company profile kcc buildcon private limited
DESCRIPTION
Company Profile KCC Buildcon Private LimitedTRANSCRIPT
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
2
PROFILE
KCC Buildcon Pvt. Ltd. (FORMERLY KUNDU CONSTRUCTION CO.)
(GOVT. CONTRACTOR) An ISO 9001:2008 Certified
Civil CONSTRUCTION COMPANY
Company’s Registered Office BU-5, IInd Floor, S.F.S. Flats, Outer Ring Road,
Pitampura, Delhi- 110034. Ph: 011-47581001 Email: [email protected],
Web Add: www.kccbuildcon.co.in Corporate Office:
Block - C, Unit No. - 501, 5th Floor, Nirvana Courtyard, Nirvana Country, Sector - 50,
Gurgaon – 122018 (HARYANA) Ph./Fax. 0124-4087524/5
Branch Office: 119, Sector - 14, Rohtak (Haryana)-124001,
Ph: 01262-279545/325077
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
3
BRIEF PROFILE
1. Name of the Company : KCC Buildcon Private Limited (Formerly Kundu Construction Co.)
2. Address (Regd. Office) : BU-5, IInd Floor, S.F.S. Flats, Outer Ring
Road, Pitampura, Delhi -110034.
3. Corporate Office : # 501, Block - C, 5th Floor, Nirvana Courtyard, Nirvana Country, Sec - 50, Gurgaon 122018
4. Branch office : 119, Sector – 14, Rohtak, (Hr) – 124001
5. Constitution : Private Limited Company under Company act 1956.
6. Date of Incorporation : The Business was run under the Partnership since 01.04.1999. Running Business of the Firm has been taken over by M/s. KCC Buildcon (P) Ltd. Ongoing concern basis w. e. f. 01.04.2010.
7. Line of Activity : CIVIL CONSTRUCTION CONTRACTORS (ROADS/highways, Bridges and BUILDINGS)
8. Key Management : Consisting following Directors:
1. Sh. Balraj Kundu, CMD 2. Sh. ShivRaj Kundu, Director 3. Sh. Vijay Kundu, Director
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
4
INDEX 1. Chairmen’s message
2. Our Aims
3. Introduction
4. DIRECTORS, Office Address, PAN Etc.
5. Registration with department
6. Annual Turnover
7. Organizational Chart
8. ISO Certificate
9. List of Plant and Equipment
10. Project successfully completed
11. Ongoing Project
12. Technical Staff
13. Site pictures
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
6
OUR AIMS To enhance Customers satisfaction through
delivery of Quality Service.
To complete the Projects within stipulated Time Frame.
To do Right thing every time.
To quote most competitive and economical Rates.
To become a leader in the field of civil construction.
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
7
Introduction M/S. KCC BUILDCON PRIVATE LIMITED IS A PRIVATE LIMITED COMPANY INCOPRPORATED WITH THE ROC (DELHI & HARYANA) IN the YEAR 2009 WITH THE OBJECT TO TAKE OVER THE RUNNING BUSINESS OF M/S. KUNDU CONSTRCUTION CO., A PARTNERSHIP FIRM ESTABLISHMENT IN THE YEAR 1999 AND THE BUSINESS WAS CARRIED UNDER THE PARTNERSHIP TILL 31.03.2010 ,THEREAFTER THE BUSINESS WAS TAKEN OVER BY THE PRIVATE LIMITED COMPANY M/S. KCC BUILDCON (P) LTD AND ALL THE ASSETS AND LIABILITIES OF THE ERSTWHILE PARTNERSHIP FIRM ON BASIS OF AUDITED BALANCE SHEET AS AT 31.03.2010 W.E.F 01.04.2010 ALL THE PARTNERS OF THE FIRM ARE THE DIRECTORS OF THE COMPANY. “Quality, integrity and Honesty set KCC, apart from any other Commercial road contraction company. We understand the importance of each and every Road/Highways project, from small tenement renovations to multi-Crores projects. We give all clients personalized attention that every project requires. KCC looks forward to working with them till completion of their Dream Destination. Not only do we have a past that we can be proud of but, we also hold dear to our hearts, the future hopes and aspirations of professionals who guide this company. We have people and resources to lead this company to a bright future. We have reached thus far owing to hard-work, dedication and determination of the team that drives this organization. We have earned the trust and respect of our clients and we are confident, that our company will grow from strength to strength in our endeavor to make this Company into one that delivers value and satisfaction to our growing base of valued clients.
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
8
We are well reputed name in Road construction in Delhi & Haryana, we specialize in the field of: - • Earth work. • All type of Pavements, • Concrete and Bituminous Roads, • Mass Excavation and • Site Development We are well equipped with a complete range of latest construction equipment and machines required in the field of construction.
