company profile€¦ · • for client management information system a qa report on each project is...
TRANSCRIPT
![Page 1: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/1.jpg)
COMPANY PROFILE
BIM & GRAFX INTEGRATED STUDIO PVT. LTD.
COMPANY PROFILE
BIM AND GRAFXENGINEERING ARCHITECTURAL SERVICES
2019/Ver11
BIM & GRAFX INTEGRATED STUDIO LLC.
![Page 2: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/2.jpg)
Company Timeline
![Page 3: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/3.jpg)
About UsWho Are We ?
Our StudioOur space in Manjeera Trinity Corporate, Kukatpally aprime loc ation of Hyderabad with around 80 work stationswith dedicated conference hall and a meeting room. A cozyand decent breakout zone which makes a difference.Manjeera Trinity Corporate is a repository of all that makesfor an efficient work space.
Manjeera Trinity Corporate is a repository of all that makesfor an efficient work space. Cutting-edge amenities andwell-planned areas for recreation and social interactioncontribute to a stress-free ambience and greaterproductivity, enhancing tremendously, the quality of timespent.
Inception of BIMgraFX by Mr. Bhanu Sri Prakash inFebruary 2017 is a collaborative effort that has got itsjourney started way back in the year 1997 with theformulation of Samhita Group in Hyderabad . Samhita hasgrown from strength to strength in due course of timebecause of its commitment and with a strong abilities indomains of Software Sales, Training, Visualizations andResearch & development departments.
The group got a defining moment after Bhanu took chargeof it as a full time business from July 2017. As DesignIntegrated, Dubai would like to focus on consulting overBIM outsourcing. BIMgraFX acquired Design Integrated BIMservices division with all the existing work force andleadership team.
Why BIMgraFX ?BIMgraFX facilitates enhanced production capability for large projects. This collaborative design Support firm comprises a 70 member BIM expert team that boasts ofhigh caliber, proven track-record, commitment, motivation,and rich experience in the Gulf region as its hallmark.
BIMgraFX is also an authorized Autodesk BIM trainingprovider and actively participates in BIM implementationand conducts BIM awareness programs across India with amission of raising the BIM professionals to the globallygrowing BIM industry. We are the first V-Ray AuthorizedTraining Center (VTC) in south India .
Professionals We Serve We offer comprehensive solutions to the whole spectrum ofprofessionals spanning AEC Industry, ManufacturingIndustry, Real Estate Developers, Interior Designers andMedia & Entertainment who have been gaining competitiveedge in their respective industries across the globe.
Our Team Our professionals comprising of Architects & Engineers,Modelers, Drafters, 3D/Multimedia Artists and ProjectManagement Professionals across Architectural, Civil andMechanical fields with national, international experienceand have relentlessly striven for customer satisfaction anddelight. Who are testimonies to our time, cost and qualityeffective services since 1997.
![Page 4: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/4.jpg)
BIMgraFX Studio & Academy, Hyderabad, India
• 70 BIM Production Team• 10 Admin | Management• Open office • Break out Area• Well secured Office premises • CC TV Monitored
BIMgraFX Studio, Dubai, UAE
![Page 5: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/5.jpg)
IT Infrastructure
DELL Server DELL ServerAD Server & Central Server Backup ServerSERVER
NETWORK
Leased Line InternetFirewall
Switches Network Cables
DataBackup
GroupPolicy
Daily, Weekly &Monthly
MirrorRAID
For Malware &Virus
USBBlocking
DATA SECURITY
FirewallDell (7040) Revit
WorkstationsGraphic
Workstations
WORKSTATIONS
VR Workstations HTCViveMSI(GS74R)
HP(420)
Quality ManagementQuality Objectives Quality Assurance Quality Control
Data CollaborationAll process and systems are reviewed and updated periodically with both parties adopting a common data environment (CDE)which helps them in
• Reducing the time and effort required to check.• Extracting selections of the latest approved data from the shared area• Reducing coordination checks• Document review process,• CDE environment in case of Revit server arrangement is not available.• BIM360 cloud based documentation and reporting documentation at additional price.
