0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Maximum Month-Average Day Flow (mgd) 95th Percentile 75th Percentile 50th Percentile 25th Percentile 5th Percentile 0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Maximum Month-Average Day Flow (mgd) 95th Percentile 75th Percentile 50th Percentile 25th Percentile 5th Percentile Communicating with Decision Makers on Water & Wastewater System Needs JD Solomon, PE, CMRP 2014 AWWA-WEA Financial Seminar

Upload: others

Post on 27-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

0

1

2

3

4

5

6

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Ma

xim

um

Mo

nth

-Av

era

ge

Da

y F

low

(m

gd

)

95th Percentile

75th Percentile

50th Percentile

25th Percentile

5th Percentile

0

1

2

3

4

5

6

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Ma

xim

um

Mo

nth

-Av

era

ge

Da

y F

low

(m

gd

)

95th Percentile

75th Percentile

50th Percentile

25th Percentile

5th PercentileCommunicating with Decision Makers on Water & Wastewater System Needs

JD Solomon, PE, CMRP

2014 AWWA-WEA Financial Seminar

Page 2: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Presentation Overview

� Brief Context Background

� Phases, Issues, and Approaches

� Lessons Learned

� Summary Thoughts

� Discussion

Page 3: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

JD Solomon – My Perspective

� Have lived in Clayton for 22 years

� 9-year Town Planning Board Member

� Worked once on contract basis as senior Town planner

� Active in community – Little League, YMCA, Cultural Arts Foundation….

� Former Johnston County Economic Development Commission Chairman

� Technical training and background provided in introduction

� Decision support and management consulting for wide range of projects

� Representation for controversial projects (Landfills, Subdivisions, Industrials)

� Former NC registered lobbyist

� Former County Political Party Chairman

� Government Affairs and Media Relations Training

Page 4: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Brief Background

Page 5: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Town of Clayton

� Located in Johnston County, North Carolina

� 17 miles from Raleigh

� Population of 16,200

� Traditional downtown

� Balance of economic vigor and historic charm

Page 6: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Brief History of Wastewater Issues in Clayton

� Small wastewater treatment plant with limited footprint

� Since the mid-1990s,

– Several small but meaningful expansions

– Re-rating

– Nitrogen issues (first credits, now process improvements)

– “Check book” flow balancing with NCDENR

– Growing residential and industrial base

– Partnerships with other public jurisdictions

Elected officials are a diverse group with different “come froms”. Information

on wastewater infrastructure investment needs to acknowledge that diversity.

In any group of elected officials you are likely to see competing values and

interests that can make approval of capital expenditures more difficult.

Page 7: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Town Manager Steve Biggs

� It is valuable to keep a balance sheet and make abundance or scarcity of capacity a well known fact by elected officials and the development community.

� It is also very important for elected officials and the public to understand the relationship of development fees to new capital investment. They drive each other.

� It is important for elected officials to perceive how resources (treatment capacity) come to be consumed and what the costs are for replacement. Financial resources become encumbered years before we begin to see a financial return in the form of having new retail customers connected and contributing to the revenue stream.

Page 8: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Town Manager Steve Biggs

� Wastewater actually bridges diverse Board interests very well and properly presented consensus can be made easier.

– Some members simply support expansion of WWTP capacity for economic development purposes.

– Others may not be as pro growth but respond well to environmental protection and water quality.

– Still others want to understand the regulatory issues at play.

Covering all aspects, all benefits, helps build support.

� Compliance and capital investment has been made more complex by the emergence of mass based limits e.g. Nitrogen. I try to keep the issue of gallons per day separate from Nitrogen removal. Mixing the two in a single study or presentation potentially sends a mixed message that can make the decision process less clear.

Page 9: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Town Manager Steve Biggs

� Finally, everyone can easily lose touch with the cost of maintenance. WWTP's operate in a very harsh environment. The materials are corrosive and the facilities typically operate 24/7/365. They tend to operate out of sight and out of mind. A vigorous maintenance program is essential but very seldom realized.

� This is where having strong and credible operators becomes crucial. They need to be advocates of their infrastructure. Also, more so than many other engineering functions (streets design, water and sewer maintenance), the nature of a plant and treatment process indicate that longer term, consistent relationships with design and process engineers are important.

