company profile - optipower projects · pdf filecompany profile. optipower projects ... mizpa-...

42
239 Broadlands Road Strand 7140 RSA Tel: +27 (21) 845 6745 Fax: +27 (21) 845 5264 www.optipower.net Company Profile

Upload: ngotram

Post on 31-Jan-2018

246 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

239 Broadlands Road

Strand

7140

RSA

Tel: +27 (21) 845 6745

Fax: +27 (21) 845 5264

www.optipower.net

Company Profile

Page 2: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

OptiPower Projects (Pty) Ltd was initiated and registered in 2001 by the current CEO Andre Swart.

Motivation to enter the industry was due to the lack of Broad-based Black Economic Empowered Companies within the Western Cape, and to

contribute and pass the experience gained from decades of transmission line related project participation within ABB South Africa. The company

started off with the installation of Overhead and underground Fibre Optics cables and advanced to turn-key construction of Overhead

Transmission Lines, Substations, and Renewable Energy Infrastructure.

OptiPower also achieved the “Transmission” and “Distribution” Black Economic Empowerment Status on Eskom’s vendor list. (Eskom Megawatt Park) as a LME, Vendor No: 11045781, as well as selected to be part of the Eskom Transmission Line Panel for al major Transmission

Lines on Eskom’s Power Delivery Projects, and Civil contractor for all Transmission Substation Works, incorporating the City of Cape Town and

Western Cape Provincial Government, Registration No: OPTI004TRW, As well as eThekwini (Durban) and many various other municipalities.

The aspiration and drive to provide a Quality turn-key solution to all aspects within the High, Medium and Low voltage Powerline, Substation and

Fibre Optic networks industry, is a commitment enforced by OptiPower’s top management.

The company is committed to uplifting previously disadvantaged communities and firmly believes in the continuous training of its whole workforce,

hence investing generously by embracing the South African Governments SD&L initiatives. All the permanent Site Personnel are trained in many

statutory requirements such as Eskom’s ORHVS, Occupational Health and Safety certification to enable them to work to the Safety Standards that

empowers the individuals as authorized persons on Substations, Overhead Powerlines and Fibre Optics.

Optipower also have its own in-house Engineering department that offers Assistance in design and specialized construction solutions to its

customers.

Background

Page 3: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

OptiPower's Mission:Committed to maintain our position as a market leader, through sustainable growth, excellent customer service and dedicated team work, while providing a challenging, rewarding and safe working environment for our employees.

OptiPower's Vision:Incrementally increasing our Revenue, Assets and profitability through improved productivity, strong leadership, and upliftment of our employees, without compromising on Health and Safety, Environmental and Quality.

Page 4: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Other area’s that we specialize in:

❖ Assessments, Refurbishment and Maintenance of MV and HV Power Lines (Distribution and Transmission).

❖ Assessments and Refurbishment of MV and HV Substations (Distribution and Transmission).

❖ Demolishing of existing HV Substations and Power Lines

❖ MV Reticulation Networks.

Our Core Business consists of:

Construction of MV and HV Power Lines (Distribution and Transmission).

Construction of MV and HV Substations (Distribution and Transmission).

Construction of Overhead and Underground Fibre Optic networks

including testing and fault finding (OPGW, ADSS).

Assist in Design of Fibre Optic on existing Powerlines (OPGW & ADSS)

Construction of Photovoltaic Infrastructure

Core B

usiness

Page 5: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Company O

rganogram

Management Team

ANDRE SWART

Chief Executive Officer

ASHLEY SOOBRAMONEYBusiness Development

(Director)

JACKIE SWART

Finance & AccountaingCOLIN ELLIOTT

General Manager

TECHNICAL FINANCIAL SERVICESAuditors

Accounting Procurement

T. SWARTPlant & Depot

Manager

ROCHELLE WILCOX

SHEQ Manager Projects

W. V D MERWEOperations Manager

K. McCABEManager – Projects

A. SOLOMONManager – Human

Resources

JACKIE SWART

Company Secretary

KEVIN SWARTSubstations Operations

Manager

GARETH WRIGHTLogistics

Marketing /Bid Proposals JHB

Substation Operations /

Bid Proposals CPT

Page 6: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

• Puller Winch: Tema 5t; twin conductor capability 1 • Puller Tensioner 5t; twin conductor capability 1 • Puller Tensioner 8 & 9ton; ZECK - Triple conductor

