company introduction……. summerhill property management in business for over 12 years exclusively...
TRANSCRIPT
Company Introduction…….
Summerhill Property Management in business for over 12 years
Exclusively manage residential condominium units
Specialize in high rise buildings that are 20 years and older
Currently manage 2000 units ranging in size from 77 to 290 units
Tony Seljak – President – R.C.M., B.Comm – Queens University Starting Managing residential Condos in 1990
Property Managers hold R.C.M. and have 5 years and 12 years exp.
“We are not environmentalist”
We have many bosses and currently the environment is not one of them.
We work for every day people - some struggle to pay their mortgages and condo fees.
The amount they are willing to spend ONLY to help the environment is limited.
All levels of governments are making operating buildings more expensive, if is not banning refrigerants, new garbage removal fee, increasing the cost of water by 8% to 10% per year, and the now the HST
So you may ask why are we here today talking to you????
In 15 Kensington Road (210 units – 19 floors):
The Condo fee is $449 for a 2-bedroom (including hydro and cable).
The accumulated surplus is more than $145,000.
We have saved more than $125,000 in the last 18 months by replacing heating and domestic boilers and re-piping air handling unit.
We replaced 180 toilets and in the last two months we have saved 450,000 liters of water which is about $5,000.
Future project: Replacing the Elevators with energy efficient motors. A new energy efficient central Chiller installed.
Good property managers find new ways to save energy and money.
Good property managers make sure that your hard working money is spent in the right way to minimize the
Condo fee increases.
Utilities – Gas:
15 Kensington Road: Boilers replaced in March 2008.
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
m3/
mon
th
Janu
ary
Febr
uary
Mar
ch
Apr
il
May
June
July
Aug
ust
Sep
tem
ber
Oct
ober
Nov
embe
r
Dec
embe
r
Month
2007
2008
2009
We have saved more than 140,000 cubic meter of gas from April 2008 to March 2009.
We saved more than $57,000 in the first year on our gas bill. It is $20 per month per unit!
The new boilers efficiency is 88% compare to the old ones which was only 55%.
Enbridge paid us more than $15,000 as incentive.
We reduced 284,000 kg of greenhouse gases per year.
In 61 Markbrook Lane (230 units – 19 floors):
The accumulated surplus is more than $40,000.
We have saved more than $38,000 in the last 18 months by replacing 307 toilets and 291 shower heads.
We are installing a Variable Frequency Drive for the Air Handling Unit which will save us about $15,000 per year.
In 41 Markbrook Lane (224 units – 19 floors):
The accumulated surplus is more than $70,000.
We have saved more than $36,000 in the 18 months by replacing 306 toilets and 147 shower heads.
We are installing a Variable Frequency Drive for the Air Handling Unit which will save us about $15,000 per year.
Utilities – Water:
61 Markbrook Lane : Toilets replaced in February and March 2008.
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Lit
er p
er d
ay
Janu
ary
Feb
ruar
y
Mar
ch
Apr
il
May
June
July
Aug
ust
Sep
tem
ber
Oct
ober
Nov
embe
r
Dec
embe
r
Water Consumption
2007
2008
The new toilets are approved by the City of Toronto for rebate. We received $60/toilet from the City.
Each time the toilet is flushed, it uses 7 litres less water.
We are saving about 1.35 million litres per month.
The project pay back period is less than 2 years.
Many in suites plumbing problems resolved; reducing flooding from toilets.
We saved about $18,000 in 2008We saved about $20,000 in 2009
We will save:About $22,000 in 2010About $24,000 in 2011About $26,500 in 2012
This is about $110,000 in five years!
How we got there…..
GET ADVANCED HIGH EFFICIENCY HEATING TECHNOLOGY
ATMOSPHERIC BOILER95% CURRENT INSTALLATIONS
TYPICAL DHW TANK20 YEARS OLD INSTALLATION
DHW TANK2 YEARS OLD INSTALLATION
CONDENSING BOILERSULTRA LOW 9.9 PPM NOX-EMISIONS
UP TO 97% THERMAL EFFICIENCY
DHW HEAT EXCHANGER TANKS
MAKE UP AIR HEAT EXCHANGERS
REPLACED OLD ATMOSPHERIC BOILERS WITH HIGH EFFICIENCY CONDENSING UNITS
REPLACED 2 OLD DHW TANKS ( 600 GAL EACH) WITH 4 HIGH EFFICIENCY TANK/HEAT EXCHANGERS ( 109 GAL EACH)
CAPITAL COST OF $ 450,000.00
PAYBACK IN 4-5 YEARS WARRANTY ON INSTALLED
EQUIPMENT 3YEARS TOTAL 10YEARS ON BURNERS AND HEAT EXCHANGERS
NOISELESS CERAMIC BURNERS
NOX RATINGS LESS THAN 9.9 PPM
BEFORE
AFTER
BEFORE
AFTER
ADVANCED CONTROLS
MAKE UP AIR HEATEXCHANGER/ COIL INSTALLED INSTEAD OF GAS FIRED BURNER
New Condensing Boilers Savings Comparison
Total Savings in 4 months= $ 22,803.71 First year of operation savings in Gas
consumption was 140,000 cubic meters equivalent to $57,000.00
2 YEARS OLD INSTALLATION IN HIGH END CONDOMINIUM BUILDING
BUILDERS ARE VERY SLOWLY IMPLEMENTING HIGH EFFICIENCY HEATING SYSTEMS INSTALLATIONS
MANAGERS RECOMMENDED REPLACE EXISTING HEATING SYSTEM POWER PLANT WITH HIGH EFFICIENCY SYSTEM
AT NO COST TO THE BUILDING FINANCED BY SAVINGS ON GAS CONSUMPTION TROUGH INSTALLATION CONTRACTORS
5 YEARS ESTIMATED FINANCING PERIOD
ATMOSPHERIC BOILERS
LARGE DHW TANKS
20 YEARS OLD TECHNOLOGY
Thank you !