Improving the Quality of Construction, Reducing Costs, and Facilitating On-time Project Completion COMMISSIONING FOR THE NYCSCA NYCSCA BUILDING SYSTEMS COMMISSIONING

Upload: others

Post on 27-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Improving the Quality of Construction, Reducing Costs, and

Facilitating On-time Project Completion

COMMISSIONINGFOR THE NYCSCA

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 2: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Airpath expertise in:

HVAC Design

HVAC Testing and Balancing

Building Systems Commissioning

Retro-Commissioning (HVAC Investigations and Studies)

HVAC Design Basis Consulting

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 3: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

20 Years of Superior TAB, Design, and Commissioning

New York State Licensed Professional Engineering Firm

N.E.B.B. Certified Commissioning

N.E.B.B. Certified Test & Balance

Other Professional membership affiliations:

USGBC, ASHRAE, IGSHPA

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 4: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

ENGINEERING AND STAFF TRAINING

NEBB Professionals and Supervisors:

Certified annually with up to 24 hours of classroom training and seminars related to NEBB disciplines

NEBB Technicians and Balancers:

Certified every 2 years with mandatory classroom training

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 5: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Quality Construction

If you could improve the total quality of your schools and facilities without extra costs, would you?

How much do Job Site Construction problems cost you in delays ?

Do you see a deviation in actual installation vs. design specifications? What is the outcome on your costs, schedule, performance and compliance?

What impact does a poorly performing building have on students and faculty? How readily does that become your problem?

What should the NYCSCA be considering?

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 6: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

A Trained Eye on Implementation

Do hard deadlines for School openings leave your projects with

gaping holes?!?

Non-Compliance of School HVAC Systems

Months or years of continued costly fixes

Improper installation

Unseen or mis-evaluated design issues

Poor air quality

Misdirected HVAC facility operations

Lack of proper perspective and understanding of the finished project

Under the gun…………………$...$$....$$$$

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 7: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Overview of the Commissioning

Process

Commissioning is the administrative act of:

Documentation of NYCSCA Performance Requirements

Evaluation and Documentation of Design Basis and

Contract Drawings

Verifying and Documentation of system installation.

Verifying and Documentation of Equipment Start Up

Verifying and Documentation of Functional performance.

Verifying and Documentation of interactions between

systems and subsystems

Training of Operations and Maintenance.

Commissioning is an Administrative Plan with components customized for

each project to match the requirements of that project.

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 8: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning Scope

Commissioning is a flexible process configured to

match each individual project.

Design parameter Documentation

Plan & Spec. Commissioning Review

Installation Verification (FIV)

Operational Performance Tests (OPT)

Functional Performance Tests (FPT)

As Built Verification

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 9: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

System Scope

HVAC Systems

Control Systems

Process Systems

Fire & Smoke Controls

Plumbing Systems

Electrical Systems

Security Systems

Integrated Systems

Other Systems

Page 10: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Project Types

New Construction

Restructuring

Energy Retrofits

I.A.Q. Investigation

HVAC Studies

Page 11: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Functional Performance

Testing (FPT)6

Commissioning Processes

Commissioning Plan•Scope

•Schedule

•Check List Format

•Training Format

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate Schedule

Pre-functional Testing

• Installation Verification

• Test Verification

Commissioning Report

• Activity Reports

• Check Lists

Post Acceptance Test

• Off Season Test

Facilities Training

• Turn Over Documents

• System Procedures

1 5

3

4

8

9

• System Performance Testing

Operational Performance

Testing (OPT)• System Start Up Verification

7

2

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

PRE DESIGN PHASE – DOCUMENT OWNERS PROJECT REQUIRMENTS

Page 12: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Functional Performance

Testing (FPT)5

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate Schedule

Field Installation

Verification (FIV)

• Installation Verification

• Test Verification

Commissioning Report

• Activity Reports

• Check Lists

Post Acceptance Test

• Off Season Test

Facilities Training

• Turn Over Documents

• System Procedures

4

2

3

7

8

• System Performance Testing

Operational Performance

Testing (OPT)

• System Start Up Verification

6

2

Design Phase• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

1 • Assist Design team in developing documents that are:

• accurately reflecting Owner’s functional needs

• operable, commissionable and maintainable

• clearly communicate to the Contracts their

obligations to participate in and support the

commissioning process

• DPC process involves:

• Development of the owners design intent

• Commissioning Reviews of Design Documents

• Development of Commissioning Specifications

Design Phase

Commissioning Processes

Page 13: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report Functional Performance

Testing (FPT)5

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate Schedule

Field Installation

Verification (FIV)

• Installation Verification

• Test Verification

Commissioning Report

• Activity Reports

• Check Lists

Post Acceptance Test

• Off Season Test

Facilities Training

• Turn Over Documents

• System Procedures

14

3

4

8

9

• System Performance Testing

Operational Performance

Testing (OPT)

• System Start Up Verification

6

Commissioning Processes

2•Scope

•Schedule

•Check List Format

•Training Format

Commissioning Plan

Page 14: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning Plan

Identify

Parties

• Owner / General Contractor / Sheet Metal Contractor

• Plumbing Contractor / Electrical Contractor / Fire & Safety

• Piping Contractor / Controls Contractor / Other Relevant Contractors

Systems

• Mechanical Systems / Domestic Water Systems / Plumbing and Waste / Controls / Fire and Safety

Scope

• Description of all systems being commissioned

• Catalog of all scheduled equipment to be commissioned

Page 15: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning ProcessesExample: Plan and Specification Checklist Report Forms

Page 16: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

6

7

• System Performance Testing

Functional Performance

Testing (FPT)5

Commissioning Processes

Commissioning Plan•Scope

•Schedule

•Check List Format

•Training Format

Field Installation

Verification (FIV)

