Community Unit School District No. 205 Knox and Warren Counties, Galesburg, Illinois Architect RFQ

Upload: vumien

Post on 26-Mar-2018

221 views

Category:

Documents


3 download

TRANSCRIPT

Community Unit School District No. 205 Knox and Warren Counties, Galesburg, Illinois

Architect RFQ

January 10, 2010

Paulette Earp, Purchasing AgentCUSD 205, Knox & Warren County932 Harrison StreetGalesburg, IL 61401

RE: R5New ARCHITECT RFQ

Dear Ms. Earp:

Fanning Howey is pleased to confirm our interest in providing architecture and engineering services for the design of your R5New-Phase I projects. You have our entire team's personal commitment that we will work hard to exceed your expectations in every aspect of our relationship.

As the Project Executive for this project, I want to assure you that our goal is to deliver excellent facilities on time and on budget, while also creating a quality environment that will make a significant contribution to your students and staff.

Why Fanning Howey?Throughout our 50-year history, we have focused on the planning and design of functional schools that reflect each district's unique educational approach. This is why we are excited about creating learning environments that help students reach higher levels of achievement and allow teachers to deliver the curriculum in the most effective manner possible.

How Can We Help? Historical Context and Fabric – Fanning Howey has provided progressive 21st century learning environments

through renovations and additions that respect and celebrate the history and traditions of each school site.

Top-Notch Teamwork – We have enlisted the help of the Peoria-based Farnsworth Group for engineering and landscape architecture services, the Galesburg-based civil engineering firm, Bruner, Cooper & Zuck, and the Galesburg-based construction firm Johnson Building Systems - ensuring significant local participation and responsiveness.

A Collaborative Approach – We will engage your district in a collaborative approach to determine the best design and construction phasing plan for your projects. We know that creating great learning environments is the ultimate goal.

Our entire team is committed to your success, and I will be your primary contact for the duration of this project to ensure consistency and the delivery of schools that are on time and on budget. We look forward to the opportunity to personally discuss our qualifications with you.

Sincerely,

FANNING HOWEY

William E. Payne, AIA, LEED AP BD+CProject Executive / Principal

A RC H I T E C T U R E A RC H I T E C T U R E || E N G I N E E R I N G E N G I N E E R I N G

9025 North River Road | Suite 200 | Indianapolis, IN 46240

317.848.09663317.848.09663 | fax 317.848.0843 | www.fhai.comwww.fhai.com

Sincncn erelelly,y,y,,,,,,,,,,,y,,,y,,,,yy,y,,,y,,,y,,y,,,yy,,,yyy,y,,yyyy,yyyyyyyyyyyyyyy

FANNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNIIININININININININNININNIINININININIINININNINIINNNNIINIINNINIINNNIINIINIIIIIINIIININIIIIINNINININININININIIININIIIIIINIIIIININIIIININIIIINNNNIIIIINNNIIIINNNNNNIIIINNNNNNNIIIINNNNNIINNNNNNINNNNNINNINNNNNINNNINNNINNNINNG GGGGGGGGGGGGGGGG HOHHHHHHHHHHHHHHHHHH WEY

WiWiiiiWiWiWiiWiiiWiiWiiWiiiiWiiiiiiiiWiiiWiiiiiiiiiiiiiiiiiWiWiiiiiiiiiiiWiiWiiWiiiiWWiiiWiWilllll iam m E.E Payynene, , AIAIAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA A, LPrrrrrrrrPrrPrrrrrrrrrrPrrrrrPrrrrrrrrrrrrrrrrrrrPrrPrrPrPrProject Executive / PrPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP innc

Fanning Howey 3

table ofcontents

firm profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

proposed team . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

primary/secondary educational experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

geothermal/geoexchange and alternative energy experience . . . . . . . . . . . . . . . . . . 45

other relevant experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

Fanning Howey 5

firmprofile

Legal Name of Firm.Fanning/Howey Associates, Inc.

exhibit 1

Location of the firm's principal office within which the work will be managed. 9025 N. River Road, Suite 200Indianapolis, IN 46240Phone: 800.452.3573Fax: 317.848.0843Contact: William E. Payne, AIA, LEED AP BD+C – Project Executive / Principal

Location of the firm's other offices, if any, within which portions of the work will be performed.More than 65% of the project work will be accomplished in Galesburg and Peoria. This represents our Associate and Consultant Team Members' efforts and our commitment to using their office locations for a significant portion of our management activities.

Number of years in business under current legal name.35

List previous legal names and years in business. Auferoth & Fanning, 1950Fanning & Gebhart, 1956Ralph Fanning & Associates, 1959Ron Fanning and Clair Howey assume leadership of the firm, 1961Mitchell & Fanning, 1963Fanning & Howey, 1967Fanning & Howey, Inc., 1970Fanning/Howey Associates, Inc., 1976

Type of organization.Corporation

Within this organization, are there any entities that are Professional Service Corporations?No

Fanning Howey6

Number of full time employees at firm's principal office and other offices.

discipline # staff # LEED AParchitectural staff 12 7

Registered Architects 9 7

Registered Landscape Architects 1 0

Intern Architects 2 0

engineering staff 17 7

Registered Structural Engineers 1 0

Structural Designers 2 0

Structural Technicians 1 0

Registered Electrical Engineers 1 1

Electrical Designers 3 1

Electrical Technicians 1 0

Registered Mechanical Engineers 3 3

Mechanical/Plumbing Designers 3 1

Mechanical/Plumbing Technicians 2 1

other technical project staff 17 2

Project Coordinators 5 0

Technology Designers 5 0

Interior Designers 3 2

Construction Administrators 4 0

administrative staff 14 0

Human Resource Personnel 2 0

Marketing/PR Personnel 6 0

Administrative/Clerical Personnel 4 0

Construction/Clerical Personnel 1 0

Information Services Personnel 1 0

indianapolis office total 60 16firm-wide total 235 61

Fanning Howey 7

Number of Illinois Licensed Personnel within each A/E discipline offered.

exhibit 2

disciplineprincipal

officeother Fanning Howey offices

Farnsworth Group

Bruner, Cooper & Zuck

Architecture 2 7 4

Structural Engineering 1 0 3 1

Mechanical Engineering0 1

0 (1 Licensed Plumber)

Electrical Engineering 0 0 1

Civil Engineering 0 0 9 5

Landscape Architect 0 0 2

Interior Design 0 0 2

Security/Technology 0 0 1

Technical Support Staff31

3 Professional Land Surveyors

LEED 16 45 21

Sustainable Design 46 132 41

Educational Facilities Programming 1 10 6

Fanning Howey 9

List the firm's general and special areas of practice. Include the percentage of work for practice areas, and dollar fee volumes of total work within last five years.

exhibit 4

Fanning Howey has focused on K-12 school design for the past 50 years, designing more than 700 projects worth nearly $5 billion in construction costs over the past five years.

practice area % of work fee volumeEducational Facilities 97% $180 M

Civic Facilities 3% $5.7 M(including libraries, community centers, and recreational facilities)

Fanning Howey 11

Provide a copy of the firm’s financial statement, for the past three years.

exhibit 5

Please see the enclosed envelope marked "Confidential."

Fanning Howey 13

Indicate the levels of professional liability and general liability insurance coverage carried by the firm. Please use industry-standard Acord form for this information.

exhibit 6

professional liability insurance

CERTIFICATE HOLDER

© 1988-2009 ACORD CORPORATION. All rights reserved.ACORD 25 (2009/09)

AUTHORIZED REPRESENTATIVE

CANCELLATION

DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE

LOCJECTPRO-POLICY

GEN'L AGGREGATE LIMIT APPLIES PER:

OCCURCLAIMS-MADE

COMMERCIAL GENERAL LIABILITY

GENERAL LIABILITY

PREMISES (Ea occurrence) $DAMAGE TO RENTEDEACH OCCURRENCE $

MED EXP (Any one person) $

PERSONAL & ADV INJURY $

GENERAL AGGREGATE $

PRODUCTS - COMP/OP AGG $

$RETENTION

DEDUCTIBLE

CLAIMS-MADE

OCCUR

$

$

AGGREGATE $

EACH OCCURRENCE $UMBRELLA LIAB

EXCESS LIAB

DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required)

INSRLTR TYPE OF INSURANCE POLICY NUMBER

POLICY EFF(MM/DD/YYYY)

POLICY EXP(MM/DD/YYYY) LIMITS

WC STATU-TORY LIMITS

OTH-ER

E.L. EACH ACCIDENT

E.L. DISEASE - EA EMPLOYEE

E.L. DISEASE - POLICY LIMIT

$

$

$

ANY PROPRIETOR/PARTNER/EXECUTIVE

If yes, describe underDESCRIPTION OF OPERATIONS below

(Mandatory in NH)OFFICER/MEMBER EXCLUDED?

WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY Y / N

AUTOMOBILE LIABILITY

ANY AUTO

ALL OWNED AUTOS

SCHEDULED AUTOS

HIRED AUTOS

NON-OWNED AUTOS

$

COMBINED SINGLE LIMIT(Ea accident)

BODILY INJURY (Per person)

BODILY INJURY (Per accident)

PROPERTY DAMAGE(Per accident) $

$

$

$

INSRADDL

WVDSUBR

N / A

$

$

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THISCERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIESBELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZEDREPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject tothe terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to thecertificate holder in lieu of such endorsement(s).

The ACORD name and logo are registered marks of ACORD

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

INSURED

PHONE(A/C, No, Ext):

PRODUCER

PRODUCERCUSTOMER ID #:

ADDRESS:E-MAIL

FAX(A/C, No):

CONTACTNAME:

NAIC #

INSURER A :

INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

INSURER(S) AFFORDING COVERAGE

7/27/2010

Patricia CholewaSelvaggio, Teske & Associates3401 Enterprise Parkway, Suite 101Beachwood OH 44122

216-839-2807 [email protected]

FANNI-1

XL Specialty Insurance Co. 37885Fanning/Howey Associates Inc.9025 North River RoadSuite 200Indianapolis IN 46240

1956751999THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICYPERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TOWHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECTTO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

A Professional LiabilityClaims MadeRetro Date: 1/1/1950

N Y DPR9686180 7/27/2010 7/27/2011 Each ClaimAggregatePollution & Envir.

3,000,0005,000,000Liab. Included

Waiver of Subrogation endorsement is provided by policy as indicated by "Y" above then these coverages areautomatically endorsed to Certificate Holder named below, but only when required by written contract oragreement.

30 Day NOC/10 Day NOC-Non-Payment

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLEDBEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVEREDIN ACCORDANCE WITH THE POLICY PROVISIONS.

SpecimenFor Purposes of EvidencingCoverage Only

Fanning Howey14

general/umbrella liability insurance

ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED?

