S.R.CONSTRUCTIONSC.O – E -13 B KHANPUR EXTN. DEVLI ROAD,

KHANPUR, NEW DELHI : 110062

PHONE : 011-29966099, 29965981

Mail : [email protected],

web : www.srconstruction.biz

S.R.CONSTRUCTIONSS.R.CONSTRUCTIONSS.R.CONSTRUCTIONSS.R.CONSTRUCTIONS

Name of the OrganizationName of the OrganizationName of the OrganizationName of the Organization M/s. S.R.CONSTRUCTIONS.M/s. S.R.CONSTRUCTIONS.M/s. S.R.CONSTRUCTIONS.M/s. S.R.CONSTRUCTIONS.

Registered Address D-19/2, Rajpur Khurd

Chattarpur, New Delhi : 68

Corporate Office C-99 First Floor

M.B Road, Khan Pur

New Delhi – 110062

Phones 011-29966099,

Tele Fax 011-29965981

E-Mai l [email protected]

[email protected]

Web site www.srconstruction.biz

Year of Incorporation 2002

PAN No AFOPJ8737N

TAN No. DELS28864D

P/F - A/C No. 31943

ESIC No. 11-10-62575-101

Service Tax No. AFOPJ8737NST001

VARIOUS TIN NO.VARIOUS TIN NO.VARIOUS TIN NO.VARIOUS TIN NO.

DELHI TIN NO. 07760303858

HARYANA TIN NO. 06281826214

PUNJAB TIN NO. 03302027188

A.P TIN NO 2887700489

U.P Tin 09388811847

Chandigarh Tin No 04610032972

Uttranchal Tin No 05009866477H. P Tin No. 02100201224

JAIPUR TIN NO. 08894201909

IntroductionsIntroductionsIntroductionsIntroductions

We are pleased to introduce ourselves as one of the fastest growing

company in field of interiors and civil constructions serving the clients

regarding from multinational companies to the Indian Corporate.

We are well equipped technically and qualitatively, which gives us

clear edge over the competition with the backing of highly trained

professional team and adequate infrastructure.

We always strive to give our clients a very high standard of project

management and execution by providing the right solutions to the civil

and interiors requirements of clients.

We have executed the civil and interior works of Assotech, Vertex,

inlopro, Spring, J.P. Greens, Chhattrapati Shivaji Memorial, Mc-

Donald’s to name a few and currently we are executing the civil and

interior works for DLF, Assotech, World One, Cardio Fitness Etc.

we are enclosing a brief profile of our company for your consideration.

We are looking forward to be associated with you for your upcoming

projects.

OurOurOurOur StrengthsStrengthsStrengthsStrengths

Being well equipped technically & qualitatively gives us a clear

edge over our competition. Our clients are not only appreciative of

our aesthetic inputs, but also the beauty of our product. Our

trained and qualified Engineers & Technicians have always

maintained a very high standard of project management and

execution with their positive attitude and innovative approach.

S R. Constructions is a strong player in the areas of:

•ConstructionConstructionConstructionConstruction•ExecutingExecutingExecutingExecuting InteriorInteriorInteriorInterior ContractsContractsContractsContracts....

We are very particular about the quality of the job & follow a

mandatory quality procedure, which is implemented irrespective of

the value of the job undertaken. We are also equipped with the

latest, sophisticated tools & techniques.

OurOurOurOur ServicesServicesServicesServices

Our goal is not simply to be an interior contractor- we believe in

adding value to our clients, wherever and whenever we can. Our

intent is to assist you in finding the right solution to your interiors

and constructions requirements. We do not look at short-term

gains, we believe in long-term relationships.

Our promoterOur promoterOur promoterOur promoterProprietor Proprietor Proprietor Proprietor ---- K.K.JHAK.K.JHAK.K.JHAK.K.JHA

Mr. KKKK....KKKK JhaJhaJhaJha started his career way back in 1992 as a project engineer with

Tirath Ram Ahuja Ltd., an Rs.200 Crore construction company and an

industry leader of its time.

