Thomas D. Gatlin Vice President, Nuclear Operations 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Subject: VIRGIL C. SUMMER NUCLEAR STATION UNIT I (VCSNS) DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 LICENSE AMENDMENT REQUEST - LAR 12-06014 CHANGES TO SNUBBER SURVEILLANCE REQUIREMENTS Pursuant to 10CFR50.90, South Carolina Electric & Gas Company (SCE&G), acting for itself and as an agent for South Carolina Public Service Authority, is hereby submits the following request for an amendment to the Technical Specifications (TS) for Virgil C. Summer Nuclear Station Unit 1 (VCSNS). The proposed amendment would revise the TS surveillance requirements (SRs) for snubbers to conform to planned revisions of the snubber inservice inspection (ISI) program. Attachment 1 provides a description and assessment of the proposed changes. Attachment 2 provides the existing TS pages marked up to show the proposed changes. Attachment 3 provides revised (clean) TS pages. Attachment 4 contains a detailed comparison of the current TS 4.7.7 SR to the proposed ISI program requirements and justification of changes. Attachment 5 provides a copy of the proposed Snubber Program Plan. Approval of the proposed amendment is requested by April 4, 2014. The start of the fourth Inservice Inspection Interval will begin January 2014. Once approved, the amendment shall be implemented within 60 days. There are no new or revised commitments associated with this proposed change. Virgil C. Summer Station . Post Office Box 88. Jenkinsville, SC - 29065 - F (803) 345-5209

Upload: others

Post on 26-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Thomas D. GatlinVice President, Nuclear Operations

803.345.4342

A SCANA COMPANY

April 2, 2013RC-1 3-0048

U. S. Nuclear Regulatory CommissionDocument Control DeskWashington, DC 20555-0001

Subject: VIRGIL C. SUMMER NUCLEAR STATION UNIT I (VCSNS)DOCKET NO. 50-395OPERATING LICENSE NO. NPF-12LICENSE AMENDMENT REQUEST - LAR 12-06014CHANGES TO SNUBBER SURVEILLANCE REQUIREMENTS

Pursuant to 10CFR50.90, South Carolina Electric & Gas Company (SCE&G), acting foritself and as an agent for South Carolina Public Service Authority, is hereby submits thefollowing request for an amendment to the Technical Specifications (TS) for Virgil C.Summer Nuclear Station Unit 1 (VCSNS).

The proposed amendment would revise the TS surveillance requirements (SRs) forsnubbers to conform to planned revisions of the snubber inservice inspection (ISI)program.

Attachment 1 provides a description and assessment of the proposed changes.Attachment 2 provides the existing TS pages marked up to show the proposedchanges. Attachment 3 provides revised (clean) TS pages. Attachment 4 contains adetailed comparison of the current TS 4.7.7 SR to the proposed ISI programrequirements and justification of changes. Attachment 5 provides a copy of theproposed Snubber Program Plan.

Approval of the proposed amendment is requested by April 4, 2014. The start of thefourth Inservice Inspection Interval will begin January 2014. Once approved, theamendment shall be implemented within 60 days. There are no new or revisedcommitments associated with this proposed change.

Virgil C. Summer Station . Post Office Box 88. Jenkinsville, SC - 29065 -F (803) 345-5209

Page 2: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskCR-12-06014RC-13-0048Page 2 of 2

In accordance with 10CFR50.91, a copy of this application is being provided to thedesignated South Carolina Official.

The proposed change has been reviewed and approved by both the VCSNS PlantSafety Review Committee and the VCSNS Nuclear Safety Review Committee.

If you should have any questions, please contact Mr. Bruce L. Thompson at(803) 931-5042.

I declare under penalty of perjury that the foregoing is true and correct.

Executed On Th6mqor . Gatln "

JMG/TDG/bqAttachments:

1. Description and Assessment2. Proposed Technical Specification Changes (Mark-Up)3. Revised Technical Specification Pages4. TS 4.7.7 SR Comparison to ISI Program Requirements5. Proposed Snubber Program Plan6. List of Regulatory Commitments

cc: K. B. MarshS. A. ByrneJ. B. ArchieN. S. CarnsJ. H. HamiltonJ. W. WilliamsW. M. CherryV. M. McCreeE. A. Brown

S. E. JenkinsPaulette LedbetterNRC Resident InspectorK. M. SuttonNSRCRTS (CR-12-06014)File (813.20)PRSF (RC-13-0048)

Page 3: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 1CR-12-06014RC-13-0048Page 1 of 7

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1DOCKET NO. 50-395

OPERATING LICENSE NO. NPF-12

ATTACHMENT 1

Description and Assessment

1.0 SUMMARY DESCRIPTION

In accordance with the provisions of 10 CFR 50.90, South Carolina Electric & Gas(SCE&G) is submitting a license amendment request to revise Technical Specification(TS) 3/4.7.7, "Snubbers," for Virgil C. Summer Nuclear Station (VCSNS). The proposedchange would revise the TS surveillance requirements for snubbers to conform to therevised VCSNS Snubber Testing Program.

2.0 DETAILED DESCRIPTION

VCSNS is currently nearing the completion of the third 10-year Inservice Inspection (ISI)interval. The fourth 10-year ISI interval at VCSNS begins on January 1, 2014.Currently, snubber testing and examination are performed in accordance with thespecific requirements of TS 3/4.7.7 as authorized in NRC correspondence under TACNo. MC4323 (Accession No. ML051290198) dated May 10, 2005. As required by10 CFR 50.55a(b)(3)(v)(B), SCE&G intends to adopt Subsection ISTD, "Preservice andInservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-WaterReactor Nuclear Power Plants," of the ASME OM Code, 2004 Edition with 2005 and2006 Addenda. The proposed changes to the VCSNS TS are summarized below:

Reference to Specification 4.7.7.g in TS ACTION 3.7.7 would be replaced withreference to Specification 4.7.7.

TS Surveillance Requirement (SR) 4.7.7 would be revised to remove specificsurveillance requirements for demonstrating snubber operability. The currentrequirements would be replaced by a reference to the "Snubber TestingProgram."

Page 4: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 1CR-12-06014RC-1 3-0048Page 2 of 7

Add a new TS Section 6.8.4.n, "Snubber Testing Program," to the AdministrativeControls section (Section 6.0) of TS to provide a description of the snubberprogram requirements.

Mark-ups of the proposed TS pages are provided in Attachment 2. A comparison of thecurrent SR 4.7.7 requirements to the revised snubber program requirements andjustification of the changes are provided in Attachment 4. Attachment 5 contains theSnubber Testing Plan.

3.0 TECHNICAL EVALUATION

Licensees are required by 10 CFR 50.55a(g) or 10 CFR 50.55a(b)(3)(v)(B) to performthe ISI and testing of snubbers in accordance with the ASME OM Code and theapplicable addenda, except where the NRC has granted specific written relief pursuantto 10 CFR 50.55a(g)(6)(i), or authorized alternatives pursuant to 10 CFR 50.55a(a)(3).

As noted in Regulatory Issue Summary 2010-06, licensees have the option to controlthe ASME Code-required ISI and testing of snubbers through their TS. For plants usingtheir TS to govern ISI and testing of snubbers, 10 CFR 50.55a(g)(5)(ii) requires that if arevised ISI program for a facility conflicts with the TS, the licensee shall apply to theCommission for amendment of the TS. Therefore, when performing 120-month programupdates in accordance with 10 CFR 50.55a(g)(4), licensees must submit any requiredamendments to ensure their TS remain consistent with the new code of record or NRC-approved alternatives used in lieu of the Code requirements.

The proposed change replaces the specific TS requirements for snubber examination,testing and service life monitoring with a reference to the Snubber Testing Program,thereby ensuring the TS remain consistent with the ISI program.

Snubbers will continue to be demonstrated OPERABLE by performance of the SnubberTesting Program. This program will be maintained in compliance with 10 CFR 50.55aper the proposed section TS 6.8.4.n. The program for ISI and testing of snubbers inaccordance with ASME OM Code and the applicable addenda as required by 10 CFR50.55a(g) is required to include evaluation of supported components/systems whensnubbers are found to be unacceptable.