Client CommunicationsIf Client requires we can implement
• Blue Beam PDF adoption across the studio would help us to track follow-ups and update the day to day client comments. • BIMgraFX research team involved in BIM implementation which makes as a huge difference and their involvement in QA/QC makes a
humongous difference in project timely deliveries. • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow teams to plan, execute, control and achieve specified goals and meet specific success criteria.
Team Exchange• For direct interaction one full time resource from our end at Client office. • Coordination and Making process as a paramount with strong NDA (Non Disclose Agreement) policies. • Day to day client communications with team leads • Weekly data transfer • Monthly status report • Half yearly face to face meetings or team lead exchange to offices at a shared expense basis with the client. • Daily time sheets log in access can be provided at request • Foresight – Collaboration will be successful if parties approach it with an eye towards future technologies and opportunities
to work together.
![Page 6: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/6.jpg)
Organization Chart
UAE
INDI
A
USA
Venk
atara
mana
SDi
recto
r of P
rojec
ts
Satis
hSr
. BIM
Coor
dinato
r (M
EP)
Mah
esh
Sr. B
IM Co
ordin
ator (
MEP
)
Rajku
mar
BIM –
Coor
dinato
r (M
EP)
Rush
iBIM
–Co
ordin
ator (
MEP
)
Avina
shBIM
-En
ginee
rPr
avee
nBIM
-En
ginee
rPr
asan
thBIM
-En
ginee
r
Dilee
p MAs
socia
te -A
rchite
ct
Ajay
Sr.Pr
oject
Arch
itect
Raju
Sr.Pr
oject
Arch
itect
Biswa
jitAr
chite
ct
Subb
a Red
dyBIM
–En
ginee
r AEC
S Kum
arSr
.BIM
-En
ginee
r AEC
Faizu
r Reh
man
BIM –
Engin
eer A
EC
Deer
ajBIM
–En
ginee
r AEC
Asho
kBIM
–En
ginee
r AEC
Venn
u Vais
hnav
iAr
chite
ct
Krish
na Pr
asad
BIM –
Coor
dinato
r (M
EP)
Yuge
nder
BIM En
ginee
r AEC
Mou
nika
BIM -
Engin
eer
Pras
hanth
Naik
BIM –
Engin
eer A
ECCh
andr
a sek
har
BIM -
Engin
eer
Tejas
wi Re
ddy
BIM –
Engin
eer A
EC
Jahna
viBIM
–En
ginee
r AEC
Ravi
Teja
BIM –
Engin
eer A
EC
Yash
pal
BIM –
Engin
eer A
EC
Man
ishBIM
-En
ginee
r
Bhan
u Sri
Prak
ash G
ejjala
Man
aging
Dire
ctor
Teja
BSr
. Pro
ject A
rchite
ct
Ramy
aAr
chite
ct
Leela
vathi
BIM –
Engin
eer A
EC
Khas
imBIM
–En
ginee
r AEC
Shail
esh
Sr.Te
chnic
ian –
Revit
/ Gra
phics
Jeeva
nBIM
–En
ginee
r AEC
Bhar
athBIM
-En
ginee
rAja
yBIM
-En
ginee
rM
ahipa
lBIM
-En
ginee
r
Chan
dras
ekha
rBIM
–En
ginee
r AEC
Siddh
arth
BIM –
Engin
eer A
ECSn
ehaja
BIM –
Engin
eer A
EC
Samb
aBIM
–En
ginee
r AEC
Kisha
nBIM
-En
ginee
r AEC
Saiku
mar
BIM -
Engin
eer
Jaya K
Asso
ciate
–QA
QC /
BIM
Md.