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
9
Directors Sh. Balraj Kundu
SH. ShivRaj Kundu
SH. Vijay Kundu
Head Office Location Flat No. BU-5, II Floor, SFS Flats, Outer Ring Road, Pitampura, Delhi-
110034, Ph: 011-47581001
Corporate Office Location Block - C, Unit No. - 501, 5th Floor, Nirvana Courtyard, Nirvana Country,
Sector - 50, Gurgaon – 122018 (HARYANA) Ph./Fax. 0124-4087524/5
Branch Offices Location Haryana (Rohtak) 119, Sector-14, Rohtak, Haryana-124001 Telephone:-
01262 279545/325077
Madhya Pradesh (Bhopal) 65, Railway Housing Society, 12 No. Stop E-8,
Arera Colony, Bhopal(MP)-462016
West Bengal(Kolkata) Durga Tower, Lichubagan, Mouzu-Kalipur, P.O.-
Grolgacha Dankuni, Hooghly, Kolkata(WB)-712708
Chandigarh Flat No. 614, Sector – 49A, IAS/IPS Society, Chandigarh-
160047
Web Page www.kccbuildcon.co.in
Email IDs [email protected], [email protected],
[email protected], [email protected],
PAN NO. AADCK8357N
Name of Bankers Bank of Baroda, ICICI Bank Limited, YES BANK, Punjab National
Bank, HDFC Bank, DENA BANK, Corporation Bank
Registration with Departments (CLASS-I) CPWD, New Delhi, MES (Military Engineering Services) & Flood Control
Department
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
12
Audited Annual Financial Data Years Turnover (F.Y.) (INR Rs. Crores)
2009-10 149.38 2010-11 235.44 2011-12 202.49 2012-13 447.80 2013-14 500.74
2014-15 496.93
AUDITED NET WORTH:-
Financial year 2014-15 = Rs. 104.38 Crores
Projected Turnover of F.Y. 2015-16
<Rs.750.00 Crores
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
14
List of Major Plant & Machinery S
No. Particulars of Equipment
No. of
Units Manufacturer
1 TIPPER/DUMPER 170 TATA/AMW
2 TRANSIT MIXTURE 13 SCHWING STETTER
3 EXCAVATOR 16 HYUNDAI/VOLVO/KOMATSU/KOBALCO
4 TRAILER 4 TATA PRIMA/ASHOK LEYLAND
5 JCB 10 JCB INDIA PVT LTD
6 SOIL COMPACTOR 19 DYNAPAC/ESCOURT/VOLVO/HAMM
7 ROLLER 14 DYNAPAC/VOLVO/HAMM/WIRTGEN
8 WHEEL LOADER 17 HINDUSTAN, LIUGONG
9 WATER TANKER 14 TATA MOTORS/MAHINDRA
10 HYDRA ESCORT 4 HYDRA ESCORT
11 CONCRETE MIXURE 2 AJAX FIORI
12 KERB LAYING MACHINE 2 APOLLO
13 CRUSHING PLANT 5 METSO, BHP
14 DRUM TYPE HOT MIX PLANT 8 EVEREST
15 BATCH TYPE HOT MIX PLANT 4 APOLLO/LINHOFF/ROADY ROAD
EQUIPMENT
16 RMC PLANT 10 APOLLO/SCHWING SETTER/AKONA
17 MOBILE CRUSHER 2 TEREX/METSO
18 WET MIX PLANT 4 EVEREST ROAD EQUIPMENTS
19 POWER SCREEN(SCREENING) 2 POWER SCREEN TEREX
S
No. Particulars of Equipment
No. of
Units Manufacturer
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
15
20. PAVER 9 METER 3 WRITGEN VOGELE
21 PAVER 5.5 METER 5 APOLLO/EVEREST ROAD EUIPMETS
23 PNEUMATIC TYRE TOLLER 4 VOLVO INDIA PVT LTD
24 GRADER 12 CATERPILLAR/LIUGONG/KOMATSU
25 MILLING MACHINE 1 WIRTGEN INDIA PVT LTD
27 LIGHTING TOWER 4 ASKA SAFETY DEVICES
28 D.G SET 17 SUDHIR/JAKSON/LEYLAND/CATERPILL
AR
29 WEIGHBRIDGE 5 WEIGHTEX SCALES
30 TOWER CRANE 2 ESCORT/ACE
31 TRACTOR 8 MAHINDRA/EICHER/ESCORT
32 AIR COMPRESSOR 7 EVEREST ROAD EQUIPMENTS
33 OTHER MACHINERY 62
ESCORT/VOLVO/IR/KOMATSU/APOLLO/
CAT/WRITGEN/SHWING
STETTER/MAHINDRA/JCB/ACE etc.