The proposed change to TS ACTION 3.7.7 for inoperable snubbers is administrative innature and is required for consistency with the proposed change to SR 4.7.7.

Page 5: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 1CR-12-06014RC-13-0048Page 3 of 7

4.0 REGULATORY EVALUATION

4.1 Applicable Regulatory RequirementsVCSNS is currently nearing the completion of the third 10-year ISI interval. Thefourth 10-year ISI interval at VCSNS begins on January 1, 2014. Currently,snubber testing and examination are performed in accordance with the specificrequirements of TS 3/4.7.7. Relief was authorized pursuant to 50.55a(a)(3)(i), forthe third 10-year inservice inspection interval at VCSNS under TAC No. MC4323(Accession No. ML051290198) dated May 10, 2005.

10 CFR 50.55a(g)(4)(ii) requires that inservice examination of componentsconducted during successive 120-month inspection intervals must comply withthe requirements of the latest edition and addenda of the Code incorporated byreference in 10 CFR 50.55a(b)(3), 12 months before the start of the 120-monthinspection interval. If a revised ISI program for a facility conflicts with the TS forthe facility, 10 CFR 50.55a(g)(5)(ii) requires licensees to apply to theCommission for amendment of the TS.

For the VCSNS fourth 10-year ISI interval beginning January 1, 2014, asrequired by 10 CFR 50.55a(b)(3)(v)(B), SCE&G intends to adopt SubsectionISTD, "Preservice and Inservice Examination and Testing of Dynamic Restraints(Snubbers) in Light-Water Reactor Nuclear Power Plants," of the ASME OMCode, 2004 Edition with 2005 and 2006 Addenda, in place of the specificrequirements of TS 3/4.7.7 as previously authorized in NRC reliefcorrespondence dated May 10, 2005.

The purpose of this amendment request is to remove the specific surveillancerequirements for demonstrating snubber operability from the TS since the ISIprogram will be revised to include the requirements of the OM Code SubsectionISTD in the Snubber Testing Program. As such, the proposed changes to TS3/4.7.7 are necessary to conform the TS to the revised ISI program.

4.2 PrecedenceThe changes proposed to TS 3/4.7.7 are similar to changes submitted by PublicService Electric and Gas (PSEG) Nuclear, LLC for Salem Generating Station,Units 1 and 2 and Dominion Nuclear Connecticut (DNC), Inc for Millstone PowerStation Unit 2. The applicable references for these similar changes are providedbelow:

4.2.1 PSEG Letter LR-N10-0363, License Amendment Request:Changes to Snubber Surveillance Requirements [for Salem Units 1/2],dated October 4, 2010 (Accession No. ML102780066).

4.2.2 PSEG Letter LR-N11-0107, Response to Draft Request forAdditional Information - License Amendment Request: Changes to

Page 6: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 1CR-12-06014RC-13-0048Page 4 of 7

Snubber Surveillance Requirements [for Salem Units 1/2], dated April 7,2011 (Accession No. ML1 10980107).

4.2.3 PSEG Letter LR-N11-0151, Response to Draft Request forAdditional Information - License Amendment Request: Changes toSnubber Surveillance Requirements [for Salem Units 1/2], dated May 23,2011 (Accession No. ML111430636)

4.2.4 DNC Letter 11-354, License Amendment Request to ReviseSnubber Surveillance Requirements [for Millstone Power Station Unit 2],dated September 21, 2011 (Accession No. ML1 1270A051).

4.2.5 DNC Letter 12-086, Response to Request for Additional InformationRegarding License Amendment Request to Revise Snubber SurveillanceRequirements [for Millstone Power Station Unit 2], dated February 24,2012 (Accession No. ML12062A069).

A minor difference is noted between these precedent license amendmentrequests and the VCSNS request. The SCE&G request is in response to therequirement of 10 CFR 50.55a(b)(3)(v)(B) to perform the ISI and testing ofsnubbers. Testing will be in accordance with Subsection ISTD of the ASME OMCode and the applicable addenda when using the 2006 Addenda and latereditions and Addenda of Section Xl of the ASME Boiler and Pressure Vessel(B&PV) Code.

The previously referenced license amendment requests were made prior to thesplitting of 10 CFR 50.55a(b)(3)(v) into parts (A) and (B) with the endorsement ofthe 2006 Addenda of the Section Xl Code. 10 CFR 50.55a(b)(3)(v)(A) permittedthe optional use of OM Code Subsection ISTD, "Preservice and InserviceExamination and Testing of Dynamic Restraints (Snubbers) in Light-WaterReactor Nuclear Power Plants," 2004 Edition, in place of the requirements forsnubbers in the B&PV Code, Section Xl, Articles IWF-5200(a) and (b), andIWF-5300(a) and (b). 10 CFR 50.55a(b)(3)(v) previously required that whenusing this alternative, preservice and inservice examination of snubbers must beperformed using the VT-3 method specified in IWA-2213.

Page 7: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 1CR-12-06014RC-1 3-0048Page 5 of 7

4.3 No Significant Hazards Consideration DeterminationSCE&G requests adoption of an approved change to the plant specific TechnicalSpecifications for VCSNS Unit 1, to revise TS 3/4.7.7, "Snubbers".

As required by 10 CFR 50.91(a), an analysis of the issue of no significanthazards consideration is presented below:

1. Does the proposed change involve a significant increase in theprobability or consequences of an accident previously evaluated?

Response: No.

The proposed changes would revise SR 4.7.7 to conform the TS to therevised ISI program for snubbers. Snubber examination, testing andservice life monitoring will continue to meet the requirements of 10 CFR50.55a(g). Snubber examination, testing and service life monitoring is notan initiator of any accident previously evaluated. Therefore, the probabilityof an accident previously evaluated is not significantly increased.

Snubbers will continue to be demonstrated OPERABLE by performance ofa program for examination, testing and service life monitoring incompliance with 10 CFR 50.55a or authorized alternatives. The proposedchange to TS ACTION 3.7.7 for inoperable snubbers is administrative innature and is required for consistency with the proposed change to SR4.7.7. The proposed change does not adversely affect plant operations,design functions or analyses that verify the capability of systems,structures, and components to perform their design functions. Therefore,the consequences of accidents previously evaluated are not significantlyincreased.

Based on the above, this change does not involve a significant increase inthe probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new ordifferent kind of accident from any accident previouslyevaluated?

Response: No.

The proposed changes do not involve any physical alteration of plantequipment. The proposed changes do not alter the method by which anysafety-related system performs its function. As such, no new or differenttypes of equipment will be installed, and the basic operation of installedequipment is unchanged. The methods governing plant operation andtesting remain consistent with current safety analysis assumptions.

Page 8: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 1CR-12-06014RC-1 3-0048Page 6 of 7

Therefore, it is concluded that this change does not create the possibilityof a new or different kind of accident from any accident previouslyevaluated.

3. Does the proposed change involve a significant reduction in a

margin of safety?

Response: No.

The proposed changes ensure snubber examination, testing and servicelife monitoring will continue to meet the requirements of 10 CFR50.55a(g). Snubbers will continue to be demonstrated OPERABLE byperformance of a program for examination, testing and service lifemonitoring in compliance with 10 CFR 50.55a or authorized alternatives.The proposed change to TS ACTION 3.7.7 for inoperable snubbers isadministrative in nature and is required for consistency with the proposedchange to SR 4.7.7.

Therefore, it is concluded that the proposed change does not involve asignificant reduction in a margin of safety.

Based on the above, SCE&G concludes that the proposed change presents nosignificant hazards consideration under the standards set forth in 10 CFR50.92(c), and, accordingly, a finding of "no significant hazards consideration" isjustified.

4.4 Conclusion10 CFR 50.55a(g)(4)(ii) requires that inservice examination of componentsconducted during successive 120-month inspection intervals must comply withthe requirements of the latest edition and addenda of the Code incorporated byreference in 10 CFR 50.55a(b) 12 months before the start of the 120-monthinspection interval.