Page 10: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Project Overview

Page 11: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Conveyance System Optimization Context

0.9 MGD Allocation

1.0 MGD Allocation

2.2 MGD Capacity

� 3 wastewater treatment options

� Growth will vary across the Town’s service area

� Industrial customer flow grows to 0.9 mgd by 2020

– 30% of 3.0 mgd of total flow

� Geographic areas within the Town have different potential for routing to treatment

Current capacity/allocation

Page 12: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Goals of the Conveyance System Optimization

� Develop a meaningful forecast of wastewater flows through 2035

� Identify the infrastructure requirements for conveyance to treatment locations

� Develop an optimization model to identify the least cost option for future wastewater conveyance and treatment

Page 13: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

A meaningful definition of system sub-areas was necessary for this study.

Partially Developed,High growth potential

Highly Developed,Low growth potential

ECIA

Page 14: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

So how much flow do we need to treat?

Unit demand

Population Growth

Future Development

Density

Single Point

Estimates

Future Employment

A single deterministic forecast

0

5

10

15

20

25

30

35

40

Fin

ish

ed

Wate

r D

em

an

d (

mg

d)

Year

Daily Finished Water Demand (1997-2010) Average Day Demand (1997-2010) Average Day Finished Water Demand (Projection)

0

5

10

15

20

25

30

35

40

Fin

ish

ed

Wate

r D

em

an

d (

mg

d)

Year

Daily Finished Water Demand (1997-2010) Average Day Demand (1997-2010) Average Day Finished Water Demand (Projection)

Traditional Deterministic Forecasting

Page 15: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

What About Uncertainty?

� There is uncertainty in every variable used– Growth rate

– Development density

– Wastewater return rate

– Water efficiency

� Traditionally, might look at sensitivity tests

� Can we build uncertainty into the projection?

– Monte Carlo analysis

– Create input distributions for a range of variables

Page 16: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

2035 Flow by ETJ Sub-Areas

ETJ – North

2012 - 0.45 mgd

ETJ – South

2012 - 1.5 mgd

Incr

easi

ng

Pro

bab

ilit

y

Flow (mgd)

98% probability < 40% build-out flowExpected Flow = 1.2 mgd

Incr

easi

ng

Pro

bab

ilit

y

Flow (mgd)

99% probability < 40% build-out flowExpected Flow = 1.9 mgd

Page 17: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Flow Forecasting Insights

� Understand how wastewater flows might vary– Magnitude and timing of flows

– Risk of building too early or too late, as well as too big

0

1

2

3

4

5

6

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Ma

xim

um

Mo

nth

-Av

era

ge

Da

y F

low

(m

gd

)

95th Percentile

75th Percentile

50th Percentile

25th Percentile

5th Percentile

Current Capacity Total

$10Min capitalcost

Page 18: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Wastewater Flow Route Optimization

� An optimization model was developed to process all possible routing scenarios.

� Model Target: – Net present value (NPV) of all Town conveyance and treatment costs through

2035.

� Model Constraints:– Forecasted wastewater flows need to be routed to a treatment location.

– Flow routing, timing and final treatment location had to be consistent with identified routing options.

– Little Creek WRF cannot exceed 2.5 mgd permitted capacity.

Page 19: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

� Easy to say “optimize this”

� Hard part is creating the logic to define flow routing

Go from here...

Optimization Model

To here..

To here..

Page 20: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Define costs based on future conveyance scenario flows

� ADD SCREEN SHOTS

$-

$20,000,000

$40,000,000

$60,000,000

$80,000,000

$100,000,000

$120,000,000

$-

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

Cu

mu

lativ

e C

os

ts

An

nu

al C

os

ts

Contract Costs R&R Costs O&M Costs Capital Cost Projected Cumualtive Total Cost

$-

$20,000,000

$40,000,000

$60,000,000

$80,000,000

$100,000,000

$120,000,000

$-

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

Cu

mu

lativ

e C

os

ts

An

nu

al C

os

ts

Contract Costs R&R Costs O&M Costs Capital Cost Projected Cumualtive Total Cost

Page 21: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Optimization Insights

� The Town can balance future flow with existing treatment capacity– Enough capacity through 2035

– Excluding flow from ECIA

� A review of the 25th, 50th and 75th percentile wastewater flows revealed that the majority of the optimal routes were similar– Minor areas shift to balance flow and capacity

� Need to start testing the waters on expanding current treatment contracts– Duration and quantity

� Model not concerned with sunk cost– Optimizing based on lowest unit cost for treatment and conveyance