Vaze
erAr
chite
ct
Venk
atara
mana
SDi
recto
r of P
rojec
ts
Hari
kiran
Sr. B
IM Co
ordin
ator (
MEP
)Sa
i Jaga
dish
Sr.BI
M –
Coor
dinato
r (M
EP)
Raju
MEP
-Inte
rnAy
yapp
aM
EP -In
tern
Srini
vas
MEP
–Int
ern
Arun
kuma
rBIM
-En
ginee
r
Naga
rjuna
BIM –
Coor
dinato
r (M
EP)
Laks
hmika
nthBIM
–Co
ordin
ator (
MEP
)Sa
i Kris
hna
BIM –
Coor
dinato
r (M
EP)
Venk
atesh
BIM -
Engin
eer
Was
if Gho
uri
BIM -
Engin
eer
Rajes
hBIM
-En
ginee
r
Rajas
ekha
r Sr
. Coo
rdina
tor –
Imple
menta
tion
BIM &
Digit
al Te
chno
logy
Avina
shEn
ginee
r –Im
pleme
ntatio
nBIM
& Di
gital
Tech
nolog
y
Vishn
umur
thyEn
ginee
r –Im
pleme
ntatio
nBIM
& Di
gital
Tech
nolog
y
Tush
arCo
ordin
ator –
Imple
menta
tion
BIM &
Digit
al Te
chno
logy
Pard
ha Sa
iInt
ern –
Imple
menta
tion
BIM &
Digit
al Te
chno
logy
Janan
iInt
ern –
Imple
menta
tion
BIM &
Digit
al Te
chno
logy
Sudh
eer. D
Dire
ctor o
f Ope
ratio
ns &
Admi
n
Srini
vasa
Chak
rava
rthy M
ocha
rlaDi
recto
rUd
aya R
Vara
nasi
Dire
ctor &
Princ
ipal A
rchite
ct
Nare
sh Ku
mar M
urala
Asso
ciate
-B.D
(Nati
onal)
Vijay
Sing
ineed
iAs
socia
te -B
.D (I
ntern
ation
al)Ra
vikum
ar Ve
gulla
Asso
ciate
-Gra
phics
Radh
ikaG
Asso
ciate
Partn
er -A
ccoun
ts
Jyothi
Acco
untan
tKa
vitha
H.R E
xecu
tive
Nikh
ilB.D
. Exe
cutiv
e
Siva R
ama S
arma
3D Ar
tist
Reen
aRe
cruitm
ent/ P
lacem
ent
Exec
utive
Suma
latha
Coun
sello
r
Kisho
reIT
Admi
nistra
tor
Souh
asi
BIM –
Engin
eer A
EC
Lava
nya
Sr.BI
M –
Engin
eer A
EC
Gopi
BIM –
Engin
eer
Venk
atesh
BIM –
Engin
eer A
EC
Kalya
n Cha
karva
rthyG
udla
Dire
ctor
Rama
Kanth
Sr.Pr
oject
Arch
itect
![Page 7: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/7.jpg)
Sr. Management ProfilesBhanu Sri Prakash Gejjala, Director
Bhanu is an Architect / BIM & Sustainability expert over a span of 25 years professionalexperience, worked on a diverse range of building projects in India, Bahrain, Qatar and the UAElike RSP, GHD, Callison, Aedas, Woods Bagot, RTKL, HOK while employed in MSCEB, Bahrain.Integrated Project Delivery (IPD) expert, Bhanu has been a BIM evangelist, practiced &Implemented BIM process for better project delivery.
Srinivasa Chakravarthy Mocharla, Director
Chakri is a seasoned professional with experience and exposure to Architecture, Exhibition &Interior design, Information Technology and Info Security. Real estate is a relationship-basedbusiness, and he strives to create client relationships built on trust and confidence with hispassion for real estate, and rich experience in Technology & financial services background.
Udaya R Varanasi, Technical Director/Principal Architect
Skillful and prolific designer with 15+ years experience in space and community planning andproject management. Extensive knowledge of fundamental principles of architecture anddesign. Transformational leader with profound sensitivity to a variety of cultures; excellent oraland written communicational skills.
Venkata Ramana S, Director of Projects
Venkata Ramana is Mechanical Engineering Graduate with Specialization in ProductionEngineering, with over 22 years of experience in various segments of Industry. Majorresponsibilities in Mechanical Services for the building Industry, MEP Design and Design co-ordination, BIM concepts Training and Implementation. Implementing the CAD and BIMStandards as per the need of the project.
