community microgrids - regen

28
Community Microgrids

Upload: others

Post on 01-Apr-2022

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Community Microgrids - Regen

Community Microgrids

Page 2: Community Microgrids - Regen
Page 3: Community Microgrids - Regen
Page 4: Community Microgrids - Regen

HH Heat = x6 max electric demand

Page 5: Community Microgrids - Regen
Page 6: Community Microgrids - Regen
Page 7: Community Microgrids - Regen
Page 8: Community Microgrids - Regen

230,000 low voltage substations

Page 9: Community Microgrids - Regen

OpenLV or Microgrid SO230,000 distribution substations

Distribution System Operator14 license areas (380 GSPs)

1 National System Operator(+4 EU Interconnectors)

Page 10: Community Microgrids - Regen

Introduction to Microgrids

Page 11: Community Microgrids - Regen
Page 12: Community Microgrids - Regen
Page 13: Community Microgrids - Regen

Housebuilders reserve a small area of each development for the construction of community

battery infrastructure.

Here we see the CEPRO developed, Bristol Energy Cooperative community battery and remote

metering monitoring equipment used for operations & maintenance

Page 14: Community Microgrids - Regen

DESIGNDESIGN

FEASIBILITY

Page 15: Community Microgrids - Regen

Feasibility Study - Hazelmead, Bridport

Page 16: Community Microgrids - Regen

Electric Hot Water

Power & Lights

Solar Generation

Page 17: Community Microgrids - Regen

Air Sourced Hot Water

All Electric Imports

Exports

‘Direct match’

Page 18: Community Microgrids - Regen

Air Sourced Hot Water

All Electric Imports

Exports

Hot Water Storage

Hot Water Storage

‘Direct match’

Page 19: Community Microgrids - Regen

Air Sourced Hot Water

All Electric Imports

Exports

Hot Water Storage

Hot Water Storage

‘Direct match’

Direct & Microgrid ‘match’

Microgrid ‘match’

Page 20: Community Microgrids - Regen

Air Sourced Hot Water

All Electric Imports

Hot Water Storage

Battery Storage &

Hot Water Storage

‘Direct match’

Direct & Microgrid ‘match’

Microgrid ‘match’

Battery Storage

Direct & Microgrid ‘match’

Page 21: Community Microgrids - Regen

Annual benefits (210 kWp) - Resident ownership

- Public grid

Annual benefits (210 kWp) - CESCo ownership

- Community microgrid

Hazelmead Community ESCo captures extra £12k benefits:

profits are distributed to investors & residents

Page 22: Community Microgrids - Regen

Switching to Heat Pumps reduces electricity Imports BUT also reduces PV self-use

Sw

itchi

ng to

a M

icro

grid

with

a C

omm

unity

Bat

tery

re

duce

s el

ectri

city

Impo

rts A

ND

incr

ease

s P

V

self-

use

Public Grid

Microgrid + Battery

Page 23: Community Microgrids - Regen

A business case assessment has been provided to Bridport Community Land Trust.

This recommends that the two best options are:

#4. Self funding with 130kWp PV and private air-source heat pumps#14. Foundry funds 210kWp PV and a 340kWh community battery

The Foundry funded option (#14) is neutral for residents while providing an average 7.5% return to CESCo investors over 25 years and reducing carbon emissions from 12 tonnes per year to -10 tonnes per year.

Page 24: Community Microgrids - Regen

The Foundry funded option (#14) is sensitive to kWh/kWp (solar insolation) but otherwise relatively insensitive to other variables

Page 25: Community Microgrids - Regen

The ‘Microgrid Foundry’ model

Page 26: Community Microgrids - Regen

Secure new schemes, form Community ESCOs, procure

microgrids from housebuilders

Customers/Members

Billing and O+M

Supply & Purchase

Agreements

Investors

Wholly owned subsidiaries during construction and first

years of operation

Own and FundIndependent funding

and financial management

Financial regulatory compliance, admin,

share register, dividend repayments, etc

Members BUY energy via a Power Supply Agreement

with the CESCo

Members SELL solar energy via a Power

Purchase Agreement with the CESCo

Framework Project Development Agreement

Page 27: Community Microgrids - Regen

Year 0

Design & Construction

CEPRO and the Microgrid Foundry secure sites then fund and support

construction of the community energy system

Incubation

The Microgrid Foundry operates and optimises the assets and benchmarks the profitability

Year 1-2

Community Refinance

Local community benefit societies (BenComs) supports the

community to bring the assets into local ownership

Year 2-3

Community Operation

Each community operates their local energy assets for the

financial benefit of their local user members

Year 3+

The Foundry de-risks early stage microgrid projects through a portfolio approach

Page 28: Community Microgrids - Regen

●●●