Capability 2 • Tensioner 9ton; ZECK - Triple conductor Capability 3 • Puller 16Ton ZECK 3• Tesmec Puller / Tensioner 28Ton 1• Tesmec Tensioner Winch 16Ton 1• Tesmec Puller / Tensioner / Winch 12Ton 1• Tesmec Puller 3.5 ton 1 • Tesmec Tensioner 3.5 ton 1 • Zeck Tensioner 4 ton 1 • Zeck Puller 4 ton 1 • Tesmec Press 100t 10 • Compression Dies 150 • Mobile Drum stands - Hydraulic 25 • Pilot rope (12mm 20km; 16mm 20km; 18mm 10km,

22mm 8km & 28mm 10km) • Water tanks – Truck mounted 4 • Samag, Truck, 190, 4x4, c/w 12t crane 4 • General Purpose 4x4 Truck, 1517, c/w 10t crane 15 • General Propose Double Diff, 22-19; 12t, c/w 15ton 4• 20-25Ton Rough Terrain Mobile Cranes 4• 45t Rough Terrain Mobile Cranes 2• 75t Rough Terrain Mobile Cranes 2• 90t All Terrain Mobile Crane 2• 80t Crawler Crane 1• Bobcat 3 • Bulldozer 3 • Unimog 3 • MAN 4x4 Truck, c/w 14t crane 2

• TRUCK TRACTOR Horses 6 • Truck with Crane 4x4 20• Truck without Crane 10 • LDV, 4 x 4, 1t 55• Tractor 4x4 6 • 12m Trailer, c/w 34t crane 3 • Personal carriers 25 • Ablution Trailer 28 • Lowed Trailer 6 • 5-30 ton Trailer 10 • 6m Trailer (16ton) 4 • Low bed (32ton) 2 • JCB 24T/33T Excavator 2 • Excavator 20t; PC200-5 2 • Complete Rock Drill incl. 2

Compressor (Dia 100mm / 400mm) • Auger Drill - Truck Mounted (Dia100mm to 500mm) 2 • 4x4 digger loader 10 • 4x4 – 4.5m³ Self Batching Concrete Mixer 5• 4x4 – 6m³ Concrete mixers 4• Cherry Picker (10m Reach/ 500kg) 3 • Vibrating Rammers 30 • Compressor 250CFM + Jack Hammers & Drills 10

complete set • Splicing and OTDR Testing Equipment 3 complete set • Recordable Dynamometer 4 • Site Accommodation for 700 people • 4x4 Tele handlers 5• (Offices, Barracks, Cravans, Toilettes, Stores etc…)

We have fully trained Tension

Stringing/Regulation teams

available, consisting of Site

Managers, Site Foreman,

Operators and Linesmen.

Even though the majority of

Linesmen are generally

contract workers, they are

subjected to all training

required by OSH,

Construction regulations, law,

and Clients requirements.

Plant &

Equipment

Page 7: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

✓ Qualified Engineers x4✓ ORHVS Authorized x8✓ FOA Certified Technicians x4✓ Qualified SHEQ Officers x8✓ SACPCMP x5

Qualified S

taff

Page 8: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Premises &

Presence

OptiPower Head office consists of in excess of 7000m2 Industrial lands with 600m2 under roof

stores and offices in Strand, Western Cape: 239 Broadlands Road Industrial Area.

Geographically this office services the Western Cape, Eastern Cape, Orange Free State &

Northern Cape.

This office houses:

• OptiPower CEO Office

• Operations Office

• All accounts and HR

• Project management - Secondary

• Bid proposals – Substations and Renewable Energies

• Depot and Stores - Primary

In Gauteng, we have a 2.2 Ha land, in easy access to OR Tambo International Airport, that

have been developed to suit our depot yard and professional office requirements and serve our

client base in the Johannesburg metropolis. Address: 136 Empire Rd, Bartlett.

This office services Gauteng, Mpumalanga, Kwazulu Natal, NW Province & Limpopo

This office houses:

• Bid Proposals - Primary

• Project management - Primary

• Tender / Bid proposals – Transmission lines and Fibre Optics

• Depot and Stores – Secondary

• Accounts and Procurement - Secondary

OptiPower Operates in all areas of South Africa , and are currently constructing in neighbouring

African countries as well.