INSR ADDL SUBRLTR INSR WVD

DATE (MM/DD/YYYY)

PRODUCER CONTACTNAME:

FAXPHONE(A/C, No):(A/C, No, Ext):

E-MAILADDRESS:PRODUCERCUSTOMER ID #:

INSURED INSURER A :

INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBERPOLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)

GENERAL LIABILITY

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB

WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY

DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required)

AUTHORIZED REPRESENTATIVE

EACH OCCURRENCE $DAMAGE TO RENTED

COMMERCIAL GENERAL LIABILITY $PREMISES (Ea occurrence)

CLAIMS-MADE OCCUR MED EXP (Any one person) $

PERSONAL & ADV INJURY $

GENERAL AGGREGATE $

GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $

$PRO-POLICY LOCJECTCOMBINED SINGLE LIMIT(Ea accident) $

ANY AUTOBODILY INJURY (Per person) $

ALL OWNED AUTOSBODILY INJURY (Per accident) $

SCHEDULED AUTOS PROPERTY DAMAGE(Per accident) $

HIRED AUTOS

$NON-OWNED AUTOS

$

OCCUR EACH OCCURRENCE $

CLAIMS-MADE AGGREGATE $

DEDUCTIBLE $

RETENTION $ $WC STATU- OTH-

TORY LIMITS ER

E.L. EACH ACCIDENT $

E.L. DISEASE - EA EMPLOYEE $If yes, describe under

E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below

INSURER(S) AFFORDING COVERAGE NAIC #

Y / NN / A

(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORETHE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED INACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIODINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THISCERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THISCERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIESBELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZEDREPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject tothe terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to thecertificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION

© 1988-2009 ACORD CORPORATION. All rights reserved.The ACORD name and logo are registered marks of ACORDACORD 25 (2009/09)

CERTIFICATE OF LIABILITY INSURANCE

24112

OP ID JP10/19/10

FANNI-2

Hamler-Gingrich Insurance102 N Miami St , PO Box 129West Milton OH 45383Phone:937-698-4101 937-698-5658Fax:

WESTFIELD INSURANCE COMPANY

Fanning/Howey Associates, Inc.1200 Irmscher BlvdCelina OH 45822

2000000

A X CMM1322960 10/28/10 10/28/11

2000000

X1000000

100000015000010000

1000000A X CMM1322960 10/28/10 10/28/11

XXX COMP $250

10000000A

X

CMM1322960 10/28/10 10/28/11

0

10000000EX LIAB= UMBRELLA

XA WCP1324076 10/28/10 10/28/11

1000000

1000000

IN, MI, VA, NC, AR, IL

1000000

A BLKT BUILDING & CMM1322960 10/28/10 10/28/11 LIMIT 8126500CONTENTS DED 1000

0000000

S P E C I M E NC E R T I F I C A T E

Mark T Hamler, CPCU CIC

X

Fanning Howey 15

proposedteam

Organization/Firm Roles and Responsibilities (Indicate prime firm, consultants, and proposed staff, with a description of the roles of each. Indicate number of professional staff for all disciplines to be assigned to the project).

Fanning Howey and Farnsworth Group are extremely proud of the team of planning and design professionals that we have assembled for Community Unit School District #205. Each company within the team is highly skilled in its area of specialization and consulting knowledge.

Our team's most recent success with the award winning Glen Oak Birth-8th Grade Community Learning Center in Peoria is an excellent demonstration of our ability to deliver 21st Century, energy-efficient, learning environments on time and on budget.

In addition to the strong credentials that each team member possesses in educational facility planning and design services, our professionals are all strong advocates for a creative and collaborative process that engages all of the key constituencies in a project including administrators, faculty and school staff, students, government representatives, businesses, parents, and community members.

team structureIf selected for your project, Fanning Howey would be the Prime/Lead Firm. We will lead all planning and design efforts, bringing to bear our extensive experience creating 21st Century schools. As a result of our 50 years of experience in the planning and design of state-of-the-art school facilities throughout the US, we are adept in the management of district-wide building initiatives. Fanning Howey will oversee the design of your projects from start to finish - and ensure consistency in building systems and materials for ease of maintenance while providing equal attention and responsiveness to all project needs.

The Farnsworth Group will act as our Associate Firm, offering years of local management experience and a deep understanding of the region and construction community. They will coordinate local efforts, working closely with the district to ensure that your goals are met. They will also provide support for our team’s efforts in engineering, landscape design, sustainable design, and commissioning. The Farnsworth Group has a strong portfolio of local projects as well as significant knowledge of local conditions and state and local requirements. Their Peoria office will serve as our team's "home base" of operations.

Kevan Cooper with Galesburg-based Bruner, Cooper & Zuck will lead civil engineering services for our team and will provide a significant understanding of the history of your Master Facility Plan, as well as prior design work at each school site.

Galesburg-based Johnson Building Systems will also serve as a key team member for this multi-facility initiative. Paul Johnson will assist our team with construction phasing and delivery, constructability evaluation, and observation during the construction administration phase.

Both Kevan and Paul's offices will be key locations for our team's activities throughout the duration of these projects.

exhibit 7

Fanning Howey16

proposed team leadershipWilliam E. Payne, AIA, LEED AP BD+C - Project Executive / PrincipalThe Fanning Howey consulting team will be directed by Bill Payne, who will serve as Project Executive. He will be the district's primary point of contact throughout the project. Bill is an award-winning architect who has incorporated state-of-the-art design solutions into new elementary, middle, and high school projects across the country. He has lectured at CEFPI’s national conference and is extremely familiar with elements of design that improve teaching and learning outcomes. A strong leader, he understands the importance of establishing relationships and clear lines of communication early on. Bill is also well-versed in the successful administration of project schedules and budgets, ensuring that the final results for all projects meet goals established by the client.

Michael L. Rossillo, AIA - Project Architect / Associate Mike Rossillo of Fanning Howey has devoted the last 18 years of his professional career to the planning and design of primary and secondary educational facilities. His portfolio of experience includes a new PK-8 school for Peoria Heights Community USD #325, the Glen Oak Birth-8th Grade Community Learning Center for Peoria Public Schools District 150, and additions and renovations to the Junior/Senior High School for Leroy CUSD #2. Mike has a deep understanding of the issues facing today's schools, including the need for proper daylighting, class size, acoustics, Indoor Air Quality, and other elements that have been proven to affect teaching and learning outcomes.

Daniel P. Gavin, AIA, LEED AP - Project Executive for Associate FirmDan Gavin has been with the Farnsworth Group since 1991. He has established himself as the Manager of the Architectural Group and project manager of full service architectural/engineering teams. He has served as project manager for designing and producing construction documents for a variety of new and renovation building projects, including schools, long term care facilities, health care facilities, office buildings, laboratories, public housing and government facilities.

Edward J. Barry, AIA, LEED AP - Project ManagerEd's 35-year architectural career has given him broad-based experience in the design and management of multi-discipline projects for a wide variety of private and public clients in the Central Illinois area. He has developed the skills and flexibility required to meet the needs of both large and small projects. Ed is a manager of architectural services for the Peoria office of Farnsworth Group, Inc. He strongly believes in having a client-centered focus both in his approach to the profession and in managing projects. He has cultivated the skills to be well organized and a good listener; as well as the people skills to bring out the best in fellow team members.

Timothy C. Lehman, PE, LEED AP BD+C - Mechanical Engineering Leed / Senior AssociateFor the past two decades, Tim Lehman has been assisting school districts across the country with mechanical engineering services. He excels at designing energy-efficient systems aimed at reducing operating costs. He recently co-authored "From the Ground Up: How Geothermal Could Benefit Your District," published in School Planning & Management. This article examined various geothermal systems, examining the pros and cons of each.

Riyad S. Bannourah - Educational Technology Director / PrincipalRiyad Bannourah will lead the educational technology design efforts for our team. With decades of experience in the technology industry, Riyad is intimately familiar with the changing face of technology and the ways in which it can positively affect teaching and learning. His past project designs have won several "Impact on Learning" awards from CEFPI and School Planning & Management for the Effective Use of Technology, Safety & Security Through Design, Accommodating Technology, and Retrofit for Technology.

Fanning Howey 17

If you plan to utilize outside consultants, indicate the name, specialty, and address of each. Provide a detailed scope of services and indicate the approximate percentage of total design fee allocated to each.We plan to utilize local Galesburg-based Bruner, Cooper & Zuck as our team's Civil Engineering Consultant. They are located at 188 East Simmons Street, and have been serving Galesburg and the surrounding communities for over 48 years. Also based in Galesburg, Johnson Building Systems of 2188 McMasters Avenue will provide construction-related services for our team.

We anticipate the following fee percentage breakdown for our team members: Fanning Howey 35% Farnsworth Group 50%

Bruner, Cooper & Zuck 5% Johnson Building Systems 10%

Brian S. Davie, AIA, LEED AP - Sustainable DesignBrian has extensive experience in planning, design, document production, contract coordination, administration, and on-site observation. He is a LEED Accredited Professional and has extensive experience in research and design of sustainable buildings. He has become an in-house resource for both the LEED rating systems and sustainable design techniques, serving as a valuable resource for both our clients and other staff members. He routinely gives presentations and educational sessions on sustainable design issues both internally and externally.

Kevan Cooper - Civil Engineering ConsultantKevan Cooper is President of Bruner, Cooper & Zuck and has been with the firm since 1997. His responsibilities include the inspection, design, and detailing of various site work and civil engineering projects. Bruner, Cooper & Zuck, Inc. is a full-service Engineering and Land Surveying firm located in the heart of downtown Galesburg. BCZ has been serving central Illinois and eastern Iowa since 1959 and has operated under its current corporate structure since 2000.

Paul Johnson - Construction AdministrationPaul Johnson has been involved in the family business his entire life and has served as CEO since 1996. Experience gained by starting at the "bottom of the ladder" as a construction laborer has provided a rare opportunity for knowledge and growth that few others have been able to experience. Raised with an ingrained philosophy of "nose to the grindstone" work ethic, Paul has benefited by this approach to work which aids and guides him in his leadership role today. Paul will oversee this project with emphasis on budget analysis, constructability, value engineering, and involvement of the local construction community.

Fanning Howey18

Structure (Provide an organization chart identifying firms, individuals, locations, and interface relationships).

Key Personnel (Include resumes of key professionals of prime firm and consultants for all disciplines and special services).Please refer to the following pages.

Community Unit School District #205

William Payne, AIA, LEED AP BD+C

Project Executive / PrincipalFanning Howey

Dan Gavin, AIA, LEED APProject Executive for

Associate FirmFarnsworth Group

Michael Rossillo, AIAProject Architect / Associate

Fanning Howey

Ed Barry, AIA, LEED APProject Manager

Farnsworth Group

Kevan CooperCivil Engineering Consultant

Bruner, Cooper & Zuck

Paul JohnsonConstruction AdministratorJohnson Building Systems

Tim Hill, PE, LEED APElectrical Engineering Lead

Fanning Howey

Tim Lehman, PE, LEED AP BD+C

Mechanical Engineering LeadFanning Howey

Steve Bishop, SE, PE, AIA, LEED AP

Structural Engineering LeadFarnsworth Group

Riyad BannourahEducational Technology Lead

Fanning Howey

Tim Kiefer, PECommissioning

Farnsworth Group

Brian Davie, AIA, LEED APSustainable DesignFarnsworth Group

Engineering Support

Bruce Brown, RLALandscape ArchitectFarnsworth Group

As noted earlier, we have team member resources of over 300 personnel to support all of your project needs.

Fanning Howey 19

educationBachelor of Architecture, Magna Cum Laude, Ball State UniversityBachelor of Science in Environmental Design, Magna Cum Laude, Ball State University

registrations / accreditationArchitect - IL, IN, OH, CANational Council of Architectural Registration BoardsLEED Accredited Professional BD+C

affiliationsAmerican Institute of ArchitectsCouncil of Educational Facility Planners International

publications"Classrooms/Small Learning Spaces," School Planning & Management, January 2010

presentations"Future Space: New Rules for Library Projects,"Indiana Library Conference, November 2010; Indiana Library Directors and Trustees, March 2010

"Why Build a Classroom in 80 Hours? Because We Can!" 2010 CEFPI Midwest Great Lakes Conference, May 2010

"Aquatic Facilities – Planning for Success," CEFPI 82nd Annual International Conference, October 2005

"A New Middle School Configuration: Carmel Clay Schools," CEFPI 81st Annual International Conference, October 2004

"Fishback Creek Public Academy - 1999 Shirley Cooper Award Winner," Texas Association of School Administrators, July 1999

experienceBloomington Public Schools, District No. 87, Bloomington, ILBloomington Junior High School Addition/Renovations Needs Assessment Study

Carterville Community USD #5, Carterville, ILPressbox and Concession StandIllinois DCEO Electric Efficiency Grant Application AssistanceCarterville High SchoolClassroom Addition - Tri-C Elementary SchoolCarterville High School Stadium

Heyworth Comm USD #4, Heyworth, ILHeyworth Elementary School AdditionsHeyworth High School Additions

Leroy Comm USD #2, Leroy, ILLeRoy Jr./Sr. High School Addition/Renovations

Olympia Comm USD #16, Stanford, ILDistrict-Wide Facility AssessmentElementary Schools Operational Costs Study

Peoria Heights Comm USD #325, Peoria Heights, ILPeoria Heights New PK-8 BuildingFeasibility Study

Peoria Public Schools - District 150, Peoria, ILGlen Oak Birth-8th Grade Community Learning Center

As Project Executive, Bill Payne brings vision and leadership to the planning and design process. He joined Fanning Howey in 1989 after 10 years of architectural and management experience with other firms. Since that time, he has focused on educational planning and design. He has provided project coordination and oversight for dozens of new construction and renovation projects.

project executive / principalWilliam E. Payne, AIA, LEED AP BD+C

Fanning Howey20

educationBachelor of Science in Advanced Technical Studies (Architectural Design), Southern Illinois UniversityAssociate of Science in Architecture Technology,Southern Illinois University

registrations / accreditationArchitect - IL, WILEED Accredited Professional

affiliationsAmerican Institute of Architects

experiencePeoria School District 150, Peoria, ILPrincipal-in-charge for the new 126,000-square-foot state-of-the-art Glen Oak Birth-8th Grade Community Learning Center. The school will support 21st century knowledge and skill development with integrated technology and classrooms designed for in-depth collaborative learning. Design also includes space for recreations opportunities including open spaces for learning, walking trails and sports fields.