Sudheer D, Director OperationsSudheer is a Civil Engineer with over 23 Years of professional experience in various positionsfrom Trainee Engineer to Senior Engineer and executed civil construction works. Later switchedto Business Management, where involved mostly in software solutions to engineering segmentand Architectural segment, Software Training and numerous Architectural Visualizations works.
Kalyan Chakravarthy Gudla, Director
Kalyan brings the best of the worlds of architecture and construction, being an Architect fromAndhra University and complimenting that with a master’s in building constructionmanagement from Michigan State University. He has associated with highly ranked firms suchas HOK and Jacobs in his professional career, He has over 20 years of Program Managementexperience with mainly concentrating on Construction Management and Project controls Hishas been instrumental in delivering the major programs in USA, UAE, KSA and India, with focuson Aviation, Healthcare, Commercial Buildings, Institutional and Smart Industrial Citiesconstruction sectors.
![Page 8: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/8.jpg)
Architectural BIM:• Our goal is to provide imaginative architectural solutions within the economic and developmental constraints of all clients with
the innovative use of today’s most advanced technologies.• The firm believes that all projects benefits from an integrated process involving client, architect, builder and other specialists
in an informative collaboration• We work with our clients through the design process from schematic design to design development and construction
documentation and responsible for complete BIM modeling.
Parametrical BIM:BIMgraFX is now looking for a promising start in the areas of sculpt geometries utilizing the skill set in the areas of Dynamo, Rhino & Grasshopper. Parametric Design Services • Complex facade modeling and resolving. • Developing complex design forms and algorithms. • Consulting for designs of non-uniform Facade, roofs or any
building components.
Structural BIM:• We provides definitive Structural Building Information Modeling services by competently handling large scale infrastructure
projects.• Our BIM structural models facilitate all-inclusive design analysis and review thus augments flexibility in engineering
management.• We take BIM structural modeling a step further by combining it with advanced design and analysis capabilities, to provide
superior 3D analysis, uncovering cost savings,and ensuring safer designs.• We provide to you is inclusive of the key components like column, beams, bolts and the Revit structural details right to the last
bolt.
MEP BIM:• MEP BIM advantages for Consultants, contractors, Clients and facility management. • We will provide BIM coordination for MEP services. • We will generate the models from concept stage to design development, shop drawings, as built models. • Value engineering for MEP services( sizing, re routing with reference NFPA, UPC, ASHRAE standards ).
• Solar Shading Analysis. • Light weight semi open structures
3D Modeling• Existing Condition models
• Laser Scanning • Animations , renderings walk-throughs • BIM driven prefabrication
4D Scheduling• Project Phasing Simulations • Lean scheduling
• Detailed Simulation Installation • Visual Validation for payment Approval
5D Estimating• Real time conceptual modeling and cost planning • Quantity extraction to support detailed cost estimates •Structural Steel , Rebar , Mechanical/ Plumbing & Electrical
• Value engineering • What if scenarios , Visualizations & Quantity Extraction • Prefabrication solutions • Equipment rooms, MEP systems , Multi - Trade prefabrication & Unique arch and str elements.
BIM in Construction:
![Page 9: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/9.jpg)
As an Autodesk BIM Authorized Training Center, we offer a wide range of instructor-led and in-house training in Architecture andEngineering technologies and project applications. Our Certified Training experts combine a broad range of technologies with the bestpractices to help our clients fully adopt BIM Technologies.
Training
• Validate your skills and join an elite team of Autodesk Certified professionals.• Display your Autodesk Certified certificate, use the Autodesk Certified logo, highlight your
achievement and get noticed by listing your name in the Autodesk Certified Professionalsdatabase.
We are also having Authorized SketchUp training Center withcertified trainers. Trimble has recognized us as professional Centerfor further. We offer comprehensive training to the students /working professionals from various backgrounds such asArchitecture, Interior Designer, Multimedia and Graphic Designer.