If a revised ISI program for a facility conflicts with the TS of the facility, 10 CFR50.55a(g)(5)(ii) requires licensees to apply to the Commission for amendment ofthe TS to conform the TS to the revised ISI program.

The proposed change amends the TS surveillance requirements to conform theTS to the revised ISI program for snubbers which shall meet the requirements of10 CFR 50.55a(g) except where the NRC has granted specific written relief,pursuant to 10 CFR 50.55a(g)(6)(i), or authorized alternatives pursuant to 10CFR 50.55a(a)(3).

In conclusion, based on the considerations discussed above, (1) there isreasonable assurance that the health and safety of the public will not beendangered by operation in the proposed manner, (2) such activities will be

Page 9: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 1CR-1 2-06014RC-1 3-0048Page 7 of 7

conducted in compliance with the Commission's regulations, and (3) the issuanceof the amendment will not be inimical to the common defense and security or tothe health and safety of the public.

5.0 ENVIRONMENTAL EVALUATION

The proposed change would change a requirement with respect to installation or use ofa facility component located within the restricted area, as defined in 10 CFR 20, orwould change an inspection or surveillance requirement. However, the proposedchange does not involve (i) a significant hazards consideration, (ii) a significant changein the types or significant increase in the amounts of any effluent that may be releasedoffsite, or (iii) a significant increase in individual or cumulative occupational radiationexposure. Accordingly, the proposed change meets the eligibility criterion forcategorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR51.22(b), no environmental impact statement or environmental assessment need beprepared in connection with the proposed change.

6.0 REFERENCES

6.1 NRC Letter dated May 10, 2005, Virgil C. Summer Nuclear Station,Unit No. 1 - Request for Relief No. RR-111-01 Regarding Snubber VisualExamination and Functional Testing (TAC No. MC4323) (Accession No.ML0511290198)

6.2 NRC Regulatory Issue Summary 2010-06, "Inservice Inspection and TestingRequirements of Dynamic Restraints (Snubbers)," June 1, 2010 (Accession No.ML101310338).

6.3 Virgil C. Summer, Unit 1, Current Facility Operating License NPF-12, TechSpecs, Revised 12/21/2012 (Accession No. ML052870422)

Page 10: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-13-0048Page 1 of 10

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1DOCKET NO. 50-395

OPERATING LICENSE NO. NPF-12

ATTACHMENT 2

Proposed Technical Specification Changes (Mark-Up)

SCE&G - EXPLANATION OF CHANGES

Paqe Affected Description of Change Reason for ChangeSection

3/4 7-16 3/4.7.7 Change to Surveillance Requirements 10 CFR 50.55a(g)(5)(ii)

3/4 7-17 4.7.7 Change to Surveillance Requirements 10 CFR 50.55a(g)(5)(ii)

3/4 7-18 4.7.7 Change to Surveillance Requirements 10 CFR 50.55a(g)(5)(ii)

3/4 7-19 4.7.7 Change to Surveillance Requirements 10 CFR 50.55a(g)(5)(ii)

.3/4 7-20 Figure 4.7-1 Deleted 10 CFR 50.55a(g)(5)(ii)

3/4 7-21 Table 1.7-2 Deleted 10 CFR 50.55a(g)(5)(ii)

6-12i 6.8.4 New Page & Subsection 10 CFR 50.55a(g)(5)(ii)

B 3/4 7-4f 3/4.7.7 Bases 10 CFR 50.55a(g)(5)(ii)

B 3/4 7-5 3/4.7.7 Bases 10 CFR 50.55a(g)(5)(ii)

Page 11: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-1 3-0048Page 2 of 10

PLANT SYSTMS

LIMITING CONDITION FOR OPERATION

3.7.7 All snubbers on Systems required for safe shutdsUlaccident mitigationshall be OPERABLE. ThMs includes safety and non-safety related snubbers onystems used to protect the code boundary and to ensure the structural integ-

rity of these systems under dnatnic loads.

APPLICABIITI: 03OES 1, 2, 3 and 4. HMOES 5 and 6 for snubbers located onsystems required OPERABLE In those HODES.

ACTION:

With one or more snubbers inoperable, within 72 hours replace or restore theinoperable snubber(s) to OPERABLE statUs and perform an engitneering evaluationper Specification 4.7.7-g-on the attached component or declare the attachedsystem inoperable and follow the appropriate ACTION statement for that system.

SUMVEILLANCE REQUIREMENTS

4.7.7 Each snubber shall be .demonstrated OPERABLE ýr. e hi,--_•.,"..... ...e 4- .... vim .. . . . ... .... .

0-0)

E-

.oC)

SUMMER - UNIT I 3/4 7-16 Amendment No. fy 3A a G "!

Page 12: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-1 3-0048Page 3 of 10

'ký w mama Uc•,~~ ( m ad'

vie sler(1)1hae trere no visableo•I () aM ft toN. lOw ANNo orf

uae lmdntlonmi. -nd (3) aS fr t at*Oulunmt=*

a4pper as•rs• a ofv•vuale Insalonu ohd be odesuwIscotme aybe reael•mollep•r le far 'e of It IuJIMlui

hyue mduitber Is burd be uncovered go shele be dedhWedas naaponiblu oi shlM besIhe aI i emided Jar sift udrhmn.the d Jar sli~ecrwlhl

ef a Ii o tes•t , SW oln nmdtIn fest Omsn moftedw e Inth asG cc . wn ing lb as kInomd*

common hkeianu M r*ev* a be 1-11 J! Ie anua beeoaaedas accepiabus for the ne" Wiepedlon kftivul pmkWe

VWa oriterin (I) &Wd @) above we rve Weeoiln"b

srdtooer. I1 coninued npeat Io ft sl m futw shld be deakdo

e. Fwf ,WT---

During the tat rolefusn ud and ath~ M-e is 1 monilwmow thIaterMpesMnat1:" e sle"VA r: (1) Atleast 10%of total meach MMe osnubbter Inwsln ihe 9Malbe funalicnalyteabsd Iplace osr inabenchtir For each of a tp O dom not wa the test a

rihw f 1ml~ 4.7.7.1 ,an . on a onal 1O% oft iW oi sml3i shele befunadotaly Ount no more hlures aeo fownd or re d aldltwo

oaeen -tesiod. or (2) A @prsnWdsamiple ofunciana teste In acoftoore with Rgwo 4.; 1$~ fte toa

iwmbrofl cia tyefundrinloo"meeting 11 th miotno r, - of4.7.7.". The cumuu•tve number of mnuibrs of a typ. Is

*W. AttheWoeancih daysteIsftn.Uisetw vaueus of OC'day* ta pb t Anwrent thy' horeleaf) •idm be pldolledo

4.7 . If at anye *no pont td kfs in the "Ae" regio. tunng ofdof snu~ber mity be temfnaed.

ER - LOWT 1 3/4 7-17 Ameodment No. 4V, 4M1.141

Page 13: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-13-0048Page 4 of 10

Page 14: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-13-0048Page 5 of 10

Page 15: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR- 2-06014RC-1 3-0048Page 6 of 10

Page 16: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-13-0048Page 7 of 10

VISMIPTO INMIAL

Pouaiel"m A Colum I Column Cor Ctor xten Interval Aepest Ineral Reuc Interal

) (Notas e and 6) (Notes 4 and 6) (Notes 6 ad

1 0 0 1so 0 0 2

100 0 1 4

1i0 0 320o 2 S300 12 25400 368600 24 4875O 40 78

2000 orrgreater 5

slzt s~hall be determined b ad t prev Inspectio Intrval O1

m erd, b pn acces bilty during powt eperationas amccessble or Inaccessble. c tee may be examined separatelyor Jointly. However. the licensee t and document that decisionbefore ary inspection and shall use decision as the basis upoe whichto determine the next inspection I for that category.

(2) Interpolation between population o csitzes eOd the nraer ofunaceptable snufers Is pertissi a. Use t lower Integer for the valueof the limit for Columns A, 8, C if that ludes a fractional value ofunacceptable snubers as deta nod by into ation.