Tolono CUSD #7, Tolono, ILPrincipal in Charge for three new schools - Unity Junior High School, Unity East Elementary and Unity West Elementary Schools.

Pontiac Township High School, Pontiac, ILClassroom Addition, Life Safety Upgrades – Project architect for high school addition and renovations.

Prairie Central C.U.S.D. #8, Fairbury, ILMaster planning, New Junior High School, High School Additions, Decennial Life Safety Inspection/Renovation – Project architect and designer for new junior high school. Project architect for life safety inspections and multiple renovations at five schools.

Mendota High School Reroofing, Mendota, ILProject architect for reroofing project.

Kewanee Schools Physical Plant Evaluation & Improvements, Kewanee, ILProject manager for multiple life safety renovation projects.

North Pekin CUSD, North Pekin/Marquette Heights, ILLife Safety Inspection/Renovations – Project architect and manager for inspections and multiple renovation projects at three existing schools.

Referendum Studies, Prairie Central CUSD #8, Forrest, ILProject architect.

Ridgeview School Physical Plant Evaluation & Improvements, Colfax, ILProject architect for school renovation project.

East Peoria Elementary Schools, East Peoria, ILProject architect for reroofing project.

Dan Gavin has been with the Farnsworth Group since 1991. He has established himself as the Manager of the Architectural Group and project manager of full service architectural/engineering teams. He has served as project manager for designing and producing construction documents for a variety of new and renovation building projects, including schools, long term care facilities, health care facilities, office buildings, laboratories, public housing and government facilities.

project executive for associate firmDaniel P. Gavin, AIA, CSI

Fanning Howey 21

educationBachelor of Professional Studies in Architecture, State University of Buffalo Architectural Technology, State University of New York at Delhi

registrationsArchitect - NY

affiliationsAmerican Institute of Architects

experienceLeroy Comm USD #2, Leroy, ILLeRoy Jr./Sr. High School Addition/Renovations

Peoria Heights CUSD #325, Peoria Heights, ILPeoria Heights New PK-8 Building

Peoria Public Schools - District 150, Peoria, ILGlen Oak Birth-8th Grade Community Learning Center

Round Lake Area Schools District 116, Round Lake, ILMaster Facilitie PlanSoftball Field StudyPhysical Assessment of Existing BuildingsEducational Adequacy StudyEnergy Benchmarking

Carmel Clay Schools, Carmel, INCarmel High School Freshman Center Educational Technology and Locker Room AdditionCarmel High School Freshman CenterCarmel High School Baseball Diamond ImprovementsCherry Tree Elementary School Finishes Remodeling

Chillicothe City Schools, Chillicothe, OHChillicothe High School/Middle School Addition/Renovations

Greeneview Local School District, Jamestown, OHGreeneview High School

Hamilton Southeastern Schools, Fishers, INFishers High School AdditionFishers High School RenovationConcession/Restroom Building for Junior High School

Muncie Community Schools, Muncie, INMuncie Southside High School AdditionMuncie Central High School RenovationsMuncie Southside High School RenovationsMuncie Central High School Asbestos AbatementMuncie Central High School Commons ReroofLong Range Strategic Facilities Plan

Page County Public Schools, Luray, VALuray High SchoolPage County High School

Van Buren Public Schools, Belleville, MIBelleville High School

MSD of Wayne Township, Indianapolis, INMaplewood Elementary School Addition/RenovationsWestlake Elementary School Cafeteria Expansion

Wayne Trace Local School District, Haviland, OHWayne Trace Jr/Sr High School Addition/Renovations

Mike Rossillo has spent the last 18 years of his career focusing on the design of educational facilities. During this time, he has been involved in the planning and design of more than $400 million worth of K-12 school new construction and renovation. Mike advocates a planning/design process that links the needs of the client with the vision of the larger community to create facilities that benefit a wide range of constituency groups. He is also a tireless advocate for the owner's needs, ensuring that they are met during each stage of planning and design.

project architect / associateMichael L. Rossillo, AIA

Fanning Howey22

educationMaster of Science in Architectural Studies,University of IllinoisBachelor of Science in Architectural Studies,University of Illinois

registrations / accreditationArchitect - ILNCARB CertificationLEED Accredited Professional

affiliationsAmerican Institute of ArchitectsVice President, Peoria Humane SocietyMember, Peoria School District 150 Master Facility Planning CommitteeCommissioner, Zoning Board of Appeals, City of PeoriaLecturer, Master of Liberal Studies Program, Bradley UniversityLecturer, Osher Lifelong Learning Institute, Bradley UniversityU.S. Peace Corps Volunteer – Uganda (1993-1997

experiencePeoria School District 150, Peoria, ILProject Manager for new 126,000-square-foot state-of-the-art Birth-8th Grade Learning Center. The school will support 21st century knowledge and skill development with integrated technology and classrooms designed for in-depth collaborative learning. Design also includes space for recreations opportunities including open spaces for learning, walking trails and sports fields.

Illini Bluffs CUSD No. 327, Glasford, ILArchitectural Manager for a master plan study, examining where and how this rural school district should grow and expand. Three schemes at Illini Bluff’s existing unified campus (elementary, middle, and high school) were explored.

ROWVA CUSD No. 208, Oneida, ILSenior Architectural Manager for a comprehensive assessment of all existing facilities in this School District (located in the towns of Wataga, Oneida, and Altona). This study looked at all architectural, mechanical, electrical, and site issues (relative to current building codes and zoning ordinances); and included approximate cost estimates for making the necessary upgrades. A second phase to the study explored options for expanding the Oneida campus, so that all District facilities might be consolidated to that location.

Elmwood CUSD No. 322, Elmwood, ILArchitectural Manager for a master plan study, examining where and how this rural school district should grow and expand. Numerous schemes at Elmwood’s existing unified campus (elementary, middle, and high school) were explored.

CUSD No. 3 High & Middle School, Cuba, ILAssistant Project Architect for this all-new 65,000 square foot middle and high school; in a rural setting on the southern outskirts of Cuba, Illinois. This award-winning school includes a large on-site photovoltaic system; a partial geo-exchange HVAC system; and numerous other green/sustainable features. The middle and high school wings of this new building are joined via a cafeteria/commons and a college-sized gymnasium.

Manual High School Campus Bus Facility, Peoria, ILSenior Project Principal and Architect for this new school bus facility to handle the southern half of Peoria Public Schools District 150’s service territory. The project includes a secure outdoor area for approximately 40 school buses; as well as a distinctive administrative facility for staff offices and support spaces. Ability to add future photovoltaic (PV) system was incorporated into the design.

Ed Barry’s 35-year architectural career has given him broad-based expertise in the design and management of multi-discipline projects for a wide variety of private and public clients in the Central Illinois area. He has developed the skills and flexibility required to meet the needs of both large and small projects. His most recent project experience has included a $1.6 M conversion of the former Federal Social Security Administration offices into a learning center for at-risk middle school students for Peoria District 150. This project included significant "green" or sustainable features and systems.

project managerEdward J. Barry, Jr., AIA, LEED AP

Fanning Howey 23

educationMaster of Science in Civil Engineering, Bradley UniversityBachelor of Science in Civil Engineering, University of IllinoisPhase II Storm Water, Environmental Protection AgencyConstruction Observation and Layout, Illinois Department of TransportationPhase I Environmental Site Assessments, ASTM

registrations / accreditationProfessional Engineer - IL, IA, MOProfessional Land Surveyor - IL

affiliationsProfessional Land Surveyors Association

experienceCUSD 205, Galesburg, ILGalesburg High School - Site plan for new science wing, drainage plan for tennis courts, site plan, topographic survey, and drainage design for multiple parking lotsLombard Middle School - Site plan for gymnasium and boundary survey, site design and layout for building addition, drainage plan, and required surveyingKing Elementary School - Parking lot design, drainage plan, surveying, and layout for parking lotNielson Elementary School - Parking lot design, drainage plan, surveying, and layout for parking lotSteele Elementary School - Site design for bus drive, parking lot design, drainage plan, and required surveyingSilas Willard Elementary School - Parking lot site design, drainage, and related surveyingParking lot restoration and design for Cooke Elementary School, Gale Elementary School, King Elementary School, Nielson Elementary School, Steele Elementary School, Silas Willard Elementary School, Churchill Junior High School, Lombard Middle School, and Galesburg High School

Western Illinois UniversityMulticultural Center - Civil engineering, site design boundary and topo survey for 14,000 SF facility that was constructed under "green" standards and included a grass roof.Topographic survey for stadium

Mable Woolsey School, Knoxville, ILUtility investigations, topographic survey, site plan

Orion High SchoolParking lot reconstruction

Macomb High SchoolNew athletic track

Bushnell Prairie-City High SchoolNew all-weather track

Rushville High SchoolNew running track

Monmouth High SchoolNew running track

Camp Point High SchoolNew running track and field complex

Monmouth CollegeRelocation of sanitary sewerApril Zorn Memorial Stadium and Bobby Woll Memorial FieldNew tennis courtsCivil engineering and site design for dormsTopographic survey for librarySite design for West Campus Housing

Knox CollegeStructural engineering for Alumni HallNew track and field complexKnosher Bowl Football Field

Kevan Cooper is President of Bruner, Cooper & Zuck and has been with the firm since 1997. His responsibilities include the inspection, design, and detailing of various site work and civil engineering projects. Bruner, Cooper & Zuck, Inc. is a full-service Engineering and Land Surveying firm located in the heart of downtown Galesburg. BCZ has been serving central Illinois and eastern Iowa since 1959 and has operated under its current corporate structure since 2000.