During his stint with Tirath Ram Ahuja, Mr. Jha was responsible for

executing several prestigious projects like Bharat Diamond Bourse Work at

Bombay (4 million sqft.), and The Kamat Hotel at Bombay Airport (50000 sq.

ft.).

Thereafter, Mr. Jha joined Duggal Associates, a leading Architecture firm as

project Director and was appreciated in the construction Fraternity forsuccessfully executing well known projects namely Define Enterprises, Triple

Ess, McDonalds, Life spring to name a few.Following this, Mr. Jha joined Bagai Constructions, a fast growing nteriors

and Constructions Company, as project Head and successfully executed

projects for Fun Republic Multiplex at Chandigarh.

In the year 2002 fuelled with the urge to excel and with a vision to provide

qualitative value added solutions to his clients Mr. Jha decided to start afresh

and ventured out on his own with SSSS....RRRR.... ConstructionsConstructionsConstructionsConstructions....

WhatWhatWhatWhat edgeedgeedgeedge wewewewe havehavehavehave overoveroverover others?others?others?others?We have a team of highly trained and qualified engineers who had been

working in this particular industry for the last 20 years with different

companies at different levels having rich experience.

Professional and experienced staff who can undertake any type of

project.

•We are resourceful and financially sound.

•Our team is very flexible can work anywhere in India

ContactContactContactContact ususususHeadHeadHeadHead OfficeOfficeOfficeOffice::::E – 13, B KHANPUR, EXTN, DEVLI RAOD,

KHANPUR, NEW DELHI : 110062Phone : 011-29966099, 29965981

Mail : [email protected]

RegisterdRegisterdRegisterdRegisterd OfficeOfficeOfficeOffice

D-19/2, Rajpur, Khurd,Chattarpur,

New Delhi : 110068

We look forward to a long and mutually beneficial association.

ForForForFor SSSS....RRRR.... ConstructionsConstructionsConstructionsConstructions

Encl:

•LIST OF COMPANY DETAILS

•LIST OF KEY PERSONNEL

•LIST OF ARCHITECTS

•LIST OF PROJECTS IN HAND

•LIST OF PROJECTS COMPLETE IN PAST

LIST OF KEY PERSONNELLIST OF KEY PERSONNELLIST OF KEY PERSONNELLIST OF KEY PERSONNEL

1.Mr. K.K.Jha Proprietor2.Mr. Vijay Kapoor G.M - Cordination

3.Mr. Ashutosh Singh Project Manager

4.Mr. Manoj Singh Project Manager

5.Mr. Gopal Malra Project Manager 6.Mr. Mritunjay Singh Project Engineer

7.Mr. Gurudev Singh Project Engineer

8.Mr. Rahul Mishra Project Engineer

9.Mr. Rohit Site Engineer

10.Mr. Rahul Site Engineer

11.Mr. Bishunjay Singh Site Engineer

12.Mr. Rahul Tewari Site Engineer

13.Mr. Dharmendar Kumar Civil Foreman

14.Mr. Arun Sharma Civil Foreman15.Mr. Kamdev Civil Foreman

16.Mr. Dilip Sharma Carpentry Foreman

17.Mr. Vishnu Dayal Sharma Carpentry Foreman

18.Mr. Arun Sharma Carpentry Foreman

19.Mr. Pawan Sharma Carpentry Foreman

20.Mr. Jayram Forman Civil Foreman

21.Mr. Sanjeev Civil Foreman

22.Mr. Rajinder Mishra Senior Supervisor

23.Mr. Shailesh Mishra Supervisor24.Mr. Lalit Supervisor

25. Mr. Arvind Supervisor

26 Mr. Rambeer Singh Supervisor

27. Mr. Alam Supervisor

28. Mr. Ramdayal Supervisor

29. Mr. Beer pal Singh Supervisor

30 Mr. Amit Kr. Supervisor

31 Mr. Mukesh Jha Supervisor32 Mr. Jakir Supervisor

33. Mr. Kamlesh Supervisor

34 Mr. Jahid Supervisor

35. Mr. Bhaskar Jha G.M Finance

36. Mr. Amit Kumar Singh Accounts Head

37. Mr. Neeraj Chowan Accounts Assistant

38 Mr. Rajesh Sharma Accounts Assistant

39. Mr. Sawan Jha Purchase Head

40 Mr. Prabhakar Jha Store Head

41. Mr. Pawan Kumar Store Assistant42. Mr. Ram Pyare yadav Purchase Assistant

43. Mr. Deepak Purchase Assistant

LIST OF MACHINERY AND TOOLSLIST OF MACHINERY AND TOOLSLIST OF MACHINERY AND TOOLSLIST OF MACHINERY AND TOOLS

1. (a) Concrete Pump 1 No.

B) Concrete Mixer machine (10/14) 10 No.

(C) Concrete Mixer machine (10/7) 6 No.

(D) Concrete Mixer cum hoist machine 6 No.

2. Welding set complete 8 No.

3. Drill machine

a) Hammer 50 Nos

b) Concrete Hammer Testing 58 –Co-181 / N 5 Nos

c) Ordinary 25 Nos.

4. Multiutility woodwork machine complete 4 Nos.

5. Router Machine 5.Nos.

6. Screw driver machine 15 Nos.

7. Laminate cutter machine 4 Nos.

8. Dovetailing machine 3.Nos.

9. Service Crane / Monkey Lifts 4.Nos

10. Hand cutter wood machine 25.Nos.

11. Hand cutter planner 2.Nos12.Trimmer and end trimmer. One set

13. Lathe machine (woodwork) 2.Nos

13. Portable edge bender machine with edge 2 set

14. Orbital sander 1 Nos.

15. Marble hand cutting machine 40 Nos.

16. Marble molding machine 10. Nos.

17. Vibrator machine 5. Nos.

18. Nozzles for vibrator 25.Nos.

19. Gas cutting se complete 2.Nos

20. Halogen light fitting (500 W)

(1000 W) 500.Nos.

21 Earth Rammer 20.Nos

22. Table Vibrator 3.Nos.

23. Power Trowel 1.Nos

24. Pump (1 HP) 5.Nos

25. Jet pump 6.Nos.

26. Dumpy Level 2 Nos27. Thedolite 3 Nos

28. Portable Material Pulley (up to 50 ft) 1 Nos

29. Electric jack hammer Machine ph-65 3.Nos

30. Heavy Duty chain pulley with Tripod 1 Nos.

31. Wheel Barrow 2.Nos

32. Heavy Duty Cycle Rickshaw for material 8.Nos

33. Safety Belt 150. Nos

34. Safety Helmet 400 Nos.

35. Stone cutting machine list

a) Full Size 3.Nos.b) Half Size 3.Nos

36. Column Ring Moulding Machine 2 Nos

List of Architects we have worked with.List of Architects we have worked with.List of Architects we have worked with.List of Architects we have worked with.1. M/s Spazzio

Mrs. Sonali Bhagwati)

2.` M/s Design Plus

3. Mr/s Aaakar Dedsign

Mr. gurgdeep Singh)

4. Habitat SystemsB-2, Nizamudin –East New Delhi

(Mohd. Imraan Syed–9818796941)

5. Design Associates Inc37, A.R. Complex, R.K. Puram

Mr. Sumer Dhar –9810290621)

6. Anma114-463, Silver OAK, DLF Ph-I Gurgaon(Mr. Anuj Vasudeva) (Tel –95124-2387048)

7. ABHIKARMA

B-72, East of Kailash, New Delhi.(Mr. Manu Rajendra - 9810340292)

8. Combine Associates

H-1, Green Park main, New Delhi(Mr. Kulbinder – 9312270206)

List of Architects we have worked with List of Architects we have worked with List of Architects we have worked with List of Architects we have worked with

9. Design Atelier

S-14, IST Floor, Okhla Ind. Area Ph-II,

10 . US Designer’s Combine

6151/8, Sector –D, Pocket –6

Vasant Kunj, New Delhi –70(Mr. Sandeep Gandhi –9811081711)

11. Arris Architect

K-1/49, C.R. Park, New Delhi.(Mr. Puneet Lall-09322216030)

12. Construct Design

(Ms. Jaspreet –09417050384)New Delhi.