WE HAVE SUFFICIENT ASSOCIATE ARRANGEMENTS FOR TAKING EXTRA PLANT & MACHINERY LIKE HOT MIX PLANTS (BATCH/DRUM TYPE), PAVERS, SLIP FORM PAVER, FIXED FORM PAVERS, DUMPERS, MILLING MACHINE, TRANSIT MIXERS, GRADERS, ROAD ROLLERS, JCB, VIBRATORY ROLLERS, EXCAVATORS, GENERATOR SETS, AIR COMPRESSORS WITH JACK HAMMER, SHUTTERING PLATES ETC. ON LEASE/RENT BASIS FOR SMOOTH OPERATION & FAST PROGRESS OF PROJECT AS AND WHEN REQUIRED.
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
16
List of Major Work Completed Sl.
No. Description of Work State Employer
Completion
Cost (INR
Crores)
1
Development of Lateri - Anandpur -
Bhagwantpur, Tyonda (NH-86) - Ganjbasoda,
Itkhedi - Raslakhedi, Kurawar - Iklera - Talen
& Ankhia - Barkheda - Dongargaon Road
Major District Roads on BOT (Annuity) basis
under Package - V
Madhya
Pradesh
MPRDC, 45-A,
Arera Hills,
Bhopal - 0755-
2765196
156.83
2
Construction of Balance Work of 8-Laning
from KM 16.500 to KM 29.300 of NH-1 in
the State of Delhi
Delhi
National Highways
Authority of India,
G 5&6, Sector-10,
Dwarka, New
Delhi - 110 075
129.72
3
Widening & Reconstruction of Package-6,
Pachor-Chhapikheda-Jirapur-Machalpur-
Soyat Road under MPSRP-III (ADB Loan
No. IND-2736)
Madhya
Pradesh
MPRDC, 45-A,
Arera Hills,
Bhopal - 0755-
2765196
116.03
4
Development of, Sijhata-Hinoti-Malgaon-
Khamariya-Ater, Poudi-Maharajpur-
Parasmaniya & Mangawar-Bekunthpur Major
District Road under Package-X on BOT
(Annuity) basis
Madhya
Pradesh
MPRDC, 45-A,
Arera Hills,
Bhopal - 0755-
2765196
100.00
5
Resurfacing of Main Runway, Dispersal and
SGA Conversion at Air Force Station
Jaisalmer
Rajasthan
Garrison Engineer
(P) (AF), Military
Engineer Services,
Air Force Station,
Jaisalmer- 345001
92.77
6
Improvemcnt of Jhajjar Dhaur Beri road,
Bahadurgarh Beri Kalanaur road, Dighal Beri
Jahazgarh road in Jhajjar District (Package
No. HSRDC/NCT/C10/2008)
Haryana
HSRDC, Opposite
T.B. Hospital, In
the Campus of
Superintending
Engineer, P.W.D.
B&R, Br. Rohtak
83.89
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
17
Sl.
No. Description of Work State Employer
Completion
Cost (INR
Crores)
7
Strengthening and widening of main carriage
way and improvement of footpath i/c central
verge, construction of RCC box drain on
Road No. 3 from Mangolpuri to Auchandi
border).
NCT
Delhi
Executive Engineer
BPD, PWD, M-
341, (GNCTD),
Old Court
Building,
Kashmere Gate,
Delhi-110006
81.33
8
Construction of 75 Mtr & 60 Mtr wide master
road between sector-81 to 95 and outer road
Gurgaon.
Haryana
ExecutiveEngineer,
Haryana Urban
Development
Authority,
Division-III,
Gurgaon
(HARYANA)
62.38
9
Construction of Four lanning of Jhajjar Badli
road from Km 0.00 to 18.250 in Jhajjar
District (Under CRF Scheme)
Haryana
Superintending
Engineer, PWD
B&R Br., Jhajjar
Circle, Jhajjar
(Haryana)
54.01
10
Strengthening and widening of main
carriage way and improvement of footpath,
i/c central verge, construction of RCC box
drain from GT Karnal Road NH-1 to
Auchandi Border via Bawana
NCT
Delhi
Executive Engineer
BPD, PWD, M-
341, (GNCTD),
Old Court
Building,
Kashmere Gate,
Delhi-110006
51.13
11
Widening & Strengthening along with
reconstruction Cement Concrete Pavement in
KM 28.200 to 58.600 & 62.500 to 67.000
(SH-22) (Sec. Jhajjar to Kosli) of
Bahadurgarh-Jhajjar-Subna-Kosli Road (Job
No. CRF/HR/2007-68)
Haryana
Executive
Engineer, Provicial
Division, PWD
B&R Br., Jhajjar
(HR)
43.60
12
Balance Work of Improvement of Four
lanning of various roads in Rewari Town &
Construction of new roads in Rewari district
Haryana
The Managing
Director, HSRDC,
Bay No.13-14,
Sec.2,Panchkula
43.03
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
18
13
Construction of Sector Dividing Road of Sec-
29, 31 & 32Sec-27&28. Construction of
Kheri Shad By Pass from RD 63.700 to
65.500. Widening of NH-71A from RD 1.100
to 3.300 & 5.500 to 7.100.