civil engineering consultantKevan Cooper

Kevan J. Cooper, PE, PLS

Gregory C. Peterson, PE, SE

Steve Blust, PE

Jeremy Pestle, PE

Neil Smith, PE

Jim Simpson, PLS

Mick Olson, PLS

Fanning Howey24

educationGalesburg High School

affiliationsAmerican Society of Healthcare Engineers

experienceCUSD 205, Galesburg, ILGalesburg High School Gym and Pool - $3.2 M

Knox College, Galesburg, ILFitness Center - $2 MField House - $4.5 M

Nees Harley Davidson Dealership, Galesburg, IL$3.2 M

F&M Bank Branch Office, Galesburg, IL$1.7 M

Tompkins Bank Branch Office, Galesburg, IL$2.5 M

OSF Home Health Care, Galesburg, IL$1.5 M

Heat and Control, Galesburg, IL$3.5 M

Fremont Fire Station, Galesburg, IL$1.5 M

Knox County Health Department, Galesburg, IL$2.7 M

St. Mary Medical Center, Galesburg, IL$7 M Medical Office Building

Wells Pet Food Manufacturing Building, Monmouth, IL$2.3 M

Monmouth Police Station, Monmouth, IL$2.2 M

Big R Farm Supply, Medford, OR$5.6 M

Coastal Farm Supply, Albany, OR$10.2 M

Aspen Warehousing, Salt Lake, UT$5.6 M

Paul Johnson has been involved in the family business his entire life and has served as CEO since 1996. Experience gained by starting at the "bottom of the ladder" as a construction laborer has provided a rare opportunity for knowledge and growth that few others have been able to experience. Raised with an ingrained philosophy of "nose to the grindstone" work ethic, Paul has benefited by this approach to work which aids and guides him in his leadership role today. Paul will oversee this project with emphasis on budget analysis, subcontract solicitation, value engineering and coordination with Architect and Owner.

construction administratorPaul Johnson

P.O. BOX 66 * GALESBURG, IL 61401 * (309) 343-3148 * FAX (309) 343-0451

Fanning Howey 25

educationBachelor of Science in Mechanical Engineering,Michigan Technological University

registrations / accreditationProfessional Engineer - IL, IA, IN, OK, CA, NH, WI, MO, NE, DE, FL, PA, NC, MN, KY, MI, MS, LA, SD, TN, VA, KS, ND, OR, AL, GA, WACertified Indoor Air Quality Professional

affiliationsState of Illinois Green Building Advisory CommitteeAmerican Society of Heating, Refrigeration and Air-Conditioning EngineersAssociation of Energy EngineersIllinois Society of Professional Engineers

experienceLife Safety Improvements, Pontiac Township High School District #90Mechanical Engineer for life safety improvements project including the following: plumbing fixtures and pipes, new high efficiency boiler installation, mechanical ventilation units, fire alarm upgrade in addition to various other repairs and improvements.

Tolono CUSD No. 7, Tolono and Philo, ILMechanical engineering design for $21 million development of two new elementary schools and a new junior high school undertaken in the same construction project. Unity East Elementary in Philo consisted of a new 47,200 SF school accommodating 400 students grades K-6. Unity West Elementary in Tolono was built for 540 K-6 students and is 53,300 SF. Unity Junior High School in Tolono housed 7th and 8th grades and is a 63,300 SF facility, including a 2,000 seat capacity gymnasium also used by the existing adjacent high school. Systems include central boiler, chiller and air handling systems.

Fisher Community School District, Fisher, ILMechanical engineering design for new 54,780 SF elementary K-6 school. Systems include central boiler, chiller and air handling systems.

Northpoint Elementary, Classroom, Gymnasium & Kitchen Additions, Normal, ILMechanical engineering design for addition to include: 15 new classrooms, common areas to 5-7 classrooms, four offices, restrooms, kitchen addition, multipurpose room addition, gymnasium addition.

Chiddix Junior High School, Renovations and Addition, Normal, ILMechanical engineering design for new electrical, mechanical and plumbing systems to update existing junior high school. Design includes new air conditioning system, elevator, and updates to gas, electrical and water systems.

New Orleans Public Schools, New Orleans, LACommissioning for the construction of 6 new K-12 public schools for the Recovery School District Quick-Start School Construction Program. All 6 schools have been designed and will be constructed to achieve LEED Silver certification.

Prairie Central Junior High School, Fairbury, ILMechanical engineering design for new 61,430 SF junior high school, including general-use classrooms an administration area, a multi-purpose room, a large cafeteria/commons room, locker rooms, a full service kitchen, and a band room.

Pontiac Township High School, Addition, Pontiac, ILMechanical Engineering design for new 6-classroom addition, including 4 computer laboratories.

Kewanee CUSD, Decennial Life-Safety Inspection, Kewanee, ILMechanical Engineer - life safety survey and report for the HVAC systems in 4 schools.

Tim Kiefer has extensive experience in building engineering for a variety of facility types. His experience includes comprehensive analysis, engineering and design of HVAC systems, plumbing, and fire protection integral to major construction projects. He is also responsible for and actively engaged in project analysis and preliminary systems planning/selection, preliminary and final systems design, calculations, equipment selection, specifications, estimates and field inspections, and building commissioning.

commissioningTimothy A. Kiefer, PE

Fanning Howey26

educationBachelor of Science in Architecture, University of Illinois

registrations / accreditationArchitect - ILLEED Accredited Professional

affiliationsAmerican Institute of Architects

experienceTolono CUSD No. 7, Tolono and Philo, ILArchitectural Intern – pre-referendum animation and graphics, design, document production, and construction administration services for new 63,000 SF junior high school, and two new elementary schools, 53,000 SF and 47,000 SF.

New Elementary School, CUSD No. 1, Fisher, ILArchitectural Intern – pre-referendum animation and graphics, design, and document production services for new $8 million elementary K-6 school.

Concept Design, New Middle School, Monticello CUSD No. 25, Monticello, ILArchitectural Intern – pre-referendum animation and graphics, and design for new middle school.

Chiddix Junior High School Addition, Normal, ILArchitectural Intern – design, document production, and construction administration services for two-story addition and renovation to existing junior high school, including science and general classrooms; various ADA improvements throughout; new staff workroom; lockers and restrooms; expanded dining room; remodeled media center; 6,600 SF kitchen/ mechanical addition, new mechanical system, including introduction of air conditioning throughout the building.

New Prairie Central Junior High School Forrest, ILArchitectural Intern – design and document production for new 61,430 SF junior high school.

Prairie Central High School Addition, Fairbury, ILArchitectural Intern – design and document production for 2-story addition with new classrooms, modern science and computer laboratories, improved facilities for special education and a new media center. Kitchen renovations and expansion of the agriculture and industrial arts areas were also included.

Pontiac High School Addition, Pontiac, ILArchitectural Intern – design and document production for 1-story addition with new classrooms, and modern computer laboratories. Science lab renovations and expansions were also included.

Kewanee School District Life Safety Improvements, Kewanee, ILArchitectural Intern – design and document production for life safety improvements including re-roofing of all schools, and bleacher replacements and restroom upgrades.

Ridgeview Elementary School Addition, Colfax, ILArchitectural Intern – design, document production, and construction administration services for new gymnasium and classroom addition to existing K-12 building.

City of Peoria Green Initiatives, Peoria, ILSenior Architect – Project Manager working with the City of Peoria to develop sustainable goals for the comprehensive city plan of 2008.

Brian Davie has extensive experience in planning, design, document production, contract coordination, administration, and on-site observation. Brian is a LEED Accredited Professional and has extensive experience in research and design of sustainable buildings. He has become an in-house resource for both the LEED rating systems and sustainable design techniques, serving as a valuable resource for both our clients and other staff members. He routinely gives presentations and educational sessions on sustainable design issues both internally and externally.

sustainable designBrian S. Davie, AIA, LEED AP

Fanning Howey 27

educationBachelor of Science in Electrical Engineering, Purdue UniversityCoordination of Industrial and Commercial Electric Power Distribution Systems, University of WisconsinProtection of Industrial and Commercial Electrical Power Distribution Systems, University of Wisconsin

registrations / accreditationEngineer - IN, DC, LA, MI, NC, OHLEED Accredited Professional

affiliationsNational Society of Professional EngineersIlluminating Engineering SocietyInstitute of Electrical and Electronics Engineers

Audio Engineering Society

publications"Illuminating the Classroom Environment," School Planning & Management, February 2005

experienceCarterville Community USD #5, Carterville, ILCarterville High SchoolTri-C Elementary School AdditionTrack/Football Field

Community High School District #128, Vernon Hills, ILPool Mechanical Renovations

Gurnee School District #56, Gurnee, ILO'Plaine Elementary School Renovation

Heyworth Community USD #4, Heyworth, ILHeyworth Elementary School Addition

Lake County High Schools Technology Campus, Grayslake, ILHVAC RenovationHVAC Replacement

Leroy Comm USD #2, Leroy, ILLeRoy Junior/Senior High School Addition/Renovation

Peoria Public Schools - District 150, Peoria, ILGlen Oak Birth-8th Grade Community Learning Center

Marion Community Schools, Marion, INSlocum Elementary School Addition/Renovation

Muncie Community Schools, Muncie, INMuncie Central High School RenovationMuncie Southside High School RenovationLong-Range Strategic Facilities Plan

Southwest Dubois County Schools, Huntingburg, INSouthridge High School and Middle School Addition/RenovationsNeeds Assessment/Referendum Assistance

Tim Hill joined Fanning Howey in 1998 after six years in the electrical engineering industry. In his roles as Electrical Designer and Electrical Engineer, he has served communities ranging from rural villages to large urban centers. As Discipline Director for Fanning Howey's Electrical Engineering services, he uses his experience with power distribution, lighting, and fire alarm systems to guide all design efforts and ensure that every project receives the highest level of service.

electrical engineering lead / senior associateTimothy E. Hill, PE, LEED AP

Fanning Howey28

educationBachelor of Mechanical Engineering Technology, The University of Toledo, College of Engineering

registrations / accreditationEngineer - DC, IN, NC, OHLEED Accredited Professional BD+C

affiliationsAmerican Society of Heating, Refrigerating, and Air Conditioning EngineersNational Society of Professional EngineersAmerican Society of Plumbing Engineers National Council of Examiners for Engineering and Surveying

publications"From the Ground Up: How Geothermal Could Benefit Your District," School Planning & Management, May 2010

presentations"What to Expect When You're Expecting a Visit from the OSFC," Ohio School Boards Association Annual Conference, September 2007

"How to Build a High Performance School," Ohio Foundation for Environmental Education, February 2002

"OSDM," American Society of Heating, Refrigerating, and Air Conditioning Engineers Conference, November 19, 2001

"Learning the Language," Redesigning Cleveland for the 21st Century - Green Schools Event, October 17, 2001

"High Performance Schools," Ohio Foundation for Environmental Education, June 2001

experienceBellbrook-Sugarcreek Schools, Bellbrook, OHSugarcreek Elementary School Renovation Miami Valley South Stadium Renovation Bell Creek Intermediate School Addition/Renovation Bellbrook Middle School Stephen Bell Elementary School Addition/RenovationBellbrook High School Addition/Renovation

Brebeuf Jesuit Preparatory School, Indianapolis, INVisual and Performing Arts Center Addition

Bucyrus City Schools, Bucyrus, OHBucyrus Elementary School Addition/RenovationBucyrus Secondary School Addition/Renovation

District of Columbia Public Schools, Washington, DCElectrical/Mechanical AssessmentsEastern Senior High SchoolWilson High School ModernizationPhelps High School

Hamilton Southeastern Schools, Fishers, INDistrict-Wide Energy Study

School City of Hammond, Hammond, INWashington Irving Elementary School

Lake Ridge Schools, Gary, INNew Tech High School, Phase I

Muncie Community Schools, Muncie, INWilson Middle School

Perry Local Schools, Massillon, OHHB264 Evaluation / Miscellaneous Energy Projects

Pickerington Local Schools, Pickerington, OHLakeview Junior High School

Tim Lehman's career began in 1991 when he joined Fanning Howey directly out of college. Since that time, he has provided mechanical systems design for numerous projects and has conducted extensive research into high performance and sustainable building systems. He has twice been asked to present on high performance school design at the annual conference for the Ohio Foundation for Environmental Education. As Discipline Director for Fanning Howey's Mechanical Engineering services, Tim oversees the development of HVAC and plumbing systems, shop drawing review, mechanical drafting, mechanical design, cost estimating, mechanical construction review, and project management.

mechanical engineering lead / senior associateTimothy C. Lehman, PE, LEED AP BD+C

Fanning Howey 29

educationMaster of Science in Architectural Engineering (Structural Engineering), University of IllinoisBachelor of Architecture with Honors,University of Illinois

registrations / accreditationStructural Engineer - IL, NE, AZProfessional Engineer - AK, CO, DE, FL, GA, IA, KS, NC, WA, WIProfessional Engineer, Structural - ORNational Council of Examiners for Engineering and Surveying Record Holder Since 1999Architect - ILLEED Accredited Professional

affiliationsAmerican Institute of ArchitectsNational Society of Professional EngineersAmerican Society of Civil EngineersStructural Engineers Association of IllinoisAmerican Concrete Institute

experienceGlen Oak Birth-8th Grade Community Learning Center, Peoria Public Schools District 150, Peoria, ILStructural design of the central one-third of a $24 million two-story steel framed Glen Oak Birth-8th Grade Community Learning Center. This portion of the building included the entry canopy and a two-story atrium that extends completely through the building.