13. V – 3, Design

( Mr. Puneet Swani – 9810410331)

14. M/s Space Frame ( Mr. Vikrant Sharma)

15. M/s Dream Space (Mrs. Vandana Jainb)

CURRENT RUNNING PROJECT - 2013-2014

S.NO NAME OF CLIENT NAME OF WORK CONTRAC

T AMOUNT

DURATION COMPLETION

(IN

PERCENTAGE)

REMARKS

1 HAMIR REAL ESTATE

PVT.LTD)GURGAON

EXTERNAL

DEVELOPMENT

800 LACS 9 MONTHS 70% IN PROGRESS

2 INDOSPACE FWS

INDUSTRIAL PARK

PRIVATE LIMITED

EXTERNAL

DEVELOPMENT

700 LACS 120 DAYS 95% IN PROGRESS

3 M/s Alice Developers

Private Limited (UNITECH

LTD), PUNJAB

Civil & Interior works 1200 LAC 18 MONTHS 50% IN PROGRESS

4 M/s Vatika City Home India

Next, Sector -83, Gurgaon

Finishing works City

Home Projects

250 Lacs 365 Days 60% IN PROGRESS

5 UNITECH CLUB HOUSE

SEC-96-97 NOIDA

CIVIL STRUCTURE 120LAC 180 DAYS 100% IN PROGRESS

6 UNITECH LTD - WATER

PARK

Civil & Interior works 220 LACS 180 DAYS 90% IN PROGRESS

SEC-18 NOIDA

7 M/s Vatika Squer Town

India Next, Sector -82,

Gurgaon

Internal finishing

works

167 Lacs 180 Days 50% IN PROGRESS

8 M/s Alice Developers

Private Limited, PUNJAB

Internal Plumbing

works

132 Lacs 365 Days 50% IN PROGRESS

9 HAMIR REAL ESTATE

PVT.LTD)MOHALI, PUNJAB

FOOD COURT Interior,

Plumbing & HVAC

Works

600 lacs 90 DAYS 50% IN PROGRESS

10 JAYPEE PAVALLION COURT

SEC-128 NOIDA

Civil & Interior 700 LACS 270 DAYS 50% IN PROGRESS

works

C U R R E N T P R O J E C T S

2 0 1 2 - 2 0 1 3

11 UNITECH LTD. AMABLA EARTH FILLING

WORK

500 LAC 180 DAYS 50% IN PROGRESS

12 NESTLE INDIA LTD,

GURGAON

CIVIL &

INTERIOR

WORKS

95 Lacs 45 Days 100% COMPLETED

13 DT CINEMA - SHALIMAR

BAGH

RENOVATION

WORKS

15 Lacs 30 DAYS 100% COMPLETED

14 M/s International Recreation

Parks Pvt. Ltd at Noida

Civil & Interior

Works

1.5 Crore 90 Days 95% IN PROGRESS

15 DLF LTD , MLCP, BKS, C.P

NEW DELHI

RENOVATION

WORKS

10 LACS 15 DAYS 100% COMPLETED

16 PIONEER URBAN SQUARE,

SECTOR -62, GURGAON

FALSE CEILING

WORKS

95 LACS 180 DAYS 50% IN PROGRESS

17 UNITECH LTD, UNIWORLD

CITY, MOHALI, CHANDIGARH

Landscape &

Civil works

60 LACS 180 DAYS 25% IN PROGRESS

18 VATIKA PROFESSIONAL

POINT AT SOHNA ROAD,

GURGOAN.