OptiPower recently registered an office in Maputo, Mozambique,

(OptiPower Mozambique LDA),

Registration number: 20140000043475

and are operating as a local entity for all Substation, Overhead Lines

and Fibre Optic Networks. The office is currently being established in

Matola.

Page 9: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Accounts &

Financials

Auditors

OptiPower is audited by AF Gatonby & Co, and outsource all accounting

work to Technical Financial Services. Our Internal accounts department

handle all basic accounting work, Debtors & Creditors. We have a valid and

cleared Tax Certificate.

Page 10: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Pow

erlines

Portfolio

Overhead Transmission Lines from Distribution (33kV) to the higher transmission voltage levels (400kV).

The vast majority of experience gained from previous contracts, ranging from Engineering, Project Management to Site

Management.

A few recent projects participated and completion by OptiPower includes: -

• 132kV Mizpah Masinga (Eskom)

• 400kV Gautrain Tower heightening (Eskom)

• 132kV Firgrove – Lourensriver (Eskom)

• 66kV Vryheid - Riviersonderend (Eskom)

• 220kV Gingindlovu Loop In / Out (Eskom)

• 66kV Bluedowns Esethu Line (Eskom)

• 66kV Mpilo Line (Eskom)

• 400kV Ingula Loop In Project (Eskom)

• 400kV Eros Vuyani (Eskom)

• 400kV Hendrina Gumeni (Eskom)

• 132kV Melkhout Kouga (Eskom)

• 132kV Gibson Bay (Eskom)

• 400kV Gromis – Oranjemond (Eskom)

• 400kV Nieuwehoop – Upington (Eskom)

Page 11: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Pow

erline Experience

POWERLINES

Company Year Reference TENDER NO Contract AMOUNT DATE COMPLETED

400kV Projects

Eskom Transmission 2008 /2009 Mr. Piet Greyling

+27 21 915 2111

Koeberg - Aurora, and Grassridge : Re-Insulation of

Various 400kv Lines, in the Western Cape Region

R

8,561,222.00 Apr-09

Eskom 2010Mr. Bheki Hlengwa

+27 83 944 6288 DC21082008

Ingula – Venus: Loop-In 400KV Overhead

Transmission Line – Quad Zebra

R

30,800,000.00 Apr-11

Eskom 2012Roger Peense

+27 21 915 9205 JNM10097539

Foundation refurbishment:

Aries - Kokerboom 400kV Line

R

12,204,136.39 Feb-12

Eskom Holdings SOC

Limited 2012/2014

Sugan Naidoo

+27 31 792 8627 CED(PDP)/2010/KR/02

Eros - Vuyani 400kV Overhead Line Section B

Turnkey Construction

R

186,600,000.00 May-15

Eskom Holdings SOC

Limited 2014

Louis de Jager

+27 71 689 6902 PS(PDP)® 2012/BS/09

Hendrina - Gumeni 400kV Overhead Line Turnkey

Construction

R

108,400,000.00 Dec-15

Eskom Holdings SOC

Limited 2015

Enock Mbokazi

011 800 3227 PS(PDP)2013/LSX/03 Vulcan 400kV Bypass

R

29,700,000.00 Sep-16

Eskom Holdings SOC

Limited 2016

Bak Potgieter

082 782 5965 PS(PDP)2015/TN/06

Gromis - Oranjemond, 120km 400kV

Overhead Transmission Line

R

162,500,000.00 Current

Eskom Holdings SOC

Limited 2016 Robert Chauke PS(PDP)2016/TN/03

Construction of the Nieuwehoop - Upington 400kV

Line

R

65,400,000.00 Current

220kV & 275kV Projects

ABB Group 2012Mr C Elliott

+27 10 202 5179 Thamaga Morupule 220kV - Flying Insulator

R

300,000.00 May-12

Eskom 2012Roger Peense

+27 21 915 9205

Emergency Conductor Repair on Gromis Oranemond

220Kv line.