(3) If th ber of IaccPt snubbers Is qual or less than the nmberin Column A, the n i Ion Interval way be ce othe previous intervalbut not greater than 48 the.

(4) If the nmber of unace %e snubbers Is equal to les than the numberIn Column S but grec than the amer in Colun A, n0A inspeti*Rinterval shall be "mne as the previous Interval.

(5) If the :mher of v Ie snu•bers is equal to or 9 t than the nm-ber In Column C, next inspection interval shall be Irds of theprevious Interv . However, If the nmber of ccepessthen the numbe I n Colum C but greater than the mndr 1n oae, thenext interva shall be reduced proportionally by interpolaion, that is,the previ Interval shall bereduced bya fctor that is on- rdoftheration of difference between the numer of unacceptable a foundduring previous interval end the amber in Column & to the di nin the _ rsInColumnsBandC.

(6) The isions of Specification 4.0.2 are applicable for all InspectiaI als up to and including 48 moths.

- UNIT 3/4 7-22 Amendeent Ho. 103JK IA I

Page 17: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-13-0048Page 8 of 10

INSERT NEW PAGE

(Section 6.8 Procedures and Programs)

6.8.4 continued

n. Snubber Testinq Progqram

This program conforms to the examination, testing and service lifemonitoring for dynamic restraints (snubbers) in accordance with 10 CFR50.55a inservice inspection (ISI) requirements for supports. The programshall be in accordance with the following:

1) This program shall meet 10 CFR 50.55a(g) ISI requirements forsupports.

2) The program shall meet the requirements for ISI of supports setforth in subsequent editions of the Code of Record and addenda ofthe American Society of Mechanical Engineers (ASME) Boiler andPressure Vessel (BPV) Code and the ASME Code for Operationand Maintenance of Nuclear Power Plants (OM Code) that areincorporated by reference. in 10 CFR 50.55a(b) subject tolimitations and modifications listed in 10 CFR 50.55a(b) and subjectto Commission approval.

3) The program shall, as allowed by 10 CFR 50.55a(b)(3)(v), meetSubsection ISTA, "General Requirements," and Subsection ISTD,"Preservice and Inservice Examination and Testing of DynamicRestraints (Snubbers) in Light-Water Reactor Nuclear PowerPlants," or meet authorized alternatives pursuant to 10 CFR50.55a(a)(3).

4) The 120-month program updates shall be made in accordance with10 CFR 50.55a(g)(4), 10 CFR 50.55a(g)(3)(v) and 10 CFR50.55a(b) (including 10 CFR 50.55a(b)(3)(v)) subject to thelimitations and modifications listed therein.

6.12i

Page 18: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-12-06014RC-13-0048Page 9 of 10

PLANT SYSTEMS

BASES

CONTROL ROOM EMERGENCY FILTRATION SYSTEM (CREFS) (Contnued)

SURVEILLANCE REQUIREMENTS (Continued)

wlich endows, wit exceptions, NE 99-03, Section 8.4 and Appendx F (Ref. 6). ThesecorpensatoFy measures may also be used as nnigating actions as required by Action3.7.6.a2. Ternporay analytical methods may also be used as cornpensato•y measures torestore OPERABILITY (Ret. 7). Options for 1estorin" te CRE boundary to OPERABLEstatus include changing te licensing basis DBA consequence analysis, repaiing the CREbounday, or a combination of these actions. Depending upon the nature dthe problem andthe corrective action, a full scope iuleakage test may not be necessary to establish that theCRE bounday has been restored to OPERABLE status.

REFERENCES

1. FSAR, Section 9.4.2. FSAR, Ch•aer 15.3. FSAR, Section 6.4.4. FSAR, Section 9.5.5. Regulatoy Guide 1.196.6. NEI 9903, "Control Room Habftty Assessment" March 2003.7. Letter frim Eric J. Leeds (NRC) to J.ames W. Davis (NEM) dated anuary 30,2004, "NB

Dralt White Paper, Use of Genedc Letter 91-18 Process and Alemative Source Tems inthe Context of Contr Room Habitability." (ADAMS Accession No. ML040300694)

3/4.7.7 SNUBBERS

Al snubbers on systems required for safe shutdownlaccident mitigation shal beOPERABLE This includes safety and non-safety related snubbers on systems used toprotect the code boundary and to ensure the structural integity of these systems underdynamic bads.

The "Snubber Testing Program" manages the requirement for demonstratingsnubber operability (examination, testing and service life monitoring) as reflectedin section 6.8.4.n thereby ensuring the TS remains consistent with the ISIprogram. The program for ISI and testing of snubbers in accordance with ASMEOM Code and the applicable addenda as required by 10 CFR 50.55a(g) isrequired to include evaluation of supported components/systems when snubbersare found to be unacceptable.

SUMMER - UNIT 1 8 3/4 7-4f - T Amendment N7 . IBRNA8, Z11

Page 19: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 2CR-1 2-06014RC-13-0048Page 10 of 10

/we classed and grouped by degn and mrarfaclamer but not by

For example••, subber utlzkng the Same design faMtuMs of the 2 klp, kip and100Mp cab company A weaotfthe same yp. The oiwsm. g nmech al anfat re by compaoy othe purpose ofthis a mcnowould betype, as wouid hydraulic. snubbers trom either imn rer.

The visual in* fremuency is based upo nmaIntalning a level ofsnubber protlection to .Therefore, the required inspection varies inversely

with the observed wwobr ures and is determined by the nmber operable snubersfund din a Inspection. 4.7-2 establishes thrse tnfts fr h,, ng the nwetvisual Inspection nterval performed belore that he• h e moy beused assa new reference point etermine the ns" inspectiont. inspection whoseresults requiresa shorterI n erNed wTo ovrr the soliedule.

To provifd assurance of r functlio•al of two sampling andacceptance Ito* methode Ore uted

11) ftcliondlytMet 10 percenttested for aod* functlonedto

2) f•nctionelly last s sample size and4.7-14 .

Figure 4.7.1 was davopd using Wacf'"Ousfty Control and Industrial 8acSWV IW Ach

r* er with an addtiona 10 percet

innl e sample acceptance usng Figure

I~tobabNiiY Ratilo Plar as described In

The servics e Wofsa enubber blished! via mam rer Input wad Informationthrough cons•ieraton of the snIA condions ad ,Instsltio andmaIntea. recof (nevty I snubber, seal replaced, replaced, In highraditio arms, In h•gh are, etc. . .). The req to monitor the onubberservice 111 Is Included to that the snubber* perlo•ducy a perormnceevkAeorn In vw of "AeIr operating conditions. These Wil pViestastical bases For future Ideration of snubber service fe. The rements for themaintenance of rekodm thes snubber service lMe review ar nOt I to affect plantoperation.

Permanenut otherexemptions form the surveillancaprogrom for I alsnubbers may by the Commission If a justilale beis for exemption pre•entedand. if apo , snubber We t desucive tsting was perorrmed to quafy the sn forthe 9 min conditions at either the completion of their fabrici•on or at aeSnubbers so exempted "I be fited In Section 3.7.7 with foono

indic extn t of the exemptions.

Uý fIR -UNT I B W/4 7-5 Amendiment No. 4;1-4O 171

Page 20: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 3CR-12-06014RC-13-0048Page 1 of 6

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1DOCKET NO. 50-395

OPERATING LICENSE NO. NPF-12

ATTACHMENT 3

Revised Technical Specification Pages

Proposed Technical Specification Changes Summary

Replace the following pages of the Appendix A to Operating License Number NPF-12,Technical Specifications with the attached revised pages. The revised pages areidentified by amendment number and contain marginal lines indicating the areas ofchange.