OFFICE

INTERIOR

WORKS

200 LACS 90 DAYS 50% IN PROGRESS

18 WORLD 1 SHOPPING

COMPLEX, MOHALI

CHANDIGARH

CIVIL WORKS 500 LACS 270 DAYS 10% IN PROGRESS

19 CRYSTAL AIR SYSTEMS,

VASANT VIHAR, NEW DELHI

CIVIL &

INTERIOR

WORKS

150 LACS 180 DAYS 50% IN PROGRESS

20

RAMPRASTHA

MULTISTOREYED HOUSING

COMPLEX, SKYZ, AT

RAMPRASTHA CITY,

GURGAON.

CIVIL,

INTERIOR &

FINISHING

WORKS

2700 LACS 730 DAYS RECENTLY AWARDED

LIST OF PROJECTS (2012 – 2013)

S.no. Name of Project

Area Cost Durati

on Status

% done

1 World – 1, Phase 2 Chandigarh 1.75 Lacs 11 Crore 365 Days

In Progress 50%

2 M/S TrivenI Engg. India Pvt Ltd MLD STp 2 Crores 180 Days

completed Completet

3 M/s Siemens Limited GridStation, Banala H.P

25000 Sqft. 5.00 Crore

180 Days

In Progress 95%

4 M/s Maratha Mitra Mandal Schoolat Karol Bagh, Delhi.

10000 Sqft. 80.00 Lacs

120 Days

completed 100%

5 M/s Jaypee Greens - Sports Villasat Greater Noida.

12 Villas 10.00 Crore

540 Days

In Progress 90%

6 M/s Design Plus - CorporateOffice at New Delhi

15,000 Sqft. 1.50 Crore

90 Days

Completed 100%

7 M/s DLF LTD - MULTILEVELCAR PARKING at Sarojini Nagar,New Delhi.

MLCP 1.40 crore

120 Days

Completed 100%

8 M/s DLF LTD - MULTILEVELCAR PARKING at ConnaughtPlace, New Delhi.

MLCP 1.50 Crore

120 Days

Completed 100%

9 M/s U.P. Sadan - Guest House atChankya Puri, Delhi.

81 Rooms 1.50 Crore

120 Days

In Progress 100%

10 M/s DLF Utilities Ltd - SavitriCinema , G.K - II, New Delhi

Acoustic & Interior

150.00 Lacs

45 Days

Completed 100%

LIST OF PROJECTS (2011 – 2012)S.no. Name of Project Area Cost Duration Status % done

11 M/s SPML - Corporate Office, at Gurgaon, Haryana

Office Interior 1.5 Crores 60 Days Completed 100%

12 M/s Metro - Cash & CarryOutlet at Ludhiana

Mall Interior 75.00 Lacs 45 Days Completed 100%

13 M/s Indo Space - at LuhariVillage, Pataudi Road, Jhajjar.

Civil works 85.00 Lacs 75 Days Completed 100%

14 M/s Unitech Limited - AtAmbala

Civil works 35 Lacs 75 Days Recently Awarded

100%

15 M/s Nestle India Ltd Office Interior 1.2 CroreLacs

60 Days Completed 100%

16 M/s Metro Cash & CarryOutlet at Jallandhar

Mall Interior 85 Lacs 60 Days Completed 100%

17 M/s Metro Cash & CarryOutlet at Delhi

Mall Interior 85 Lacs 60 Days Completed 100%

18 M/s International RecreationParks Pvt. Ltd at Noida

Civil & Interior Works

1.5 Crore 90 Days Recently Awarded

50%

20 M/s Metro Cash & Carryoutlet at Jaipur

Mall Interior 65 Lacs 60 Days Completed 100%

LIST OF PROJECTS (2011 – 2012)