• Installation Verification

• Test Verification

Commissioning Report

• Activity Reports

• Check Lists

Post Acceptance Test

• Off Season Test

Facilities Training

• Turn Over Documents

• System Procedures

15

4 8

Operational Performance

Testing (OPT)

• System Start Up Verification

2

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

Commissioning

Field Coordination

•Coordinate Responsibilities

•Coordinate Schedule3

Page 17: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Functional Performance

Testing (FPT)6

Commissioning Processes

Commissioning Plan•Scope

•Schedule

•Check List Format

•Training Format

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate ScheduleCommissioning Report

• Activity Reports

• Check Lists

Post Acceptance Test

• Off Season Test

Facilities Training

• Turn Over Documents

• System Procedures

15

3

7

8

• System Performance Testing

Operational Performance

Testing (OPT)

• System Start Up Verification

6

2

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

Pre-Functional

Testing (PFT)

•Installation Verification

•Test Verification4

Page 18: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning Processes

• Installation Verification

• Test Verification

Field Installation Verification (FIV) Example Report Forms

Page 19: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning Processes

Commissioning Plan•Scope

•Schedule

•Check List Format

•Training Format

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate Schedule

Field Installation

Verification (FIV)

• Installation Verification

• Test Verification

Commissioning Report

• Activity Reports

• Check Lists

Post Acceptance Test

• Off Season Test

Facilities Training

• Turn Over Documents

• System Procedures

1

3

4

8

9

7

2

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

Functional Performance

Testing (FPT)6

•System Performance Testing

5

Operational

Performance Testing

(OPT)

•System Start Up Verification

Page 20: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning ProcessesExample: Operational and Performance Testing Report Forms

Page 21: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Functional Performance

Testing (FPT)6

Commissioning Processes

Commissioning Plan•Scope

•Schedule

•Check List Format

•Training Format

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate Schedule

Field Installation

Verification (FIV)

• Installation Verification

• Test Verification

Commissioning Report

• Activity Reports

• Check Lists

Post Acceptance Test

• Off Season Test

15

3

4

8

9

• System Performance Testing

Operational Performance

Testing (OPT)

• System Start Up Verification

Facilities Training

•Turn Over Documents

•System Procedures7

2

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

Page 22: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning ProcessesExample: Training Verification Report Form

Page 23: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

• System Performance Testing

7

Functional Performance

Testing (FPT)6

Commissioning Processes

Commissioning Plan•Scope

•Schedule

•Check List Format

•Training Format

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate Schedule

Field Installation

Verification (FIV)

• Installation Verification

• Test Verification

Post Acceptance Test

• Off Season Test

Facilities Training

• Turn Over Documents

• System Procedures

15

3

4

Commissioning Report

•Activity Reports

•Check Lists8

9

Operational Performance

Testing (OPT)

• System Start Up Verification

2

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

Page 24: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Functional Performance

Testing (FPT)6

Commissioning Processes

Commissioning Plan•Scope

•Schedule

•Check List Format

•Training Format

Commissioning

Field Coordination

• Coordinate Responsibilities

• Coordinate Schedule

Field Installation

Verification (FIV)

• Installation Verification

• Test Verification

Commissioning Report

• Activity Reports

• Check Lists

Facilities Training

• Turn Over Documents

• System Procedures

15

3

4

8

Post Acceptance Test

•Off Season Test9

• System Performance Testing

Operational Performance

Testing (OPT)

• System Start Up Verification

7

2

Design Phase

• Basis of Design Evaluation

• Drawing Evaluation

• Pre-Submittal Report

Page 25: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Benefits of Commissioning

Improved Contract Enforcement

Improved Quality of Documentation

Reduced O & M Costs

Improved System Performance

Improved School Comfort

Reduced Liability & Warranty Claims

Improved I.A.Q. (Indoor Air Quality)

Future Expansion or Renovation Made Easier

Greater Faculty and Student Satisfaction

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 26: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Commissioning Costs

100,000 sq. ft. School

$4,000,000 HVAC Design and Construction Costs

Estimated 250 Ton HVAC System

Commissioning Cost

2% - 2.5% of HVAC Construction Cost

$80,000 - $100,000

Traditionally included in HVAC Cost

Final cost will depend on the detail of the scope of work

Average cost of commissioning is approximately

2 to 3 times the test and balance costs.

COST EXAMPLE

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 27: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Minimum Costs of Not Commissioning

First Year Problem Detection and Solutions Operational problems not discovered at start up

30% of one operator

Second Year Problem Detection and Solutions Operation problems not discovered at start up

15% of one operator

Out of Warranty Expense Repair of items not discovered during the 1st year

Early repair due to incorrect operation

Early repair due to incorrect maintenance

Energy Inefficiency Lack of Calibration & Tuning

Lack of Proper Operation

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 28: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

Implementing Commissioning

Specification– Commissioning Administrator (Division 13000 or 18000)

– Mechanical Commissioning Support Responsibilities (Division 15000)

– Electrical Commissioning Support Responsibilities (Division 16000)

– Vendor Commissioning Support Responsibilities (Equipment Division)

Contract with Owner– Furnished as an Allowance (Preferred way to guarantee quality)

NYCSCA BUILDING SYSTEMS COMMISSIONING

Page 29: COMMISSIONING - AIRPATHairpath.us/NYCSCA_PPT_Commisioning.pdfCommissioning Field Coordination •Coordinate Responsibilities •Coordinate Schedule Pre-functional Testing •Installation

“Quality is Value”

“The Agony of Poor Quality lives

long after the Ecstasy of a Cheap Price.”

NYCSCA BUILDING SYSTEMS COMMISSIONING