R

822,142.98 Jul-13

Eskom Holdings SOC

Limited 2015

Zukiswa Kadira

011 800 3475 JB1071835155 Ferrum Lewensaar, 275kV Turn in Line R 31,697,000.00 Nov-16

Page 12: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Pow

erline Experience

Cont.…

132kV Projects

Eskom 2007Mr. Neil Bodger

+27 82 895 1363 DD 4750/MG

Mizpa- Msinga Project: 132KV S/C 45km; Extreme

Difficult Terrain

R

19,263,651.35 Mar-08

City Of Cape Town 2007Mr. Edgar Capes

+27 21 9187097

City of Cape Town: Transmission: 132kV Twin

Conductor, Double Circuit

R

1,619,562.75 Nov-07

Eskom 2009Mr. Max Jacobs

+27 21 980 3918

Eskom Distribution: 132kV Twin Conductor, Double

Circuit –N2 Crossing

R

3,256,000.00 Oct-09

Eskom 2010Mr. Max Jacobs

+27 21 980 3918 E/ZM2310

Firgrove – Lourensriver : 132KV – Double Circuit

Monopole Line – Twin Kingbird

R

24,372,232.40 Jan-11

CVG Consulting

Engineers (Eskom) 2011

Mr. R. van Gruenen

+27 31 764 3301 DD 5437/CS

132kV Turn-In Lines at Gingindlovu 132/88/22/11- kV

Substation

R

23,737,354.02 Oct-11

Eskom 2012Ms. Miliswa Beqezi

+27 21 980 3966 E/AM 2377

Bluedowns - Esethu 132kV Steel Monopole

Overhead Line, Constructred through Seasonal

Wetland

R

9,000,000.00 Mar-13

Eskom 2014Howard Blane

+27 43 703 5429 EZN 5337 Melkhout - Kouga 132kV Line Phase 2

R

32,896,000.00 Sep-14

Eskom - Eastern

region 2015

Ms Claire Tredoux

+27 43 703 5434 WBS: C.DS 01292 Melkhout - Dieprivier, 132kV Line R 18,861,939.28 Sep-16

66kV Projects

Eskom 2010Ms. Miliswa Beqezi

+27 21 980 3966 E/AM2377

Mpilo-Spine: Supply & construction of a new 3.5km

66kV Monopole Line

R

7,384,411.39 Dec-11

Eskom 2011Mr. Nico Schoeman

+27 83 658 9990 E/HEN2051

Vryheid – Riviersonderend: 40km Single Circuit 66kV

Line

R

13,500,000.00 Jul-11

Page 13: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

MIZPAH – MSINGA 132kV LINE:Build a Kingbird 132kV Line from the existing (Tower 33) Double Circuit Line located 10.7km from Mizpah Substation

to the new Masinga Substation

Page 14: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

INGULA 400kV TURN IN LINE:The construction of a 400kV, 11.5km, From Ingula Pump Storage Scheme to Turn In Point (Intersection of Majuba

Venus 400kV Line)

Page 15: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

EROS VUYANI 400kV LINE:The construction of a 400kV, 77km, From Tower #211 to Vuyani Substation

Page 16: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

EROS VUYANI 400kV LINE: Continued…The construction of a 400kV, 77km, From Tower #211 to Vuyani Substation

Page 17: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

HENDRINA GUMENI 400kV LINE:The construction of a 400kV, 40.9 km, in the vicinity of the town of Waterval Boven in the Highveld area of Mpumalanga

Page 18: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

VULCAN 400KV LOOPS:The Construction of Vulcan Bypass 400KV Transmission power lines

Page 19: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

VRYHEID – RIVERSONDEREND 66kV LINE:The construction of a 66kV Monopole Line, 40km, From Vryheid to Riversonderend Substation

Page 20: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

OptiPower Projects initially launched the Sub-station Division in 2007, and its first substation project (Duinzicht Substation) was completed within the

same year.

Subsequently various turnkey substation projects were completed successfully.

This division has received high accolades from clients on its substation design department’s experience.

Turnkey construction of Substations from 11kV to 400kV.

Upgrading of existing substations

Refurbishment

List of substations projects completed to date include:

• Duinzicht Substation Upgrade (Petro SA)

• Khayelitsha Substation Refurbishment (Eskom)

• Mpilo Substation 66kV/11kV (Eskom)

• Klapmuts Substation 132kV/66kV (Eskom)

• Vredeluslus 132kV/33kV (Eskom)

• Hermanus Substation (Eskom)

• Nampula Substation (RXPE / EDM)

• Greenville Substation (Eskom / Garden Cities NPO)

• Kliprug Substation (Eskom / Drakenstein Municipality)

• Pennyville Substation (JHB City Power / ABB)

Su

bs

ta

tio

ns

Po

rt

fo

lio

Page 21: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Su

bs

ta

tio

n E

xp

er

ien

ce

SUBSTATION

Company Year Reference TENDER NO Contract AMOUNT DATE COMPLETED

Anglo American 2008 Mr. Eric Gilfillan

+27 11 638 3230

Duinzuicht Substation: 66kV Feeder bays

install and commission for generating Plant

at Petro SA – Mosselbay.