Page 22: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Optimization Insights

� Least unit cost option for treatment is the Town’s facility, but due to its age it will best to reduce the load on the facility

� Good for the Town to maintain system flexibility– Balance short term capacity and cost by sending flow to Town owned facility

– Provides for future options

Page 23: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Lessons Learned - Communications

Page 24: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Lessons Learned – Phase 1 (Pre-treatment at source)

� Framing the problem correctly was essential for success

� Building the initial decision tree in Phase 1 was key to understanding future changes

� Probabilistic modeling of construction costs was very important for credibility with all parties

Phase 1 had limited external uncertainties and focused mainly on process engineering and construction cost estimating.

Probabilistic approaches can and should be used inside the relative technical environments, but over-complexity too early in the initial analysis stage related to external conditions should be avoided.

Page 25: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Lessons Learned – Phase 2 (Offsite pre-treatment)

� Be able to identify when the problem frame has changed!

� Build a new approach when the problem frame changes, rather than building complexity and layers into an existing one

� Use all of the tools at your disposal, and anticipate which ones will be most meaningful to decision makers

� At some points in the process, a deterministic approach may serve you better than a probabilistic one

� The truth is powerful – use it when it is on your side, and stay on an honest, non-threatening message

Elected officials and administrators do not need to be reminded or lectured on political realities – they work with them every day!

Page 26: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Lessons Learned – Phase 3 (System Optimization)

Decision trees, with or without financial expected values, are very effective in maintaining the project frame for technical team. However, not necessarily the tool for every elected official.

Page 27: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Conveyance Study Context

0.9 MGD

Allocation

1.0 MGD

Allocation

2.2 MGD

Capacity

� 3 wastewater treatment options

� Growth will vary across the Town’s service area

� New industrial flow grows to 0.9 mgd by 2020

– 30% of 3.0 mgd of total flow

� Geographic areas within the Town have different potential for routing to treatment

Current capacity/allocation

Geographic picture for ease of understanding is worth a

thousand words

Page 28: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

0

1

2

3

4

5

62012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Max

imu

m M

on

th-A

ve

rag

e D

ay

Flo

w (

mg

d)

Maximum Month-Average Day Flow (mgd)

Uncertainty and Future Wastewater Flows

0

1

2

3

4

5

62012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Max

imu

m M

on

th-A

ve

rag

e D

ay

Flo

w (

mg

d)

95th Percentile

75th Percentile

50th Percentile

25th Percentile

5th Percentile

Maximum Month-Average Day Flow (mgd)

Current Capacity Total

Most laypeople can understand potential uncertainty in costs and timing if conveyed visually

Page 29: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Numerous options for routing wastewater for treatment

Be careful and limited in use of influence diagrams and flow charts when dealing with laypeople

Page 30: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Summary Comments

Page 31: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Example: What Elected Leaders Want(Executives, Public Administrators, Coaches, Generals, etc. have their own lists)

• To do something good and be part of the solution

• To get re-elected

• To get things done that are important to them

• To avoid making people mad at them if they do not care much about the issue

• To not look bad or stupid to the public, their colleagues, or the media

We have some powerful (and cool) tools at our disposal.In presentation, they must be aligned with decision maker

and needed purpose at that particular point in time.Do your best to understand the people and the situation, and

make it about them and not you or the analysis.

Page 32: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

Acknowledgements

� Adam Sharpe

� Jennifer Bell

� Phil Ogden

� Town of Clayton, NC

– Steve Biggs, Town Manager

– Jody McLeod, Mayor

– Nancy Medlin, CFO

– Tim Simpson, Public Works Director

– James Warren, WWTP Manager

Page 33: Communicating with Decision Makers on 5th Percentile Water ......0 1 2 3 4 5 6 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

0

1

2

3

4

5

6

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Ma

xim

um

Mo

nth

-Av

era

ge

Da

y F

low

(m

gd

)

95th Percentile

75th Percentile

50th Percentile

25th Percentile

5th Percentile

0

1

2

3

4

5

6

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

Ma

xim

um

Mo

nth

-Av

era

ge

Da

y F

low

(m

gd

)

95th Percentile

75th Percentile

50th Percentile

25th Percentile

5th PercentileCommunicating with Decision Makers on Water & Wastewater System Needs

JD Solomon, PE, CMRP

2014 AWWA-WEA Financial Seminar