Dunlap CUSD, Banner Elementary School, Peoria, ILStructural Engineer of Record – Creative six classroom addition with a variety of roof slopes and exposed roof structures.

Elmwood School District, Grade School Addition, Elmwood, ILStructural Engineer for a two-classroom addition to an existing elementary school.

Unit 7 Schools, New Junior High School, Tolono, ILStructural Engineer of Record for foundations under a pre-engineered steel building housing a new Junior High School.

Warren High School Addition/Remodel, Warren, ILProject Structural Engineer for this single-story addition connecting two existing buildings.

Ridgeview CUSD No. 19, Sidewalk Replacement, Colfax High School, Colfax, ILProject Manager - Replacement of 400 lineal feet of sidewalk utilizing a 50/50 cost sharing offer from the Village of Colfax.

Ridgeview Community Unit School District No. 19, Renovation of Science Classrooms, Colfax, ILProject Manager - Renovation of the existing Junior High and High School Science classrooms and labs.

Pontiac Township High School, Community Recreation Center, Pontiac, ILStructural Engineer of Record for foundations supporting a pre-engineered steel building. Completion Date: 2000, Cost: $4 million

Prairie Central Community Unit School District No. 8, Masterplanning for Education Expansion, Forrest, ILProject Manager - Several schematic studies were developed for the Board of Education to review in anticipation of a Referendum issue in April 1995. The referendum passed for over $13 million.

Steve Bishop has over 35 years of professional responsibility for project management and structural engineering in the following areas: primary, secondary, and higher education facilities; elder care facilities; industrial manufacturing plants; chemical plants; healthcare facilities; civic buildings; commercial buildings; criminal justice facilities; structural inspections and evaluations; and renovation of existing buildings.

structural engineering leadStephen E. Bishop, SE, PE, AIA, LEED AP

Fanning Howey30

educationBachelor of Science in Electrical Engineering Technology, Purdue UniversityAssociate Degree in Electrical Engineering Technology, Purdue UniversityAssociate Degree in Computer Science, George Washington UniversityOSHA, Construction Safety and HealthNECA, Estimating Electrical Construction

affiliationsBuilding Industry Consulting Services InternationalCouncil of Educational Facility Planners InternationalInstitute of Electrical and Electronics Engineering, Inc. Illumination Engineering Society of North America, Indianapolis ChapterPanduit Certified Designer - Certificate of Participation

presentations"Future Proofing Schools," E-School (for School Technology Management), 2000

"Architecture and Infrastructure That Open Options," E-School

"Tabletop Discussion on the Approach for the Technology Design at Avon High School in Indianapolis," CEFPI Annual Conference

"How to Determine the Technology Needs for New Instruction and Renovation," Michigan Institute for Educational Management

publications"Security and Education," School Construction News,September/October 2001

Quoted in: "Safe Schools," School Construction News, May/June 2007

experience Carterville Community USD #5, Carterville, ILCarterville High SchoolTrack/Football Field

Community HSD #218, Oak Lawn, ILTechnology Consultation ServicesTechnology Audit Services

Heyworth Comm USD #4, Heyworth, ILHeyworth Elementary School Addition

Peoria Public Schools - District 150, Peoria, ILHarrison Birth-Eighth Grade School

Thornton Twp HSD #205, South Holland, ILTechnology Evaluation

Hamilton Southeastern Schools, Fishers, INRiverside Intermediate SchoolThorpe Creek Elementary SchoolFall Creek Elementary School Addition/Renovation Fishers High SchoolRiverside SchoolSand Creek Elementary SchoolHigh School Applied Technology RenovationFishers Junior High School Addition/RenovationGeist Elementary SchoolBrooks School ElementaryHoosier Road Elementary School Sand Creek Intermediate School

School City of Hammond, Hammond, INGavit Middle School Addition/RenovationJoseph Hess Elementary SchoolHarding Elementary SchoolThomas Jefferson Elementary SchoolWashington Irving Elementary SchoolFrank O'Bannon Elementary School

Riyad Bannourah spent 17 years in the technology design industry before joining Fanning Howey in 1996. He pioneered the development of Fanning Howey’s in-house technology design services, and today serves as the Discipline Director for the department. In this role, he provides leadership and oversight, and also directs the firm’s research into new and more efficient methods of serving our clients. Riyad has been a featured speaker at conferences for E-School and the Council of Educational Facility Planners International.

educational technology lead / principalRiyad S. Bannourah

Fanning Howey 31

educationBachelor of Architecture, University of Illinois

registrations / accreditationLandscape Architect - IL

affiliationsAmerican Society of Landscape ArchitectsBoard Member of Keep Peoria BeautifulMember of Grand Prairie Friends of Illinois

experienceGlen Oak Birth-8th Grade Community Learning Center, Peoria, ILDesign team Landscape Architect. Provide site and landscape architecture service for the new community park, outdoor amphitheater, outdoor nature classroom, and compliance of the landscape with the new Peoria land development code.

Methodist North at Allen Road, Peoria, ILDesign team Landscape Architect. Provided complete planting and irrigation design for this new northside facility. Plantings are designed for all season color and low maintenance.

Peoria Public Library, Peoria, ILFarnsworth Group has been selected to redesign the downtown main library and the existing Lincoln Branch as well as provide the complete design of the new North Branch Location. Our Group will be providing streetscape documents for the Downtown Library and Lincoln Branch. We will also be providing overall site planning and a LEED Landscape Design for the new North Branch Location.

Sheridan Triangle Streetscape, Peoria, ILDesign team Landscape Architect. Worked with engineers, urban planners, and City of Peoria staff to create a new and dramatic streetscape and pocket park as part of the “Heart of Peoria Plan” and the new land development code.

M2 Streetscape, Champaign, ILDesign team Landscape Architect. Working with the civil engineers and owner to develop the new streetscape along Neil Street for the One Main Development M2 project.

Peoria Civic Center Expansion; Peoria, ILWorked in collaboration with the Landscape Architects from HOK Sports Architecture to develop site plans, for new plazas, water features lighting, planting, and irrigation.

East Peoria Embassy Suites and Convention Center; East Peoria, ILProject Manager and Landscape Architect for the new 9 story 200 room hotel and 50, 000 sq. ft. convention center complex overlooking the Illinois River. Work included the master plan for the site (convention center / hotel / and three additional outlots), pile package coordination for both the hotel and convention center, coordination with building architects Butler, Rosenbury & Partners, design of all public streets, parking lots, pedestrian circulation system, a river front promenade, street lighting, planting design, irrigation design, bidding and construction administration services.

Bruce Brown is a Project Manager and has over 25 years of experience in the broad field of Landscape Architecture. Bruce’s background includes broad and diversified projects such as planning for commercial, campus, residential and mixed used developments, planting and irrigation design for large corporate campuses, and native landscape development.

landscape architectBruce A. Brown, RLA

Fanning Howey 33

primary/secondaryeducational experience

Client List (school districts served in Illinois and elsewhere) within the last five years.

Illinois School Districts Served by Fanning HoweyBeach Park SD #3 - Beach ParkOak Crest Elementary School - ADA Renovations $0.13 M 2009

Bloomington Public Schools, District No. 87 - BloomingtonBloomington Junior High School Additions & Renovations $5.58 M 2006

Carterville Community USD #5 - CartervilleCarterville High School $29.99 M In ProcessCarterville High School - Synthetic Turf Football Field $0.51 M 2007Classroom Addition - Tri-C Elementary School $1.03 M 2009

Community Consolidated School District 46 - GrayslakeAir Quality Improvement Project $0.57 M In Process

Deerfield Public Schools District 109 - DeerfieldRestroom Renovations at Caruso and Shepard Middle Schools $0.40 M In ProcessWilmot Elementary School - Entrance Renovation $0.50 M In ProcessWilmot Elementary School - Elevator $0.06 M In Process

Grass Lake SD #36 - AntiochGrass Lake Elementary School - Window Replacement $0.36 M 2009

Gurnee School District #56 - GurneeAir Conditioning Renovations to O'Plaine Intermediate School $0.77 M 2009New 3-5 Elementary School $24.05 M In ProcessNew Elementary School $25.00 M In ProcessO'Plaine School - Fire Sprinkler System Rebid $0.88 M 2008O'Plaine School Addition $1.13 M In Process

Heyworth Comm USD #4 - HeyworthHeyworth Elementary School Additions (in association with Melotte Morse Leonatti) $0.60 M 2005Heyworth High School Additions (in association with Melotte Morse Leonatti) $4.13 M 2005

Lake County High Schools Technology Campus - GrayslakeAutomobile Paint Booth Replacement $0.15 M 2007HVAC Renovations $0.31 M 2009HVAC Replacement $1.45 M 2007Masonry Wall Repair $0.02 M 2006Parking Lot Remodeling $0.60 M 2007

Leroy Comm USD #2 - LeroyLeRoy Jr./Sr. High School Additions/Renovations (in assoc. with Melotte Morse Leonatti) $6.18 M 2006

Olympia Comm USD #16 - StanfordDistrict-Wide Facility Assessment N/A 2006

Peoria Public Schools - District 150 - PeoriaGlen Oak Birth-8th Grade Community Learning Center (in association with Farnsworth Group) $23.10 M 2010

Waukegan Public School District 60 - WaukeganWHS Trapp Auditorium Rehabilitation Project $0.53 M 2009

Please refer to the Other Relevant Experience tab for Fanning Howey's additional K-12 clients.

exhibit 8

Fanning Howey34

Illinois School Districts Served by Farnsworth GroupPeoria Public Schools District 150 - Peoria

Dunlap CUSD 323 - Dunlap

Fisher CUSD 1 - Fisher

Tolono CUSD No. 7 - Tolono

Midwest Central CUSD No. 191 - Manito

North Pekin-Marquette Heights School District 102 - Marquette Heights

ROWVA CUSD 208 - Oneida

Illini Bluffs CUSD 327 - Glasford

Elmwood CUSD 322 - Elmwood

Bloomington Public Schools District 87 - Bloomington

McLean CUSD 5 - Bloomington

Ridgeview CUSD 19 - Colfax

Fanning Howey 35

Project Experience (selected projects similar in nature to that proposed by District 205 with more detailed information on team members involved to be engaged with District 205, project scope, cost and schedule performance, completion dates, etc. Clearly indicate if role was that of prime firm, consultant, or individual).

References (provide name, title, phone number, address, and e-mail for ten people who can speak to the firm's overall performance and key individual team members' service performance).

Please find details regarding several past similar projects beginning on the following page.