Remove Paqes3/4 7-16

3/4 7-17

3/4 7-18

3/4 7-19

3/4 7-20

3/4 7-21

Insert Pages3/4 7-16

3/4 7-17

6-12i

B 3/4 7-4fB 3/4 7-4f

B 3/4 7-5 B 3/4 7-5

Page 21: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

PLANT SYSTEMS

3/4.7.7 SNUBBERS

LIMITING CONDITION FOR OPERATION

3.7.7 All snubbers on systems required for safe shutdown/accident mitigation shall beOPERABLE. This includes safety and non-safety related snubbers on systems used to protect thecode boundary and to ensure the structural integrity of these systems under dynamic loads.

APPLICABILITY: MODES 1, 2, 3 and 4. MODES 5 and 6 for snubbers located on systemsrequired OPERABLE in those MODES.

ACTION:

With one or more snubbers inoperable, within 72 hours replace or restore the inoperablesnubber(s) to OPERABLE status and perform an engineering evaluation for Specification 4.7.7 onthe attached component or declare the attached system inoperable and follow the appropriateACTION statement for that system.

SURVEILLANCE REQUIREMENTS

4.7.7 Each snubber shall be demonstrated OPERABLE by performance of the SnubberTesting Program.

SUMMER - UNIT 1 3/4 7-16 Amendment No. 47, 103,

Page 22: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

The following pages have been deleted.

3/4 7-173/4 7-183/4 7-193/4 7-203/4 7-21

SUMMER - UNIT 1 3/4 7-17 Amendment No.

Page 23: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

PLANT SYSTEMS

BASES

CONTROL ROOM EMERGENCY FILTRATION SYSTEM (CREFS) (Continued)

SURVEILLANCE REQUIREMENTS (Continued)

which endorses, with exceptions, NEI 99-03, Section 8.4 and Appendix F (Ref. 6). Thesecompensatory measures may also be used as mitigating actions as required by Action3.7.6.a.2. Temporary analytical methods may also be used as compensatory measures torestore OPERABILITY (Ref. 7). Options for restoring the CRE boundary to OPERABLEstatus include changing the licensing basis DBA consequence analysis, repairing the CREboundary, or a combination of these actions. Depending upon the nature of the problem andthe corrective action, a full scope inleakage test may not be necessary to establish that theCRE boundary has been restored to OPERABLE status.

REFERENCES

1. FSAR, Section 9.4.2. FSAR, Chapter 15.3. FSAR, Section 6.4.4. FSAR, Section 9.5.5. Regulatory Guide 1.196.6. NEI 99-03, "Control Room Habitability Assessment," March 2003.7. Letter from Eric J. Leeds (NRC) to James W. Davis (NEI) dated January 30, 2004, "NEI

Draft White Paper, Use of Generic Letter 91-18 Process and Alternative Source Terms inthe Context of Control Room Habitability." (ADAMS Accession No. ML040300694).

3/4.7.7 SNUBBERS

All snubbers on systems required for safe shutdown/accident mitigation shall beOPERABLE. This includes safety and non-safety related snubbers on systems used toprotect the code boundary and to ensure the structural integrity of these systems underdynamic loads.

The "Snubber Testing Program" manages the requirement for demonstrating snubberoperability (examination, testing and service life monitoring) as reflected in section 6.8.4.nthereby ensuring the TS remains consistent with the ISI program. The program for ISI andtesting of snubbers in accordance with ASME OM Code and the applicable addenda asrequired by 10 CFR 50.55a(g) is required to include evaluation of supportedcomponents/systems when snubbers are found to be unacceptable.

SUMMER - UNIT 1 B 3/4 7-4f Amendment No. BRN 08 002,

Page 24: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Bases Page 3/4 7-5 deleted

SUMMER - UNIT 1 B 3/4 7-5 Amendment No. 47,103, 17-1,

Page 25: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

ADMINISTRATIVE CONTROLS

n. Snubber Testing Program

This program conforms to the examination, testing and service life monitoring fordynamic restraints (snubbers) in accordance with 10 CFR 50.55a inserviceinspection (ISI) requirements for supports. The program shall be in accordancewith the following:

1) This program shall meet 10 CFR 50.55a(g) ISI requirements for supports.

2) The program shall meet the requirements for ISI of supports set forth insubsequent editions of the Code of Record and addenda of the AmericanSociety of Mechanical Engineers (ASME) Boiler and Pressure Vessel(BPV) Code and the ASME Code for Operation and Maintenance ofNuclear Power Plants (OM Code) that are incorporated by reference in10 CFR 50.55a(b) subject to limitations and modifications listed in10 CFR 50.55a(b) and subject to Commission approval.

3) The program shall, as allowed by 10 CFR 50.55a(b)(3)(v), meetSubsection ISTA, "General Requirements," and Subsection ISTD,"Preservice and Inservice Examination and Testing of Dynamic Restraints(Snubbers) in Light-Water Reactor Nuclear Power Plants," or meetauthorized alternatives pursuant to 10 CFR 50.55a(a)(3).

4) The 120-month program updates shall be made in accordance with10 CFR 50.55a(g)(4), 10 CFR 50.55a(g)(3)(v) and 10 CFR 50.55a(b)(including 10 CFR 50.55a(b)(3)(v)) subject to the limitations andmodifications listed therein.

SUMMER - UNIT 1 6-12i Amendment No.

Page 26: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-13-0048Page 1 of 13

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)DOCKET NO. 50-395

OPERATING LICENSE NO. NPF-12

ATTACHMENT 4

TS 4.7.7 SR Comparison to ISI Program Requirements

Page 27: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-1 3-0048Page 2 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.a Inspection Types ISTD-5252 allows for defined test plan groups The revised ISI program requirements for

As used in this specification, type of snubber (DTPGs) to be established based upon inspection types allow the same distinction for

shall mean snubbers of the same design and differences in design, application, size, or type. DTPGs as SR 4.7.7.a.

manufacturer, irrespective of capacity.

4.7.7.b Visual Inspections ISTD-4220(a) requires all snubbers to be Use of ISTD-4200 for snubber inserviceconsidered one population for examination, or examination in lieu of current SR 4.7.7.b does

Snubbers are categorized as accessible or alternatively, to categorize them individually as not change the number of snubbers required toinaccessible during power operation. Each of accessible or inaccessible. The categories of be examined or the required examinationthese categories may be inspected accessible and inaccessible snubbers shall be intervals.independently according to the schedule cniee eaaeyfreaiain

detemind b Tale 47-2 Th viualconsidered separately for examination.determined by Table 4.7-2. The visual

inspection interval for each category of ISTD-4220(b) requires the decision to examinesnubber shall be determined based on the the snubbers as one population or as separatecriteria provided in Table 4.7.2, and the first categories to be made and documented beforeinspection interval determined using this the scheduled examination begins and notcriteria shall be based upon the previous changed during the examination.inspection interval as established by therequirements in effect before Amendment No.103.

Page 28: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-13-0048Page 3 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.c Refueling Outage Inspections

Each refueling outage an inspection shall beperformed of all the snubbers defined insection 3.7.7 attached to sections of safetysystems piping that have experiencedunexpected, potentially damaging transients asdetermined from a review of operational dataand a visual inspection of the systems. Inaddition to satisfying the visual inspectionacceptance criteria, freedom of motion ofriiechanical snubbers shall be verified using atleast one of the following:

(i) manually induced snubber movement; (ii)evaluation of in-place snubber piston setting;or (iii) stroking the mechanical snubber throughit full range of travel.

ISTD-1 750 states that if a transient dynamicevent (e.g., water hammer, steam hammer)occurs that may affect snubber operability,then the affected snubbers and systems shallbe reviewed and any appropriate correctiveaction taken.

ISTD-1800 requires an evaluation to beperformed of the system(s) or components ofwhich an unacceptable snubber is a part, forpossible damage to the supported system orcomponent.

ISTD-5325 also requires the operationalreadiness of all snubbers in this FMG to beevaluated by stroking or testing.

Use of ISTD-1750, ISTD-1800 and ISTD-5325to evaluate snubbers subject to anyunexpected potentially damaging transients asdo the requirements of SR 4.7.7.c.

