Construction Update Meeting
August 17, 2016
Oakland Children’s Hospital
3
• Doug Nelson – Executive Director of Development & Construction, UCSF Benioff Children’s Hospital Oakland
• Nick Chiu and Tony Solano – JLL
• Darrel Graef, Tyler Hester – Project Superintendent, Turner Construction Company
• Ed Walsh and Abhishek Gupta – Turner Construction Company
Welcome
4
UCSF Benioff Children’s Hospital / Turner – General Discussion
Project Communication
Upcoming Construction Activities
Where is Waldo?
Agenda
5
• Project Communication
• Project Communication– Darrel Graef (Turner Supt) 510-764-3059– Flyers and Project Website
• notifications of change to site conditions as it pertains to the neighborhood
• http://chonext100.org
• Concerns/Issue Reporting—Contact information are posted on Site Signage and Project Website
Communication & Reporting
6
• Metal Stud Framing at OPC-2• Overhead Mechanical & Plumbing at OPC-2• Rebar / Concrete install at Ground Floor OPC-2• Fire Proofing 7/11 – 8/26• Exterior wall Attachment • Upcoming Weekend Work. (Saturday 8:00 am – 5:00pm)
* August 27th – Prepare loading S.O.G with heavy material. This would be approximately 8 people on site.
* September 10th – Prepare to set AHUs. This would be approximately 6 workers setting up the barrier.
* September 17th – Set AHUs and other curbs. We would need 8 people on site to perform this work. A crane would be brought in as well to hoist the equipment.
* September 24th – Finalize and load the remaining equipment on the roof. This would be a couple crews stocking the building, totaling approximately 8 people.
Upcoming Major Construction Activities