Dr. Scott Robison, SuperintendentZionsville Community Schools900 Mulberry StreetZionsville, IN 46077(317) [email protected]

Dr. Concetta Raimondi, SuperintendentMSD of Lawrence TownshipFormer Superintendent, Hamilton Southeastern Schools7601 East 56th StreetIndianapolis, IN 46226(317) [email protected]

Dr. Jeff Swensson, SuperintendentCarmel Clay Schools5201 East Main StreetCarmel, IN 46033(317) [email protected]

Mr. Stephen Fort, Vice President, General ManagerTurner Construction Company55 East Monroe Street, Suite 3100Chicago, IL 60603(312) [email protected]

Mr. Ron Goad, Business DevelopmentThe Skillman Corporation3834 S. Emerson Avenue, P.O. Box 33518Indianapolis, IN 46203(317) [email protected]

Mr. Dave Ryon, Former Director of Capital Projectsfor Peoria Public Schools-District 150Now with Caterpillar5001 N. Longview PlacePeoria, IL 61616(309) [email protected]

Mr. Roger M. Bergia, SuperintendentPeoria Heights Comm USD #325500 East Glen AvenuePeoria Heights, IL 61616(309) [email protected]

Dr. Robert S. Nielsen, Retired SuperintendentBloomington Public Schools, District No. 87300 East Monroe Street, P.O. Box 249Bloomington, IL 61701(309) [email protected]

Dr. Grenita Lathan, SuperintendentPeoria Public Schools District 150Administration Building, 3202 N Wisconsin AvenuePeoria, IL 61603(309) [email protected]

Mr. Guy Cahill, Asst. Supt. for Finance & OperationGalesburg CUSD #205632 Harrison StreetGalesburg, IL 61401(309) [email protected]

Fanning Howey36

Birth-8th Grade Community Learning Centerpeoria, illinois

With the design of the Glen Oak Birth-8th Grade Community Learning Center, the City of Peoria strived to create a true community center that supports collaboration among students and staff. Inspired by the principles of new urbanism, the site design turned the school grounds into a park with community gardens, playgrounds, and play fields that are open for public use. Inside, almost 50% of the building is available for shared use by the neighborhood, including meeting venues, classrooms, and performing art spaces.

The students attending Glen Oak Birth-8th Grade Community Learning Center enjoy a highly collaborative environment. Students are grouped by "villages" which feature flex classrooms and operable walls to maximize flexibility. Expansive windows and skylights bring daylighting into all classrooms as well as the main commons. The school utilizes geothermal heat pumps and other sustainable components.

One of the key site design concepts located the new facility in a way to allow for construction while the existing Glen Oak School remained in place. After completion, the existing facility was demolished to make room for community park spaces.

Key architectural elements from the original Glen Oak School were incorporated into a new arch, welcoming the neighborhood to the grounds. A hybrid geothermal system with 120- 500 foot deep wells provides energy efficient heating and cooling. Many other sustainable design features are included as well.

Farnsworth Group served as the prime, with Fanning Howey as associate partner/consultant. This project came in ahead of schedule and under budget.

awards2010 Honorable Mention (Educational Environments)Service Associates of the IL Association of School Boards

2010 Green Building of America AwardReal Estate & Construction Review - Midwest Edition

project dataclient: Peoria Public Schools District 150

grade levels: PK-8

area: 126,000 New SF

construction cost: $23.1 M

completion date: 2010

partner firm: Farnsworth Group

Relevance: Sustainable Design · Geothermal · Historical Fabric · Phased Construction

Fanning Howey 37

Bloomington JHS Modernizationbloomington, illinois

The 1990 additions and renovations project that Fanning Howey designed, turning a small elementary school into the new Bloomington Junior High, proved to be very successful and resulted in Fanning Howey being retained for the subsequent modernization project.

With construction costs of less than $6 million, the modernization of Bloomington Junior High School proved that a little project can still have a big impact.

A strategically placed two-story addition added 12 classrooms and corresponding restrooms and support spaces. Located on the southeast corner of the building, the addition extended the existing academic wing and accommodated a recent increase in enrollment.

On the opposite side of the building, a 15,200 square foot gymnasium expansion provided new opportunities for community use. The new gymnasium included a full size basketball court, spectator seating, locker rooms, and restrooms. The addition allowed the existing gymnasium to be used as an auxiliary space, and provided another venue for local residents to participate in after-school fitness programs.

Fanning Howey served as the prime on this project, which was completed two months ahead of schedule and under budget.

project dataclient: Bloomington Public Schools District No. 87

grade levels: 6-8

area: 30,600 New SF

construction cost: $5.5 M

completion date: 2006

Relevance: Phased Construction · Systems Upgrades · Expanded PE Facilities

Fanning Howey38

Greensburg Field Housegreensburg, indiana

Greensburg Community High School has a robust program in physical education, competitive sports, and intramural activities. Administrators sought a facility that would meet a range of student needs, both for the existing high school as well as a middle school planned for their educational campus.

Existing gymnasium space in the school system was in high demand, with practices and events often lasting until late in the evening in order to accommodate all of the daily activities. The district decided to build a new field house positioned between the football field and the high school building and just a short walk to both - serving both present and future needs for the district. The field house includes three basketball courts, a walking track around the perimeter, a new fitness room, a wrestling room, locker rooms, and public rest rooms.

Long-term plans call for a new middle school on the same campus and a new elementary complex, which will consolidate existing elementary schools, is now under construction. The field house is located centrally to all of the schools on the campus, creating a secure path of travel for the students.

Fanning Howey was the prime for this project, which arrived ahead of schedule and under budget.

project dataclient: Greensburg Community Schools

grade levels: 9-12

number of students: 700

area: 30,000 New SF

construction cost: $1.8 M

completion date: 2002

Relevance: Phased Construction · Expanded PE Facilities · Flexible/Multi-Use

Fanning Howey 39

Peoria Heights PK-8 Schoolpeoria heights, illinois

The new Peoria Heights PK-8 school replaces two aging facilities. The building has a separate Pre-K and Kindergarten wing with a segregated entrance and play area. The two-story educational wing is separated into academic houses with primary classrooms on the first floor and middle school programs on the second floor.

The budget was very tight for this 87,000-square-foot building, which includes new program spaces such as music and laboratories not contained in the previous, older schools. The site is a heavily wooded 12-acre parcel, which provides natural drainage across the land.

An attractive bermed waterway, designed as part of the civil engineering portion of the project, reduces downstream water runoff and protects adjacent residential properties.

Fanning Howey was the consultant for this project, which arrived on time and on budget.

project dataclient: Peoria Heights Community Unit Schools #325

grade levels: PK-8

number of students: 792

area: 87,000 New SF

construction cost: $9.4 M

completion date: 2001

partner firm: Melotte Morse Leonatti, Ltd.

Relevance: Budget-Conscious Solution · Limited Site

Fanning Howey40

Muncie Southside High Schoolmuncie, indiana

As one of two high schools serving the Muncie community, Southside has long represented the city's commitment to education. While expansions to the 40-year-old building took place in 1962 and 1969, major renovations had not occurred since the school first opened its doors.

To provide equity between Southside and the district's other high school, Fanning Howey created a comprehensive renovations plan that would upgrade finishes, hardware, building systems, technology, and furnishings. This complete renovation of the 227,430-square-foot facility took place while school was in session.

A new field house was constructed as a first phase and provided temporary housing for classroom activities while the remaining areas of the existing building were renovated.

A dramatic new entry canopy serves as an important wayfinding device and acts as a symbol of the changes that have occurred inside. Now that renovations are complete, Southside High School will proudly serve the Muncie community for another 40 years.

Fanning Howey was the prime for this project, which arrived on time and on budget.

project dataclient: Muncie Community Schools

grade levels: 9-12

number of students: 1,200

area: 21,673 New SF | 227,430 Renovated SF

construction cost: $21.8 M

completion date: 2008

Relevance: Comprehensive Renovation · Phased Construction · Expanded PE Facilities · Systems Replacement

Fanning Howey 41

Battle Creek Central High Schoolbattle creek, michigan

Battle Creek High School is a circa-1907 building located in historic downtown Battle Creek. A comprehensive modernization and expansion enabled the district to integrate ninth-grade students into the school and increase its capacity by 300.

New construction allowed for a dramatic expansion of the media center. Expansive, 18-foot-high windows in the media center were duplicated in the addition, along with ornate plaster pilaster and capital details. The two-story space features study areas, a conference room, and computer labs.

A new 500-seat cafeteria and two new science labs were also added. The cafeteria features an à la carte menu and is accented by playful patterns, colors, and lighting designs. Careful attention was given to historic detailing throughout the modernized space, while upgrading the facility to a 21st-century academic environment.

Fanning Howey served as the prime for this project, which arrived on time and within budget.

awards2002 Silver Citation Media CenterAmerican School & UniversityEducational Interiors Showcase

project dataclient: Battle Creek Schools

grade levels: 9-12

number of students: 1,500

area: 16,585 New SF | 58,803 Renovated SF

construction cost: $7.9 M

completion date: 2001

Relevance: Historic Fabric · Comprehensive Renovation · Phased Construction

Fanning Howey42

Eastern Senior High Schoolwashington, dc

Eastern High School was built in 1923 and is one of the oldest continuously-operating high schools in the District of Columbia. Due to its age and size, the school building was renovated and "right sized" to better meet the needs of the community, as well as DCPS standards.

The exterior of this historic high school facility was restored to its original grandeur. All interior spaces were renovated, including the enclosure of two courtyards.

All building systems and components were renovated and upgraded to increase efficiency and decrease operating costs. Restoration of high ceilings and original window designs brought back the old school charm, while offering modernized classrooms and improved learning environments. Eastern High School was designed to achieve LEED® silver certification.

Fanning Howey served as the prime for this project, which arrived on time and within budget.

project dataclient: District of Columbia Public Schools

grade levels: 9-12

number of students: 1,100

area: 4,000 New SF | 280,000 Renovated SF

construction cost: $45 M

completion date: 2010

Relevance: Historic Fabric/History · Comprehensive Renovation · Phased Construction · Systems Replacement

Fanning Howey 43

awards2004 Montgomery Historic Preservation AwardMontgomery Historic Preservation Society

2004 Education Design Showcase WinnerSchool Planning & Management

project dataclient: Sycamore Community Schools

grade levels: K-4

number of students: 625

area: 79,900 New SF

construction cost: $7.4 M

completion date: 2003partner firm: CR architecture + design

The new Montgomery Elementary School connects the past with the future by incorporating several historic design elements from the neighborhood. The three-story building's bell tower features the original bell from the "Montgomery Special School" - built on the same site in 1899. An arched dedication stone from this same school also serves as the focal point of the main entry.

Inside, the elementary school reflects the latest and best practices in educational design. Students from kindergarten through fourth grade enjoy a bright and open environment that maximizes natural light.The building also features a cafetorium, centrally-located media center, controlled access main entry vestibule, gymnasium, art and music rooms, as well as26 classrooms and support areas.

Fanning Howey was a consultant on this project, which arrived ahead of schedule and within budget.

cincinnati, ohioMontgomery Elementary School

Relevance: Historic Fabric/History · Neighborhood Context · Sustainable Design

Fanning Howey 45

geothermal/geoexchange andalternative energy

Include two or more examples of in-place work each of two or more years. For each describe the owner's goals and objectives and your approach to addressing the same. Describe challenges encountered along the way. Quantify the outcome based upon two years operating experience. What might be done differently given today's technology?

Hicksville PK-12 Schoolowner's goals and objectives Energy-efficient HVAC system with a low annual operating cost (goal: to have operating cost at or below existing

building cost - new building has air-conditioning whereas existing did not)

100% electric building - no gas to be onsite

Manageable installed cost / life-cycle cost

Equipment that the maintenance staff could operate/repair

approach to addressing goals/objectives and challenges facedBased on the Owners goals and objectives, geothermal was indicated as an optimal HVAC system for the district. The challenges occurred when trying to provide the 150,000 square foot building with a complete geothermal system, and remain in budget (due to cost premium of geothermal system). Due to the tight budget, a horizontal loop field was investigated, in lieu of a vertical well-field, in order to reduce initial cost. Although the horizontal loop field relieved budget constraints, it created another challenge of site-constraints. The approximately 5.9 acres of real-estate required for the horizontal loop field was causing issues with wastewater detention and storm water basins.