Page 29: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-1 3-0048Page 4 of 13

Current TS Surveillance Requirement Revised IS[ Program Requirement Justification for Change

4.7.7.d Visual Inspection Acceptance Criteria

Visual inspections shall verify (1) that there areno visible indications of damage or impairedOPERABILITY and (2) attachments to thefoundation or supporting structure arefunctional, and (3) fasteners for the attachmentof the snubbers to the component and to thesnubber anchorage are functional.

ISTD-4210 states that inservice examinationshall be a visual examination to identifyphysical damage, leakage, corrosion, ordegradation that may have been caused byenvironmental exposure or operatingconditions; and that external characteristicsthat may indicate operational readiness of thesnubber shall be examined.

ISTD-4231 requires that examinations shallinclude observations for loose fasteners, ormembers that are corroded or deformeddisconnected components or other conditionsthat might interfere with the proper restraint ofmovement. If observed these conditions shallbe evaluated.

ISTD-4232 requires that examinations verifysnubbers do not restrain thermal movement toan extent that unacceptable stresses coulddevelop in the snubber, the pipe, or otherequipment that the snubber is designed toprotect or restrain.

ISTD-4233 requires that examinations verifysnubbers are free of defects that may begeneric to particular designs as may bedetected by visual examination.

10 CFR 50.55a(b)(3)(v) allows the use ofsubsection ISTD for inservice examinationrequirements.

The revised ISI program requirements forinservice examination satisfy the visualinspection acceptance criteria in SR 4.7.7.d.

Page 30: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-1 3-0048Page 5 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.d Visual Inspection Acceptance Criteria(cont)

Snubbers which appear inoperable as a resultof visual inspections shall be classified asunacceptable and may be reclassifiedacceptable for the purpose of establishing thenext interval, provided that (i) the cause forbeing classified as unacceptable is clearlyestablished and remedied for that particularsnubber and for other snubbers irrespective oftype that may be generically susceptible; and(ii) the affected snubber is functionally tested inthe as found condition and determinedOPERABLE per Specifications 4.7.7.f.

ISTD-4240 permits snubbers classified asunacceptable during inservice examination tobe tested in accordance with the requirementsof ISTD-5210. Results that satisfy theoperational readiness test criteria of ISTD-5210 shall be used to accept the snubber,provided the test demonstrates that theunacceptable condition did not affectoperational readiness.

The revised ISI program requirements forinservice examination is equivalent to thevisual inspection acceptance criteria in SR4.7.7.d.

Page 31: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-1 3-0048Page 6 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.d Visual Inspection Acceptance Criteria(cont)

When a fluid port of a hydraulic snubber isfound to be uncovered, the snubber shall bedeclared inoperable and shall not bedetermined OPERABLE via functional testingunless the test is started with the piston in theas-found setting, extending the piston rod inthe tension mode direction. All snubbers foundconnected to an inoperable common hydraulicfluid reservoir shall be counted asunacceptable and may be reclassified asacceptable for determining the next inspectioninterval provided that criterion (i) and (ii) aboveare met. A review and evaluation shall beperformed and documented to justify continuedoperation with an unacceptable snubber. Ifcontinued operation cannot be justified, thesnubber shall be declared inoperable and theACTION requirements of 3.7.7 shall be met.

ISTD-4233 requires that fluid supply or contentfor hydraulic snubbers shall be observed. Ifthe fluid is less than the minimum amount, theinstallation shall be identified as unacceptable,unless a test establishes that the performanceof the snubber is within specified limits. Testsshall be performed in accordance with ISTD-5210(b) and ISTD-5210(c). The initial test shallstart with the piston at the as-found setting andbe performed in the extension (tension)direction, or in a mode that more closelyresembles the operating and designrequirements of the snubber.

ISTD-4270 requires that snubbers that do notmeet examination requirements of ISTD-4230shall be evaluated to determine the root causeof the unacceptability.

ISTD-4280 requires that unacceptablesnubbers shall be adjusted, repaired, modified,or replaced.

The revised ISl program requirements forinservice examination is equivalent to thevisual inspection acceptance criteria in SR4.7.7.d.

Page 32: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-13-0048Page 7 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.e Functional Tests

During the first refueling shutdown and at leastonce per 18 months thereafter, arepresentative sample of either:

(1) At least 10% of the total of each type ofsnubber in use in the plant shall be functionallytested either in place or in a bench test.

For each snubber of a type that does not meetthe functional test acceptance criteria ofspecification 4.7.7.f, an additional 10% of thattype of snubber shall be functionally tested, or

ISTD-5200 requires snubber operationalreadiness testing to be performed each fuelcycle. Testing shall be performed duringnormal system operation, or during system orplant outages.

ISTD-5223 and ISTD-5224 permit snubbers tobe tested in their installed location or in abench test.

ISTD-5261 requires snubbers of each DefinedTest Plan Group (DTPG) to be tested usingeither:

(a) the 10% testing sample plan

(b) the 37 testing sample size

ISTD-5330 requires the snubbers of eachDTPG and failure mode group (FMG) to betested as required. Testing is complete whenthe mathematical expressions of ISTD-5331are satisfied, or all snubbers in the DTPG orFMG have been tested.

ISTD-5331 requires that testing shall satisfythe mathematical expressions as follows:

(a) for each DTPG

N > 0.1n + C(0.1n/2)

(b) for each FMG

NF > CF(O.1n/2)

The frequency of snubber testing in the revisedprogram is unchanged from the frequencyspecified in current TS SR 4.7.7.e.

The initial sample size in the revised programis as large as the size specified in current SR4.7.7.e.

The revised program provides for an expandedsample of one half the initial sample be testedfor each failed snubber when using the 10%test plan. Although the present programrequires an additional sample of the same 10%for each failed snubber this is not consideredto be a reduction in safety since the proposedprogram includes an increased emphasis onservice life monitoring, and this proposed testprogram has been previously approved by theregulator and is widely in use elsewhere.

Page 33: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-13-0048Page 8 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.e Functional Tests (cont.)

(2) A representative sample of each type ofsnubber shall be functionally tested inaccordance with Figure 4.7-1, "C" is the totalnumber of snubbers of a type found notmeeting the acceptance requirements ofSpecification 4.7.7.f. The cumulative number ofsnubbers of a type tested is denoted by "N". Atthe end of each days testing, the new values of"N" and "C" (previous day's total plus currentday's increments) shall be plotted on Figure4.7-1. If at any time the point plotted falls in the"Accept" region, testing of that type snubbermay be terminated.

When the point plotted lies in the "ContinueTesting" region, additional snubbers of thattype shall be tested until the point falls in the"Accept" region or all the snubbers of that typehave been tested.

The representative sample selected forfunctional testing shall include the variousconfigurations, operating environments, andthe range of size and capacity of snubbers ofeach type. The representative sample shall beweighted to include more snubbers fromsevere service areas such as near heavyequipment. Snubbers placed in the samelocation as snubbers which failed the previousfunctional test shall be included in the next testlot if the failure analysis shows that a failurewas due to location.

ISTD-5411 requires an initial sample of 37snubbers to be selected randomly from each37 plan DTPG.

ISTD-5431 requires testing to satisfy themathematical expressions as follows:

(a) for each DTPG

N Ž> 36.49 + 18.18C (Fig. ISTD-5431-1)

Figure ISTD-5431-1 reflects the sameacceptance line as SR Figure 4.7-1 only it isdefined in terms of N rather than C.

ISTD-5500 requires that snubbers placed inthe same location as snubbers that failed theprevious inservice operational readiness testshall be retested at the time of next operationalreadiness testing unless the cause of thefailure is clearly established and corrected.

The initial sample size using the 37 plan in therevised program is as large as the sizespecified in current SR 4.7.7.e.

Figure ISTD-5431-1 reflects the sameacceptance line as SR Figure 4.7-1 only it isdefined in terms of N rather than C.

It requires the same equation to be satisfied tocomplete testing.

Retests of failed snubber locations arerequired by the revised program as in SR4.7.7.e.