R 4,517,211.84 Oct-08

Eskom Distribution -

Western Cape 2008/2009

Ms. Miliswa Beqezi

+27 83 522 1986 E/VD2136

Khayelisha 132kV Substation: Installation

and Commissioning of new Equipment R 1,769,475.14 Mar-09

Eskom 2010 Ms. Miliswa Beqezi

+27 83 522 1986 E/MD2299

Mpilo Substation: Installation and

Commissioning of 66kV Upgrade R 7,006,941.77 Jun-12

Eskom 2012 Mr. Steve Brooks-Neill

+27 21 980 3108 E/NB2456

Klapmuts Substation 132 / 11 kV

Substation Turnkey Construction R 22,295,954.67 Jun-12

Eskom 2012 Mr. LM Jonck

+27 11 516 7040 PS (PDP) 2012/MM/06

Supply, Installation, Testing and

Commissioning of Fibre Optic Cables at

Gamma Substation

R 550,000.00 Nov-12

Eskom 2012 Mr. V Matshego

+27 11 800 3780 PS (PDP) 2012/MM/06

Installation and commissioning of the

multimode fibre optic cables required at

Hydra Station within the new 765kV control

room and also between the 765kV control

and the Diameter Marshalling Kiosks

(DMKs).

R 600,000.00 Oct-12

Eskom 2013 Mr. Benjamin Gqoba

+27 11 800 8535 PS (PDP) 2012/MM/06

Supply, Installation, Testing and

Commissioning of Fibre Optic Cables at

Sterrekus Substation

R 361,595.81 Nov-12

Eskom 2011/2012 Dirk Weideman

+27 21 526 6917

Klapmuts 132kv Substation: complete

supply and construct greenfield substation,

2x 20MVa. Contract in Klapmuts, near

Paarl

R 22,295,954.67 Jun-12

Page 22: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Su

bs

ta

tio

n E

xp

er

ien

ce

Co

nt

...

Eskom 2012/2013 Shantal Gordon

+27 27 213 3944 E/AV 2896

Vredelus 132kV Substation: complete

supply and construct Greenfield Substation,

1x 10MVa 132/11kK and 1x 10MVa

132/22kV. Contract in near Vredendal in the

Northern Cape

R 6,195,757.77 Sep-13

Abb South Africa 2013 Colin Elliot

+27 10 202 5179 SC1190/20212

Hermanus Substation-Substation Electrical

and Mechanical Works R 1,200,000.00 Jul-13

Group5 / Iberdrola 2013 Alberto Lopez-Pando Novoa

+34 91 713 3307

Klipheuwel Wind Farm

Substation

Klipheuwel Substation-Complete Supply

and Construct Greenfield Substation for

Dassiesklip Windfarm

R 10,299,418.75 Mar-14

Eskom 2014 Vuyisile Lloyd

+27 83 749 6570 EMM 55344

Melkhout Capacitor Banks - Control Coom,

Platform Extension and Preparation of

Capacitor Bank Bay-Project in

Humansdorp-Project.

R 7,278,463.27 Sep-14

Eskom 2014 Brandon Naidoo

+27 11 800 3515 PS(PDP)2013/TN/04

Grassridge Substation-Construction of

132kV Feederbay. Project is in Port

Elizabeth-Currently Under Construction

R 2,786,746.09 Sep-14

Abb South Africa 2013/2014 Collin Elliot

+27 10 202 5179 SM_SEGP_18082013

Witkop Substation-Complete Supply and

Construct Greenfield Substation, 2x

20MVa.