S.no. Name of Project

Area Cost Durati

on Status

% done

21 M/s Nestle India Ltd – Gurgaon Sales Office 50 Lacs 60 Days

Completed 100%

22 M/s Distribution Systems – Bakhri Whare House 30 Lacs 60 Days

Completed 100%

23 M/s Hamir Real Estate PrivateLimited C/o Gumberg India Ltd, -Mohali Punjab.

Civil & Tubewell work

8.00 Crore

270 Days

InProgress

70%

24 M/s International RecreationParks Pvt. Ltd at Water park, atNoida

Civil & Interior works

1.50crore

120 Days

InProgress

40%

24 M/s International RecreationParks Pvt. Ltd at Galleria Mall atNoida

Civil & Interior Works

50 Lacs 30 Completed 100%

25 M/s MC - cormick - Gurgaon Civil & Interior Works

75 Lacs 30 Days

Completed 100%

26 M/s DLF Ltd at prominad &Emporio Mall at Vasant Kunj,

Civil & Interior Works

4.00 Crore

90 Days

InProgress

70%

27 Dt CINEMA – MEGA MALL,GURGAON

Acoustical &finishing of Mulrtiplex

1.65 Crore

90 Days

Completed 100%

28 M/s Unitech Ltd - Amber Club ,Noida

Civil works 75 Lacs 60 Days

InProgress

20%

29 M/s DLF Ltd - IT park ,Chandigarh

Interior works 25 Lacs 30 Days

InProgress

70%

30 M/s DLF Ltd - Miss Sixty - ToiletBlock, Saket, New Delhi

Civil & Interior works

60 Lacs 30 Days

Completed 100%

31 M/s DLF Assests Private Ltd – HubArea Cyber City , Gugaonr

Civil & Interior works

88 Lacs 75 Days

In Progress

65%

32 M/s DT Cinema – City Centre,Gurgaon.

Acoustical & Finishing

works

1.25 Crore

60Days

Completed 100%

33 M/s DLF ASSEST PRIVATE LTD –for FIRE CONTROL ROOMOFFICE – GURGAON.

Civil & Interior works

88 Lacs 75 Days

InProgress

70%

34 M/s Metro Cash & Carry Outlet atZirakhpur, Chandigarh

Civil & Interior Works

80 Lacs 30 Days

In Progress

95%

35 M/s Metro Cash & Carry Outlet atAmritsar, Punjab.

Civil & Interior Works

90 Lacs 30 Days

InProgress

50%

36 M/s Vatika India Next, Sector -83, Gurgaon

Finishing of City home project

250 Lakhs

12months

RecentlyAwarded

37 M/s Realtech Constructions Pvt ltd,City Emporium Mall, Chandigarh

Food court –Civil & Interior works

85 Lakhs 60Days

Recently Awarded

36 DT – Star Mall, Gurgaon Civil & Interior works

50 lacs 30 Days

RecentlyAwarded

37 DT – Cinema – It Park Chandgiarh Civil & Interior works

30 lakhs 30 Days

Recently Awarded

LIST OF PROJECTS (2010 – 2011) S.no. Name of Project Area Cost Duration Status

1 World – 1, Phase 2 Chandigarh 1.75 Lacs 11 Crore 365 Days In Progress

2 U.P. Bhawan (Guest House) (Interiors Works New Delhi )

2 Lacs Sqft 8 Crore 6 Months Completed

3 Pent House, Arelia 216,Gurgaon

15000 Sqft 3 Crores 90 Days Completed

4 M/S Great Indian NautankiCo.India Pvt Ltd at Gurgaon

28000 SqftAcoustical &

Theatre

Interior

3Crores 150Days Completed

5 M/S TrivenI Engg. India PvtLtd

MLD STp 2 Crores 180 Days Completed

6 M/s Siemens Limited GridStation, Banala H.P

25000 Sqft. 5.00 Crore 180 Days In Progress

7 M/s Dupond Gurgaon 50000 Sqft. 1.00 Crores 60 Days Completed

