common grid model and operational planning data ... … · network operation center network...

12
Common Grid Model and Operational Planning Data environment (OPDE) concepts and development Jean-Philippe Paul System Operation European Stakeholder Committee 14 March 2017

Upload: others

Post on 23-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

  • Common Grid Model and Operational Planning Data environment (OPDE)

    concepts and development

    Jean-Philippe Paul

    System Operation European Stakeholder Committee14 March 2017

  • From SOGL/CACM requirements to implementation by all TSOs and RSCs

    Page 2

    SOGL (/CACM)

    Operational planning activities to

    be coordinated

    RSCs to provide 5 services based

    on CGM

    All data shared in a common OP

    Data Environment (OPDE)

    Common format definition

    CGM

    Methodology

    Data quality controls

    CGMA (Alignment of Net

    Positions) service

    Applications

    & general

    services Merging

    function

    CGMES 2.4

    Reliable &

    secure network

  • Data Exchange & Services Conceptual Picture

    Page 3

    OPDEstorage: OPDM

    Protocols: ECP/EDX

    Data Publishing

    Data Subscription

    TSO

    Data Publishing Data Subscription

    Data Publishing

    Data Subscription

    RSC

    Individual Grid Model

    IGM

    1.Subscription to all IGMs

    2.Merging process

    3. Publishing of CGMATOM

    CGMA – QAS

    PEVF - Boundary

    common

    applications

    common midware

    services

  • OPDE and ATOM Service Providers

    Page 4

    ATOM

    BACKBONENODE

    ATOM BACKBONE

    NODE

    TSO

    TSO

    TSO

    RSC

    ATOM BACKBONE

    NODE

    ATOM BACKBONE

    NODE

    NETWORK

    APPLI-

    CATION

    (OPDE)

    Shared component

    hosting and operation

    Shared component

    hosting and operation

    ECP DirectoryEDX

    Catalogue

    OPDM Service Provider

    CGMA Boundary

    ManagementQA

    Portal

    OPDM Service Provider

    RSCRSC

    Network operation center

    Network security center

    Page 4

  • SUPPLIER Agreements

    • Operating OPDE

    • Hosting of OPDE shared components

    • IT operation of OPDE shared components

    • OPDE ASC (Application Network Centre)

    • OPDE Service desk

    • Operating ATOM

    • ATOM NOC (Network Operation Centre)

    • ATOM NSC (Network Security Centre)

    Contract framework :ENTSO-E – Legal Party in the middle

    Users:

    TSOs

    RSCs

    Suppliers:

    RSCs

    TSOs

    IT providers

    ENTSO-ECorporate

    Entity

    USER Agreements

    • Access to OPDE

    • Access to ATOM

    Page 5

  • CGM-OPDE Program Phases: current planned milestones

    Page 6

    11 December 201713 January 2017 11 June 2018

    Development

    Phase

    Develop software,

    Services and

    the ATOM network

    All TSO’s/RSC’s

    Implement

    CGMES

    Set up of the

    ATOM/OPDE

    design and

    contract

    Transition

    Phase

    TSO’s/RSC’s

    connect to OPDE/

    ATOM

    Test processes,

    optimize

    (individual)

    connections/

    process

    Hybrid merging

    (RG CE only)

    Stability

    Phase

    Parallel run of

    UCTE + CGMES of

    6 months (RGCE only)

    CGMES provided for

    operational purposes,

    fallback to UCTE

    format possible

    Users of CGMES data

    get used to new data

    format in operational

    processes

    Operational

    Phase

    CGMES used for

    pan-European

    operational

    services

  • THANK YOU FOR YOUR ATTENTION

    Jean-Philippe PaulPG Coordinated Security Analysis Convenor

    RTE

  • System Operation Framework*Implementation Activities

    Tahir Kapetanovic

    System Operation European Stakeholder Committee14 March 2017

    * System Operation Guideline and Network Code Emergency & Restoration

  • KEY IMPLEMENTATION ACTIVTIES

    Page 9

    IMPLEMENTATION** SO Guideline only, because ER is Network

    Code hence no „implementation“ after its

    entering into force

    Data exchange, § 40(6)

    Y-1 outage planning scenarios, § 65

    Operational security analysis method., § 75

    Synchronous area agreements, § 118

    Min. FCR activation in CE & Nordic, § 156(10-11)

    Min. inertia study per SA, § 39(3)(a)

    Outage coordination methodology, § 84

    Short/medium term adequacy, § 81

    Determination of LFC blocks, § 141(2)

    YA/DA/ID CGM from IGM, §§ 67(1), 70(1) * A large part of SO GL implementation –

    subject to NRAs

    approval – is prepared

    through rollout of 5

    standard services by

    the Regional Security

    Coordinators

    RSCs*

    … RSCs

    REPORTING

    ICS Report, § 15SO GL NC ER

    RSC Report § 17

    LFC Report § 16

    RSC on TSOs defence & restoration plans, § 6(3)

    ENTSO-E on market suspension consistency, § 36

    & REPORTING

  • RSC „WHATABOUTS“

    Page 10

    #1: „trigger“ in the past

    * „Options for the future of power systems regional coordination“, FTI-CR Study, www.entsoe.eu

    All TSOs‘

    MLA

    12/2015

    #2: contract

    #5: Possible future enhancements of:

    operational planning, balancing,

    long-term adequacy, network

    planning*

    CACM SO GL & NC ER

    #3: legal framework

    #4: five stand. services by RSCs

    CORESOTSC

    NORDIC RSC

    BALTIC RSC

    SCC

    SEE-T RSC

    http://www.entsoe.eu/http://networkcodes.enthttp/networkcodes.entsoe.eu/wp-content/uploads/2014/12/market_codes_overview.jpgsoe.eu/wp-content/uploads/2014/12/market_codes_overview_cbe.jpghttp://networkcodes.enthttp/networkcodes.entsoe.eu/wp-content/uploads/2014/12/market_codes_overview.jpgsoe.eu/wp-content/uploads/2014/12/market_codes_overview_cbe.jpg

  • PRELIMINARY TIMELINE

    Page 11

    1

    20182 3 6 74 5 8 9 10 11 12 1

    20192 3 6 74 5 8 9 10 11 12

    1st published, for 2019

    1st

    rp

    td

    ue ICS Report, § 15SO GL NC ER

    RSC Report § 17

    LFC Report § 16

    RSC on TSOs defence & restoration plans, § 6(3)

    ENTSO-E on market suspension consistency, § 3609/2019

    09/2019

    09/2020

    201710 11 128 96 7

    LEGEND

    SO GL EIF

    Public consultation / WS

    Stakeholder workshop

    Delivery by TSOs/ENTSO-E

    Approval by NRAs

    no methodology approval, but rollout as 1 of 5 RSC

    services

    5

    Data exchange, § 40(6)

    Min. FCR activation in

    CE & Nordic, §156(10-11)

    Tim

    elin

    e in

    clu

    din

    g N

    RA

    ap

    pro

    va

    l

    Determ. of LFC blocks, §141(2)

    Oper. security analysis method., § 75

    Synchronous area agreements, § 118

    Min. inertia study per SA, § 39(3)(a)

    Outage coordination methodology, § 84

    Short/medium term adequacy, § 81

    YA/DA/ID CGM, §§ 67(1),70(1)

    Y-1 outage planning scenarios, § 65

    CBA methodology

    Proposal of min. activation period

  • THANK YOU FOR YOUR ATTENTION

    Tahir KapetanovicSO Framework Convenor

    ENTSO-E RSC Project Manager

    Austrian Power Grid AG