R 15,000,000.00 Jun-14

Eskom 2014 Vuyolethu Matiwane E/TP 3324 Windmill- Lebonne 132kV Feeder Bay R 2,173,746.91 Sep-16

RXPE 2014 Richie chen Electrical installation, Nampula statcom

plant R 17,644,003.23 Aug-16

Eskom 2014 Jullian Muller Duinzight Substation refurbishment R 8,491,501.64 Dec-16

Garden Cities 2015 Riaan van Greunen

+27837783909 1440/3.4

Establishment of the new 132/11kV

2x40MVA Greenville

Substation

R 39,901,356.69 Aug-16

Transnet Ports Authority 2015 Sishosonke Dlamini

031 361 1115 M-2123388-623

Supply, deliver, install and commission

distribution power

tansformers in the Port of Durban

R 4,248,911.00 Jul-16

Page 23: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

KHAYELITSHA SUBSTATION - Installation and Commissioning of 66kV Upgrade

Page 24: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

MPILO SPINE - Supply & construction of a new 3.5km 66kV Monopole Line & Refurbishment of 66kV Substation

Page 25: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

KLAPMUTS SUBSTATION – Complete Construction of 132kV Substation

Page 26: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

VREDELUS SUBSTATION – Complete Construction of 132kV / 11kV Substation

Page 27: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

KLIPHEUWEL / DASSIESKLIP SUBSTATION – Construction of 132/22kV Step-Up Substation for Iberdrola

Page 28: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Nampula Substation – Construction of 220kV / 110 / 66 / 6.6kv Statcom Plant.

Page 29: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Fib

re

Op

tic

s

Po

rt

fo

lio

• OptiPower Projects initially started out as its core business to install fibre optics on overhead lines

• OptiPower has ensured that we skill ourselves with trained and experienced staff which are certified by the Fibre Optic

Association of South Africa (FOA).

• Teams are readily available for any emergency repairs and maintenance.

• Turnkey Installation of all Fibre Optic Types

• Specialist Splicing and Testing

• Emergency repair work

• Fibre Optic Design Work

• Fault locating

• Patching

• Assisting in the Commissioning of Fibre Optic network with an approved specialist

Page 30: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Fib

re

Op

tic

Ex

pe

rie

nc

e

FIBRE OPTICS (OPGW)

Company Year Reference TENDER NO Contract AMOUNT DATE COMPLETED

2009

Eskom 2008/2009 Mr. Attie van Wyk

+27 82 887 2070

Stellenbosch – Lyndoch: Supply,

installation and testing of OPGW R 550,000.00 Nov-08

Eskom 2009Mr. Pine Pienaar

+27 21 980 3911

Acacia - Montague Gardens: Supply,

installation and testing of OPGW R 650,000.00 Mar-09

Eskom 2009Mr. Egon Davids

+27 82 553 7090 E/ZM2271

Briers: Supply, installation and testing of of

6km OPGW R 1,463,078.90 Oct-10

2010

Eskom 2010Mr. Mansoor Barday

+27 21 980 3911 E/NB1789

Romansrivier - Boskloof : Design, Supply,

installation and testing of OPGW R 701,109.54 Mar-10

Eskom 2010Mr. Jeffrey Jacobs

+27 21 915 1148 E/HEN2430

Acacia – Ascot Substation: design, supply,

install & testing of a 4.77km greased

OPGW

R 1,367,052.08 Apr-10

Eskom 2010

Mr. Naj Moodley

+27 11 800 4446

+27 83 632 7699 CED(PDP)/2010MF/02

Supply, delivery off-loading & installation of

fibre optic cable at Mercury, Perseus &

Zeus Substation

R 2,134,000.00 Apr-11

Eskom 2010Mr. Max Jacobs

+27 21 980 3918 E/ZM2310

Firgrove – Lourensriver : 132KV – Double

Circuit Monopole Line – 8.5km 16kA 24F

OPGW

R 800,000.00 Mar-11

Eskom 2010Mr. Egon Davids

+27 82 553 7090 R 4,501,053,255.00

Stikland Serepta: Emergency Repair - 2km

12kA 24F OPGW R 350,000.00 Nov-10

Page 31: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Fib

re

Op

tic

Ex

pe

rie

nc

e

Cont.…

2011

Eskom 2011

Mr. Derrick Woolley (HERMES)

+27 827699270

Mr. Vince De Bruin (MERCURY)

