commissioning: a critical path to mission success · title: commissioning: a critical path to...
TRANSCRIPT
Site
Sec
urity
I n the mission-critical world, there's no room for trial and error. Avoidingcatastrophic failures and costly downtime is essential.That’s why TotalSite Solutions' Commissioning Services are key to the success of a mis-
sion-critical facility. Commissioning prevents unexpected problems, antici-pates and regulates system interactions and implements methodologies foroperating critical systems.
Total Site Solutions' Commissioning ensures that a mission-critical facil-ity achieves maximum reliability, availability, maintainability and scalability(RAMPSTM). It provides a clearly defined path to systems configuration andoperation to achieve optimum efficiency and sustainability. It also integratestested equipment at the system level and verifies and documents overall mis-sion-critical facility performance.
Total Site Solutions' Commissioning Services are tailored to each client'srequirements and critical load design intent. Factors influencing the level ofcommissioning services include the complexity of the building and its sys-tems, the facility's purpose, system reliability and efficiency requirementsand the project budget.
The phases of the commissioning process mirror the development anddeployment of a new or renovated mission-critical facility. At each phase,Total Site Solutions' commissioning services are orchestrated by a team ofspecialists with the experience and skills to ensure that your facility is com-missioned to the industry's highest standards.
Commissioning: A Critical Path toMission Success
� rust Total Site Solutions to commission your mostmission-critical assets.
www.totalsitesolutions.com
Pre-Commissioning
Through Pre-Commissioning, Total Site Solutions ensures that a facilitybegins its life cycle at optimal productivity. We take an active role in projectplanning, design and construction to ensure long-term efficiencies in facilityoperation and maintenance. During pre-commissioning, Total Site Solutions:
•
•Defines project scope and develops a project blueprintDevelops commissioning and integrated system testing (IST) plans
Commissioning is an ongoing process which contin-ues through warranty, including a 30-day operational re-view and completion of any “punch list” items. Inaddition, seasonal commissioning procedures are neces-sary to respond to environmental and organizationalchanges.
The mission-critical facility is constantly adapting tochanging technologies and demands. In theory, this makescommissioning a continual process as well. Ideally, recom-missioning is conducted every three to five years. TotalSite Solutions has particular expertise in the unique chal-lenges and specialized requirements of the recommis-sioning process.
MechanicalElectricalSafety & SecurityFuel DeliveryPlumbing
UPS System OperationUPS/Generator CompatibilityComputer Room Heat LoadMonitoring SystemsEPO Systems
Post-commissioning involves documentation and train-ing, which are vital as the facility enters occupancy. TotalSite Solutions develops, consolidates and provides facilitystaff with:
CCoorrppoorraattee HHeeaaddqquuaarrtteerrss7226 Lee DeForest Drive, Suite 104
Columbia, Maryland 21046Phone: 410-423-7300 | 888-321-4TSS
www.totalsitesolutions.com
Atlanta • Baltimore/Washington • Boston • Chicago • Houston • Miami • New York • Wilmington/Philadelphia • Dubai
Total Site Solutions' Commissioning maximizes effi-ciency and minimizes risk by fine-tuning performance andidentifying weaknesses before the facility goes online. Atthis stage, tests are conducted to ensure that equipmentand systems operate as an integrated system and in ac-cordance with the design intent. Our comprehensiveCommissioning process includes testing of:
Reviews the Design Intent document, relevant draw-ings and specifications to ensure that factory-testingdocuments and manufacturer specifications are incomplianceReviews conceptual design, final design and construc-tion documentsIdentifies and repairs any installation or equipmentdeficienciesConducts pre-functional and functional electrical/me-chanical, water, air and balance testsReviews O&M manuals, contractor start-up proce-dures, discrepancy logs and operational sequence doc-uments
�
•
•
•
•
Commissioning
In addition, Total Site Solutions conducts tests of loadrun and failure modes, assessing how the facility operatesupon loss and restoration of utility. A final IST report de-tails all tests conducted, test results and recommenda-tions for follow-up actions.
Post-Commissioning
Multiple Disciplines. One Solution.
Total Site Solutions plans, designs, builds and main-tains specialized facilities. In fact, we've been doing so fornearly 30 years. Our clients include some of the world'smost demanding mission-critical organizations, includingFortune 500 firms and US government agencies.
Total Site Solutions specializes in providing a single-source solution for companies requiring highly technicalfacility integration and project execution. Our team boaststhe industry's most experienced IT hardware planners, ar-chitects, telecommunications engineers, facility plannersand estimators, electrical, mechanical and structural en-gineers, draftsmen, project managers and field personnel.
Find out how Total Site Solutions' commissioning serv-ices can help your organization achieve unprecedentedlevels of availability, reliability and cost-effective opera-tions.
For more info, visit www.totalsitesolutions.com.
�
•
•
•
•
•
•
•
•
•
O&M manualsAs-built drawingsMethods of ProcedureEmergency Operating ProceduresMaintenance Procedures
In addition, operator and occupancy training sessionsare conducted to provide hands-on instruction from ex-perienced instructors.
•
•
•
•
•