Page 34: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-1 3-0048Page 9 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.f Functional Test Acceptance Criteria

The snubber functional test shall verify that:

1. Activation (restraining action) is achievedwithin the specified range in both tension andcompression, except that inertia dependent,acceleration limiting mechanical snubbers,may be tested to verify only that activationtakes place in both directions of travel.

2. Snubber bleed, or release rate whererequired, is present in both tension andcompression, within the specified range.

3. Where required, the force required toinitiate or maintain motion of the snubber iswithin the specified range in both directions oftravel.

4. The snubber ability to withstanddisplacement under continuous loading.

5. Fasteners for attachment of the snubber tothe component and to the snubber anchorageare secure.

Testing methods may be used to measureparameters indirectly or parameters other thanthose specified if those results can becorrelated to the specified parameters throughestablished methods.

ISTD-5210(a), (b) and (c) require the sameverification for operational readiness testing.

ISTD-4231 Requires Snubbers to be installedso they are capable of restraining movementwhen activated. Examinations includefasteners and other components that mightinterfere with proper restraint of movement.

ISTD-5226 States when test methods are usedthat either measure parameters indirectly, ormeasure parameters other than thosespecified, the results shall be correlated withspecified parameters through establishedmethods.

The revised ISI program requirements forsnubber acceptance criteria are equivalent tothose of current SR 4.7.7.f.

Page 35: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-1 3-0048Page 10 of 13

Current TS Su,rveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7.g Functional Test Failure Analysis

An engineering evaluation shall be made ofeach failure to meet the functional testacceptance criteria to determine the cause ofthe failure. The results of this evaluation shallbe used, if applicable, in selecting snubbers tobe tested in an effort to determine theOPERABILITY of other snubbers irrespectiveof the type that may be subject to the samefailure mode.

ISTD-5271 states that snubbers that do notmeet test requirements shall be evaluated todetermine the root cause of the failure.

ISTD-5272 states that snubbers foundunacceptable according to operationalreadiness test requirements should beassigned to FMGs unless the failure is isolatedor unexplained. FMGs shall include allunacceptable snubbers with the same failuremode and all other snubbers with similarpotential for similar failure.

The revised ISI program requirements forsnubber acceptance criteria are equivalent tothose of current SR 4.7.7.g.

4.7.7.g Functional Test Failure Analysis(cont.)

For snubbers found inoperable, an engineeringevaluation shall be performed on thecomponents to which the inoperable snubbersare attached. The purpose of this engineeringevaluation shall be to determine if thecomponents to which the inoperable snubbersare attached were adversely affected by theinoperability of the snubbers in order to ensurethat the component remains capable ofmeeting the desired service.

ISTD-1800 requires an evaluation beperformed on the system(s) or component(s)of which an unacceptable snubber is a part, forpossible damage to the supported system orcomponent.

The revised ISI program requirements forsnubber acceptance criteria are equivalent tothose of current SR 4.7.7.g.

Page 36: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-1 3-0048Page 11 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement I Justification for Change

4.7.7.g Functional Test Failure Analysis(cont.)

If any snubber selected for functional testingeither fails to lockup or fails to move, i.e.,frozen in place, the cause will be evaluatedand if caused by the manufacturer or designdeficiency all snubbers of the same typesubject to the same defect shall be functionallytested. This testing requirement shall beindependent of the requirements stated inSpecification 4.7.7.e for snubbers not meetingthe functional test acceptance criteria.

ISTD-5271 states that snubbers that do notmeet test requirements shall be evaluated todetermine the root cause of the failure.

ISTD-5272 states that snubbers foundunacceptable according to operationalreadiness test requirements should beassigned to FMGs unless the failure is isolatedor unexplained. FMGs shall include allunacceptable snubbers with the same failuremode and all other snubbers with similarpotential for similar failure.

As an alternative to additional testing forDesign or Manufacturing FMGs, ISTD-5323requires no additional testing when allsnubbers in the FMGs are replaced ormodified in accordance with ISTD-1600.

If replacement or modification is not performedin accordance with ISTD-5323, additionaltesting is required in accordance with ISTD-5324. Testing is required to continue until theacceptance limit is satisfied or all snubbers inthe FMG have been tested.

The revised program requirements formanufacturer or design deficiencies requirereplacement or modification of all snubbers inthe FMG or additional testing until themathematical expression of ISTD-5331(b) issatisfied or all snubbers in the FMG have beentested. This may result in fewer snubbersbeing tested after a test failure. However, therevised program requirements provideadequate assurance of snubberOPERABILITY because all potentially affectedsnubbers will be replaced or modified; or theacceptance limit for additional testing will bemet, demonstrating an acceptable level ofreliability.

Page 37: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-1 2-06014RC-13-0048Page 12 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

4.7.7,h Functional Testing of Repaired and ISTD-1610 Requires replacement or modified The revised ISI program requirements forReplaced Snubbers snubber(s) to have a proven suitability for the supported component(s) or system evaluation

Snubbers which fail the visual inspection or the application and environment and; are equivalent to those of current SR 4.7.7.h.

functional test acceptance criteria shall be ISTD-5134 Requires adjusted, modified,repaired or replaced. Replacement snubbers repaired, or replacement snubbers to be testedand snubbers which have repairs which might to meet the requirements of ISTD-5120 prior toaffect the functional test result shall be tested service.to meet the functional test criteria beforeinstallation in the unit. These snubbers shallhave met the acceptance criteria subsequentto their most recent service, and the functionaltest must have been performed within 12months before being installed in the unit.

4.7.7,i Snubber Seal Replacement Program ISTD-6100 requires initial snubber service life The service life evaluation requirements in

The seal service life of hydraulic snubbers to be predicted based on manufacturer's ISTD-6100 and ISTD-6200 are equivalent to

shall be monitored to ensure that the seal's recommendation or design review. the requirements in current TS SR 4.7.7.i.

service life is not exceeded between ISTD-6200 and ISTD-6200(c) requires servicesurveillance inspections. Seal materials, and life to be evaluated at least once each fuelapplications shall be determined and cycle. If the evaluation indicates that serviceestablished based on engineering information life will be exceeded before the next scheduledand the seals shall be replaced so that the system or plant outage, the snubber shall bemaximum service life will not be exceeded reconditioned such that its service life will beduring a period when the snubber is required extended to or beyond the next scheduledto be OPERABLE. The seal replacements system or plant outage.shall be documented and the documentation ISTA-9310 requires the maintenance ofshall be retained in accordance with records in accordance with the Owners QASpecification 6.10.2. program.

Figure 4.7-1 SAMPLING PLAN FOR Fig. ISTD-5431-1, The 37 Testing Sample Plan Figure ISTD-5431-1 reflects the sameSNUBBER FUNCTIONAL TEST acceptance line as SR Figure 4.7-1 only it is

defined in terms of N rather than C.

Page 38: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 4CR-12-06014RC-13-0048Page 13 of 13

Current TS Surveillance Requirement Revised ISI Program Requirement Justification for Change

TABLE 4.7-2 SNUBBER VISUAL ISTD-4252(b) requires inservice examinations Table ISTD-4252-1 is identical to SR TableINSPECTION INTERVAL to be conducted in accordance with Table 4.7-2 for population/category population sizes.

ISTD-4252-1.

Page 39: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 5CR-12-06014RC-1 3-0048Page 1 of 8

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)DOCKET NO. 50-395

OPERATING LICENSE NO. NPF-12

ATTACHMENT 5

Proposed Snubber Program Plan

Page 40: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Virgil C. Summer Nuclear Station, Unit I

Snubber Examination, Testing, andService Life Monitoring Program Plan

Revision 0

South Carolina Electric & GasVirgil C. Summer Nuclear Station, Unit 1

P.O. Box 88Jenkinsville, SC 29065

Page 41: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

South Carolina Electric & GasVirgil C. Summer Nuclear Station Unit I

Revision Log

Effective Revision Description Prepared: Date Approved: DateDate Snubber Engineering

Program ManagerEngineer

4 4. 4. + I

2013 Rev 0 Page 1 of 6

Page 42: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

South Carolina Electric & GasVirgil C. Summer Nuclear Station Unit 1

TABLE OF CONTENTS

SECTION

1.0 INTRODUCTION:

2.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORINGREQUIREMENTS:

3.0 EXAMINATION and TESTING METHODS:

4.0 EXAMINATION and TESTING FREQUENCY:

5.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING EVAUATION:

6.0 REPAIR, REPLACEMENT, AND MODIFICATION REQUIREMENTS:

7.0 SCHEDULING:

8.0 REPORTS AND RECORDS:

2013 Rev 0 Page 2 of 6

Page 43: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

South Carolina Electric & GasVirgil C. Summer Nuclear Station Unit 1

INTRODUCTION:

1.1 Purpose:To provide requirements for the performance and administration of assessing theoperational readiness of those dynamic restraints (Snubbers) whose specificfunctions are required to ensure the integrity of the Reactor Coolant PressureBoundary.