Architecture Structure MEP
BIM/ Digital PracticeThe Implementation of BIM can have a large impact on the operations of your organization and you’ll define your organizationalBIM vision, including goals, objectives, and alignment with your overall organizational vision. We include one pilot project as apart of our implementation program to make sure the professionals are well equipped with the tool. We provide services to “ Gaina competitive edge and grow your business”.• BIM Consulting & implementation services• Firm wide BIM policy and implementation guidelines
(Integrated Project Delivery)• Project wise BIM implementation• BIM & CAD manual for company• Setting up QA/QC standards• Revit customized content development - families,
templates• Change Management Strategy
• Software & Hardware consulting with ROI (Return on investment)
• Staff Augmentation & Recruitment Improved communication and collaboration among all project team members.
• Fewer problems related to overruns in cost, schedule, and scope, or quality concerns.
• The ability to more reliably deliver projects faster, more economically, and with less environmental impact
BIM & CAD ManagementCAD Management for ClientsIn the process the development of any CAD standards should be viewed in three stages.• Meta stage• Development stage• Execution stage
![Page 10: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/10.jpg)
Graphics & Virtual Reality We harness the creativity, diversity and imagination of our skill set while ensuring that the technology we create and enhance continually sets industry standards and drives innovation across the content value chain. Our unrivalled teams of creative talent and acclaimed experts create and deliver customer requirements to their expectations.
Visualization and Rendering
• Photo-realistic architectural rendering (interior and exterior)
• Pre-recorded as well as Live (interactive) building walk through
• 360° panoramic rendering.
• Project 360° Virtual Tour (Using Head Mounted Devices)· • Product Rendering and Demonstration· • Object 360° view
Virtual RealityFrom the creation of animated content, the visual and aural wonder of post-production, Virtual Reality we setindustry standards for excellence.
• Experience the design in virtual reality • Explore your model’s interior and exterior. • Adjust the materials to add bump maps and transparent or reflective effects. • Add a Sun light with shadows and ensure even lighting • Improve interior lighting with additional lights
Visualization
![Page 11: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/11.jpg)
Project Name MEP Contractor Project Type Location Stage Area
DHE Mall AE Arma-Elektropanc, UAE Mall UAE Construction Stage 186,000 Sq m.
Scope :• BIM LOD 400• Lower Ground Floor, Ground Floor, First Floor• LGF – Parking• GF, FF, Tenant Areas• Coordination between all MEP services along with Structure
and Architecture• Developing of Shop Drawings
Project Brief :Mall is the latest addition to the premier lifestyle destination inUAE. The mall complements the destinations high-end residential,commercial and office spaces, chic hospitality offerings, enrichingleisure facilities and its prestigious golf fairways. The architectureand interiors take inspiration from the concept of a centralcourtyard with a series of interconnected streetscapes. Theangular layout provides easy orientation and a clear focus on thecentral space for events and special features
Projects
![Page 12: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/12.jpg)
Project Name Lead Consultant Project Type Location Stage Area
Expo Mosque ACE, UAE Religious UAE Concept 5,050 Sq m.
Scope :• LOD 300 BIM model for Architectural, Structural and MEP
Services based on EXPO-2020 guidelines along with alldiscipline
• Solibri model check • Integration of COBIE data to the elements• Master Spec• BOQ (limited to master spec based elements and standard
output from Naviswork)
Project Brief :The design is a modern interpretation of Islamic Architecture. Theshell was formed with a series of different leveled concreteframes with a glass facade at the bottom of the roof for lighting.Viewing from the front elevation these frames maintain the slopeof ascending to descending order. Stepped glass wall was givenfor the Front and Rear Facade The interior can be experienced asa single space with a height of 12m
Projects
![Page 13: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/13.jpg)
Project Name Owner Project Type Location Stage Area
Pinnacle Tower White Lotus Group, Nirobi
Hospitality/Commercial
Nairobi Pre Construction 140,000 Sq m.
Scope :• Firm wide BIM policy and implementation guidelines
(Integrated Project Delivery) • Project wise BIM implementation • BIM & CAD manual for company • Setting up QA/QC standards • Revit customized content development - families, templates
Project Brief :The proposed development comprises of two high rise buildings(300m 67-story office tower and 201m 40-story hotel) with aretail podium over four floors car parking. When completed in2018, Nairobi Towers will be the tallest building in Africa. Oncecomplete, this record-breaking mixed use development willinclude Grade A offices, a 5-star Hilton hotel, plus a luxury retailand entertainment complex. Standing over 300 meters high with67 storey, the tower is designed to represent ‘the height ofAfrican achievement.
