101 HOV ProjectCommunity Coalition Alternative
October 18, 2012
![Page 2: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/2.jpg)
Caltrans Community
![Page 3: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/3.jpg)
Presentation Outline
Compare - Community Alternative and Caltrans plans for two time periods:
Construction Phase
Final Product
![Page 4: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/4.jpg)
Community Coalition GoalsMinimize time required for
construction
Minimize disruption to local roads & regional businesses
Spend the money wisely
Solve the Congestion Problem
![Page 5: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/5.jpg)
Caltr
ans
Rec
onst
ructi
onCa
brill
o/H
ot S
prin
gs In
terc
hang
e
Com
mun
ity A
ltern
ative
Cabr
illo/
Hot
Spr
ings
Inte
rcha
nge
![Page 6: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/6.jpg)
Caltrans ReconstructionSheffield Drive
Com
mun
ity C
oaliti
on A
ltern
ative
Sh
effiel
d D
rive
![Page 7: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/7.jpg)
Construction Phase ComparisonCaltrans Community Alternative
DURATION 51 MONTHS 19 MONTHS
DISRUPTION –Impact business
OFF RAMP & LANE CLOSURES
NONE WORK OFF FRWY
COST – Cabrillo/Hot Springs
$50 MILLION $15 MILLION
COST – PROJECT $185 MILLION $135 MILLION – Save 27%
![Page 8: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/8.jpg)
Left Side Ramp Safety
Accident data shows superior safety compared to 5 right hand ramps –Milpas, Garden, Castillo, Carrillo, Mission
Familiarity & virtually exclusive local use keep it safe
![Page 9: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/9.jpg)
Caltrans HOV (Carpool) Lanes
STARTS at the most constrained point
Requires a forced merge and lane elimination in less than ½ mile on a curve going into a narrow underpass
![Page 10: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/10.jpg)
Operational AnalysisCaltrans Community Alternative
CARPOOL LANE FORCED MERGE AT OLIVE MILL
HOV START EAST OF CORRIDOR
SIGNAL AT ROUNDABOUT
DEFEAT PURPOSE ROUNDABOUT, CONGESTION
CAPACITY & FLOW INCREASED
3 REMAINING CONGESTION ISSUES
OLIVE MILL ONSAN YSIDRO OFF &
ON
IMPEDIMENTS REMOVED
![Page 11: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/11.jpg)
Caltr
ans
Rec
onst
ructi
onCa
brill
o/H
ot S
prin
gs In
terc
hang
e
Com
mun
ity C
oaliti
on A
ltern
ative
Cabr
illo/
Hot
Spr
ings
Inte
rcha
nge
![Page 12: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/12.jpg)
Unaddressed Safety and Congestion Issues
Olive Mill southbound on ramp short merge
San Ysidro southbound off ramp congestion
San Ysidro/Posilipo southbound on ramp safety
![Page 13: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/13.jpg)
Community Coalition Questions – Does it:
Minimize time required for construction?
Minimize disruption to local roads & regional businesses?
Spend the money wisely?
Solve the congestion problem?
![Page 14: Community Coalition Alternative October 18, 2012](https://reader036.vdocuments.us/reader036/viewer/2022062713/56649cd65503460f9499e6cb/html5/thumbnails/14.jpg)
Next StepsCaltrans plan has significant and
unanswered questions – cannot go forward as presented
Request Caltrans include a full analysis of the alternative in a recirculated Draft EIR
If justified, support design exceptions for:Retention of southbound left side ramps