8 M/s Unitech Ltd , Villas,Manasar

50,000 Sqft. 6.00 Crores 180 Days Completed

9 M/s Wizcraft - CorporateOffice at Gurgaon

25000 Sqft. 1.00 Crores 60 Days Completed

10 M/s Protovity - CorporateOffice at Cyber City, Gurgaon

15000 Sqft. 75.00 Lacs 45 Days Completed

11 M/s Lanco Power Trading Ltd -Corporate office at StatementHouse, C.P. New Delhi

10000 Sqft. 2.5 Crores 60 Days Completed

12 M/s Association Power Trading- Office at Mercantile House,New Delhi.

5000 Sqft. 60.00 Lacs 45 Days Completed

13 M/s SRS MULTIPLEX ATSECTOR -12, Faridabad

Acoustical & Multiplex Intterior

120.00 Lacs 90 Days Completed

14 M/s Maratha MitraMandal School at KarolBagh, Delhi.

10000 Sqft. 80.00 Lacs 120 Days In Progress

15 M/s Jaypee Greens -Sports Villas at GreaterNoida.

12 Villas 10.00 Crore 540 Days In Progress

16 M/s Congnezent - OfficeInterior at Hyderabad

Office Interior

3.00 Crore 90 Days Completed

17 M/s Invista - CorporateOffice

Office Interior

75.00 Lacs 90 Days Completed

18 M/s Connaught PlazaRestaurant - Mecdonald atChandigarh.

3000 Sqft 60.00 Lacs 45 Days Completed

19 M/s EGIS - Corporate Office atBhaskar Estate, Faridabad

15000 Sqft. 70.00 Lacs 45 Days Completed

LIST OF PROJECTS (2010 – 2011)S.noS.noS.noS.no.... Name of Project Area Cost Duration Status

LIST OF PROJECTS (2009 – 2010)S.no. Name of Project Area Cost Duration Status

1 Corporate Office DRDLLIMITED DLF Retail Office,DLF Center 7th Floor ,Con.Place

11000 Sqft 1.5 Crores 60 Days Completed

2 Amazon Enterprises Pvt Ltd.(Reliance) Ludhiyana

28000 Sqft 1.25 Crores 45 Days Completed

3 Corporate Office BIDM AsiaPacific Systems Pvt LtdGurgaon

7000 Sqft 90 Lacs 45 Days Completed

4 Corporate Office Kohler India,Ambiance Mall

3500 Sqft 1.25 Crores 60 Days Completed

5 Amazon Enterprises Pvt Ltd(Reliance)

12000 Sqft 55 Lacs 45 Days Completed

6 DLF Limited (The IconProject)

65 Lacs 120 Days

7 DLF CITY PHASE - V Gurgaon 16000 Sqft 75 Lacs 90 Days Completed

8 M/s LANCO INFRATECHLIMITED. Corporate Office,Udyog Vihar, Gurgaon

2100 Sqft 1.50 Crores 120 Days Completed

9 M/s DLF Ltd Food Court GrandMall Gurgaon

6000 Sqft

1.25 Crores 45 Days Completed

10 M/s Aspire Jalandhar 2000 Sqft 25 Lacs 35 Days Completed

11 DLF ASSETS PVT. LTD, DLFSatyam Office, Hyderabad

1 Lac Sqft 4 Crores 50 Days Completed

12DLF Courtyard Food CourtSaket

24000 Sqft.

2.00 Crore 50 Days Completed

13DLF FOOD COURT, Chandigarh

20000 Sqft 1.5 Crore 45 Days Completed

14T. S InfoTech India , Gurgaon

15000 Sqft 1.25 Crore 30 Days Completed

15Patarsi Mall & Restaurant CGems and Jewels Pvt. Ltd.(Interior Works) Patarsi, Punja)

24000 Sqft 2 Crore 50 Days Completed

16M/S Jayanti Film, India Pvt LtdGurgaon

18000 Sqft 3.00 Crore 120 Days Completed

LIST OF PROJECTS (2009 LIST OF PROJECTS (2009 LIST OF PROJECTS (2009 LIST OF PROJECTS (2009 –––– 2010)2010)2010)2010)