+27 836330843

BS082010

Hermes – Mercury 400Kv Line: Remove

existing redundant opgw, install free issue

opgw, test & install hardware for opgw

R 3,315,434.06 Dec-11

Eskom 2011

Laurianne Van Zyl

+27 21 980 3544

+27 82 493 7585

E/NB2563 OPGW on Windmill 3 - Paarl 66kV line R 850,000.00 Jan-12

CVG Consulting

Engineers (Eskom) 2011

Mr. R. van Gruenen

+27 31 764 3301 DD 5437/CS

132kV Turn-In Lines at Gingindlovu

132/88/22/11- kV Substation - Including

4.5km 21kA 24F OPGW

R 750,000.00 Oct-11

Eskom Holdings SOC

Limited 2011/2012

Sugan Naidoo

+27 31 792 8627 CED(PDP)/2010/KR/02

Eros - Vuyani 400kV Overhead Line

Section B Turnkey Construction Including

48Core OPGW

R 8,500,000.00 Sep-15

2012

Eskom 2012Ms. Miliswa Beqezi

+27 21 980 3966 E/AM 2377

Bluedowns - Esethu 132kV Steel Monopole

Overhead Line, Including 4.7km 17kA 24F

OPGW

R 524,000.00 Mar-13

Eskom 2012Ms. Miliswa Beqezi

+27 21 980 3966 E/AM2377

Mpilo-Spine: Supply & construction of a

new 3.5km 66kV Monopole Line, Including

5km 17kA 48F OPGW

R 770,000.00 Mar-13

2013

Eskom / Roshcon 2013 Roshcon Ingula Venus 400kV OHL Ingula Venus 400kv Power Line Earthing

and OPGW - 45km R 1,800,000.00 May-14

Eskom 2013Lungile Mtambo

+27 31 710 5390 DD5838/LM

Ludeke Zwelethu 132kV Overhead Line

Stringing, Including 42km 24F OPGW (Mink

Equiv.)

R 950,000.00 Aug-13

Page 32: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Fib

re

Op

tic

Ex

pe

rie

nc

e

Cont.…

2014

Eskom Holdings SOC

Limited 2014

Johan vd Westhuizen

+27 43 703 5429 EZN 5337

Melkhout Kouga 132kV Overhead Line

Tunkey Construction, Including 13km 24F

OPGW.

R 520,000.00 Jul-14

Eskom Holdings SOC

Limited 2014

Danesh Durgapersad

+27 11 800 5522 PS(PDP)® 2012/BS/09

Hendrina - Gumeni 400kV Overhead Line

Turnkey Construction, Including 45km 21kA

24F OPGW

R 3,250,000.00 Mar-15

Emfuleni Local

municipality 2014 11/2013/65

Supply, Delivery, Installation and

commissioning of Optical Power Ground

Wire and All-Dielectric Self Supporting Fibre

Optic Cables on 88kV Lines Between

Various High Voltage Substations

R 1,000,000.00 Dec-14

2015

Eskom Holdings SOC

Limited 2015

Johan vd Westhuizen

+27 43 703 5429 EMG 5519

Melkhout Dieprivier 132kV Overhead Line

Tunkey Construction, Including 26.5km

10kA 48 Core OPGW.

R 2,500,000.00 Feb-16

ZTT / Goldern Dynasty 2015

Gordon Jiang

+27 83 324 1888

Melanie Naiker

+27 72 248 9884

ESETHU - KHAYALITSHA Installation of 5.5km of ZTT 12kA 24 & 48

core OPGW. R 650,000.00 Jun-15

2016

ZTT / Goldern Dynasty 2016

Gordon Jiang

+27 83 324 1888

Melanie Naiker

+27 72 248 9884

SWELLENDAM –

BUFFELSJAG

Installation of 15km of ZTT 5kA 48 core

OPGW. R 890,000.00 Aug-16

Page 33: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Fib

re

Op

tic

Ex

pe

rie

nc

e

Cont.…

FIBRE OPTICS (ADSS)