1.2 Scope:The program plan was prepared to meet the requirements of the followingsubsections of the American Society of Mechanical Engineers (ASME) OM Code2004 Edition with 2005 and 2006 Addenda.

* Subsection ISTA, "General Requirements"

ISTA contains the requirements directly applicable to inserviceexamination and testing including the Owner's Responsibility andRecords Requirements.

• Subsection ISTD, "Preservice and Inservice Examination and Testing ofDynamic Restraints (Snubbers) in Light-Water Reactor Nuclear PowerPlants"

ISTD establishes requirements for preservice and inservice examinationand testing, and the service life monitoring of Dynamic Restraints(Snubbers) in light-water reactor nuclear power plants. The snubberscovered are required to support the systems and components that arerequired in shutting down a reactor to the safe shutdown condition, inmaintaining the safe shutdown condition, or in mitigating theconsequences of an accident.

1.3 Discussion:In order to ensure the required operability of all safety related snubbers forVCSNS during a seismic or other events, initiating dynamic loads, the inspection,testing, and the service life monitoring of these snubbers shall be implementedand performed in accordance with the requirements of SAP-0161, StationAdministrative Snubber Program Document.

The examination boundaries shall include the snubber assembly from pin to pininclusive. Coordination with the ISI program owner will be required to completethe surveillance requirements for piping and structural attachments. Integral andnonintegral attachments for snubbers shall be examined in accordance with therequirements of the ASME Code Section Xl, Article IWF-2500(a), (b), (c) and (d)within the ISI program.

The Snubber Program described in SAP-0161 adheres to the requirements of theASME OM Code, Subsection ISTD, 2004 Edition with 2005 and 2006 Addenda,as required by 10CF.R50.55a(b)(3)(v).

2013 Rev 0 Page 3 of 6

Page 44: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

South Carolina Electric & GasVirgil C. Summer Nuclear Station Unit I

2.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING REQUIREMENTS:

2.1 Visual Examinations, Functional Testing, and Service Life requirements shall beperformed to the extent specified within SAP-0161 and referenced SurveillanceTest Procedures (STP).

2.2 Snubbers are grouped into Defined Test Plan Groups (DTPGs) by design type,size, and accessibility in accordance with ISTD-5252. Each DTPG will be testedusing the 10% sample plan per ISTD-5300. There are no snubbers attached tothe Steam Generators. All mechanical snubbers at Virgil C. Summer Station Unit1 are grouped as separate DTPGs by size.

DTPGsPSA 1/4PSA 1/2PSA 1PSA 3PSA 10PSA 35PSA 100

2.4 The service life of all snubbers shall be monitored and snubbers replaced,reconditioned or evaluated in accordance with SAP-0161 and ISTD-6200 toensure that the service life is not exceeded between surveillance inspections.The replacement or reconditioning shall be documented and records retained inaccordance with VCSNS procedures.

3.0 EXAMINATION and TESTING METHODS:

3.1 Visual examinations shall be performed by individuals qualified in accordancewith VCSNS procedures. These examinations are conducted to ensure themechanical and structural condition of the snubber support location and toobserve conditions that could affect functional adequacy. Visual examinationsand functional testing shall be performed to verify the requirements specifiedwithin SAP-0161 are met in accordance with Subsection ISTD.

4.0 EXAMINATION and TESTING FREQUENCY:

4.1 Visual Examinations and Functional Testing shall be performed at the frequencyspecified within SAP-0161 and ISTD-4250 and ISTD-5240. VCSNS currentlyperforms accessible and inaccessible snubber visual examinations as one groupwith the frequency shown in Table ISTD 4252-1.

4.2 Code Case OMN-13, which allows the extension of the visual examinationinterval, will be implemented for snubber inspections during this interval. CodeCase OMN-1 3 is approved for use in Regulatory Guide 1.192 (June 2003). TheVisual Examinations of Table ISTD 4252-1 may be extended in accordance withCode Case OMN-1 3 once the prerequisites of the code case have been satisfied.

2013 Rev 0 Page 4 of 6

Page 45: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

South Carolina Electric & GasVirgil C. Summer Nuclear Station Unit 1

4.3 Visual Examinations shall be performed whenever new snubbers are installed,reinstallation of existing or swapped snubbers that were functionally tested, orafter repairs, replacements or modifications.

4.4 Functional testing requirements for new installations or spares shall be equal toor more stringent than that specified within SAP-0 161.

5.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING EVAUATION:

5.1 Snubbers that do not appear to conform to the Visual Examination requirementsof SAP-0161, shall be reported for evaluation and appropriate corrective action.

5.2 Snubbers that do not appear to conform to the visual examination acceptancerequirements and are later confirmed as operable as a result of functional testingmay be declared operable for the purpose of establishing the next visualinspection interval, providing that the unacceptable condition did not affectoperational readiness.

5.3 Snubbers that do not meet the operability testing acceptance criteria in SAP-0161 shall be evaluated to determine the cause of the failure and appropriatecorrective action taken.

5.4 The service life of a snubber is evaluated using manufacturing input andengineering information gained through consideration of the snubber serviceconditions and inservice functional test results. A service life monitoring programis included in SAP-0161.

6.0 REPAIR, REPLACEMENT, AND MODIFICATION REQUIREMENTS:

6.1 Repairs, Replacements and Modifications performed on snubbers under thisprogram shall conform, as applicable, to the requirements specified within theASME Code, Section Xl.

7.0 SCHEDULING:

7.1 The Visual Examinations, Functional Testing schedules, and Service LifeReplacements shall be established, tracked and maintained in accordance withSAP-0161 and Subsection ISTD by the Snubber Program Engineer.

7.2 The Snubber Program Engineer shall identify and track expanded or additionaltesting and/or examinations as required by SAP-0161 and Subsection ISTD.

8.0 REPORTS and RECORDS:

8.1 Reports and records for the Visual Examinations and Functional Testing shall bemaintained for all snubbers included within the Snubber Program.

2013 Rev 0 Page 5 of 6

Page 46: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

South Carolina Electric & GasVirgil C. Summer Nuclear Station Unit 1

8.2 Applicable records and reports, as required for Repair and Replacements, shallbe maintained for snubbers.

8.3 Records of the service life of all snubbers listed in this program, including thedate at which the service life commences or expires, and associated installationand maintenance records will be maintained.

2013 Rev 0 Page 6 of 6

Page 47: COMPANY April 2, 2013 RC-1 3-0048 Subject: VIRGIL C. SUMMER … · 803.345.4342 A SCANA COMPANY April 2, 2013 RC-1 3-0048 U. S. Nuclear Regulatory Commission Document Control Desk

Document Control DeskAttachment 6CR-12-06014RC-1 3-0048Page 1 of 1

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)DOCKET NO. 50-395

OPERATING LICENSE NO. NPF-12

ATTACHMENT 6

LIST OF REGULATORY COMMITMENTS

The following table identifies those actions committed to by Virgil C. Summer NuclearStation (VCSNS) in this document. Any other statements in this submittal are providedfor information purposes and are not considered to be regulatory commitments. Pleasedirect questions regarding these commitments to Mr. Bruce L. Thompson at(803) 931-5042.

Commitment Due DateNone.