM : +6(017) 954 9749E : [email protected]

I N T E G R A T E DQUALITY SYSTEMS

ISO 9001 : 2008ISO 14001 : 2004OHSAS 18001 : 2007ASME ‘U’, ‘U2’, ‘S’, ‘R’ Stamps5S Management System

37

Main OfficeLot 74-A, Jalan Gebeng 1/6, Gebeng Industrial Estate,26080 Kuantan, Pahang,MALAYSIAT : +6(09) 5833 888F : +6(09) 5833 999E : [email protected]

KL OfficeNo. 10, Level 2, Block C3, PUBLIKA,Solaris Dutamas, Jln. Dutamas 1,50480 Kuala Lumpur, MALAYSIA

WILD WELL SERVICESSamsudinM : +6(019) 921 1424E : [email protected]: www.wellservices.com.my

WILD WELL SERVICESLot 12404 Bestari Warehouse,Jalan Patau-Patau F.T.,87000 Labuan,MALAYSIA

MAINTENANCE SERVICESNazifM : + 6(019) 352 9880E : [email protected] : www.sikapbekal.com.my

ASTURI TRUCK & CRANEMuaz M : + 6(019) 9942 898E : [email protected] : www.asturitruckcrane.com.my

R4/16,october