company ipes - wobi country italy€¦ · floorheating expected design begin date 2015 expected...

7
Energy Saving Group | May, 16 2014 | Darmstadt, Germany Company IPES - WOBI Country Italy City Bolzano - Bozen Name and surname Gianfranco Minotti Ferdinand Tavernini

Upload: others

Post on 22-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Company IPES - WOBI Country Italy€¦ · floorheating Expected design begin date 2015 Expected works begin date 2016 Tenants will stay inside yes Is there an energy consumption target?

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Company IPES - WOBI

Country Italy

City Bolzano - Bozen

Name and surname Gianfranco MinottiFerdinand Tavernini

Page 2: Company IPES - WOBI Country Italy€¦ · floorheating Expected design begin date 2015 Expected works begin date 2016 Tenants will stay inside yes Is there an energy consumption target?

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site name Brescia 1-3-5 (AJB)

City Bolzano - Bozen

Year of construction

1978

N° of dwellings 106

N° of floors 7 + 1

Total floor surface 7.830 m²

Pilot site overall informations

Please paste a map showing the

location of your pilot site here

Page 3: Company IPES - WOBI Country Italy€¦ · floorheating Expected design begin date 2015 Expected works begin date 2016 Tenants will stay inside yes Is there an energy consumption target?

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site overall informations

Please paste a picture of your

pilot site here

Page 4: Company IPES - WOBI Country Italy€¦ · floorheating Expected design begin date 2015 Expected works begin date 2016 Tenants will stay inside yes Is there an energy consumption target?

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site overall informations

Page 5: Company IPES - WOBI Country Italy€¦ · floorheating Expected design begin date 2015 Expected works begin date 2016 Tenants will stay inside yes Is there an energy consumption target?

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Energy consumption(energy certification)

178,3 kWh/m²

Generator for heating

District heating

Generator for hot water

District heating

Type of windows State of art 1978

Walls insulated(Y/N)

No

Roof insulated(Y/N)

No

Floor insulated(Y/N)

No

Mechanical ventilation(Y/N)

No

Pilot site thermal informations

Please paste a thermal picture (if

available) of your pilot site here or

another interesting image

Page 6: Company IPES - WOBI Country Italy€¦ · floorheating Expected design begin date 2015 Expected works begin date 2016 Tenants will stay inside yes Is there an energy consumption target?

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Pilot site overall informations

Page 7: Company IPES - WOBI Country Italy€¦ · floorheating Expected design begin date 2015 Expected works begin date 2016 Tenants will stay inside yes Is there an energy consumption target?

Energy Saving Group | May, 16 2014 | Darmstadt, Germany

Description of the expected works to be realized

external thermal damping of wall and roof,replacement of external windows, rehabilitation balustrade of the balconies, in discussion mecanical ventilation and floorheating

Expected design begin date

2015

Expected works begin date

2016

Tenants will stay inside

yes

Is there an energy consumption target?

Reducing the energieconsumption to 35 kW (Klimahaus B) or better

Budget for works € 3.500.000,00

Prevision of works

Please paste pilot site’s plan here