RE: AUSTPAC RESOURCES N.L.
2019 ANNUAL GENERAL MEETING
PRESENTATIONS – 18 DECEMBER 2019
We are pleased to provide visual presentations for the Austpac Resources NL 2019 Annual
General Meeting held on Wednesday 18 December 2019.
Yours faithfully
N.J. Gaston
Company Secretary
enc
AUSTPAC RESOURCES N.L.
ACN 002 264 057
Level 5
37 Pitt Street
SYDNEY NSW 2000
GPO Box 5297
SYDNEY NSW 2001
Telephone: (+61 2) 9252 2599
Facsimile: (+61 2) 9252 8299
Email: [email protected]
www.austpacresources.com
Welcome to the
Annual General Meeting18 December 2019
2
Austpac’s
Zinc & Iron Recovery Process
and its place in the
Steel Industry
Colin ILESDirector
This presentation is provided to you for information purposes only and should not be construed as and shall not form
part of an offer or solicitation to buy or sell any securities or derivatives. It should not be considered as an offer or
invitation to subscribe for or purchase any securities in Austpac Resources NL or as an inducement to make an offer or
invitation with respect to those securities. No agreement to subscribe for securities in Austpac Resources NL will be
entered into on the basis of this presentation.
To the maximum extent permitted by applicable laws, Austpac Resources NL makes no representation and can give no
assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no responsibility
for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information,
statement or opinion contained in this presentation.
Certain statements may be made herein that use the words “estimate”, “project”, “intend”, “expect”, “believe” and
similar expressions intended to identify forward-looking statements. These forward-looking statements involve known
and unknown risks and uncertainties which could cause the actual results, performance or achievements of the
Company to be materially different from those which may be expressed or implied by such statements, including,
among others, risks or uncertainties associated with the development of the Company’s technology, the ability of the
Company to protect its proprietary technology, the market for the Company’s products, government regulation,
changes in tax and other laws, changes in competition and the loss of key personnel. For additional information
regarding these and other risks and uncertainties associated with the Company’s business, reference is made to the
Company’s reports filed from time to time with the Australian Securities and Investments Commission and ASX.
Disclaimer
3
4
• Identify commodities we want to be in for the longterm, seek projects to acquire or develop, build valuewithin our sphere of expertise and then bring inpartners to jointly realise the value.
• The strategy is to join with partners who will assist usby shouldering most of the operating and capital riskout of our projects.
• This gives us a better chance to develop projects at theoptimal scale, accelerate returns and create greaternear-term value for our shareholders.
Austpac’s Vision
• Annual iron oxide dust generation globally:
– Approx. 18 million tonnes
• Recycling Zn-contaminated Fe dust is problematic
• Disposal is costly
• Potential Zn availability 1 – 3 million tonnes
• Industry is focused on recycling this product
• APG has successfully completed the PoC work
• APG’s ZIRP process can recycle Zn-Fe dust
Steel Industry By-Product Dust
5
6
ZIRP - A Circular Process
• Scrap:
Galvanised Steel
Pig Iron
• HCl Steel making process
• BF Dust, EAF Dust, BOF Filter Cake
• SPL
By-Product evolution
PROCESS STEPS
• 1 FeCl2-MeOx
• 2 FeOx-ZnOx & HCl
• 3 FeO-ZnOx
• 4 Fe & ZnO
ZIRP• Pig Iron
• HCl
• Zn Oxide
Virgin products
• SSPP in April 2019 raised $426,000
• Share placement to YanGang to support the Proof of Concept (PoC) testwork – $804,000
• Synthetic rutile package sold to Lido Holdings –$1,500,000
• Majority of funding targeted to complete PoC work on BOF filter cake.
Funding to Support the Business
7
• EVAP redesigned
• Suitable vessel for pyro and pre-reduction constructed
• Ancillary pipework and pumps installed
• PoC testwork program undertaken Oct-Nov 2019
• Process was proven technically
• Partnership with steel company to complete analysis.
• Contract with CSIRO to complete stage 4 (EIF melt tests) and report on results
• Target additional work to commercialisation in early 2020
PoC test work at Newcastle
8
9
PoC testwork (Nov 2019)
EVAP
10
PoC testwork (Nov 2019)PYRO Fluid
Bed Roaster
11
PoC testwork - ProductsIron Chloride
after EVAPIron oxide
after PYRO
Pre-reduced
pellets
12
PoC testwork - Products
FeCl2 pelletsBOF Filter cake Pyro Pellets Pre-reduced
pellets
• 5 x magnification
• Distance between lines is 1 mm
Zn supply and demand
13
High Purity Pig Iron
• HPPI used exclusively in Mass Iron production
• 15,000 tonnes per year imported into Australia
• 30% higher value than standard pig iron
• Demand is increasing
14
Australian Import stats (2008 – 2018)
Note source ABS statistics 2008 - 2018
15
Pig iron import pricing (SA 2008 – 2018)
Note source ABS statistics 2008 - 2018
16
• Assess results from CSIRO work
• Develop ongoing program to verify commercial application
• Engage with Steel Mill partners
• Advance project to commercialisation
Forward Plan
17
Base Metals/Gold Exploration
at
Nhill, Western Victoria
Mike SmithG.M. Exploration
18
Austpac’s drillhole GG-01 intersected encouraging zinc and gold values (up to 3.6% Zn and up to 0.6 g/t Au).
DDH GG-01 EL 5291
19
Detailed gravity & magnetic surveys have indicated two massive sulphide targets
Zinc Gold Iron Sulphur Silica
20
Two Targets
Plan view
of proposed
drill targets
GG-02
and
GG-03
21
Collar of DDH GG-02
1122
Detailed gravity & magnetic surveys have delineated two massive sulphide targets
DDH GG-02 - Sampling
1123
• Add to ground geophysical coverage
• Refine drilling methodology
• Drill best target in March/April 2020
Drilling in 2020
24