The site challenge was alleviated by placing the horizontal geothermal loop field under the storm collection basin, thus using the same real-estate for two different functions and eliminating the site concerns. The stormwater detention above the horizontal loop field also assists the performance of the loop field by saturating the ground around the horizontal loop field, thus increasing the heat transfer rate of the loop field.

quantify outcome - what might be done differently today?After two years of operation, the Hicksville PK-12 building is operating below expected energy usage and cost levels (see spreadsheet on following page for data), while achieving all of the owners goals and expectations. Since the design of this project, technology has advanced in areas that would allow the designer to evaluate more energy-efficient equipment, such as Heat Pump 2-stage or variable speed compressors, ECM motors on supply fans, and central geothermal plant designs. These technologies were either "untested" or had high initial costs and high repair costs, which made them unreasonable for the Hicksville project. Advancements have since been made that could allow for future investigations into their usefulness.

exhibit 9

Fanning Howey46

Hicksville Exempted Village SchoolsAEP Annual Electricity Use

Month kWH kBtuh kW Billed Amount Cost/kWH

Jan – 09 52800 180206.4 787.2 $3,475.48 $.066Feb – 09 220800 753590.4 1495.2 $17,453.82 $.079Mar – 09 204000 696252 751.2 $14,225.23 $.070Apr – 09 168000 573384 631.2 $13,281.83 $.079May – 09 170400 581575.2 566.4 $13,199.93 $.077Jun – 09 122400 417751.2 621.6 $10,298.73 $.084July – 09 81600 278500.8 216 $6,036.47 $.074Aug – 09 100800 344030.4 223.2 $6,970.36 $.069Sept – 09 153600 524236.8 616.8 $11,410.65 $.074Oct – 09 168000 573384 662.4 $12,417.54 $.074Nov – 09 148800 507854.4 578.4 $10,984.49 $.074Dec – 09 168000 573384 645.6 $12,363.48 $.074

Total kWH for 12 Months: 1759200

Monthly Average Cost: $11,009.83

Average Cost/KWH: $0.075 per month

Size of Bldg 147,747

Total Cost $132,118.01

Cost per s.f. $0.89

kbtu/s.f. 40.64

Fanning Howey 47

Spencerville K-12 Schoolowner's goals and objectives Examine geothermal option for potential operating cost savings

approach to addressing goals/objectives and challenges facedThe Spencerville HVAC system is a complete geothermal system. The geothermal system is a closed loop system consisting of 216-305 foot deep, bore holes. The bore holes provide the source of heating and cooling for the building. Water is circulated through the bore holes, into the building, and through each individual heat pump.

The Temperature Control System is a direct digital control system that allows the school district to monitor space temperatures, and monitor HVAC equipment. There are 15 individual Temperature Control zones throughout the building. Each Temperature Control zone can be scheduled on/off based on the operation of the building.

School started in January 2007. That winter was an unusually cold winter. As a result, the commissioning agent did thermal imaging to pinpoint and resolve infiltration issues. The maintenance staff has been pleased with system performances. Also, the heat pumps arrived onsite with minimum access to heat pump filters. To solve this problem, we revised the ductwork at the heat pump/filter access to include an access door to allow easy filter replacement and coil cleaning. This will benefit the owner for the life of the building. All but three of the heat pumps are located in mechanical rooms, which allows easier unit access and maintenance. Providing this space within the state-wide building square footage requirements was a challenge.

quantify outcome - what might be done differently today?Superintendent Joel Hatfield was quoted in The Lima News as saying the savings in both operations and maintenance made geothermal the best option for the district. "It is tremendous. It's (equivalent to) a couple of teachers," he said of the cost savings. "With funding issues today, ever dollar saved is to the good."

Please refer to the spreadsheets on the following page for building usage data. Since the design of this project, heat pumps can now be provided with a dehumidification cycle to allow space dehumidification, which would have been beneficial for both gyms. Also, the efficiencies of today's heat pumps are better, along with more options and sizes.

Fanning Howey48

Building Summary Year: 2007

Building Name: Spencerville K-12Building Size: 179,529 SF

January 0 324,600 1,107,535 $19,999 127 136,095 $1,409 1,243,630 $21,408February 0 304,500 1,038,954 $19,027 34 36,013 $378 1,074,967 $19,405March 0 244,500 834,234 $15,785 33 35,260 $392 869,494 $16,177April 0 200,100 682,741 $13,343 107 114,703 $1,263 797,444 $14,606May 0 207,000 706,284 $13,670 64 68,800 $769 775,084 $14,439June 0 127,800 436,054 $9,166 39 42,140 $473 478,194 $9,639July 0 130,500 445,266 $8,916 6 6,450 $74 451,716 $8,990August 0 187,800 640,774 $12,573 70 75,358 $753 716,131 $13,326September 0 170,100 580,381 $11,592 10 10,428 $857 590,809 $12,449October 0 191,100 652,033 $12,578 92 99,008 $265 751,041 $12,843November 0 240,900 821,951 $15,459 58 62,243 $701 884,193 $16,160December 0 225,600 769,747 $15,905 41 44,075 $492 813,822 $16,397Totals: 2,554,500 8,715,954 $168,013 680 730,570 $7,826 9,446,524 $175,839

Total Cost per SF: $0.98 Total MBtus per SF: 52.62

GasEnergy(Btus)

GasCost($)

TotalCost($)

MonthElectricDemand

(kW)

ElectricEnergy(Btus)

TotalEnergy(MBtus)

ElectricUsage(kWh)

ElectricCost($)

GasUsage(MCF)

Building Summary Year: 2008

Building Name: Spencerville K-12Building Size: 179,529 SF

January 0 258,900 883,367 $18,089 37 39,775 $478 923,142 $18,567February 0 185,700 633,608 $13,467 62 66,113 $778 699,721 $14,245March 0 172,500 588,570 $12,816 28 29,885 $380 618,455 $13,196April 0 118,500 404,322 $8,857 49 52,460 $778 456,782 $9,635May 0 148,200 505,658 $10,503 35 37,840 $588 543,498 $11,091June 0 121,200 413,534 $8,556 38 40,958 $676 454,492 $9,232July 0 96,600 329,599 $7,181 26 27,843 $361 357,442 $7,542August 0 126,600 431,959 $9,783 7 7,095 $144 439,054 $9,927September 0 160,800 548,650 $11,521 51 54,288 $206 602,937 $11,727October 0 145,800 497,470 $10,654 61 65,683 $174 563,152 $10,828November 0 195,900 668,411 $14,137 35 37,518 $103 705,928 $14,240December 0 125,700 428,888 $15,814 81 87,075 $235 515,963 $16,049Totals: 1,856,400 6,334,037 $141,378 508 546,530 $4,901 6,364,603 $146,279

Total Cost per SF: $0.81 Total MBtus per SF: 35.45

MonthElectricDemand

(kW)

ElectricUsage(kWh)

ElectricEnergy(Btus)

ElectricCost($)

GasUsage(MCF)

GasEnergy(Btus)

GasCost($)

TotalEnergy(MBtus)

TotalCost($)

Fanning Howey 49

Fanning Howey projects which include geothermal heat pump systemsPeoria Public Schools - District 150Glen Oak Birth-8th Grade Community Learning Center

Clark-Shawnee Local SchoolsNew Administration Building

Detroit Public SchoolsNew Martin Luther King High SchoolChadsey High School

District of Columbia Public SchoolsPhelps High School

Galion City SchoolsGalion Primary SchoolGalion Intermediate SchoolGalion Middle School

School City of HammondMaywood Elementary SchoolMaywood Elementary School Addition/Renovations

Hicksville Exempted Village SchoolsHicksville PK-12 School

Indian Lake Local SchoolsIndian Lake Elementary School

Manheim Township School DistrictManheim Township High School

Rio Rancho Public SchoolsV. Sue Cleveland High School

Spencerville Local SchoolsSpencerville K-12 School

St. Marys City SchoolsSt. Marys Memorial High School/St. Marys Middle School

Fanning Howey50

geothermal and alternative energy experience - Farnsworth GroupFarnsworth Group has also been involved in the several geothermal/geoexchange and alternative energy experience projects, including the following:

geothermal projects Glen Oak Birth-8th Grade Community Learning Center, Peoria, IL

Thomas Jefferson Elementary School, Peoria, IL

Sugar Creek Elementary School, Normal, IL

Peoria High School Renovations & Additions, Peoria, IL

Geothermal Grant Procurement Services, Glen Oak, Harrison, and Thomas Jefferson Schools, Peoria, IL

First State Bank, Bloomington, IL

alternative energy projects Photovoltaic system for the Atwood-Hammond School District, IL

Wind and solar photovoltaic systems for the Sturgis, MI schools

Photovoltaic system for the V.I.T. School District in Table Grove, IL

Photovoltaic system for the Elmwood School District, IL

Fanning Howey 51

other relevantexperience

Include other information with supportive data or graphics, which you believe is relevant for District 205's consideration in enhancing the team's performance in accomplishing the services for the proposed scope of work.

LEED/sustainable design

exhibit 10

The environment – it is the one universal component of the human experience. Every man, woman, and child is bound together by their reliance on natural resources. As a global community, we have a responsibility to preserve these resources and create a better world for future generations.

At Fanning Howey, creating a vibrant, sustainable future starts with collaboration. We are a member of the U.S. Green Building Council and an ENERGY STAR® partner. Our internal LEED® Accreditation program connects professionals from various disciplines and offices to promote understanding of sustainable issues and encourage innovation in the field. Fanning Howey has been named one of the "Top 100 Green Design Firms" by Engineering News-Record.

We provide a holistic approach to all segments of the "green" spectrum. From LEED Certification to operating cost reductions, we work to make sure no stone goes unturned in the search for sustainability, an approach that helps preserve many stones – and trees – in the process.

in-house LEED Accredited ProfessionalsWe currently employ 61 LEED Accredited Professionals across numerous disciplines.

projects pursuing LEED certificationFanning Howey currently has 56 projects pursuing various categories and levels of LEED certification, including:

1 LEED Silver Certified project

1 project pursuing LEED Platinum Certification

6 projects pursuing LEED Gold Certification

48 projects pursuing LEED Silver Certification

Fanning Howey has been named one of the "Top 100 Green Design Firms"

by Engineering News-Record.

Fanning Howey52

student-centered sustainable designInterested in raising test scores and lowering operating costs? For your district, the answer may be as close as your next building program.

A growing body of research indicates that there is a specific sub-set of sustainable design practices that dramatically affect student and teacher performance. These "student-centered" design solutions are easily implemented and have a positive impact on teaching and learning.

The six key components of student-centered sustainable design are:

Indoor Air Quality - Air quality has been shown to have a direct effect on attendance and performance. The temperature range most conducive to learning is 68 to 74 degrees Fahrenheit, while the ideal humidity range is 40% to 70% relative humidity.

Thermal Comfort - Research suggests that student achievement, performance, and attention span decrease as room temperature increases. Physical working conditions can affect teacher morale and effectiveness, making a teacher's ability to control temperature crucial to increasing student performance.

Lighting - Optimal lighting levels within the classroom can improve test scores and reduce discipline problems. Specifically, adequate daylighting can foster higher student achievement.

Acoustics - Excessive noise has a negative effect on student performance and can cause decreased efficiency for teachers. With research showing that many classrooms have acoustics that impede listening and learning, special attention must be given to optimal noise levels.

Building Quality - Studies show that disciplinary incidents decrease as building quality increases. A strong link has been established between capital outlay and leadership/teaching.

School Size - Smaller schools achieve benefits ranging from higher test scores to greater parental involvement. Elementary schools of 300 to 400 students and high schools with less than 1,000 students can achieve small school benefits. "School-within-a-school" design concepts address these issues while allowing school sizes that are appropriate for the community and financial constraints.

Test results compiled from National Clearinghouse for Educational Facilities Booklet "Do School Facilities Affect Academic Outcomes?" by Mark Schneider, November 2002

8 Benefits of Student-Centered Sustainable Design

Increased Student Performance

Increased Student/Staff Attendance

Increased Teacher Satisfaction

Reduced Operations Cost

Reduced Liability Exposure

Reduced Impact on the Environment

Building Used as Teaching Tool

Supports Community Values

Fanning Howey 53

Farnsworth Groupgreen incentives incorporated into recent school building projectsToday, there are any number of ways to be "green." Tomorrow, there will be countless more. We are inundated with ideas about conservation, sustainability, and the environment, on scales ranging from local to global.