Projects
![Page 14: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/14.jpg)
Project Name Owner Project Type Location Stage Area
Manjeera Trinity Corporate
MRHPL,Hyderabad
Commercial Hyderabad, India Construction 100,000 Sq m.
Scope :• BIM LOD-400 and Services Integration• Architecture, Structure and MEP• BIM Clash Detection• BOQ’s from BIM Model• As-Built Model• Visualization
Project Brief :Corporate spaces start from 2,300 sft. And go up to 55,000 sft., inindependent and customized office modules.Cutting edge amenities, and well-planned areas for recreationand social interaction contribute to a stress-free ambience andgreater productivity enhancing tremendously, the quality of timespent.Its masterly blend of functional and aesthetic excellence, makesManjeera trinity Spread across 900,000 sft.
Projects
![Page 15: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/15.jpg)
Project Name MEP Contractor Project Type Location Stage Area
Nakheel Mall Al-Arabia, Dubai Mall Dubai Pre Construction 418,181 Sq m.
Scope :• BIM LOD400 • Clash Detection through Naviswork • Clash Resolution • Reporting • CSD Extraction • LOD 500 as built drawings
Project Brief :The project consists for 3 Level Shopping/ Retail area & MEPMezzanine ( Approx BUA: 147,750 SQM) Roof plaza /CrystalMezzanine ( Approx BUA: 42,800 SQM)
Projects
![Page 16: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/16.jpg)
Project Name Lead Consultants Project Type Location Stage Area
Palm Tower RSP. Dubai Hospitality UAE Design/Architectural Support 90,808 Sq m.
Scope :• BIM LOD300• Design Development• Documentation for Authorities• Submission IFC/Tender Set through BIM
Project Brief :Project is an impressive 52 storey hotel and residential complex.The Project comprises 502 luxury residences and a five-star, 290room hotel with an array of dining and leisure facilities, includinga rooftop infinity pool, restaurant and viewing deck.
The Project comprise fully-furnished studios and one, two andthree bedroom apartments with uninterrupted, panoramic viewsof Palm Jumeirah, the Arabian Gulf and the Dubai skyline.Residents and guests will enjoy direct access to iconic landmarksin U.A.E.
Projects
![Page 17: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/17.jpg)
Project Name Lead Consultant Project Type Location Stage Area
DHE Business Park 1
RSP, Dubai Office Building UAE Design/ArchitecturalSupport
Approx 1,40,000Sq m.
Scope :• BIM LOD 300• Clash Detection through Naviswork• Schematic to IFC
Project Brief :Project is situated in the neighborhood of Dubai, UAE. With Built-up area of 1,50,000 sq. mts , Project comprises of CorporateOffice & Retail areas. Four office buildings are 7 storied + Groundlevel with 6 floors of parking provided in a separate building.One of the first in Dubai to comply with the new buildingsustainability performance ratings. The design of towerincorporates an advanced design approach in-terms ofsustainability, energy saving, intelligence in to the local context,and creates a space which is trans-parent, modern & dignified.
Projects
![Page 18: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/18.jpg)
Project Name Lead Consultant Project Type Location Stage Area
Rove Satwa Arch GroupInternational
Hospitality UAE Design/ArchitecturalSupport
109,808 Sq m.
Scope :• BIM LOD 300• Schematic Submission
Project Brief :An elegantly designed two-tower development, will feature twodedicated towers one for the 480-room hotel. The Project locatedcentrally in the neighborhood with direct links through a walkwayto the Dubai International Convention Centre and DubaiInternational Financial Centre, also marks the introduction of thefirst serviced residences.
Projects
![Page 19: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/19.jpg)
Project Name MEP Consultant Project Type Location Stage Area
PHS BIM Project
SPEC, Dubai Health Care India Construction/ MEP Support
23,226 Sq m.
