company profile scaffolding
TRANSCRIPT
COMPANY PROFILE
1
SCAFFOLDING
Head Office : 39/65 Moo. 4, Highway No.36, Tubma Sub-district, Muang DistrictRayong, Thailand 21000 | Tel: 038-688-791
Stock Yard : 169/9 Moo. 4, Sriracha District, Nongkham Sub-District, Thailand20110 | Tel: 033-047-238
Mobile : 083-466-3597, 092-385-6436
www.tplm.co.th [email protected]
2
3
1) BS1139 Free Clamp(Ø 48.3 X 48.3 MM.)
6) JP48 BS1139 SleeveCoupler Galvanize Ø 48MM.
13) BS1139 Beam Clamp
TYPE I
- BS1139 Free Clamp (Ø 48.3X48.3 MM.)
7) BS1139 Pipe Joint Ø 48 MM.
14) BS1139 Beam ClampTYPE II
2) BS1139 Fixed Clamp(Ø 48.3X48.3 MM.)
8) BS1139 Arm Scaffolding 15) BS1139 Single Clamp
(Ø 3/8 )
- BS1139 Fixed Clamp(Ø 48.3X48.3 MM.)
9) Galvanize Stretch Wall
3) BS1139 Base Plate 10) PIPE Galvanize 6 M.(Ø 48.6, Ø 42.7)
4) BS1139 – Jack Base
Screw
11) BS1139 Metal Plank
5) BS1139 Sleeve Coupler Ø 48.3 MM.
12) BS1139 Metal Plank
10’x 2 M.
4
PLATFORM SCAFFOLDING
BRACKET SCAFFOLDING
TOWER SCAFFOLDING
5
INDEPENDENT SCAFFOLDING OVER HUNG
SCAFFOLDING
6
CANTILEVER SCAFFOLDING
MOBILE SCAFFOLDING
SUSPENDED SCAFFOLDING
7
Manpower
• 1. Management and admin. staff 4
• 2. Engineer and Supervisor 4
• 3. Helper 8
• 4. Foreman 10
• 5. Scaffold 124
Total 150
8
9
10
11
12
Material List of Scaffolding
50,000 Cubic Meters
13
ITEM DESCRIPTIVE QUANTITY UNIT
1 Galvanize Pipe BS1139 Dia 1-1/2“
x 3.2 mm x 6 m
15,000 PCS
2 Galvanize Pipe BS1139 Dia 1-1/2" x 3.2 mm x 4 m
11,250 PCS
3 Galvanize Pipe BS1139 Dia 1-1/2" x 3.2 mm x 3 m
12,500 PCS
4 Galvanize Pipe BS1139 Dia 1-1/2" x 3.2 mm x 2 m
12,500 PCS
5 Galvanize Pipe BS1139 Dia 1-1/2" x 3.2 mm x 1.5 m
10,000 PCS
6 Fixed clamp BS1139 size 1-12" Forge (Clamp ตาย )
62,500 PCS
7 Free clamp BS1139 size 1-12" Forge ( Clamp เป็น )
31,250 PCS
Material List of Scaffolding50,000 Cubic Meters
ITEM DESCRIPTIVE QUANTITY UNIT
8 Coupler BS1139 ข้อต่อตรง size 1-1/2"
12,500 PCS
9 Put Log BS1139 size 1-1/2" 6,250 PCS
10 Metal Plank 210mm x 3 m 43,750 PCS
11 Metal Plank 210mm x 2m 12,500 PCS
12 Ladder Aluminum 3 m 1,875 PCS
13 Ladder Aluminum 4 m 1,875 PCS
14 Base Plate 25,000 PCS
14
• Send Employees to training course.
• Scaffolding Safety Course.
• General Principle of Erection and Dismantle Scaffolding.
• Implementation Plan.
• Planning Manpower.
• Preparing Material, Equipment.
• Calculation Sheet Certifies by สย.
15
Material Certificate
16
17
Material Certificate
18
Material Certificate
19
Material Certificate
20
Material Certificate
21
Material Certificate
22
Material Certificate
Picture of Material
23
Transportation and yard area
24
25
1. PPE, Safety glasses, Helm, Gloves, Safety Shoes, Long Sleeve Shirt, Long trousers, Safety Belt.
2. Scaffolder must trained about safety scaffolding course.
3. Scaffolder must trained about inspector (ปจ.)
26
27
28
Installation at Thai Oil
29
Installation at BLUESCOPE LYSAGHT (Thailand)
30
Installation at VIPCO (Laem Chabang Port)
31
Installation RTH at Samut Sakorn
32
Installation RTH at Lad Krabang
33
Installation WHA at Saraburi
34
Installation WHA at Bangplee
35
Mahanakorn Project at Bouygues-Thai
36
Installation at Wangnoi Powerplant
37
Installation at Tesco Lotus Suraj Thani (NS BLUESCOPE)
38
Installation at Sahapat Group
39
Installation at MOC ( Maptaphut ) Rayong
40
Installation and Dismantle at โรงไฟฟ้าขนอม จ.นครศรีธรรมราช
41
Installation at NS BlueScope นิคม อมตะซติี ้ปลวกแดง จ.ระยอง
42
Installation at PTT ป่ายบุ
43
Test Load at PTT ป่ายบุ
44
45
Installation at TPL&M Yard – NS Bluescope
46
Test Load at TPL&M yard - NS BLUESCOPE
47
MODULE SCAFFOLDING ( STP&I Public Company Limited ) at Laem Chabang Yard
During April-15 to August-16
48
MODULE SCAFFOLDING AT STP&I ( Laem Chabang Yard)ICTHYLS ONSHORE LNG FACILITIES PROJECT
49
MODULE SCAFFOLDING AT STP&I ( Laem Chabang Yard)ICTHYLS ONSHORE LNG FACILITIES PROJECT
50
MODULE SCAFFOLDING AT STP&I ( Laem Chabang Yard)ICTHYLS ONSHORE LNG FACILITIES PROJECT
51
MODULE SCAFFOLDING AT STP&I ( Laem Chabang Yard)ICTHYLS ONSHORE LNG FACILITIES PROJECT
52