NameNameNameName ofofofof ProjectProjectProjectProject AreaAreaAreaArea CostCostCostCost DurationDurationDurationDuration StatusStatusStatusStatus

LIST OF PROJECTS (2008 – 2009)

S.no.Name of Project

Area Cost Duration Status

1 World One StructureAnd finishing WorksChandigarh

400,000

sqft30.00

Crore 1095 Days Completed

2 Corporate OfficeAssotech VasantVihar, New Delhi

10,000 sqft 1.75 Crore 90 Days Completed

3 Chattrapati ShivajiMemorial TrustCorporate Office

8,000 Sqft

0.90 Crore 60 Days Completed

4 Corporate Office DLFCenter 6 Th FloorCon. Place (OfficeInteriors)

4,000 Sqft

0.40 Crore 20 Days Completed

5 Showroom CardioFitness Spa & wellnessCentre

11,000 Sqft 1.20 Crore 120 Days Completed

6 CardioFitnessWellness Showroom 6,000

Sqft0.70

Crore 90 Days Completed

Projects Successfully Completed By us Before 2007Projects Successfully Completed By us Before 2007Projects Successfully Completed By us Before 2007Projects Successfully Completed By us Before 2007

1.Fun Multiplex (Moti Nagar, New Delhi) Architect: -Arris

Architects (Bombay)

Mr. Bharat Contact Person: - Mr. Manish Berwal

2.Zee News – (Filmcity Noida)

Architect: - Arris Architects (Bombay)

Contact Person: - Mr. Manish Berwal

3. Spring Enterprises (Infinity tower Gurgaon)

Architect: - Design Associates

Contact Person: - Mr. Rakesh Makkar Mob: 9810192570

4. Delfin Enterprises

Architect: - Hittite Systems Contact Person: - Mr. S.N Singh

5.True Blue Restaurant at Patparganj

Architect: - Design Assocites

Mr. Sumer Dhar - Mob: 9810290621

6. Moskha at New Friends Colony Client: - Mr. Ashish Ahuja

7. Pizza corner (Agra)

Client: - Pizza Corner Architect: - Abhi Krama

8. Restaurant Fortune Cookie

Shoping Complex, Pritam pura

Projects Successfully Completed By us Before 2007Projects Successfully Completed By us Before 2007Projects Successfully Completed By us Before 2007Projects Successfully Completed By us Before 2007

9. Pizza Corner (Sector -56, Gurgaon)

Client: - Pizza Corner Architect: - Abhi Krama

10. Pizza Corner ,DLF Cyber green Gurgaon

Client: - Pizza Corner Architect: - Abhi Krama

11. Tecomaker – S.D.A Market,

I.I.T. Gate New Delhi Client: -H.S. Singh

12. Residence – Mr. Sanjay Malhotra Sector – 44, Noida,

13. Residence – Mr. Jyoti Kachroo

Sector – 51 Noida Architect: - Mr. Kailash Kant

14. Bunti Parwar

Sector – 51, Noida Client: - Mrs. Ashima

15. Office Multilink2nd floor, Deepak Tower, Nehru Place

16. Sukala Residence

Sector - 39, Noida. Architect: - Habitat System

Md. Sayed Imran (Mb. 9818796941)

ProjectsProjectsProjectsProjects SuccessfullySuccessfullySuccessfullySuccessfully CompletedCompletedCompletedCompleted ByByByBy usususus BeforeBeforeBeforeBefore 2007200720072007

16. Ice Cream Parlour Kwality Wall’s

Pecefic mall at Anand Vihar

17. GTL Ltd.

DLF Square GurgaonArchitect: Design Associates

18. Barnie’s CoffeeSpice World Mall , Sector-25A, Noida

19. True Blue Restaurant at Okhla

Client: - Mr. Parsant AroraArchitect: - Design Assocites

20. Cardio Fitness ShowroomR-57, Greater Kailash-INew Delhi

21. UPESDeheradun

22 McDonaldsMilap Building , New Delhi.

23 Kwality Walls

Pacific mall, Ghaziabad