Company Year Reference TENDER NO Contract AMOUNT DATE COMPLETED

2009

Eskom 2009Mr. Attie v. Wyk

+27 82 887 2070

George – Blanco: Supply, installation and

testing of ADSS 66kV Double circuit 16km R 969,690.00 Jun-09

City Of Cape Town 2009Mr. Ted Brader

+27 21 763 5615

City of Cape Town: Supply, installation and

testing of ADSS Fibre install over informal

settlement

R 850,000.00 Jun-09

Eskom 2009Mr. Mansoor Barday

+27 21 980 3911 E/HEN2071

Knysna – Eastford: Design, supply,

installation and testing of ADSS 5.2km R 650,000.00 Dec-09

2010

Eskom 2010Mr. Ryan De Leeuw

+27 21 980 3911 E/NB2258

Stikland – Eversdal: Design, supply,

installation and testing of ADSS 7.2km R 760,951.21 May-10

Eskom 2010Mr. Pine Pienaar

+27 21 980 3911

Serepta – Belhar: ADSS Replacement

5.5km R 850,000.00 Aug-10

Eskom 2010Mr. Ebrahim Ismail

+27 21 980 5475

Acacia third transformer bay project

Substation – supply, installation, splicing,

testing & commissioning of Fibre Optic

cable

R 130,000.00 Oct-10

Broadband Infraco 2010Mr. Rama Pillay

+27 11 235 1678 INF/TEN0053

Grahamstown: Fibre Optic installation &

testing & handover for 2km of underground

& 10km of aerial construction

R 2,167,048.61 Dec-10

2011

Eskom 2011Mr. Irvin Tyambetyu

+27 73 723 0275 E/AV2524

Helmond Substation: Installation of 11kV

cables & terminals, Supply & installation of

Fibre Optic Cable

R 1,092,925.43 Jan-12

Page 34: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Fib

re

Op

tic

Ex

pe

rie

nc

e

Cont.…

2012

Eskom 2012

Aldrey Africa

+27 22 713 5200

+27 83 953 2559

E/AV2533

E/AV2689

Design, Supply, installation and testing of

ADSS Fibre Optic cable between

Wellington-Windmill substation

R 817,355.09 Sep-11

2013

Eskom 2013Nevin Nel

+27 41 994 8620 EETEL00114/AT

Neptune - Aloe Glen - Royston; Supply,

Installation and Testing of ADSS Fibre R 1,400,000.00 Feb-14

Eskom 2013Loyiso Ntintise

+27 43 703 2708 EBJ 5218

Pembroke - Yellowwoods & Dimbaza -

Debenek 66kV Line ADSS Installation R 5,297,526.43 Sep-14

Page 35: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

COPPERBELT ENERGY CORPORATION OPGW (OPTICAL FIBER GROUND WIRE) INSTALLATION - Installed approximately

520km of OPGW to replace a section of the Current Guard wire, which runs along CEC’s 220kv and 66kV power network throughout the Copperbelt.

Page 36: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Grahamstown ADSS - Perform Design Engineering work, Fibre Optic installation & testing & hand-over

for 12km of underground & 20km of Aerial construction

Page 37: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Ascot Acacia 66kV OPGW - DESIGN, SUPPLY, INSTALLATION AND TESTING OF A 10KM GREASED OPGW EQUIVALENT TO

CHICKADEE CONDUCTOR BETWEEN ACACIA – ASCOT SUBSTATION 66KV LINE

Page 38: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

HERMES – MERCURY 220 kV OPGW - Remove existing redundant OPGW; Install free issue OPGW; Supply

and Install hardware for OPGW on the Hermes- Mercury 400kV Line. The line length is approximately 50km, gantry to gantry.

Page 39: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

PV

Fa

rm

Po

rt

fo

lio

• In Mid 2013, OptiPower Projects were approached by ABB South Africa to assist in the construction of Soutpan PV Farm

• Scope of work included the following:

– Install of Steel Footing (Including all foundation drilling)

– Install complete tracker system

– Install all PV panels and wiring

• Due to our resilience on site ABB South Africa had furthered our scope to include civil works and Collector blocks

• OptiPower is currently generating the capacity and resources to form a specialized unit to continue in the construction of PV

Farms and the associated works

Page 40: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Soutpan Photovoltaic Farm – Complete construction of all trackers and PV Panels, Including Civil Works and

collector system.

Page 41: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

Ou

r C

lie

nt

s

Page 42: Company Profile - OptiPower Projects · PDF fileCompany Profile. OptiPower Projects ... Mizpa- Msinga Project: 132KV S/C 45km; Extreme Difficult Terrain R 19,263,651.35 Mar-08 City

• Ashley Soobramoney+27 83 558 [email protected]

• Andre Swart+27 83 300 [email protected]

• Willie van der Merwe+27 83 560 [email protected]

• Colin Elliott +27 82 659 [email protected]

• Kevin Swart+27 83 952 [email protected]