Haryana
Executive
Engineer, HUDA,
Division No. 1,
Rohtak (HR)
35.33
14 Construction of Roads in Phase - II at Growth
Centre, Bawal Haryana
HSIIDC, Industrial
Growth Centre,
Bawal, Distt.
Rewari (HR)
25.36
15
Construction of Badli Bypass KM 0.000 to
5.681 and Improvement of 2 KM existing
Bahadurgarh Badli Chandu Border road in
NCR area in Jhajjar Distt.
Haryana
Executive
Engineer, HSRDC,
Bay No. 13-14,
Sector-2,
Punchkula
24.61
16
Widening & Strengthening in KM 94.350 to
113.800 of Murthal-Sonepat-Kharkhode-
Sampla-Jhajjar-Dadri Road (SH-20) in
Bhiwani Distt. (Job No. CRF-HR-2007-72)
Haryana
Executive
Engineer, Provicial
Division, PWD
B&R Br., Ch.
Dadri (HR)
20.21
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
19
List of Major Work-in-Hand
Sr.No
. Name of Project/Work
Value of contract
as per Agreement
/LOA
Anticipated date
of completion
1
Development of Access Controlled Kundli-
Manesar-Palwal Expressway section
(Manesar RD 83.320 k.m to Palwal RD
135.650 K.M (Balance Work) on Item Rate
mode. (401.50*75/100) =
401.50 24.01.16
2
trengthening and Widening to 2 lane/2-lane
with paved shoulder configuration of
Chanditala-Seakhala-Champadanga
(Section of) SH15) in West-Bengal Km Ch
0.00 to KmCh 36.20 Length=36.20 Km
(Approx) (District – Hugli )
155.35 21.07.16
3
Strengthening and Widening to 2 lane/2-
lane with paved shoulder configuration of
Saptagram-Triveni-Kalna-Katwa Road
(Section of SH-6) in West-Bengal Km 0.00
Ch to Km 34.00 Ch but excluding Km
Ch2.515 to Km Ch3.415 Length = 33Km
(Approx)(District –Hugli)
151.56 31.12.15
4
Maksudanganj Najeerabad (MDR-06-03) &
Najeerabad Maksudangarh (MDR-23-08),
Berasia Najeerabad (MDR-23-06) and
Vidisha Berasia (MDR-23-10) & Vidisha
Berasia (MDR-27-01)
143.29 31.12.16
5
Construction of Manwar-Mangod
(Bandheri) (Balance Work) and Sardarpur-
Rajgarh-Bagh (Balance Work) Road.
111.44 31.12.15
M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)
20
6
Construction of internal roads, providing
and laying of water supply, tertiary network
system, sewerage, storm water and
electrification and all other works
contingent thereto for sector 27 & 28 and
construction of circulation road for Sector
3,4 & 5 of Pinjore Kalka Urban Complex
including 3 year mtc. & defect liability
period free of cost for civil work and one
year mtc. & defect liability period free of
cost for electrical works).
104.79 22.07.16
7
Construction of 200 feet wide road from
aerocity/airport road junction to kharar
banur (PR-9), S.A.S Nagar
92.51 30.04.16
8.
Construction of 65 mtr., 60 mtr & 45 mtr.
wide master road between Sector- 30/37,
31/37, 32/36, 33/35, 34/35, 35/36, 32/33,
4/32 ,26/26A, 26A/34, 34/33, 27/33 &
26/33, U/E, Sonipat.
70.08 31.01.16
9. Upgradation of Dighal Sampla road via
Behrana Kultana Road in Jhajjar District.
40.36 31.12.15
10.
Upgradation of Beri Dubaldhan Majra
Bigowa upto Jhajjar Dadri road in Jhajjar
District.
33.33 31.12.15
11.
Development of Infrastructure facilities i.e.
Roads, Storm Water Drainage System,
Water Supply Distribution System, Waste
water Conveyance system & development
of water works at Transport Hub at IMT
Manesar
33.07 31.12.15