With all of these opportunities comes a clear and strong demand for help: to understand what being green means, how it can be meaningfully achieved, when it should be pursued, and what are the costs and benefits.

Our team understands there are many opportunities for schools to integrate green elements throughout their facilities and to accomplish them through the use of stimulus monies or other federal, state, and local grants.

In the August 2009 issue of School Planning & Management, Fanning Howey published the article "Renewable Energy Solutions." This article examines the potential for the use of solar, wind, and photovoltaic systems on school campuses.

As a firm, we have completed projects with on-site wind turbines for power generation and regularly include provisions for future installation of photovoltaic power systems. This approach provides our clients with an easy path to implement PV systems when prices reach levels more suitable for purchase without grants or other offsets. We also explore the purchase of renewable energy credits, possibly through a local utility or through a third party broker.

As a school design firm, Fanning Howey believes green systems should enhance learning in addition to achieving budgetary goals. For example, at Phelps Architecture, Construction and Engineering High School in Washington, DC, students use the school's photovoltaic arrays, wind turbines, and geothermal systems to learn more about the emerging "green collar" job market. At Browning High School in Browning, Montana, a biomass boiler system turns refuse created by the local Blackfeet Indian Tribe's tradition of slash and burn into a viable way to heat the building during the winter.

At Farnsworth Group, the wide variety of the firm's green and sustainable services across its many disciplines are promoted under the heading of Green Navigation, which was developed in response to the needs and requests of clients who wanted a single-source wayfinding firm. With this aggregation of professional services, Farnsworth Group can help lead clients through the numerous opportunities for sustainability and green practices.

Green Navigation services include:

Green Planning & Education

LEED Pursuit/Application

Sustainable Design

Building Commissioning

Greening Existing Buildings

Renewable Energy Services

Green Advocacy/Grant Pursuit

Green Corporate Practices

Farnsworth Group has assisted school districts with the grant process for obtaining meteorological towers and PV solar panels. Designers also seek to maximize sustainable features such as daylighting.

Additionally, Farnsworth Group's Commissioning Section, recognized for its leadership in developing industry standards, is providing LEED commissioning services on eight K-12 public school projects in Chicago and six in New Orleans, analyzing the design, installation, and startup of critical building systems. Previous commissioning projects were completed at multiple school facilities in Hammond, Indiana, and Colorado Springs, Colorado.

Fanning Howey54

energy clientsFanning Howey has assisted or is currently assisting the following school districts with energy-related services:

Allen East Local Schools

Batavia Public School District 101

Baugo Community Schools

Bellbrook-Sugarcreek Schools

Carmel Clay Schools

Carterville Community USD #5

Deerfield Public Schools District 109

Dubuque Community Schools (with Durrant Group)

Louisville City Schools

Millburn CCSD #24

Montpelier Exempted Village Schools

Oak Hill United School Corporation

Pike-Delta-York Local Schools

St. Henry Consolidated Local Schools

Seneca East Local Schools

Spencerville Local Schools

energy servicesAs operating budgets dwindle, school districts are investing in energy saving technologies to make the most of available funding. To maximize their Return on Investment (ROI), administrators must make decisions based on all the facts and they are turning to Fanning Howey to help develop comprehensive energy plans.

energy modelingAs a standard practice, Fanning Howey performs an electronic energy model on all new construction or major renovation projects, and benchmarks the performance using the EPA Target Finder program.

Energy modeling answers a simple question: Where is energy going? To answer this, we gather data regarding:

Past energy usage (if applicable)

Building components such as lighting, windows, and walls

Type of building equipment in use or planned

Local weather patterns

Hours of operation

energy auditsDetailed energy audits analyze information obtained from the energy model and identifies options for potential cost savings. Options may include capital investments, building schedule changes, or simply training sessions for students and staff. Benefits and drawbacks of each option should be evaluated prior to making any decisions, including initial costs and long-term savings.

energy monitoringOnce your energy plan is in place, regular monitoring will help you determine its success. Quarterly reviews of energy usage should include the building as a whole as well as a breakdown of individual areas.

Fanning Howey 55

ability to handle multiple projectsToday's challenging school construction programs require a firm with vast resources and specialized experience. Fanning Howey has been involved in planning, design, and project management for numerous building programs featuring multiple buildings. We know how to use our national experience to bring these projects in on time and on budget.

The following key strengths enhance our ability to meet the needs of multiple projects at once:

A project management structure that includes a full complement of in-house services for architecture, engineering, site design, technology design, and interior design.

A team of more than 60 professionals in our Indianapolis office.

The support of additional professionals firm-wide, plus professionals at our associate and consultant firms.

Prior experience with multiple projects ranging from $20 million to $160 million in construction costs.

experience with multiple projectsCarmel Clay Schools; Carmel, INPlanning and design for $120 million district-wide building program, including two new elementary schools, new middle school, freshman center addition to high school, and additions/renovations to two middle schools.

District of Columbia Public Schools; Washington, D.C.Overlapping design of new elementary school, new middle school, and renovated junior high school.

Hamilton Southeastern Schools; Fishers, INOngoing design services for new high school, new intermediate school, and four new elementary schools.

Huron Valley Schools; Highland, MIPlanning and design for $110 million district-wide building program including 20 addition/renovation projects.

Lima City Schools; Lima, OH$109 million district-wide building program including new high school, two new middle schools, and four new elementary schools.

New York City School Construction Authority; Long Island, NYSchool design specialist for $200 million Glen Oaks Campus featuring new high school and two new PK-8 schools.

Warren City Schools; Warren, OHPlanning and design for $160 million district-wide building program including new high school and five new PK-8 schools.

Fanning Howey56

maintaining the educational processwhile remodelingCurrent research indicates that test scores may decrease by several points during a remodeling project, due to construction distractions in the educational environment. However, our experience indicates that with proper advance planning, educational standards can be maintained, and even enhanced. The key to success lies in assembling a well thought out plan for addressing educational needs throughout the entire remodeling/expansion process.

begin with planningThe planning process begins with an identification of the desired scope of work and a sense of each item's construction duration. It is imperative that a construction professional with real-life remodeling experience be involved at this point to accurately estimate timeframes for desired tasks and analyze system relationships.

create temporary spacesIf a building is being expanded, it may be wise to construct the additions first, providing places for students to be educated while their rooms are being remodeled. Sometimes temporary classrooms are needed, and locations and utility connections for temporaries should be planned. We have also used new or existing gymnasiums with appropriate temporary partitions as classrooms while remodeling is being conducted. The need to integrate construction activities with available new or existing building areas is paramount and must be thought through before a design is finalized.

involve district staffThe next step to ensure success is to present the phased construction plan at the Schematic Design Phase to administrators and staff, indicating what work will be accomplished and the estimated time frame for each component. Traffic issues such as staff parking, bus loading, parent drop-off, main entrance points, and impact of construction on play areas must be discussed in advance. Locations for material storage, construction access and parking, worker restrooms, and temporary fencing should be presented and reviewed with staff and administrators.

The purpose of this early presentation is to gain input from those most affected by the construction, and to begin a team communication process that will be vital during the actual construction phase. Many times, the phasing plan can be adjusted at this early stage to accommodate educational or operational issues that are important to the building users, but unknown to the design and construction team. A sense of involvement and teamwork is created, and the opportunity to provide input is always appreciated.

plan aheadOnce the plan is agreed upon, the actual detailed design can commence, and procurement of long-lead items can be initiated. All critical linking items, such as boilers, electrical panels, HVAC units, etc., can be purchased in advance and stored for future use. The best-laid plans can be severely curtailed by shipping errors or shortages. Summer work can be halted if the neighboring districts are competing for the same boilers needed for your project. Advance planning and procurement can circumvent these problems.

use the building as a teaching toolDuring the construction phase, students can be presented with unique educational opportunities. A building site can become a learning laboratory if properly and safely utilized. After-hours tours, complete with hard hats, can introduce children to the mechanics of construction, as well as physics, mathematics, engineering, and art. The building program can benefit everyone involved and be a memorable experience for the entire school community.

Fanning Howey 57

prototype design and replicationFanning Howey has extensive experience in creating prototype designs for elementary schools, middle schools, and high schools. To date, we have designed several successful prototype plans and completed more than 80 replications for clients ranging from Alaska to Southern Florida.

customizing designs for youEvery school district is unique, with specific goals, wishes, and needs. Our experience in school design over the past 50 years has allowed us to excel at the development of customized prototypes - a design process that we prefer to be interactive. Collaborating with the district and school administrators helps to create a cost-effective solution for future educational building needs. By working collectively on the original design, fewer changes will result when the design is utilized in the future.

Case Study: School City of HammondFor the School City of Hammond, we organized a two-day design charrette to reevaluate and modify the district's existing elementary school prototype. Six small groups comprised of elementary school staff and an architect used cutouts of various program areas to assemble and reassemble their ideal school. The concepts used in these sessions led to a new direction for the district's elementary school prototype - a vision which was implemented in three elementary schools.

maintaining each school's identitySteele Elementary School will serve as a template for design modifications to the four other prototype schools. An important consideration when designing this template is to develop a design solution that will easily transfer from site to site. The basic layout of the facility should fit as seamlessly as possible into areas of varying size and shape.

Although replicated facilities are cost effective and less time consuming than new construction, it is important to give each facility its own identity. Fanning Howey focuses on using building systems and materials that allow for flexibility. Some of these elements include facility signage and flooring options that can be used in various colors or patterns.

Case Study: Olentangy Local SchoolsTo meet the needs of its rapidly growing district, Olentangy Local Schools teamed with Fanning Howey to develop a prototype elementary school design in the early 1990s. This design could be easily replicated, allowing the district to pursue more aggressive, fast-track schedules. The design, which separated the building into five main areas, was duplicated in 1996 at Alum Creek Elementary and was later revised for economic and program revisions two additional times at Scioto Ridge Elementary and Arrowhead Elementary in 1998.

Fanning Howey58

Fanning Howeyother K-12 clients - past 5 years Anchorage School District - Anchorage, AK

Juneau Schools - Juneau, AK

Jonesboro Public Schools - Jonesboro, AR

Fort Huachuca Accommodation Schools - Ft. Huachuca, AZ

Batesville Community School Corporation - Batesville, IN

Brebeuf Jesuit Preparatory School - Indianapolis, IN

Brownsburg Community School Corp. - Brownsburg, IN

Carmel Clay Schools - Carmel, IN

Crown Point Community School Corp. - Crown Point, IN

Diocese of Lafayette-In-Indiana - Lafayette, IN

Edinburgh Community School Corporation - Edinburgh, IN

Greencastle Community School Corp. - Greencastle, IN

Greensburg Community Schools - Greensburg, IN

Hamilton Boone Madison Special Services Co-op - Noblesville, IN

Hamilton Southeastern Schools - Fishers, IN

Indianapolis Public Schools - Indianapolis, IN

Marion Community Schools - Marion, IN

Muncie Community Schools - Muncie, IN

Nineveh-Hensley-Jackson USC - Trafalgar, IN

Pike Township, MSD of - Indianapolis, IN

Southwest Dubois County School Corporation - Huntingburg, IN

Speedway, School Town of - Speedway, IN

MSD of Wayne Township - Indianapolis, IN

Zionsville Community Schools - Zionsville, IN

New Orleans Public Schools - New Orleans, LA

Plaquemines Parish School Board - Belle Chasse, LA

Recovery School District - Baton Rouge, LA

Clark County School District - Las Vegas, NV

Chillicothe City Schools - Chillicothe, OH

Oklahoma City Public Schools - Oklahoma City, OK

Manheim Township School District - Lancaster, PA