Scope :• BIM LOD-400 and SERVICES INTEGRATION• MEP• BIM Clash Detection
Project Brief :Project is a modular hospital, first of its kind in India. The 500 bedhospital is being constructed in two stages, each around 250beds. The architecture is simple and modern. It is derived by acontemporary elegance with straight simple lines.Symmetrical design & placement of windows are also directreflection of the minimal and simple plans within. The buildingwas designed keeping in mind the functionality as it is veryimportant in public buildings. Planned to have the pre fabricatedModule with all MEP services of each 6m length of corridor.Incorporating BIM
Projects
![Page 20: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/20.jpg)
Project Name Lead Consultant Project Type Location Stage Area
Rove Theme Park
Arch Group International Hospitality UAE Design Development/ MEP Support
60,000 Sq m.
Scope :• The development of the project Basement & 7levels of hotel building• Scope: LOD 300
Project Brief :The development of the project Basement, Ground G+7 storeyHotel building.The Hotel building designed with 552 Guest rooms, servicesareas.
Projects
![Page 21: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/21.jpg)
Project Name Contractor Project Type Location Stage Area
Modular Data Center
Nebula3dservice, Bangalore
Commercial USA Pre-Construction 140 Sq m.
Scope :• BIM LOD-350• Quantification through Navisworks
Project Brief :Developed the model as per American standards. Learnt newthings like connection details of I-channels, wall standards inroof. Learnt working on separated wall layers which ends atdifferent locations with tube steel column in between and learntworking on mullion details.The development of project in Ground Level, with heavystructural connection/fabrication, and quantification of thedeveloped element categories through Navisworks.
Projects
![Page 22: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/22.jpg)
Project Name Lead Consultant Project Type Location Stage Area
Corniche Towers Arch Group International
Commercial/ Residential
UAE Design / MEP Support 180,000 Sq m.
Scope :• BIM LOD-300• MEP BIM Clash Detection• Service Co-ordination• The development of the project basement 4 levels,podium 4
levels and G+54 floors,• 2 buildings are residential, comprising of high end 1bhk,2bhk,
3bhk apartments.
Project Brief :The development of the project Basement 4 levels, P and G+54storey 2 Buildings residential project in the Opera District,Downtown Dubai. Project is the final residential project in theOpera District masterplan.
Projects
![Page 23: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/23.jpg)
Project Name Lead Consultant Project Type Location Stage Area
ACT Towers Arch Group International Commercial/ Residential
UAE Design / MEP Support 160,000 Sq m.
Scope :• BIM LOD-300• MEP BIM Clash Detection• Service Co-ordination• The development of the project basement 4 levels, podium 4
levels, and G+30 floors, 3 buildings are residential, comprising of high end 1bhk,2bhk,3bhk apartments.
Project Brief :Project consists of 1, 2, and 3 bedroom luxury apartments, themajority of which will overlook the Opera house, the Burj Khalifaand potentially the Fountains at Dubai Mall.
Projects
![Page 24: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/24.jpg)
Project Name Main Contractor Project Type Location Stage Area
SecondaryTechnical School
IVRCL,India Industrial UAE Construction Approx 1,00,000Sq m.
Scope :• BIM LOD-400 and Services Integration• Architecture, Structure• BIM Clash Detection
Project Brief :The project was procured after the design stage, IFC drawingswere provided to us to develop shop drawings. Team consisted of4 members.The Project reflects the sincere interest of the wise leadership ofthe UAE in education for all of its citizens. It also reflects that thestate needs national youth trained in the technical, vocational andtechnological fields.
Projects
![Page 25: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/25.jpg)
Visualization ProjectsVirtual Reality
![Page 26: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/26.jpg)
Visualization ProjectsInteriors
![Page 27: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/27.jpg)
Visualization ProjectsExteriors
![Page 28: COMPANY PROFILE€¦ · • For client management information system a QA report on each project is issued to concerned clients every month. • BIMgraFX process and procedures allow](https://reader034.vdocuments.us/reader034/viewer/2022042206/5ea81ec8b5e2d35269650fe2/html5/thumbnails/28.jpg)
2019/08/03 | Ver11